Loading...
Town Square Phase Two (MSPM 19-002) DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: Town Square Phase Two (MSPM 19-002) APPLICANT: James S. Gielda, JKM BTS South, LLC APPLICANT'S ADDRESS: 2300 Glades Road, Suite 202E, Boca Raton FL 33431 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: April 16, 2019 APPROVAL SOUGHT: Approve the Major Site Plan Modification (MSPM 19-002) for Town Square Phase two in order to construct a 261 unit apartment building that wraps the southern garage approved in the Town Square Phase 1 site plan on a 3.94 acre site. LOCATION OF PROPERTY: The property bound on the west by Seacrest Blvd.; on the north by SE 15t Avenue; on the east by NE 1st Street; and on the south by SE 2nd Avenue DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. THIS MATTER was presented to the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the approval sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the approval sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant X HAS HAS NOT established by substantial competent evidence a basis for the approval requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included." 4. The Applicant's request is hereby X GRANTED subject to the conditions referenced in paragraph 3 above. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other: DATED: //�/l .7)at 9 %I ( City Clerk S:\Planning\SHARED\WP\PROJECTS\TOWN SQUARE\Town Square Phase 2_MSPM 19-002\StaffReport\MSPM19-002_DO.doc Page 763 of 993 EXHIBIT "C" Conditions of Approval Project Name: Town Square Phase Two File number: MSPM 19-002 Reference: 4th review of plans identified as a Major Site Plan Modification with a March 18. 2019 Planning and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT ENGINEERING / PUBLIC WORKS / FORESTRY/ UTILITIES Comments: 1. Provide additional handicap parking spaces at main entrance. X 2. Depict handicap ramps on all sidewalks along the perimeter of the X property. 3. Provide a ramp under the porte cochere. X 4. Provide an 18 inch clear zone for the columns supporting the porte X cochere. 5. Depict a white stripe delineating the outside radii of the lane X entering and leaving the parking garage and ensure a consistent width of 24 feet. 6. Provide a circulation plan showing service of the compactor. X Provide 42 feet to safely service and ensure enough head clearance is provided if servicing from the garage. FIRE Comments: Additional comments may be rendered at time of permitting. POLICE Comments: All previous comments addressed at DART meeting. BUILDING Comments: All previous comments addressed at DART meeting. PARKS AND RECREATION Comments: 7. Park impact fees are due at time of permitting. X Page 760 of 993 Town Square Phase Two (MSPM 19-002) Conditions of Approval Page 2 of 3 DEPARTMENTS INCLUDE REJECT PLANNING AND ZONING Comments: 8. Prior to permitting, obtain approval of Major Master Plan X Modification 19-001. 9. At time of permitting, provide manufacturer paint chips and call out X all proposed colors and materials on proposed elevations. 10. Prior to permit approval, vacate the 10 foot FPL easement X currently located under the west portion of the building. 11. Prior to permitting, provide a ROW dedication on Seacrest, SE X 2nd Ave and SE 1 St per site plan hatched area. 12. Provide details of the first floor front porch railing. They must X include accessible gates to the provided walkway to be consistent with the front porch design concept. 13. A sign program is required prior to issuance of any sign permits. X 14. Correct line of sight diagrams to include a straight line from a X person to the top of the parapet. 15. Coordinate with the City's Public Art's Manager to implement the X approved Town Square Public Art's Master plan. 16. Provide parking spaces at 16.5 feet long with a two foot overhang. X 17. Provide pedestrian connections from the residential building to the X garage including a sidewalk and crosswalk at the southern end of the driveway. 18. Provide dimensions of driveway to be 24 feet in width. X 19. Site plan and civil engineering plan dimensions are inconsistent. X Revise plans to be consistent and meet Land Development Regulations. 20. Please provide a Tree Disposition / Mitigation Plan for the existing X trees, per Chapter 4, Article I, Section 4.C. 21. On the Landscape Plan, please provide a chart depicting the % of X landscape material by type (trees & palms, shrubs, and groundcovers), meeting the native / drought tolerant requirement Page 761 of 993 Town Square Phase Two (MSPM 19-002) Conditions of Approval Page 3 of 3 DEPARTMENTS INCLUDE REJECT of 50% in each category. 22. Please revise the canopy tree / palm tree ratio to depict no more X than 50% of the trees as palm species, per Chapter 4, Article II, Section 4.A.3.a.(2) d. 23. Please revise Sheets LP-1, LP-2, and LP-3 to indicate the "Street X Trees" — Live Oak High Rise will have a minimum 8 foot clear trunk, in compliance with Chapter 4, Article II. Section 4.B.5.c.(1). 24. Please correct the "Safe Sight Detail" on Sheet LP-3 to reflect the X code requirement of clear space between 30" and 8'. 25. Please consider alternating segments of the Liriope plantings with X blooming or colorful shrubs and groundcovers. 26. Please depict the required Signature Trees on each side of the X driveway entrances, as required by Chapter 4, Article II, Section 4.A.3.a.(1). COMMUNITY REDEVELOPMENT AGENCY Comments: All previous comments addressed at DART meeting. PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: None. CITY COMMISSION CONDITIONS Comments: To be determined. t _ 1-7 S:\Planning\SHARED\WP\PROJECTS\TOWN SQUARE\Town Square Phase 2_MSPM 19-002\StaffReport\ExhibitC_MSPM 19-002 COA.doc Page 762 of 993