R92-120RESOLUTION NO. ~f~-/~ A RESOLUTION OF THE CITY COM/~ISSlON OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING AND DIRECTING THE F~YOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 2 OF THE AGREEMENT FOR CONSTRUCTION 5IANAGEMENT SERVICES WEST WATER TREATMENT PLANT BETWEEN THE CITY OF BOYNTON BEACH AND STANLEY CONSULTANTS, iNC.; A COPY OF SAID AMENDMENT BEING ATTACHED HERETO AS EXHIBIT "A"; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on July 7, 1992 the City Commission of the City of ~oynton Beach selected Stanley Consultants, Inc., to perform the Engineering Services for the Utility Data Acquisition and Control ~ystem; and WHEREAS, upon recommendation of staff, the City Commission f the City of Boynton Beach deems it to be in the best interests )f the citizens and residents of the City of Boynton Beach, Florida~ to execute Amendment No. 2 to the contract with Stanley Dnsultants, Inc., which amendment increases the existing Dntract for construction management services of the West Water lant and raw water pipeline from $1,033,330 to an amount not to ~xceed $1,306,330. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE ~ITY OF BOYNTON BEACH, FLORIDA THAT: Section 1. The Mayor and City Clerk are hereby ~uthorized and directed to execute Amendment No. 2 to the agreement between the City of Boynton Beach, Florida and Stanley lonsultants, Inc., said Amendment being attached hereto as Khibit "A". Section 2. lpon passage. This Resolution shall take effect immediately PASSED AND ADOPTED this ~/ day of July, 1992. CITY OF BOYNTON BEACH, FLORIDA Mayor %TTEST: ~It~C,~er~ (C6,tpora%e Seal ) A~.d2 .~DAC/Stanley 7/~6/92 Vice Mayor Commissione~ AMENDMENT ~ 2 AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES - WEST WATER TREATMENT PLANT This amendment amends th~ Consultant Agreement for Constz-action Management Se~vicesbetween the City of BoyntonBeach, hereinafter referred to as. "the CITY", and Stanley Consultants, Inc., hereinafter referred to as "theCON~VJLTANT" inoonsider&tion of the mutual benefits, terms, and conditions hereinafter .s~ecified. *The general terms and conditions of the a~reement remain unchanged. *In 2.23 Items TIES The w~itten includethe together with the Dated this day of .. City of BOynton Be~oh 1992. Stanley Consultants, to Inc. Mayor Attest/Authenticate~ David W. Grounds Vice President Florida Branch Manager Attest/Authenticated City Clerk Approved as to form: Secretary SEAL Office of the City Attorney 2.21.2 2.21.8 2.21.4 Explore flexibility of West Water Treatment Plant Contract I for modifications advantageous for future integration with DACS. Such modifications miF~ht include elimination of the Moore Products 352 controllers and substitution of network based SCADA products for the Intellution FIX ACE station currently specified. Conduct a one week on-site study with the CITY and representative DACS manufacturers to establish requirements, review alternatives, assemble vendor literature, hold selected vendor presentations and develop recommendations including very rough cost and schedule estimates. The series of meetings for this study will be held in Boynton Beach. Prepare a letter report of the results of the study including budgetary engineering for the design and construction phases of the DACS. 2.22 During the DACS coordination phase and for the period provided, the OONSULTANT shall, usin~ its best efforts, provide the followin~basic services for the additional work. 2.22.1 Prepare revised Instrument and Control Plan Sheets (or Sketches) and SPecification revisions for changes to construction Contract Documents for the ongoing construction of the West Water Treatment Plant and for the ongoin~ modifications of the East Water Treatment Plant. 2.22.2 Prepare Instructions to Contractor and Change Orders to implement the recommended instrument andcontrol changes to the West Water Treatment Plant. 2.23 During the DACS design phase and for the period provided, the CONSULTANT shall, uein~ its best efforts, provide the following basic services for the additional work. 2.23.1 Prepare Instrument and Control Plans and Specifications for the DACS. 2.23.2 2.23.3 2.23.4 Prepare NETWORK architecture diagram for the DACe. Prepare DACS input/output device point listing. Prepare written system description for configuration of the DACS. 2.24.2 2.24.;3 2.24.4 2.24 Durin~ the DACS construction management phase and for the ~eriod provided, the CONSULTANT shall, usfn@ its best efforts, provide the followin~ basic services for the additional work. 2.24.1 Review of the DACS shop drawings. Support for DACS equipment Facto~ Acceptance Testin~ includin~attendance at test when necessaz-j. Periodic visits site dur~n~ construction and installat~ion of the ! o.f t staff on'site for ass~stance du~in~ the start-up 2.24.5 Review system trainin~ by DACS vendor 2.24.5 Coord/nate Opera, rich and;Matntenence~anuale Construction Management Field Time and F~penses, Office Support, Shop Drawing Review 1.2 Month 1. Month 2 Month 3 Month4 Month 5 Month 6 Month ? Month,8 Month 9 Month 10 Month 11 Month I2 Month 13 Month 14 Month I5 Month ~6 Mont~h 17 Month 18 Month 19 Month20 Month 21 Month 22 Month 23 Month 24 8,330 8.330 8,330 8,330 8,330 8.350 25,600 · 25,600 48.370 48.370 35,680 35.680 42.150 42.150 42,150 42,150 42,150 42.150 42,150 53,880' 64,300 64,300 58 49o $ 1,306,3~0 The City shall pay 'CM fo~ Additional Services not othe~wise provided for in this AGREEMENT through a negotiated fee or on the basis of the OH's then current houx'lF fees in effect at the time service is provided PluB~ reimhumsable expenses. Per diem expenses will be paid in-accordance with City of BoFnton Beach policy. Compensation for additional services shall be earned as ad~itional services are rendered and as related reimbursable expenses a~e incurred, and shall be separately calculated and billed on the C~°s monthly statements, E2HIBIT 1~ HOURLY FEES United States Office - Eased Members Fiscal Year 1992-93 ClassiflcaflQn ' ° Hourly Ratee S¢-1 .................................................. :. ............... $ 1950 SC-2 ................................................................... 23.80 $C-3 .................................................................... 27.60 SC-4 ................................................................... 31.68 SC-5 .................................................................... 35.85 $C-6 .................................................................. 39.65 SC-7 ................................................................... 44.00 .............................. 48.30 SC-9. .............. ~ .................................................. 53.40 SC-lO .................................................................. 58.40 sc-11 ........................... .~ ..................................... 63.so sc-12 .................................................................. 68.50 SC-13 .................................................................. 74.S0 SC-14 ................................................................. 80.00 SC-15 ...................................... .-. ......................... 88.00 SC-16 .................................................................. 99.00 SC-17 .................................................................. 110.00 SC-18 ................................................................ 128.00 SC-I 9., ............................................................ 155.00 These mtee are for office-based members In the contiguous United Statae and are subject to change on or after Apdl 3, 1993. E/~HIBIT C 2. l0 The CITY shall provide copies of existin~ report's and studies on the DACS along with information on the existing control systems for the East Plant and the Lift Station~ Pumps. 2.11 The CITY shall make available and schedule for substantial periods of time the appropriate personnel to partiCiPate in the held in series Of meetings on the' DA~S to be 2.12 The City shall provide a meetin~ room for the one week · ntensive se. rise ,of meetings on the DACS. E~RIBIT B 1.1 1.1.1 1.1.2 1.1.8 CONSTRUCTION MANAGEMENT COMPENSATION The CITY will 6ompensats. the CM in accordance with the tez~ns and condi~ionsof this A~q~q~4ENT as follows: For the Basic Services p~ovided by the CM as sat out in be paid as'~ Total Basic This The CM°s lump sum fee shall accordance with the followins: The fee diem~ sepa~atel statements. exceed-$2~8 ~1,306,330.00. of $1,088,830. be earned and paid in Phase III IV (Construction onthe%hasis of the C~4°s expenses. Per City of for these services rendemed and as~el&ted and shall be CM°s monthly is not to Obtainin~ Pe~mtt to Oonstruct and Permit to Operate Award of General Construction Contract Mobiltzatio~ of Const~uction Management TeamOn Site Operation and Maintenanoe ~anusls Record Drawin~ Review Operator Tratnin~ ContrAct Closeout Phase I DACS, Study Phase $11,090 28,990 13,020 56,830 19,420 43,300 13,560 55,000 AMENDMENT # 2 AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES - WEST WATER TREATMENT PLANT This amendment amends the Consultant Agreement for Construction Management Services betweenthe City of Boynton Beach,herelnafter~ referred to as "the CITY", and Stanley Consultants, ~nc., hereinafter referred to as 'the CONSULTANT" in consideration of the mutual benefits, terms, and conditions hereinafter specified. *The general terms and conditions of the agreement remain unchanged. *In EXHIBIT A of the agreement the PROJECT SCOPE shall be revised to include Items 1.5 through 1.8 and the BASIC SERVICES DURING CONSTRUCTION PHASE shall be revised to include Items 2.21 through 2.21.4, Items 2.22 through 2.22.2, Items 2.23 through 2.23.4 and Items 2.24 through 2.24.6. *The Construction Managers Compensation shall be revised as per Exhibit B which shall replace Exhibit B of Amendment $1 *In EXHIBIT C of the agreement the CITY'S RESPONSIBILITIES shall be revised to include Items 2.10 through 2.12 The written agreement, Dated March 5, 1991, is hereby amended to include the Additional Servzces as stated in this Amendment $ 2 together with the attachments. Dated this day of City of Boynton Beach 1992. Stanley Consultants, Inc. Mayo~ Attest/Authenticated Ci~ Clerk Approved as to form: David W. Grounds Vice Presiden~ Florida Branch Manager Attest/Authenticated Secretary Office of the City Attorney SEAL ~4IBIT A 1.5 The additional work for Phase I of the Data Acquisition and Control System (DACS) includes a team to: review of available existing DACS reports and studies, identify DACS requirements, develop DACS alternatives, prepare costs and schedule estimates, make specific recommendations for integrating the West Water Treatment Plant Controls in the DACS and provide recommendations for the strategic DACS direction. The DACS study phase is to include integration with the specified West Plant control system, data communication to the East Plant, integration of the East Plant controls, and integration with the lift station pump control system. 1.6 The additional work for Phase II of the Data Acquisition and Control System (DACS) includes preparing revisions to plans, Instructions to Contraotor and Change Orders for the ongoing West Water Treatment Plant Construction Contracts to integrate the West Water Treatment Plant Controls into the DACS. This DACS coordination phase will also include providing information for recommended changes in the ongoing modifications of the East Water Treatment Plann Control to integrate them into the DACS. 1.7 1.8 2.21 2.21. The additional work for Phase III of the Data Acquisition and Control System (DACS) includes preparing of Plans and Specifications for the construction/installation of the DACS. This DACS design phase will include integration of the West Water Treatment Plant control system, integration of the East Water Treatment Plan% controls, integration of lift station pump controls and data communication from all points to a centrally located system. The additional work for Phase IV of the Data Acquisition and Control System (DACS) includes Construction Management Services during the construction/installation of the DACS. During the DACS study phase and for the period provided, the CONSULTANT shall, using its best efforts, provide the following basic services for the additional work. 1 Review existing DACS reports and preliminary requirement statements provided by the CITY. 2.21.2 2.21.3 2.21.4 Explore flexibility of West Watsr Treatment Plant Contract I for modifications advantageous for future integration with DACS. Such modifications might include elimination of the Moore Products 352 controllers and substitution of network based SCADA products for the Intellution FIX ACE station currently specified. Conduct a one week on-site study with the CITY and representatzve DACS manufacturers to establish requirements, review alternatives, assemble vendor literature, hold selected vendor presentations and develop recommendations including very rough cost and schedule estimates. The series of meetings for this study will be held in Boynton Beach. Prepare a letter report of the results of the study including budgetary engineering for the design and const'ruction phases of the DACS. 2.22 During the DACS coordination phase and for the period provided, the CONSULTANT shall, using its best efforts, provide the followinE basic services for the additional work. 2.22.1 Prepare revised Instrument and Control Plan Sheets (or Sketches) and Specification revisions for changes to construction Contract Documents for the ongoing construction of the West Water Treatment Plant and for the ongoing modifications of the East Water Treatment Plant. 2.22.2 Prepare Instructions to Contractor and Change Orders to implement the recommended instrument and control changes to the West Water Treatmen~ Plant. 2.23 During the DACS desi~ phase and for the period provided, the CONSULTANT shall, using its best efforts, provide the following basic services for the additional work. 2.23.1 Prepare Instrument and Control Plans and Specifications for the DACS. 2.23.2 2.23.3 2.23.4 Prepare NETWORK architecture diagram for the DACS. Prepare DACS input/output device point listing. Prepare written system description for configuration of the DACE. 2.24 During the DACS construction managemen~ phase and for the period provided, the CONSULTANT shall, using its best efforts, provide the following basic services for the additional work. 2.24.1 Review of the DACS shop drawings. 2.24.2 Support for DAC$ equipment Factory Acceptance Testing, including attendance at test when necessary. 2.24.3 Periodic visits to the site during construction and installation of the DACS. 2.24.4 Provide staff on site for assistance during the start-up of the DACS. 2.24.5 Review and coordinate system training by DACS vendor and/or system integrator. 2.24.6 Coordinate Operation and Maintenance Manuals EXHIBIT B 1.1 CONSTRUCTION MANAGEMENT COMPENSATION Compensation for Basic Servlce~ 1.1.1 1.1.2 1.1.3 The CITY will compensate the CM in accordance with the terms and conditions of this AGPEEMENT as follows: For the Basic Services provided by the CM as set out in Exhibit A, the CM shall be paid as Total Basic Compensation, an amount not to exceed $1,306,330.00. This amount includes a Lump Sum of $1,088,330. The C~s ltunp sum fee shall be earned and paid in accordance with the following: The fee for Phase II DACS (Coordination Phase), Phase III DACS (Design Phase), and Phase IV (Construction Management Phase) shall be paid on the basis of the CM's hourly fees, Exhibit E, plus reimbursable expenses. Per diem expenses will be paid in accordance w~th City of Boynson Beach policy. Compensation for these services shall be earned as services are rendered and as related reimbursable expenses are incurred, and shall be separately calculated and billed on the CM°s monthly statements. Compensation for these services is not to exceed $218,000. At the completion of: Obtaining Permit to Construct and Permit to Operate Award of General Construction Contract Mobilization of Construction Management Team On Site Operation and Maintenance Manuals Record Drawing Review Operator Training Contract Closeout Phase I DACS, Study Phase The followin~ tumm sum will be invoiced $11,090 28,990 13,020 56,830 19,420 43,300 13,560 55,000 Construction Management Field Time and Expenses, Office Support, Shop Drawing Review Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month t0 Month 11 Month 12 Month 13 Month 14 Month 15 Month 16 Month 17 Month 18 Month 19 Month 20 Month 21 Month 22 Month 23 Month 24 8~330 8~330 8,330 8,330 8,330 8,350 25,600 25,600 48 370 48 370 35 680 35 880 42 150 42 150 42 150 42 150 42 150 42.150 42,150 53,880 64,300 64,300 56,490 $ 1,306,330 1.2 Compensation for Additional Service~-, The City shall pay CM for Additional Services not otherwise provided for in this AGREEMENT through a negotiated fee or on the basis of the CM's then current hourly fees in effect at the time service is provided plus reimbursable expenses. Per diem expenses will be paid in accordance with City of Boynton Beach policy. Compensation for additional services shall be earned as additional services are rendered and as related reimbursable expenses are incurred, and shall be separately calculated and billed on the CM's monthly statements. E~4IBIT C 2.10 The CITY shall provide copies of existing reports and studies on the DACS along with information on the existing control systems for the East Plant and the Lift Station Pumps. 2.11 The CITY shall make available and schedule for substantial periods of time the appropriate personnel to participate in the one week intensive series of meetings on the DACE to be held in Boynton Beach. 2.12 The City shall provide a meeting room for the one week intensive series of meetings on the DACE. EXHIBIT HOURLY FEES United States Office - Based Members Fiscal Year 1992-93 Classification Hourly Rates SC-1 .................................................................... $ 19.50 SC-2 .................................................................... 23.80 SC-3 ........................ ............................................. 27.60 SC-4 .................................................................... 31.65 SC-5 ..................... ............................................... 35.85 SC-6 .................................................................... 39.65 SC-7 .................................................................... 44.00 SC-8 .................................................................... 48.30 SC-9 ............... ~ .................................................... 53.40 SC-lO ..................... ............................................. 58.40 SC-11 .................................................................. 63.50 SC-12 .................................................................. 68.50 SC-13 .................................................................. 74.30 SC-14 .................................................................. 80.00 SC-15 ........................................ ~ ......................... 88.00 SC-16 .................................................................. 99,00 SC-17 .................................................................. 110.00 SC-18 .................................................................. 128.00 SC-t 9 .................. ................................................ 155.00 These rates are for office-based members in the contiguous United States and are subject to change on or after April 3, 1993. MEMORANDUM TO: Barbara Conboy DATE: July 24 1992 Utilities Dept. , FROM: Sue Kruse City Clerk RE: Resolution #R92-120 Attached please find three original agreements pertaining to Resolution R92-120 which was approved at the City Commission meeting held on July 21, 1992. When the agreement is signed, please return an original agreement to this office for placement in Central Files. Thank you. AttachmenTs /mas Sue Kruse TO: FROM: M EMORAN Scott Blasie Code Enforcement Admin. Sue Kruse City Clerk D U M DATE: RE: July 24, 1992 Satisfaction of Liens, #92-74, 92-61 (recorded two times due to error in recording orginally) Attached please find copies of the above mentioned liens which were satisfied two times in Palm Beach County on July 9, 1992. Since the lien was originally recorded two times due to error, we had to satisfy it two times. If you have any questions, please contact me. Attachments Sue Kruse c; Finance Dept. /mas