Loading...
R19-131 1 RESOLUTION NO. R19-131 2 3 A RESOLUTION OF THE CITY OF BOYNTON BEACH, 4 FLORIDA, APPROVING AMENDMENT#3 TO TASK ORDER NO. 5 R13-063-09 TO CH2M HILL FOR BOYNTON BEACH LANDFILL 6 POST-CLOSURE MAINTENANCE ASSISTANCE IN THE 7 AMOUNT OF $25,338.00, INCREASING THE CURRENT TASK 8 ORDER TO$260,384.94;AND PROVIDING AN EFFECTIVE DATE. 9 10 WHEREAS, Task Order No. R13-063-09, approved by Commission on December 1, 11 2015, provides professional design and oversight services for the creation of bid documents to 12 repair the landfill cover according to Health Department Standards; and 13 WHEREAS,this Task Order has had two previous amendments in 2016 and 2017;and 14 WHEREAS, Amendment #3 is to authorize CH2M Hill to review the results of 15 groundwater sampling and to prepare a report to be submitted to the Palm Beach County Health 16 Department in accordance with specific condition 16 of the Permit; and 17 WHEREAS, staff is recommending that the City Commission approve Amendment#3 18 to Task Order No. R13-063-09 with CH2M Hill for Boynton Beach Landfill Post-Closure 19 Maintenance assistance in the amount of$25,338.00. 20 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 21 THE CITY OF BOYNTON BEACH,FLORIDA,THAT: 22 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 23 being true and correct and are hereby made a specific part of this Resolution upon adoption 24 hereof. 25 Section 2. The City Commission of the City of Boynton Beach,Florida does hereby 26 approve and authorize the City Manager to sign Amendment#3 to Task Order No. R13-063-09 27 with CH2M Hill for Boynton Beach Landfill Post-Closure Maintenance assistance in the 28 amount of$25,338.00, a copy of Amendment#3 is attached hereto as Exhibit"A". C:\Users\StanzioneTlAppData\Local\Microsoft\Windows\INetCache\IE\DHL1 S8RX\Jacobs_(CH2M_HiII)_Landfill Task_Order_Amendment_3__Reso.docx 1 Section 3. This Resolution shall become effective immediately upon passage. 2 PASSED AND ADOPTED this J� day of govt. .r, 2019. 3 CITY OF BOYNTON BEACH, FLORIDA 4 5 YES NO 6 ✓ 7 Mayor— Steven B. Grant 8 9 Vice Mayor—Justin Katz 10 11 Commissioner—Mack McCray 12 13 Commissioner-Christina L. Romelus ✓ 14 15 Commissioner—Ty Penserga 16 17 18 VOTE S D 19 ATTEST: 20 21 y<� 22 23 C tal Gibson, MMC 24 City Clerk 25 26 . .: 2-V12-Va I 28- (Cc ;p,‘prate Seal) • • • r' ' '30 . O b�ti C:\Users\StanzioneT\AppData\Local\Microsoft\Windows\INetCacheUE\DHLIS8RXUacobs_(CH2M_HiII) Landflll_TaskOrder Amendment_3_=Reso.docx \)->\ck- vs\ Task Order No. R13-063-09-Amendment 3 Boynton Beach Landfill Post-Closure Maintenance Assistance A. Background CH2M HILL Engineers, Inc. (CH2M), now Jacobs, historically has assisted the City of Boynton Beach (City) with the preparation and certification of semi-annual groundwater sampling reports for the City's Class I landfill(Landfill) in accordance with the Palm Beach County Health Department(PBCHD) Permits for post- closure monitoring. Additionally, CH2M helped the City develop a groundwater investigation program, accepted by the PBCHD,designed to evaluate a decision to cease long-term groundwater monitoring. Concurrent with the groundwater investigation, CH2M assisted the City with implementation of a corrective action plan in response to Consent Order SW-15-08 issued by the PBCHD.The corrective action plan involved the following activities: • Repair of exposed geomembrane(20-mil very low density polyethylene); • Importing and placing granular fill to provide a minimum of 18 inches of soil overlying the geomembrane; • Installation of sod to provide vegetative erosion protect for the newly placed soil;and • Installation and monitoring of landfill gas (LFG) monitoring probes along the northern and eastern perimeter of the Landfill. Following this initial effort, CH2M assisted the City with follow-up activities under Amendments 1 and 2, which included: • Development of a gas remediation plan in accordance with Chapter 62-701.530(3)(a), Florida Administrative Code. • Notification of residents near the landfill. • Development of contract documents for gas vents and monitoring probes,followed by services during construction. • Monitoring and reporting weekly,then monthly and finally quarterly.The On June 24, 2019,the Florida Department of Health, Palm Beach County, sent a letter concurring with the recommendation to terminate gas monitoring,and on August 20, 2019,the Department of Health notified the City that Consent Order SW-15-08 was resolved and that the case was closed. Although this resolved the landfill cover issues,the City did not receive concurrence from the Department of Health in response to its July 2019 Certification of Long-Term Care Report for the landfill,which included a long-term groundwater monitoring analysis.The City intends to continue to comply with their permit,which expires in April 2020 and therefore requires at least one to two more rounds of groundwater sampling and reporting. The scope of services below details the services to be provided by CH2M. PAGE 10F4 B. Scope of Services This is Amendment 3 to Task Order No. R13-063-09.Tasks 1 through 7 were authorized under the original Task Order.Tasks 8 through 13 were authorized under Amendments 1 and 2;therefore,the Tasks under this amendment begin at Task 14. Permit specific condition 16 of the Palm Beach County Health Department Permit 124522-005-SF requires that the groundwater level and water quality data collected by the CITY be presented in reports that include: 1. Cover letter; 2. Summary of exceedances and recommendations; 3. Groundwater contour maps; 4. Chain of custody forms; 5. Water levels,water elevation table; 6. Groundwater monitoring report certification, using the appropriate Department form; 7. Appropriate sampling information on Form FD 9000-24(DEP-SOP-001/01); and 8. Laboratory and Field EDDs and error logs, as applicable. The permit requires that the report be signed and sealed by a Florida registered professional geologist or professional engineer with experience in hydrogeologic investigations. Task 14—Groundwater Sampling Review and Reporting(Up to 2 Events) Under this task,CH2M will perform the following activities: • Review water level and water quality data, including exceedances summary table, provided by the CITY; • Summarize the water quality exceedances and interpretations in a brief technical memorandum (TM). • Prepare groundwater contour map(s) using CITY data • Prepare a signed and sealed report for the CITY, ready for PDF transmittal to the PBCHD; Electronic Data Deliverables (EDDs)for the water quality data will be submitted directly by the CITY using the FDEP Automated Data Processing Tool (ADaPT). • Four follow up calls with the CITY and regulatory agencies. Deliverables • Draft Semiannual Report for the landfill. • Final Signed and Sealed Semiannual Report for the landfill. PAGE 2 OF 5 C. Assumptions This estimated cost is based on the following assumptions: • The City will be responsible for collecting the groundwater levels and water quality data; • The City will provide properly completed chain of custody forms, and appropriate County and FDEP reporting forms. • The City will be responsible for submitting documents to the PBCHD or requesting CH2M to submit on the City's behalf, consistent with previous reports; • Technical responses to requests for information and responses to letters from regulatory agencies is not included beyond the time allocated for coordination calls. • No subcontractors will be utilized by CH2M during the delivery of the scope included herein;and • No site work is anticipated. D. Contract Reference This Task Order shall be performed under the terms and conditions described within the Agreement titled Hydrogeological Consulting Services, dated August 19, 2013, between the City of Boynton Beach and CH2M Hill Engineers, Inc.,as amended, and under the terms and conditions described within Task Order R13- 063-09, amended herein. E. Compensation Compensation by the City to CH2M will be on a lump sum basis in accordance with the above-referenced Agreement.The estimated compensation for the additional services described in this Task Order Amendment 3 is$26,486 as presented in Table 1,which is attached. Material or other changes in the Scope of Services for this work may serve as a basis of modifying the agreement as mutually agreed between CH2M and City. CH2M's Project Manager will notify City's Project Manager in writing if it appears that a deviation from the currently authorized Scope of Services will be necessary. The notification will describe the specific reason for the deviation, and identify the anticipated impact on the authorized Contract Amount and project schedule. In no event shall the CH2M perform work outside of the scope of services without direct prior authorization from the City. PAGE 3 OF 5 F. Schedule Schedules for activities performed on an as needed basis will be as mutually agreed by the parties at time of service.Two sampling events are assumed, one in October 2019 and a potential second in April 2020.The draft report summarizing water quality exceedances and interpretations of the water quality data to be provided by the CITY will be submitted to the City within 21 calendar days of receiving the laboratory results for the groundwater samples.The Signed and Sealed Semiannual Report for the Landfill will be submitted within 7 calendar days of receiving comments from the City on the draft report. G. Authorization APPROVED BY: CITY OF BOYNTON BEACH, FLORIDA By: Dated this -1 day of rN \ , 2019 SUBMITTED BY: CH2M i By: / ` 10/8/19 Sirpa Hall, P.E. Vice President Dated this 8th day of October 2019 PAGE 4 OF 5 Task Order No,R13-063-09 Amendment 3 Table 1-Task 14 Level of Effort Follow up Calls with the Groundwater Contour Signed and sealed Data Review ma s Report City and Regulatory Total p p Agencies Classification Bill Rate Hrs $ rHrs $ Hrs $ Hrs $ Hrs $ Sr.Technologist $ 191.87 18 $ 3,454 6 $ 1,151 10 $ 1,919 8 $ 1,535 42 $ 8,059 Engineer/Scientist $ 120.00 20 $ 2,400 12 $ 1,440 16 $ 1,920 $ - 48 $ 5,760 Engineer/Scientist _$ 120.00 0 $ - 0 $ - 0 $ - $ - 0_$ - Office _$ 86.22 0 $ - 0 $ - 8 $ 690 $ - 8 $ 690 Sr.Technologist _$ 191.87 0 $ - 0 $ - 0 $ - 8 $ 1,535 8_$ 1,535 Sr.Technologist $ 191.87 4 $ 767 4 $ 767 10 $ 1,919 8 $ 1,535 26 $ 4,989 Project Manager $ 137.74 8 $ 1,102, 4 $ 551 8 $ 1,102 4 $ 551 24 $ 3,306 SUBTOTAL 50 $ 7,723 26 $ 3,910 52 $ 7,549 28 $ 5,156 156 $ 24,338 Expenses $ 1,000 TOTAL $ 25,338 PAGE 5 OF 5