Loading...
OFS Office Building (NWSP 19-002) DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: OFS Office Building (NWSP 19-002) APPLICANT: Joni Brinkman, Urban Design Kilday Studios APPLICANT'S ADDRESS: 610 Clematis Street, Suite CU02, West Palm Beach, FL 33401 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: October 15, 2019 APPROVAL SOUGHT: New Site Plan approval to construct a one (1) story, 1,989 sq. ft. professional office building and related site improvements on a 12,822 square foot vacant lot. - LOCATION OF PROPERTY: Northwest corner of NW 7th Court and Boynton Beach Boulevard. DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. THIS MATTER was presented to the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the approval sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1. Application for the approval sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicgpt VHAS HAS NOT established by substantial competent evidence a basis for the approval requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included." 4. The Applica 's request is hereby GRANTED subject to the conditions referenced in paragraph 3 above. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other: DATED: /Q/o2.//02.0i 9 City Clerk k S:\Planning\SHARED\WP\PROJECTS\OFS Office Building NWSP 19-002 DO.doc EXHIBIT C Conditions of Approval Project Name: OFS Office Building File number: NWSP 19-002 Reference: 2nd review plans identified as a Major Site Plan Modification with an August 13th 2019 Planning and Zoning Department date stamp marking. ENGINEERING/PUBLIC WORKS / FORESTRY /UTILITIES Comments: None. All previous comments addressed at DART meeting. FIRE Comments: None. All previous comments addressed at DART meeting. POLICE Comments: None. All previous comments addressed at DART meeting. BUILDING DIVISION Comments: None. All previous comments addressed at DART meeting. PARKS AND RECREATION Comments: None. PLANNING AND ZONING Comments: 1. It is the applicant's responsibility to ensure that the application requests are publicly advertised in accordance with Ordinance 04- 007 and Ordinance 05-004, and an affidavit with attachments (ownership list, radius map, and copy of mailing labels) is required to X be provided to the City Clerk and Planning & Zoning one (1) week prior to the first public hearing. 2. Palm Beach County Palm Tran requested the applicant dedicate a 7' by 15' bus stop easement for a new covered bus stop shelter facing Boynton Beach Boulevard to be constructed and maintained by the property owner. Be advised that the design and architecture of the X structure should be compatible with the design of the principal building. Please revise all drawings to show the above requested information, and provide elevations and details of the structure. OFS Office(NWSP 19-002) Conditions of Approval Page 2 of 2 3. Ensure the wall sign on the north elevation is not illuminated as it is facing residential properties. X COMMUNITY REDEVELOPMENT AGENCY Comments: Not applicable. PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 4. Include additional dense landscaping material above the height of the wall located along the northside of the project. X CITY COMMISSION CONDITIONS Comments: To be determined. Al On ADDITIONAL REPRESENTATIONS /COMMITMENTS The applicant or applicant's representatives made the following representations and commitments during the quasi-judicial and/or public hearings that now constitute binding obligations of the applicant. The obligations have the same weight as other conditions of approval. S:\Planning\SHARED\WP\PROJECTS\OFS Office Building\NWSP 19-002 COA-REVISED 9.25.19 Post P&D Meeting.doc