Minutes 11-14-95 MINUTES OF THE PLANNING ~ DEVELOPMENT BOARD MEETING
HELD IN COMMISSION CHAMBERS, CITY HALL, BOYNTON BEACH, FLORIDA,
ON TUESDAY, NOVEMBER 14, 1995, AT 7:00 P.M.
]. Stanley Dub&, Chairman
]im Golden, Vice Chairman
Dave Beasley
Robert Eisner (Arrived Late)
Maurice Rosenstock
]aime Titcomb
Lee Wische
William Burton, Alternate
Pat Frazier, Alternate
Tambri Heyden, Planning ~: Zoning
Director
Mike Rumpf, Senior Planner
1. ~F ALLF_,GIANCE
Chairman Dub& called the meeting to order at 7:03 p.m., and led the Pledge of Allegiance
to the Flag.
2. INTRO~D~ OF MAYOR.. CC)[vlMISSIONERSAND BOARD ~
Chairman Dub& acknowledged the presence in the audience of Commissioner Sid Rosen, and
introduced the board members. He announced that alternate member, William Burton, would
sit as a voting member in the absence of Robert Eisner.
3. ~PPRCLV~kL
Mr. Rosenstock moved to approve the agenda as presented. Mr. Wische seconded the motion
which carried unanimously.
4. APPILO~/~d,~)F M~
Mr. Golden moved to approve the minutes. Mr. Titcomb seconded the motion which carried
unanimously.
5. COIvllvJU N I CAT I~_Ul~ZEIvlF~LT~S
A. Report from the Planning K Zoning Department
1. Final Disposition of Last Month's Agenda Items
This report was deferred until the arrival of the Planning 8~ Zoning Director.
~IINUTES
PLANNING ~Z DEVELOPblENT BOARD
BOSTON BEACH, FLORIDA
NOVEMBER ! 4, ! 995
6. OJ.,D BUSINESS_
None
7. NEW BUSJI~IESS
A. PUBLIC HEARING
RezoJlklg
I. Pro|ect:
Agent:
Owner:
Location:
Description:
Hills of Lake Eden PUD
Burlison A. Gentry
Gentry Engineering ~ Land Surveying, Inc.
Newport Properties, Inc.
Northwest corner of S. E. 36th Avenue &c Seacrest Blvd.
Request for zoning and master plan approval to
construction 62 single-family detached homes on 15.45
acres of land in connection wi~h a rezoning from R- 1 -AAB
(Single-family Residential) to Planned Unit Development
with a land use intensity of 5 (PUD with LUI=5)
Mike Rumpf made the presentation. This property is located on the west side of the
intersection of Seacrest Boulevard and Gulfstream Boulevard. The proposed construction
provides for a gross density of 4.0 units per acre. The future land use classification will remain
as Low Density Residential, and continue to limit the area to a maximum gross density of 4.84
units per acre. Adjacent land uses include St. ]oseph's Church/School to the north; Seacrest
Boulevard to the east, with single-family homes farther east and vacant property in Delray to
the southeast; Lakeview Baptist Church to the southwest in Delray Beach; North Swinton
Avenue to the west; and single-family homes farther west.
The minimum lot area proposed is 6,727.50. square feet. The minimum lot front includes
47 lots at 63.75 feel and 15 irregular-shaped lots at 30 feet. The minimum building
setbacks are 22.5 feet for the front, 7.5 feet for the sides, 12.5 feet for the side corners, and
7.5 feet for the rear. The maximum structure height is 35 feet. The maximum net density
is 5.77 units per acre (nec density).
The internal road network consists of a 40 foot wide private right-of-way with 24 feet of
asphalt pavement. Each dwelling unit has direct access to the internal road with no direct
access to Seacrest Boulevard or North Swinton Avenue. The project has a single ingress/egress
onto North Swinton Avenue. The project entrance is gated. In lieu of ingress/egress onto
Seacrest Boulevard, a 20 foot wide emergency access into the project is provided. The
2
MINUTES
PLANNING 6t DEVELOPMENT BOARD
BOYNTON BEACH, FLORIDA
NOVE~4BER ! 4, 1995
roadway meanders along the sides of the natural terrain which includes two prominent ridges
that run in the north and south directions near the center of the project.
The grade elevations of North Swinton Avenue at the north and south ends of the site are
22.06 feet and 27.45 feet respectively. The elevation of the site increases from the adjacent
right-of-way elevations to an elevation of 32 feet along the north-central portion of the site
and 27 feet along the south-central portion of the site.
As indicated on Table #2 of the Conservation Support Document, the subject property is a
"C" rated ecosystem. Pursuant to Policies 1.11.14 and 4.4.1, a minimum of 25 percent of
the property occupied by the environmentally-sensitive ecosystem must be preserved. The
preserve for this project is proposed as two similarly-sized "micro-preserves" which total 1.28
acres. This total represents 32 percent of the total scrub habitat which is indicated as being
4.2 acres in the applicant's environmental assessment.
Dr. Eisner arrived for the meeting at 7:12 p.m., and took his place at the dais as a voting
member. Mr. Burton remained at the dais as a non-voting member of the board.
The location of the cwo areas proposed to be preserved by the applicant, which are consistent
with the recommendation within the environmental assessment, are along the higher elevations
of the site, atop the site's two natural ridges. The City's Environmentalist/Forester concurs
with the location and size of the proposed preservation tracts.
The Comprehensive Plan Traffic Circulation Element and Support Document recommends the
extension of S.W. 36th Avenue from Seacrest Boulevard to North Swinton Avenue, and
specifically recommends coordination between Boynton Beach and The City of Delray Beach.
However, the proposed master plan proposes the development of this area over which this
road would be extended. The City of Delray Beach was notified of this issue; however, staff
had not received comments prior to completing this report. This recommendation is included
within their Comprehensive Plan which they will be reconsidering next week at a presentation
to the local planning agencies.
With respect to evaluating the proposed project's compatibility with, or impact upon values
of adjacent properties, scarf has considered the consistency of the request with the maximum
density of the Low Density Residential land use classification, the consistency with the
Comprehensive Plan Objective 1.15 and Policy 1.16.2, and current factors which
predominantly determine land values within the adiacent neighborhoods and impacts of the
proposed project. As the project proposes a density less than the maximum density allowed
within the Low Density Residential land use classification (4.84), the project would be
consistent with the Future Land Use Map which is the predominant residential classification
within the area surrounding the subject property, and specifically consistent with the
3
lqlNUTES
PLANNING ~z DEVELOPlqENT BOARD
BOYNTON BEACH, FLORIDA
NOVEMBER 14, 1995
Comprehensive Plan Objective 1.15 and Policy 1.16.2. These Comprehensive Plan
recommendations generally allow for Planned Unit Developments up to the maximum density
of the corresponding future land use classification and, in particular, when combined with a
site with unique characteristics. Although the proposed master plan contains smaller lots and
shorter setbacks than typical within this waterfront subdivision, the size and intended price of
the planned unit (in excess of $150,000), the quality of the project produced by unique
features related to buffering, varying topography, and security, will all produce a project with
character which will likely be incapable of negatively affecting the remaining adjacent
residential properties. Furthermore, specifically consistent with Objective 1.15 is the design
of the project. Having the effect of both minimizing the project's impact upon adjacent
properties and effects of adjacent properties upon titis planned community, is the inward
orientation of the units, and the placement of a landsCaping buffer on those sides of the
property that abut adjacent roadways and residential neighborhoods. A 25 foot buffer is
proposed on the west side, and a 35 foOt hufferis proposed on £he east side.
The traffic study maintained that ail roadway levels of service would be maintained despite
added traffic from the proposed project. However, all of the 620 projected daily trips would
be lh~ited to Swinton Avenue rather than being lessened through the provision Of access onto
Seacrest Boulevard. Two possibilities are recommended to address this in lieu of complying
with Comprehensive Plan 2.2.9 regarding,extending Gu?tream Boulevard. One possibility
wou d be to add an entrance on Seacresc Boulevard chat aligns with S.W, 35th Avenue, or one
thac aligns with S.W. 36th Avenue witich is signalized.
The subject property is within Neighborhood Park Planning Area #17 which had original
standards of 1.2 acres per 1,000 persons and a one-mile walking distance. These
requirements are indicated in Table #2 of the Recreation 8c Open Space Support Document.
To improve this acreage deficiency Within Area #17, the City had assumed development of
the Girl Scout Park by the 1995 planning period. As this neighborhood park has not been
constructed, the level of service standard adopted for the t 995 planning period is not
achieved. As a consequence of this deficiency, if new development within this area is to be
approved, the City must take immediate actions to either increase the surplus of neighborhood
park resources, or lower the adOpted.level of service. Of the alternatives provided to address
this deficiency, the Recreation 8C Pa~ks Director has ~ecommended the lowering of the adopted
levels of service standards to reflect postponement of construction of G~rl Scout Park.
It should be noted that if private recreation facilities were to be provided within this
sub.division, the future, residents would be directly Supplied with recreation resources, and this
project could be certified for concurrency for ne~gl~b0rhood parks.
The applicant has satisfied a unique requirement on the development of this property by
preserving slightly over the minimum percentage of native habitat existing on site.
4
MINUTES
PLANNING ~z DEVELOPlViENT BOARD
BOYNTON BEACH, FLORIDA
NOVEMBER 14, 1995
By allowing this design, the City is, in effect, providing an incentive for the preservation of
native scrub habitat, which action furthers Comprehensive Plan Policy 4.3.3 while the project
is also consistent with Objective I. 15.
Based on this analysis and discussions, staff recommends approval of the Hills at Lake Eden
PUD rezoning request, subject to staff commen~s.
Mr. Rumpf enumerated the more significant comments:
Show in dimension on the master plan a minimum lot frontage of 47.81 feet
at the proposed 22.5 foot front setback line for half of the lots (irregular-
shaped lots).
Reduce the front building setback from 22.5 feet to 2 ! feet to increase the rear
building setback from 5 feet to 9 feet.
3. Increase the rear screen enclosure and pool setback from 3.5 feet to 5 feet.
4. Reduce maximum building height to 30 feet from the proposed 35 feet.
A street connection shall be made to Seacrest Boulevard at either SE 35th
Avenue or S.E. 36th Avenue. if extension of S.W. 36th Avenue is not
approved, the Commission should direct staff to amend the Comprehensive
Plan.
6. Show sidewalks on both sides of the streets internal to the project.
The City shall recommend appropriate action regarding correcting the park
deficiency in Area # 17.
These are not all of the staff's comments; however, they are the more significant ones.
Mr. Rosenstock inquired about the Planning Department's feelings on cutting back on the ratio
of park sites within the City as compared to what is currently listed in the Comprehensive Plan.
Mr. Rumpf explained staff's difficulty in assuming that tile City will take on the responsibility
given the amount of capital required. The Planning Department would want to see the
Neighborhood Parks Analysis followed, but staff recognizes the problems involved.
Vice Chairman Golden questioned how the preserve areas will be protected from residents
extending their backyards into those areas. Mr, Rumpf explained that a condition exists that
maintains the setbacks. In addition, staff has always intended to have a requirement in the
MINUTES
PLANNING ~Z DEVELOPMENT BOARD
BOYIqTON BEACH, FLORIDA
NOVEMBER ! 4, ! 995
form of a Tree Preservation Plan or Site Preservation Plan which would outline preservation
measures. The Tree Preservation Plan was rececently received which sets forth measures to
maintain individual properties. This would have to be accomplished through constant
monitoring.
Vice Chairman ~Golden asked whether or not any barrier-type fencing would be erected. Mr.
Rumpf responded negatively.
Mr. Rosenstock referred to the third line of Page 10 of Planning 8~ Zoning Department
Memorandum No. 95-648, and read the following: "Also, although the lot sizes proposed
are smaller than both that are required by the current zoning district and existing within
adjacent residential areas, the lots are larger than lot sizes approved within several projects
approved within the newly-developing areas of the City." Mr. Rosenstock expressed surprise
that the City Attorney allowed this statement to be printed since it says that by precedent, as
opposed to published Code, the Code has been changed. Mr. Rumpf disagreed and advised
that the PUD regulations do not contain thresholds. This PUD proposal was compared to the
existing zoning district which is R- 1 -AAB.
Vice Chairman Golden questioned whether negotiations have taken place with St. Joseph's to
offer temporary use of the school's recreation. Mr. Rumpf responded negatively.
Mr. Titcomb asked about the possibility of tying this project into the signalized intersection at
Gulfstream Boulevard. Mr. Rumpf explained that there are a number of entities involved in
this issue. Staff is not recommending that Gulfstream Boulevard be extended. There is no
justification in the Comprehensive Plan for the extension. As an alternative, staff has indicated
that more of a priority might be better circulation of this project with the networks.
Ms. Heyden advised that the Tree Management Plan requires fencing the preserve areas, if
fencing is not part of the proposal, it will have to be added; therefore, that now becomes an
additional Planning ~ Zoning comment.
' eedng, said the developer is in agreement with a majority of the
comments, and there are a number of items the developer would like to work through during
the permitting process prior to plat. The developer's intention is to make this development
secure; therefore, there will be one access and a emergency access on Seacrest Boulevard. The
developer is amenable to the recommendations relative to the preserve area. He would like
to provide a walkway around the perimeter, and the fence could be incorporated. This
walkway could be utilized as an exercise trail and a viewing area.
The only other comment the developer is questioning is the location of the corner lots. There
is an accessway into a lot for a drive. At the TRC meetings, a dimension was added to each
6
MINUTES
PLANNING ~: DEVELOPlqENT BOARD
BOYNTON BEACH, FLORIDA
NOVElqBER 14, 1995
lot. One of the comments contained in the report states that a note on the master plan to
see the sketch could satisfy that comment. They would be situated to allow an adequate
driveway and turnaround for the longer driveways.
Mr. Rosenstock asked Mr. Gentry about the amount of footage available in the average
backyards of each of the homes. Mr. Gentry explained that there are 7.5 feet between the
boundary line and the house. Chairman Dub~ said that according to what he read, there will
be 7.5 feet without a pool, and 3.5 feet if there is a pool.
Chairman Dub& expressed concern about a number of problems he sees with this project. He
questioned why the decision was made to gate this community. Mr. Gentry said it is the
ideology of the PUD development, and there is a requirement for the dedication of the
preserve areas. Chairman Dub& pointed out that gating this community is not for the purpose
of security because there is no fence around the project. Anyone can walk into the
community. Mr. Gentry said the gates are to protect the integrity of the area.
Chairman Dub& explained that a 2,000 square foot, or a 2,500 square foot home will cost
over $150,000. With a gatehouse and maintenance of the buffer and common grounds, the
monthly assessment for each home will be $158. This will be one of the highest monthly
assessments in the City of Boynton Beach. This fee amounts to $1,800 per year over and
above the homowner's mortgage. From a sales standpoint, Chairman Dub~ can envision the
homes in this project not selling.
Chairman Dub& acknowledged the present in the audience of Hayor Taylor.
Erank Pinto, of Newport Proped:ties_~ addressed the 2,500/3,000 square foot house. With
a 50 foot frontage available for building, a 60 foot depth would be required for the house.
That would leave a reasonably-sized backyard. He said the buildable area depicted on the plan
is not necessarily the size of the house.
In an infill project, there are a number of different zoning complexes. He flied to address this
problem on this site, There are smaller lots with lower priced houses to the east. To the west,
there is Swinton Avenue with higher priced houses and larger lots. The proposed community
will be a buffer between these two zoning complexes. There is a church to the north, and one
to the south. There are no lots that back up to each other. This was done to ensure the
liveability and comfor~ of the area.
A management plan of the preserve areas was submitted to the Forester. Hr. Pinto
understands the concern about the lack of fencing, but he wanted to keep this preserve area
open so that people can enjoy it. Chairman Dub& advised that the fence is not a negotiable
item; it is a requirement.
7
t41NUTES
PLANNING ez DEVELOP~IENT BOARD
BOYNTON BEACH, FLORIDA
HOVEklBER 14, ! 995
Chairman Dub~ referred to a Building Department comment relative to lighting the streets in
the development. In response to Chairman Dub&'s question, Mr. Pinto advised that the streets
will be lighted. Chairman Dub& explained that the maintenance of the street lights is an
additional cost for the homeowners.
Chairman Dub& questioned whether or not a budget had been worked up to determine what
it would cost a homeowner to live in this community. He reiterated that this is a 62-home
community with absolutely no amenities. The expense to live in this community very probably
could reduce the saleable of the homes. He sees this as an attempt to build an upperclass
community. However, the children will have to go to St. Joseph's to play because of the lack
of amenities, and the homeowner will be paying $1,800 per year just to maintain the buffers,
the street lights and the guard.
Mr. Pinto advised that there will not be a guard in this community. The gate will be
electronically controlled, but the costs associated with this are not yet available from FPL.
Chairman Dub& feels the only reason for a gated community in this instance is to go to a PUD.
Mr. Pinto said that was not the case. He said a number of people interested in the
development approached him when he purchased the parcel. They were interested in buying
lots, and their preferences were discussed. One of the things they addressed was the fact that
they did not want an access to Seacrest Boulevard. Another issue was whether or not they
would pay more money for a house in a gated community. The reason for this is not to go
to a PUD. Thedeveloper went in this direction to accomplish a better design for the people
who purchase homes in this project. They could go with normal zoning, and have streets
running from Seacrest to Swinton, but he does not feel such a project is marketable.
Mr. Beasley noted the recommended building height of 30 feet, and questioned whether or
not the residential building height is only 25 feet. Mr. Rumpf explained that staff recognizes
the necessity in the design to be greater than 25 feet. Mr. Beasley felt that because of building
characteristics, the residential building height should be increased to allow 30 feet for all
projects.
Hr. Beasley expressed concern about the 7.5 foot rear setback. In almost every other zoning
district, the rear setback is 25 feet. Mr. Gentry advised that adjoining properties to the north
and south have rear setbacks of 10 feet. The applicant has requested relief because the homes
are not backing up to other residences.
Mr. Beasley inquired as to the reasoning involved in taking this project from residential zoning
to a PUD other than to circumvent the setbacks. Mr. Rumpf said they have interpreted the
Comprehensive Plan as recommending the maximum allowed by the Future Land Use Plan,
and establishing incentives to encourage set asides. In addition, the recreation dedication can
MINUTES
PLANNING ~z DEVELOPMENT BOARD
BOYNTON BEACH, FLORIDA
NOVEPIBER 14, ! 995
be lowered to encourage as much set aside as possible for preservation. Although staff realizes
that the setbacks are Iow, the only impact will be felt on the southern border. The developer
is not compelled to include buffer areas. Mr. Beasley said the preservation areas are in the
backyards, The pools will be 3 feet from the fence, and the house will be 7.5 feet from the
fence. He has a problem with this.
In Mr. Rosenstock's opinion, it is horrendous to allow a development like this to take place in
the City.
CHAIRMAN DUBI~ ANNOUNCED THE PUBLIC HEARING.
Ingrid Eckler, 2750 Seacrest Boulevard, Delray Beach, owner of the vacant property to
the south of this project, is very concerned about the density proposed. The property
owners in the area have always been aware of the possibility of the extension of Gulfstream
Boulevard. She hopes that never happens. The traffic on Seacrest is already an abomination,
and this would add to present problems.
George Cyphers, 701 SW 36th Avenue, is very concerned about how this project will affect
the property values of the residents on the west side of Swinton Avenue. He was furious
because his property is 125' x 165', If this parcel is developed properly, it can be beautiful.
However, the density they are requesting wilt ruin the property values for everyone in the
area. He urged denial of this project.
Isabel Hill owns property next to the Ecklers. She feels this project would be devastating to
the community and urged denial of the project.
Mary Law, 3481 South Seacrest Boulevard, feels that if this project is approved, they must
preserve the property at the north or the south, Having all of the traffic access on Swinton
will create a problem when going through Mission Hill and Seacrest. She would like to see the
addition of a traffic light. She further pointed out that in order to extend Gulfstream
Boulevard, something would have to be worked out with the Ecklers relative to the right-of-
way. Lake Eden is a subdivision of lots with widths of 100 feet, and depth of 120 feet. They
are zoned R- 1 -,6,AB. All of the neighbors were of the opinion that mini-estate type homes
would be developed in this area. When this property is developed, thought should be given
to the animals resMing in the Seacrest Scrub. Those animals go across Seacrest Boulevard to
Lake Eden for their water. She urged the board to consider the total concept.
Stella Rossi, 625 Whispering Pines Road, feels the environmental concerns should be part
of the record, With regard to the two preservation areas, the Gentry survey says the preserve
area totals 2,22 acres. In reading the back-up material, it says the preserve will be 1.28 acres.
She felt 2.2 acres was acceptable, but 1.28 acres in two small areas is unacceptable and
9
MINUTES
PLANNING ~ DEVELOPMENT BOARD
BOYNTON BEACH, FLORIDA
NOVEMBER ! 4, ! 99S
objectionable. She explained that this area is not all scrub. It contains scrub, pine and Florida
native habitat. With regard to inflll, it is very difficult to transfer scrub. The percentage of
survivability is very small. She questioned whether these preserve areas will be monitored, and
wondered how long they will be monitored. If this project is approved, she recommends that
there be no exotic trees or plants used for landscaping. She expressed her dissatisfaction with
the preserve areas because they are inadequate for the site.
Dan Boyer, of Lake Boynton Estates, has looked at different subdivisions around the City
when in the market for a home. He was not happywith the subdivisions that were laid out in
a grid-like pattern similar to this proposal. He liked communities that had curvy roads and
pods with clusters of vegetation that were set aside to keep the site somewhat similar to its
undeveloped state. He expressed concern about the way the [~reserves are designed. The
preserves would be better if they were rounded and connected, or consolidated into one area.
Jeff Hill, son of the property owner to the south, served on the Planning and Zoning Board
in Delray Beach for five years. When they had an oppo~unity to work with a PUD, staff and
the board had a great deal of leeway as to what they accepted in terms of development in a
PUD. He does not see much creativity in this development, and it is much too dense a use
of the property.
l~iLche]l Kirschner: attorney for the develo4~er, feels the developer should have anticipated
the issues that were raised. He realizes that the major issue is the density; however, the density
is less under the PUD than it is presently. He also realizes that once people have been exposed
to wooded property, any development would make them unhappy. With regard to flee
clearing, Mr. Kirschner had a conversation with Attorney Cherof today. He learned from
Attorney Cherof that there was a finding that the clearing was outside the permit, but nothing
that was cleared was in excess of what would have been cleared.
With regard to expenses associated with this homeowners' association, Mr. Kirschner said if
the developer .intends to develop a project that is not marketable, he would be an idiot
because he would not be able to get his financing. After working with Mr. Pinto for a long
time, he knows Mr. Pinto will not do that. It is his burden and his risk.
At a recent variance hearing, lvlr. Kirschner heard a city attorney advise the board that with
the advent of the Harris Act, the board must give deference to the economic impact on the
developer. Staff now realizes that there is a new series of law to consider when attempting to
deny a project based on aesthetics. He reminded the members that Mr. Pinto bought this
property and has a financial stake in it.
Vice Chairman Golden is disturbed about the recent trend to not require the extension of
public roads so that undeveloped parcels can connect other public roads. In this case, there
]0
MINUTES
PLANNING ~z DEVELOPlqENT BOARD
BOYNTON BEACHj FLORIDA
NOVEIqBER ! 4, 199S
is a specific policy in the Comprehensive Plan for this to happen. He feels this trend is
shortsighted, and as the City approaches buildoub we will be sorry we did not require these
road extensions. The benefits of these extensions are several--they expand the road network,
relieve congestion in certain segments of the road network, improve levels of service, improve
provision of emergency services, and they provide alternatives for the traveling public.
Although there is nothing specific in the Comprehensive Plan about justification, there are
other situations in the City where these recommendations are made and there are no
justifications. There are additional reasons for extending the roads.
The second consideration is the location and configuration of the preserve areas. They are
surrounded by the homes which have minimal backyards. There will be families with children
occupying them, and people tend to expand their backyards into these areas. Over time,
these preserves will become very degraded.
A third issue deals with the comments made by staff relative to the corner lots. In a normal
subdivision, there is a curve in these areas. On this project, the recessed home in the corner
is very una~ractive. The platting was done in this manner in the Boynton Lakes PUD. It is a
very unattractive, negative look. Staff's comment to comply with the 75 percent requirement
may create a situation where they will not be able ~o get the number of lots they anticipated.
Redesign work is needed in these areas to make this work properly.
Mr. Beasley reiterated his concern about the setbacks and lot coverage.
Motion
Vice Chairman Golden moved to recommend denial of the Hills of Lake Eden PUD, request
for zoning and master plan approval to construct 62 single-family detached homes on 15.45
acres of land in connection with a rezoning from R-1-AAB (Single-Family Residential) £o
Planned Unit Development with land use intensity of 5 (PUD with LU] = 5). Mr. Rosenstock
seconded the motion which carried unanimously.
Project:
Agent:
Owner:
Location:
Description:
Poinciana Elementary School
]on C. Hansen
The School Board of Palm Beach County
Multiple parcels: west of Seacrest Boulevard between
N.W. 11 th Avenue and N.W. 13th Avenue
Request to amend the Comprehensive Plan Future Land
Use Hap from Medium Density Residential to Public and
Private Governmental/Institutional and rezone from R-1 -
A (Single-Family Residential) and R-2 (single and two-
family dwelling) to Public Usage.
11
lqlNUTES
PLANNING 8z DEVELOPI~4ENT BOARD
BOYNTON BEACH, FLORIDA
NOVEt4BER ! 4, 199S
Since the board was familiar with this case and the information in the back-up agenda
information, Mr. Rumpf gave a very brief presentation. During the past ! 2 months, The
School Board of Palm Beach County has acquired the subject parcels, removed exisdng
structures on those newly-acquired parcels, submitted abandonment applications for the
adjacent rights-of-way of NW 12th Avenue and Washin~on Avenue, and besun construction
of a new Poinciana Elementary School. With respect to the current school use, the existing
school facilities will continue to be utilized during construction of the new building. This
school redevelopment project will enable consolidation and be~er utilization of the campus,
and the replacement of multiple antiquated facilities with a single and larger modern
elementary school.
CHAIRMAN DUBI~ ANNOUNCED THE PUBLIC HEARING.
Mr. Rosenstock left the dais.
]oJ~Hansen: w[tlLThe School Board of Palm Be,tdLCounty, was present to address any
questionS from the board.
Mr. Beasley questioned how The School Board of Palm Beach County was able to begin
construction prior to rezoning for the abandonments. Ms. Heyden advised that The School
Board does not need City building permits. Mr. Hansen said there are State Statutes relative
to the construction of SChools. However, The School Board is working very closely with staff
to make this a true partnership.
Vice Chairman Golden moved to recommend approval of the request for Poinciana
Elementary School to amend the Comprehensive Plan Future Land Use Map from Medium
Density Residential to Public and Private Governmental/Institutional and rezone from R-1-A
(Single-Family Residential) and R-2 (Single and Two-family Dwelling) to Public Usage. Dr.
Eisner seconded the motion.
Chairman Dub~ recommended that Mr. Burton vote in Mr. Rosenstock's place.
The motion carried unanimously.
12
lqlNUTES
PLANNING ~z DEVELOPMENT BOARD
BOYNTON BEACH, FLORIDA
NOVEMBER ! 4, 1995
B. SITE PLANS
A. l~aster Plan Modificafioj~
Project:
Agent:
Owner:
Location:
Description:
Tara Oaks PUD
Kilday and Associates
Bill Ray Winchester
Northeast corner of Woolbright Road and Knuth
Road
Request for approval to modify the previously-
approved master plan to change access points,
recreational amenities, and unit type from
apartments to townhouses and use acreage.
Ms. Heyden distributed a handout requesting a postponement. Staff prepared a summary of
the occurrences of the City Commission meeting. The applicant presented a revised master
plan during the City Commission meeting that staff had not had an opportunity to review.
From the recommendations made by the City Commission, there are changes required.
To prevent this type of situation from occurring in the future, and to give staff an opportunity
to prepare additional comments if necessary, staff recommended that the plan be sent hack
to staff for comments. The applicant agreed and submitted the new plan. They are prepared
to go forward at the next TRC meeting, and the next Planning and Development Board
meeting.
Ms. Heyden provided a report on the disposition of agenda items from last month's meeting:
Rezoning for Boynton Commons - This board recommended approval and that
approval was endorsed by the City Commission.
St. Joseph's Episcopal Church/School Condition Use Approval - This hoard
recommended approval which was endorsed by the City Commission.
Landscape Appeal for Boynton Commons - This hoard recommended approval
subject to staff comments, and that approval was endorsed by the City Commission.
UPS Landscape Appeal - This board recommended approval subject to staff
comments, and recommended landscaping in equal cost in front of the building instead
of installing the landscaping along the south of the building. The City Commission
accepted that recommendation, and also allowed a change on the north property line.
They recommended that the gaps in the hedge be filled in.
13
MINUTES
PLANNING ~ DEVELOPlqENT BOARD
BOYNTON BEACH, FLORIDA
NOVEMBER ! 4, 1995
Carrabba's Italian Grill - This board recommended approval subject to staff comments,
and the City Commission endorsed that recommendation.
UPS Master Site Plan Modification - This board recommended approval subject to all
staff comments and planting of additional trees at the northwest corner of the sidewalk
at Congress Avenue, and that recommendation was endorsed by the City Commission.
Parking Lot Variance for UPS - This board recommended approval subject to staff
comments, and that recommendation was endorsed by the City Commission.
Time Extension for RaceTrac - This board recommended approval subject to staff
comments, and the City Commission endorsed that recommendation.
Chairman Dub& reminded the members to respond to the City Manager's Office regarding
the Board Dinner to be held on December 7, 1995, at Hunters Run. Chairman Dub& and Mr.
Rosenstock will not be able to attend the dinner.
Chairman Dub& apologized for allowing the first application to take up so much time; however,
this may assist the City Commission at their meeting next week. Dr. Eisner and other members
of the board noted Mr. Kirschner's implication of the possibility of a lawsuit depending on the
board's decision.
There being no further business to come before the board, the meeting properly adjourned
at 8:40 p.m.
(~anet M. Pralnito
Recording Secretary
(Two Tapes)