Minutes 02-13-90MINUTES OF REGULAR MEETING OF PLANNING AND ZONING BOARD HELD
IN COMMISSION CHAMBERS, CITY HALL, BOYNTON BEACH, FLORIDA,
TUESDAY, FEBRUARY 13, 1990 AT 7:30 P.M.
PRESENT
Robert Walshak, Chairman
Nathan Collins, Jr.,
Vice Chairman
Harold Blanchette
Murray Howard
Gary Lehnertz
Daniel Richter
Carl Zimmerman
Denys "Sam" DeLong, Alternate
(Present in Audience)
Dee Zibelli, Alternate
(Present in Audience)
Tim Cannon, Interim
Planning Director
Jim Golden, Senior Planner
Tambri Heyden,
Assistant City Planner
Chairman Walshak called the meeting to order at 7:40 P.M.
Following the Pledge of Allegiance to the Flag, he intro-
duced the Interim Planning Director and the Members of the
Board, Vice Mayor Bob Olenik and Commissioner Lee Wische.
AGENDA APPROVAL
Under "8. Other C." Mr. Lehnertz wished to add discussion
about a Statute directed toward saving water in the City.
As there were people in the audience with prior commitments,
Chairman Walshak wished to move item "C. 4. Site Plan
Modification" for Casa Blanca Apartments immediately prior
to the Public Hearing segment of the meeting.
Mr. Richter moved to approve the Agenda as modified.
Howard seconded the motion which carried 7-0.
Mr.
APPROVAL OF MINUTES
Minutes of January 9, 1990
Mr. Richter moved to approve the Minutes of the January 9,
1990 meeting as submitted. Mr. Collins seconded the motion
which carried 7-0.
COMMUNICATIONS AND ANNOUNCEMENTS
Tim Cannon, Interim Planning Director had provided the Board
with a copy of the City's Finding of Non-Compliance on the
Cbmprehensive Plan. He reported the City is trying to nego-
tiate a compliance agreement with the DCA. Most of the com-
ments concern the completeness of the Capital Improvements
- i -
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA
FEBRUARY 13, 1990
Element. Few comments are directly related to land develop-
ment. The intent of the City is to work it out and avoid a
hearing before the Florida Dept.'of Administration.
NEW BUSINESS
SITE PLAN MODIFICATION
Project Name:
Agent:
Owner:
Location:
Legal
Description:
Description:
Casa Blanca Apartments
James W. McManus
Boynton Lakes Ltd.
West Boynton Beach Boulevard at Old
Boynton Road, northwest corner
See "Addendum A" attached to the origi-
nal copy of these Minutes in the Office
of the City Clerk
Request for approval of an amended site
plan to allow for changes in building
layout and design.
Jim Golden, Senior Planner reported the applicant protested
having to go through this procedure due to the amount of the
change. This protest was explained in James McManus'
January 29, 1990 letter to Mr. Golden.
Mr. Golden explained the applicant was requesting approval
of an amended site plan to allow for a change in the
footprint of the buildings that resulted from modifications
to the FPL meter rooms. The meter rooms have been taken off
one side of the buildings and enlarged on the other side.
This change is fairly minor. Reference was made to some
changes in elevations which the Building Official considered
to be substantial. The elevation changes will be reviewed
by the CAB on February 15, 1990. The TRB recommended appro-
val, subject to the following staff comments:
Building Department
"1. Proposed modification creates an exterior design change
which requires Community Appearance Board (CAB) review
and recommendation to the City Commission for their
approval. Apply for CAB review.
2. All plans submitted for public record and prepared by a
design professional shall show original raised seal
(legible) and signature of the Florida registered
design professional responsible for the drawings.
3. Provide revised landscape plans for the foundation
- 2 -
MINUTES PLANNING & ZONING
BOYNTON BEACH, FLORIDA
BOARD
FEBRUARY 13, 1990
landscaping around multifamily buildings where meter
room change occurred."
Mr. Golden stated no elevation changes were submitted for
the changes. Based on a previous ruling under the former
Commission, it was determined that on changes under $10C,000
in value, it could simply be permitted through the Building
Dept. Mr. Golden repeated that the Building Dept. had
determined these changes to be substantial in nature and are
requiring the applicant to submit the changes for review by
the CAB.
Chairman Walshak was in possession of a letter dated
February 6, 1990 from Mark Gustetter, AIA, to the attention
of the Planning & Zoning Dept. The letter is attached to
and made a part of these Minutes. Chairman Walshak read the
letter to the board members which enumerated 10 various
changes to the exterior of the buildings and/or site plan as
originally approved by the City.
Chairman Walshak felt the roof changes alone had to amount
to $200,000 to $250,000. He felt these were substantial
changes. The Board had been impressed with the quality of
the project as originally approved. The Chairman was upset
that the CAB was going to be advised of these changes and
yet the Planning & Zoning Board had not been told by the
Planning Dept. Mr. Golden and Mr. Cannon were unaware of
the existence of the February 6, 1990 letter. Discussion
ensued. Since the changes were so numerous, the Board was
desirous of seeing them in presentation form with the
colored renderings.
Mr. Lehnertz felt this was a case where a number of small
changes totalled a major change. He was concerned that this
could happen again and it might not be caught. Discussion
took place between Mr. Lehnertz and Chairman Walshak on the
proposed changes no Chapter 19. Chairman Walshak noted with
the conceptual site plan approval you get the permit review
on the back end where this is up to the Building Official.
If the Building Official ever missed anything like this he
would be in trouble.
Don Jaeger, Building Official stated he did have elevations
which had been submitted for CAB review. He offered to
return to the Building Dept. to retrieve the elevations.
(See Page 5 of these Minutes where discussion on this topic
resumes.)
- 3 -
MINUTES PLANNING & ZONING BOARD
BOYI~TON BEACH, FLORIDA FEBRUARY 13, 1990
OLD BUSINESS
A. PUBLIC HEARINGS
PARKINGLOT UARIANCE
i. Pro~ect Name:
.Agent:
Owner: .
Lo6~tion.
~. D~sC~iptlon:
~alm BeachrLeisureville -
ecrea~on Center ~3
Siteworks Architects and Planners, Inc
S~W. I3~I~-:AV~nue at 's.w.~ 20th ~
R~ for a, y~ia~c~' ~o sections
5~f~2~fj:'(i ~ "S%~a&raS" Ahd' 5-142(1)
""P~k~h~'~6~'Striping" of Article X
Parking Lots.
Jim Golden, Senior Planner stated the recommendation was
that this be continued until the March 13, 1990 Planning &
Zoning Board meeting at 7:30 P.M. at the request of the
applicant.
Mr. Lehnertz moved to continue the Public Hearing on this
item to the March 13, 1990 meeting. Mr, Howard seconded the
motion which carried 7-0.
NEW BUSINESS
A. PUBLIC HEARINGS
PARKING LOT VARIANCE
Project Name:
Agent:
Owner:
Location:
Legal
Descriptzon:
Description:
All-Right Auto Repair
None
Avelardo & Elizabeth Maldonado
East side of North Federal ~ighway,
between N.E. 7th Avenue and N.E. 8th
Avenue.
Lot 23 and the North 30 feet of Lot
24, less the westerly 20 feet road
right of way, Block 1, BOYNTON
PLACE, Boynton Beach, Florida, and
more specifically described in the
Public Records of the Clerk of the
Circuit Court of Palm Beach County,
Florida. Plat Book 11, Page 40.
Request for a variance to Section
5-142(h)(3) "Driveways" of Article
X-Parking Lots.
- 4
MINUTES - PLANbIING & ZONING BOAtRD
BOYNTON BEACH, FLORIDA FEBRUARY 13, 1990
Tamri Heyden, Assistant City Planner explained the need for
t'his request arose when renovations took place for Joe's
Drive-In. For years the driveway on Federal Hwy. provided
access to Joe's Drive-In and ~ll-Right Auto Repair through a
cross access agreement which was not properly recorded and
was not detected during the 1988 site plan review of the
Joe's Drive-In renovations. Joe's Drive-In renovations left
A~l-Right Auto Repair with no access from Federal Hwy.
This request is for approval to construct a driveway 57'
from the intersecting right-of-way lines between Federal
Hwy. and N.E. 7th Ave. The Parking Lot Regulations require
180'. No driveway constructed to provide access to this
site can meet that 180' requirement, therefore the TRB had
recommended this variance be granted.
Mr. Lehnertz moved to recommend approval of this variance.
Mr. Howard seconded the motion which carried 7-0.
SITE PLAN MODIFICATION
Project Name:
Agent:
Owner:
Location:
Legal
Description:
Description:
Casa Blanca Apartments
James W. McManus
Boynton Lakes Ltd.
West Boynton Beach Blvd. at Old
Boynton Rd., northwest corner.
See "Addendum A" attached to the
original copy of these Minutes in
the Office of the City Clerk.
Request for approval of an amended
site plan to allow for changes in
building layout and design.
Discussion on this application resumed as Don Jaeger,
Building Official had returned with the old colored eleva-
tions and the new black and white elevations. The fact that
the new elevations were in black and white made it difficult
to clearly see the changes.
The applicant proposed changzng the roof materials from
concrete tile to gray asphalt shingle on all buildings.
The building color will be white. Chairman Walshak asked
the applicant why the change to asphalt shingles. Mr.
McManus indicated finances were the reason. The lending had
not taken place when the project was originally presented.
All fireplaces are coming out of the units thereby elimi-
nating the chimneys.
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA FEBRUARY 13, 1990
Mr. Zimmerman made reference to the communities of Venetian
Isles and Treasure Island. With a "cheapened" development
he didn't think there would be a blending. He noted
Leisureville had white tile roofs.
Chairman Walshak felt the Board had approved this project
previously predicated on certain conditions. He liked the
original plans and felt the units were of higher quality
before the proposed changes.
Mr. McManus remarked that every multi-family rental project
that has been permitted in the City in about the last five
years has had asphalt shingle roofing. Chairman Walshak was
concerned with addressing this project and didn't like the
end product.
Don Jaeger and Mr. McManus pointed out various architectural
changes on the renderings which stood on the easel. Lengthy
discussion took place. Mr. McManus noted that none of these
proposed changes affect the buildings which are presently
under construction. On these buildings, Mr. McManus men-
tioned they had gone ahead with plywood decking to handle a
heavier roof~ because they didn't know what the City's
response was going to be. Mr. McManus felt the only appre-
ciable change to the elevations was in the roof color.
Chairman Wal~hak was concerned the project could end up
looking like a barracks.
Mr. Richter referred to the final page of the application,
item #19 where it asks for the "Estimated construction costs
of proposed improvements shown on this site plan". Mr.
Richter questioned the entry of "$9,000.000", as it appeared
on the application. Mr. McManus stated "The value of the
project is $9,000,000. That is the total value of the pro-
ject on the last page of the application." A period had
been typed where a comma should have appeared.
Mr. Richter thought the board was going to be addressing
changes to the meter rooms and yet actually numerous
substantial changes were being proposed. The various board
members expressed their feelings on the individual changes.
The consensus was that the changes were substantial and
changed the appearance of the project adversely. Chairman
Walshak had a problem with the roof changes, the change in
the curved window arches and the change in the built out
gables on the sides of the building.
Mr. McManus remarked the units will rent from between
$550/month to $800/month. FHA is the lender. This is not a
government sponsored subsidy program.
- 6 -
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA FEBRUARY 13, 1990
Mr. Blanchette moved to deny the changes
amended site plan. Mr. Collins seconded
carried 7-0.
requested in the
the motion which
A. PUBLIC HEARINGS
REZONING
Project Name:
Agent:
Owner:
Location:
Description:
Boynton Nurseries
Delfin F. Menendez & Roger Saberson
Boynton Nurseries
Lawrence Rd. at the L.W.D.D. L-21
Canal, northwest corner
Request for rezoning from AG
(Agriculture) uo a Planned Unit
Development with a Land Use
Intensity = 4 (PUD w/LUI=4)
Jim Gotdenr Senior Planner remarked a letter had been
received from the applicant requesting a continuance of this
hearing until the March 13, 1990 meeting.
Mr. Zimmerman moved to continue this request for rezoning
the March 13, 1990 meeting. Mr. Lehnertz seconded the
motion which carried 7-0.
to
3. Project Name:
Agent:
Target Shopping Center
Jose Aguila,
Currie-Schneider Associates
Owner: American Development Corp.
Location: North Congress Ave. at N.W. 22nd
Ave., southwest corner
Legal
Description:
Description:
See "Addendum B" attached to the
original copy of these Minutes in
the Office of the City Clerk.
Request for rezoning from PUD to
C-3 (Community Commercial) to allow
for the development of a 140,000
square foot shopping center.
B. SUBDIVISIONS
MASTER PLAN MODIFICATION
2. Project Name:
Agent:
Congress Lakes PUD
Jose Aguila,
Currie-Schneider Associates
- 7 -
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACh, FLORIDA
FEBRUARY 13, 1990
Owner:
Location:
Legal
Description:
Description:
American Development Corp.
West side of North Congress Ave.,
north of the Boynton (C-16) Canal.
See "Addendum B" attached to the
original copy of these Minutes in
the Office of the City Clerk.
Request for approval of an amended
master plan to allow for the remo-
val of a"I3.179 acre parcel from
the boundary of the planned unit
development to allow for the pro-
cessing of an application for
rezon~ng to C-3 (Community
Commercial).
C. SITE PLANS
NEW SITE PLAN
1. Project Name:
Agent:
Owner:
Location:
Legal
Description:
Description:
Target Shopping Center
Jose Aguila,
Currie-Schneider Associates
American Development Corp.
North Congress Ave. at N.W.
Avenue, southwest corner.
22nd
See "Addendum B" attached to the
original copy of these Minutes in
the Office of the City Clerk.
Request for site plan approval to
allow for the construction of a
140,000 sq. ft. shopping center,
including a junior department
store and three outparcels on
13.179 acres.
Mr. Golden mentioned three applications before the board
involved the American Development piece of property. Target
Shopping Center and Marie Callender's Restaurant at Catalina
Centre were part of the Walboyn piece. The three American
Development applications listed above were to be reviewed
prior to the Walboyn application.
Mr; Golden explained 'the approval of the Master Plan
Modification should take place prior to approval of the site
plan and rezoning applications, as the American Development
Corp. parcel is currently within the Congress Lakes P.U.D.
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA
FEBRUARY 13, 1990
It must be removed from the Master Plan for the P.U.D. prior
to rez0ning. The City Commission reviewed the Master Plan
Modification at the February 6, 1990 Commission meeting and
voted that the request was not substantial in nature. The
recommendation of the TRB to the Commission had been that
the request was substantial in nature~ Since the rezonlng
app!ication is based on a previously approved change to the
Future Land Use Element of the Comprehensive Plan, staff
analysis of the rezoning is not required as it is imple-
menting land use shown on the Comprehensive Plan. Mr.
Golden felt the heart of the anal~sis lied in the si%e plan
application. A Public Hearing is still required on the
rezoning before the Plannln~ & Zoning Board and the
Commission.
The site plan provided for a 142,500 sq. ft. shopping
center, however, the traffic statement submitted by
Kimley-Ho~n analyzed 140,000 sq. ft. The approval would be
limited to 140,000 sq. ft. The shopping center will be
anckored by a Target Store and there will be 3 out parcels.
Access will be provided to Congress Ave. by utilizing the
existing driveway at the north end cf' tile Catalina Shopping
Centre. As a safety measure, Palm Beach County Traffic
Division is recommending a modification to the median at the
existing north driveway, which would prevent northbound lsft
turns out of the driveway.
The center had been designed in a manner that appeared to be
an extension of the Catalina Shopping Centre. The building
will have a creme colored concrete stucco finish with aqua
awnings and a Spanish barrel-type roof. No color chart was
submitted by the applicant which indicated specific colors.
The TRB recommended that the construction drawings submitted
with the plat document reflect the changes outlined in the
staff comments, prior to site plan sign-off. The TRB recom-
mended approval of the site plan, subject to the following
staff comments:
Building Department
See Addendum C attached to the original copy of these
Minutes in the City Clerk's Office.
Engineering Department
1) See Addendum D attached to the original copy of these
Minutes in the City Clerk's Office.
2) Subject to successful replatting.
- 9 -
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA
FEBRUARY 13, 1990
Utilities Department
See Addendum E attached to the original copy of these
Minutes in the City Clerk's Office.
Police Department
See Addendum F attached to the original copy of these
Minutes in the City Clerk's Office.
Public Works
"Must show dumpster or compactor locations with details."
Fire Department
"Provide fire hydrants to comply with subdivision require-
ments for all parcels shown, i.e. No portion of any
building shall be over 200' from a fire hydrant."
Planning Department
See Addendum G attached to the original copy of these
Minutes in the City Clerk's Office.
Forester/Horticulturist
See Addendum H attached to the original copy of these
Minutes in the City Clerk's Office.
Mr. Golden explained that included in the Planning Dept.'s
comments are some subjective issues. With the Catalina out-
parcels and the ones included in this site plan there is a
row of five out-parcels on Congress Ave. from the Boynton
Canal to 22nd Ave. He also addressed comments relative to
the desirability of having a continuous rear access at the
back of the shopping center.
Discussion took place about the history of this property.
At one point, Chairman Walshak recalled this property was
referred to as the "black hole" because it was acres of pro-
perty that couldn't be used for anything. Mr. Golden com-
mented the rezoning was before the board at this time. The
local retail land use was already in place. The Master Plan
now permits construction of 59 multi-family dwelling units.
Mr. Blanchette made comments about the property having been
a "black hole" which was used and now it will be used again.
Technical discussion took place about density.
- 10
MINUTES PLANNING & ZONING BOARD
BOYI~TON BEACH, FLORIDA FEBRUARY 13, 1990
Mr. Alan Ciklin, attorney for American Development Corp.
addressed the fact that 59 multi-family residential units
are assigned to this tract. He acknowledged that perhaps
the property was "double-dipped" but felt there was no
question it deserved to be commercial because of its loca-
tion. He noted there were some recreational facilities on
this property at one time but each of the projects developed
within the PUD each did their own recreational facilities.
In essence, this will exceed what would have been there.
Remarks were made about the City designating this as commer-
cial in the land use plan. It went to the DCA and came back
with that designation. He stated he was present to fulfill
the Comprehensive Plan and State Statute requirements. Mr.
Ciklin stated the property doe,s have to be platted.
Rezoning Application:
Relative to the rezoning application, Mr. Ciklin indicated
he agreed with staff comments. Chairman Walshak asked if
there was anyone present who wished to speak in opposition
to or in support of the application. As there was no
response from the audience THE PUBLIC HEARING WAS CLOSED.
Mr. Lehnertz moved to recommend approval of the rezoning
from PUD to C-3. Mr. Collins seconded the motion which
carried 7-0.
Request for Site Plan Approval:
In connection with the request for site plan approval, Mr.
Ciklin remarked he didn't have a problem with the staff com-
ments but he hadn't had time to work out all the details.
They had been in touch with Walter Keller and trust these
items will be worked out prior to the Commission meeting.
The applicant will comply with whatever the conditions are.
The original site plan application was for 140,000 sq. ft.
Because of design criteria the site plan went up to 142,500.
Mr. Godfrey, the Traffic Engineer had indicated it didn't
make any difference at all on impacts. Rather than do
140,000 now and then have to come through the whole process
again for the 2,500 sq. ft., Mr. Ciklin asked that the
142,500 sq. ft. be approved. Mr. Cannon thought it could be
approved as long as Mr. Godfrey could certify that it would
not affect the road improvements that are required. Mr.
Ciklin stated they would submit a revised r~port in this
regard prior to the Commission meeting.
- 11
MINUTES PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA FEBRUARY 13, 1990
Mr. Blanchette moved to approve the request for site plan
approval to allow for the construction of a 142,500 sq. ft.
shopping center, subject to staff comments. Mr. Howard
seconded the motion which carried 7-0.
Master Plan Modification - Deleting the
Property from the Congress Lakes PUD:
Mr. Lehnertz moved to recommend approval of the amended
master plan to allow for the removal of the parcel from the
PUD, to allow for the processing of the application for
rezoning to C-3. Mr. Richter seconded the motion which
c~arried 7-0.
SITE PLAN MODIFICATION
3. Project Name:
Agent:
Owner:
Location:
Legal
Description:
Description:
Marie Callender's Restaurant at
Catalina Centre
Tom McMurrain
Walboyn, Inc.
West side of North Congress Ave.,
north of the Boynton C-16 Canal
See "Addendum I" attached to the
original copy of these Minutes in
the City Clerk's Office.
Request for approval of an
amended shared parking allocation
and site plan to allow for the
deletion of two parking spaces.
Jim Golden, Senior Planner reported the approved site plan
and shared parking allocation were based on 59 parking spaces
being provided on the ou5 parcel. When the parking lot was
completed, two spaces were lost due to the location of the
existing FPL utility pole and a proposed fire sprinkler
meter. These improvements were not shown to be encroaching
on parking spaces on the original approved site plan. The
loss of the two spaces reduced the shared parking buffer
below 10% as required in the Zoning Ordinance. As a result,
the restaurant has been operating under a temporary
Certificate of Occupancy. To address the parking shortage,
Kimley-Horn revisited the shared parking study to determine
if there was any opportunity to amend the report to raise
the buffer above 10%. Kimley-~orn discovered there was a
portion of the report concerning retail weekday accumulation
that was more conservative than wh~t was outlined in the
Urban Land Institute standards.
- 12
MINUTES PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA FEBRUARY 13, 1990
On this basis, the TRB recommended approval, subject to the
following staff comments:
Building Department
See "Addendum J" attached to the original copy of these
Minutes in the City Clerk's Office.
Utilities Department
"1. Approval for revision to parking only.
2. Provide corrected drawing showing actual location of
fire protection and water services.
3. The second water meter for irrigation will not be
allowed."
Planning Department
See "Addendum K" attached to the original copy of these
Minutes in the City Clerk's Office.
Jose Aguila, an associate of Currie Schneider Architects,
stated they have no problems with the City's staff comments.
Mr. Richter moved to approve the request for an amended
shared parking allocation and site plan to allow for the
deletion of two parking spaces, subject to staff comments.
Mr. Collins seconded the motion which carried 7-0.
Chairman Walshak declared a brief recess at 8:55 P.M. The
meeting resumed at 9:10 P.M.
PUBLIC HEARINGS
ABANDONMENTS
Jim Golden, Senior Planner reported that due to some site
plan problems, the applicant had requested a continuation of
the following Public Hearings until the March 13, 1990
Planning & Zoning Board meeting:
4. Project Name:
Agent:
Owner:
Location:
waste Management South
Pruitt & Pruitt, P.A.
Dual County Surveyors
Boynton Industrial Venture
East side of High Ridge Road,
between Industrial Way and Miner
Road extended.
- 13 -
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA FEBRUARY 13, 1990
Description:
Project Name:
Agent:
Owner:
Location:
Description:
Project Name:
Agent:
Owner:
Location:
Description:
Project Name:
Agent:
Owner:
Location:
Description:
Project Name:
Agent:
Owner:
Location:
Description:
Project Name:
Agent:
Request for the abandonment of a
portion of Commerce Park Dr.
Waste Management South
Pruitt & Pruitt, P.A.
Dual County Surveyors
Boynton Industrial Venture
East side of High Ridge Road,
between Industrial Way and Miner
Road extended.
Request Eor the abandonment of a
12 ft. by 20 ft. drainage ease-
ment.
Waste Management South
Pruitt & Pruitt, P.A.
Dual County Surveyors
Boynton Industrial Venture
East side of High Ridge Road,
between Industrial Way and Miner
Road extended.
Request for the abandonment of a
5 ft. by 18 ft. utility easement.
Waste Management South
Pruitt & Pruitt, P.A.
Dual County Surveyors
Boynton Industrial Venture
Eas~ side of High Ridge Road,
between Industrial Way and Miner
Rd. extended.
equeslt for the abandonment of a
or,ion of a 12 ft. utility ease-
ment.
Waste Managemenu South
Pruitt & Pruitt, P.A.
Dual County Surveyors
Boynton Industrial Venture
East side of High Ridge Road,
between Industrial Way and Miner
Rd. extended.
Request for the abandonment of a
25 ft. easement for Miner Road.
~aste Management South
Rruitt & Pruitt, P.A.
Dual County Surveyors
- 14
MINUTES - PLANNING & ZONING BOARD
BOY'TON BEACH, FLORIDA FEBRUARY 13, 1990
Owner:
Location:
Description:
Boynton Industrial Venture
East side of High Ridge Road,
between Industrial Way and Miner
Road extended.
Request for the abandonment of
Tract S-1 (a portion of Miner
Rd.)
10. Project Name:
Agent:
Owner:
Location:
Description:
Waste Management South
Pruitt & Pruitt, P.A.
Dual County Surveyors
Boynton Industrial Venture
East side of High Ridge Road,
between Industrial Way and Miner
Rd. extended.
Request for the abandonment of a
5 ft. access control easement for
Miner Road.
Since this property is located in the County, Chairman
Walshak wondered if anyone had suggested that they pave
Miner Rd. to the northeast corner of their property and see
if the County will go along with using impact fees to do
that road and get away from the abandonment of S-1.
Mr. Golden replied the applicant had contacted the County
about the two abandonments for Miner Rd. The County had
called Mr. Golden after they met with the applicant as they
had some concerns. One of the County's recommendations was
that the applicant improve Miner Rd. and cut a driveway to
it as essentially a local street.
Rather than having all of these abandonments, Chairman
Walshak suggested they go to replat on the project. Mr.
Golden responded they do have to replat. One reason that
they like to have abandonments in situations like this is
because then you have clear title. He assumed that was why
they wanted to handle it this way.
Mr. Richter moved to continue these abandonments until the
March 13, 1990 meeting. Mr. Collins seconded the motion
which carried 7-0.
Mr. Lehnertz suggested that the bulky packets provided to
the board members on these applications be retained for the
next meeting to save paper and work. New information and
comments received could be provided to the board members.
There was agreement.
15 -
MINUTES - P/-J~NNING & ZONING BOARD
BOYNTON BEACH, FLORIDA FEBRUARY i3, 1990
B. SUBDIVISIONS
MASTER PLAN MODIFICATION
Project Name:
Agent:
Owner:
Location:
Legal
Description:
Description:
Boynton Lakes Plat 6
Charles W. DeSanti
Lennar Corporation
East of North Congress Ave.,
south of Hypoluxo Road.
Plat 6, Block 10, Lot 10,
Boynton Lakes PUD
Request for approval of amended
master plan to allow for a non-
zero lot line unit on Block 10,
Lot 10.
Tambri Heyden, Assistant City Planner sxplained this request
for a Master Plan Modification of Boynton Lakes, Plat 6, a
zero lot line project, would allow a non-zero lot line unit
on Block 10, Lot 10. This would amend the side yard setback
from zero to 3½ ft. on the south side and from 15' to 8½ ft.
on the north side of the lot. The south side of the zero
lot line side of Lot 10 is encumbered by a portion of a 38'
utility easement containing overhead transmission lines,
which cannot be reduced in width. Approval of this Master
Plan Modification will result in an 8.6' building separation
between the proposed building on Lot 10 and the building to
the north, which is a deviation from the standard 15'
building separation.
The TRB, based on Fire Dept. concerns about insufficient
building separation and creating one non-zero lot line lot
within a zero lot line community, determined that this was a
significant change once the developer could provide documen-
tation from FPL that a hardship existed. Verification was
received and the City Commission recommended approval of
this Mastsr Plan Modification to the board, subject to the
following staff comments:
Building Department
"Provide elevation view drawings of proposed unit to occupy
Block 10, Lot 10 showing north and south exterior walls
with a maximum of twenty percent (20%) wall openings for
each side consistent with the requirements of Standard
Building Code 1988 Edition, Table 600."
- 16
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA FEBRUARY 13, 1990
Fire Department
"The Fire Department feels there would mot be enough
distance between structures, creating a~ exposure problem,
should there be a fire."
Ms~. Heyden noted the Fire Dept. comment is advisory in
nature. She stated approval, of the request could he.subject
to just .the Building Dept. commen~.
There was no representative for the applicant present at the
meeting..
Mr. Collins moved to approve.the amended ~aster Plan to
allow for a non-zero lot line unit on.Block 10, Lot 10,
ject to staff comments. Mr. Howard seconded the mo~ion
which carried 7-0.
sub-
Project Name: Lawrence Grove PUD
Agent: Enrico Rossi, P.E.
Owner: K. Hovnanian Companies
Location: L~wrence Rd. at the L.W.D.D.
Canal, southeast corner
Legal
Description:
Description:
L-19
See "Addendum L" attached to the
original copy of these Minutes in
the City Clerk's Office.
Request for approval of an
amended master plan to delete a
eonditi0n of zoning approval that
requires the construction of
Bedford Bl~d. between the
Lawrence Grove PUD and the
Meadows 300 PUD.
Tambri Heyden, Assistant City Planner ~explained the contents
of her January 24, 1990 memorandum to ~the City Manager on
this topic. The memorandum~is attached_to and made a part
of these Minutes. She noted the~applicant was requesting
that he only be required to,dedicate a 10' utility easement
for the 8" water main in lieu of the 60' right~of-way con-
nection.
The TRB's recommendation was that theconditions continue to
be imposed because they are still in need of the right-of-
way connections to promote ~apid-response for emergency
vehicles. The City Commission determined that this request
was not a subatantial change and forwarded the request to
the Planning & Zoning Board for final consideration~
- 17 -
MINUTES PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA FEBRUARY 13, 1990
Staff comments are as follows:
Police Department
It was recommended "That every attempt be made to obtain
the right of way for Bedford Blvd. We should grant this
modification only after all avenues to obtain it are
exhausted. (Public Safety)"
Fire Department
"There is a dearth of connecting roads in this area, to
promote rapid response by the Fire Department. As origi-
nally proposed, this roadway would have alleviated a por-
tion of the problem. We cannot recommend any change from
the original plan.~
Utilities Department
"We would like to take this opportunity to reinforce our
position on the need for a potable water interconnection
between the Meadows PUD and Lawrence Groves. Said inter-
connect is becoming increasingly critical if we are to
maintain reliability of service and adequate disinfection.
The 10-foot wide easement indicated on the drawings is
sufficient if the main is to be located adjacent to a
future right-of-way. However, if the right-of-way will
not be obtainedt then a 20-foot wide easement is preferred
so as to allow for the necessary minimum setback of 10
feet from any future structures."
Chairman Walshak was interested in whether the City
Commission felt they needed a 10' or a 20' easement. Ms.
Heyden stated she did not believe that issue came up. Vice
Mayor Olenik, who was present in the audience, remarked that
regardless of whether it was a 10' or a 20' easement, the
CommIssion saw no substantial change. He didn't think the
Commission had really ~addressed the issue. Commissioner Lee
Wische who was also in the ~udience agreed.
Chairman Walshak asked if the applicant was present. Mr.
Rick Rossi had been present at the meeting earlier, but at
this time they were unable to locate him.
Tim Cannon, Interim Planning Director reported he had met
with the Palm Beach County Land Acquisition Dept. Since
this is a local street as opposed to a thorough-fare and as
- 18
MINUTES - PLANNING & ZONING BOARD
BOYi~TON BEACH, FLORIDA FEBRUARY 13, 1990
a local street it would serve people within the City, the
County has a tough case proving a public need for the County
to go into a condemnation proceeding. Their Land
Acquisition Dept. had been informed by their County Attorney
that this is almost a "sure loser" going into Court. It
could be pursued but it probably would not be successfull.
Since there Ks only one water utility system in the whole
area that the City controls, there is a legal basis for the
County condemning the utility easement. Mr. Cannon noted
that since this is on an unincorporated parcel, the City
could not condemn the right~of-way. The County would have
to. The County would have to prove there is a need on the
part of the County residents for th~s right-of-way. It is
difficult to prove this on road righ~-of-ways, but it is not
a problem for a utility easement.
Remarks were made about the roads existing in the area.
Referemce was made to road work Knollwood Groves was doing
which would result in an east/west road. Mr. Golden com-
mented about there being no guaranteed timeframe for the
construction of the road and staff felt there was an imme-
diate need to improve access in the area. Other remarks
were made.
Mr. Howard moved to approve the amended mas=er plan to
delete the condition of zoning approval that required the
construction of Bedford Blvd. between the Lawrence Grove PUD
and the Meadows 300 PUD, subject to staff comments requiring
the 20' easement. Mr. Collins seconded the motion which
carried 7-0.
C. SITE PLANS
NEW SITE PLANS
2. Project Name:
Agent:
Owner:
Location:
Legal
Description:
Description:
Quantum Office Park
Jeff Falkanger & Associates, Inc.
Quantum Associates
N.W. 22nd Ave. at the L.W.D.D.
E-4 Canal, northeast corner
Lots 20, 21, 20-A and 21-B of
"Quantum Park" at Boynton Beach,
PID Plat No. 2, as recorded in
Plat Book 59, Pages 184 and 185,
of the Public Records of Palm
Beach County, Florida.
Request for site plan approval to
MINUTES
BOYNTON
PLANNING & ZONING BOARD
BEACH, FLORIDA
FEBRUARY 13, 1990
construct a 50,978 sq. ft. office
complex consisting of two
buildings on 4.38 acres on lots
20 and 21 at the Quantum Park of
Commerce Planned Industrial
Development.
Tambri Heyden, Assistant City Planner explained Quantum Park
was requesting approval to construct two identical office
buildings, one on lot 20 and the other on lot 21. They will
be integrated using cross access and will be constructed in
two phasesi Color elevations showed the buildings will be
light tan stucco with green tinted windows.
The TRB recommended approval, subject to the following staff
comments:
Building Department
See "Addendum M" attached to the original copy of these
Minutes in the City Clerk's Office.
Fire Department
"Provide fire hydrant on Northwest 22nd Ave. in front of
the project."
Engineering Department
See "Addendum N" attached to the original copy of these
Minutes in the City Clerk's Office.
~Utilities Department
"1. Provide fire flow calculations.
2. Relocate the water mains to a point at least 5 feet
further from the buildings.
3. Indicate all easements to be dedicated for the on-site
water mains.
4. Re-align the water main or storm drainage in the
Southeasn and southwest portions of the parcel so as
eliminate the crossing conflicts.
5. Relocate the 6" gate valve shown in the stub to the
east to a location south of the nearest tee."
to
Police Department
"1. Stop signs and stop bars at the ends of parking lot
isles. (Ord. 5-142C)
- 20
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEAC~t, FLORIDA
FEBRUARY 13, 1990
2. Comply with Construction Security Code. (Ord. 5-8G)
3. Rear door be key access only, due to its close proxi-
mity to the stairwell, bathrooms, and elevator. (Public
Safety)"
Public Works Department
"Turn dumpster pad on right 45° for better access. Call
Public Works prior to forming dumpster pad."
Planning Department
See "Addendum O" attached to the original copy of these
Minutes in the City Clerk's Office.
Forester/Horticulturist
See "Addendum P" attached to the original copy of these
Minutes in the City Clerk's Office.
Harlan Kuritzky from Architect Jeff Falkanger's office indi-
cated they had some details to work out in regard to
landscaping, screening issues, placement of fire hydrants
and on-site required pavement markings, stop signs, etc.,
which would be worked out with staff. They were agreeable
to these staff comments.
Mr. Richter moved to approve the request for site plan
approval to construct the 50,978 sq. ft. office complex con-
sisting of uwo buildings on 4.38 acres on lots 20 and 21 at
the Quantum Park of Commerce PID, subject to all staff com-
ments. Mr. Lehnertz seconded the motion which carried 7-0.
SITE PLAN MODIFICATION
5. Project Name:
Agent:
Owner:
Location:
Legal
Description:
Motorola
~oe/Eliseo, Inc.
Architects & Planners, Inc.
Motorola, Inc.
North Congress Ave. at N.W.
Ave., southeast corner.
22nd
A parcel of land within the plat
of Motorola, as recorded in Plat
Book 43, pages 139 140 of the
public records of Palm Beach
County, Florida.
- 21
MINUTES PLANNING & ZONING BOARD
BOYI~TON BEACH, FLORIDA FEBRUARY 13, 1990
Description:
Request for approval of an
amended site plan to allow for
the addition of a tank farm.
Tambri Heyden, Assistant City Planner explained the amended
site plan would allow for the construction of a hydrogen
tank, a nitrogen tank, equipment enclosure for screening
purposes and an access road on the south side of the
existing building. The hydrogen and nitrogen storage is
needed in the processing of electronic equipment. Enclosure
material and colors will be compatible with the existing
building.
The TnB recommended approval, subject to the following staff
comments:
Building
"1. The new vehicular use area, as seen from the south and
east property line, requires a visual screen barrier
(preferably hedge material). Identify appropriate loca-
tion, type, size and spacing of required screening
material.
2. The new vehicular use area, as seen from the west pro-
perty line public right-of-way, requires visual screening
(landscape material or wall) and trees planted forty feet
(40') on center. Identify appropriate location, type, size
and spacing of required screening material and trees."
Mr. Bob Sever of Airco Industrial Gases and Joe Sperlazza of
Motorola were present at the meeting. Mr. Sperlazza
remarked they did wish to review staff comments with the
CAB. Of the landscaping which had been put down, they
wanted to review the interpretation of the screening of the
road. Staff had indicated that a tree was needed every 40'
on this private road. The greenbelt of the property had
lust been upgraded on the property with the last expansion.
Mr. Sperlazza stated they would comply with staff comments.
Mr. Collins moved to approve the amended site plan to allow
the addition of a tank farm, subject to staff comments.
Mr. Richter seconded the motion which carried 7-0.
8. Other
A. Minor repair of automobile/passenger vehicles as a prin-
ciple use in the C-3 zoning district
Chairman Walshak thought this had been solved but somehow we
- 22
MINUTES - PLANNING & ZONING BOARD
BOYI~TON BEACH, FLORIDA
FEBRUARY 13, 1990
ended up with nothing in the Ordinance but tire stores. He
had been under the impression that the board had discussed
minor in-frame repairs and maintenance on licensed vehicles,
including trucks. He didn't see how the City could allow
the service stations in C-3 to work on trucks and yet other
maintenance facilitios not be allowed to. He thought this
was inconsistent with what the City already had in the
Comprehensive Plan.
Mr. Richter thought motor vehicle service buildings that
have several businesses that might include mufflers, tires,
tune~ups and lube and oil changes, should be allowed in C-3.
Chairman Walshak thought this topic had been "beat to death"
and clarification was needed on what they were specifically
addressing. Mr. Cannon explained in C-3 the Code presently
allows automobile service stations and that includes minor
repairs on any type of vehicle in-frame. This would exclude
pulling an engine or transmission out. Chairman Walshak
stressed the word "in-frame".
Chairman Walshak passed the gavel and moved that ~he board
recommend to the Commission that in the C-3 zoning district
any minor in-frame repair or maintenance to any licensed
vehicle be allowed. Mr. Howard seconded the motion which
carried 7-0. The gavel was returned to Chairman Walshak.
B. Consistency Review - Dry Boat Storage in the Central
Business District (pursuant to Chapter 163.3194 F.S.)
If the Commission was considering allowing dry boat ssorage
in the CBD, Mr. Blanchette could not see what this could do
for that area. It might be something that could be handled
later but as a primary building to go into the area he
couldn't see it. He stated he would like to see a plan for
a marina rather than just a boat storage building.
Chairman Walshak clarified the board was being asked to
decide one way or the other on the consistency of dry boat
storage in the CBD. The Chairman had mixed feelings about
this. He thought it probably was consistent witk the
Comprehensive Plan but on the other hand he hated to see a
dry boat storage facility being the focal point in the CBD.
Chairman Walshak did not think this was the answer to
getting people to want to come to the CBD, unless they own a
boat.
23 -
MINUTES PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA
FEBRUARY 13, 1990
Mr. Lehnertz did not think dry boat storage would be con-
sistent with the Comprehensive Plan. Essentially he felt
they were talking about warehouses in the CBD which is not
consistent. It is a water related use but it is not a
marina type of use or something that belongs in the CBD.
Chairman Walshak didn't think the board had the prerogative
to determine the use. He repeated that the board needed to
vote on whether they feel it is consistent with the
Comprehensive Plan or not.
Ail of the board members expressed their individual feelings
about the concept.
Mr. Lehnertz moved that the board find and transmit to the
City Commission that dry boat storage in the CBD is not con-
sistent with the Comprehensive Plan. Mr. Btanchette
seconded the motion. ~ne motion carried 4-3. Mr. Richter,
Mr. Collins and Chairman Walshak voted against the motion.
C. Discussion on Water Useage
Mr. Lehnertz indicated he would like to see a statute which
specified that a certain percentage of the units in each
new ~evelopment would have low use toilets, shower heads and
faucets. He requested Don Jaeger, Building Official's input
on whether this was feasible.
Mr. Jaeger responded that Chapter 553 of the Florida
Statutes requires all municipalities to adopt minimum codes.
For any amendment to that the local municipality must ascer-
tain that there are specific local conditions that warrant
amending that and then they have to be forwarded to the DCA
and argued before the DCA. It is a lengthy process. Me
noted the issue was discussed at the County level when the
County amendments were adopted and this City adopted the
Countywide amendments to the Code. At that point the
Building Code Advisory Board did not feel they could justify
this. This issue i~s one that Mr. Jaeger felt strongly about
and he thought they needed to somehow restrict water useage.
He was not sure legislation was the means to do it. ~e
thought the press should have a big role in this. He
suggested putting something in the next Newsletter in this
regard.
Discussion took place about water pressure which is
currently being cut back and new bathroom fixtures that are
available that use reduced amounts of water.
- 24 -
MINUTES - PLANNING & ZONING BOARD
BOYNTON BEACH, FLORIDA
FEBRUARY 13, 1990
AD JOUR~MENT
The meeting properly adjourned at
Shannon Burkett
Recording Secretary
(Three Tapes)
10:00
- 25 -
February 6, 1990
CITY OF BOYNTON BEACH
BUILDING DEPAR%5[ENT
100 East Boynton Beach
Boynton Beach, Florida
33425-0310
Boulevard
Attn: Planning and Zoning Department
Re:
Casablanca Apartments
Boynton Beach Boulevard
Boynton Beach, Florida
HUD # 066-36651
WHA # 88086 F9
Dear Sirs:
We respectfully submit the following items as proposed
changes to the Project referenced above. We request that you
review these in order that they be approved for implementa-
tion in the field as soon as possible.
The proposed changes listed below are those that would
affect the exterior of the Project's bui%dings and/or site
plan, as originally approved by the city of Boynton Beach.
1. Change roof material from concrete tile to asphalt
shingles on all buildings.
2. Delete chimneys from all apartment buildings; ther~.-are
no longer any fireplaces in the units. The fireplaces and
chimne~ on the Clubhouse remain as originally designed.
Delete the sloping, frame construction build-outs between
the windows of the first and second floors on the fronts
and sides of all apartment buildings.
4~. Delete the curved arch above the second floor windows on
the fronts and sides'of all apartment buildings.
5. Delete the two-story, ~ull~-Qut gable form on the sides
of all apartment buildings.
6. Delete ons (1) electrical meter room from the end of each
apartment building; enlarge the one (1) remaining meter
room to accommodate eao~ Buildings' meters. Change the
meter room roof from a s~ed roof to a gable roof.
Boca Race 2255Gl~des Roa~ Suit~ 324Atrium Boca Raton. F[crida 33431
Boca Raton 407/~41,1971 Oallas 2141770-2300
CITY OF BOYNTON BEACH
BUILDING DEPARTMENT
February 6, 1990
Page 2
Add four inches (4") of height to all apartment
buildings.
Delete raised stucco banding from center portion (second
floor line) of all apartment buildings. Roof line and
base line raised stucco banding i~ to remain as
originally designed.
Add screen enclosures to all apartment patios and
balconies. Screen enclosure members to be white in color.
10. Delete guardrail from first floor patios of all apartment
buildings. Change remaining second floor balcony rail,
color to white on all apartment buildings.
If you should have any questions
the items noted above, please contact
possible.,
or comments regarding
our offices as soon as
Sincerely,
~ark R. Gustetter, AIA
Vice President
cc:
Mr. Bill Brisben
Mr. Bob Schuler -
Mr. Jim McManus
Mr. Dick Funk
Mr. Kerry Endsley
Mr. Paul Betz
Mr. Dwayne Faulkner
Mr. John Russell
Mr. Tom Cole
Mr. Paul Poppleton
Mr. Charles Womack -
Mr. David Patterson -
W.O. Brisben Company
W.O. Brisben Company
W.O. Brisben Company
Bradley Construction Co., Inc.
Bradley COnstruction Co., Inc.
Bradley Construction Co., Inc.
Bradley Construction Co., Inc~
Cole & Russell Architects, Inc.
Cole & Russell Architects, Inc.
Cincinnati Mortgage Corporation
Womack-Humphreys Architects, Inc.
Womack-~umphreys Architects, Inc.
CASABOYN.107
PLANNING DEPT~. MEMORANDUM
TO: J. Scott. Mi.ller
'.City Manager- ' ~
THRU:- Timothy P. Cannon
FROM: !'~'-Tambri J. I
'.~ ASsistant City ~
DATE: January 24~ 1990~,
SUBJECT~~ Lawrence Grove P.U;D. '~,~
Master Plan Modification~;<File~No~240~i
Enrico Rossi, agent ifor K. Hovnanian~Comp~ies~,has' requested a
modification .to, th6 previously' aPDroved~'maSter'' plan for the
Lawrence .Grove P.U.D.,' as outllnedlin'the attached O0~respondence
in Exhibit "A".- The modification]'requested~is'f~=~'deletion of
one of'the.conditiohs of P.U.D. zoni, ng ap~roval~'~that~requires the
applicant 'to construct the' missing}lin~'~(approximateyi629 feet)
of Bedfor~ Boulevard. The western,~segment~of~BedfordBoulevard
currently begins at Lawrence R0ad~nd~dead~'ends'' at'the eastern
boundar~ of the Lawrence G~ove F.U,D.,~The eastern segment, begins
at Meadows Boulevard and dg~d ends at, the wes~rnboundary'of'the
Meadows ~300 ~P.u.D.. (see attached.diagr,a?~'and~location map) in
Exhibit'~"B''. This condition ~f app~oval~entails"~acquiring ~the
necessary land (either by purchase ~Or,~ oon~emnat£on);from the
~roperty owner of the Undeveloped,parcel'~tha~lies';in 'Palm Beach
Countybetwe~n ~the Lawrence Grove P.U.D.i.iand~!~he~M~adows"P.U.D.,
to~ construct, a~d ;~'dedicate a, minimum%~ 60~foot:~righ~-of-way
connection .t~ Bedford Boulevard ~or · the~'~ fol~ewing~publie
pu~p6ses: An east/wes~ emergency.'~access?whioh~ould be an
alternate to Eypoluxo ~ the
installation of'an 8
The applicant is requesting'that
foot utility easement ~n lieu
connection for
modification was
Steven Brannock,, was notified
instituting eminent domain action
connection, of P~lm Beach ~oun}y's
specifically cost and 3ust~ in
Th? procedur~ fo~ ~pproving master plan mod~i, fications in planned
unat developments 'is twofold. First, ~the :City Commission must
make a determination as to whether,or not thechanges requested
are substantial in nature. A determinationofjsubs~antial change
on the part 'of the City commission/which has '~ole~disoretion in
this matter, would' requirea new~application?for~U~. On, the
other hand, 'a determination of no substantial~'~change allows the
forwarding of the request to
procedure appears.in
Ordingn~e~ '.
Wit~ respect to the
Rev~ew'Board (TRB)'met
anddocuments submitted and
Commission make a'"finding of
modification. This
Planning Dept. Memorandum N6~ 90-020
SUBJECT: Lawrence .Grove
Page 2
thoroughfares are limited in the vicinit]
P.U.D., a condition which
the Lawrence GroVe P.U.D., there
Bedford Boulevard connection to
gency vehicles. Currently,
west from existing fire ~
population of new
is the ~oard's
Polioe, Fike
all avenues be pUrsued
TJH: frb
Encs
xc: Rick Rossi
Central file
LawrGrov
LEGAL DESCRIPTf0N FOR .TARGET SHOPPING CENTER
betng ~ pa~ of ~ha No~th
~g, TOwn~htp 45 $o~th~
Flo~d& &nd being
particular1 e~c'r~ ~d ts' follo~$:
corne~ of Section IB, ~hence $.ou~h
along part o~ the Nor1;h ~tne of=the
~nS on the Hast Rtgh~-o¢-W&y
¢tel Records Book
ltne ~30~.4~ feat along
deed from N,R. ;iald to
Ea{t II )eok 3206
Llong
-N~rthwe$~
)9
CU
S~ le [0 .i:ha inca o
ta an
~ve~ue
ne
4~ 5.35
~o , of
id arc
Wast,
thence
West,
;t g~nd Avenue and
~DDENDL~ B-
MEMORANDUM
February 6, 1990
TO: Timothy Cannon, Acting City Planner
FROM: Michael~ E. Haag, Zoning & Site Development Administrator
RE: TARGETS- ~ SHOPPING CE~TERWI~H ANCHOR TENAI~r (Target)
Upon review of the above mentioned project, the followinc
comments mus% be addressed in order to conform with Boyn~on Beach
~lty Codes. ~
1. Ail p!a~s submitted for public record a~d prepared by a
desicn~ professional shall show or~glna=' ' 1 raised seal'
(legible) and signature cf.the Florida registered A=~i=~n
professional responsible for the drawings.
2. South Florida Water Management District oermi~ or ~_Ler of
exemption is required to establish the building m~t~
finish floor elevation.
Lake Worth Drainage District permit or letter of e~ion
is required. - '
Proposqd property use will require rezo~i~g of
Dedicate the outparcel, proposed to be & restaurant
identif~ number of seats. Include the.required
spaces ~or the ~estaurant outparcel in your ~ ~-~
~0~=~ r~?~ired
parkingspaces da~a.
6. Show the elevation drawings of each outmarcel b~i'~_=~'~ '~-~
identifying the exterior finish material and color.
7. Identify the color of the exterior finish material _~'~-~ on
the drawings submitted.
8. ~Identif~ the overall height of each building, show
identify elevation of roof line.
J
9. Show iha~dicapped accessibility route f~om public
right-of-~ay .to each building. Include spot elevation along
'the ~at~ or route. ' . ~
10. Show th~~ 1ocatioK of handicapped parking spacez for the..
14,2.00 ~quare foot retail arena and identify location of
.handicapped accessible route ~o sgore front
p~arking[stall. ~ . from handicapped
~ . A~DENDUM C
Memo to: Timothy
Re: Target
February 6, 1990
Page T~'o
il.
126
14. .
16.
~=nno~
Provide~a ~ypica! handfcapped and regular parking
detail drawzng,' showing the dimensions of both t~e of
stalls and the appropriate size, color and location cf ~taii
striping. For handicapped accessibility, for each build=~
show and identify the following: location and he~
handicapped signs, appropriate location~ width~ s!o~-~ ~nd
length Of handicapped ramp, elevation ofeach ~=~=3-c~Dped~ =~
parking~spaee and adjacent curb or sidewalk where
handicapped r~mp is located. Provide spot eievation along
the handicapped accessible path leading to the entrance doom
of each building from each handicapped par~ing s~c~ All
handicapped code requirements must con~ty wi~
Accessibility Requirement Manual, Janual-~z 1990 First
Edition, first printing.
Show and identify the location, width~ length ~nd.
of the level platform required at the enhance ~o
building.
Provide plan view and detail section ~--awing of dm~r pad
and enclosure. Identify overall size of d-~mpst~ e~lmsure,
including the clear opening_ minimum width dLm~u=~ =~ ~'~?~ ~= ten
feet (10'). Include type of building materials
structural components. -Also, identify' the ~loca~ color
and typ_e of the finish material proposed for tl~e ~-~ter
enclosure.
Indicate location, type, size and spac~g of
lands'cape material required around' three (3) si~es~D_~t
dumpsters.
Show the location and identify the type of la~_~ras~s:
landscape, material.
The vehicular use area, as seen from the south
line, requires a visual screen barrier (preferaD±a.?
material. Identify appropriate location, type
spacing of required screening material.
Provide a detail section drawing of buffer wall. iden~fy
types Of building material and 'structural components.
Identify location, type and color of finisk material
proposed for the buffer wall. Include on the section
drawing the location of the property line (minimum t~ ~oot
[2] ~from wall). Also, show and identify, on plan view
drawing, the location of buffer wall two feet (2') in from
the property line.
Memo to: Timothy Cannon
Re: Target
February 6, 1990
Page Three
18.
19.
Show location of all signs and/or sign~ge, including
directional signs and building and/or tenant adver~s~_nu~
signage.
Show unobstructed cross visibility area, and space through
the required site perimeter landscape ~trip at both sides of
all ingress and egress driveways. The.cross visibility area
and space is shown by placing and dimensioning~ on ~e site
landscape plan drawing, a ten foot (10') isoscelesrl~k~
angle triangle with the right angle on the property ~e at
the e~ge of the driveway and landscape strip and co~ap_ieting
the remainder of the triangle into unobstructed
stating that the vertical space within ~his area is clear of
!andscape materiat between thirty inches (30") ~
a._~ S~ feet
(6').
20.
21.
Show unobstructed cross visibility are~ and space
the reqllired site perimeter landscaping at the cor~ of the
property (where two adjacent public right-of-ways.
intersect). The cross visibility area and space Ls
placing and dimensioning, on the site landscap~
drawing, a thirty-five foot (35') isosceles trlancle 5t the
corner of the property'line where the intersect~o~ J_~
!ocated, andlcompletin? the remainder of, the tri~2~into
unobstructed landscapzng, stating that the vert~Wp_ace
within this area is clear of landscap~materiai~n
thirty inches (30") and six feet (6').
Providestate~ent that site lighting pole structu~ ~iil
meet the requirements of the Standard Building ~ods~ i9B8
edition, Chapter 12.
22. Both public rights-of-way are considered front cf ~ot~ Show,,
a minimum of twenty feet (20') from property line ~300 ~
square'foot outparce! building.
23'. Identify and show the appropriate percentage of reqdir~=d
native landscape material.
In order to facilitate the permitting process, the fol!ow~g
information should be included within your documents
the Building Department for required permits:
to
1. Al! signage must comply with Boynton Beach Sign Ordinande
and/or approved sign program.
Memo to: ~%mothy Cannon
Re: Ta~-~=~
Febru~- 5, 1990
P~ge F~
2. Se~_~e approval from Boynton Beach Utility Department and
ot~utiiitycompaniest including Florida Power & Ligh~
for Location and type of trees planted within utilit~
ea~-~-~ent areas bordering on public rights-of-way.
/
~ ~ t~ //
icha~l * i ~
~ ~ Haag
MEMORANDUM
JLm Golden
Senior City Pla~-ner
Vincent A. Finizio
Acting Assistant to the City Engineer
T.R.B. Cca~nents ~or "Target Shopping Ce~nter"
Currie Schneider Associates A!A, P.A.
Architects Pl~ner & Interior Designers
Jerry Turner s-nd Associates of Florida Inc.
Shallow-ay Inc., ~.gineer, Planners & Surveyors
February/ 5, 1990
1. Locate all inlet structures within grass%f, areas ~ ~orm~n~--~
Beach Parking-Lot Re~dlatiens, Article X, Section 5-142',g) ,~_=,_=~---- ~naaras".
~/nlets are prohibited in p~ved areas)
2. Revise Engineer's parking lot. striping detail to L~icate par]C.'~ =-~t=--,'-'~i double
striping in conformance with Section 5-142(g) ,,S~T2,~i~,,~.~ Stand~s~
Suggestion: it may be more econcm4cai for the ~n~ t~ app!~v D~O.T~
cfdick drying paint at parking stalls, instead of'tZ¢~ cost!v
3. C~ncrete l~destrian sidewalks within the public R.O.W. ~nd ~on~ ~
driveway are not shown on the Engineer's drawing. ~,na~ter ~ ~%--~2cs" and
Section 5-141 (a), (e) "To provide for park{ng lots ~zch are ~.
a n~%ner that the physically handican~ed .... ~ ~-~'
Indicate on plans =ne requzred szdewalk alonq ac~s= ~4~== ~Z-~_
Continue throught' the ingres¢, egress approach in ~o~nce ¢C~.2.n
5-142 (g) "Standards". Indicate on plan sidewalks ~,;_-tZ~n ~he eZ~L; %_~bic R;,Q.W.
4. Provide grassy swale details for the grassy swale ~-eas al-o~ N..W¢ ~ Avenue
end Cc~gre~s Avenue. - ~[ '~
5. Clarify on plans that the dark blue lines on Engine's dra%~ng S~L·
are in fact raised continuous cc~crete curbir~, Section 5-142(e)
- - -. crzve~y zn~ersect~g :~j¢. 22nd
Avenue has dark blue lines along the outside edge of L~c==fie l~es~ '~ A-A
Section detail on Sheet 5 of 8 does .not indicate curbing at this
Clarify all confliccs between plan views and construction details.
6. Indicate on plans that the fire t8-nes will contain the pavemsnt ma~ngs "Fire,.
Lane', at intervals of 50 feet '~th signage at intervals of 50 ft.
rm~-kings to be white end the face of the curb along building frontage shall be
_ painted in reflective yellow paint. Section 5-t42(m) "Fire Lanes,~ and Sechion
' " 5-!~2(g) "Fire Lane Standards" '
cont ' ~ ...... ·"
ADDENDUM D
To: Jim C~lde~n, Senior City P!a~ner Februa~ 5, 1990
Re: T.R.B. Con%Tents for "Target Shopping Center" Page ~2
7. Parking lot lighting standards withzn paved areas d~gnish ve~icie ~rhangmr~
diste=nce at wheel stops, thereby dL~ihishing required stall len~-hs. Section
5-t42 (g} "Stall standards".
8. Indicate on Paving& Drainage plans that wheel sto~ns will be uti~_ized at
parking stalls in conformance with Section 5-142 (e) "Curbs", '~o ~ ~han
two (2) access aisles may be traversed without J~nqerruphion ~i~n~_, ei~i be
accomplished by the p!ac~ment of wheel stops or ~he inst~laticg~ ~ ~ raised
continuous curb".
9. Prowlde suitable fmnding to cover the ~cost of installine ~+~-eet ~ ~
within the public R.O.W.'s.
Vincent A. FiD~lzio ~
w~/ck
cc: J. Scott Miller, City Manager
MEMORANDUM
Utilities ~90-086
TO:
FROM:
DATE:
SUBJECT:
Timothy Cannon
Acti~'g Planning Director
John A. Guidry
Direcnor of Utiiitie~
.e~,ruary 7~ 1990
TRB Review - Targen Shoppin~ Center Site Plan
Shew the iozatiDn of the
along Congress Avenue.
exisslllg i6" se~age force
Add gate valves on all hydrant lines ever 20~ ion~ ~j near
the hydrant located on~n_= north side of the
building.
Please replace the single detector check valve on ~r_e= fire
line with a double detector chedk valve located ~
finished grade.
All waser services with either end under pavem=n~ -' 'a~.~-e ~o be
of type K copper.
Provide reduced pressure backf~low preventors
side of all wa~er meters. We recommend dual
para~lel_ for those services where water ms
operation of the business.
Shorten wauer services no the Ollt parcels and ret-aim- -~ ~ .s-seres
to'a maximum of 60' in length by ~ --~- n~ ~ the
ze ~g.._n,~ w~:n~ mains' '
and p!acin~ meters in landscaped areas,
Show all utility easements. Large nrees are not ~ -'~-=
within easements, s,-~--~=u~ea
Add a nome that the city will own and maintain main
sewers only.
Provid'e calculations on the site's antmc!pated domess±c
water demand.
ADDENDUM E
Timothy Canno~
Page 2
February 7, 1990
Memorandum 590-086
I0, Irrigation is not to be supplied by city water. Use e!ther
the neighboring lake or a well as the irrlgation wa~er
source.
!1. Re-align the sewer line from manhole i to manhole 5 further
away from the building to allow for safe excavation and
repair.
12.
13.
Justify the used for Ewo meters to serve the Ta~.~=e =~
Relocate the %,a~.~.~.-'"=,- main out of tile loading zone ~or .the
Target sEore and away from pa~klng spaces where eve~-
possible.
Sanitary servlces shall have cleanouts at a maxlm~ ~cing
of 75' as required by the plumbing code. We recommend
access covers for c%eanouts in paved areas 5nd mbs ~s.e of
APC markers under all cleanouts.
Rectify the apparent conflict between sanitary
services and storm drainage for the out parcels om 't~e east
side of the
16. Add a note that all water mains must be cleane~ w~ a soft
sided swab before pressure testing. Also add an
blind tee pointing upward near the connection poin~ ~u allow~,
swab lnsern!on.
17. Please provide e construction schedule that in~ica~ when
potable water capacity will be needed, so as to al.law ~uis
departmenu to make a determination that reserve
will/will not be available for the project.
clw
bc:
Peter Mazzetla
MEMOEANDUM
TO: Mr. James Golden
FROM: Lt~ Dale Ha~mack
RE: Target
DATE: February 7, 1990
. =he
in regards to this project, I am recommending ~
1. Interior traffic oattern does not flow
Safety)
2. Parking lot designed with several parking spaces
out into through traffic lanes. (Public
North entrance has a blind spot created k~_~ the proposed
9,300 s.f. out parcel. Vehicles East boum~ to ~he rea~
of this out parcel would have to pull into the tb~ou~
lane to see oncoming traffic. (Public Safety)
4. Parking lot lighting to be photocell activated. (Or~ 5-138)
5. Any A, E, or E-1 lighting fixtures ~h
must be directed downward. (Ord. 5-138)
6. Stop signs and stop bars at the ends of parking isies~
(Ord. 5-142C)
'7o Comply with security constrUction code. (~d. 5-8G)
DH/cm
Dale Hammack
RECEivED
ADDENDUM
MEMORANDUM
TO:
TH~':
FROM:
DATE:
SUBJECT:
chairman and Me~ers
Planning and Zoning Board
Timothy P. Cannon ~C
Interim Planning Director
James J. Golden
Senior City Planner
FebrUary 7, 1990
Target Shopping Center - Site Plan -~ File No. 411
If it is the decision of the Planning a~ Zoning Board
recommend approval or the City CommisSion to approve this
application, compliance with the following condition~
necessary for consistency with the City's Code of Ordinance~ and
Comprehensive Plan:
1. Loading zones have not been provided to serve outparcels
Isection ll.J of Appendix A-Zoning)~
2. The design of the internal intersections at the southeast
and northwest corners of the Target Store' result in poor
traffic flow and turning movements and create potentially
hazardous situations. In addition, there is a visability
problem at the intersection at the northwest corner of the
Target S~ore that results from the design of the outparcel
~t this iocation. Vehicles turning left on the south side
of the outparcel cannot see around the corner of the
building. It is strongly recommended that the site be
redesigned in these two areas to eliminate these problems
(Objective 2.5 of the Comprehensive Plan).
3. Exterior mechanical equipment at the rear of the shopping
center should have proper screening and noise mitigation
incorporated in the ~esign of the center (Policy 1.17.7 of
the Comprehensive Plan). A note should be added to the
plans ~o reflect this requirement.
Due to the close proximity at the rear o~ the shopping]center
to the planned unit development, it is recommended that the
rear design of the center be similar to the front design of
the center (Policy 1.17.7 of the Comprehensive Plan).
The design of the stormwater drainage system does not
provide for the pre-treatment of the first one-half inch of
stormwat~r runoff in grassy swales or other landscaped areas
(Policy 1.11.7 and 4.2.9 of the Comprehensive Plan and the
drainage design requirements of Article X-Parking Lots).
Redesign of the on-site drainage system!will be required.
6. The color scheme of the shopping center has not been
indicated on the blueprint elevations (see item ~14 o~ site
plan application check list).
7. Typical floor plans and elevations have not been submitted
for ouuparcel buildings. Therefore, a site plan
modification will be required for the outparcel buildings
(section 19-18 of the Code of Ordinances;.
8. Platting is required pursuant to Objective 1.20 of the
comprehensive Plan, as the portion of the original Congress
Lakes planned unit developmen~ which lies south of N.W. 22nd
Avenue ~as been divided into more than 3 parcels since 1978.
Lighting poles should not encroach park%ng spaces and should
be relocated to landscaped islands (Section 5-t42(i)~2) of
Article X-Parking Lots).
ADDENDUM G
TO: Chairman and Members, Planning and Zoning Board
SUBJECT: Target Shopping Center - Site Plan - File No. 411
February 7, 1990, Page 2
10. Approval of the site plan is contingent 6~on approval of the
rezonlng tQ C-3.
11. Review of the developer's traffic impact anatysls is based
on a maximum 140,000 square foot shopping center. The
square footage proposed on the site plan-is 142,500 square
feet. The square footage Of the shopping center must be
reduced ~y 2.500 square feet to comply with the square
footage ~nticipated in the traffic report submitted by
Kimley-Horn.
12. The adjacent medians on Congress Avenue and N.W. 22nd Avenue
should be' landscaped in accordance with Policy 2~9.4 of thee
Comprehensive Plan.
13. Turn lane improvements recommended by Kimley-Horn for the
project driveway onto N.W. 22nd Avenue have not been
incorporated into the set of plans. These improvements must
be shown on all of the site drawings at ~he time of siam-off.
14. The additional right turn-in/right turn-out driveway onto
N.W. 22nd Avenue should be removed from the plans, as this
driveway has not been included in the Kimley-Horn traffi~
analysis.
15. Restaurant floor area should be indicated on the site plan,
including the maximum seating proposed, to determine the
specific number of parking spaces required.
16. The orientation of the shopping center to the intersection
is significantly different than that which exists at t~e
southeast {Motorola) and northwest (Mahogany Bay) corners
and that proposed a5 the northeast corner (Shoppes of
Boynton). The visual impact of ~he ~roposed design with
respec~ to the other corners at this intersection should be
taken into consideration.
(With respect to 17.-19. below, see attach~id excerpts from the
Future Land Use Element Support Documents in Exhibit "A").
17. Since this is a commercial project, no residents would be
added as a re~u!t of ~he construction of the project.
Therefore, parks and recreations facilities would not be
needed and the levels of service for these facilities would
not be affected.
18. Sanitary sewer capacity is available for the project,
consistent with the adopted level of service, as evidenced
by the analysis un pages 9-10 of the Future Land Use Elemen%
Support Documents.
19. Drainage and solid waste facilities are available fo~ the
project, consistent with the adopted level of service, as
evidenced by the analysis on pages 11-13 of the Future Land
Use Element Support Documents.
TO: Chairman and Members, Planning and Zoning Board
SUBJECT: Target Shopping Center - Site Plan t File No. 411
February 7, 1990, Page 3
20. Roadway Improvements
The following roadway improvements are required:
o Site Access on N.W. 22nd Avenue
Northbound through/left-turn lane
Sepa.rate northbound right-turn lane:~
N.W. 22nd Avenue and Congress Avenue
Separate northbound right-turn lane
Seeond northbound left-turn lane by restriping
Separate southbound right-turn lane
Separate eastbound right-turn lane
Second westbound through lane
H~q~oluxo Road and Congress Avenue
Second westbound left-turn lane
Six-laning of Congress Avenue from .Hypoluxo Road to Bo~nton
Beach Boulevard.
Six-laning of Boynton Beach Boulevard from Old Boynton Road
to 1-95.
Based on Palm Beach Count~ ~tandards, assurance of roadway
improvement would require the project to be. schedule~ for
construction in the County Transportation Improvement Prqgram,
the State Five. Year Work Program or part of 'a Municipal Capital
Improvement Program. The project may also be considered assured
if it Ks part of a developer agreement and has been s~cured
through bonding with the City or County.
In order to meet City requirements, the Applicant should provide
an analys~s of impacts to N.W. 22nd Avenue, support the
historical t~affic growth rates and provide the City with
assurance of improvements. If the applicant provides information
acceptable to the City, the project may be approved but may not
commence until such time as construction of required rdadway
improvements has been assured, meaning that a building permit
cannot be issued for the proposed shopping center until the
roadway improvements listed above have either been included in
the State, County, or City transportation improvements program,
or have been bonded or are under contract.
Pursuant to policy 2.6.2 of the Comprehensive Plan, the cit~ can
recommend to Palm Beach County that the de%eloper's road %mpact
fee payment be credited toward any of the roadway improvements
listed above, subject 5o approval by Palm Beach County.
The traffic analys~s submitted by the developer was reviewed by
Walter H. Keller, Jr., Inc., the City's traffic consultant, to
determine consistency with the 1989 City of Boynton Beach Compre-
hensive Plan (Ordinance 89-39) and section 9.c.4.h(5) of Appendix
A-Zoning. A copy of Mr. Keller's report can be found in Exhibit
"B" of this memorandum.
21. Potable Water
Since the proposed project would consist of con~aerciat uses and
would not'bring additional residents into the City, construction
of the projec= would not affect the adopted Level of service
TO: chairman and Members, Planning and Zoning Board
SUBJECT: Target Shopping Center - Site Plan - File No. 411
February 7, 1990, Page 4
However, connection co the City's water system may be prohibited
by DER, through the County Health Department7 under the regula-
tions administered by those agencies. Furthermore, sinee it is
very likely that the level of service for water is not currently
being met, it is possible that vesting of this project with
respect to this LOS may be a potential problem, if constmuction
does not begin immediately. The City Commission will need to
adopt a concurrency management ordinance by 3u~e 1, 1990, This
ordinance will need to include specific rules for determining
whether a project is vested.
22.
Ail of the statements which have been made in items 17.
through 21. concerning availability of public facilities
will be subject to the vesting rules Which will bet
incorporated into the concurrency management regulations
that the City must adopt by June 1, 19907
In addition to the requirements necessary pursuant re_ ~-~.~ Code
and Comprehensive Plan, the following recommendations should also
be considered:
23.
Additional buffering should be required between the shopping
center and the planned unit development through the use of
natural ~features such as ~akes, dense landscaping,
architectural treatment to rear building elevations,
screening of exterior mechanical equipment, and mitigation
of noise generated by exterior mechanical equipment.
24.
The applicant should be required to construct the addi-
tional median/turn lane improvements outlined in items no. 5
and 7 of the correspondence from the Palm Beach County
Tr~ffiu Division that appears in Exhibit "C" of this
memorandum.
JJG:frb
Enos
Targetsp
RECREATION & PA~Ri,'~ MEMOR~_NDUM ~90-068
TO:
FROM:
SUBJECT:
DATE:
Tim Cannon, Interim Planning Director
Kevin J. Haltahan, Forester/Horticulturist
Target Shopping Center Site Plan
February 6, 1990
Ah_ following comments pertain to the landscaping at ~ ~-~=
site:
I. 30% of the shrubs/bushes musu be native species.
The hedge along Congress Avenue & NW 2zn~ Avenue ~dsu ~ 36~'
in height at the time of planting.
Trees which will be planted under overhead power l~
should be reviewed for future tree trim~ingr~_-e ~e~=.--
It is recommended that a landscaped is!~ud be
~ ~ eak
wherever ,10-12 adjacent parking stalls a~e located
up the expanse of parking.
It is recommended that additional landscape materi~s ~e
installed at the rear of the target building to ~s~
screen the future residential properties.
The applicant must apply to the Palm Beach Cou~.ty
Engineering Department to landscape and-irrigate the-m~ans
of Congress Avenue and NW 22nd Avenue.
7. Ail road R.O'.W. areas must receive irrigation.
Kevin J. K~tlahan ~-~
Forester/Ho-tzcultur~st
KJH:ad
ADDENDUM H
LEGAL DESCRIPTION:
· A par~ of .C~:l~'.x~:5S LA~S~I~.AT-..M:]o .i LP.U.Do), as rlcocded ~n Plat
LEGAL DESCRIPTION FOR MARIE OALLENDER'S RESTAURANT
' AT CATALINA CENTRE
MEMORANDUM
January 2, 1990
FROM:
RE:
Timothy P. Cannon, Interim Planning Direct0r
Development ComplianceAdmznistrator
~NISTRATIVE SITE.PLANMODIFICATION FOR E CALLENDER'S RESTAURANT - DELETING
TWO'PARKING SPACES
~pon review of the above-mentioned project, 'the following
ommehts mist be~add~essed in order to conform with Bcynton Beach
City Codes:
All d
res
and/~r documents submitted for p~blic record and
' a design professional, shall. ~how original raised
of the Florida design professional
Provide statement on site plan that the joint allocation of
req~i~e~ .pa~king spaces, w%th a minimum buffer of ten percent
(10%),.is maintained as requi~ed by Section ll-H(13) of
Appendix A, Zoning, for the mixed uses of the Catalin~ Centre
DevelOpment,
In order to facilitate the permitting process, the following
information should be included within your documents submitted
to the Building Department for required permits:
Provide revised landscape drawings for approval to the
Building Department, including a completed landscape
revlslon form provided at the Building Department.
MEH:eaf
xc:Don Jaeger ~
CALLNDRS.SDD
ADDENDU~rJ
MEMORANDUM
TO: 'Chairman and Members
Planning and Zoning Board
THRU: Timothy P. Cannon
Interim Planning Director
FROM: James J. Golden
Senior City Planner
DATE: February 8, 1990
SUBJECT: Marie Callender's Restaurant at Catalina
Shopping Centre - Reques~ for Modificationto
Shared Parking Allocation
Section 11-H(13) of Appendix A, Zoning, contains the following
provision for shared parking~
Parking spaces required in this ordinance for one use' or
structure may be allocated in part or in whole for the required
parking spaces of another use or structure
· evidence isi provided showing that parking demand for the
different uses or structures would occur on different days of the
week or at different hours. Quantitative evidence shall include
estimates for peak hour/peak season parking demand based on
statistical data furnished by. the Urban Land. Institute or an
equivalent traffic engineering or land planning and design
organization~ Quantitative evidence may also include, where
appropriate, field studies and traffic counts prepared by a
traffic consultant experienced in the preparation of p~rking
studies. In addition, a minimum buffer of ten (10) percent shall
be provided .to ensure that a sufficient number of parking ~paces
are available at the peak hour/peak season of parking demand
Calculation Of said buffer shall be based on the total number of
parking spaces determined to be required at the peak hour/peak
season Of parking ~demand. Evidence for ilJoint allocatipn of
required parking space shall be submitted to~the Technical Review
Board, and .approval of Joint allocation '.of required ~arking
spaces shall be made by the City Commission, after review a~d
recommendatibns by the Planning and Zoning Board·
With respect to the above, Tom McMurrian, agent for Walboyn
Incorporated, is requesting approvalof a modified shared parking
allocation which is necessary to allow for the issuance of a
Certificate of Occupancy for the recently completed restaurant·
The approved site plan and shared parking allocation for the
Marie callender's ~estaurant required that'59 parking spaces be
provided on the restaurant outparcel in order to meet the
required 10% buffer for shared parking. However, only 57 parking
spaces were constructed on the outparcel~ Tw6 parking spaces
were deleted durzng construction, ~as a ~esult of an exzsting
Florida Power and Light Company power pole and a proposed fire
sprinkler meter. These impr~vements were not shown to be
encroaching parking spaces on the approved site pla9 and
eng~neering~drawings. Pursuant to the approved parking study,
deletion of the two parking spaces reduced:the buffer bel0w 10%
to 9.6%.
To address the reduction Of the buffer below 10%, the appkicant
ha~ Kimley-Horn revisit the shared parking Study. Kimley Horn is
recommending that the weekday parking accumulation for the retail
shopping centre be reduced from 4 Spaces per 1,000 aquare feet of
gross leasable floor area to 3.8 spaces per 1,000 s~uare feet of
gross leasable floor area. AlthoUgh KimleyrHorn had based the
To: Chairman and Members, Planning and Zoning Board
SUBJECT: Marie Callender's Restaurant at Catalina Centre
February 8, 1990, Page 2
repail parking accumulation figures on 4 spaces per thousand,
this ratio is more appropriately applied to Saturday parking
accumulation for shopping centers less than 400,000 square feet,
whereas 3.8 spaces per thousand is the standard for weekday
parking accumulation. Therefore, the original Kimley-Horn
parking study was more conservative than the ~rban Land Institute
standards.
On Tuesday, February 6, 1990 the Technical Review Board me~ and
recommended approval of the shared parking allocation, based on
the revised documentation submitted. This recommendation ~as
made based on findings that the proposed changes fall within the
g~idelines established by the Urban Land I~stitute in the 1983
publication entitled Shared Parking.
JAMES J. GOLDEN
JJGzcp
MarieC
LEGAL DESCRIPTION FOR LAWRENCE GROVE PUD
ADDENDUYi L
MEMORANDUM
February 6, 1990
TO:
FROM:
RE:
Timo%hy Cannon, Acting City Planner
Michael E. Haag, Zoning & Site Development Administrator
QUANTUM OFFICE PARK - NEW SITE PLAN
Upon review of the above mentioned project, the following
comments must be addressed in order to conform with Boynton Beach
City Codes:
South Florida Water Management District permit or letter of
exemption is required to establish the buildings'~ minimum
finish floor elevation.
2. Lake Worth Drainage District permit or letter of exemption
3. Identify the type of material and color proposed for the
north and west wall exterior entrance decor.
4. Show~ntr~jkc~on east wall elevation drawing.
5. Show each building with the required number of handicapped
parking spaces. Provide a typical handicapped and regular
parking stall detail drawing showing the dimensions of both
types of stalls and the appropriate size, color and location
of stall striping. For handicapped accessibility to both
buildings show and identify the following: loca%ion and
height of all handicapped signs (not in sidewal~),
appropriate location, width, slope and length of handicapped
ramp, elevation of each handicapped parking spade and
adjacen~ curb or sidewalk where handicapped ramp is to be
located. Provide spot elevations along the handicapped
accessibility path leading to the entrance of t%e building
from each handicapped parking space. All handiOapped code
requirements must comply with the Accessibility Requirements
Manual, January 1990, first edition, first prin~ing.
6. Show and identify the location, width, length amd elevation
of the level platfof~a required a5 the entrance ~o each
building.
Provide plan vzew and detail section drawing of ~umpster pad
and enclosure. Identify overall size of dumpster enclosure,
including the clear opening minimum width dimension of ten
feet (10'). Include type of building material a~d
structural components. Also, identify the location, type
and color of finish material for the dumpster enclosure.
~emo tq: ~an~on
Re: ~uantu~ OT~ice Park
February 6~ 1990
Page Two
8. Indicate location, type, size and spacing of accent shrub
landscape material required around three (3) sides of all
dumpsters.
Show the location and identify the type of lawn grass
landscape material.
10.
Continue the vehicular use area screening material around
the perimeter of the project to form a solid continuous
barrier.
11.
All landscaped areas shall be provided with an automatic
irrigation water supply system.
12. Identify the type, size and spacing of the required
vehicular use area visual screening landscape material.
13. Identify and show the appropriate percentage of required
native landscape material.
14.,~·~~'t~-rty
not older than six (6)
15.
Show unobstructed cross visibility area and space through
the required site perimeter landscape strip at both sides of
all ingress and egress driveways. The cross visibility area
and space is shown by placing and dimensioning on the site
landscape plan drawing a uen foot (10') isosceles right
angle triangle with the right angle on the property line at
the edge of the driveway and landscape strip and completing
the remainder of the triangle into unobstructed landscaping
and stating that the vertical space within this area is clear
~f~ztscapm. m~terial between thirty inches (30) and slx
fe~t ,(6'). ~ ~
16.
Show unobstructed cross visibility area and space through
the require site perimeter landscaping at the corner of the
property (where nwo adjacent public right-of-ways
inte~ct)i,',~i~e cross visibility area and space is shown by
placing and dimensioning on the site landscape plan drawing
a thirtyifive foot (35') isosceles triangle au the corner of
the properuy line where the intersection is located and
complete the remainder of the triangle into unobstructed
landscaping and stating that the vertical space within this
area is clear of landscape material beuween thirty inches
(30") and six feet (6'
Memo to~.Tg~5~nnon
Re: Quantum Office Park
February 6, 1990
Page Three
17.
Show location of all signs and/or signage, including
directional signs and building and/or tenant advertisement
signage.
18.
Provide statement that site lighting pole structures will
meet the requirements of the Standard Building Code, 1988
edition, Chapter 12.
19.
Provide spot elevation along required handicapped
accessibility path leading to the entrance~of the building
from the sidewalk starting at the public right-of-way,
inCludih~ the gradient in rise in inches per foot of run
where elevation changes.
In order to facilitate the permitting precess, the following
informat~u2~l~be included within your documents submitted to
the Building Department for required permits:
1. A'll~ signag~' mus% comply with the Boynton Beach Sign
~.._~" ~~ ~__~.~g~ pro~ram.~
2. Secure approval from Boynton Beach Utility Department and
other utility companies, including Florida Power & Light,
for location and type of trees planted within utility
easement areas bordering on public right-of-ways.
meh:eaf
cc: Don Jaeger
QUNTMOFC.SDD
MEMORANDUM
February 5, 1990
Jim Golden
Senior City Planner
Vincent A. Finizio
Acting Assistant to the City Engineer
T.R.B. Cc~ments for "Quant~ Office Park"
Architect Jeff Falkanger & Associates Inc.
Camero & Associates Inc.
t'. Locate all inlet structures in grassy swale areas. Boynuon ~each Parking Lot
Regulations, Article X, Section 5-142 (g) "Standards" including Appendix C,
Article X, Section 5A, 5B "Drainage and Stormwater Treatment".
2.~ ~53t~ca~~~ a~h~a on Paving & Drain~e plan docs not comply
with minm~m City standards. Revise curbing detail to indicate a total curb
height of 13½", 8'[ wilde at base and 6" wide at the top. See Engineering
~~~A-8~Q30~ ~-kicte X, Section 5-142 (g) "~tandards".
3, orms to the specifmcatmons contained
withi~n~Hwy. Administration's Manual on Uniform Traffic Control
Devices (M.U.T.C.D.) and State of Florida Standards. Article X, Section 5-142
(g) "Traffic Control Standards".
Revise Site Plan sheet A-1 of 4 to indicate the color 'Blue" for handicap
stalls, and include handicap logo which shall be applied to .pay ~e~e~nt surface.
Standard stalls shall be of a "white" color, Article X, Section 5-142 (k)
Handicap.
5. Provide a headwall construction detail for the two headwalls that are shown on
the P~D~,~g?~?lan. Article X, Section 5-142(g) 'Parking Lot Construction".
6. Include note that drainage retention area abutting north property line shall be
grassed in conformance with stormwater pre-treatment requirements stated in
Article X, Section 5-142 (g) "Drainage Standards"and Appendix "C", Article X,
Section 5A, 5B 'Drainage and Storn~ater Treatment.
7. Provide percolation test dat~' (geot~chnical), test locations and drainage calcu-
lations for the' design of the drainage/stormwater treatment plan. Drainage
calculations are required in all instances in accordance with Article X, Section
5-142 (f) "Drainage" and Section 5-142(g) "Drainage Standards '.
VAF/ck
cc: J.
Scott Miller,
Vincent A. Finizio
ADDENDUM N
City Manager
MEMOR~DUM
TO:
THRU:
FROM:
DATE:
SUBJECT:
Chairman and Members
Planning and Zoning Board
Timothy P. Cannon T~
Interim Planning Director
Tambri J. Heyden
Assistant Ciuy Planner
February 7, 1990
Quantum office Park (lots 20
Site Plan - File No. 408
& 21)
Please be advised of the following Planning Department comments
with respect to the above-referenced request for site plan
approval:
1. I~dicate on the elevation sheet the materials and color
of the roof-mounted equipment screen, canop~ doors add
railing. Application checklisu, page 5, item 14.
2. No signs are shown on the plans submitted. A future
site plan modification will be needed prior to
permitting signs on these two lots. Chapter 21-14(M)2.
3. Show on the site plan the existing 15 foot utility
easement along the wesu property line of lot 21 and the
6 foot drainage easement along the east property line
of lot 20. Appendix A-S~ction ll(A)8.
4. Show stop sign locations'on the site plan and pavement
markings on the paving and drainage plan. Chapter 19
~^-~rti~le~tI~.~Sec~ 19-17(e). '
5. Submit a copy of the cross access agreement prior to
"final sign-off" for review by the City's legal
~ ': ~- ~ide~o~ the cross parking areas,
~~s shown on the site plan.
--~ ~ - - ~to submit a unity of title.
6. If development of lot 21 ~s not construcued as shown on
the site plan, with respect to cross access, then the
layou~ and design of t~e driveway and parking area
along the property line between the uwo lots must be
modified to meet the Landscape Code - Article 7.5-35(e)
and the Parking Lot'Regulations - Article X, Sec.
5-142(1).
7. If the type of ownership should change to condominium,
--~~gineer. should be consulted to determine
~'"'~'h-e~'~-platting is necessary.
TAMBRI J. ~YDEN ~
~ON & PARK MEMORANDUM 990-069
TO:
FROM:
SUBJECT:
DATE:
Tim Cannon, Interim Planning Director
Kevin J. Hallahan, Forester/Horticulturist
Quantum office Park - Site Plan
February 6, 1990
The following comments pertain to landscaping at the above site:
1. The size of the saw palmetto species should be noted on the
landscape legend.
30%_o_f_t~e~ l~d~c~pe plants (not trees) must be native
The applicant should be aware that the rear of the property
~lan' al and upland hardwood plantings) must
~-g--Iot from sites directly across
- - : ~ t/~e ~p~l±~ant to make
-. : _-- : ~.~1 plantzngs are not requzred
for visual screening.
4. If there are any locations along the lake edge abutting the
two sites where soil erosion has occurred, the areas must be
sodded. This will be determined with a site review by the
applicant and myself.
5. The phase II site must be seeded and receive irrigation to
prevent blowing sand, until the site is developed.
6. ~"hedge" material should be noted on the
landscape legend.
7. Potable water cannot be used for landscaped areas.
Kevin J~ Hallahan
Forester/Horticulturist
KJH:ad
ADDENDL~ P