Everett Jenner DEVELOPF~- ~iT ORDER OF THE CITY COMMIS'~ -'~N OF THE
=~,.,,TY OF BOYNTON BEACH, FLORID,-`=
PROJECT NAME: Woolbright Medical Building
APPLICANT'S AGENT: Everett Jenner
APPLICANT'S ADDRESS: 9776 S. Military Trail, Boynton Beach Florida
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: November 8, 2000
TYPE OF RELIEF SOUGHT: Request for new site plan approval to construct a medical office building.
LOCATION OF PROPERTY: Woolbdght Road and 22nd Street
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings
and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Flodda on the date of hearing stated above. The City Commission having considered the relief
sought by the applicant and heard testimony from the applicant, members of city administrative staff and
the public finds as follows:
Application for the relief sought was made by the Applicant in a manner consistent with the
requirements of the City's Land Development Regulations.
The Applicant
X HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set forth
on Exhibit "C" with notation "Included".
The Applicant's application for relief is hereby
~ GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
All further development on the property shall be made in accordance with the terms and
conditions of this order.
7. Other
Project name: Woolbright Medical Building (Freeman)
File number: NWSP 00-008
Page: 2
DEPARTMENTS INCLUDE REJECT
approved site plan/conditional use documents. Permit application forms are
available in the Building Division of the Development Department. A
permit submittal checklist is available in the Building Division. The list
identifies the basic documents that the Plans Analyst checks for when an
applicant submits for permit review.
PARKS AND RECREATION
Comments: NONE X
FORESTER/ENVIRONMENTALIST
Comments: NONE X
PLANNING AND ZONING
Comments:
4. At time of permit review, correct sign dimension data in the table to be X
consistent with the provided sign detail.
5. At the Planning and Development Board meeting, provide mounted color X
elevation drawing of all elevations.
ADDITION PLANNING AND DEVELOPMENT BOARD CONDITIONS
6. NONE X
ADDITIONAL CITY COMMISSION COMMENTS
No -
MR/blw
J:\SHRDATA\PLANNING\SHARED\WF~PROJECTS\WOOLBRIGHT MEDICAL BUILDING (FREEMAN)\CC 11-8-00 3RD REVIEW CONDITIONS OF APPROVAL.DOC
EXHIBIT "C"
Conditions of Approval
Project name: Woolbright Medical Building (Freeman)
File number: NWSP 00-008
Reference: 3rd review as NeW Site Plan. File # NWSP-00-008 with a September 26, 2000 Planning and Zoning
Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments: NONE X
UTILITIES
Comments: NONE X
FIRE
Comments: NONE X
POLICE
Comments: NONE X
ENGINEERING DIVISION
Comments: NONE X
BUILDING DIVISION [
Comments:
1. At time of permit review, provide detailed drawings and documentation on X
the plans that will verify the accessible route that is shown from the
accessible parking spaces to the accessible building entrance is in
compliance with the regulations of the Florida Accessibility Code for
Building Construction. The documentation shall include, but not be limited
to, identifying the type of material proposed for the route, type of surface
finish, width, cross slope, slope and length of the entire accessible route
including, where applicable, landings, ramps and handrails. Correct the
inconsistency With respect to the floor elevatiOns that are specified on the
plans for the lobby area. The engineering plan indicates that the lobby floor
elevation is 14.50' and the site plan and floor plan drawings indicate the
elevation is 15.00'.
2. Compliance with the Building Codes will be evaluated at time of permit X
review. The permit fee, water and sewer facility fees, Fire and Life Safety
fees, County fees and State fees will be determined at time of permit review.
3. Permits are required to construct the improvements that are shown on the X