Loading...
Michael J. JarochDEVELOPM' ':'IT ORDER OF THE CITY COMMI,c' ~ON OF THE ~', I'Y OF BOYNTON BEACH, FLORIbA PROJECT NAME: QUANTUM LOT 50B - GALE INDUSTRIES INC. APPLICANT'S AGENT: Michael J. Jaroch c/o Bentley Architects & Engineers, Inc. APPLICANT'S ADDRESS: 2339 Benville Road, Daytona Beach, Florida 332119 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: November 8, 2000 TYPf OF RELIEF SOUGHT: New Site Plan LOC~\TION OF PROPERTY: Lot 50-B Quantum Corporation Park DRAiNING(S): SEE EXHIBIT "B" ATTACHED HERETO. X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appe.~ring on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR I THIS MATTER came on to be heard before the City Commission of the City of Boynton Beacl~, Florida on the date of hearing stated above. The City CommissiOn having considered the relief ~sought by the applicant and heard testimony from the applicant, members of city administrative staff @nd the public finds as follows: 1. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. The Applicant X HAS HAS NOT established by substantial competent evidence a basis for the relief requested. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". The Applicant's application for relief is hereby ~ GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other ~' City Clerk J:\SHRDATA\Planning~SHARED\WP',PROJECTS\Quanturn. Gale Industries Inc\CC 11-8-00 D O.doc EXHIBIT "C" Conditions of Approval Project name: Gale Industries File number: NWSP 00-0012 Reference: 3rd review plans identified as New Site Plan. File # NWSP-00-0012 with an August 29~h 200~ Planning and Zoning Department date stamp markin DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Cgmments: NONE X UTILITIES Cqmments: NONE , X FIRE I C4mments: 1. ~k fire hydrant flow test is required prior to site plan approval (LDR 6- X 16). poLIcE Cdmments: NONE X ENGINEERING DIVISION Co~nnents: NONE X BUILDING DIVISION I I Comments: 2. Permits are required to construct the improvements that are shown on X ~he approved site plan documents. Permit application forms are ~tvailable in the Building Division of the Development Department. A l~ermit submittal checklist is available in the Building Division. The list identifies the basic documents that the Permit Application Technician ~hecks for when an applicant submits for permit review. 3. 4kt time of permit review, indicate within the footprint of the mezzanine X t~te proposed use of that area. 4. ~t time of permit review, indicate within the footprint of the 1~t floor of X Quantum Lot 50B (Gale Industries) NWSP 00-012 Page 2 of 4 DEPARTMENTS iNCLUDE REJECT Ithe building the proposed finish floor elevation. The elevation shall be !consistent with the floor elevation that is specified on the site plan. 5. iThe site plan and survey indicate that the applicant is combining two X llots. It is recommended that the applicant process a unity of title to I . ~omb~ne both lots as one. At time ofperrnit review, provide a ~,ompleted and executed City unity of title form. The form shall ~lescfibe both lots combined as one. A copy of the recorded deed with ~egal descriptions of each property that is being unified is required to be Submitted to process the form. The property owner that is identified on each deed shall match 6. g,t the time that the tie-in survey is required, identify on the survey the X Ictual distance that each side of the building is set back fi:om the djacent property lines. The location of the building depicted on the tie- !n survey shall match the location specified on the approved site plan. 7. ~t time of permit review, specify (in tabular form) on the site plan X md/or floor plan the proposed use of the facility, type of construction md occupancy classification of the building. The building area, )ccupancy classification and type of construction shall comply with the ~pecificafions identified in the 1997 edition of the Standard Building .2ode, including the City of Boynton Beach amendments to the Standard ']uilding Code. Indicate on the architectural plans that the facility is ,tesigned consistent with the regulations that are specified in the 1997 edition of the Standard Building Code, including the City of Boynton Beach amendments to the Standard Building Code. Working drawings 6fthe building shall comply with the codes that are specified in Chapter ~.0 of the Land Development Regulations. 8. ['he permit fee, water and sewer facility fees, Fire and Life Safety fees, X 2ounty fees and State fees will be determined and accessed at time of ~ermit review. pARKs AND RECREATION Co~ents: NONE X I I FoREsTER/ENVIRONMENTALIST I Comments: Quantum Lot 50B (Gale Industries) NWSP 00-012 Page 3 of 4 DEPARTMENTS INCLUDE REJECT Tree Relocation and Preservation Notes: Sheet L-1 X 9. The applicant must delineate on the landscape sheet L-1 the existing desirable trees and quantities that will be relocated on the site. The receiving area(s) within the site for the relocated trees should also be Shown on the landscape plan. This would include existing trees in the park Ridge Boulevard road right-of-way and median to allow ingress / pgress to the site. 10. The tree survey sheet indicates approximately 140 desirable trees on the X Site. Preservation of the desirable trees will be coordinated with the applicant, prior to issuance of the clearing and grubbing permit. The trees that cannot be successfully preserved or relocated must be replaced and shown on the landscape plan. Additional Comments: . ~ X 11. The applicant must submit a fauna survey and preserve or relocate by State permit any gopher tortoise found on the site. This must be ~ompleted prior to issuance of the clearing and grubbing permit. PLANNING AND ZONING C4mments: 12. in the tabular data summary, indicate square footage of warehouse and X 9ffice use, indicate use of the mezzanine. 13. indicate setbacks on the site plan, and provide a setback table in the X !abular data summary (include the required setbacks). 14. ~ndicate dimensions of dumpster enclosure on the site plan and the X !andscape plan. 15. City water cannot be used for irrigation. Indicate alternative water X Source. 16. The following comment relates to Chapter 9, Community Design Plan: X ; Recommendation: review architectural design to create a look more , compatible with the Oriana Granite and Gevas buildings to the east of the project site. 17. No dimension for the driveway width at the right-of-way line was X Quantum Lot 50B (Gale Industries) NWSP 00-012 Page 4 of 4 DEPARTMENTS INCLUDE REJECT Provided; administrative waiver will be required if the width exceeds the maximum 32 feet specified by the Code. 18. A traffic statement for the proposed project has been submitted, but has X been found deficient with respect to uses and square footage used to estimate trip generation. Provide the revised statement. Prior to final approval, the revised statement will be sent to Palm Beach County's Traffic Division to confirm compliance with County traffic performance ~tandards and for the purpose of monitoring total traffic approved within the Quantum Park Development of Regional Impact (DRI). 19. Project may require an Environment Review Permit pursuant to Chapter X 2, Section 11.3. Provide information regarding the type of material tinsulation) to be stored on site. 20. Provide confirmation of review and approval of design by Quantum X Architectural Review Committee. ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 21. NONE X ADDITIONAL CITY COMMISSION CONDITIONS J:\SHRDA~TA\PLANNING\SHAREDtWP~PROJECTS\QUANTUM - GALE INDUSTRIES INC\CC 11-8-00 CONDITIONS OF APPROVALDOC