Loading...
Richard AhermsDEVELOPV~NT ORDER OF THE CITY COMMI~ ~,ION OF THE ~,~,I'Y OF BOYNTON BEACH, FLORIDA PROJECT NAME: PGD-Second Facility APPLICANT'S AGENT: Richard Aherns, Aherns Companies APPLICANT'S ADDRESS: 151 Commerce Road, Boynton Beach Florida, 33426 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: August 1, 2000 TYPE OF RELIEF SOUGHT: New Site Plan LOCATION OF PROPERTY: Lot 6 High Ridge Commerce Park DP,~WING(S): SEE EXHIBIT "B" ATTACHED HERETO. X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appE,aring on the Consent Agenda on the date above. The City Commission hereby adopts the findi~lgs and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Bea(~h, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. The Applicant X HAS HAS NOT established by substantial competent evidence a basis for the relief requested. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". The Applicant's application for relief is hereby X GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other DATED: ,~/,~//,~,' ~~,~J~~~.~. City Clerk ':\SHRDATA~°Ianning',SHARED\WI=\PROJECTS\PGD~ Inc. - Second Facility~CC 8-1-00 Develop Order. doc EXHIBIT "C" Conditions of Approval Project name: PGD Inc. - Second Facility File number: NWSP 00-009 Reference: 2nd review New Site Plan. File # NWSP-00-009 with a July 7, 2000 Planning and Zoning Department date stam~ marking. PUBLIC WORKS ! Cgmments: NONE X 1 UTILITIES 1 COmments: NONE X 1 FIRE I I COmments: 1. A fire hydrant flow test is required prior to issuance of a building permit. (LDR 6- X 16) poLIcE C°mments: 2. I South elevation shows no lighting and no lighting on rear of building structure east X elevation. Suggest the use of the same 400 watt, metal halide fixtures being installed on the front west elevation. EN GINEERING DIVISION C ~mments: NONE X BUILDING DIVISION c,l>mments: 3. Add text to the site data indicating that the accessible route is designed in X compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida Accessibility Code for Building Construction. 4. Using the FIRM map, identify within the site data the base flood elevation of the X flood zone that the building is located within. If there is no base flood elevation, indicate that on the plans. 5. At the time of permit submittal, provide a completed and executed City unity of title X form. The form shall describe all lots, parcel or tracts combined as one lot. A copy of the deed with legal descriptions of each property that is being unified is required to process the form. The property owner that is identified on each deed shall match. 6. At time of permit review, provide detailed drawings and documentatiOn on the plans X Project name: PGD Inc. - Second Facility File number: NWSP 00-009 Page:i 2 DEPARTMENTS IrNCLUDE t REJECT that will verify the accessible route that is shown from the accessible parking spaces to the accessible building entrances are in compliance with the regulations of the Florida Accessibility Code for Building Construction. The documentation shall include, but not be limited to, identifying the type of material proposed for the route, type of surface finish, width, cross slope, slope and length of the entire accessible route including, where applicable, landings, ramps and handrails. 7. Compliance with the Building Codes will be evaluated at time of permit review. X The permit fee, water and sewer facility fees, Fire and Life Safety fees, County and State fees will be determined at time of permit review. 8. Permits are required to construct the improvements that are shown on the approved X site plan/conditional use documents. Permit application forms are available in the Building Division of the Development Department. A permit submittal checklist is available in the Building Division. The list identifies the basic documents that the Plans Analyst checks for when an applicant submits for permit review. PARKS AND RECREATION C~mments: NONE , X FOX, ESTER/ENVIRONMENTALIST C°mments: 9. The applicant must address the possible existence of any protected animals or plants X on the site. This will be coordinated prior to issuance of the clearing and grubbing permit. PL~ iNNING AND ZONING C{ ~mments: 10. Provide written confm'nation fi:om Palm BeachCounty's Traffic Division that the X project meets the Traffic Performance Standards. ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 11. NONE X ADDITIONAL CITY COMMISSION CONDITIONS MWl [/blw J:\SHR[ ~ATA~PLANNING\SHARED\WP\PROJECTS\PGD, INC. - SECOND FACILITY~CC 8-1-00 CONDITIONS OF APPROVAL. DOC