Del Swilley DEVELOPI~NT ORDER OF THE CITY COMMI?'~ION OF THE
._. rY OF BOYNTON BEACH, FLORi,.,A
PROJECT NAME: Commerce Road Realty
APPLICANT'S AG[::NT: Del Swilley
APPLICANT'S ADDRESS: 2559 Webb Avenue, Unit 1, Delray Beach Florida 33444
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: June 6, 2000
TYPE OF RELIEF SOUGHT: New Site Plan
LOCATION OF PROPERTY: High Ridge Commerce Park
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
The Applicant
X HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
The Applicant's application for relief is hereby
X GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
All further development on the property shall be made in accordance with the terms
and conditions of this order.
7. Other
DATED: ~ 7 ~~ ~~~ ~~
C~ty Clerk
~CH~AIN~SHRDATA~Planning~SHARED~PROJECTS~Comme~ Ro~ ReaE~C~me~ Road Deve~p.O~er.~
EXHIBIT "C"
Conditions of Approval
Project name: Commerce Road Realty
File number: NWSP 00-002
Reference: 2nd review plans consists of 12 sheets identified as New Site Plan. File # NWSP 00-002 with a
May 9, 2000 Planning and Zoning Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments:
X
1. Relocate dumpster. Current location does not allow sanitation track to exit
properly.
UTILITIES
Comments:
X
2. All utilities easements shall be shown On the rectified landscaping drawings
so that we may determine which trees may interfere with utilities. In
general, palm trees will be the only tree species allowed within utility
easements. Canopy trees may be planted outside of the easement so that
roots and branches will not impact those utilities within the easement in the
foreseeable future. LDR Sec. 7.5-18.1 gives public utilities the authority to
remove any trees that interfere with utility services, either in utility
easements or public rights-of-way.
X
3. Dept. of Health permits will be required for the water system serving this
project. (Sec.26-12).
X
4. Fire flow calculations will be required demonstrating the City Code
requirement of 1500 g.p.m, as stated in LDR Chap. 6, Art.lV, Sec. 16, or the
requirement imposed by insurance underwriters, whichever is greater. (see
Sec. 26-16(a)). Please submit these calculations with your Health
Department permit submittal.
X
5. Sec. 26-34(E) of the City Code requires that a capacity reservation fee be
paid for this project either upon my request for signature on the Health Dept.
application forms or within 30 days of site plan approval, whichever occurs
first. This fee will be $790.02 based upon a 1 inch meter.
X
6. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City before the first permanent meter is set. Note that setting of a permanent
water meter is a prerequisite to obtaining the certificate of occupancy.
X
7. LDR Chap. 6, Article IV, Sec 16 requires that all points on each building
will be within 200 feet of an existing or proposed fire hydrant. Based upon
the hydrant shown, the plan does not appear to meet this criterion. Please
demonstrate that the plan meets this condition, by showing all hydrants.
Page 2
Commerce Road Realty
NWSP 00-002
DEPARTMENTS INCLUDE REJECT
X
8. The water main to the fire hydrant appears to conflict with dumpster
enclosure. Please relocate the enclosure. Note that a 16-inch water main
exists in an easement on the south side of the property.
X
9. Please show the existing FPL Utility easement on all plan sheets
FIRE
X
Comments: NONE
POLICE
Comments:
X
11. Illumination concerns for both the rear elevation and north wall. No lighting
fixtures are shown on the plans. Provide lighting fixtures in these areas.
Indicate location, type and intensity of the lighting.
ENGINEERING DIVISION
X
Comments: NONE
BUILDING DIVISION
Comments:
X
12. At time of permit review, indicate on Site plan drawing the length of the
handicap landing off each ramp.
X
13. At time of permit review, identify the finish floor elevation that the design
professional established on the floor plan drawing.
X
14. At time of permit review, show entire area of second floor storage.
X
15. At time of permit review, submit Unity of Title, including all abandonments.
X
16. Compliance with the Building Codes will be evaluated at time of permit
review. The permit fee, water and sewer facility fees, Fire and Life Safety
fees, County fees and State fees will be determined at time of permit review.
X
17. Permits are required to construct the improvements that are shown on the
approved site plan/conditional use documents. Permit application forms are
available in the Building Division of the Development Department. A
permit submittal checklist is available on the Building Division. The list
identifies the basic documents that the Permit Application Technician
checks for when an applicant submits for permit review.
Page 3
Commerce Road Realty
NWSP 00-002
DEPARTMENTS INCLUDE I REJECT
PARKS AND RECREATION
X
Comments: NONE
FORESTER/ENVIRONMENTALIST
X
Comments: NONE
PLANNING AND ZONING
Comments:
X
18. On the site plan, correct surrounding zoning & provide land uses for the
adjacent properties in order to determine correct greenbelt and vegetative
screening application.
X
19. On the site plan, label and dimension all easements and required landscape
buffers. Ch. 4, Sec. 7, Par. B.
X
20. Project is proposed/designed with uses minimal parking spaces. Future
intenSification of project by proposing addition of industrial uses will
require prior confirmation of parking capacity.
X
2 I. On the landscape plan, locate & label fire hydrants, and any utilities that
may conflict with tree locations.
X
22. On the landscape plan, locate & label the 25 -foot wide greenbelt easement
as well as the 10' utility easement along the south property line. Relocate
the five (5) canopy trees out of the utility easement, and leave the hedge
along the property line to match with established green belt planting
scheme. The master plan requirement is to provide one (1) mahogany tree
per 40 linear foot of frontage and a continuous eugenia hedge (maintained at
6 feet) along the outside edge of the buffer.
X
23. In the landscape plan plant list, provide for 50% native shrub materials, not
including the 288 liriope in the calculations.
X
24. Amend the traffic study to include 1,936 square feet of the second story
storage space. Prior to final approval the study must be re-submitted to the
Palm Beach County Traffic Division for confirmation of standards
compliance.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
X
25. NONE
Page 4
Commerce Road Realty
NWSP 00-002
DEPARTMENTS INCLUDE REJECT
ADDITIONAL CITY COMMISSION CONDITIONS
26. To u~ ., ............. /9~Ar~- ~
I:\SHRDATAXPlanning~SHARED\WP~PROJECTS\Commerce Road Realty\lST REVIEW COMMENTS.doe