Robert Fetrow, Gate EngineeringDEVELOPIV'~'~iT ORDER OF THE CITY COMMI?"~ION OF THE
~, i'Y OF BOYNTON BEACH, FLORh.,A
PROJECT NAME: Poly Plastic Packaging, Inc.
APPLICANT'S AGENT: Robert Fetrow, Gator Engineering
APPLICANT'S ADDRESS: 510 East Industrial Avenue
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: March 21, 2000
TYPE OF RELIEF SOUGHT: New Site Plan
LOCATION OF PROPERTY: 510 East Industrial Avenue in Boynton ~dustrial Park
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
x THIS MATTER came before the City Commission of ti ~ City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
The Applicant
X HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
The Applicant's application for relief is hereby
X GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
All further development on the property shall be made in accordance with the terms
and conditions of this order.
7. Other
47 City Clerk
JASHRDATA\Planning\SHARED\VVP\PROJECTS~POLY PLASTIC PACKAGING\poly plastic D.O.doc
EXHIBIT "C"
Conditions of Approval
Project name: POLY PLASTIC PACKAGING
File number: MSPM 00-002
Reference: 2nd Review, Major site plan modification. File # MSPM 00-002 with a February 22, 2000
Planning and Zoning Department date stamp marking.
DEPARTMENTS
PUBLIC WORKS
Comments: NONE
UTILITIES
Comments:
1.
Utilities Department will not require surety for installation of the water and
sewer utilities, on condition that the systems be fully completed, and given
to the City before the first permanent meter is set. Note that setting of a
permanent water meter is a prerequisite to obtaining the certificate of
occupancy.
2. The waste stream from all manufacturing processes must meet the City's
FIRE
pretreatment requirements. A sampling point must be provided to allow
monitoring of such a waste stream. (Sec. 26-143, 26-147)
Comments:
3. Prior to signing offofa rectified plan, a fire flow test is required. LDR 6-16
Entry gates must have approval for type and operation from Fire Marshal
prior to installation. BBCC 9-15
POLICE
Comments: NONE
ENGINEERING DIVISION
Show a five-foot sidewalk along E. Industrial Avenue within the limits of
the site with a six-inch thick section through the driveways. [LDR Chapter
23, Article II.P.] or obtain sidewalk waiver.
6. Drainage calculations showing length provided of 307 ft. is not correct.
BUILDING DIVISION
7. As the design professional-of record- for the project state, within the site
data, that the proposed elevation is the above the highest 100-year base
INCLUDE
X
X
X
X
X
X
REJECT
Page 2
Poly Plastic Packaging
File No.: MSPM 00-002
DEPARTMENTS [ INCLUDE REJECT
flood elevation applicable to the building site, as determined by the South
Florida Water Management District's surface water management
construction development regulations. [Section 3107.1.2, Chapter 31 of the
Boynton Beach amendments to the 1997 edition of the Standard Building
Code]
8. At the time of permit review provide detailed drawings and documentation X
on the plans that will verify the accessible route that is shown from the
accessible parking spaces to the accessible building entrance is in
compliance with the regulations of the Florida Accessibility Code for
Building Construction. The documentation shall include, but not be limited
to, identifying the type of material proposed for the route, type of surface
finish, width, cross slope, slope and length of the entire accessible route
including, where applicable, landings, ramps, and handrails.
9. At the time of permit review specify, in tabular form, on the site plan and/or X
floor plan the proposed use of the facility, type of construction and
occupancy classification of all portions of the building. The building area,
occupancy and type of construction shall comply with the specifications
identified in the 1997 edition of the Standard Building Code including the
City of Boynton Beach amendments to the Standard Building Code.
Working drawings of the building shall comply with the codes specified in
Chapter 20 of the Land Development Regulations.
10. Permit fees, water, and sewer facility fees, Fire and Life Safety fees, County X
fees and State fees will be determined at the time of permit review.
11. Permits are required to construct the improvements that are shown on the X
approved site plan. Permit application forms are available in the Building
Division of the Development Department. A permit submittal checklist is
available in the Building Division. A list identifies the basic documents that
the Plans Analyst checks for when an applicant submits for permit review.
PARKS AND RECREATION
Comments: NONE
FORESTER/ENVIRONMENTALIST
Comments: NONE
PLANNING AND ZONING
Comments:
12. Clarify what part of the building is existing and what part is proposed on the X
site plan, including square footage calculation. There is an inconsistency in
square footage figures for the proposed addition between the figure provided
on the revised site plan (11,338 sq. ft.), the figure on which the traffic study
is based (11,652 sq. ft.), and the numbers for the existing square footage of
manufacturing, warehousing and office provided in Environmental Review
Permit Application (and those of 1993 Environmental Review). Revise
Page 3
Poly Plastic Packaging
File No.: MSPM 00-002
DEPARTMENTS H INCLUDE I REJECT
traffic study.
13. Include maximum height dimension of building on the site plan drawing X
(Chapter 4, Section 7, Site Plan submission requirements).
14. Indicate the proposed colors for the building addition on the elevation X
drawings. The color and materials of the addition should match the existing
building (Chapters 4 and 9; Chapter 4, Section 7, Site Plan submission
requirement).
15. Indicate the number of required trees which are native species. At least 50% X
of required trees must be native species (Comprehensive Plan Policy 4.4.5.)
16. Existing hedge on adjacent property to the north and south may be used to X
meet the landscape requirement provided the existing hedge meets all
applicable standards of the landscape code (Chapter 7.5, Article II,
Landscape Code).
17. Indicate and label location of fire hydrants on the landscape plan. (Chapter X
7.5, Article II, Landscape Code.
18. Provide a 5 foot concrete sidewalk to connect with existing sidewalk along X
Industrial Avenue (Chapter 6, Article III, Sec. II) or obtain sidewalk
waivers.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
NONE X
ADDITIONAL CITY COMMISSION COMMENTS
J:\ SHRDATA~PLANNING\SHARED\WPXPRO JECT S~POLY PLASTIC PACKAGING\I ST REVIEW COMMENTS.DOC