Loading...
Robert Fetrow, Gate EngineeringDEVELOPIV'~'~iT ORDER OF THE CITY COMMI?"~ION OF THE ~, i'Y OF BOYNTON BEACH, FLORh.,A PROJECT NAME: Poly Plastic Packaging, Inc. APPLICANT'S AGENT: Robert Fetrow, Gator Engineering APPLICANT'S ADDRESS: 510 East Industrial Avenue DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: March 21, 2000 TYPE OF RELIEF SOUGHT: New Site Plan LOCATION OF PROPERTY: 510 East Industrial Avenue in Boynton ~dustrial Park DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. x THIS MATTER came before the City Commission of ti ~ City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. The Applicant X HAS HAS NOT established by substantial competent evidence a basis for the relief requested. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". The Applicant's application for relief is hereby X GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other 47 City Clerk JASHRDATA\Planning\SHARED\VVP\PROJECTS~POLY PLASTIC PACKAGING\poly plastic D.O.doc EXHIBIT "C" Conditions of Approval Project name: POLY PLASTIC PACKAGING File number: MSPM 00-002 Reference: 2nd Review, Major site plan modification. File # MSPM 00-002 with a February 22, 2000 Planning and Zoning Department date stamp marking. DEPARTMENTS PUBLIC WORKS Comments: NONE UTILITIES Comments: 1. Utilities Department will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy. 2. The waste stream from all manufacturing processes must meet the City's FIRE pretreatment requirements. A sampling point must be provided to allow monitoring of such a waste stream. (Sec. 26-143, 26-147) Comments: 3. Prior to signing offofa rectified plan, a fire flow test is required. LDR 6-16 Entry gates must have approval for type and operation from Fire Marshal prior to installation. BBCC 9-15 POLICE Comments: NONE ENGINEERING DIVISION Show a five-foot sidewalk along E. Industrial Avenue within the limits of the site with a six-inch thick section through the driveways. [LDR Chapter 23, Article II.P.] or obtain sidewalk waiver. 6. Drainage calculations showing length provided of 307 ft. is not correct. BUILDING DIVISION 7. As the design professional-of record- for the project state, within the site data, that the proposed elevation is the above the highest 100-year base INCLUDE X X X X X X REJECT Page 2 Poly Plastic Packaging File No.: MSPM 00-002 DEPARTMENTS [ INCLUDE REJECT flood elevation applicable to the building site, as determined by the South Florida Water Management District's surface water management construction development regulations. [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the 1997 edition of the Standard Building Code] 8. At the time of permit review provide detailed drawings and documentation X on the plans that will verify the accessible route that is shown from the accessible parking spaces to the accessible building entrance is in compliance with the regulations of the Florida Accessibility Code for Building Construction. The documentation shall include, but not be limited to, identifying the type of material proposed for the route, type of surface finish, width, cross slope, slope and length of the entire accessible route including, where applicable, landings, ramps, and handrails. 9. At the time of permit review specify, in tabular form, on the site plan and/or X floor plan the proposed use of the facility, type of construction and occupancy classification of all portions of the building. The building area, occupancy and type of construction shall comply with the specifications identified in the 1997 edition of the Standard Building Code including the City of Boynton Beach amendments to the Standard Building Code. Working drawings of the building shall comply with the codes specified in Chapter 20 of the Land Development Regulations. 10. Permit fees, water, and sewer facility fees, Fire and Life Safety fees, County X fees and State fees will be determined at the time of permit review. 11. Permits are required to construct the improvements that are shown on the X approved site plan. Permit application forms are available in the Building Division of the Development Department. A permit submittal checklist is available in the Building Division. A list identifies the basic documents that the Plans Analyst checks for when an applicant submits for permit review. PARKS AND RECREATION Comments: NONE FORESTER/ENVIRONMENTALIST Comments: NONE PLANNING AND ZONING Comments: 12. Clarify what part of the building is existing and what part is proposed on the X site plan, including square footage calculation. There is an inconsistency in square footage figures for the proposed addition between the figure provided on the revised site plan (11,338 sq. ft.), the figure on which the traffic study is based (11,652 sq. ft.), and the numbers for the existing square footage of manufacturing, warehousing and office provided in Environmental Review Permit Application (and those of 1993 Environmental Review). Revise Page 3 Poly Plastic Packaging File No.: MSPM 00-002 DEPARTMENTS H INCLUDE I REJECT traffic study. 13. Include maximum height dimension of building on the site plan drawing X (Chapter 4, Section 7, Site Plan submission requirements). 14. Indicate the proposed colors for the building addition on the elevation X drawings. The color and materials of the addition should match the existing building (Chapters 4 and 9; Chapter 4, Section 7, Site Plan submission requirement). 15. Indicate the number of required trees which are native species. At least 50% X of required trees must be native species (Comprehensive Plan Policy 4.4.5.) 16. Existing hedge on adjacent property to the north and south may be used to X meet the landscape requirement provided the existing hedge meets all applicable standards of the landscape code (Chapter 7.5, Article II, Landscape Code). 17. Indicate and label location of fire hydrants on the landscape plan. (Chapter X 7.5, Article II, Landscape Code. 18. Provide a 5 foot concrete sidewalk to connect with existing sidewalk along X Industrial Avenue (Chapter 6, Article III, Sec. II) or obtain sidewalk waivers. ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS NONE X ADDITIONAL CITY COMMISSION COMMENTS J:\ SHRDATA~PLANNING\SHARED\WPXPRO JECT S~POLY PLASTIC PACKAGING\I ST REVIEW COMMENTS.DOC