Loading...
Agenda 10-26-21C I TY O F B O Y N TO N B E A C H P L AN N I N G AN D D E VE L OP ME N T B OARD ME E T I N G AG E N D A D AT E: Tuesday, October 26, 2021 T I M E : 6:30 P M P L AC E :City Hall Commission Chambers, 100 E . Ocean Avenue 1.Pledge of Allegiance 2.Roll Call 3.Agenda Approval 4.Approval of Minutes 4.A.Approve board minutes from the 09/28/21 Planning & Development Board meeting. 5.Communications and Announcements: Report from Staff 6.Old Business 7.New Business 7.A.C LM Apartments Abandonment (AB AN 21-004) - Request for the abandonment of a 119-foot long segment of the 57-foot wide S E 21st Avenue right-of-way, extending from the F E C Railroad right-of-way to S E 3rd Street. Applicant: Lawrence Mastropieri, C LM Capital L L C. 7.B.C LM Apartments (L U AR 21-001) - Approve request for Future Land Use Map amendment from Medium Density Residential (ME D R) to High Density Residential (HD R), and Rezoning from R-3, Multi-Family 11 du/ac to I P UD, I nfill Planned Unit Development, property located at 2107 S E 3rd St. Applicant: Lawrence Mastropieri, C L M Capital LLC. 7.C.CLM Apartme nts (M SP M 21-002) - Approve Major Site Plan Modification to allow the addition of a four (4) unit apartment building, associated parking and related site improvements, on a 0.86-acre parcel, located at the northwest corner of SE 20th Court and S E 3rd Street, and east of the F EC Railroad, in the IPUD (Infill Planned Unit Development) zoning district. Applicant: Lawrence Mastropieri, C LM Capital LL C. 8.Other 9.Comments by members 10.Adjournment T he Board may only conduct public business after a quorum has been established. If no quorum is established within fifteen minutes of the noticed start time of the meeting, the City Clerk or her designee will so note the failure to establish a quorum and the meeting shall be concluded. B oard members may not participate further even when purportedly acting in an informal capacity. Notice Any pe rson who de cides to appeal any decision of the planning and de v e lopme nt board Page 1 of 61 with respect to any matter conside re d at this me eting will ne ed a re cord of the procee dings and for such purpose may ne e d to ensure that a v erbatim re cord of the procee ding is made, which record includes the testimony, and ev idence upon which the appe al is to be base d. (f. S. 286.0105) The city shall furnish appropriate aux iliary aids and se rv ice s where nece ssary to afford an indiv idual with a disability an equal opportunity to participate in and enjoy the benefits of a se rv ice , program, or activ ity conducted by the city. Ple ase contact the City Clerk's office, (561) 742-6060, at le ast forty -eight (48) hours prior to the program or activity in order for the city to re asonably accommodate y our re quest. Page 2 of 61 4.4.A. Approval of Minutes 10/26/2021 CIT Y OF BOY NTON BEACH AG ENDA I TEM REQUEST F ORM P LAN N IN G AN D D E V E L O P ME N T ME E TIN G D AT E: 10/26/2021 R E Q U E S TE D AC T IO N B Y P L AN N IN G AN D D E V E LO P ME N T B O AR D: Approve board minutes from the 09/28/21 Planning & Development Board meeting. E X P LAN ATIO N O F R E Q U E S T: H O W W IL L T H IS AFF E C T C IT Y P R O G R AMS O R S E RV IC E S? FIS C AL IMPAC T: ALT E R N ATIV E S: S TR ATE G IC P LAN: S TR ATE G IC P LAN AP P LIC AT IO N: C L IMAT E AC T IO N AP P LIC AT IO N: Is this a grant? Grant Amount: AT TAC H ME N TS: Type Description Minutes 09-28-21 Minutes Page 3 of 61 MINUTES a PLANNING AND DEVELOPMENT BOARD 100 E. OCEAN AVENUE, BOYNTON BEACH, FLORIDA TUESDAY, SEPTEMBER 28, 2021, 6:30 P.M. PRESENT: STAFF: Trevor Rosecrans, Chair Mike Rumpf, Planning & Zoning Administrator Butch Buoni, Vice Chair Sean Swartz, City Attorney Tim Litsch John Kuntzman, Building Official Darren Allen Lisa Tayar, Prototype, Inc. Kevin Fischer Lyman Phillips, Alternate Jay Sobel, Alternate ABSENT: Thomas Ramiccio Chris Simon The meeting was called to order at 6:47 p.m. 1. Pledge of Allegiance 2. Roll Call Roll was called and it was determined a quorum was present. 3. Agenda Approval Motion made by Vice Chair Buoni, seconded by Mr. Sobel, to approve the agenda. In a voice vote, the agenda was unanimously approved (7-0). 4. Approval of Minutes 4.A. Approve board minutes from the 05/25/2021 Planning & Development Board meeting. Motion made by Mr. Sobel, seconded by Vice Chair Buoni,to approve the May 25,2021 meeting minutes. 5.Communications and Announcements: Report from Staff Mr. Rumpf thanked the Board for their service. Mr. Rumpf reported that staff is nearing completion of an amendment to City sign regulations. Target areas have been reviewed and problems with compliance issues are being addressed. The regulations are being reviewed mainly for business promotion and development purposes. Money has come in from Page 4 of 61 Meeting Minutes Planning and Development Board Page 2 September 28, 2021 Federal and State offices to assist businesses impacted by Covid, but not enough for all who needed it. The City is looking at additional signage provisions which could be beneficial to local businesses. There have been recent instances where residential communities have requested expansion or replacement of non-conforming signage. Amendments are proposed in that area as well. A notice and draft of the amendments were placed on the City's website to collect public comments; however, there are glitches in the document which will need further cleaning up, although Mr. Rumpf expects the document to be ready for distribution the following day. The City will also be reaching out to sign contractors and the business community. A final draft will be provided to the Board next month prior to submission to the Commission. Ongoing draft revisions with significant changes will be provided to the Board as available. 6.Old Business - none 7. New Business 7.A. Flood Mitigation & CRS Rating (CDRV 21-002) -Approve proposed amendments to the Land Development Regulations, Chapter 1. General Administration,Article IL Definitions, and Chapter 4. Site Development Standards, Article X. Flood Prevention Standards necessary to maintain compliance with FEMA requirements and to maximize the City's CRS score. Applicant: City initiated. Mr. Rumpf advised that FEMA sets down rules for cities to follow with regard to flood plain management, which are reflected in Land Development Regulations and the Florida Building Code. FEMA has made recent changes to the flood maps, which will affect home construction and flood insurance premiums. Premiums are impacted by a city's rating as a result of audits conducted every three years by FEMA representatives. Audits are another opportunity for the City to drop or increase its rating. A rating increase could result in as much as a five percent reduction in insurance premiums. Provisions have been removed for mobile homes and mobile home parks within high flood hazard areas and definitions had been changed per FEMA's request. Mr. John Kuntzman has worked closely with the State's Flood Plain Office on the changes, having obtained preliminary support and approval. A handout flood map was provided as a visual aid for the Board members. Mr. Rumpf introduced John Kuntzman, City Building Official and Official Flood Plain Manager, who was in attendance to answer any questions of the Board. Mr. Fischer inquired regarding the prohibition of the placement of manufactured homes and was advised by Mr. Rumpf that restrictions would be on new manufactured homes, although he pointed out that there are no mobile homes or mobile home parks within the subject areas. Page 5 of 61 Meeting Minutes Planning and Development Board Page 3 September 28, 2021 Chair Rosecrans then opened the meeting to public comment. Mr. Ernest Mignoli, 710 SE 7 Street, commented on saltwater intrusion and its affect on buildings, suggesting that the City is remiss in taking responsibility for building inspections. Motion made by Mr. Sobel, seconded by Vice Chair Buoni, to approve item 7.A. In a voice vote, the motion passed unanimously (7-0). 8.Other—none 9.Comments by Members Mr. Sobel commended City administration who had reached out to him after he had expressed his dissatisfaction and concerns regarding lack of handicap accessibility at City Hall. It was explained that mistakes had been made which are in the process of being rectified. 10. Adjournment Upon Motion duly made and seconded, the meeting at was adjourned at 7:18 p.m. Minutes prepared by L. Tayar,Prototype,Inc.] Page 6 of 61 7.7.A. New Business 10/26/2021 CIT Y OF BOY NTON BEACH AG ENDA I TEM REQUEST F ORM P LAN N IN G AN D D E V E L O P ME N T ME E TIN G D AT E: 10/26/2021 R E Q U E S TE D AC T IO N B Y P L AN N IN G AN D D E V E LO P ME N T B O AR D: C L M Apartments Abandonment (AB AN 21-004) - Request for the abandonment of a 119-foot long segment of the 57-foot wide S E 21st Avenue right-of-way, extending from the FE C Railroad right-of-way to S E 3rd Street. Applicant: Lawrence Mastropieri, C L M Capital LLC. E X P LAN ATIO N O F R E Q U E S T: T he applicant, Lawrence Mastropieri with C LM Capital LL C is requesting the abandonment (ABAN 21-004) of a portion of the unimproved 57-foot wide right-of-way of SE 21st Avenue, approximately 119 feet measured from the Florida East Coast Railroad right-of-way to S E 3rd Street (see Exhibit “A” – Location Map). T he request for abandonment has been filed concurrent with a Major Site Plan Modification Application (MSP M 21-002), and a Future Land Use Map Amendment and Rezoning Application (L U AR 21-001). T he subject request has been filed along with applications for Future Land Use Map Amendment and Rezoning, and a Major Site Plan Modification to allow the addition of a four- (4) unit apartment building to an existing multifamily residential development, associated parking and related site improvements. Staff recommends that the subject request be approved. H O W W IL L T H IS AFF E C T C IT Y P R O G R AMS O R S E RV IC E S? N/A FIS C AL IMPAC T: N/A ALT E R N ATIV E S: None recommended S TR ATE G IC P LAN: S TR ATE G IC P LAN AP P LIC AT IO N: N/A C L IMAT E AC T IO N AP P LIC AT IO N: N/A Is this a grant? Page 7 of 61 Grant Amount: AT TAC H ME N TS: Type Description Staff Report Staff Report Location Map Exhibit A - ROW Abandonment Location Map Drawings Exhibit B - Survey Agreement Exhibit C - Abutting Property Owners Consent to Abandon ROW- Conditions of Approval Exhibit D - Conditions of Approval Page 8 of 61 DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO. PZ 21-012 TO: Chair and Members Planning & Development Board FROM: Luis Bencosme Planner II THRU: Mike Rumpf Planning & Zoning Administrator DATE: October 18, 2021 SUBJECT: Approve request for Abandonment (ABAN 21-004) of the 119-foot long segment of the 57-foot wide SE 21st Avenue right-of-way, between the FEC Railroad Right-of-Way to SE 3rd Street. Applicant: Lawrence Mastropieri, CLM Capital LLC. BACKGROUND The applicant, Lawrence Mastropieri with CLM Capital LLC is requesting to abandon (ABAN 21-004) a portion of the unimproved 57-foot wide right-of-way of SE 21st Avenue, approximately 119 feet measured from the Florida East Coast Railroad right-of-way to SE 3rd Street (see Exhibit “A” – Location Map). The request for abandonment is concurrent with a Major Site Plan Modification Application (MSPM 21-002) and a Land Use Map Amendment and Rezoning Application (LUAR 21- 001) for a proposed Infill Planned Unit Development, CLM Apartments, to construct a new four (4) unit apartment building to an existing multi-family development, associated parking and related site improvements. This abandonment is for the following street segment: PARCEL 'B' TOGETHER WITH THE NORTH 1/2 OF LOT 14, SUNNY OAKS ADDITION, ACCORDING TO THE PLAT OR MAP THEREOF AS RECORDED IN PLAT BOOK 22, PAGE 10 OF THE PUBLIC RECORDS OF PALM BEACH COUNTY, FLORIDA, LESS AND EXCEPT THE FOLLOWING PORTION OF THE NORTH 1/2 OF LOT 14 HEREIN DESCRIBES AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF THE AFORESAID LOT 14, THENCE SOUTHERLY ALONG THE EAST LINE OF LOT 14, A DISTANCE OF 57.21 FEET, TO SOUTHEAST CORNER OF LOT 14; THENCE, FORMING AN ANGLE FROM NORTH TO WEST OF 89°22'15" ALONG THE SOUTH LINE OF LOT 14 FOR A DISTANCE OF 24.43 FEET TO A POINT ON THE SOUTH LINE OF LOT 14, SAID POINT BEING THE NORTHEAST CORNER OF LOT 31 CREST VIEW, AS RECORDED IN PLAT BOOK 23, PAGE 154, OF THE PUBLIC RECORDS OF PALM BEACH COUNTY, FLORIDA; THENCE, FORMING AN ANGLE FROM THE WEST TO NORTH EAST OF 112°35'27" FOR A DISTANCE OF 61.95 FEET TO THE POINT OF BEGINING. CONTAINING 6300 SQ FEET, 0.14 ACRES, MORE OR LESS. The location map attached as Exhibit "A” shows the location of the right-of-way to be abandoned. The attached Exhibit “B” is a Boundary Survey of the portion of the right-of-way to be abandoned and associated legal description. The segment of the right-of-way to be abandonment has an existing driveway that provides access to the adjacent property to the south (2201 SE 3rd Street, Lot 31). The applicant submitted a letter of consent signed by the adjacent property owner, as well as a written agreement regarding the Page 9 of 61 Page 2 Memorandum No. PZ 21-012 ABAN 21-004 relocation of the existing driveway. According to the agreement, the applicant is fully responsible for the construction of an alternate access driveway connecting to SE 3rd Street, as well as the costs associated with the project” (See Exhibit C). A condition of approval has been added to the Development Order to ensure the required access driveway is constructed prior to recordation of this Abandonment application with Palm Beach County (see Exhibit D). The following is a description of the zoning districts and land uses of the properties that surround the subject right-of-way abandonment request: Adjacent Uses: North: Developed multi-family residential parcel (CLM Apartments) classified Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3). South: Developed single-family properties classified Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3). East: Right-of-way of SE 3rd Street; further east developed single-family properties classified Medium Density Res idential (MEDR) and zoned Multi-Family Residential (R3). West: FEC Railroad followed by developed multifamily properties classified Medium Density Residential (MEDR) and zoned Duplex (R2). ANALYSIS Owners of properties within 400 feet of the subject site were mailed a notice of this request and signs posted for the Planning & Development Board and City Commission hearing dates. The applicant has certified that they posted signage and mailed notices in accordance with Ordinance No. 04-007. A summary of the responses follows: CITY DEPARTMENTS/DIVISIONS Engineering No objection. Public Works/Utilities No objection, with the following Conditions of Approval: 1. Provide a 25-foot wide utility easement along the south property – as depicted on the associated Major Site Plan Modification Application (MSPM 21-002) – prior to permitting (see Exhibit D). 2. Walls, fences and other structures are prohibited within the easement (see Exhibit D). Planning and Zoning No objection, with recommended conditions (see Exhibit D) PUBLIC UTILITY COMPANIES Florida Power and Light No response received as of the date of this report. Should any utility companies that have not responded to the request for abandonment as of the date of this report require relocation of utilities, the property owner is responsible for the Page 10 of 61 Page 3 Memorandum No. PZ 21-012 ABAN 21-004 relocation and associated costs. AT&T No objection. Florida Public Utilities No objection. Comcast No objection. RECOMMENDATION Staff has determined that the requested abandonment would not adversely impact traffic or other City functions and would not adversely impact other adjacent property owners. Based on the above - analysis, staff has determined that the subject right-of-way segment no longer serves a public purpose other than retention of necessary utility easements and therefore recommends APPROVAL of the requests, subject to the attached conditions. Any conditions requested by the Planning and Development Board or required by the Commission will be placed in E xhibit “D” - Conditions of Approval. S:\Planning\SHARED\WP\PROJECTS\CLM Apartments\ABAN 21-004\Abandonment of ROW \CLM Apartments_Staff Report ABAN 21-004.doc Page 11 of 61 F E C R a i l r o a d SE 20th Ct SE 3rdStSE 21st Ave S E 21 s t Ave SE 3rd StExhibit A: R.O.W. AbandonmentExhibit A: R.O.W. Abandonment CLM Apartments ABAN 21-004CLM Apartments ABAN 21-004 ¹0 25 50 75 10012.5 Feet Proposed Abandonment Page 12 of 61 Page 13 of 61 Page 14 of 61 EXHIBIT D Conditions of Approval Project Name: CLM Apartments File number: ABAN 21-004 Reference: 2nd review plans identified as a Right-of-Way Abandonment with a September 9, 2021 Planning and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT ENGINEERING / PUBLIC WORKS / FORESTRY / UTILITIES Comments: 1. A 25-foot wide utility easement along the south property line is required prior to permitting. X PLANNING AND ZONING Comments: 2. Right-of-Way Abandonment approval is contingent upon approval of the associated Land Use Map Amendment and Rezoning (LUAR 21-001) and Major Site Plan Modification (MSPM 21-002) applications. X 3. The segment of S.E. 21st Avenue (a.k.a. Sunny Oaks Addition, Lot 14) to be abandoned is serving a pu blic purpose as it provides access to the adjacent property (Crestview Boynton Beach, Lot 31). Be advised that Planning and Zoning approval of this Right-of-Way Abandonment request is contingent upon the construction of an alternate access driveway connecting to SE 3rd Street prior to recording the Abandonment documents with Palm Beach County. Please coordinate the submittal of a Right-of-W ay Permit for the required driveway with the City’s Engineering Division. X UTILITY PROVIDERS Comments: 4. Should any utility companies that have not responded to the request for abandonment as of the date of this report require relocation of utilities, the property owner is responsible for the relocation and associated costs. X PLANNING & DEVELOPMENT BOARD CON DITIONS Comments: To be determined. CITY COMMISSION CONDITIONS Comments: To be Determined Page 15 of 61 CLM Apartments (ABAN 21-004) Conditions of Approval Page 2 of 2 DEPARTMENTS INCLUDE REJECT ADDITIONAL REPRESENTATIONS / COMMITMENTS The applicant or applicant’s representatives made the following representations and commitments during the q uasi-judicial and/or public hearings that now constitute binding obligations of the applicant. The obligations have the same weight as other conditions of approval. S:\Planning\SHARED\WP\PROJECTS\CLM Apartments\ABAN 21-004\Abandonment of ROW \Exhibit D - ABAN 21-004 COA.doc Page 16 of 61 7.7.B. New Business 10/26/2021 CIT Y OF BOY NTON BEACH AG ENDA I TEM REQUEST F ORM P LAN N IN G AN D D E V E L O P ME N T ME E TIN G D AT E: 10/26/2021 R E Q U E S TE D AC T IO N B Y P L AN N IN G AN D D E V E LO P ME N T B O AR D: C L M Apartments (L U AR 21-001) - Approve request for Future Land Use Map amendment from Medium Density Residential (ME D R) to High Density Residential (HD R), and Rezoning from R-3, Multi-Family 11 du/ac to I P UD, I nfill Planned Unit Development, property located at 2107 S E 3rd St. Applicant: Lawrence Mastropieri, C LM Capital L L C. E X P LAN ATIO N O F R E Q U E S T: The subject site is developed and contains two (2), four-unit multi-family buildings and assoc iated parking lots which were constructed in 2000 acc ording to P alm Beac h County Property Appraiser records. I n 2019, the site was sold to 2107 S E 3rd S T. L L C, the current property owner. The site c urrently has a Future Land Use designation of Medium Density Residential and is zoned R-3, Multi-Family, which permits up to 11 dwelling units per acre, or a total of eight units at the subject site. The site is located within the Federal Highway District of the C RA’s Community Redevelopment Plan (C RA Plan). The C RA Plan recommends for the site, the Future Land Use designation of High Density Residential and corresponding Zoning designation, I nfill Planned Unit Development. The High Density Residential classification allows a maximum density of 15 dwelling units per acre. The owner has submitted an application to amend the Future Land Use Map to High D ensity Residential and to rezone the property to I nfill Planned Unit Development in alignment with the C RA Plan. As per Chapter 2, Article I I , Section 2 of the C ity’s Land D evelopment Regulations, a Major Site Plan Modification (MS P M 21-002) and abandonment of S E 21st Ave (A B A N 21-004) has been applied for concurrently with this request. The applicant proposes the construction of one additional two-story, four-unit multi-family residential building to be located north of the two existing multi-family residential buildings that currently exist at the site, resulting in a total of 12 dwelling units. Staff recommends that the subject request be approved. H O W W IL L T H IS AFF E C T C IT Y P R O G R AMS O R S E RV IC E S? N/A FIS C AL IMPAC T: N/A ALT E R N ATIV E S: None recommended S TR ATE G IC P LAN: S TR ATE G IC P LAN AP P LIC AT IO N: N/A C L IMAT E AC T IO N AP P LIC AT IO N: N/A Page 17 of 61 Is this a grant? Grant Amount: AT TAC H ME N TS: Type Description Staff Report Staff Report Location Map Exhibit A - Location Map Exhibit Exhibit B - Existing Zoning Exhibit Exhibit C - Proposed Zoning Exhibit Exhibit D - Existing Future Land Use Exhibit Exhibit E - Proposed Future Land Use Page 18 of 61 DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO. PZ 21-013 STAFF REPORT TO: Chair and Members Planning and Development Board THRU: Michael Rumpf Planning and Zoning Administrator FROM: Andrew Meyer, Senior Planner DATE: October 19, 2021 PROJECT: CLM Apartments LUAR 21-001 REQUEST: Approve CLM Apartments request for Future Land Use Map amendment from Medium Density Residential (MEDR) to High Density Residential (HDR), and Rezoning from Multi-Family 11 du/ac (R3) to Infill Planned-Unit Development (IPUD), property located at 2107 SE 3rd St. Applicant: Lawrence Mastropieri, CLM Capital LLC. ________________ PROJECT DESCRIPTION Property Owner: CLM Capital LLC through 2107 SE 3rd St LLC Applicant: Lawrence Mastropieri, CLM Capital LLC Agent: Christi Tuttle and Bradley Miller, Urban Design Studio Address: 2107 SE 3rd Street Location: Northwest of where SE 20th Court and SE 3rd Street meet and east of the FEC Railroad. Existing Land Use: Medium Density Residential (MEDR) Proposed Land Use: High Density Residential (HDR) Existing Zoning: Multi-Family Residential (R3) Proposed Zoning: Infill Planned-Unit Development (IPUD) Proposed Use: Multi-Family Residential Acreage: 0.86 acres Page 19 of 61 Page 2 CLM Apartments LUAR 21-001 2 Adjacent Uses: North: Vacant residential parcel with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3); further north developed parcel with an existing place of worship and with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3). South: SE 21st Avenue right-of-way (to be vacated); further south developed single-family property with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3). East: Developed single-family properties with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3). West: Florida East Coast (FEC) Railroad right-of-way, followed by developed multi-family properties with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Duplex (R2) and Planned Unit Development (PUD). BACKGROUND The existing site is developed, and contains two (2), four-unit multi-family buildings and associated parking lots which were constructed in 2000 according to Palm Beach County Property Appraiser records. In 2019, the site was sold to 2107 SE 3rd ST LLC, the current property owner of the site. The site currently has a Future Land Use designation of MEDR and a Zoning designation of R3, which permits up to 11 dwelling units per acre, or a total 8 units at the subject site. The site is located within the Federal Highway District of the CRA’s Community Redevelopment Plan (CRA Plan), which recommends a Future Land Use designation of HDR and corresponding zoning designation of IPUD at the site, and allows for a density of up to 15 dwelling units per acre. The owner has submitted an application to change the Future Land Use to HDR and amend the Zoning of the the property to IPUD in alignment with the CRA Plan, which, with a proposed abandonment of SE 21st Ave, would permit a total of 12 units at the site. As per Chapter 2, Article II, Section 2 of the City’s Land Development Regulations, a site plan (MSPM 21-002) and abandonment of SE 21st Ave (ABAN 21-004) has been applied for concurrently with this request. The applicant proposes the construction of an additional two- story, four-unit multi-family residential building to be located north of the two existing multi-family residential buildings that currently exist at the site, resulting in a total of 12 dwelling units. PROCESS Since the size of the property under consideration does not exceed 50 acres, does not involve a text change to the goals, policies, and objectives of the comprehensive plan, and is not located within an area of critical state concern, the proposed Future Land Use Map amendment is subject to the small-scale comprehensive plan amendment process per provisions of Chapter Page 20 of 61 Page 3 CLM Apartments LUAR 21-001 3 163.3187, Florida Statutes. The final adoption by the City Commission is tentatively planned for December 2021. REVIEW BASED ON CRITERIA The criteria used to review Comprehensive Plan amendments and Zoning Map amendments are listed in the Land Development Regulations, Chapter 2, Article II, Section 2.B and Section 2.D.3. These criteria are required to be part of a staff analysis when the proposed change includes an amendment to the Comprehensive Plan Future Land Use Map (FLUM) or a Zoning Map amendment. a. Demonstration of Need. A demonstration of need may be based upon changing conditions that represent a demand for the proposed land use classification and zoning district. Appropriate data and analysis that adequately substantiates the need for the proposed land use amendment and rezoning must be provided within the application. The City has expressed desire to increase the supply of attainable housing within it’s limits. The proposed Future Land Use and Zoning Map amendments, in conjunction with the aforementioned abandonment, would permit the constructon of a total of four (4) dwelling units, or three (3) more than what would be permitted under the current conf iguration and designations. b. Consistency. Whether the proposed Future Land Use Map amendment (FLUM) and rezoning would be consistent with the purpose and intent of, and promote, the applicable Comprehensive Plan policies, Redevelopment Plans, and Land Development Regulations. The proposed FLUM amendment is consistent with the intent of several Comprehensive Plan Future Land Use Element policies, including: Policy 1.7.1 The City shall follow the recommendations of the adopted Community Redevelopment Plan to the maximum extent feasible when reviewing development applications pertaining to property within the Community Redevelopment area. Policy 1.8.2 The City shall discourage urban sprawl by ... continuing to promote compact developments within the City’s utility service areas, while requiring the maximization of all public services for each development in the most cost effective manner possible Policy 1.9.1 New development and redevelopment shall be consistent with the policies of the Future Land Use Element and conform to the Future Land Use Map or, if applicable, comply with the Future Land Use recommendations of the CRA Community Redevelopment Plan and any future redevelopment plans. Policy 1.11.1 The City shall continue efforts to encourage a variety of housing choices by allowing a full range of residential densities to accommodate a diversity of housing choices including, single family, multi-family, manufactured and mobile dwellings and group homes. Page 21 of 61 Page 4 CLM Apartments LUAR 21-001 4 Furthermore, the site is located within the Federal Highway District of the CRA Plan, which recommends a Future Land Use designation of HDR and corresponding Zoning of IPUD at the site, and allows for a density of up to 15 dwelling units per acre. As such, the proposed FLUM amendment and Zoning Map amendment is consistent with the CRA Plan. c. Land Use Pattern. Whether the proposed Future Land Use Map amendment (FLUM) and rezoning would be contrary to the established land use pattern, or would create an isolated zoning district or an isolated land use classification unrelated to adjacent and nearby classifications, or would constitute a grant of special privilege to an individual property owner as contrasted with the protection of the public welfare. This factor is not intended to exclude FLUM reclassifications and rezonings that would result in more desirable and sustainable growth for the community. The proposed four-unit multi-family residential building would be of the same scale of the existing multi-family residential buildings on the site. In addition, the existing land use pattern surrounding the site consists of an assortment of single-family, two-family, and multi-family residential buildings, as well as parking lot facilities for a place of worship. Furthermore, as stated in criterion “b”, the site is located within the Federal Highway District of the CRA Plan, which recommends a Future Land Use designation of HDR and corresponding Zoning of IPUD at the site, and allows for a density of up to 15 dwelling units per acre. The CRA Plan was developed to guide more desirable and sustainable growth for the community. As such, the proposed Future Land Use Map amendment and Zoning Map amendment would not create a conflict with the established land use pattern and would result in more desirable and sustainable growth for the community. d. Sustainability. Whether the proposed Future Land Use Map amendment (FLUM) and rezoning would support the integration of a mix of land uses consistent with the Smart Growth or sustainability initiatives, with an emphasis on 1) complementary land uses; 2) access to alternative modes of transportation; and 3) interconnectivity within the project and between adjacent properties. The proposed FLU and Zoning designations support increasing density in close proximity to complementary land uses and alternative modes of transportation, resulting in a neighborhood- wide horizontal mix of uses. The site is approximately one-quarter of a mile from both Federal Highway and Seacrest Boulevard, which both contain neighborhood-scale commercial uses. Furthermore, two Palm Tran bus routes, Route 1 and Route 70 are accessible within walking distance from the subject site. e. Availability of Public Services / Infrastructure. All requests for Future Land Use Map amendments shall be reviewed for long-term capacity availability at the maximum intensity permitted under the requested land use classification. Water and Sewer. Long-term capacity availability for potable water and sewer for the subject request has been confirmed by the Utilities Department. Both potable water and sewer mains are available adjacent to the site. Solid Waste. The Palm Beach County Solid Waste Authority determined that sufficient disposal capacity will be available at the existing landfill through approximately the year 2046. Drainage. Drainage has be reviewed in detail as part of the site plan, land development, and Page 22 of 61 Page 5 CLM Apartments LUAR 21-001 5 building permit review processes. Traffic. The applicant has provided a letter from the Palm Beach County Traffic Division indicating that the proposal meets the Traffic Performance Standards (TPS) of Palm Beach County. Schools. The School Capacity Availability Determination application has been submitted to the School District of Palm Beach County. f. Compatibility. The application shall consider the following factors to determine compatibility: (1) Whether the proposed Future Land Use Map amendment (FLUM) and rezoning would be compatible with the current and future use of adjacent and nearby properties, or would negatively affect the property values of adjacent and nearby properties; and (2) Whether the proposed Future Land Use Map amendment (FLUM) and rezoning is of a scale which is reasonably related to the needs of the neighborhood and the City as a whole. See the responses to criteria “a”, “b” and “c”. The property will be difficult to develop under the current R3 Zoning, as it would only allow for one additional dwelling unit next to existing multi- family residential development. As stated earlier in this report, the site is located within the Federal Highway District of the City’s Community Redevelopment Plan (CRA Plan), which recommends a Future Land Use designation of HDR and corresponding Zoning of IPUD at the site, and allows for a density of up to 15 dwelling units per acre. The proposed amendments would bring the site up to a density which is consistent with the vision of the area and the City as a whole, and bring the Future Land Use and Zoning Map designations into further consistency with existing redevelopment plans. g. Direct Economic Development Benefits. For rezoning / FLUM amendments involving rezoning to a planned zoning district, the review shall consider the economic benefits of the proposed amendment, specifically, whether the proposal would: (1) Further implementation of the Economic Development (ED) Program; (2) Contribute to the enhancement and diversification of the City’s tax base; (3) Respond to the current market demand or community needs or provide services or retail choices not locally available; (4) Create new employment opportunities for the residents, with pay at or above the county average hourly wage; (5) Represent innovative methods/technologies, especially those promoting sustainability; (6) Be complementary to existing uses, thus fostering synergy effects; and (7) Alleviate blight/economic obsolescence of the subject area. The proposed amendment would encourage development of the site and thus contribute to the enhancement of the City tax base, as a demand for multi-family dwellings appears to continue unabated. Page 23 of 61 Page 6 CLM Apartments LUAR 21-001 6 h. Commercial and Industrial Land Supply. The review shall consider whether the proposed rezoning/FLUM amendment would reduce the amount of land available for commercial/industrial development. If such determination is made, the approval can be recommended under the following conditions: (1) The size, shape, and/or location of the property makes it unsuitable for commercial/industrial development; or (2) The proposed rezoning/FLUM amendment provides substantiated evidence of satisfying at least four of the Direct Economic Development Benefits listed in subparagraph “g” above; and (3) The proposed rezoning/FLUM amendment would result in comparable or higher employment numbers, building size and valuation than the potential of existing land use designation and/or rezoning. The proposed FLUM amendment and Zoning Map amendment would not reduce the amount of land available for commercial/industrial development as the current zoning designation does not permit commercial uses. The increase of dwelling units would result in a greater building area and valuation than the potential of the existing Future Land Use and Zoning designations. i. Alternative Sites. Whether there are adequate sites elsewhere in the City for the proposed use in zoning districts where such use is already allowed. There are no comparable sites. The subject site is looking for additional development options, rather than alternate site location). See criterion “a.” j. Master Plan and Site Plan Compliance with Land Development Regulations. When master plan and site plan review are required pursuant to Section 2.D.1.e above, both shall comply with the requirements of the respective zoning district regulations of Chapter 3, Article III and the site development standards of Chapter 4. The proposed site plan complies with the requirements of the IPUD zoning district. RECOMMENDATION Staff has reviewed the proposed Future Land Use and Zoning Map amendments against the review criteria provided in Chapter 2, Article II, Section 2, Subsections B.3.c D.3 and h as found the proposal to meet the aforementioned criteria. Therefore staff recommends that the request be approved. Page 24 of 61 S I T E F E C R a i l r o a d S E 1 s t Cir SE 20th Ct SE 21st Ave SE 22nd AveSE 2nd StSE1stCirSE 21st AveSE 3rd StSE 3rd StS E 20th Ave SE 4th StExhibit A: Location MapExhibit A: Location Map CLM Apartments LUAR 21-001CLM Apartments LUAR 21-001 ¹0 80 160 240 32040 Feet Page 25 of 61 S I T E F E C R a i l r o a dSE 1st CirSE 20th Ct SE 21st Ave SE 22nd Ave SE 2nd StSE1stCirSE 21st AveSE 3rd StSE 3rd StSE 20th Ave SE 4th StExhibit B: Existing ZoningExhibit B: Existing Zoning CLM Apartments LUAR 21-001CLM Apartments LUAR 21-001 ¹0 80 160 240 32040 Feet Existing Zoning R2 Duplex, 10 du/ac R3 Multi Family, 11 du/ac PUD Planned Unit Development C1 Office Professional C2 Neighborhood Commercial C3 Community Commercial PU Public Usage Page 26 of 61 S I T E F E C R a i l r o a dSE 1st CirSE 20th Ct SE 21st Ave SE 22nd Ave SE 2nd StSE1stCirSE 21st AveSE 3rd StSE 3rd StSE 20th Ave SE 4th StExhibit C: Proposed ZoningExhibit C: Proposed Zoning CLM Apartments LUAR 21-001CLM Apartments LUAR 21-001 ¹0 80 160 240 32040 Feet Existing Zoning R2 Duplex, 10 du/ac R3 Multi Family, 11 du/ac PUD Planned Unit Development C1 Office Professional C2 Neighborhood Commercial C3 Community Commercial PU Public Usage Annexation Proposed Zoning: IPUD Page 27 of 61 S I T E F E C R a i l r o a dSE 1st CirSE 20th Ct SE 21st Ave SE 22nd Ave SE 2nd StSE1stCirSE 21st AveSE 3rd StSE 3rd StSE 20th Ave SE 4th StExhibit D: Exist. Future Land UseExhibit D: Exist. Future Land Use CLM Apartments LUAR 21-001CLM Apartments LUAR 21-001 ¹0 80 160 240 32040 Feet Future Land Use MEDIUM DENSITY RESIDENTIAL (MEDR); 11 D.U./Acre OFFICE COMMERCIAL (OC) LOCAL RETAIL COMMERCIAL (LRC) PUBLIC & PRIVATE GOVERNMENTAL/INSTITUTIONAL (PPGI) Page 28 of 61 S I T E F E C R a i l r o a dSE 1st CirSE 20th Ct SE 21st Ave SE 22nd Ave SE 2nd StSE1stCirSE 21st AveSE 3rd StSE 3rd StSE 20th Ave SE 4th StExhibit E: Prop. Future Land UseExhibit E: Prop. Future Land Use CLM Apartments LUAR 21-001CLM Apartments LUAR 21-001 ¹0 80 160 240 32040 Feet Future Land Use MEDIUM DENSITY RESIDENTIAL (MEDR); 11 D.U./Acre OFFICE COMMERCIAL (OC) LOCAL RETAIL COMMERCIAL (LRC) PUBLIC & PRIVATE GOVERNMENTAL/INSTITUTIONAL (PPGI) Proposed FLU: HDR Page 29 of 61 7.7.C. New Business 10/26/2021 CIT Y OF BOY NTON BEACH AG ENDA I TEM REQUEST F ORM P LAN N IN G AN D D E V E L O P ME N T ME E TIN G D AT E: 10/26/2021 R E Q U E S TE D AC T IO N B Y P L AN N IN G AN D D E V E LO P ME N T B O AR D: C L M Apartme nts (MSP M 21-002) - Approve Major Site Plan Modification to allow the addition of a four (4) unit apartment building, associated parking and related site improvements, on a 0.86-acre parcel, located at the northwest corner of S E 20th Court and SE 3rd Street, and east of the F EC Railroad, in the IPUD (Infill Planned Unit Development) zoning district. Applicant: Lawrence Mastropieri, C LM Capital LL C. E X P LAN ATIO N O F R E Q U E S T: The subject residential property is currently developed with two (2) multi-family buildings, each containing 4 dwelling-units. The applicant is requesting approval of a Major Site Plan Modification application (MS P M 20- 001) to construct an additional four (4) unit apartment building on the north side of the project site, associated site improvements, and required amenities. The project is dependent on City Commission approval of the following requests, which are undergoing concurrent review: (1) Right-of-Way Abandonment of a segment of S E 21st Avenue; and (2) Land Use Map Amendment from Medium Density Residential (ME D R) to High Density Residential (HD R), and Rezoning from Multi-Family 11 du/ac (R3) to I nfill Planned-Unit Development (I P UD). Should these applications be approved, the project site would be of sufficient size (0.86 acres) to accommodate 4 additional dwelling units, required parking lot and amenities. H O W W IL L T H IS AFF E C T C IT Y P R O G R AMS O R S E RV IC E S? Not applicable. FIS C AL IMPAC T: Not applicable. ALT E R N ATIV E S: Not applicable. S TR ATE G IC P LAN: S TR ATE G IC P LAN AP P LIC AT IO N: Not applicable. C L IMAT E AC T IO N AP P LIC AT IO N: Not applicable. Is this a grant? Grant Amount: Page 30 of 61 AT TAC H ME N TS: Type Description Addendum Staff Report Exhibit Exhibit A - Location Map Exhibit Exhibit B - J ustification Statement Drawings Exhibit C - Project Plans Addendum Exhibit D - Conditions of Approval Page 31 of 61 DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO. PZ 21-010 STAFF REPORT TO: Chair and Members Planning and Development Board THRU: Mike Rumpf Planning and Zoning Administrator FROM: Luis Bencosme, Planner II DATE: October 13, 2021 PROJECT NAME: CLM Apartments (MSPM 21-002) REQUEST: Approve request for Major Site Plan Modification (MSPM 21 -002) to the CLM Apartments project to allow the construction of a new four (4) unit apartment building and associated parking and related site improvements, on a 0.86- acre parcel, located northwest of where SE 20th Court and SE 3rd Street meet and east of the FEC Railroad , in the IPUD (Infill Planned Unit Development) Zoning District. Applicant: Lawrence Mastropieri, CLM Capital LLC. PROJECT DESCRIPTION Property Owner: CLM Capital LLC through 2107 SE 3rd St LLC Applicant: Lawrence Mastropieri, CLM Capital LLC Agent: Christi Tuttle and Bradley Miller, Urban Design Studio Address: 2107 SE 3rd Street Location: Northwest of where SE 20th Court and SE 3rd Street meet and east of the FEC Railroad. Existing Land Use: Medium Density Residential (MEDR) Proposed Land Use: High Density Residential (HDR) Existing Zoning: Multi-Family Residential (R3) Proposed Zoning: Infill Planned-Unit Development (IPUD) Proposed Use: Multi-Family Residential Acreage: 0.86 acres Page 32 of 61 CLM Apartments (MSPM 21-002) Memorandum No PZ 21-010 Page 2 2 Adjacent Uses: North: Vacant residential parcel with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3); further north developed parcel with an existing place of worship and with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3). South: SE 21st Avenue right-of-way (to be vacated); further south developed single-family property with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3). East: Developed single-family properties with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Multi-Family Residential (R3). West: Florida East Coast (FEC) Railroad right-of-way, followed by developed multi-family properties with a Future Land Use designation of Medium Density Residential (MEDR) and zoned Duplex (R2) and Planned Unit Development (PUD). PROPERTY OWNER NOTIFICATION Owners of properties within 400 feet of the subject request were mailed a notice of this request and its respective hearing dates. The applicant certifies that they posted signage and mailed notices in accordance with Ordinance No. 04-007. BACKGROUND Proposal: The subject residential property is currently developed with two (2) multi - family buildings, each containing four (4) dwelling-units. The applicant is requesting approval of a Major Site Plan Modification application (MSPM 20 - 001) to construct an additional four (4) unit apartment building on the north side of the project site, associated site improvements, and required amenities. The project is dependent on City Commission approval of the following requests, which are undergoing concurrent r eview: (1) Right-of-Way Abandonment of a segment of SE 21 st Avenue; and (2) Land Use Map Amendment from Medium Density Residential (MEDR) to High Density Residential (HDR), and Zoning Map amendment from Multi-Family 11 du/ac (R3) to Infill Planned-Unit Development (IPUD). Should these applications be approved, the project site would be of sufficient size (0.86 acres) to accommodate four (4) additional dwelling units, required parking lot and amenities. Page 33 of 61 CLM Apartments (MSPM 21-002) Memorandum No PZ 21-010 Page 3 3 ANALYSIS Traffic: A traffic statement was sent to the Palm Beach County Traffic Division for review. The applicant provided an approval letter from the Palm Beach County Department of Engineering and Public Works confirming the proposed development would meet the County’s T raffic Performance Standards (TPS). The traffic statement indicates the project is expected to generate 88 net daily trips, six (6) net AM peak hour trips and seven (7) net PM peak hour trips, which is a net increase of 29 daily trips. School: The proposed development is required to submit an approved SCAD (School Capacity Availability Determination) application to ensure the area schools have adequate capacity to accommodate the potential public-school students who will reside in the proposed dwelling units with their families. An approval letter from the County is required prior to permit issuance (See Exhibit “D” - Conditions of Approval). Utilities: The Utility Department has reviewed the proposed Civil Engineering plans and agree the City’s water capacity would meet the projected potable water demand for this project. Additionally, sufficient sanitary sewer and wastewater treatment capacity is currently available to serve the project. Additionally, a 25 feet wide utility easement has been proposed to ensure the existing utilities are protected from future improvements and ensure service providers have adequate access (See Exhibit “D” - Conditions of Approval). . Police/Fire: The Police Department has reviewed the proposed Site Plan (SP -1) and Photometric Plan (A3.0) to ensure the project meets the CPTED (Crime Prevention Through Environmental Design) standards. The review comments have been addressed by the applicant. Also, the Fire Department will be able to provide an adequate level of service for th is project with current or expected infrastructure and/or staffing levels. Further plan review by Police and Fire will occur during the building permit process. Drainage: The applicant submitted a preliminary Engineering Plan with conceptual drainage information. The Engineering Division has found the conceptual information to be adequate and is recommending that further review of specific drainage solutions will be conducted at time of permitting. Access: The development would maintain two (2) points of ingress/ egress, each providing vehicular access to the north and south parking lots. The entry drive located on the south side of the site would provide access to the south parking lot from SE 3rd Street; and, the second entry drive on the north side would provide access to the second parking lot from SE 20 th Court. Both parking lots have a two-way drive isle that is of sufficient width to ensure safe, adequate and efficient vehicular circulation. Walkways are also proposed in front of each buil ding. The walkaways Page 34 of 61 CLM Apartments (MSPM 21-002) Memorandum No PZ 21-010 Page 4 4 provide a safe route to the recreational areas located on opposing sides (north and south) of the property. The walkways also connect to the existing sidewalk running parallel to SE 3rd Street. Parking: Multi-Family Residential Developments consisting of two (2) or more bedroom apartments are required to provide two (2) parking spaces per unit, as well as additional parking spaces for guests calculated at a rate of 0.15 spaces per unit. The project proposes a total of twelve (12) dwe lling units, each consisting of 3 bedrooms and two (2) baths. Therefore, a total of 26 parking spaces – including two (2) spaces for guests and two (2) accessible handicap spaces – would be required. The project meets the parking requirements as it propose s 23 standard size parking spaces and three (3) accessible handicap parking spaces. Landscaping: The proposed landscape improvements will meet the City’s minimum code requirements. According to the Existing Tree Plan (L -1), the site currently has a total of seven (7) trees. The applicant proposes to remove three (3) Live Oak trees and preserve three (3) Gumbo Limbo trees and one (1) Bismarck Palm tree. The Plant List included on the Planting Plan (L -2) indicates that the great percentage of the proposed trees would be native and drought tolerant. According to the Plant List, the landscape will include 89 trees – including 51 large trees (Gumbo Limbo, Green Buttonwood, East Palatka Holly, Live Oak, Paradise Tree and Bald Cypress), 21 medium size trees (Yellow Elder, Spanish Stopper and Wild Lime) and 17 palm trees (Sabal Palm and Solitaire Palm) – 763 shrub specimens, and 2,737 small shrubs/groundcover plants. The plant material would be located around the site perimeter, building base and within the parking lot landscape islands. Additionally, the applicant included a note on the Planting Plan (L -2) indicating Florida number one grade plant material would be utilized. The applicant is proposing a variety of butterfly attracting plant species, which have been identified on the Landscape Plan (L-2) with an asterisk. The plant species include Live Oak, Dune Mistflower, Sweet Almond Verbena, Cocoplum and Dwarf Firebush. The Landscape Plan (L -2) proposes dense landscape buffers along the interior side property lines abutting the existing residential properties to the south and east. The twelve (12) foot wide landscape buffer along the south property line consists of Green Buttonwood trees and staggered wild Lime understory trees. The buffer also i ncludes two rows of staggered shrubs (Green Island Ficus and Small Leaf Clusia). The ten (10) foot wide landscape buffer along the east interior side property line consists of a six (6) foot tall decorative wall landscaped with closely spaced Green Buttonw ood trees, Live Oak trees and a dense Small Leaf Clusia hedge. The proposed five (5) foot wide landscape strip along SE 3 rd Street includes Yellow Elder canopy trees and two rows of shrubs (Gold shower and Nora Grant Ixora). Lastly, the five (5) foot wide landscape strip along the west property line Page 35 of 61 CLM Apartments (MSPM 21-002) Memorandum No PZ 21-010 Page 5 5 consist of a six (6) foot tall chain link fence, East Palatka Holly trees and a dense Cocoplum Hedge. Building and Site: The existing aparment development is comprised ot two (2) parcels totaling 0.78 AC and developed with two (2) multi-family residential buildings, a single-story garage and two (2) parking lots. Approval of the associated Right-of-Way Application would increase the project area to 0.86 acres, which is required in order to build four (4) additional dwelling units. The project proposes one (1) additional multi -family residential building and associated site improvements and amenities. The new building would be located on the north side of the site. The proposed building size and design is consistent with existing buildings on site. It would contain four (4) dwelling units, each comprising of three (3) bedrooms, two (2) bathrooms, kitchen, dining/ living room, closet and covered patio/ balcony. Access to the second floor is provided with an exterior staircase located on the east side of the building. Building Height: The building height allowed in the IPUD (Infill Planned Unit Development) Zoning District is flexible. The flexibility is intended to ensure compatibility and consitency of scale by requiring height of new buildings to be consistent surrounding buildings. According to the building elevations (A2.1 and A2.2), the new building will be the same height as the existing buildings on site , 23’5” as measured from finished graded . Setbacks: The required IPUD (Infill Planned Unit Development) Zoning District setbacks are flexible. According to the Site Plan (SP-1), the new building would be located on the north side of the site and setback from the property lines as follows: Yard Required Setback (ft.) Proposed Setback (ft.) Front (East) Side Flexible 23.5 Interior (North) Side Flexible 36.4’ Rear (West) Side Flexible 10.2’ Interior (South) Side Flexible 53.2’ Amenities: IPUD (Infill Planned Unit Developments) projects are requir ed to provide a programmed open space area in addition to pedestrian and bicyclist amenities. According to the Site Plan (SP -1), the project would include two (2) outdoor recreational areas, totaling 3,703 SF. The larger (3,053 SF) recreational area is located on the south side of the site and includes one (1) barbecue grill, two (2) benches and one (1) picnic table; the smaller (650 SF) recreational area located on the north side includes one (1) picnic table and barbecue grill. Design: The building mass, architectural features, color palette, size and height of the proposed building is consistent with the existing buildings on site, and in harmony with the neighborhood character. T he building design is inspired by Page 36 of 61 CLM Apartments (MSPM 21-002) Memorandum No PZ 21-010 Page 6 6 the Floribbean style, which is a combination of Florida Vernacular Architecture and Key West Architecture. The project architect designed the building with adequate horizontal and vertical façade articulation. The building design includes step backs, stucco banding and pitched standing seam metal roof. The building will be painted with cool light colors (Sea Salt and High Reflective White). A textured stucco horizontal band has been added between the 1 st and 2nd floors. Suspended aluminum canopies are proposed above the front bedroom win dows. The upper portions of the building (2 nd floor) include covered, recessed balconies with white railings. Sustainability: According to the City’s Sustainability Development Standards, new multi - family residential developments consisting of a minimum of three (3) dwelling units and up to 25 dwelling units shall achieve at least fifteen (15) points. Projects are required to incorporate a mix of sustainable site and building design features, which are listed on the Sustainable Design Options (Table 3-1) of the Land Development Regulations. The Sustainable Development Chart on the Site Plan (SP -1) indicates the project would achieve the required 15 points by incorporating the following options: SUSTAINABLE DEVELOPMENT STANDARDS POINTS Energy Efficient Cooling - All air conditioners are Energy Star qualified. Minimum SEER 16. 2 Efficient Water Heating - At least 75% of hot water on premises is heated via Energy Star Certified water heaters or solar water heaters. 2 Cool Roof - Use roofing materials that have a Solar Reflective Index (SRI) 75 for low-sloped roofs (<2:12) or 25 for steep- sloped roofs (>2:12) for a minimum of 75% of the roof surface. 2 Building Color – Utilization of white or cool light colors for the body of buildings to reflect rather than absorb heat and reduce cooling costs. Accent and trim colors are not limited to these choices. 2 Lighting – Provide energy efficient lighting such as LED lighting for building interiors for 100% of proposed lighting. 1 Energy star appliances – All appliance with in a building are 100% energy star. 2 Urban Nature Tree Canopy – Provide canopy trees in an amount that exceeds the minimum number of required trees by 20%. 4 Total Points 15 Lighting: The Photometric Plan (A3.0) includes a 20 feet tall freestanding light pole. It also includes two (2) light fixtures mounted to the building walls to illuminate the parking lot located between buildings A and B. The City’s Land Development Regulations restricts the lighting levels to a maximum of 5.9 foot-candles. The Site Photometric Plan depicts lighting levels below the Page 37 of 61 CLM Apartments (MSPM 21-002) Memorandum No PZ 21-010 Page 7 7 above-mentioned foot-candles limit. Signage: The project scope of work does not include signage. However, permit approval would be required for new signs. Public Art: The applicant is in communication with Glenn Weiss, Public Art Manager, in regards to the Public Arts Program requirements applicable to the project. RECOMMENDATION Staff has reviewed this request for a Major Site Plan Modification and recommends APPROVAL, subject to approval of the accompanying applications and satisfying all comments indicated in Exhibit “D” – Conditions of Approval. Any additional conditions recommended by the Board or required by the City Commission shall be documented accordingly in the Co nditions of Approval. S:\Planning\SHARED\WP\PROJECTS\CLM Apartments\MSPM 21-002\Staff Report\Staff Report-CLM Apartments (MSPM 21-002).doc Page 38 of 61 S I T E F E C R a i l r o a d S E 1 s t Cir SE 20th Ct SE 21st Ave SE 22nd AveSE 2nd StSE1stCirSE 21st AveSE 3rd StSE 3rd StS E 20th Ave SE 4th StExhibit A: Location MapExhibit A: Location Map CLM Apartments LUAR 21-001CLM Apartments LUAR 21-001 ¹0 80 160 240 32040 Feet Page 39 of 61 1 CLM APARTMENTS JUSTIFICATION STATEMENT Request(s): Abandonment of ROW, Rezoning and Land Use Amendment, Major Site Plan Modification , Engineering Waiver Submitted: August 4, 2021/DART 09.14.2021 PROJECT DESCRIPTION Property Owner: CLM Capital, LLC Applicant: Larry Mastropieri Agent: Christi Tuttle / Bradley Miller AICP, Urban Design Studio Location: On the northwest corner of SE 21st Avenue and SE 3rd Street, 2107 SE 3rd Street Existing Land Use/Zoning: MEDR/ R-3 Existing Uses: 8 Multi-Family units in Buildings A & B Proposed Land Use/Zoning: HDR / IPUD Proposed Uses: 4 Multi-Family units in Building C Parent Parcel Area: 0.78 acres / 34,154 Square Feet Abandonment Area: 0.08 acres/ 3,484 Square Feet Gross Site Area: 0.86 acres/ 37,638 Square Feet Adjacent Uses: North: Multi-Family Residential Use - Future Land Use of LRC and Zoning is R-3 South: Multi-Family Residential Use with a Future Land Use of HDR and Zoning is R-3 East: Single-Family Residential Use with a Future Land Use of HDR and Zoning is SFR Urban Planning and Design Landscape Architecture Communication Graphics Page 40 of 61 2 West: 100’ Right-of-Way for Florida East Coast Railroad and west of that is Multi-Family Residential Use with a Future Land Use of MEDR and Zoning is PUD BACKGROUND The parent parcel of subject property consists of .78 acres of developed land located at the northwest corner of SE 21st Avenue and SE 3rd Street, 2107 SE 3rd Street, within the boundaries of the City Community Redevelopment Area (CRA). The site contains two multi-family residential buildings (Buildings A & B) with 4 units in each building and parking to support the existing residential units. The site is currently designated with a MEDR land use and a zoning of R-3. The CRA Redevelopment Plan identifies this property and the surrounding area to ultimately be developed under the HDR land use designation. In addition, there is a 57’ foot wide unused right of way abutting the south line of the parent parcel in which the northern .08 acres of the right of way is being proposed to be added to the parent parcel. The remainder of the abandoned area will be added to the residential parcel to the south. APPLICATION REQUEST The proposed development is to construct an additional freestanding 4 multi-family unit residential building (Building C) on the northern portion of the property for a total of 12 units, plus additional parking. Accordingly, Urban Design Studio, agent for the applicant and owner of the property, is requesting concurrent approvals of the following:  Abandonment of the right of way in which the northern .08 acres of land will be added to the parent parcel for a total of 0.86 acres.  An amendment to the Land Use designation from MEDR to HDR to allow for a density of 15 units per acre, equating to the 12 units proposed.  A change to the zoning from R-3 to an Infill Planned Unit Development (IPUD).  A Major Site Plan to implement applicable regulations for the proposed development of the additional building, parking and related site improvements.  An Engineering waiver for the minimum sidewalk width for the new sidewalk proposed along the eastern side of the multifamily residential building. The sidewalk for this location is covered and 4’ in width. The Engineering Standards require a 5’ sidewalk width, therefore this waiver request is for a reduction in width of one foot. PROPOSED DEVELOPMENT With the approval of the above, the proposed CLM Apartment development will provide attainable housing consisting of 3 two-story buildings and a total of 12 residential units (4 additional). All buildings are two stories in height and will contain 4 units, each with three-bedrooms and two baths. The units sizes within Buildings A & B are approximately 1,100 square feet. The units within the proposed building C are approximately 1,138 square feet each. The overall building area for Buildings A & B is 2,132 square feet per floor and 2,275 square feet per floor for Building C. Each unit in Building C will also provide approximately 95 square feet of outdoor covered living space, directly accessible from each living room. The main entrances will be covered and include a porch for comfortable access with a 4 foot covered walkway along the front of building. Page 41 of 61 3 The exterior finish consists of smooth stucco surfaces with stucco banding surfaces to provide an aesthetically pleasing façade. Each window and sliding glass door will be picture framed with an accent band to provide architectural interest. All windows and doors include code mandated and approved hurricane impact resistant products. The construction will consist of exterior concrete masonry unit (CMU) load bearing partitions, with code required concrete tie columns and beams. The interior partitioning will consist of industry standard metal framing and gypsum board sheathing. The building will include a series of hip roofs including covered porch and balcony areas. The sloped metal roofs are a pleasing 4/12 slope and include a variety of intersecting roof lines. The exterior finish color palate will consist of finishes which are consistent with the surrounding residential neighborhood and match the existing apartment buildings on the property. Access to the property will be provided by two full access driveways from SE 3rd Street. To support the residential community, a new parking lot will be constructed for 13 additional parking spaces located at the northern portion of the site, for a total of 26 spaces on the property, including 3 handicap spaces. Based on current code, 26 parking spaces required. A new dumpster enclosure will be constructed south of the proposed parking area with improved access from SE 3rd Street and SE 10th Court. The existing dumpster which has no enclosure and located at the west end of the existing parking lot will be removed from site. Recreational open space area is also provided for use by the residents of the community as required by the IPUD zoning district. Based on the 12 total units, a minimum of 2,400 square feet of useable open space is required. As shown on the Site Plan, there is 3,703 square feet provided in two areas so that all units have access to a grills, tables, benches and open space for outdoor recreation. According to Sustainable Development, found in Chapter 4, Article XII of the City Code, multifamily residential development with less than 20 units are required to achieve at least 15 points based on listed criteria. The proposed development proposes to satisfy the minimum 15 points by at least providing the following: Energy: All air conditioners are Energy Star qualified, minimum SEER 16 - 2 points Use roofing material that has a SRI > 5 for low sloped roofs for a minimum of 75% of the roof surface. – 2 points Use of white or cool light colors for the body of buildings to reflect rather than absorb heat and reduce cooling costs - as shown on architectural plans. – 2 points Provide energy efficient lighting such as LED lighting for building interiors for 100% of proposed lighting - 1 point. All appliances within a building are 100% Energy Star – 2 points At least 75% of hot water on premises is heated via Energy Star Certified watrer heaters or solar water heaters. – 2 points Urban Nature Page 42 of 61 4 Provide canopy trees in an amount that exceeds the minimum number of required trees by 20% - 4 points. Based on the elements above, the criteria for sustainable development will be met for the proposed development. The area along SE 3rd Avenue between the proposed parking area and the single-family home will be landscaped with a 10-foot-wide buffer and 6’ high wall as shown on the provided landscape plans. The plan also provides for a 5-foot wide landscape buffer along the frontages of SE 3rd Street and SE 20th Court, and a 12-foot wide landscape buffer on the south property line with dense vegetation barrier in place of a 6-foot wall. There is existing vegetation along the west property line, adjacent to the railroad, that is proposed to remain as the required buffer. A traffic study has been submitted to Palm Beach County Traffic Division for concurrency review in order to ensure an adequate level of service. We will be applying for school concurrency through The School District of Palm Beach County confirming that adequate capacity exists to accommodate student residents of the proposed 12 multi-family units. We have included that application for you to execute and return to UDS for submittal to the school board. REVIEW CRITERIA FOR FUTURE LAND USE MAP AMENDMENTS/REZONING Section 2.B.3. of the Land Development Regulations contains the following review criteria for a future land use map amendment and rezoning. Approval of a FLUM amendment/zoning request shall be based on one (1) or more of the following factors. Following each of these criteria is an explanation of how this application complies with each of the criteria. (1) Demonstration of Need. A demonstration of need may be based upon changing conditions that represent a demand for the proposed land use classification and zoning district. Appropriate data must be provided within the application. It has been indicated that the City is in need of additional workforce/attainable housing. Approval of these application will allow for the construction of 4 additional units that will be priced accordingly for workforce/attainable housing. Although this site is small i n size, the proposed HDR land use and IPUD rezoning will implement the regulations to allow for the construction of these 4 additional units. (2) Consistency. Whether the proposed FLUM amendment and rezoning would be consistent with the purpose and intent of, and promote, the applicable Comprehensive Plan policies, redevelopment plans, and Land Development Regulations. Approvals of requests to rezone to a planned zoning district may include limitations or requirements imposed on the site plan in order to maintain such consistency. This property is identified by the City’s Future Land Use Maps and is planned for the proposed HDR land use which is consistent on the CRA Redevelopment Plan. After meeting with staff it was agreed that the HDR land use is much more consistent with the surrounding area and a better fit with this site. The IPUD zoning is specifically established for infill redevelopment sites such as the subject parcel and therefore is consistent with the intent of the Land Development Regulations. Page 43 of 61 5 (3) Land Use Pattern. Whether the proposed FLUM amendment and rezoning would be contrary to the established land use pattern, or would create an isolated zoning district or an isolated land use classification unrelated to adjacent and nearby classifications, or would constitute a grant of special privilege to an individual property owner as contrasted with the protection of the public welfare. This factor is not intended to exclude FLUM reclassifications and rezoning’s that would result in more desirable and sustainable growth for the community. The pattern for HDR land use is established on the property to the south as well as the properties to the east. The HDR land use and IPUD zoning will be a continuation of that pattern and not create an isolated district or land use classification. The entire surrounding properties in this area are residential. (4) Sustainability. Whether the proposed rezoning/FLUM amendment would support the integration of a mix of land uses consistent with the smart growth or sustainability initiatives, with an emphasis on 1) complementary land uses; 2) access to alternative modes of transportation; and 3) interconnectivity within the project and between adjacent properties. The site and proposed building offer sustainable features in its proposed design and construction as indicated above. Covered bicycle storage will be provided with the proposed new development to encourage alternative modes of transportation. There are also connecting sidewalks within the development for the residents to have comfortable access to all recreational space. The proposed HDR land use and IPUD zoning are certainly consistent with and complement other development within the area as planned for by the CRA Redevelopment Plan. (5) Availability of Public Services/Infrastructure. Requests for rezoning to planned zoning districts and FLUM amendments shall be subject to review pursuant to Chapter 1, Article VI, Concurrency. All public services and infrastructure required for the development are available and provided by the City of Boynton Beach. (6) Compatibility. The application shall consider the following factors to determine compatibility: (a) Whether the proposed FLUM amendment and rezoning would be compatible with the current and future use of adjacent and nearby properties, or would negatively affect the property values of adjacent and nearby properties. (b) Whether the proposed FLUM amendment and rezoning is of a scale which is reasonably related to the needs of the neighborhood and the city as a whole. The City has planned for this property to be designated with the proposed HDR land use by the CRA Redevelopment Plan and the IPUD zoning regulations have been established to provide for regulations for development to be compatible for smaller infill parcels such as the subject site. The IPUD regulations are found in Chapter 3, Article III, Section 2, G of the Land Development Regulations and are addressed below. Where there are adjacent single family or duplex residential uses, the Site Plan incorporates the required buffering and screening. (7) Alternative Sites. Whether there are adequate sites elsewhere in the city for the proposed use in zoning districts where such use is already allowed. Alternative sites are likely available in the City for this type of development, however the subject site and proposed development further the goals for development of infill parcels within the City. Page 44 of 61 6 INFILL PLANNED UNIT DEVELOPMENT (IPUD) CRITERIA Chapter 3, Article III, Section 2.G.1. of the City’s Land Development Regulations states the purpose and intent of the Infill Planned Unit Development District as well as the prerequisite location standards. This property and the proposed development is the perfect example of why these regulations were established as justified by the following according to the sequential paraphrased sections of the referenced code: The purpose of the IPUD zoning district is to implement the high density residential (HDR) future land use map (FLUM) classification of the Comprehensive Plan. The subject site is identified on the CRA Redevelopment Plan for High Density Residential (HDR) land use and therefore eligible for a maximum of 15 dwelling units per acre. As specifically indicated by the code reference, the purpose of the IPUD zoning district is to implement the HDR land use classification for the promotion of new development on infill properties. The proposed rezoning to IPUD implements the HDR land use classification and the proposed multi-family units are permitted uses in the IPUD zoning district and promotes the development of this infill property. This district is intended for infill purposes, promoting new development and redevelopment within the Community Redevelopment Area (CRA) area consistent with land use recommendations from the Community Redevelopment Plan at densities no greater than fifteen (15) dwelling units per acre.  The boundaries of the CRA extend along Federal Highway and to the west on SE 3rd Street, including this property.  With the inclusion of the .08 acre area being abandoned, the total site will consist of 0.86 acres of land. The proposed development of 12 residential units therefore yields a density of 13.95 units per acre which is less than the maximum allowed density of 15 units per acre of the HDR land use. The IPUD district will include design standards that exceed the standards of the basic development standards in terms of site design, building architecture and construction materials, amenities and landscape design.  The design of the property and architectural features described above and from the applicant’s perspective, exceed the standards. Each unit provides a significant amount of living space, outdoor covered living space /porches, covered walkway along the front side of the proposed building and recreational use of a benches, grills and picnic tables. The units are positioned near the roadways with pedestrian walkways and porch/balcony areas consistent with the goals of the CRA Redevelopment Plan. The landscape areas will be enhanced with plant material, especially along the common property lines of existing residential properties to the south and east. The extent of variance or exception to basic design standards, including but not limited to requirements for parking spaces, parking lot and circulation design and setbacks will be dependent on how well the proposed project otherwise exceeds the other applicable standards. Page 45 of 61 7  The standards for IPUD developments are flexible to allow for creative and responsible infill developments. This is a small site and will only be developed if the regulations are more flexible than standard zoning districts. The site regulations for IPUD development found in Table 3-11 mostly indicate “flexible” relative to project area, frontage and setbacks. The proposed development plan complies with the standards for IPUD developments and other applicable sections of the Code. The minimum standard drive aisle width is 24 feet which is provided along with 9’ x 18’ parking spaces.  Setbacks for the building area have been established as close to the property lines as possible to not conflict with sight/visibility triangles but yet provide a more pedestrian friendly frontage with sidewalks leading to all units. There is an existing concrete walk along SE 3rd Street which will be removed for landscape and setbacks along interior property lines have complied with the minimum setbacks of the adjacent residential uses.  Although the maximum building height allowed by IPUD zoning is 45 feet, the proposed structure is designed at 21’-6” to Mean Roof Height as defined by City code. The IPUD shall minimize adverse impacts on surrounding property. In order to be approved an IPUD project must be compatible with and preserve the character of adjacent residential neighborhoods.  The proposed development is consistent with the character of other multi-family developments along SE 3rd Street, just northeast of our property there are several multi- family developments including the PUD to the west of the site on the other side of the FEC railroad. The proposed development is also compatible in height and architectural style of the other referenced multi-family developments. The proposed multi-family design is encouraged and supported by the intent of the CRA Redevelopment Plan, HDR land use classification and the IPUD zoning district. The IPUD district is optimum when there is an opportunity to promote sustainability with respect to land use, energy conservation, resource management and social equity. Rezoning to the IPUD district is encouraged for proposed development on lands that are in close proximity to existing infrastructure, public and alternative transportation routes and modes, employment centers, community areas, or have sustained or are complicated by environmental contamination.  The subject property and proposed development satisfy many of the sustainability goals of this regulation by providing condensed housing with pedestrian routes to local employment opportunities as close as the commercial businesses just to the south of our site and bus route opportunities on Federal Highway that extend to other communities throughout the entire County. The closest bus stop is 0.18 miles from the property.  The other locational standards only pertain to non-residential uses and therefore are not applicable to this application. Overall, the applications are following the policies and goals of the Comprehensive Plan to apply the HDR and IPUD zoning on infill parcels along SE 3rd Street. The proposed development and design are consistent with the character of new development along the CRA South Federal Highway corridor which were also established and approved after consideration of these same policies, goals and standards. Page 46 of 61 8 Abandonment Criteria - LDR Chapter 2, Article II, Section 2.G.3. Review Criteria. The vacation and abandonment of a right-of-way, special purpose easement, or other non-fee interest of the city shall be based on a demonstration that the above interest no longer serves a public purpose and there is no encumbrance which would prohibit the clear transfer of ownership of such land. The following review criteria shall be used to justify an application: a. Access. Does the subject land provide a legal means of access to a lot of record, subdivision, or development? Would the vacation and abandonment cause or result in a permanent stoppage, interruption, or an unacceptable level of service for the subject lot or on neighboring lots, subdivisions, or developments with respect to police, fire, or other emergency services; or solid waste removal?  The 57.1’ Right-of-Way will be split between the north and south property owners. We have included the consent from the property owner to the South to abandon the Right-of-Way. S.E. 21st Avenue dead ends in the area we are proposing to abandon. The driveway for the property to the south will be reconstructed once the abandonment application is approved and during construction of the subject parcel improvements. There are two driveways to the subject site along SE 3rd Street for all access. b. Utilities. Does the subject land contain, support, or allow potable water, sanitary sewer, or any other utility (e.g. cable, telephone, electricity, gas, etc.), which would be permanently stopped or interrupted, or cause an unacceptable level of service to the subject lot or neighboring lots, subdivisions, or developments?  All utilities are currently servicing the subject site. A 20-foot utility easement will be recorded over existing utilities within the area of abandonment. Consent from some of the utility companies is provided with this application for the abandonment of the right-of-way. As demonstrated in the attached correspondence, several attempts have been made since May 2021 for contact with FPL and Comcast to obtain their consent. We will continue pursuing them throughout this process for same. c. Drainage and Wastewater Management. Does the subject land contain, support, or allow a legal means of drainage or wastewater management for such lot or on neighboring lots, subdivisions, or developments, which would cause or result in a stoppage, interruption, or unacceptable level of service?  Approximately 4,317 square feet of onsite drainage areas are proposed within the site. Exfiltration trenches will also be used to allow a legal means of drainage for the site. d. Conservation. Does the subject land contain, support, or allow the means for the conservation or preservation of flora or fauna?  There is no native significant flora or fauna to be preserved and any that can be relocated has been identified on the landscape plans. Page 47 of 61 9 REVIEW CRITERIA FOR MAJOR SITE PLAN APPLICATION The review of the site plan will satisfy the review criteria of Section 2.B.3. of the Land Development Regulations for a major site plan application to confirm compliance with the applicable land development regulations of setbacks, landscape buffers, parking, and building height. CONCLUSION Based on the information provided, this application complies with the CRA Redevelopment Plan for the South Federal corridor, the purpose and intent of the HDR land use classification, this IPUD zoning and review criteria and regulations for the proposed development plan of 4 Multi-Family unit development project requiring an amendment to the Future Land Use Map, Re-zoning, Abandonment of a Right-of-Way, Engineering Waiver and Final Site plan approval. Christi Tuttle is the Senior Project Manager should additional information be required. Page 48 of 61 118.61'(P&M)342.35'123.96'(P&M)238.20'101.50'LOT7LOT 143259 SF (0.07 AC)LOT18LOT15FLORIDA EAST COASTRAILROADCLS.E. 3rd STREETS.E. 20th COURTWEST LANEOCCUPIEDS.E. 21st AVENUES.E. 21st AVENUECLBUILDING B4 EXISTINGUNITS2,132 SFPER FLOOR2 STORYBUILDING A4 EXISTINGUNITS2,132 SFPER FLOOR2 STORYREC. AREA3,053 SF49.97'9.0'18.0'24.0'DRIVE AISLE18.0'9.0'5.0'18.0'12.0'9.0'18.0'24.0'DRIVE AISLE4.0' SIDEWALK5.0'SW10.0'U.E.EXISTING FENCEEXISTING 5.3' SWTYPE DCURB, TYP.CURB CUT REQ.5.0'LANDSCAPEBUFFER5.0'LANDSCAPEBUFFER18.0'9.0'10.0' LANDSCAPE BUFFER w/ 6' WALL6.0' CHAIN LINK FENCE6.0' CHAIN LINK FENCE6.0' CHAIN LINK FENCECONCRETE WALLEX. 6.0' CHAINLINK FENCEREC AREA650 SFDRAINAGE2,377 SFFLU: HDRZONING: R3EXISTING USE: SFRFLU: LRCZONING: R3EXISTING USE: INS1FLU: ROWZONING: ROWEXISTING USE: ROWFLU: HDRZONING: R3EXISTING USE: SFRFLU: HDRZONING: R3EXISTING USE: SFRFLU: HDRZONING: R3EXISTING USE: DUPLEXBUFFER PROVIDED BYEXISTING VEGETATION23.5'FRONTSETBACKFLU: MEDRZONING: PUDEXISTING USE: MFRBENCH2.0'OVERHANG10.0' NEW DRIVEWAYADJACENT PROPERTY57.1' AREA TOBE ABANDONED10.2' REARSETBACKRECREATION AREAWILL CONTAIN PICNICTABLE WITH GRILL15.3'WHEEL STOP,TYP.BUILDING C4 PROPOSEDUNITS2,275 SFPER FLOOR2 STORYGRILLDRAINAGE337 SF10.2'DRAINAGE790 SFDRAINAGE605 SFDRAINAGE539 SFRECREATION AREAWILL CONTAIN PICNICTABLE WITH GRILL &BENCHESPROPOSED25.0' U.E.60' MANEUVERING FOR TRASH PICK UPGRILLMECHANICAL EQUIPMENTMECHANICAL EQUIPMENTPICNIC TABLE36.4'SIDES.B.53.2'SIDESTREETSETBACK7667EX.EX.DR25.0'R25.0'5.0'22.3'R25.0'CANOPYCANOPY12.0' LANDSCAPE BUFFER(SEE LANDSCAPE PLAN FOR PLANTINGDETAIL RELATIVE TO EXISTING UTILITY LINES)NOT INCLUDEDLESS AND EXCEPTPROPOSED FIRE HYDRANTEXISTING FIRE HYDRANTPICNIC TABLECOVERED BIKE RACKS. FEDERAL HWYSE 20ST CTFLORIDA E A S T C O A S T R A I L R O A D S. S E A C R E S T B L V D SE 21ST AVESITESE 23RD AVEDrawing name: H:\JOBS\CLM Apartments_20-150\CLM Capital_DD_.000\Drawings\Site Plan\2021.09.07 CLM Apartments_SP.dwg Urban Planning & DesignLandscape ArchitectureCommunication GraphicsRevision Dates:Designed By:Drawn By:Checked By:Project No.:Date:Scale:0NORTHCopyright:All ideas, designs, arrangements, and plansrepresented by this drawing are owned by andthe property of the designer, and were createdfor the exclusive use of the specified project.These ideas, designs, arrangements or plansshall not be used by, or disclosed to any person,firm, or corporation without the writtenpermission of the designer.610 Clematis Street, Suite CU02West Palm Beach, FL 33401561.366.1100 FAX 561.366.1111www.udsflorida.com#LCC00003507/02/202120-150.000CCCCBDMSP-1of 1Submittal 08.04.2021DART 09.14.2021Boynton Beach, Florida Site Plan CLM APARTMENTS 40'20'10'1" = 20'-0"LOCATION MAPDEVELOPER/APPLICANT:URBAN DESIGN STUDIO508 E. BOYNTON BEACH BLVD.BOYNTON BEACH, FL 33435(561) 736-8838PLANNER:DEVELOPMENT TEAMN.T.SARCHITECT /PHOTOMETRIC:AK ARCHITECTS, INC.100 NE 6TH STREET, SUITE 102BOYNTON BEACH, FL 33435(561)374-9242SURVEYOR:BOB BUGGEE, INC.P.O. BOX 243887BOYNTON BEACH, FLORIDA. 33424561-732-7877CLM CAPITOL INC.170 NE 2ND STREETBOCA RATON, FL 33429-0620TRAFFICENGINEER:JOHN DONALDSON JMD ENGINEERING12773 FORESST HILL BLVD, SUITE 204WELLINGTON, FL. 33414(561)383-5595CIVILENGINEER:MCLEOD, MCCARTHY & ASSOCIATES, P.A.1655 PALM BEACH LAKES BLVD #901,WEST PALM BEACH, FL 33401(561) 689-9500LANDSCAPEARCHITECT:DAVE BODKER LANDSCAPEARCHITECTURE / PLANNING, INC.610 N CONGRESS AVE. SUITE 105 ADELRAY BEACH, FL 33445(561)276-6311Notes1. This plan is based on a survey prepared by Bob Buggee Surveyor,dated 09/02/2020.2. This plan is subject to applicable zoning and development regulations.3. All plans submitted for permitting shall meet the City's codes and the applicable building codes in effectat the time of permit application.4. All above ground mechanical equipment such as, but not limited to, exterior utility boxes, meters, andtransformers shall be visually screened.5. Curb cut required where access aisle meets sidewalk.6. All utilities are available and will be provided by the appropriate agencies.7. All plans submitted for specific permits shall meet the City's code requirements at time of application.These permits include, but are not limited to the following: Site Lighting, Paving, Drainage, CurbingLandscaping and Irrigation. Permits required from other permitting agencies such as FDOT, PBC,SFWMD, DERM, LWDD, FDEP, and any others, shall be included with the permit request.8. All striping and signage shall conform to the Engineering Design Handbook & Construction Standards.9. The drainage system shall conform to Engineering Design Handbook & Construction Standards.10. Catch basins and manhole covers shall be bicycle proof.12'12'12'12'DUMPSTER COLOR:SW - SEA SALT SW6204SW - HIGH REFLECTIVE WHITEPage 49 of 61 Page 50 of 61 WM 118.61'(P&M)342.35'123.96'(P&M)238.20'101.50'LOT7LOT 143259 SF (0.07 AC)LOT18LOT15FLORIDA EAST COASTRAILROADCLS.E. 3rd STREETS.E. 20th COURTWEST LANEOCCUPIEDS.E. 21st AVENUEBUILDING B4 EXISTINGUNITS2,132 SFPER FLOOR2 STORYBUILDING A4 EXISTINGUNITS2,132 SFPER FLOOR2 STORYREC. AREA3,053 SF49.97'EXISTING FENCE6.0' CHAIN LINK FENCE6.0' CHAIN LINK FENCE6.0' CHAIN LINK FENCECONCRETE WALLEX. 6.0' CHAINLINK FENCEREC AREA650 SFDRAINAGE2,377 SFFLU: HDRZONING: R3EXISTING USE: SFRFLU: LRCZONING: R3EXISTING USE: INS1FLU: ROWZONING: ROWEXISTING USE: ROWFLU: HDRZONING: R3EXISTING USE: SFRFLU: HDRZONING: R3EXISTING USE: SFRFLU: MEDRZONING: PUDEXISTING USE: MFRBENCHRECREATION AREAWILL CONTAIN PICNICTABLE WITH GRILLBUILDING C4 PROPOSEDUNITS2,275 SFPER FLOOR2 STORYGRILLDRAINAGE337 SFDRAINAGE790 SFDRAINAGE605 SFDRAINAGE539 SFRECREATION AREAWILL CONTAIN PICNICTABLE WITH GRILL &BENCHES60' MANEUVERING FOR TRASH PICK UPGRILLMECHANICAL EQUIPMENTMECHANICAL EQUIPMENTPICNIC TABLE6EX.DCANOPYCANOPYNOT INCLUDEDLESS AND EXCEPTPROPOSED FIRE HYDRANTEXISTING FIRE HYDRANTPICNIC TABLECOVERED BIKE RACKPage 51 of 61 PLAN LEGEND BEDROOM #2 13'-9" X 10'-5.5" MASTER BEDROOM 14'-1" X 11'-0" DINING ROOM / LIVING AREA 11'-11" X 15'-0" GUEST BATH 5'-0" X 7'- 7.5" MASTER BATHROOM 10'-0" X 5'-0"WALK-IN CLOS. 5'-2" X 5'-0" KITCHEN 6'-5" X 11'-3" WALK-IN CLOS. 5'-0" X 4'- 3.5" BEDROOM #1 11'-1" X 10'-11.5" PATIO 9'-3" X 3'-7" BEDROOM #2 13'-9" X 10'-5.5" MASTER BEDROOM 14'-1" X 11'-0" GUEST BATH 5'-0" X 7'- 7.5" MASTER BATHROOM 10'-0" X 5'-0"WALK-IN CLOS. 5'-2" X 5'-0" KITCHEN 6'-5" X 11'-3" WALK-IN CLOS. 5'-0" X 4'- 3.5" BEDROOM #1 11'-1" X 10'-11.5" DINING ROOM / LIVING AREA 11'-11" X 15'-0" PATIO 9'-3" X 3'-7" COVERED CANOPYCOVERED CANOPY A 1.2 GROUND LEVEL FLOOR PLAN GROUND LEVEL FLOOR PLAN SCALE: 1/4" = 1'-0"N TO THE BEST OF MY KNOWLEDGE THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH THE 2020 FLORIDA BUILDING CODE, 7TH EDITION ALL AMENDMENTS AND SECTION 633 OF THE FLORIDA STATUTES. www.K rchitectsInc.com $Oe[is KniJht $rchitects, Inc. 100 NE 6th St. Ste. 102 Boynton Beach, FL 33435 Phone: (561) 374-9242 License Number: AR26002172 Copyright AKArchitects, Inc. 2010 STEVEN W. KNIGHT R.A. FLORIDA R.A. #15312 ARCHITECT CLM APARTMENTS PROJECT KEY PLAN REVISION Scale Date Project Number Filename PROJECT ADDRESS NEW BUILDING SUBMITTAL PHASE SHEET CONTENTS SHEET NO. P&Z SUBMITTAL PROJECT DISCRIPTION 2107 SE 3RD STREET A BOYNTON BEACH FL 21.0044PROJECT OWNER 2107 SE 3RD ST LLC LAYOUT DRAWN REVIEWED No.Description Date TOTAL FIRST FLOOR UNDER AIR ------------------------------- 2,275 SQ FT TOTAL SECOND FLOOR UNDER AIR ----------------------------- 2,275 SQ FT TOTAL BALCONY -------------------------------96.4 SQ FT TOTAL STAIR -------------------------------169.3 SQ FT SQUARE FOOTAGE BY UNIT -------------------------------1,138 SQ FT TOTAL BUILDING -------------------------------4,816 SQ FT BUILDING SQUARE FOOTAGE BREAKDOWN OCCUPANCY / CONSTRUCTION TYPE CONSTRUCTION TYPE = TYPE V-B OCCUPANCY TYPE = RESIDENTIAL OCCUPANT LOAD = 4,816/200= 25 NUMBER OF STORIES = TWO (2) OUTDOOR BENCH SPECIFICATION2SCALE: N.T.S OUTDOOR PICNIC TABLE DETAIL3SCALE: N.T.S TYPICAL COVERED BICYCLE RACK DETAIL3SCALE: N.T.S BICYCLE RACK TO PROVIDE A MINIMUM OF 5 BICYCLES. DETAIL IS REPRESENTATIVE OF THE STYLE ONLY. BICYCLE RACK NOTE Page 52 of 61 PLAN LEGEND BEDROOM #2 13'-9" X 10'-5.5" MASTER BEDROOM 14'-1" X 11'-0" DINING ROOM / LIVING AREA 11'-11" X 15'-0" GUEST BATH 5'-0" X 7'- 7.5" MASTER BATHROOM 10'-0" X 5'-0"WALK-IN CLOS. 5'-2" X 5'-0" KITCHEN 6'-5" X 11'-3" WALK-IN CLOS. 5'-0" X 4'- 3.5" BEDROOM #1 11'-1" X 10'-11.5" BALCONY 9'-3" X 3'-7" BEDROOM #2 13'-9" X 10'-5.5" MASTER BEDROOM 14'-1" X 11'-0" GUEST BATH 5'-0" X 7'- 7.5" MASTER BATHROOM 10'-0" X 5'-0"WALK-IN CLOS. 5'-2" X 5'-0" KITCHEN 6'-5" X 11'-3" WALK-IN CLOS. 5'-0" X 4'- 3.5" BEDROOM #1 11'-1" X 10'-11.5" DINING ROOM / LIVING AREA 11'-11" X 15'-0" BALCONY 9'-3" X 3'-7" COVERED CANOPYCOVERED CANOPY SECOND LEVEL FLOOR PLAN A 1.3 SECOND LEVEL FLOOR PLAN TO THE BEST OF MY KNOWLEDGE THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH THE 2020 FLORIDA BUILDING CODE, 7TH EDITION ALL AMENDMENTS AND SECTION 633 OF THE FLORIDA STATUTES. www.K rchitectsInc.com $Oe[is KniJht $rchitects, Inc. 100 NE 6th St. Ste. 102 Boynton Beach, FL 33435 Phone: (561) 374-9242 License Number: AR26002172 Copyright AKArchitects, Inc. 2010 STEVEN W. KNIGHT R.A. FLORIDA R.A. #15312 ARCHITECT CLM APARTMENTS PROJECT KEY PLAN REVISION Scale Date Project Number Filename PROJECT ADDRESS NEW BUILDING SUBMITTAL PHASE SHEET CONTENTS SHEET NO. P&Z SUBMITTAL PROJECT DISCRIPTION 2107 SE 3RD STREET A BOYNTON BEACH FL 21.0044PROJECT OWNER 2107 SE 3RD ST LLC LAYOUT DRAWN REVIEWED No.Description Date SCALE: 1/4" = 1'-0"N TOTAL FIRST FLOOR UNDER AIR ------------------------------- 2,275 SQ FT TOTAL SECOND FLOOR UNDER AIR ----------------------------- 2,275 SQ FT TOTAL BALCONY -------------------------------96.4 SQ FT TOTAL STAIR -------------------------------169.3 SQ FT SQUARE FOOTAGE BY UNIT -------------------------------1,138 SQ FT TOTAL BUILDING -------------------------------4,816 SQ FT BUILDING SQUARE FOOTAGE BREAKDOWN OCCUPANCY / CONSTRUCTION TYPE CONSTRUCTION TYPE = TYPE V-B OCCUPANCY TYPE = RESIDENTIAL OCCUPANT LOAD = 4,816/200= 25 NUMBER OF STORIES = TWO (2) Page 53 of 61 Page 54 of 61 Page 55 of 61 Page 56 of 61 EXHIBIT D Conditions of Approval Project Name: CLM Apartments File number: MSPM 21-002 Reference: 2nd review plans identified as a Major Site Plan Modification with a September 9, 2021 Planning and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT ENGINEERING / PUBLIC WORKS / FORESTRY / UTILITIES Comments: 1. The plans must conform to all of the City of Boynton Beach Code of Ordinances, standards, and requirements at time of Land Development Permit. These permits include, but are not limited to, the following: paving, drainage, curbing, site lighting, landscaping and irrigation. The “Engineering Division Design Handbook and Construction Standards ” manual is available at the Engineering Division of the Public Works Department. Please email mendozap@bbfl.us with your request to receive a copy. The City’s code of Ordinances can be found: http://library.amlegal.com/nxt/gateway.dll/Florida/boynton/boynton beachfloridacodeofordinances?f=templates$fn=default.htm$3.0$ vid=amlegal:boyntonbeach_fl 2. The lighting design shall provide a minimum average light level of one foot-candle with all light poles to withstand a 140 MPH wind load and shall be operated by photoelectrical control and are to remain on until one hour after closing or 2:00 a.m. whichever is later per (2010 LDR, Chapter 4, Article VII, Section 3.). Lighting plan does not comply with the minimum average lighting levels. 3. Page C1.2 Section A, please revise to prevent runoff to the adjacent property. Please extend regrading to the new lot boundary, I see a small section of the project still draining to the south property. 4. Section C- Please continue positive grading to the property boundary as a small area still draining to the north property. 5. Section D- Please continue positive grading to the property boundary as a small area still draining to the north property. 6. An approved addressing plan will be required prior to permitting. 7. Provide concrete a concrete collar around all yard drains. 8. Please retain the existing sidewalk along SE 3 rd Street and provide an easement for access to the sidewalk. Provide a pedestrian connection at SE 20 th Ct. Page 57 of 61 CLM Apartments (MSPM 21-002) Conditions of Approval Page 2 of 5 DEPARTMENTS INCLUDE REJECT 9. A four (4) foot wide sidewalk will be acceptable for the project. 10. The required Land Development Permit shall include a geotechnical report and a drainage area map. 11. Please clarify how was the 13.3-foot berm elevation was determined. Reflect clarification in the drainage calculations. 12. A 25-foot wide utility easement along the south property line is required prior to permitting. FIRE Comments: None. All previous comments addressed at DART meeting. POLICE Comments: None. All previous comments addressed at DART meeting. BUILDING DIVISION Comments: None. All previous comments addressed at DART meeting. PARKS AND RECREATION Comments: 13. The applicable park impact fees ($2,712) is due at time of permitting. PLANNING AND ZONING Comments: 14. Site Plan approval is contingent upon approval of the associated Land Use Map Amendment, Rezoning and Right -of-Way Abandonment applications. 15. A Unity of Title is required for lots 8,9,10,11,12 and 13 prior to permit approval. Be advised that the City has a Unity of Title application process in place that should be completed prior to recordation with Palm Beach County. Please contact the Planning and Zoning Division (561 -742-6260) to discuss the application process. 16. The segment of S.E. 21st Avenue (a.k.a. Sunny Oaks Addition, Lot 14) to be abandoned is serving a public purpose as it Page 58 of 61 CLM Apartments (MSPM 21-002) Conditions of Approval Page 3 of 5 DEPARTMENTS INCLUDE REJECT provides access to the adjacent property (Crestview Boynton Beach, Lot 31). Be advised that Planning and Zoning approval of this project is contingent upon the construction of an alternate access drive connecting to SE 3rd Street prior to recording the ROW abandonment documents with Palm Beach County. Please coordinate the submittal of a Right-of-W ay Permit for the required driveway with the City’s Engineering Division. 17. An approved SCAD (School Capacity Availability Determination) application is required. Please submit a letter of approval from Palm Beach County at time of permitting. 18. The east property line of the adjacent single -family property to the south (Lot 31) is shown incorrectly on the Site Plan. Please correct the property line on the site plan to be consistent with the recorded Plat for the Crestwood subdivision (Book 23, Page 154). 19. Please revise the proposed lot size provided on the Property Development Regulations table (0.78 AC) of the Site Plan to include the portion of the ROW to be abandoned (0.78 AC + 0.08 AC = 0.86 AC total). 20. Please correct proposed square footage of Building C on the Site Plan. 21. The required covered bicycle rack must support a minimum of five (5) bicycles by its frame. At time of permitting, please provide a color detail of the proposed covered bike rack with dimensions, colors and materials. 22. The Photometric Plan (A3.0) should be prepared by a licensed engineer. 23. Please revise the Luminaire Schedule and Calculation Summary tables on the Photometric Plan (A3.0) to be consistent with the proposed lighting levels. 24. The Photometric Plan should include the footcandle spot readings along the walkways. 25. Per code, off-street light fixtures shall not illuminate any vertical or horizontal surface on adjacent property or rights -of-way at a level greater than 0.3 footcandles. Please reduce the lighting levels along the interior side property line on the north side of the site to 0.3 footcandles or less. Otherwise, include the adjacent property/ structures on the plan and lighting levels near the Page 59 of 61 CLM Apartments (MSPM 21-002) Conditions of Approval Page 4 of 5 DEPARTMENTS INCLUDE REJECT building to show compliance with the above code requirement. 26. Please provide details of the proposed pole mounted light fixtures with manufacturer specifications. Ensure the proposed light fixtures are baffled, shielded, screened, or recessed to prevent visibility of the lit portion of the fixture from off the premises. 27. Be advised that sod is only permitted within open -play recreational areas, as well as areas used principally for drainage and storm water retention. Please remove the unnecessary sod shown on the Planting Plan (L-2). 28. The required six (6) foot tall landscape buffer wall should include a continuous hedge planted between the wall and property line. 29. The landscape buffer and strip on the southeast side of the property is encroaching into the right-of-way – the triangular area of the existing ROW labeled as Less and Except. Please revise the landscape plan to depict the vegetation entirely inside the property and along the diagonal property line. 30. The Planting Plan (L-2) shows a Cocoplum hedge overlapping the parking lot area on the north side of Building A. Either, increase the width of the foundation planting area to provide sufficient space for the Cocoplum hedge to grow or remove the hedge. 31. Per code, walls shall be designed in an architectural style consistent with the principal structure(s) incorporating the dominant exterior material(s), colors, and finishes of that structure. At time of permitting, please provide a detail and elevation of the decorative buffer wall showing the proposed materials and color(s) specifications. 32. The Site Plan (SP-1) shows a walkway southeast of Building A that connects to the existing sidewalk. This walkway connection is not depicted on the Planting Plan (L -2). Please correct the drawings to be consistent. Please ensure both plans are consistent. COMMUNITY REDEVELOPMENT AGENCY Comments: None. All previous comments addressed at DART meeting. PLANNING & DEVELOPMENT BOARD CONDITIONS Page 60 of 61 CLM Apartments (MSPM 21-002) Conditions of Approval Page 5 of 5 DEPARTMENTS INCLUDE REJECT Comments: To be Determined CITY COMMISSION CONDITIONS Comments: To be Determined ADDITIONAL REPRESENTATIONS / COMMITMENTS The applicant or applicant’s representatives made the following representations and commitments during the quasi-judicial and/or public hearings that now constitute binding obligations of the applicant. The obligations have the same weight as other conditions of approval. S:\Planning\SHARED\WP\PROJECTS\CLM Apartments\MSPM 21-002\MSPM 21-002 COA.doc Page 61 of 61