Loading...
R02-053 RESOLUTION NO. R02- OS3 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE CHANGE ORDERS NO. 1, 2, 3 AND 4 FOR CONSTRUCTION TECHNOLOGY, INC., IN THE CUMULATIVE AMOUNT OF $22,013 FOR THE BOAT CLUB PARK RENOVATIONS AND SITE IMPROVEMENTS PROJECT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Commission upon recommendation from staff, deems it essential to effective and efficient site drainage which were not anticipated during the design phase, to approve Change Orders no. 1, 2, 3 and 4 for Construction Technology, Inc., in the cumulative amount of $22,013 for the Boat Club Park Renovations and Site Improvements Project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida does hereby authorize and direct the Mayor and City Clerk to approve and execute Change Orders no. 1, 2, 3 and 4 for Construction Technology, Inc., in the cumulative amount of $22,013 for the Boat Club Park Renovations and Site Improvements Project. Section 2. This Resolution shall become effective immediately upon passage. PASSED AND ADOPTED this ~ day of April, 2002. ATTEST: Commissioner Commissioner Philadelphia Coral Gables Dallas Lake Placid San Diego San Francisco Planning & Design Change Order Owner Architect Consultant Contractor Field Other Project: Boat Club Park Renovation Boynton Beach, FL 33425 Owner: City of Boynton Beach To Contractor: : Construction Technology Inc. P.O. Box 16576 West Palm Beach, FL 33416-6576 Change Order No.: #1 Date of Issuance: 1/15/02 Architect's Project No.: 001997 Contract Dated: 9/19/01 Contract For: $944,575 Architect: Wallace Roberts & Todd, LLC 191 Giralda Avenue, Penthouse Coral Gables, FL 33134 The Contract is Changed as Follows: 1. Change Reinforced Concrete Pipe (RCP) to High Density Polyethylene (HDPE), as denoted in Sheets C-2 and C-3 of the Contract Documents, in all drainage systems. $1,960.00 credit. 2. Change location of (2) light poles and leave existing light poles at north and south sides of ramps. (See Attachment 1) No Charge. 3. Add approximately 20 linear feet of 5' concrete walkway on east side of clubhouse from curb to connect with existing walkway. (See Attachment 2.) $810.00 Attachments: 1. Attachment I - Plan Modifying Sheet E-2 Depicting New Locations'for Light Fixtures. 2. Attachment 2 - Plan Modifying Sheet L-1 Depicting Location of New Walkway. The original Contract Sum was $944,575. The net change by previously authorized Change Orders - $0 The Contract Sum prior to this change order was $944,575. The Contract Sum will be decreased by this Change Order in the amount of $1,150.00. The new Contract sum including this change Order will be $943,425. The Contract Time will be Unchanged. T. whae date of Substantial Completion as of the date of this Change Order therefore is Unchanged. llace Roberts & Todd, LLC Construction Technology, Inc. City of Boynton Beach Architect Contractor Owner ~- (4 ignature)'. ~ ' (Signature) ,_ ,~ x-~ ' //~na.ture') D. tte ¢ Date / / Date / 2.' hl///I Wallace Roberts & Todd, LLC 305.448.0788 APPROVED AS '191 G iralda Avenue. Penthouse w ww. wrtdesig,.¢om ~:::><...-~--~-.~'~'~'"~ C~ % Coral Gables, FL 33134 fax 305.443.8431 Planning & Design Philadelphia Coral Gables Dallas Lake Placid San Diego San Francisco Change Order Project: Boat Club Park Renovation Boyntor~,Beach, FL 33425 Owner: City of Boynton Beach To Contractor: Construction Technology Inc. P.O, Box 16576 West Palm Beach, FL 33416-6576 Owner Architect Consultant Contractor Field Other Change Order No.: #2 Date of Issuance: 2/5/02 Architect's Project No.: 001997 Contract Dated: 9/19/01 Contract For: $944,575 Architect: Wallace Roberts & Todd, LLC 191 Giralda Avenue, Penthouse Coral Gables, FL 33134 The Contract is Changed as Follows: Remove the existing 24" diameter outfall pipe and Supervision $ 496.00 Labor 1,652.00 Material 40 I.f. of 24" dia. HDPE 738.00 Concrete and Grout 292.00 8" Aluminum Header Channel 134.00 #57 Stone 320.00 Equipment Compactor 134.00 Pumps 211.00 Saw 93.00 Crane & Vibro 620.00 Trackhoe 744.00 Disposal 93.00 Total $ 5,527.00 replace with 40 linear feet of 24" HDPE: Wallace Roberts & Todd, LL¢ 191 Giralda Avenue, Penthouse Coral Gables, FL 33134 305.448.0788 www. wrtdesign.com fax 305.443.8431 Page1 of 2 Attachments: Attachment 1: Plan Modifying Sheet L-1 Depicting Location of Area of Reinforced Concrete Pipe to be Replaced. The original Contract Sum was $944,575. The net change by previously authorized Change Orders - $1,150.00 (CREDIT) The Contract Sum prior to this change order was $943,425. The Contract Sum will be increased by this Change Order in the amount of $5,527.00. The new Contract sum including this change Order will be $948,952. The Contract Time will be Unchanged. The date of Substantial Completion as of the date of this Change Order therefore is Unchanged. Wallace Roberts & Todd, LLC  /~rchitect ~ (~ r~a{ure~ Kevin ~. Mi,qJqt, ASLA Date Construction Technolo.qy, Inc. Contractor (Signature) by Date City of Boynton Be~ach ~Signatu~) Date APPROVED AS TO FORM-, Page2 of 2 INSTALL 4" THICK :CONCRETE WALKWAY :W/ SAWCUT .CONTROL JOINTS TO :MATCH EXISTING. :INSTALL PREMOLDED · EXPANSION JOINT :WHERE SLAB MEETS · EX ST NG PAVEMENT :INSTALL TO MEET :FINISH ELEVATION 'FLUSH AT EXSTNG : PAVEMENT. &EUU~NATED, SEE SHEET\ FOR STRIPING. ' FOR PRECISE LIMITS OF -- MARINA WORK, SEE SHEETS B-1 - B-8. & ACC E~' ~ATH SEE DETAILG REF. SHT. C-3 FOR HANDICAP STALLS ELIMINATED, SEE SHEET ASPHALT WALK DETAIL 0-2 FOR STRIPING. LEGEND: TREE LEGEND: -- MARINA IMPROVEMENTS ALTERNATE (AA2.) SEE SHEETS B-1 THRU B-8. REPLACE 24-" FROM SEAWALL CATCH BASIN 24" HDPE. ~EI'S C-la~ C ALSO NOTE #15 BI LEDAL DESCRtPT/ON; 0 50' 100' Wallace ROberts & Todd, LLC 191 Giralda Avenue, Pentflouse 305.448.0788 Coral ~ables, FL 33134 fa~ 305.443~431 C-~rd Not~ REFER TO PLANTING PLAN SHEET L-2 FOR EXISTING VEGETATION TO BE REMOVED AND TO REMAIN. REFER TO SHEET E-1 - E-3 FOR LIGHTING AND ELECTRICAL. CONTRACTOR SHALL MAINTAIN ACCESS & FUNCTIONALITY OF BOAT CLUB PARK DURING CONSTRUCTION. CONSTRUCTION FENCING SHALL BE PROVIDED AS NECESSARY TO PROTECT THE HEALTH, SAFETY, AND WELFARE OF THOSE PERSONS HAVING ACCESS TO THE CONSTRUCTION SITE (BOAT CLUB PARK). KeyP/a~ A ~ly ~ ~ Revisions to Chancje Order i~1 Planning & Design Philadelphia Coral Gables Dallas Lake Placid San Diego San Francisco Change Order Owner Architect Consultant Contractor Field Other Project: Boat Club Park Renovation Boynton Beach, FL 33425 Owner: City of Boynton Beach To Contractor: Construction Technology Inc. P.O. Box 16576 West Palm Beach, FL 33416-6576 The Contract is Changed as Follows: Change Order No.: #3 Date of Issuance: 3/4/02 Architect's Project No.: 001997 Contract Dated: 9/19/01 Contract For: $944,575 Architect: Wallace Roberts & Todd, LLC 191 Giralda Avenue, Penthouse Coral Gables, FL 33134 Excavate additional rock and debris and remove in area of current excavation for aluminum sheet pile wall as follows: Supervision $ 380.00 Labor 960.00 Equipment Trackhoe 3 days 1,050.00 6 Loads of Fill 528.00 Total $27918.00 Attachments: The original Contract Sum was $944,575. The net change by previously 8uthorized Change Orders $4,377 The Contract Sum prior to this change order was $948,952. The Contract Sum will be increased by this Change Order in the amount of $2,918. The new Contract sum including this change Order will be $951,870. The Contract Time will be Unchanged. The date of Substantial Completion as of the date of this Change Order therefore is Unchanged. Wallace Roberts & Todd, LLC Construction Technoloqy, Inc. Contractor (Signature) Wallace Roberts & Todd, LLC 19:[ Giralda Avenue, Penthouse Coral Gables, FL 33134 305.448.0788 www. wrtdesign.com ~!O FORM, Page1 of 2 fax 305.443.8431 Planning & Design Change Order Owner Architect Consultant Contractor Field Other Philadelphia Coral Gables Dallas Lake Placid San Diego San Francisco Project: Boat Club Park Renovation Boynton Beach, FL 33425 Owner: City of Boynton Beach To Contractor: Construction Technology Inc. P.O. Box 16576 West Palm Beach, FL 33416-6576 Change Order No.: #4 Date of Issuance: 3/4/02 Architect's Project No.: 001997 Contract Dated: 9/19/01 Contract For: $944,575 Architect: Wallace Roberts & Todd, LLC 191 Giralda Avenue, Penthouse Coral Gables, FL 33134 The Contract is Changed as Follows: Remove the existing 24" diameter outfall pipe and Supervision $ 580.00 Labor 2,950.00 Material 150 I.f. of 18" dia. HDPE 4,970.00 170 I.f. of 24 "dia. HDPE #57 Stone 580.00 Misc. 168.00 Equipment Trackhoe 1,600.00 Compactor 150.00 Pumps, Saws, etc. 1,650.00 Disposal 420.00 Walkway Repair and sod 1,650.00 Tota! $14,718.00 Attachments: replace with 40 linear feet of 24" HDPE: Attachment 1' Plan Modifying Sheet L-1 Depicting Location of Area of Reinforced Concrete Pipe to be Replaced. The original Contract Sum was $944,575. The net change by previously authorized Change Orders $7,295 The Contract Sum prior to this change order was $951,870 The Contract Sum will be increased by this Change Order in the amount of $14,718. Wallace Roberts 8, Todd, LLC 191 Giralda Avenue, Penthouse Coral Gables, FL 33134 305.448.0788 www. wrtdesign.com fax 305.443.8431 Page1 of 2 The new Contract sum including this change Order will be $966,588. The Contract Time will be Unchanged. The date of Substantial Completion as of the date of this Change Order therefore is Unchanged. Wallace Roberts & Todd, LLC A, rchite~ct Construction Technoloqy, Inc. Contractor (Signature) City of Boynton Beach Ow r , ~( 'g are) Kevin D. Miqht, ASLA Date Date Date APPROVED AS TO FORM: · CITY ATTORNE~ Page2 of 2 ~..3o o£ON 1,- 0 ..;J OZO OZ~=