R02-053 RESOLUTION NO. R02- OS3
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORIDA,
AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE CHANGE ORDERS NO. 1, 2, 3 AND 4 FOR
CONSTRUCTION TECHNOLOGY, INC., IN THE
CUMULATIVE AMOUNT OF $22,013 FOR THE BOAT
CLUB PARK RENOVATIONS AND SITE
IMPROVEMENTS PROJECT; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City Commission upon recommendation from staff, deems it
essential to effective and efficient site drainage which were not anticipated during the
design phase, to approve Change Orders no. 1, 2, 3 and 4 for Construction Technology,
Inc., in the cumulative amount of $22,013 for the Boat Club Park Renovations and Site
Improvements Project.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION
OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT:
Section 1. The City Commission of the City of Boynton Beach, Florida does
hereby authorize and direct the Mayor and City Clerk to approve and execute Change
Orders no. 1, 2, 3 and 4 for Construction Technology, Inc., in the cumulative amount of
$22,013 for the Boat Club Park Renovations and Site Improvements Project.
Section 2. This Resolution shall become effective immediately upon passage.
PASSED AND ADOPTED this ~ day of April, 2002.
ATTEST:
Commissioner
Commissioner
Philadelphia
Coral Gables
Dallas
Lake Placid
San Diego
San Francisco
Planning & Design
Change Order
Owner
Architect
Consultant
Contractor
Field
Other
Project:
Boat Club Park Renovation
Boynton Beach, FL 33425
Owner:
City of Boynton Beach
To Contractor:
:
Construction Technology Inc.
P.O. Box 16576
West Palm Beach, FL 33416-6576
Change Order No.: #1
Date of Issuance: 1/15/02
Architect's Project No.: 001997
Contract Dated: 9/19/01
Contract For: $944,575
Architect:
Wallace Roberts & Todd, LLC
191 Giralda Avenue, Penthouse
Coral Gables, FL 33134
The Contract is Changed as Follows:
1. Change Reinforced Concrete Pipe (RCP) to High Density Polyethylene (HDPE), as denoted
in Sheets C-2 and C-3 of the Contract Documents, in all drainage systems. $1,960.00 credit.
2. Change location of (2) light poles and leave existing light poles at north and south sides of
ramps. (See Attachment 1) No Charge.
3. Add approximately 20 linear feet of 5' concrete walkway on east side of clubhouse from curb
to connect with existing walkway. (See Attachment 2.) $810.00
Attachments:
1. Attachment I - Plan Modifying Sheet E-2 Depicting New Locations'for Light Fixtures.
2. Attachment 2 - Plan Modifying Sheet L-1 Depicting Location of New Walkway.
The original Contract Sum was $944,575.
The net change by previously authorized Change Orders - $0
The Contract Sum prior to this change order was $944,575.
The Contract Sum will be decreased by this Change Order in the amount of $1,150.00.
The new Contract sum including this change Order will be $943,425.
The Contract Time will be Unchanged.
T. whae date of Substantial Completion as of the date of this Change Order therefore is Unchanged.
llace Roberts & Todd, LLC Construction Technology, Inc. City of Boynton Beach
Architect Contractor Owner ~-
(4 ignature)'. ~ ' (Signature) ,_ ,~ x-~ ' //~na.ture')
D. tte ¢ Date / / Date / 2.' hl///I
Wallace Roberts & Todd, LLC 305.448.0788 APPROVED AS
'191 G iralda Avenue. Penthouse w ww. wrtdesig,.¢om ~:::><...-~--~-.~'~'~'"~ C~ %
Coral Gables, FL 33134 fax 305.443.8431
Planning & Design
Philadelphia
Coral Gables
Dallas
Lake Placid
San Diego
San Francisco
Change Order
Project:
Boat Club Park Renovation
Boyntor~,Beach, FL 33425
Owner:
City of Boynton Beach
To Contractor:
Construction Technology Inc.
P.O, Box 16576
West Palm Beach, FL 33416-6576
Owner
Architect
Consultant
Contractor
Field
Other
Change Order No.: #2
Date of Issuance: 2/5/02
Architect's Project No.: 001997
Contract Dated: 9/19/01
Contract For: $944,575
Architect:
Wallace Roberts & Todd, LLC
191 Giralda Avenue, Penthouse
Coral Gables, FL 33134
The Contract is Changed as Follows:
Remove the existing 24" diameter outfall pipe and
Supervision $ 496.00
Labor 1,652.00
Material
40 I.f. of 24" dia. HDPE 738.00
Concrete and Grout 292.00
8" Aluminum Header
Channel 134.00
#57 Stone 320.00
Equipment
Compactor 134.00
Pumps 211.00
Saw 93.00
Crane & Vibro 620.00
Trackhoe 744.00
Disposal 93.00
Total $ 5,527.00
replace with 40 linear feet of 24" HDPE:
Wallace Roberts & Todd, LL¢
191 Giralda Avenue, Penthouse
Coral Gables, FL 33134
305.448.0788
www. wrtdesign.com
fax 305.443.8431
Page1 of 2
Attachments:
Attachment 1: Plan Modifying Sheet L-1 Depicting Location of Area of Reinforced Concrete Pipe
to be Replaced.
The original Contract Sum was $944,575.
The net change by previously authorized Change Orders - $1,150.00 (CREDIT)
The Contract Sum prior to this change order was $943,425.
The Contract Sum will be increased by this Change Order in the amount of $5,527.00.
The new Contract sum including this change Order will be $948,952.
The Contract Time will be Unchanged.
The date of Substantial Completion as of the date of this Change Order therefore is Unchanged.
Wallace Roberts & Todd, LLC
/~rchitect ~
(~ r~a{ure~
Kevin ~. Mi,qJqt, ASLA
Date
Construction Technolo.qy, Inc.
Contractor
(Signature)
by
Date
City of Boynton Be~ach
~Signatu~)
Date
APPROVED AS TO FORM-,
Page2 of 2
INSTALL 4" THICK
:CONCRETE WALKWAY
:W/ SAWCUT
.CONTROL JOINTS TO
:MATCH EXISTING.
:INSTALL PREMOLDED
· EXPANSION JOINT
:WHERE SLAB MEETS
· EX ST NG PAVEMENT
:INSTALL TO MEET
:FINISH ELEVATION
'FLUSH AT EXSTNG
: PAVEMENT.
&EUU~NATED, SEE SHEET\
FOR STRIPING. '
FOR PRECISE LIMITS OF --
MARINA WORK, SEE
SHEETS B-1 - B-8.
& ACC E~' ~ATH
SEE DETAILG REF. SHT. C-3 FOR
HANDICAP STALLS
ELIMINATED, SEE SHEET ASPHALT WALK DETAIL
0-2 FOR STRIPING.
LEGEND: TREE LEGEND:
-- MARINA
IMPROVEMENTS
ALTERNATE (AA2.)
SEE SHEETS B-1
THRU B-8.
REPLACE 24-"
FROM SEAWALL
CATCH BASIN
24" HDPE.
~EI'S C-la~ C
ALSO NOTE #15 BI
LEDAL DESCRtPT/ON;
0 50' 100'
Wallace ROberts & Todd, LLC
191 Giralda Avenue, Pentflouse 305.448.0788
Coral ~ables, FL 33134 fa~ 305.443~431
C-~rd Not~
REFER TO PLANTING PLAN SHEET
L-2 FOR EXISTING VEGETATION TO
BE REMOVED AND TO REMAIN.
REFER TO SHEET E-1 - E-3 FOR
LIGHTING AND ELECTRICAL.
CONTRACTOR SHALL MAINTAIN ACCESS
& FUNCTIONALITY OF BOAT CLUB
PARK DURING CONSTRUCTION.
CONSTRUCTION FENCING SHALL BE
PROVIDED AS NECESSARY TO
PROTECT THE HEALTH, SAFETY, AND
WELFARE OF THOSE PERSONS HAVING
ACCESS TO THE CONSTRUCTION SITE
(BOAT CLUB PARK).
KeyP/a~
A ~ly ~ ~ Revisions to
Chancje Order i~1
Planning & Design
Philadelphia
Coral Gables
Dallas
Lake Placid
San Diego
San Francisco
Change Order
Owner
Architect
Consultant
Contractor
Field
Other
Project:
Boat Club Park Renovation
Boynton Beach, FL 33425
Owner:
City of Boynton Beach
To Contractor:
Construction Technology Inc.
P.O. Box 16576
West Palm Beach, FL 33416-6576
The Contract is Changed as Follows:
Change Order No.: #3
Date of Issuance: 3/4/02
Architect's Project No.: 001997
Contract Dated: 9/19/01
Contract For: $944,575
Architect:
Wallace Roberts & Todd, LLC
191 Giralda Avenue, Penthouse
Coral Gables, FL 33134
Excavate additional rock and debris and remove in area of current excavation for aluminum sheet
pile wall as follows:
Supervision $ 380.00
Labor 960.00
Equipment
Trackhoe 3 days 1,050.00
6 Loads of Fill 528.00
Total $27918.00
Attachments:
The original Contract Sum was $944,575.
The net change by previously 8uthorized Change Orders $4,377
The Contract Sum prior to this change order was $948,952.
The Contract Sum will be increased by this Change Order in the amount of $2,918.
The new Contract sum including this change Order will be $951,870.
The Contract Time will be Unchanged.
The date of Substantial Completion as of the date of this Change Order therefore is Unchanged.
Wallace Roberts & Todd, LLC
Construction Technoloqy, Inc.
Contractor
(Signature)
Wallace Roberts & Todd, LLC
19:[ Giralda Avenue, Penthouse
Coral Gables, FL 33134
305.448.0788
www. wrtdesign.com ~!O FORM, Page1 of 2
fax 305.443.8431
Planning & Design
Change Order
Owner
Architect
Consultant
Contractor
Field
Other
Philadelphia
Coral Gables
Dallas
Lake Placid
San Diego
San Francisco
Project:
Boat Club Park Renovation
Boynton Beach, FL 33425
Owner:
City of Boynton Beach
To Contractor:
Construction Technology Inc.
P.O. Box 16576
West Palm Beach, FL 33416-6576
Change Order No.: #4
Date of Issuance: 3/4/02
Architect's Project No.: 001997
Contract Dated: 9/19/01
Contract For: $944,575
Architect:
Wallace Roberts & Todd, LLC
191 Giralda Avenue, Penthouse
Coral Gables, FL 33134
The Contract is Changed as Follows:
Remove the existing 24" diameter outfall pipe and
Supervision $ 580.00
Labor 2,950.00
Material
150 I.f. of 18" dia. HDPE 4,970.00
170 I.f. of 24 "dia. HDPE
#57 Stone 580.00
Misc. 168.00
Equipment
Trackhoe 1,600.00
Compactor 150.00
Pumps, Saws, etc. 1,650.00
Disposal 420.00
Walkway Repair and sod 1,650.00
Tota! $14,718.00
Attachments:
replace with 40 linear feet of 24" HDPE:
Attachment 1' Plan Modifying Sheet L-1 Depicting Location of Area of Reinforced Concrete Pipe
to be Replaced.
The original Contract Sum was $944,575.
The net change by previously authorized Change Orders $7,295
The Contract Sum prior to this change order was $951,870
The Contract Sum will be increased by this Change Order in the amount of $14,718.
Wallace Roberts 8, Todd, LLC
191 Giralda Avenue, Penthouse
Coral Gables, FL 33134
305.448.0788
www. wrtdesign.com
fax 305.443.8431
Page1 of 2
The new Contract sum including this change Order will be $966,588.
The Contract Time will be Unchanged.
The date of Substantial Completion as of the date of this Change Order therefore is Unchanged.
Wallace Roberts & Todd, LLC
A, rchite~ct
Construction Technoloqy, Inc.
Contractor
(Signature)
City of Boynton Beach
Ow r ,
~( 'g are)
Kevin D. Miqht, ASLA
Date
Date
Date
APPROVED AS TO FORM:
· CITY ATTORNE~
Page2 of 2
~..3o
o£ON
1,-
0
..;J
OZO
OZ~=