Loading...
R02-054 RESOLUTION NO. R02- 051/ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, APPROVING THE AWARD OF RFQ #016-2910- 02/KR TO CHARLES ANKROM, GOLF COURSE ARCHITECT, PROVIDING FOR CONSULTANT AND ARCHITECTURAL SERVICES IN THE REMODELING OF THE NINE (9) HOLE EXECUTIVE COURSE AND PRACTICE AREAS AT THE LINKS OF BOYNTON BEACH.; AUTHORIZING AND DIRECTING THE MAYOR AND CITY CLERK TO EXECUTE CONTRACT DOCUMENTS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, upon recommendation of staff, the City Commission of the City of Boynton Beach does hereby approve the award of RFQ #016-2910-02./KR to Charles Ankrom, Golf Course Architect, providing for consultant and architectural services in the remodeling of the nine (9) hole executive course and practice areas at the Links of Boynton Beach, Florida, with an estimated expenditure of $56,500.00, based on the negotiated agreement; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA, THAT: Section 1. The City Commission of the City of Boynton Beach, Florida, hereby approves the award of RFQ #016-2910-02/KR, to Charles Ankrom, Gold I Course Architect, a copy of said Contract is attached hereto I Section 2. That this Resolution shall become effective immediately. PASSED AND ADOPTED this ~ day of April, 2002. m~~ I i I :1 CR, FLORIDA " ~ 1. Co~ssioner /~ C 7&--#-- Commissioner . Roa-~s'1 CONSUL TING AGREEMENT This Consulting Agreement is made and entered into this ~ day of ~Q.. i L. , 2002, by and between the City of Boynton Beach. hereinafter called the "OWNER', and Charles F. Ankrom. Inc.. hereinafter called the "CONSULTANT". WHEREAS, the OWNER desires to remodel the 9 hole Executive Golf Course and practice facilities of the OWNERS 27 hole golf course named "The Links at Boynton Beach", a public golf course operation. WHEREAS, the OWNER desires to engage the services of the CONSULTANT to consult the OWNER and the OWNER'S" Site Representatives" on the design and improvements to be made to the 9 hole Executive Golf Course, including the goal of converting the 9 hole Executive Golf Course into "The Family Golf Course" by adding additional tees to each golf hole, and for improvements to all practice facilities. THEREFORE, the OWNER hereby engages the services of the CONSULTANT, and III consideration of the mutual promises herein contained, the parties agree as follows: SECTION A: SERVICES TO BE RENDERED BY THE CONSULTANT: 1. To provide general consulting services and design consulting services to the OWNER, and the OWNER'S Site Representatives, for improvements to be made to the golf course. The OWNER'S Site Representatives shall be: Joe Sciortino, Golf Director; Scott Wahlin, Golf Course Superintendent; and appointed staff. The direct line of communications to/from the project shall be between the CONSULTANT and Joe Sciortino. 2. To attend site meetings and site research with the Site Representatives to determine: a) The philosophy and scope ofthe remodeling program. b) Improvements to all tees, including existing tees and new multiple tee positions, and the design theme of the tees. To convert the 9 hole golf course to a Family Golf Center, to be named "The Family Golf Course", c) Improvements to all green sites and their respective putting surfaces, and including green sand traps, mounding concepts, grass pockets or hollows, and the establishment of. new features, such as decorative and functional timber retaining walls on selected greens by existing lakes, d) To commJ.lIlicate and consult with the Site Representatives on any and all desired changes and improvements to the fairways and roughs, including drainage where possible, fairway traps and mounds, the lakes of the golf course, and any cart path improvements. e) To consult on improvements to the practice facilities, including the practice range and tees, the putting green, and the trap and chip green. t) To review irrigation changes necessary due to the remodeling improvements of the golf course features. g) To advise on any other site improvements within the scope and abilities of the CONSULTANT. 3. To provide a sample "Bid Form" for the bidding of the golf course remodeling work to qualified golf course contractors. To attend a " pre-bid conference", consult with the OWNER and bidding contractors during the bid phase, and assist the OWNER, if necessary, in the selection of the awarded contractor. 4. To write and develop the "Golf Course Construction Specifications" for the remodeling program. 5. " Consulting Design Task ": a) Using topographic mylars provided by the OWNER on a 1 "=100' scale, or a 1" = 60' scale, or a scale to be determined that will fit the 9 hole golf course on a 36" size of paper or mylar (height), to design a "Master Plan" for remodeling improvements demonstrating the location of all features changed, improved, added or deleted to the golf course, including the outlines and location of: existing tees, improved tees, and all new tees; all green sites and new features improvements, including the location of new timber retaining walls; improvements to the practice facilities; changes to any lakes; and any major improvements to fairways and roughs, including catch basins (turf drains) and drain lines where recommended. b) "Green Detail Plans": To provide topographically mapped green detail plans on a design scale of 1"=20', and including: one foot contour intervals with spot elevations; the putting surface outline and size of each putting surface; all sand traps; mounding; and all special features such as grass pockets or hollows, and the location of any timber retaining walls. c) Any special "Exhibits" to demonstrate a feature for construction (to be determined by the CONSULTANT). 2 6 The fees of the CONSULTANT shall be: a) Initial site meetings, golf course inspections, evaluations of design concepts and improvements to the golf course, preparation of the "Master Plan," preparation of the "Green Detail Plans," any exhibits determined by the CONSULTANT, additional insurance, and preliminary cost estimates subject to Contractors bids: $ 37,500.00 b) Preparation of written construction specifications: 6,000.00 c) Bid Form and Bid Phase: 3,000.00 d) Construction site inspections. Based on 10 trips, plus communication between site trips: 10,000.00 e) Any additional task requested by the OWNER shall be at the CONSULT ANTS per diem rates, plus expenses. f) Reimbursable expenses shall include personal vehicle travel at $0.38 per mile, turnpike tolls, long distance calls and fax, postage and shipping cost, blueprinting, mylars or sepias, printing services, and photo enlargements or reductions. g) An initial deposit retainer shall be $7,000.00. This amount shall be credited in equal proportions ($3500.00) on the CONSULTANT'S first two progress statements. h) Per diem rates of the CONSULTANT for additional work request: 1. GENERAL CONSULTING SERVICES provided by Charles F. Ankrom shall be charged at $125.00 per hour 2. CONSULTING DESIGN TASK provided by Charles F. Ankrom shall be charged at $150.00 per hour 3. Any required DESIGN STAFF shall be charged at $80.00 per hour. 4. CLERICAL: All clerical duties shall be charged at $35.00 per hour. 5. Reimbursable expenses shall apply according to paragraph 6f. 3 ~ i) The COl'{SULTANT shall submit monthly progress Statements to the OWNER. These Statements shall be paid within twenty days after submittal. All statements 30 days past due shall accumulate interest at the rate of 1.5 % per month, compounded monthly. 7. Insurance: The CONSULTANT shall carry $1,000,000.00 professional liability insurance, and $500,000/500,000/500,000 insurance on any vehicle owned by the CONSUL T ANT and operating on the golf course site, with the City designated as an additional insured party. SECTION B: THE OWNER AGREES: 1. The OWNER, where remodeling deems these services to be necessary, shall retain building architects, engineers, surveyors, and consultants for all required designs of buildings and structures, dams or lakes, bridges, bulkheads or retaining walls, storm storage devices, drainage engineering, erosion control plans, culverts, roads, paths, parking lots, utilities, wetland and environmental consulting of design, all survey task, and any specialist needed to complete the project or to provide design or services that are not within the qualifications of the Golf Course CONSULTANT, or the scope of the Consulting Agreement. 2. The OWNER and its agents shall be responsible for obtaining any required construction permits necessary to remodel the 9 hole golf course and practice facilities, and pay all permit fees, with the exception of any permits required ofthe Contractor. 3. The OWNER'S Site Representatives shall participate in site improvement reviews and meetings with the CONSULTANT, and shall: provide design concept reviews for greens remodeling and renovation; green sites for functional and decorative timber retaining walls; the location of new tees and tees to be remodeled, all fairway and rough improvements; all practice facilities improvements; lake expansion areas; clearing areas; conceptual planning for all irrigation improvements or any irrigation designers if necessary. 4. The OWNER'S Site Representatives and maintenance staff shall participate in selected site construction task such as design and installation of all new irrigation requirements, applications of Roundup to eradicate all existing turf grass in the remodeled or renovated- area, site staking of tees and new tee positions, and any task determined between the CONSULTANT and Site Representatives. 5. The OWNER'S Site Representatives shall inspect and monitor the contractors performance on a daily basis. Any field changes to improve any feature shall be reviewed with the CONSULTANT. 4 6. The OWNER'S Site Representatives shall locate sources of any required purchased sandy fill, and sandy topsoils, and have physics and chemical test performed on selected soils, 7. Grow-in Phase: The OWNER'S Site Representatives shall be responsible for all task of the turfgrass grow-in phase, and preparing the golf course for play. This includes any pre-plant fertilizer and lime, pre-plant pre-emergency herbicides, all irrigation practices as each zone of the golf course is planted, fertilization practices, any necessary post grassing herbicides and .insecticides, erosion repairs, mowing, verticutting, and topdressings, and any practice or maintenance item necessary to prepare the course for opening and play. 8. The Site Representatives will participate in calculations on volumes of construction task to be performed, such as total renovation areas (acres), grassing volumes, fill materials, cart path volumes, and any task pertaining to volumes of areas necessary to bid and construct the project. 9, The OWNER shall provide all city of Boynton Beach specifications and documents applicable to golf course construction remodeling, including bonding requirements, insurance requirements, and construction delay penalties. The OWNER shall also be responsible for processing the" Bid Phase" to qualified Golf Course Contractors, and all documents or notices applicable to the Bid Phase, 10. The CONSULTANT, along with the OWNER'S Site Representative, will approve all contractor construction draw requests for payment when appropriate based on the request and work completed. GENERAL ITEMS 1. Due to the participation of the OWNER'S Site Representatives in conceptual studies and site planning of features, general planning services, and construction inspections, the projected gross fees of the CONSULTANT have been reduced as compared to a typical design contract. 2. Due to the participation of the OWNER'S Site Representatives and Maintenance Staff in selected phases of construction tasks (all tasks to be determined), the cost of construction will be reduced by eliminating these tasks from the Contractor's requirements. 3. Unless extended by addendum or consulting per diem rates, this Consulting Agreement shall be complete when the golf course contractor's work is 100% complete and the newly renovated golf course and practice areas are 100% grassed. 5 Charles F. Ankrom, P esident Charles F. Ankrom; In . Consultin~ A!!reement AcceDted by: ~~/i Ii Gerald Broening, Mayor City of Boynton Beach ~--- -f..{lc,!ot. b /1 ~(' G'- {>,J- c/ S 1 Y/\1/oa 6