17-4373AIR CONDITIONING SPECIFICATION A. GENERAL 1. AIR CONDITIONING CONTRACTOR SHALL VISIT THE JOB SITE PRIOR TO BID AND VERIFY ALL CONDITIONS, LOCATIONS, DIMENSIONS, MATERIALS, ELEVATIONS AND COUNTS AS SHOWN AND/OR NOTED ON THE DRAWINGS AND INCLUDE IN THE BID ANY AND ALL FABRICATION REQUIRED PRIOR TO INSTALLATION. THE CONTRACTOR SHALL VERIFY SIZE, ELEVATION, AND PRESENT STATE OF ALL EXISTING UTILITIES, 2. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED OF ANY AND ALL EXISTING FIELD CONDITIONS WHICH DEVIATE FROM WHAT WAS SHOWN ON THE PLANS, CONTRACTOR IS RESPONSIBLE TO PROVIDE PRICING FOR A COMPLETE INSTALLATION INCLUDING ANY COSTS ASSOCIATED WITH FIELD CONDITIONS AT THE TIME OF BIDDING. 3. IT SHALL BE THE RESPONSIBILITY OF THE AIR CONDITIONING CONTRACTOR FOR THE ADVANCED ORDERING OF LONG LEAD ITEMS SO THAT DELIVERY WILL NOT INTERFERE WITH THE PRODUCTION OF OTHER TRADES RESULTING IN ANY DOWN OR LAG TIME. 4. IT SHALL BE THE RESPONSIBILITY OF THE AIR CONDITIONING CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION NECESSARY TO ACCOMPLISH THE WORK SHOWN AND/OR NOTED ON THE DRAWINGS. THE DRAWINGS ARE DIAGRAMMATIC: DO NOT SCALE FOR EXACT LOCATIONS. THE AIR CONDITIONING CONTRACTOR SHALL INSTALL ALL NECESSARY OFFSETS, BENDS, AND TRANSITIONS AS REQUIRED TO PROVIDE A COMPLETE AND FULLY OPERATIVE SYSTEM. ALL DUCT SIZES ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL NOTIFY ENGINEER IF DUCT SIZE CHANGES ARE REQUIRED BECAUSE OF EXISTING CONDITIONS. 5. CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES, INSPECTIONS, TESTS, AND ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 6: AFTER BID SELECTION AND PRIOR TO COMMENCEMENT OF WORK, THE AIR CONDITIONING CONTRACTOR SHALL SUBMIT (6 COPIES) OF EQUIPMENT CUTS FOR ALL DUCT WORK, EXHAUST FANS, AIR DEVICES, AND EQUIPMENT AS STATED ON SCHEDULES AND OR NOTES. IF THE CONTRACTOR PROPOSES TO USE ANY ARTICLE, DEVICE, PRODUCT, OR MATERIAL WHICH IS NOT AS SPECIFIED, THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVE TO THE ENGINEER THAT THE PROPOSED SUBSTITUTION IS EQUAL AND WILL FIT ALLOCATED SPACE. B. WORKMANSHIP i 7. ALL WORK SHALL BE PERFORMED BY A LICENSED AIR CONDITIONING CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. ALL WORK- MANSHIP AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE NATIONAL, STATE AND LOCAL CODES AND ORDINANCES. 8. THE AIR CONDITIONING CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR TO ORIGINAL CONDITION ANY AND ALL DAMAGES TO BUILDING SURFACES, EQUIPMENT, AND FURNISHINGS CAUSED BY THE CONTRACTOR DURING THE PERFORMANCE OF WORK. 9. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY. C. PIPING 10. ALL REFRIGERANT PIPING SHALL BE TYPE "L" OR TYPE "K" COPPER WITH WROUGHT COPPER OR BRASS FITTINGS. STEEL VALVES ARE NOT PERMITTED. 11. THE AIR CONDITIONING CONTRACTOR SHALL RUN ALL CONDENSATE DRAINS PER PLUMBING SPECIFICATIONS. (SEE PLUMBING SHEETS) 12. INTERIOR CONDENSATE DRAIN PIPING AND REFRIGERANT SUCTION LINES SHALL BE INSULATED WITH 5/8" THICK IMCOLOCK OR ARMAFLEX. 13. COMBUSTIBLE PIPING IS NOT PERMITTED IN RETURN AIR PLENUMS OR CEILING SPACES USED FOR RETURN AIR. D. INSTALLATION 14, LOCATION OF AIR CONDITIONING DUCTS AND AIR DEVICES MAY CHANGE. VERIFY EXACT LOCATION WITH ARCHITECT/ENGINEER PRIOR TO INSTALLATION. DRAWINGS ARE DIAGRAMMATIC, DO NOT SCALE FOR THE EXACT LOCATION OF DUCTS, DIFFUSERS, GRILLES, REGISTERS, PIPING, EQUIPMENT, ETC. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF AIR DEVICES. 15. THE AIR CONDITIONING CONTRACTOR SHALL USE VANED ELBOWS OR APPROVED 3 PIECE ELBOWS, SPLITTER DAMPERS WHERE INDICATED, VOLUME CONTROLS IN ALL BRANCH LINES AND SUPPLY AND RETURN AIR DEVICES. 16. THE AIR CONDITIONING. CONTRACTOR SHALL SEAL ALL DUCTS IN AN APPROVED MANNER TO INSURE AGAINST LEAKAGE. 17. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID ANY CONFLICTS IN LOCATIONS FOR DUCTS, DIFFUSERS, GRILLES, REGISTERS, PIPING, EQUIPMENT, ETC., INORDER TO NOT INTERFERE WITH THE PROGRESS OF CONSTRUCTION. E. EQUIPMENT AND MATERIALS 18. THE AIR CONDITIONING CONTRACTOR SHALL PROVIDE FLEXIBLE DUCT CONNECTIONS.TO ALL FANS, A/C UNITS, OR MECHANICAL EQUIPMENT, EXCEPT FOR EXHAUST HOODS. 19. ALL EXHAUST AND OUTSIDE AIR DUCTSSHALL BE GALVANIZED SHEET METAL CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH ASHRAE, SMACNA, AND LOCAL CODES. ALL OUTSIDE AIR DUCTS SHALL HAVE V INSULATION IN AIR CONDITIONED SPACES, 20. UNLESS NOTED AS EXISTING, ALL EQUIPMENT, PIPING, DUCTS, REGISTERS, ETC., SHALL BE NEW. 21. TERMINAL AIR DISTRIBUTION DEVICES SHALL BE TITUS, METALAIRE OR NAILOR-HART OR EQUAL AS SCHEDULED: ALL VOLUME DAMPERS SHALL BE OPPOSED BLADE TYPE WITH SCREWDRIVER ADJUSTMENT. GLASS AIR DUCTWORK J MANVILLE FIBERGLASS 1.5" THICK). T FIBER ORK SHALL 8E JOHNS M E RG I K . TYPE 475 OR 800 OR SHEET 22. ALL SUPPLY AND RETURN) FETAL WITH MMUM R-6 EXTER IOR FOILBACK INSULATION. UNLESS OTHERWISE NOTED ON PLANS _ : ALL DUCTS SHALL BE SUPPORTED IN AS STRAIGHT AND LEVEL AS FASHION AS POSSIBLE. THE ENTIRE INSTALLATION SHALL BE INSTALLED IN ACCORDANCE WITH ASHRAE, SMACNA, AND LOCAL CODES. FLEXIBLE DUCTS SHALL BE UL -181 RATED, NONMETALLIC, CLASS 1, R-6 - INSTALLED IN ACCORDANCE WITH FBC-M 304.1 FLEXIBLE DUCTS SHALL NOT BE LIMITED IN LENGTH PER FBC-M 603.6.1.1 23. THE AIR CONDITIONING CONTRACTOR SHALL PROVIDE ALL CONTACTORS, STARTERS, RELAYS, AND THERMOSTATS. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL SWITCHES, DISCONNECTS, POWER WIRING AND CONTROL WIRING. 24. THE AIR CONDITIONING CONTRACTOR SHALL PROVIDE V THICK FARR 30/30 (THROW -AWAY TYPE) FILTERS WITH EACH A/C UNIT. 25. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND SHALL BEAR UNDERWRITERS LABEL WHERE APPLICABLE, F. SAFETY 26. ALL PENETRATIONS OF FIRE -RATED WALLS, FLOORS OR CEILINGS SHALL BE FIREPROOFED BY A SEALING METHOD AND RATING AS SPECIFIED ON THE DRAWINGS OR AS REQUIRED BY THE LOCAL OR STATE CODES. 27, AIR HANDLING DEVICES IN EXCESS OF 2000 CFM WILL HAVE A DUCT SMOKE DETECTOR TO STOP THE FAN AND ACTIVATE A HORN AND STROBE LIGHT. ALL EQUIPMENT SHALL BE INTERLOCKED AS REQUIRED BY LOCAL CODES OR FIRE SAFETY OFFICIALS. 28. ALL WORK SHALL COMPLY WITH BASE BUILDING LIFE SAFETY/SMOKE CONTROL SYSTEM REQUIREMENTS, PROVIDE ALL NECESSARY WIRING, CONTACTORS, RELAYS, ETC., AS REQUIRED FOR INTERFACE WITH BASE BUILDING SYSTEM. 29. THE AIR CONDITIONING CONTRACTOR SHALL KEEP ALL AREAS IN WHICH WORK IS BEING PERFORMED, FREE FROM DEBRIS AT ALL TIMES AND SAID AREAS SHALL BE LEFT BROOM CLEAN AT THE END 'OF EACH WORKING DAY. G. COMPLETION 30. THE AIRCONDITIONING CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS BUILT DRAWINGS TO THE ENGINEER UPON COMPLETION OF INSTALLATION. IF FIELD CHANGES ARE MADE WHICH DEVIATE FROM ENGINEERING DRAWINGS TO THE EXTENT THAT THE BUILDING DEPARTMENT REQUIRES THESE CHANGES BE INCORPORATED PRIOR TO INSPECTION, THE CONTRACTOR SHALL PROVIDE SKETCHES TO THE ENGINEER FOR INCORPORATION INTO THE BUILDING PLANS. ENGINEERING EXPENSES THAT ARE INCURRED DUE TO REVISIONS OR SUBSTITUTIONS REQUESTED BY THE CONTRACTOR SHALL BE PAID FOR BY THAT CONTRACTOR. 31. THE AIR CONDITIONING CONTRACTOR SHALL PROVIDE A TEST AND BALANCE REPORT PER 2010 FBC ENERGY CONSERVATION SEC 503.2.9:1 FOR ALL MECHANICAL EQUIPMENT, AIR DEVICES, DAMPERS, AHU'S AND FANS FOR ALL PROJECTS 15 -TONS OR LESS PER SYSTEM. THE T & B REPORT SHALL BE IN ACCORDANCE WITH AIR BALANCE COUNCIL STANDARDS AND SHALL INCLUDE AIR QUANTITIES FOR ALL SUPPLY GRILLES, RETURN GRILLES, AND EXHAUST GRILLES AND THE LEAVING AND ENTERING AIR TEMP (°F) FROM SUPPLY GRILLES AND EVAPORATORS. IF THE OWNER EXPERIENCES UNCOMFORTABLE CONDITIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION OF AIR FLOW TO WITHIN PLUS OR MINUS 10% FROM AIR QUANTITIES STATED ON THE PLANS 32. AIR CONDITIONING CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP TO BE FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN (1) YEAR FROM DATE OF ACCEPTANCE, AND ALL GUARANTEES AND WARRANTIES SHALL BE DELIVERED TO THE OWNER. COMPRESSORS SHALL HAVE EXTENDED FIVE YEAR WARRANTIES. H. EXISTING CONDITIONS 33. IF THE NATURE OF THIS CONTRACT INVOLVES EXTENSIVE REMODELING OF THE EXISTING BUILDING. THE AIR CONDITIONING CONTRACTOR, PRIOR TO BID, SHALL INSPECT THE EXISTING CONDITIONS AT THE JOB SITE AND ACQUAINT HIMSELF WITH THE CONDITIONS THAT WILL AFFECT HIS WORK. 34. PRIOR TO INSTALLATION, THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF ALL EQUIPMENT WITH THE OWNER'S REPRESENTATIVE AND THE ACTUAL EQUIPMENT BEING FURNISHED. 35. PRESENT AIR CONDITIONING EQUIPMENT WHERE INDICATED ON THE DRAWINGS IS FOR INFORMATION ONLY AND THE CONTRACTOR SHALL INCLUDE THE INSTALLATION OF CONDUIT AND WIRE AS REQUIRED. THE INSTALLATION OF NEW EQUIPMENT THAT INTERFERES WITH EXISTING SHALL BE REMOVED, RELOCATED, OR RE -FLOUTED TO PERMIT COMPLETION OF SUCH WORK. 36. SALVAGED MATERIALS, EQUIPMENT, AND DIFFUSERS SHALL BE DELIVERED TO THE OWNER AT HIS PROPERTY AND STORED WITHIN THE BUILDING WHERE DIRECTED, ANY REMOVED MATERIALS OR EQUIPMENT WHICH THE OWNER DOES NOT WISH TO KEEP,SHALL BE DISPOSED OF BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER. 37. THE AIR CONDITIONING CONTRACTOR SHALL DETERMINE THE EXTENT TO WHICH EXISTING DUCTWORK AND PIPING WILL HAVE TO BE RE- ROUTED, RELOCATED, OR RECONNECTED, AND THE AMOUNT OF ADDITIONAL WORK WHICH MAY BE REQUIRED DUE TO THE PHYSICAL CONDITIONS OF THE DUCTWORK & PIPING SHALL BE PERFORMED UNDER THIS CONTRACT WITHOUT ADDITIONAL CHARGES TO THE OWNER: 38. INTERRUPTION OF EXISTING FACILITIES OR SERVICES SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONDITIONS ARE NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTION OF SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, AND THE WORK OF MAKING FINAL CONNECTIONS TO NEW WORK SHALL BE DONE ONLY AT SUCH TIMES AS PERMITTED AND SCHEDULED BY THE OWNER WITHOUT ADDITIONAL COST. THE AIR CONDI- TIONING CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE THE SERVICE INTERRUPTIONS WITH THE OWNER & GENERAL CONTRACTOR. zi NEW 8"0 SHT MTL FRESH AIR DUCT TO WALL CAP.-� Existing Bathroom ro NOTE: PER 2010 FBC ENERGY CONSERVATION CH. 5, SECTION 503.2.5.4: PROVIDE MOTORIZED SHUTOFF CONTROL DAMPERS ON ALL OUTSIDE AIR INTAKES. NEW 4"0 SHT MTL EXH, AIR DUCT TO WALL CAP. 1VIR TL n 11. NEW I � 4 IECT NEW FRESH REF. TO THE EXISTING I MAIN RETURN DUCT E IST G --- ;. ---- ( EXISTING FIELD VERIFY. AHU-1 F-Asting q 3 TON Bathroom (� AHU-2 SHALL REMAIN.._-- 4 3 TON C,71 SHALL FIELD VERIFY 0 8"0 SHT MTL I.... FRESH AIR DUCT TO �\ WALL CAP.- w REVIEWED BY w L,� N � lf-j I e'1'>41•`�i {A �. � � ids .� w ITS �c�� �y �-�� • l-w- t � I r.. ]117 6i=-jI Lli MECHANICAL PLAN 3116" = 1'-0" ,'•(Ii�G j Lfr���3 RECORD SET: 07/25/12 4ECH [j ELEC Q PLUMB FAE CONSULTING HAS PREPARED THESE RECORD DOCUMENTS BASED ON THE INFORMATION PROVIDED TO US BY THE CONTRACTOR. ANY INACCURACIES OR OMISSIONS ON THESE -PLANS ARE NOT THE RESPONSIBILTY OF FAE CONSULTING. THESE PLANS HAVE BEEN REVIEWED FOR ORIGINAL DESIGN INTENT & CODE COMPLIANCE ONLY. EXHAUST FAN DATA FAN # CONNECT NEW FRESH 11c :ji�l DUCT TO THE EXISTING MVD MAIN RETURN DUCT ----_I : E.S.P. IN. WG. FIELD VERIFY. RPM - ROOF CURB TYPE - DIRECT DRIVE O/A 829 ELECTRIC V/O/HZ 120/1/60 14.7 WATTS EXISTING 10.36 LBS ACCESS. - ROOF CURB TYPE - FIRESTAT - BACKDRAFT DAMPER - DISCONNECT SWITCH - SPEED CONTROL - - 0 AHU-3 - REMARKS x 4"0 SHEET METAL DUCT. x SEE PLANS FOR TERMINATION. DIFFUSER TYPE 3 TON ,CFM CU -1 AUTOMATED VOLUME HAMPER LA - SHALL REMAIN. c?] AIR HANDLER UNIT FIA RETURN AIR GRILLE ABBREVIATIONS FIELD VERIFY ABOVE FINISHED FLOOR R.A. RETURN AIR Q ROOF CAP W.C. WALL CAP O/A OUTSIDE AIR S.A.D. w REVIEWED BY w L,� N � lf-j I e'1'>41•`�i {A �. � � ids .� w ITS �c�� �y �-�� • l-w- t � I r.. ]117 6i=-jI Lli MECHANICAL PLAN 3116" = 1'-0" ,'•(Ii�G j Lfr���3 RECORD SET: 07/25/12 4ECH [j ELEC Q PLUMB FAE CONSULTING HAS PREPARED THESE RECORD DOCUMENTS BASED ON THE INFORMATION PROVIDED TO US BY THE CONTRACTOR. ANY INACCURACIES OR OMISSIONS ON THESE -PLANS ARE NOT THE RESPONSIBILTY OF FAE CONSULTING. THESE PLANS HAVE BEEN REVIEWED FOR ORIGINAL DESIGN INTENT & CODE COMPLIANCE ONLY. EXHAUST FAN DATA FAN # EF -1 MANUFACTURER PANASONIC FV-0$VQ5 CFM 50 E.S.P. IN. WG. 0.100 RPM - ROOF CURB TYPE - DIRECT DRIVE O/A 829 ELECTRIC V/O/HZ 120/1/60 14.7 WATTS OPERATING WEIGHT 10.36 LBS ACCESS. - ROOF CURB TYPE - FIRESTAT - BACKDRAFT DAMPER - DISCONNECT SWITCH - SPEED CONTROL - - X - - REMARKS x 4"0 SHEET METAL DUCT. x SEE PLANS FOR TERMINATION. VENTILATION PER F.M.C. 403.3 VENTILATION PER TABLE 443.3 OCCUPANCY: OFFICE (UNIT 1 & UNIT 2) AREA: 1600 SF PEOPLE:8 O/A REQUIRED: (8 x 5) + (1600 x 4.06) = 136 CFM O/A PROVIDED: = 150 CFM TO EACH UNIT AHU W (X) PROVIDE MOTORIZED VOLUME DAMPER VENTILATION PER F.M.C. 403.3 VENTILATION PER TABLE 403.3 UNIT 3 OCCUPANCY: OFFICE () AREA: 700 SF PEOPLE 10 0/A REQUIRED: (10 x 5) + (1700 x 0.06) = 152 CFM 0/A PROVIDED: = 200 CFM (X) (X) PROVIDE MOTORIZED VOLUME DAMPER AIR CONDITIONING A/C LEGEND . 4W - DIFFUSER -�-- 2W - DIFFUSER CONDENSING UNIT AIR HANDLER UNIT QTY. UNIT N0. MFG. TOTAL TRANSITION SEER MANUAL VOLUME DAMPER O/A (M.V.D.) ELECTRIC HEAT FIRE DAMPER (F.D.) i� THERMOSTAT QTEMPERATURE & HUMIDITY CONTROL s S /SENSOR EXISTING LIQUID/SUCTION LINE A DIFFUSER TYPE 144 ,CFM CU -1 AUTOMATED VOLUME HAMPER LA - CONDENSING UNIT c?] AIR HANDLER UNIT FIA RETURN AIR GRILLE ABBREVIATIONS A.F.F. ABOVE FINISHED FLOOR R.A. RETURN AIR R.C. ROOF CAP W.C. WALL CAP O/A OUTSIDE AIR S.A.D. SUPPLY AIR DUCT R.A.D. RETURN AIR DUCT R.A.G. RETURN AIR GRILLE E.A.G. EXHAUST AIR GRILLE T.E.D TOILET EXHAUST DUCT AVD AUTOMATED .VOLUME DAMPER FHP FLORIDA HEAT PUMP AHU AIR HANDLER UNIT CU CONDENSING .UNIT WAHU WALL MOUNTED AIR HANDLER UNIT OAHU CEILING MOUNTED AIR HANDLER UNIT (N) NEW (E) EXISTING TO REMAIN (0) EXISTING TO BE DEMOLISH (RE) EXISTING. TO BE TZELOCATED (RP) EXISTING TO BE REPLACED ® UP y ON SUPPLY DUCT (UP & DOWN) UP y ON RETURN DUCT (UP & DOWN). UP ON EXHAUST DUCT (UP & DOWN) ® UP y ON 0/A DUCT (UP & DOWN) NEW DUCT - WIDTH x DEPTH EXISTING DUCT -WIDTH x DEPTH 5t NEW FLEX DUCT - DIAMETER AIR CONDITIONING DATA CONDENSING UNIT AIR HANDLER UNIT QTY. UNIT N0. MFG. TOTAL SENSIBLE SEER TOTAL O/A FAN E.S.P. - IN WATER ELECTRIC HEAT i�.flDEL NO. MODEL NO. 1 AHU-1 EXISTING EXISTING EXISTING 36,400 EXISTING 13 SEER 1,200 150. EXISTING EXISTING CU -1 Q LA - 1 AHU-2 EXISTING EXISTING EXISTING 36,000 C o� EXISTING 13 SEER 1,200 150 EXISTING EXISTING CU -2 ® C � C7 Q CO C3 1 AHU-3 EXISTING EXISTING EXISTING 36,000 CA EXISTING 13 SEER .1,200 200 EXISTING EXISTING CU3 o A/C EQUIPMENT NOTES: 1) VERIFY ALL A/C ELECTRICAL REQUIREMENTS WITH MANUFACTURERS SPEC. PRIOR TO INSTALLATION. 2) PROVIDE 7 DAY DIGITAL PROGRAMMABLE T -STAT WITH NIGHT SET -BACK, 3) A I, WORK:SCOPE OF 1 AIR CONDITIONING SYSTEM IS EXISTING AND TO REMAIN WITH EXCEPTION OF PROVIDING NEW ITEMS SHOWN ON PLANS. 2 PRIOR TO CONSTRUCTION MECHANICAL CONTRACTOR. SHOULD VISIT SITE TO VERIFY SCOPE OF WORK. 3 PROVIDE NEW FRESH AIR DUCT TO EACH AHU INCLUDING MOTORIZED AND MANUAL VOLUME DAMPER. REFER TO FLOOR PLAN FOR LOCATION. 4 BALANCE AHU-1 AND AHU-2 TO 1,200 CFM SUPPLY AIR, OUTDOOR AIR TO 150 CFM, AND RETURN AIR TO 1,050 CFM. 5 BALANCE AHU-3 TO 1,200 CFM SUPPLY AIR, OUTDOOR AIR TO 200 CFM AND RETURN AIR TO 1,000 CFM. 6 PROVIDE NEW EXHAUST FAN TO UNIT #2 BATHROOM. 7 T -STAT ARE EXISTING TO REMAIN, CONTRACTOR TO VERIFY IF THERMOSTAT ARE 7 DAYS DIGITAL PROGRAMMABLE T --STATS 8 THIS RENOVATION SHALL INCLUDE, BUT IS NOT LIMITED TO THIS SCOPE OF WORK. NOTIFY ARCHITECT/ENGINEER OF ANY CONDITIONS THAT WILL PREVENT COMPLETION OF THE WORK DESCRIBED. � RECORD SET: 07/25/12 PERMIT SET: 05/15/12 PRIOR TO SUBMITTING HIS BED, THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND INFORM THE ARCHITECT AND THE ENGINEER OF ANY DISCREPANCY BETWEEN THESE DOCUMENTS ARID THE EXISTING CONDITIONS AND HE SHALL INCLUDE IN HIS BID TO CORRECT THE SAME AS DIRECTED. THE ENGINEER AND THE ARCHITECT, ARE NOT RESPONSIBLE FOR ANY ADDITIONAL COSTS RESULTING FROM VERIFIABLE EXISTING CONDITIONS DISCOVERED AFTER CONTRACT HAS BEEN AWARDED. NO CHANGES SHALL BE MADE TO THESE PLANS WITHOUT PRIOR APPROVAL FROM THE ENGINEER OF RECORD. ALL CHANGES SHALL BE SUBMITTED FOR REVIEW PRIOR TO INSTALLATION. NOT FOR BiD UNTIL PERMIT HAS BEEN ISSUED. m Cn rn � Cn N ai C13 H C4 in t9 0414 Mw zw Wr? Z > X z z m' `moo z 0 N :1 w �i V r�tC4jj p az Ol w a m Us: a U w b U. r. w p 4 M ° cq z w f a 3°�Qa�z Z Zcezn _ . cp Q w w Q , �mrC3w_ URSULA IAFRATE, P.E. CONSULTING ENGINEER #73122 MARTIN WHITELOCKE, P.E. CONSULTING ENGINEER #53899 I REVI5ION: # DATE DE5CRIPTION 0 06-26-12 AS BUILT 155UED fOR PERMIT: 05-15-12 DRAWING TITLE: ME(NANICALPLAN DATE: 05-15-12 SCALE: AS NOTED DRAWN BY: DCM CHECKED BY: UI PROJECT NO. 12276 M1.1 C4 t/! v' Q LA - C" C a C o� V V Z'3 ® C � C7 Q CO C3 .`� M CA ;Q. o I REVI5ION: # DATE DE5CRIPTION 0 06-26-12 AS BUILT 155UED fOR PERMIT: 05-15-12 DRAWING TITLE: ME(NANICALPLAN DATE: 05-15-12 SCALE: AS NOTED DRAWN BY: DCM CHECKED BY: UI PROJECT NO. 12276 M1.1