March 1, 2021
Re: Coritna III
Old Boynton Beach Road
Boynton Beach, Florida
This letter is in response for the revisions to the 4-story apartment buildings for the Cortina III project.
Sheet FP2- First Floor
On sheet FP2 we did not install 3 pendent sprinklers in the corridor due to the ceiling not having a bulk head between the
corridor & the entrance way to the garages. With no bulkhead the
design indicated there was to be a bulkhead but since there was not one installed we had to remove 3 pendents since the
sprinkler in the corridor sufficiently protected the entrance to the garages. In the C1 unit we ended removing the sprinkler
head that was located at the entrance of the bathroom & the concealed head at the kitchen cabinets since the sidewall
sprinkler in the kitchen covered that same area.
Also on sheet FP2 we have removed the note stating to install a sprinkler head in the trash compactor. The trash compactor
installed is an open compactor which does not require a sprinkler to be installed.
Also on sheet FP2 we have removed the note stating to install a sprinkler head in the trash compactor. The trash compactor
installed is an open compactor which does not require a sprinkler to be installed.
Sheet FP3-Second & Third Floor
In the C1 unit we ended removing the sprinkler head that was located at the entrance of the bathroom & the concealed head
at the kitchen cabinets since the sidewall sprinkler in the kitchen covered that same area.
Sheet FP4-Fourth Floor
In the C1 unit we ended removing the sprinkler head that was located at the entrance of the bathroom since the sidewall
sprinkler in the kitchen covered that same area.