Loading...
PERMIT DOCUMENTS Jairo A. Rojas, PE CONSULTING ENGINEER 66 Edinburgh Drive Palm Beach Gardens, FL 33418 561.644.2537 FL REG #54859 Plan Examiner Building Division City of Boynton Beach 100 E. Ocean Ave. Boynton Beach, FL 33435 September 8, 2021 RE: Permit 21-4308 24SOUTHPORT LN FBB Dear Plan Reviewer This letter is to respond to your comments on the Application for Permit. ELECTRICAL: GFCI device must be located in a readily accessible location per NEC 210.8 Respond: On page 3& 5, added notation that electrical service needs to be accessible as specified in NEC 210.8 MECHANICAL: Application indicates 2 new exhaust fans, however no information is shown on the drawingsregarding exhaust fans. Respond:There no additional exhaustfans added to the scope of work. General Contractor will provide an errata letter to change wording. PLUMBING: Add detail for the relocation of the stack;107.2.1BBA to FBC. Show compliance for an Automatic Clothes Washer, shall discharge through an Air-Break… Respond: On page 3, the plan shows the existing 3” vertical plumbing stack –this is not being relocatedor modified in anyway. Scope of Work is to add anew 2” branch drain line from Washer Outlet Box to existing vertical sanitary line.Air Break is provided in Washing Machine Outlet Box(See Laundry Clos –Sanitary) Please feel free to contact our office with any questions you may have Sincerely, Jairo A. Rojas, PE CONSULTING ENGINEER FL REG #54859 Jairo A. Rojas, PE CONSULTING ENGINEER 66 Edinburgh Drive Palm Beach Gardens, FL 33418 561.644.2537 FL REG #54859 Plan Examiner Building Division City of Boynton Beach 100 E. Ocean Ave. Boynton Beach, FL 33435 September 8, 2021 RE: Permit 21-4308 24SOUTHPORT LN FBB Dear Plan Reviewer This letter is to respond to your comments on the Application for Permit. ELECTRICAL: GFCI device must be located in a readily accessible location per NEC 210.8 Respond: On page 3& 5, added notation that electrical service needs to be accessible as specified in NEC 210.8 MECHANICAL: Application indicates 2 new exhaust fans, however no information is shown on the drawingsregarding exhaust fans. Respond:There no additional exhaustfans added to the scope of work. General Contractor will provide an errata letter to change wording. PLUMBING: Add detail for the relocation of the stack;107.2.1BBA to FBC. Show compliance for an Automatic Clothes Washer, shall discharge through an Air-Break… Respond: On page 3, the plan shows the existing 3” vertical plumbing stack –this is not being relocatedor modified in anyway. Scope of Work is to add anew 2” branch drain line from Washer Outlet Box to existing vertical sanitary line.Air Break is provided in Washing Machine Outlet Box(See Laundry Clos –Sanitary) Please feel free to contact our office with any questions you may have Sincerely, Jairo A. Rojas, PE CONSULTING ENGINEER FL REG #54859 Jairo A. Rojas, PE CONSULTING ENGINEER 66 Edinburgh Drive Palm Beach Gardens, FL 33418 561.644.2537 FL REG #54859 Building Division City of Boynton Beach 100 E. Ocean Ave. Boynton Beach, FL 33435 October 26, 2021 RE:2021.08.1649 24SOUTHPORT LN F PCNo : 08-43-46-06-06-000-0246 Dear Plan Reviewer This letter is to respond to your comments, dated 10-6-21,on the Application for Permit. MECHANICAL #1 : provide mechanical floor plan detailing mechanical scope of work… MECHANICAL #2 : A new dryer duct is shown for a relocated appliance… Respond: Please note that page 7 has been added to address both comments: This isolates dryerduct layout, detailand mechanical noteson to separate sheet as requested. Total developedlength of dryer duct (existing and new) from termination box to roof jack is34’– this accounts for 24’ of straight length of ductplus (4) 45degree elbows (@ 2.5’ each). Added notation on detail#1 to specifythatthe passagewayof ductshallnotbe reduced alongfull path. Added clarificationthat the minimumrequired open area ofductto be12.5 s.i. Please feel free to contact our office with any questions you may have Sincerely, Jairo A.Rojas, PE CONSULTING ENGINEER FL REG #54859