PERMIT DOCUMENTS
Jairo A. Rojas, PE
CONSULTING ENGINEER
66 Edinburgh Drive
Palm Beach Gardens, FL 33418
561.644.2537
FL REG #54859
Plan Examiner
Building Division
City of Boynton Beach
100 E. Ocean Ave.
Boynton Beach, FL 33435
September 8, 2021
RE: Permit 21-4308
24SOUTHPORT LN FBB
Dear Plan Reviewer
This letter is to respond to your comments on the Application for Permit.
ELECTRICAL: GFCI device must be located in a readily accessible location per NEC
210.8
Respond: On page 3& 5, added notation that electrical service needs to be accessible as specified in
NEC 210.8
MECHANICAL: Application indicates 2 new exhaust fans, however no information is shown on the
drawingsregarding exhaust fans.
Respond:There no additional exhaustfans added to the scope of work. General Contractor will
provide an errata letter to change wording.
PLUMBING: Add detail for the relocation of the stack;107.2.1BBA to FBC.
Show compliance for an Automatic Clothes Washer, shall discharge through an Air-Break…
Respond: On page 3, the plan shows the existing 3” vertical plumbing stack –this is not being
relocatedor modified in anyway. Scope of Work is to add anew 2” branch drain line from Washer
Outlet Box to existing vertical sanitary line.Air Break is provided in Washing Machine Outlet Box(See
Laundry Clos –Sanitary)
Please feel free to contact our office with any questions you may have
Sincerely,
Jairo A. Rojas, PE
CONSULTING ENGINEER
FL REG #54859
Jairo A. Rojas, PE
CONSULTING ENGINEER
66 Edinburgh Drive
Palm Beach Gardens, FL 33418
561.644.2537
FL REG #54859
Plan Examiner
Building Division
City of Boynton Beach
100 E. Ocean Ave.
Boynton Beach, FL 33435
September 8, 2021
RE: Permit 21-4308
24SOUTHPORT LN FBB
Dear Plan Reviewer
This letter is to respond to your comments on the Application for Permit.
ELECTRICAL: GFCI device must be located in a readily accessible location per NEC
210.8
Respond: On page 3& 5, added notation that electrical service needs to be accessible as specified in
NEC 210.8
MECHANICAL: Application indicates 2 new exhaust fans, however no information is shown on the
drawingsregarding exhaust fans.
Respond:There no additional exhaustfans added to the scope of work. General Contractor will
provide an errata letter to change wording.
PLUMBING: Add detail for the relocation of the stack;107.2.1BBA to FBC.
Show compliance for an Automatic Clothes Washer, shall discharge through an Air-Break…
Respond: On page 3, the plan shows the existing 3” vertical plumbing stack –this is not being
relocatedor modified in anyway. Scope of Work is to add anew 2” branch drain line from Washer
Outlet Box to existing vertical sanitary line.Air Break is provided in Washing Machine Outlet Box(See
Laundry Clos –Sanitary)
Please feel free to contact our office with any questions you may have
Sincerely,
Jairo A. Rojas, PE
CONSULTING ENGINEER
FL REG #54859
Jairo A. Rojas, PE
CONSULTING ENGINEER
66 Edinburgh Drive
Palm Beach Gardens, FL 33418
561.644.2537
FL REG #54859
Building Division
City of Boynton Beach
100 E. Ocean Ave.
Boynton Beach, FL 33435
October 26, 2021
RE:2021.08.1649
24SOUTHPORT LN F
PCNo : 08-43-46-06-06-000-0246
Dear Plan Reviewer
This letter is to respond to your comments, dated 10-6-21,on the Application for Permit.
MECHANICAL #1 : provide mechanical floor plan detailing mechanical scope of work…
MECHANICAL #2 : A new dryer duct is shown for a relocated appliance…
Respond: Please note that page 7 has been added to address both comments:
This isolates dryerduct layout, detailand mechanical noteson to separate sheet as requested.
Total developedlength of dryer duct (existing and new) from termination box to roof jack is34’– this
accounts for 24’ of straight length of ductplus (4) 45degree elbows (@ 2.5’ each).
Added notation on detail#1 to specifythatthe passagewayof ductshallnotbe reduced alongfull path.
Added clarificationthat the minimumrequired open area ofductto be12.5 s.i.
Please feel free to contact our office with any questions you may have
Sincerely,
Jairo A.Rojas, PE
CONSULTING ENGINEER