Loading...
PERMIT DOCUMENTS DJUZ!PG!CPZOUPO!CFBDI Q!P!CPY!421 CPZOUPO!CFBDI!GM!44536 D!F!S!U!!!P!G!!!D!P!N!Q!M!F!U!J!P!O!!!J!T!T!V!F!ED!F!S!U!!!P!G!!!D!P!N!Q!M!F!U!J!P!O!!!J!T!T!V!F!E`````````````````````````````````````````````````` Jttvf!Ebuf!!/!/!/!/!/!/!/!!!2015033 Qbsdfm!Ovncfs!/!/!/!/!/!/!!19.54.56.43.15.237.1111 Qspqfsuz!Beesftt!!/!/!/!/!!2811!X!XPPMCSJHIU!SE!6 CPZOUPO!CFBDI!GM!44537 Tvcejwjtjpo!Obnf!!/!/!/!/!!QBMN!CFBDI!MFJTVSFWJMMF!21UI Mfhbm!Eftdsjqujpo!/!/!/!/!!Q!C!MFJTVSFWJMMF!21UI!TFD Qspqfsuz!\[pojoh!/!/!/!/!/!!PGGJDF0QSPGFTTJPOBM Pxofs!/!/!/!/!/!/!/!/!/!/!!UPQNFE!XPPMCSJHIU!MMD 611!T!EJYJF!IXZ IBMMBOEBMF IBMMBOEBMF!GM!4411: Dpousbdups!!/!/!/!/!/!/!/!!NJDSPO!DPOTUSVDUJPO!JOD Bqqmjdbujpo!Ovncfs/!/!/!/!!32.11115884!111!111 Eftdsjqujpo!pg!Xpsl!/!/!/!!DPNN!JOUFSJPS0FYUFSJPS!SFNPEFM Dpotusvdujpo!Uzqf!/!/!/!/!!UZQF!JJ!C!DPOTUS Pddvqbodz!Uzqf!!/!/!/!/!/!!CVTJOFTT Gmppe!\[pof!!/!/!/!/!/!/!/!!Y!GMPPE!\[POF0!1/3&!DIBODF BVUPNBUJD!TQSJOLMFS!TZTUF!!O FEJUJPO!PG!DPEF!!!!!!!!!!!!3131 TQFDJBM!DPOEJUJPOT!!/!/!/ Gps!cvjmejoht!boe!tusvduvsft!jo!gmppe!ib{bse!bsfbt- epdvnfoubujpo!pg!uif!bt.cvjmu!mpxftu!gmpps!fmfwbujpo!ibt cffo!qspwjefe!boe!jt!sfubjofe!jo!uif!sfdpset!pg!uif!Cvjmejoh Ejwjtjpo/ Cvjmejoh!Pggjdjbm!!!Kpio!Lvou{nbo Bqqspwfe!!/!/!/!/!/!/!/!/!!``````````````````````````````````` Cvjmejoh!Pggjdjbm WPJE!VOMFTT!TJHOFE!CZ!CVJMEJOH!PGGJDJBM Uif!eftdsjcfe!qpsujpo!pg!uif!tusvduvsf!ibt!cffo!jotqfdufe!gps dpnqmjbodf!xjui!uif!sfrvjsfnfout!pg!uif!dpef!gps!uif!pddvqbodz boe!ejwjtjpo!pg!pddvqbodz!boe!uif!vtf!gps!xijdi!uif!qspqptfe pddvqbodz!jt!dmbttjgjfe/ THE TAMARA PEACOCK COMPANY Architects 10.14.2021 RE: 21-4773 CareATC - 1700 W Woolbright Rd 5 Review Cycle 01 To whom it may concern, 1.Provide digital signature per FAC-61G15-23.004, 61G1-16.005 A: Signature updated 2.Provide FRT wood frame materials design on the plans, type IIB construction per FBCB- 603.1(1) 1.1 incomplete design A: Note added to A-02 Thanks, Joey Burnett, AIA Project Manager Tamara Peacock Co Architects 828.808.1642 1512 East Broward Blvd Suite 103 Ft Lauderdale, FL 33301lic:12126 tamarapeacock.com THE TAMARA PEACOCK COMPANY Architects 10.14.2021 RE: 21-4773 CareATC - 1700 W Woolbright Rd 5 Review Cycle 01 To whom it may concern, 1.Provide digital signature per FAC-61G15-23.004, 61G1-16.005 A: Signature updated 2.Provide FRT wood frame materials design on the plans, type IIB construction per FBCB- 603.1(1) 1.1 incomplete design A: Note added to A-02 Thanks, Joey Burnett, AIA Project Manager Tamara Peacock Co Architects 828.808.1642 1512 East Broward Blvd Suite 103 Ft Lauderdale, FL 33301lic:12126 tamarapeacock.com 2012 Monthaven Drive Wake Forest, NC 27587 (919) 533-7667 MEMO To: Henry Glass From: Marc W. Wachter, PE Date: 11 October 2021 Re: CIER-2021.09.2230 21-4773 Care ATC Mechanical Review 1. No plans were provided for the mechanical scope of work. Please provide plans showing the existing mechanical systems, and the proposed changes. BBA to FBC 107.2.1. a. HVAC systems are existing to remain. Use of space is not being altered. Existing diffusers and return grilles added to plans with balancing values for contractor to re-affirm flowrates. 2. A ventilation analysis was not provided. Please provide an analysis to show the existing mechanical systems can provide the ventilation required by FBC-EB 809.2. a. Ventilation analysis calculated and added to plan. 3. Ventilation for the new toilet compartment was not shown. Please provide plans showing the installation of duct and equipment necessary to provide the ventilation mandated by FBC-M Table 403.3.1.1. a. Exhaust fan and associated ductwork added for toilet room. Њ ΋ tğŭĻ 2012 Monthaven Drive Wake Forest, NC 27587 (919) 533-7667 MEMO To: Henry Glass From: Marc W. Wachter, PE Date: 11 October 2021 Re:CIER-2021.09.2230 21-4773 Care ATC Plumbing Review 1. A plumbing fixture analysis was not included. Please provide a fixture analysis for the proposed occupancy and the adjoining space per FBC-P 403.1.1 to verify the existing facilities are sufficient. Please show the existing fixtures in the communal facilities. a. Plumbing fixture analysis added to the plan. Existing fixtures shown on riser diagrams for domestic and sanitary. Existing plans dated indicated). Existing fixtures calculated as 70 drainage fixture units. Fixture units added per this project: 19; total: 89 drainage fixture units. Assuming minimum slope of 1% max fixture unit capacity: 700 2. The proposed accessible toilet compartment was not marked with the required approach maneuvering spaces to verify compliance with FBC-ACC Table 404.2.4, paras. 604.3, 607.8.1.1, and 604.8.1.7. Please show the required maneuvering clearances at the water closet, the lavatory and the door. a. Approach maneuvering spaces added to plan from Architectural sheet - 3. The plumbing layout on the architectural sheet does not correspond to the layout on the plumbing sheet. Please coordinate the fixture, furniture and equipment layout between the disciplines. a. Architectural layout updated. Reference sheet P-01. 4. There is plumbing piping shown in the demising walls, but no penetration details were provided. Please provide penetration details referenced from a traceable source on the plans. a. Penetration detail added to sheet P-04. 5. The waste, vent, and hot water to the new accessible toilet compartment 113 and the sink in the Break Room 112 were not shown. Please provide all plumbing connections on the plans. BBA to FBC 107.2.1 a. Waste, vent and hot water piping is shown on sheet P-01. Piping revised to new for ADA Bath 113. The sink in Break Room 112 is existing to remain; the hot water piping is shown as being re-fed from the new water heater within the space. 6. The fixture in Toilet 113 and Break Room 112 are shown as existing on the sanitary riser. Please clarify the scope of work in these rooms. BBA to FBC 107.2.1 a. The water closet and lavatory in ADA Bath 113 is new. The sink in Break Room 112 is existing to remain. 7. plan. Please clarify the Њ ΋ tğŭĻ a. ied on plan. Notation was obscured by EWH-1. 8. Please clarify the difference in the specified trap size and the sanitary drain connection for the Mop Receptor. Pipe sizes are not permitted to decrease in the direction of flow for the waste stream per FBC-P 704.2. a. same as trap. 9. The source of hot water was not shown for the lavatory in Toilet 113 or the sink in Break Room 112. Hot water shall be provided per FBC-P 607.1. Please provide hot water distribution to the sink and lavatory. a. Plans currently show lavatory in Toilet 113 and sink in Break Room 112 as being re-fed from new water heater - Reference sheet P-- 10. The following items were not addressed on the plumbing plans: a. Isolation Valves, FBC-P 606 i. Notation regarding Isolation valves added to Plumbing notes - #6a,b,c. b. Tempering Valves, FBC-P 419.5 i. -02. Lavatories are called to -of-use lead c. Pipe Insulation, FBC-EC Table C403.2.10 and FBC-ACC i. Please states: ii. 1. piping <1- conveying fluids between 105- piping <1--60 (mean 75). End of Document Ћ ΋ tğŭĻ