Loading...
PERMIT DOCUMENTS DUE TO THE MATERIALS ARRIVING LATE MIAMI-DADE COUNTY PRODUCT CONTROL SECTION 11805 SW 26 Street, Room 208 DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)Miami, Florida 33175-2474 BOARD AND CODE ADMINISTRATION DIVISION T (786) 315-2590 F (786) 315-2599 www.miamidade.gov/building NOTICE OF ACCEPTANCE (NOA) Lawson Industries, Inc. 8501 NW 90 Street Medley, FL 33166 S COPE: This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The documentation submitted has been reviewed and accepted by Miami-Dade County RER - Product Control Section to be used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ). This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control Section (In Miami-Dade County) and/ or the AHJ (in areas other than Miami-Dade County) reserve the right to have this product or material tested for quality assurance purposes. If this product or material fails to perform in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance if it is determined by Miami-Dade County Product Control Section that this product or material fails to meet the requirements of the applicable building code. This product is approved as described herein, and has been designed to comply with the Florida Building Code, including the High Velocity Hurricane Zone. D ESCRIPTION:Series “HS-8700 (FlangeFrame)” Aluminum Horizontal Sliding Window –L.M.I. A PPROVAL DOCUMENT:Drawing No. L8700-0901, titled “HS-8700 Horizontal Rolling Flange Impact Window”, sheets 1 through 10 of 10, dated 05/30/09, with revision F, dated 07/31/20, prepared by –Dade County Product manufacturer, and signed and sealed by Thomas J. Sotos, P.E., bearing the Miami Control Revision stamp with the Notice of Acceptance number and expiration date by the Miami–Dade County Product Control Section. M ISSILE I MPACT R ATING: Large and Small Missile Impact Resistant L ABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state, series, and following statement: "Miami-Dade County Product Control Approved", unless otherwise noted herein. R ENEWAL of this NOAshall be considered after a renewal application has been filed and there has been no change in the applicable building code negatively affecting the performance of this product. T ERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the materials, use, and/ or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply withany section of this NOA shall be cause for termination and removal of NOA. A DVERTISEMENT:The NOA number preceded by the words Miami-Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall be done in its entirety. I NSPECTION:A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This NOA revises NOA No. 19-0708.09 and consists of this page 1 and evidence pagesE-1, E-2, E-3, E-4 and E-5, as well as approval document mentioned above. The submitted documentation was reviewed by Manuel Perez, P.E. NOA No. 20-0813.06 Expiration Date: April 11, 2022 Approval Date: October 08, 2020 10/01/20 Page 1 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED 1.EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s A.DRAWINGS 1.Manufacturer's die drawings and sections. (Submitted under NOA No. 02-0227.05) 2.Drawing No.L8700-0901, titled “HS-8700 Horizontal Rolling Flange Impact Window”,sheets 1 through 10 of 10, dated 05/30/09, with revision E dated 06/21/19, prepared by manufacturer, signed and sealed by Thomas J. Sotos, P.E. (Submitted under NOA No. 19-0708.09) B.TESTS 1.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94 2) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94 3) Water Resistance Test, per FBC TAS 202-94 4) Large Missile Impact Testper FBC, TAS 201-94 5) Cyclic Wind Pressure Loading per FBC, TAS 203-94 6) Forced Entry Test, per FBC 2411 3.2.1, TAS 202-94 along with marked-up drawings and installation diagram of a series HS-8700 flange frame aluminum horizontal sliding window, XO and XOX configurations, prepared by Fenestration Testing Laboratory, Inc., Test Report No. FTL-10715, dated 05/08/19, signed and sealed by Idalmis Ortega, P.E. (Submitted under NOA No. 19-0708.09) 2.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94 2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94 3) Water Resistance Test, per FBC, TAS 202-94 4) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94 along with marked-up drawings and installation diagram of an aluminum horizontal sliding window, XOX (1/4-1/2-1/4 and 1/3-1/3-1/3) configuration, prepared by Hurricane Engineering & Testing, Inc., Test Reports No. HETI-10-3049 and HETI-10-3051, dated 03/23/11, signed and sealed by Candido F. Font, P.E. (Submitted under NOA No. 11-0705.10) 3.Testreports on: 1) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94 along with marked-up drawings and installation diagram of 8 specimens of an aluminum horizontal sliding window, XOX (1/4-1/2-1/4 and 1/3-1/3-1/3) configuration, prepared by Hurricane Engineering & Testing, Inc., Test Reports No. HETI-10-3047, HETI-10-3053, HETI-10-3057, HETI-10-3130, HETI-10-3223 and HET-10-3225, all dated 03/23/11, and signed and sealed by Candido F. Font, P.E. (Submitted under NOA No. 11-0705.10) Manuel Perez, P.E. ProductControl Examiner NOA No. 20-0813.06 Expiration Date: April 11, 2022 Approval Date: October 08, 2020 E -1 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED 1.EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s (CONTINUED) B.TESTS (CONTINUED) 4.Testreports on: 1) Large Missile Impact Test per FBC, TAS 201-94 2) Cyclic Wind Pressure Loading per FBC, TAS 203-94 along with marked-up drawings and installation diagram of an aluminum horizontal sliding window, XOX (1/4-1/2-1/4 and 1/3-1/3-1/3) configuration, prepared by Hurricane Engineering & Testing, Inc., Test Reports No. HETI-10-3048, HETI-10-3049I, dated 11/09/10, HETI-10-3050, HETI-10-3052B, HETI-10-3056, HETI-10-3131, HETI-10-3224 and HETI-10-3226, alldated 03/23/11, and signed and sealed by Candido F. Font, P.E. (Submitted under NOA No. 11-0705.10) 5.Testreports on: 1) Large Missile Impact Test per FBC, TAS 201-94 2) Cyclic Wind Pressure Loading per FBC, TAS 203-94 along with marked-up drawings and installation diagram of an aluminum horizontal sliding window, XOX configuration, prepared by Hurricane Engineering & Testing, Inc., Test Report No.HETI-10-3251, dated 04/25/11, signed and sealed by Rafael E. Droz-Seda, P.E. (Submitted under NOANo.11-0705.10) 6.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94 2) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94 3) Water Resistance Test, per FBC TAS 202-94 4) Large Missile Impact Testper FBC, TAS 201-94 5) Cyclic Wind Pressure Loading per FBC, TAS 203-94 6) Forced Entry Test, per FBC 2411 3.2.1, TAS 202-94 along with marked-up drawings and installation diagram of 8 specimens of an aluminum horizontal sliding window, XO configuration, prepared by Hurricane Engineering & Testing, Inc., Test Reports No. HETI-08-2033, HETI-08-2034, HETI-08-2035, HETI-08-2036, HETI-08-2037, HETI-08-2038, HETI-08-2116A and HETI-08-2116B, all dated 02/28/08, and signed and sealed by Candido F. Font, P.E. (Submitted under NOA No.09-0706.05) Manuel Perez, P.E. ProductControl Examiner NOA No. 20-0813.06 Expiration Date: April 11, 2022 Approval Date: October 08, 2020 E -2 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED 1.EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s (CONTINUED) B.TESTS (CONTINUED) 7.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94 2) Uniform Static Air Pressure Test, Loading per FBC TAS 202-94 3) Water Resistance Test, per FBC TAS 202-94 4) LargeMissile Impact Testper FBC, TAS 201-94 5) Cyclic Wind Pressure Loading per FBC, TAS 203-94 6) Forced Entry Test, per FBC 2411 3.2.1, TAS 202-94 along with marked-up drawings and installation diagram of 8 specimens of an aluminum horizontal sliding window, XO configuration, prepared by Fenestration Testing Laboratory, Inc., Test Reports No. FTL-3097, FTL-3098 and FTL-3364, dated 12/06/01,12/11/01 and 01/28/02, respectively, all signed and sealed by Luis Antonio Figueredo, P.E. (Submitted under NOA No. 02-0227.05) C.CALCULATIONS 1.Anchor verification calculations and structural analysis, complying with FBC, prepared by Lawson Industries, Inc., dated 05/28/09,revised on07/10and updated on 01/25/12, signed and sealed by Thomas J. Sotos, P.E. (Submitted under NOA No. 12-0127.08) 2.Glazing complies with ASTM E1300-09 D.QUALITY ASSURANCE 1.Miami-Dade Department of Regulatory and Economic Resources (RER). E.MATERIAL CERTIFICATIONS 1.Notice of Acceptance No. 19-0305.02 issued to Kuraray America, Inc.for their “Trosifol® Ultraclear, Clear and Color PVB Glass Interlayers”dated 05/09/19, expiring on 07/08/24. 2.Notice of Acceptance No. 17-0712.05 issued to Eastman Chemical Company (MA) for their “Saflex Clear and Color Glass Interlayers”dated 09/07/17, expiring on 05/21/21. Manuel Perez, P.E. ProductControl Examiner NOA No. 20-0813.06 Expiration Date: April 11, 2022 Approval Date: October 08, 2020 E -3 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED 1.EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s (CONTINUED) F.STATEMENTS th 1.Statement letter ofconformance, complying with the FBC 6Edition (2017), dated June 24, 2019, issued,signed and sealed by Thomas J. Sotos, P.E. (Submitted under NOA No. 19-0708.09) 2.Statement letter of no financial interest, dated June 24, 2019, signed and sealed by Thomas J. Sotos, P.E. (Submitted under NOA No. 19-0708.09) 3.Proposal No. 18-1697 issued by the Product Control Section, dated January 04, 2019, signed by Manuel Perez, P.E. (Submitted under NOA No. 19-0708.09) 4.Laboratory compliance letter for Test Reports No. HETI-10-3047, HETI-10-3048, HETI-10-3049, HETI-10-3049I, HETI-10-3050, HETI-10-3051, HETI-10-3052B, HETI-10-3053, HETI-10-3056, HETI-10-3057, HETI-10-3130, HETI-10-3131, HETI-10-3223, HETI-10-3224, HET-10-3225 and HETI-10-3226, all issued by Hurricane Engineering & Testing, Inc., dated 11/09/10, 03/23/11 and 04/25/11, signed and sealed by Candido F. Font, P.E. (Submitted under NOA No. 11-0705.10) 5.Laboratory compliance letter for Test Report No.HETI-10-3251, issued by Hurricane Engineering & Testing, Inc., dated 04/25/11, signed and sealed by Rafael E. Droz- Seda, P.E. (Submitted under NOA No. 11-0705.10) 6.Laboratory compliance letter for Test Reports No. HETI-08-2033, HETI-08-2034, HETI-08-2035,HETI-08-2036,HETI-08-2037, HETI-08-2038,HETI-08-2116A and HETI-08-2116B, all issued by Hurricane Engineering & Testing, Inc., dated 01/15/08through 02/28/08, and signed and sealed by Candido F. Font, P.E. (Submitted under NOA No.09-0706.05) 7.Laboratory compliance letter for Test Reports No. FTL-3097, FTL-3098 and FTL-3364, all issued by Fenestration Testing Laboratory, Inc., dated 12/06/01, 12/11/01 and 01/28/02, and signed and sealed by Luis Antonio Figueredo, P.E. (Submitted under NOA No.02-0227.05) G.OTHERS 1.Notice of Acceptance No. 17-1212.17, issued to Lawson Industries, Inc. for their Series “HS-8700 (Flange-Frame) Aluminum Horizontal Sliding Window –LM.I.” approved on 02/01/18 and expiring on 04/11/22. Manuel Perez, P.E. ProductControl Examiner NOA No. 20-0813.06 Expiration Date: April 11, 2022 Approval Date: October 08, 2020 E -4 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED 2.NEW EVIDENCE SUBMITTED A.DRAWINGS 1.Drawing No.L8700-0901, titled “HS-8700 Horizontal Rolling Flange Impact Window”,sheets 1 through 10 of 10, dated 05/30/09, with revision F dated 07/31/20, prepared by manufacturer, signedand sealed by Thomas J. Sotos, P.E. B.TESTS 1.None C.CALCULATIONS 1.None. D.QUALITY ASSURANCE 1.Miami-Dade Department of Regulatory and Economic Resources (RER) E.MATERIAL CERTIFICATIONS 1.Notice of Acceptance No. 19-0305.02 issued to Kuraray America, Inc.for their “Trosifol® Ultraclear, Clear and Color PVB Glass Interlayers”dated 05/09/19, expiring on 07/08/24. 2.Notice of Acceptance No. 20-0622.01 issued to Eastman Chemical Company (MA) for their “SaflexPVBClear and Color Glass Interlayers”dated 08/06/20, expiring on 05/21/21. F.STATEMENTS th 1.Statement letter of conformance,complying with FBC 7Edition (2020), dated August 03, 2020, issued by the manufacturer, signed and sealed by Thomas J. Sotos, P.E. G.OTHERS 1.Notice of Acceptance No. 19-0708.09, issued to Lawson Industries, Inc.for their Series “HS-8700 (FlangeFrame)” Aluminum Horizontal SlidingWindow –L.M.I., approved on 08/01/19and expiring on 04/11/22. Manuel Perez, P.E. ProductControl Examiner NOA No. 20-0813.06 Expiration Date: April 11, 2022 Approval Date: October 08, 2020 E -5 PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control PRODUCT REVISED as complying with the Florida Building Code NOA–No. 20-0813.06 Expiration Date: 04/11/2022 By:________________________ Miami–Dade Product Control MIAMI–DADE COUNTY, FLORIDA PRODUCT CONTROL SECTION DEPARTMENTOF REGULATORYAND ECONOMIC RESOURCES (RER)11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION T (786) 315–2590 F (786) 315–2599 www.miamidade.gov/economy NOTICE OF ACCEPTANCE (NOA) Lawson Industries, Inc. th 8501 NW 90Street Medley, FL 33166 S COPE: This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The documentation submitted has been reviewed and accepted by Miami–Dade County RER–Product Control Section tobe used in Miami–Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ). This NOA shall not be valid after the expiration date stated below. The Miami–Dade County Product Control Section (In Miami–Dade County) and/or the AHJ (in areas other than Miami–Dade County) reserve the right to have this product or material tested for quality assurance purposes. If this product or material fails to perform in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance, if it is determined by Miami–Dade County Product Control Section that this product or material fails to meet the requirements of the applicable building code. This product is approved as described herein andhas been designed to complywith the Florida Building Code, including the High Velocity Hurricane Zone. D ESCRIPTION: Series “SDG–9200"Aluminum Sliding Glass Door(Steel reinforced)–L.M.I. A PPROVAL DOCUMENT:Drawing No. L9200–1201Rev D,titled “Series SGD–9200 Aluminum Sliding Glass Door (LMI)”, sheets 01 through 14 of 14, prepared by manufacture, dated 09/25/12and last revised on AUG 03, 2020, signed and sealed by Thomas J. Soto, P.E., bearing the Miami–Dade County Product Control Section Revisionstamp with the Notice of Acceptance number and Expiration date by the Miami–Dade County Product Control Section. M ISSILE I MPACT R ATING: Large and Small Missile Impact Resistant 1.See Design Pressure (DP) Vs door size, glass type, reinforcements, sill type and configuration in sheets 2, sheet 5 and sheet 8. 2.See pocket installation detail in sheet 11 and notes #15 and #16 in sheet 1. 3.Applicable Egress requirements to be reviewed by AHJ. L ABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state, series, and following statement: "Miami–Dade County Product Control Approved", unless otherwise noted herein. R ENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change in the applicable building code negatively affecting the performance of this product. T ERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply with any section of this NOA shall be cause for termination and removal of NOA. A DVERTISEMENT:The NOA number preceded by the words Miami–Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall be done in its entirety. I NSPECTION:A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This NOA revisesNOA#17-1212.05 and consists of this page 1 and evidence pages E–1,E–2, E–3, E-4 andE– 5, as well as approval document mentioned above. The submitted documentation was reviewed by Ishaq I. Chanda, P. E. NOA No. 20-0901.06 Expiration Date: February 13, 2023 Approval Date: December 03, 2020 Page 1 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED 1.Evidence submitted in previous files A.DRAWINGS 1.Manufacturer's die drawings and sections. (Submitted under previous NOA No. 12–1204.12) 2.Drawing No.L9200–1201,titled “Series SGD–9200 Aluminum Sliding Glass Door (LMI)”, sheets 01 through 14 of 14, prepared by manufacture, dated 09/25/12, with the latest revision “B”, dated 04/15/15,signed andsealed by Thomas J. Soto, P. E. B.TESTS 1.Test reports on: 1) UniformStatic Air Pressure Test, Loading per FBC, TAS 202–94 along with marked–up drawings and installation diagram of an Aluminum SGD, prepared by Hurricane Engineering &Testing, Inc., Test ReportsNo.’s HETI–11– 3269,dated 05/16/11,HETI–11–3292,dated 10/20/11,HETI–11–3274,dated 10/20/11, HETI–11–3329,dated 01/16/12,HETI–12–4040,dated 10/12/12,HETI–12–4051,dated 06/13/12,HETI–12–4053 and HETI–12–4064,dated 09/24/12, allsigned and sealed by Rafael E. Droz–Seda, P.E. (Submitted under previous NOA No. 12–1204.12) 2.Test reports on: 1) LargeMissile Impact Test per FBC, TAS 201–94 2)Cyclic Wind Pressure Loading per FBC, TAS 203–94 along with marked–up drawings andinstallationdiagram of an Aluminum Sliding Glass Door, prepared by Hurricane Engineering & Testing, Inc., Test ReportsNo.’s HETI– 11–3270,dated 05/16/11,HETI–11–3275,dated 10/20/11,HETI–11–3307,dated 10/03/11,HETI–11–3314,dated 10/20/11,HETI–11–3330,dated01/16/12,HETI–12– 4052,dated 07/10/12,HETI–12–4054 and HETI–12–4065, dated 09/24/12, all signed and sealed by Rafael E. Droz–Seda, P. E. (Submitted under previous NOA No. 12–1204.12) 3.Test reports on: 1) UniformStatic Air Pressure Test, Loading per FBC, TAS 202–94 2)Large Missile Impact Test per FBC, TAS 201–94 3)Cyclic Wind Pressure Loading per FBC, TAS 203–94 along with marked–up drawings and installation diagram of an Aluminum Sliding Glass Door, prepared byHurricane Engineering & Testing,Inc., Test Report No. HETI–12– 4041,dated 10/12/12,signed and sealed by Rafael E. Droz–Seda, P. E. (Submitted under previous NOA No. 12–1204.12) 4.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202–94 2)Uniform Static Air Pressure Test, Loading perFBC, TAS202–94 3)Water Resistance Test, per FBC, TAS 202–94 along with marked–up drawings and installation diagram of an Aluminum Sliding Glass Door, prepared by Hurricane Engineering & Testing, Inc., Test Reports No.’s HETI–11– 3291,dated 07/15/11and HETI–11–3292,dated 10/20/11,both signed and sealed by Rafael E. Droz–Seda, P. E. (Submitted under previous NOA No. 12–1204.12) Ishaq I. Chanda, P. E. Product Control Unit Supervisor NOA No. 20–0901.06 Expiration Date: February 13,2023 Approval Date: December 03, 2020 E –1 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED B.TESTS (CONTINUED) 5.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202–94 2)Uniform Static Air Pressure Test, Loading per FBC, TAS 202–94 3)Water Resistance Test, per FBC, TAS 202–94 4)Large Missile Impact Test per FBC, TAS 201–94 5)Cyclic Wind Pressure Loading per FBC, TAS 203–94 6)Forced Entry Test, Type “C” sliding door, Grade10, per FBC 2411.3.2.1, TAS 202–94 and per ASTM F 842–04 along with marked–up drawings and installation diagram of an Aluminum Sliding Glass Door, preparedby Hurricane Engineering & Testing, Inc., Test Report No. HETI–11– 3313,dated 10/20/11,signedandsealed by Rafael E. Droz–Seda, P. E. (Submitted under previous NOA No. 12–1204.12) 6.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202–94 2)Uniform Static Air Pressure Test, Loading per FBC, TAS 202–94 3)Water Resistance Test, per FBC, TAS 202–94 4)Large Missile Impact Test per FBC, TAS 201–94 5)Cyclic Wind Pressure Loading per FBC, TAS 203–94 6)Forced Entry Test, Type “C” sliding door, Grade 10, per FBC 2411.3.2.1, TAS 202–94 and per ASTM F 842–04 along with marked–up drawings and installation diagramof an Aluminum Sliding Glass Door, prepared by Fenestration Testing Laboratory, Inc., Test Reports No.’s FTL– 3078, dated 01/10/02, signed and sealed by Luis Figueredo, P.E.; FTL–3525 and FTL–3572, dated 09/09/02, both signed and sealed by Joseph C. Chan, P. E.;FTL–3424, dated 04/18/02, FTL–3425, dated 04/29/02, FTL–3426, dated 04/26/02, FTL–3492, dated 06/20/02, FTL–3493, dated 06/24/02 and FTL–3516, dated 07/12/02, all signed and sealed by James G. Worth, P. E. (Submitted under previous NOA No. 02–1126.04) C.CALCULATIONS 1.Anchor verification calculations and structural analysis, complying with FBC, prepared by manufacture, dated 04/28/15, signed and sealed by Thomas J. Soto, P.E. 2.Glazing complies with ASTM E1300–04/ 09 D.QUALITY ASSURANCE 1.Miami–Dade Departmentof Regulatory and Economic Resources(RER). E.MATERIAL CERTIFICATIONS 1.Notice of Acceptance No.14–0916.10 issued to Kuraray America, Inc.for their “KurarayPVB Glass Interlayer”, expiring on 12/11/16. 2.Notice of AcceptanceNo. 14–0916.11 issued to Kuraray America, Inc.for their “Kuraray SentryGlas® Interlayer”, expiring on 01/14/17. 3.Notice of Acceptance No. 14–0423.15 issued to Eastman Chemical Company (MA)for their “Saflex CP –Saflex and Saflex HP Composite Glass Interlayers with PET Core”dated 06/19/14, expiring on 12/11/18. Ishaq I. Chanda, P. E. Product Control Unit Supervisor NOA No. 20–0901.06 Expiration Date: February 13,2023 Approval Date: December 03, 2020 E –2 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED F.MATERIAL CERTIFICATIONS 4.Notice of Acceptance No.14–0916.10 issued to Kuraray America, Inc.for their “KurarayPVB Glass Interlayer”, expiring on 12/11/16. 5.Notice of Acceptance No. 14–0916.11 issued to Kuraray America, Inc.for their “Kuraray SentryGlas® Interlayer”, expiring on 01/14/17. 6.Notice of Acceptance No. 14–0423.15 issued to Eastman Chemical Company (MA)for their “SaflexCP –Saflex and Saflex HP Composite Glass Interlayers with PET Core”dated 06/19/14, expiring on 12/11/18. 7.Notice of Acceptance No. 14–0423.16 issued to Eastman Chemical Company (MA)for their “Saflex HP Clear or Color Glass Interlayers”dated 06/19/14, expiring on 04/14/18. 8.Notice of AcceptanceNo. 14–0423.17 issued to Eastman Chemical Company (MA)for their “Saflex Clear and Color Glass Interlayers”dated 06/19/14, expiring on 05/21/16. 9.Technical data sheet of flexible vinyl compound FPVC 7267–75 (White)&FPVC 7200– 75 (Black), published by Team Plastics. Inc./ Bayshore Vinyl Compounds,Inc. G.STATEMENTS th 1.Statement letter of conformance to and complying with FBC 5Edition (2014), issued by manufacturer, dated 09/02/14, signed and sealed by Thomas J. Sotos,P. E. 2.Statement lettersof no financial interest, independence, conformanceandcomplying with FBC–2010, issued by manufacture, dated 12/03/12, signed and sealed by Thomas J. Soto, P. E.(Submitted under previous NOA No. 12–1204.12) 3.Laboratory complianceletters for Test Reports No.’s HETI–11–3269,dated 05/16/11, HETI–11–3270,dated 05/16/11, HETI–11–3271,dated 10/20/11,HETI–11–3272,dated 10/20/11,HETI–11–3274,dated 10/20/11,HETI–11–3275,dated 10/20/11,HETI–11– 3291,dated 07/15/11,HETI–11–3292,dated 10/20/11, HETI–11–3307,dated 10/03/11, HETI–11–3313,dated 10/20/11, HETI–11–3314,dated 10/20/11,HETI–11–3329,dated 01/16/12,HETI–11–3330,dated 01/16/12, HETI–12–4040,dated 10/12/12,HETI–12– –12–4051,dated 06/13/12,HETI–12–4052,dated 07/10/12, 4041,dated 10/12/12, HETI HETI–12–4053, dated 09/24/12, HETI–12–4054, dated 09/24/12, HETI–12–4064, dated 09/24/12,and HETI–12–4065, dated 09/24/12, all issued by Hurricane Engineering & Testing, Inc., all signed and sealed by Rafael E. Droz–Seda, P.E. (Submitted under previous NOA No. 12–1204.12) Laboratory addendum letter for Test Reports No.’s HETI–11–3269,HETI–11–3270, HETI–11–3271,HETI–11–3272,HETI–11–3274,HETI–11–3275,HETI–11–3291, HETI–11–3292, HETI–11–3307, HETI–11–3313,HETI–11–3314,HETI–11–3329, HETI–11–3330,HETI–12–4040,HETI–12–4041,HETI–12–4051,HETI–12–4052, HETI–12–4053, HETI–12–4054, HETI–12–4064 and HETI–12–4065, dated 01/15/13, issued by Hurricane Engineering & Testing, Inc., signed and sealed by Rafael E. Droz– Seda, P. E. Ishaq I. Chanda, P. E. Product Control Unit Supervisor NOA No. 20–0901.06 Expiration Date: February 13,2023 Approval Date: December 03, 2020 E –3 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED F.STATEMENTS (CONTINUED) 4.Laboratory addendum letter for Test Reports No.’s HETI–11–3269,HETI–11–3270, HETI–11–3271,HETI–11–3272,HETI–11–3274,HETI–11–3275,HETI–11–3291, HETI–11–3292,HETI–11–3307, HETI–11–3313,HETI–11–3314,HETI–11–3329, HETI–11–3330,HETI–12–4040,HETI–12–4041,HETI–12–4051,HETI–12–4052, HETI–12–4053, HETI–12–4054, HETI–12–4064 and HETI–12–4065, dated 01/15/13, issued by Hurricane Engineering & Testing, Inc., signedandsealed by Rafael E. Droz– Seda, P. E.(Submitted under previous NOA No. 12–1204.12) 5.Proposal issued by Product Control, dated 03/30/12, signed by Jaime D. Gascon, P. E. 6.Proposal issued by Product Control, dated 03/13/08, signed by Ishaq Chanda, P. E. (Submitted under previous NOA No. 11–0518.03) 7.Laboratory compliance letters issued by Fenestration Testing Laboratory, Inc., for Test Reports No.’s FTL–3078, dated 01/10/02, signed and sealed by Luis Figueredo, P.E. (Submitted under previous NOA No. 02–1126.04) 8.Laboratory compliance letters issued by Fenestration Testing Laboratory, Inc., for Test Reports No.’s FTL–3525 and FTL–3572, dated 09/09/02, both signed and sealed by Joseph C. Chan, P. E.(Submitted under previous NOA No. 02–1126.04) 9.Laboratory compliance letters issued by Fenestration Testing Laboratory, Inc., for Test Reports No.’s FTL–3424, dated 04/18/02, FTL–3425, dated 04/29/02, FTL–3426, dated 04/26/02, FTL–3492, dated 06/20/02, FTL–3493, dated 06/24/02 and FTL–3516, dated 07/12/02, allsignedand sealed by James G. Worth, P. E. (Submitted under previous NOA No. 02–1126.04) G.OTHERS 1.Notice of Acceptance No. 12–1204.12, issued to Lawson Industries, Inc.for their Series “SGD–9200 Aluminum Sliding Glass Door –L.M.I.”, approved on 01/31/13and expiring on 02/13/18. 2.Evidence submittedunder previous approval. A.DRAWINGS 1.Drawing No. L9200–1201 Rev C,titled “Series SGD–9200 Aluminum Sliding Glass Door (LMI)”, sheets 01 through 14 of 14, prepared by manufacture, dated 09/25/12 andlast revised on NOV 21, 2017, signed and sealed by Thomas J. Soto, P. E. th Note: This revision consistsof editorial changes of FBC 2017 (6Edition) code compliance. B.Test 1. None. C.CALCULATIONS 1.None D.QUALITY ASSURANCE 1.Miami Dade Department ofRegulatory and Economic Resources (RER). Ishaq I. Chanda, P. E. Product Control Unit Supervisor NOA No. 20–0901.06 Expiration Date: February 13,2023 Approval Date: December 03, 2020 E –4 Lawson Industries, Inc. NOTICE OF ACCEPTANCE:EVIDENCE SUBMITTED E.MATERIAL CERTIFICATIONS 1.Notice of Acceptance No. 14-0916.11 issued to Kuraray America, Inc. (Former E.I. DuPont DE Nemours) for the “Sentry Glass ® clear & white interlayer”, expiring on 07/04/18. 2.Notice of Acceptance No. 16-1117.01 issued to Kuraray America., Inc. for their “Trosifol ® Ultraclear, Clear and Color PVB Glass Interlayers”, expiring on 07/08/19. 3.Notice ofAcceptance No. 15–1201.11 issued to Eastman Chemical Company (MA) (former Solutia, Inc.) for the “Saflex: Saflex Clear & Color glass interlayer”, expiring on 05/21/21. F.STATEMENTS th 1.Statement letter of conformance to FBC 2017 (6 Edition) and “Nofinancial interest” dated 11/17/17, prepared by the manufacturer, signed and sealed by Thomas J. Sotos, P.E. G.OTHER 1.This NOA revises& renews#14-0908.02, expiring 02/13/23. 3.New Evidence submitted. A.DRAWINGS 1.Drawing No. L9200–1201 Rev D,titled “Series SGD–9200 Aluminum Sliding Glass Door (LMI)”, sheets 01 through 14 of 14, prepared by manufacture, dated 09/25/12 and last revised on DEC 03, 2020, signed and sealed by Thomas J. Soto, P. E. th Note: This revision consistsof editorial changes of FBC 2020(7Edition) code compliance. B.Test 1. None. C.CALCULATIONS 1.None D.QUALITY ASSURANCE 1.Miami Dade Department of Regulatory and Economic Resources (RER). E.MATERIAL CERTIFICATIONS 1.Notice of Acceptance No. 17-0808.02 issued to Kuraray America, Inc.fortheir “SentryGlas® (Clear and White) Glass Interlayers”, expiring on 07/04/23. 2.Notice of Acceptance No.19-0305.02 issued to Kuraray America, Inc.for their “Trosifol® Ultraclear, Clear and Color PVB Glass Interlayers”, expiring on 07/08/24. 3.Notice ofAcceptance No. 15–1201.11 issued to Eastman Chemical Company (MA) (former Solutia, Inc.) for the “Saflex: Saflex Clear & Color glass interlayer”, expiring on 05/21/21. F.STATEMENTS th 1.Statement letter of conformance to FBC 2020(7 Edition) and “Nofinancial interest” dated 08/03/20, prepared by the manufacturer, signed and sealed by Thomas J. Sotos, P.E. G.OTHER 1.This NOA revises#17-1212.05 and updates to FBC 2020, expiring02/13/23. Ishaq I. Chanda, P. E. Product Control Unit Supervisor NOA No. 20–0901.06 Expiration Date: February 13,2023 Approval Date: December 03, 2020 E –5 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 20-0901.06 02/13/2023 ‘źƓķƚǞ \[ğǤƚǒƷ tƩƚƦĻƩƷǤ ƌƚĭğƷźƚƓʹ ЋЉ tĻğĭŷƷƩĻĻ tƌğĭĻͲ .ƚǤƓƷƚƓ .ĻğĭŷͲ C\[ ЌЌЍЌЏ ‘źƓķƚǞ ϔʹЊ Description:ААЉЉ {ĻƩźĻƭ {źƓŭƌĻ IǒƓŭ ΏΛĻƩƷźĭğƌ {ƌźķĻƩΜ Interior Location:Bathroom Exterior Location:Front of House Frame:Width = 25.75", Height = 26" Glass:1/8 AN/ 090 Solutia Int/ 1/8 AN, NOA Glass = 2, Clear, Interlayer = Gray, 5/16" Performance:Required +/- DPs = +50/-50, Calculated +/- DPs = +/-80 Hardware:Latch Lock with Spring ‘źƓķƚǞ ϔʹЋ Description:ААЉЉ {ĻƩźĻƭ {źƓŭƌĻ IǒƓŭ ΏΛĻƩƷźĭğƌ {ƌźķĻƩΜ Interior Location:Bedroom Exterior Location:Front of House Frame:Width = 53.125", Height = 50.625" Glass:1/8 AN/ 090 Solutia Int/ 1/8 AN, NOA Glass = 2, Clear, Interlayer = Gray, 5/16" Performance:Required +/- DPs = +50/-50, Calculated +/- DPs = +/-80 Hardware:Latch Lock with Spring ‘źƓķƚǞ ϔʹЌ Description:БАЉЉ {ĻƩźĻƭ {źƓŭƌĻ {ƌźķĻƩ –h ΏΛIƚƩźǩƚƓƷğƌ {ƌźķĻƩΜ Interior Location:Living Room Exterior Location:Left Side of House Frame:Width = 49", Height = 48.5" Glass:1/8 AN/ 090 Solutia Int/ 1/8 AN, NOA Glass = B, Clear, Interlayer = Gray, 5/16" Performance:Required +/- DPs = +50/-50, Calculated +/- DPs = +/-65 Type:Sill Type = Std. Sill Hardware:Latch Lock with Spring ‘źƓķƚǞ ϔʹЍ Description:ВЋЉЉ {ĻƩźĻƭ 5ƚǒĬƌĻ {ƌźķźƓŭ 5ƚƚƩ –– ΏΛIƚƩźǩƚƓƷğƌ {ƌźķĻƩΜ Interior Location:Living Room Exterior Location:Rear of House Frame:Width = 71", Height = 79.5" Glass:3/16 HS/ 090 Butacite Int/ 3/16 HS, NOA Glass = B, Clear, Interlayer = Gray, 7/16" Performance:Required +/- DPs = +50/-50, Calculated +/- DPs = +/-65 Sill Type = 2 1/4", Door Stacking = Standard, Door/Track = 2 Panel / 2 Track, Standard Screen Type: Hardware:Mortise Lock ‘źƓķƚǞ ϔʹЎ Description:ВЋЉЉ {ĻƩźĻƭ 5ƚǒĬƌĻ {ƌźķźƓŭ 5ƚƚƩ –– ΏΛIƚƩźǩƚƓƷğƌ {ƌźķĻƩΜ Interior Location:Kitchen Exterior Location:Rear of House Frame:Width = 70.5", Height = 79.5" Glass:3/16 HS/ 090 Butacite Int/ 3/16 HS, NOA Glass = B, Clear, Interlayer = Gray, 7/16" Performance:Required +/- DPs = +50/-50, Calculated +/- DPs = +/-65 Sill Type = 2 1/4", Door Stacking = Standard, Door/Track = 2 Panel / 2 Track, Standard Screen Type: Hardware:Mortise Lock tƩƚƦĻƩƷǤ ƌƚĭğƷźƚƓʹ ЋЉ tĻğĭŷƷƩĻĻ tƌğĭĻͲ .ƚǤƓƷƚƓ .ĻğĭŷͲ C\[ ЌЌЍЌЏ ‘źƓķƚǞ ϔʹЏ Description:БАЉЉ {ĻƩźĻƭ {źƓŭƌĻ {ƌźķĻƩ –h ΏΛIƚƩźǩƚƓƷğƌ {ƌźķĻƩΜ Interior Location:Kitchen Exterior Location:Rear of House Frame:Width = 49", Height = 36.5" Glass:1/8 AN/ 090 Solutia Int/ 1/8 AN, NOA Glass = B, Clear, Interlayer = Gray, 5/16" Performance:Required +/- DPs = +50/-50, Calculated +/- DPs = +/-65 Type:Sill Type = Std. Sill Hardware:Latch Lock with Spring ‘źƓķƚǞ ϔʹА Description:БАЉЉ {ĻƩźĻƭ {źƓŭƌĻ {ƌźķĻƩ –h ΏΛIƚƩźǩƚƓƷğƌ {ƌźķĻƩΜ Interior Location:Bedroom Exterior Location:Rear of House Frame:Width = 48.5", Height = 49" Glass:1/8 AN/ 090 Solutia Int/ 1/8 AN, NOA Glass = B, Clear, Interlayer = Gray, 5/16" Performance:Required +/- DPs = +50/-50, Calculated +/- DPs = +/-65 Type:Sill Type = Std. Sill Hardware:Latch Lock with Spring