April 28, 2000
Robert Fetrow
Gator Engineering, Inc
7289 Garden Road, Suite 104
West Palm Beach, Florida 33404
Re Poly Plastic Packaging
MSPM 00-002
Dear Mr Fetrow'
As the applicant for the above-referenced project, enclosed please find your rectified
plan that was approved by the City Commission It has been signed-off to confirm that it
accurately represents the approved site plan and that all staff comments have been
addressed
Please make sure that the person managing your permit applications is aware of any
remaining Development Order conditions which were specified to be met at the time of
permit review and that the documents pertaining to those conditions are submitted with
your permit package
Your copy of the signed-off rectified plan is to be submitted as part of your permit
package to the Building Division
Sincerely,
-/'L-/UV
Michael W Rumpf
Director of Planning and Zoning
MWR/nl
J:ISHRDATAIPlanmngISHAREDlWPIPROJECTS\POL Y PLASTIC PACKAGINGIRectified Letter Applicant.doc
America's Gateway to the Gulfstream
100 East Boynton Beach Blvd.. P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 375-6260 FAX. (561) 375-6259
DEPARTMENT OF DEVELOPMENT
Division of Planning and Zoning
Building
Planning & Zoning
Engineering
Occupational License
Community Redevelopment
March 24, 2000
Robert Fetrow
Gator Engineering
7289 Garden Road, Suite 104
Boynton Beach, Florida 33404
Re:
File No:
Location:
Poly Plastic Packaging Company
MSPM 00-002
510 East Industrial Avenue in Boynton Industrial Park
Dear Mr. Fetrow:
Enclosed is the City of Boynton Beach Development Order for site plan approval granted on
March 21,2000.
To continue this project through the development process, please submit to this office four (4)
sets of rectified plans (a site plan revised to incorporate all applicable conditions of approval).
A rectified plan must be signed off by all TRC members prior to submitting for building permits.
Your copy of the signed-off rectified plan is to be submitted in your permit plan package and
represent your site (e.g. site plan, landscape plan, etc.)
Should you have any questions regarding this matter, please feel free to contact this office at
(561) 742-6260.
Sincerely,
Michael W. Rumpf
Director of Planning & Zoning
MWRlnl
l:\SHRDA T AIPlanninglSHARED\WPlPROJECTSIPOL Y PLASTIC PACKAGINGIDevelopment Order letter. doc
America's Gateway to the Gulfstream
100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 375-6260 FAX: (561) 375-6259
DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE
CITY OF BOYNTON BEACH, FLORI~~ _ ~t..
.. . r:\ fa 0 ~ ~ \~ LS : l! \'
PROJECT NAME: Poly Plastic Packaging, Inc. \ \ n l ~ ' i:' ·
APPLICANT'S AGENT: Robert Fetrow, Gator Engineering J. n \ \ MpR '2. 3
.~ "-'" ~
APPLICANT'S ADDRESS: 510 East Industrial Avenue
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: March 21,2000
TYPE OF RELI EF SOUGHT: New Site Plan
LOCATION OF PROPERTY: 510 East Industrial Avenue in Boynton Industrial Park
DRAWING(S): SEE EXHIBIT liB" ATTACHED HERETO.
x THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
1. Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
2, The Applicant
1- HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3. The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included",
4, The Applicant's application for relief is hereby
.1L GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
6. All further development on the property shall be made in accordance with the terms
and conditions of this order.
7. Other
\\\\\\\1 11111 flllll.
<~,>\\ U ,( ~ TOAt I'I~
.:$ ~ ......... ~ -^ ~
~ . ~o~ .... ....'- ~
~ ~ ..'0 ~... ..., ~
:= :u () e. C') ~
= >- :~ \ ~ =
-...- . =
% 0 \.. "\ 920./ f
s .. .. ~
~ ........... ~ .;::.
~//, F'L 0 p.\Q \\~
1'1111111111 \I \\\\\\\
DATED: ~M~d ~~~.~~...
. City Clerk
JISHROATAIPlanningISHAREDIWP\PROJECTSIPOL Y PLASTIC PACKAGINGIpoIy plastic D.O.doc
EXHmIT "C"
Conditions of Aporoval
Project name: POLY PLASTIC PACKAGING
File number: MSPM 00-002
Reference: 2nd Review. Maior site plan modification. File # MSPM 00-002 with a February 22. 2000
PlanniOlz and Zoning Department date stamR marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments: NONE
UTILITIES
Comments:
1. Utilities Department will not require surety for installation of the water and X
sewer utilities, on condition that the systems be fully completed, and given
to the City before the first permanent meter is set. Note that setting of a
permanent water meter is a prerequisite to obtaining the certificate of
occupancy.
2. The waste stream from all manufacturing processes must meet the City's X
pretreatment requirements. A sampling point must be provided to allow
monitoring of such a waste stream. (Sec. 26-143, 26-147)
FIRE
Comments:
3. Prior to signing off of a rectified plan, a fire flow test is required. LOR 6-16 X
4. Entry gates must have approval for type and operation from Fire Marshal X
prior to installation. BBCC 9-15
POLICE
Comments: NONE
ENGINEERING DIVISION
5. Show a five-foot sidewalk along E. Industrial Avenue within the limits of X
the site with a six-inch thick section through the driveways. [LOR Chapter
23, Article II.P.] or obtain sidewalk waiver.
6. Drainage calculations showing length provided of 307 ft. is not correct. X
BUILDING DIVISION
7. As the design professional-of record- for the project state, within the site X
data, that the proposed elevation is the above the highest 100-year base
Page 2
Poly Plastic Packaging
File No.: MSPM 00-002
DEPARTMENTS INCLUDE REJECT
flood elevation applicable to the building site, as determined by the South
Florida Water Management District's surface water management
construction development regulations. [Section 3107.1.2, Chapter 31 of the
Boynton Beach amendments to the 1997 edition of the Standard Building
Code]
8. At the time of permit review provide detailed drawings and documentation X
on the plans that will verify the accessible route that is shown from the
accessible parking spaces to the accessible building entrance is in
compliance with the regulations of the Florida Accessibility Code for
Building Construction. The documentation shall include, but not be limited
to, identifying the type of material proposed for the route, type of surface
finish, width, cross slope, slope and length of the entire accessible route
including, where applicable, landings, ramps, and handrails.
9. At the time of permit review specify, in tabular form, on the site plan and/or X
floor plan the proposed use of the facility, type of construction and
occupancy classification of all portions of the building. The building area,
occupancy and type of construction shall comply with the specifications
identified in the 1997 edition of the Standard Building Code including the
City of Boynton Beach amendments to the Standard Building Code.
Working drawings of the building shall comply with the codes specified in
Chapter 20 of the Land Development Regulations.
10. Permit fees, water, and sewer facility fees, Fire and Life Safety fees, County X
fees and State fees will be determined at the time of permit review.
11. Permits are required to construct the improvements that are shown on the X
approved site plan. Permit application forms are available in the Building
Division of the Development Department. A permit submittal checklist is
available in the Building Division. A list identifies the basic documents that
the Plans Analyst checks for when an applicant submits for permit review.
PARKS AND RECREA nON
Comments: NONE
FORESTERJENVIRONMENTALIST
Comments: NONE
PLANNING AND ZONING
Comments:
12. Clarify what part of the building is existing and what part is proposed on the X
site plan, including square footage calculation. There is an inconsistency in
square footage figures for the proposed addition between the figure provided
on the revised site plan (11,338 sq. ft.), the figure on which the traffic study
is based (11,652 sq. ft.), and the numbers for the existing square footage of
manufacturing, warehousing and office provided in Environmental Review
Permit Application (and those of 1993 Environmental Review). Revise
Page 3
Poly Plastic Packaging
File No.: MSPM 00-002
DEPARTMENTS INCLUDE REJECT
traffic study.
13. Include maximum height dimension of building on the site plan drawing X
(Chapter 4, Section 7, Site Plan submission requirements).
14. Indicate the proposed colors for the building addition on the elevation X
drawings. The color and materials of the addition should match the existing
building (Chapters 4 and 9; Chapter 4, Section 7, Site Plan submission
requirement).
15. Indicate the number of required trees which are native species. At least 50% X
of required trees must be native species (Comprehensive Plan Policy 4.4.5.)
16. Existing hedge on adjacent property to the north and south may be used to X
meet the landscape requirement provided the existing hedge meets all
applicable standards of the landscape code (Chapter 7.5, Article II,
Landscape Code).
17. Indicate and label location of fire hydrants on the landscape plan. (Chapter X
7.5, Article II, Landscape Code.
18. Provide a 5 foot concrete sidewalk to connect with existing sidewalk along X
Industrial A venue (Chapter 6, Article III, Sec. II) or obtain sidewalk
waivers.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
NONE X
ADDITIONAL CITY COMMISSION COMMENTS
1:0 ee aeteFHliRea. -- ~N~
JISHRDA T AIPLANNINGlSHAREDIWP\PROJECTS\POL Y PLASTIC PACKAGING\l ST REVIEW COMMENTS.DOC