Loading...
LEGAL APPROVAL 100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 375-6260 FAX: (561) 375-6259 America's Gateway to the Gulfstream nSHRDA T AIPlanninglSHAREDIWPIPROJECTSILEARNING DEPOT - COUSIDevelopment Order Letter,doc MWRlnl Michael W. Rumpf Director of Planning & Zoning Sincerely, To continue this project through the development process, please submit to this office four (4) sets of rectified plans (a site plan revised to incorporate all applicable conditions of approval). A rectified plan must be signed off by all TRC members prior to submitting for building permits. Your copy of the signed-off rectified plan is to be submitted in your permit plan package and represent your site (e.g. site plan, landscape plan, etc.) Should you have any questions regarding this matter, please feel free to contact this office at (561) 742-6260. Enclosed is the City of Boynton Beach Development Order for site plan approval granted on March 21,2000. Dear Mr. Carlson: Hampton Inn-Quantum Park MSPM 00-00 I 1475 West Gateway Boulevard Re: File No: Location: Richard Carlson 1425 Neptune Drive Boynton Beach, Florida 33425 March 24, 2000 Building Planning & Zoning Engineering Occupational License Community Redevelopment DEPARTMENT OF DEVELOPMENT Division of Planning and Zoning \\ \ \\" I" 11111111. ~,,\\\ '1 NTON "/~ ~:::. q;O. .oW..;.... ~~ ~ ~ 4. ...."# "~".'" ~ :: 0 IUQ o.)~ ~ ~ 4iI) ;~ = -.... - %0\ "'920~. i ~ ..... ' .. ~ ~ ........... t""\"'" ~ ~F o.\V ~ ~//, lOp \\~ ;1//11111/111\\\\\\\\ DATED: .~eA/&:JC/ -t7~~.~~,,~ ~ City Clerk J:ISHRDATAIPlanningISHAREOIWPlPROJECTSIQUANTUM 20001HAMPTON INN MSPM 00-00l\Hampton Inn O,O,doe Other 7. All further development on the property shall be made in accordance with the terms and conditions of this order. 6. 5. This Order shall take effect immediately upon issuance by the City Clerk. 4. The Applicant's application for relief is hereby 1.. GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the pUblic and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". established by substantial competent evidence a basis for the relief requested. 2. The Applicant 1.. HAS HAS NOT 1. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. THIS MA TIER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: OR x THIS MA TIER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: DRAWING(S): SEE EXHIBIT liB" ATTACHED HERETO. TYPE OF RELIEF SOUGHT: Major Site Plan Modification LOCATION OF PROPERTY: 1475 West Gateway Boulevard in Quantum Park '.'~ ll-[~ fl';: ! ~ ~ : 1 "J "I : I ,---' ,." i\_~H MAR 2 3 L_"., DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: March 21,2000 APPLICANT'S ADDRESS: 1475 West Gateway Boulevard APPLICANT'S AGENT: Richard W. Carlson, Esquire PROJECT NAME: Hampton Inn- Quantum Park DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CITY OF BOYNTON BEACH, FLORIDA . DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments: NONE UTILITIES Comments: X 1. All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. LDR Sec. 7.518.1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way. 2. Comp Plan policy 3C.3.4 requires the conservation of potable water. X City water may not, therefore, be used for irrigation where other sources are readily available. 3. A building permit for this project shall not be issued until this office has X approved the plans for the water and/or sewer improvements required to serve the project. (Sec. 26-15) Dept. of Health Permits will be required for the water and sewer systems X 4. serving this project. (Sec. 26-12) FIRE Comments: 5. A water distribution system plan is required and was not provided. LDR X 6-16. Include location ofF.D. connection. POLICE Comments: NONE ENGINEERING DIVISION Comments: 6. Combine Lots 1 & 2 with a Unity of Title. X 7. Any fill operation shall require an excavation/fill permit. X Project name: HAMPTON INN - QUANTUM PARK File number: MSPM 00-001 Reference: 2nd Review. Maior site plan modification. File # MSPM 00-001 with a February 22.2000 Planning and Zoning Department date stamp marking EXHIBIT "C" Conditions~fAl!I!roval DEPARTMENTS INCLUDE REJECT BUILDING Comments: 8. Add a symbol to the site plan drawings (SP-l and SP-2) that represents the X perimeter limits of constructions for the proposed new work. 9. Show and label the handicap accessible entrance doors on the drawing X entitled I st floor plan. The location of the accessible entrance doors shall match those that are shown on the site plan. 10. Add a labeled symbol to the site plan drawing (SP-I). The symbol shall X represent and delineate the path of travel of the accessible route that is required between the new accessible parking spaces and the accessible entrance door to the building. Identify on the plan the width of the accessible route (Note: The minimum width required by the code is forty- four (44) inches). Add text that would indicate that the symbol represents the accessible route and the route is designed in compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida Accessibility Code for Building Construction. The symbol represents the location of the path of travel, not the location of the detectable warning or other pavement markings required to be installed along the path. Please note at the time of permit review, the applicant shall provide detailed documentation on the plans verifying that the accessible route in compliance with the regulations specified in the Florida Accessibility Code for Building Construction. II. The number of new accessible parking spaces that are shown on site plan X SP-I does not match the number shown on site plan SP-2. The number shown on both plans shall match. X 12. Within the site data found on both sheets titled site plan, identify the proposed finish floor elevation of the building (lowest floor elevation). Verify that the proposed elevation complies with regulations of the code by adding specifications and notes to the site data addressing the following issues: a.) From the FIRM map, identify the title of the flood zone the building is located within. Where applicable, specify the base flood elevation. If there is no base flood elevation, indicate this on the plans b.) As the design professional-of-record for the project, state that the proposed floor elevation is above the highest 100-year base flood elevation applicable to the building site, as determined by the South Florida Water Management District's surface water management construction development regulations. [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the 1997 edition of the Standard Building Code] Page 2 Hampton Inn - Quantum Park File No.: MSPM 00-001 DEPARTMENTS INCLUDE REJECT c.) Identify the floor elevation the design professional has established for the new building within the footprint of the building showing on the site plans, 1 st floor plan and civil plan. Also, identify the finish floor elevation of the existing building. 13. On site plan (SP-2), label the symbol that represents the location of the X proposed site lighting poles. 14. On site plan (SP-l and SP-2), identify the symbol that represents the X property line. 15. Add to the site plan (SP-l) all the easements that are shown on the survey. X The location type and size of the easement(s) shall be shown and identified on the site plan. Where applicable, amend the plans so that the structures do not encroach into an easement. 16. Identify on both drawings that are titled site plan the actual distance that the X building is setback from the north, east and west property lines. Please note that overhangs, covered walkways, canopies, awnings and other appurtenances that are attached to the building shall be considered when identifying building setbacks. Therefore, identify the width of the overhangs, covered walkways, canopies, awnings, etc. The building setbacks shall comply with setback regulations specified in the Zoning Code. Identify whether the area located on the west side of the building is covered. Also, indicate the use of the area. 17. At the time of permit submittal, provide a completed and executed City X Unity of Title form. The form shall describe all lots, parcels or tracts combined as one lot. A copy of the recorded deed for each property being unified is required to process the form. Each recorded deed shall include a legal description and the owner identified on each deed shall match. 18. Before permit review, submit a current survey of the subject site. X 19. Compliance with the Building Codes will be evaluated at time of permit X review. The permit fee, water and sewer facility fees, Fire and Life Safety fees, County fees and State fees will be determined at time of permit review. 20. Permits are required to construct the improvements shown on the approved X site plan. Permit application forms are available in the Building Division of the Development Department. A permit submittal checklist is available in the Building Division. The list identifies the basic documents the Plan Analyst checks for when an applicant submits for permit review. PARKS AND RECREATION Comments: NONE Page 3 Hampton Inn - Quantum Park File No.: MSPM 00-001 DEPARTMENTS INCLUDE REJECT FORESTER/ENVIRONMENT AUST Comments: NONE PLANNING AND ZONING Comments: The following comments relate to the requirements in Chapter 4 - Site Plan Review 21. Provide a current survey of the adjacent property (Lot 1) showing the X connection between the existing building and the addition, a portion of which is located on Lot 1. 22. Provide a north arrow on the site plan sheet SP.2. X 23. Indicate on the elevation drawings the building colors and materials to be X used. 24. Indicate the dimension of the setback from the west property line. X 25. Indicate and label the location of the sidewalk on site plan sheets SP.1 and X SP-2. 26. Indicate and label the location of the site lighting on the site plan and landscape plan. Provide a site lighting detail with the height dimension. X 27. Provide a colored elevation drawing showing all elevations of the building for the Planning and Development Board Meeting. X 28. Indicate on the landscape plan the method of irrigation and the source of X water to be used on site. The following comments relate to the requirements of Chapter 23 - Parking Lots 29. Provide a dimension for the parking lot drive aisle width on the site plan. X 30. Provide a detail of the required handicapped parking sign. X 31. The proposed building addition must match the character and design of the X existing building. Indicate this on the elevation drawings. (Chapter. 9, Sec. 2) 32. Additional signs were not submitted for approval with this site plan. Signs X must meet the requirements of Chapter 23. ADDITIONAL PLANNING AND DEVELOPMENT CONDITIONS X 33. NONE X ADDITIONAL CITY COMMISSION CONDITIONS 34.:1:8 Be det..-i~~ ;V&l,.v 6' Page 4 Hampton Inn - Quantum Park File No.: MSPM 00-001