REVIEW COMMENTS
{
6.
Comments:
Comments: NONE
ENGINEERING DIVISION
A water distribution system plan is required and was not provided. LDR
6-16 In d..J.A.de loczAc(in f#.. F. 0._ {]{fYl1l! cJr.~ .
POLICE
x
/\
Comments:
x
A building permit for this project shall not be issued until this office has
approved the plans for the water and/or sewer improvements required to
serve the project. (Sec. 26-15)
(,>t. Dt He~ peerY/its WI -- ---
/... '",. .J '$I2W.e.J!!. $LtS.Jef'i>'; ytf!ui
;\
Comp Plan policy 3C.3.4 requires the conservation of potable water.
City water may not, therefore, be used for irrigation where other sources
are readily available.
K
All utilities easements shall be shown on the rectified landscaping
drawings so that we may determine which trees may interfere with
utilities. In general, palm trees will be the only tree species allowed
within utility easements. Canopy trees may be planted outside of the
easement so that roots and branches will not impact those utilities within
the easement in the foreseeable future. LDR Sec. 7.518.1 gives public
utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
Comments:
Comments: NONE
UTILITIES
Project name: HAMPTON INN - QUANTUM PARK
File nu er MSP 00-001
Referen. eview Ma'or site Ian modification.
and Zoning -Department date stamp marking.
;1 DEPARTMENTS
I
PUBLIC WORKS
I INCLUDE I REJECT I
1ci. ;2-2-
File # MSPM 00-001 with a Jamrarv 11, lOOO Plannin
1 st REVIEW COMMENTS
(11~1Z/tL
;(
x
~
x
INCLUDE I REJECT
15. Add a labeled symbol to both drawings that are titled site plan. The
symbol shall represent and delineate the path of travel of the accessible
route that is required between the new accessible parking spaces and the
accessible entrance door to the building. Identify on the plan the width
of the accessible route (Note: The minimum width required by the code
is forty-four (44) inches). Add text that would indicate that the symbol
represents the accessible route and the route is designed in compliance
with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger
Loading Zones) of the Florida Accessibility Code for Building
Construction. The symbol represents the location of the path of travel,
not the location of the detectable warning or other pavement markings
that are required to be installed along the path. Please note that at time
of permit review, the applicant shall provide detailed documentation on
the plans that will verify that the accessible route is in compliance with
14. Add a labeled symbol to the new building that is depicted on both
drawings titled site plan that identifies the location of the handicap
accessible entrance door to the building. Show and label the same door
on the drawing titled 1st floor plan.
13. Add a symbol to both site plan drawings that represents the perimeter
limits of construction for the new work.
wo.;j- ~JA ~ +1C4'.
(~~JvJ,)
Comments:
BUILDING DIVISION
(Pv iSpJ
Any fill operation shall require an excavation/fill permit.
II.
10.
9.
8.
Combine Lots I & 2 with a Unity of Title.
DEPARTMENTS
from other permitting agencies, such as FDOT, PBC, SFWMD, DERM,
L WDD, DEP and any others, shall be included with the permit request.
Page 2
Hampton Inn - Quantum Park
File No.: MSPM 00-001
Page 3
DEPARTMENTS INCLUDE REJECT
the regulations specified in the Florida Accessibility Code for Building
Construction.
16. Within the site data found on both sheets titled site plan, identify the
proposed finish floor elevation of the building (lowest floor elevation).
Verify that the proposed elevation complies with regulations of the code
by adding specifications and notes to the site data that address the
following issues:
a) From the FIRM map, identify the title of the flood zone that the
building is located within. Where applicable, specify the base
flood elevation. If there is no base flood elevation, indicate that
on the plans.
b) As the design professional-of-record for the project, state that
the proposed floor elevation is above the highest I DO-year base
flood elevation applicable to the building site, as determined by
the South Florida Water Management District's surface water
management construction development regulations. [Section
3107.1.2, Chapter 31 of the Boynton Beach amendments to the
1997 edition of the Standard Building Code]
c) Identify the floor elevation that the design professional has
established for the new building within the footprint of the
building that is shown on site plans, 1 st floor plan and civil
plan. Also, identify the finish floor elevation of the existing
building.
17. Add to both site plan drawings a labeled symbol that represents the
location of the proposed site lighting poles. Add the following notes to
the plan:
a) Indicate that the locations of the site lighting poles are
conceptual.
b) Site lighting will be evaluated at time of permit review.
c) The proposed site lighting fixtures will illuminate the site
consistent with the specifications identified in the Parking Lot
Code.
d) Identify the overall height dimension of the site lighting pole
and fixture. (Note: The overall height of the pole/fixture shall
not exceed the height limitations of the Zoning Code.)
Omit the pole lighting photometric information and drawing. This
information is required at time of permit submittal, not at site plan
review.
18. On both drawings titled site plan, identify the symbol that represents the
property line.
19. Add to the drawing titled site plan (sheet SP-l) all of the easements that
are shown on the survey. The location, type and size of the easement(s)
shall be shown and identified on the site plan. Where applicable, amend
the plans so that structures do not encroach into an easement.
Page 3
Hampton Inn - Quantum Park
File No.: MSPM 00-001
~
K
c{
)(
X
Y<
Indicate on the elevation drawings the building colors and materials to
be used.
Provide a north arrow on the site plan sheet SP-2.
Provide a current survey of the adjacent property (Lot 1) showing the
connection between the existing building and the addition, a portion of
which is located on Lot 1.
Comments: The following comments relate to the requirements in Chapter 4
- Site Plan Review
PLANNING AND ZONING
lake el
24.
the
23.
22.
NO}J 1-
Comments:
FORESTER/ENVIRONMENT ALIST
Comments: NONE
PARKS AND RECREA nON
21. At time of permit submittal, provide a completed and executed City unity
oftide form. The form shall describe all lots, parcels or tracts combined
as one lot. A copy of the deed with legal descriptions of each property
that is being unified is required to process the form. The property owner
that is identified on each deed shall match.
20. Identify on both drawings that are titled site plan the actual distance that
the building is setback from the north, east and west property lines.
Please note that overhangs, covered walkways, canopies, awnings or
other appurtenances that are attached to the building shall be considered
when identifying building setbacks. Therefore, identify the width of the
overhangs, covered walkways, canopies, awnings, etc. The building
setbacks shall comply with setback regulations specified in the Zoning
Code. Identify whether the area located on the west side of the building
is covered. Also, indicate the use of the area.
I INCLUDE I REJECT I
DEPARTMENTS
Page 4
Hampton Inn - Quantum Park
File No.: MSPM 00-001
fl\'
~
~
L./'
K
L>(
-
K
-
V 'X
I
c/ I
;(
I
IX
-
Y
REJECT
INCLUDE
D(
Thefollowing comments relate to the requirements of Chapter 7.5,
Article ll- Landscape Code:
37.
Indicate the dimension of the setback from the west property line.
a.Nl\a\)e\ ~~~
Indicate'\he location of the sidewalk on site plan sheets SP-l and SP-2.
0.....-/
@ IEdicate on the landscape plan the method of irrigation and the source of
water to be used on site.
The following comments relate to the requirements of Chapter 23 -
Parking Lots
31.
vIew.
buil"
Provide a colored elevation drawing showing all elevations of the
building for the Planning and Development Board meeting.
Indicate and label the location of the site lighting on the site plan and
landscape plan. Provide a site lighting detail with the height dimension.
DEPARTMENTS
Page 5
Hampton Inn - Quantum Park
File No.: MSPM 00-001
\X
REJECT
~
J(
INCLUDE
J-ISHRDA T AIPLANNlNGISHAREDlWPIPROJECTS\QUANTUM 2000IHAMPTON INN MSPM 00-0011] ST REVIEW COMMENTS.DOC
@ The proposed building addition must match the character and design of
the existing building. Indicate this on the elevation drawings. (Ch. 9,
Sec. 2)
DEPARTMENTS
Page 6
Hampton Inn - Quantum Park
File No.: MSPM 00-00 I
"'J
1"
-,,1/1
. II
u
4. The number of new accessible parking spaces that are shown on site plan SP-l does not
match the number shown on site plan SP-2. The number shown on both plans shall match.
3. Add a labeled symbol to the site plan drawing (SP-l). The symbol shall represent and
delineate the path of travel of the accessible route that is required between the new
accessible parking spaces and the accessible entrance door to the building. Identify on the
plan the width ofthe accessible route (Note: The minimum width required by the code is
forty-four (44) inches). Add text that would indicate that the symbol represents the
accessible route and the route is designed in compliance with Section 4.3 (Accessible
Route) and 4.6 (Parking and Passenger Loading Zones) ofthe Florida Accessibility Code
for Building Construction. The symbol represents the location of the path of travel, not the
location of the detectable warning or other pavement markings required to be installed
along the path. Please note at time of permit review, the applicant shall provide detailed
documentation on the plans verifying that the accessible route is in compliance with the
regulations specified in the Florida Accessibility Code for Building Construction.
2. Show and label the handicap accessible entrance doors on the drawing titled 1 st floor plan.
The location of the accessible entrance doors shall match those that are shown on the site
plan.
1. Add a symbol to the site plan drawings (SP-l and SP-2) that represents the perimeter limits
of construction for the proposed new work.
Buildine Division (Permit & Site Specific Comments)
We have reviewed the subject plans and recommend the request be forwarded for Board review,
with the understanding that all remaining comments will be shown in compliance on the working
drawings that are submitted for permits:
Michael Rumpf, Planning and Zoning Director ~~
Michael E. Haag, Building Code AdministralOf"\tJ
March 2, 2000 V
Hampton Inn @ Quantum Park - Major Site Plan Modification
(MSPM 00-001) 2nd Review Comments
TO:
RE:
DATE:
FROM:
., PI';U
.D~PT.
-\ R (iLl 1.-..'
. 0) l!; ~'l
! . r-t'-~"'
I~ r" ~ ~
:1.
:i MAR - 2 '
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-055
9. Identify on both drawings that are titled site plan the actual distance that the building is
setback from the north, east and west property lines. Please note that overhangs, covered
walkways, canopies, awnings or other appurtenances that are attached to the building shall
be considered when identifying building setbacks. Therefore, identify the width of the
overhangs, covered walkways, canopies, awnings, etc. The building setbacks shall comply
with setback regulations specified in the Zoning Code. Identify whether the area located on
the west side of the building is covered. Also, indicate the use of the area.
8. Add to site plan (SP-I) all of the easements that are shown on the survey. The location
type and size ofthe easement(s) shall be shown and identified on the site plan. Where
applicable, amend the plans so that structures do not encroach into an easement.
7. On site plan (SP-l and SP-2), identify the symbol that represents the property line.
6. On site plan (SP-2), label the symbol that represents the location of the proposed site
lighting poles.
5. Within the site data found on both sheets titled site plan, identify the proposed finish floor
elevation of the building (lowest floor elevation). Verify that the proposed elevation
complies with regulations of the code by adding specifications and notes to the site data
addressing the following issues:
a) From the FIRM map, identify the title of the flood zone the building is located within.
Where applicable, specify the base flood elevation. Ifthere is no base flood elevation,
indicate this on the plans.
b) As the design professional-of-record for the project, state that the proposed floor
elevation is above the highest 1 OO-year base flood elevation applicable to the building
site, as determined by the South Florida Water Management District's surface water
management construction development regulations. [Section 3107.1.2, Chapter 31 of
the Boynton Beach amendments to the 1997 edition of the Standard Building Code]
c) Identify the floor elevation the design professional has established for the new building
within the footprint of the building showing on the site plans, 1st floor plan and civil
plan. Also, identify the finish floor elevation of the existing building.
Building Division Memo No. 00-055
Re: Hampton Inn @ Quantum Park-Major Site Plan Modification (MSPM 00-001) 2nd Review
Comments
March 2, 2000
Page Two
S:\Development\Building-6870\Documents\TRC\MSPM 00-001 2nd review Hampton Inn @ Quantum Park.doc
13. Permits are required to construct the improvements shown on the approved site plan.
Permit application forms are available in the Building Division of the Development
Department. A permit submittal checklist is available in the Building Division. The list
identifies the basic documents the Plans Analyst checks for when an applicant submits for
permit review.
12. Compliance with the Building Codes will be evaluated at time of permit review. The permit
fee, water and sewer facility fees, Fire and Life Safety fees, County fees and State fees will
be determined at time of permit review.
11. Before permit review, submit a current survey ofthe subject site.
10. At time of permit submittal, provide a completed and executed City Unity of Title form.
The form shall describe all lots, parcels or tracts combined as one lot. A copy of the
recorded deed for each property being unified is required to process the form. Each
recorded deed shall include a legal description and the owner identified on each deed shall
match.
Building Division Memo No. 00-055
Re: Hampton Inn @ Quantum Park-Major Site Plan Modification (MSPM 00-001) 2nd
Review comments
March 2, 2000
Page Three
1
Thank you
Peter Mazzella
"Dept. of Health permits will be required for the water and sewer systems serving this project.
(Sec. 26-12). "
Please add the following comment to our original comments. Note that none of the original comments were satisfactorily
addressed from the first review.
Mazzella, Pete
Tuesday, February 22,20008:34 PM
Galav Lusia; Rumpf, Michael
Guidry, John
Hampton Inn MSPM- 2nd review
From:
Sent:
To:
Cc:
Subject:
Galav Lusia
DEPARTMENTS INCLUDE REJECT
from other permitting agencies, such as FOOT, PBC, SFWMD, DERM, D\jl__
L WDD, DEP and any others, shall be included with the permit request.
(7) "'--
Combine Lots 1 & 2 with a Unity of Title. IN
../
8. Add engineer's certification to sheet C-l that the drainage system shall
conform to all rules, regulations and codes of the City's Land
Development Regulations. [LOR Chapter 4, Section 7.F.] Also add a o U'T ,
general note that the exfiltration system shall comply with City Standard
Drawing B-91 007.
9. On the site and civil plan add the general note that all striping, markings (j IJT.
and signage shall conform to City Standard drawing. B-9800 1.
10. The addition of 64 new spaces shall require a minimum of three CJ\JT,
handicap stalls per 4.1. of the Florida Accessibility Code.
11. On the sheet S-P-l, correct the length of the "Typical Handicap Stall" to OJT,
18' .
~ Any fill operation shall require an excavation/fill permit. eN -
--
I
BUILDING DIVISION
Comments:
13. Add a symbol to both site plan drawings that represents the perimeter
limits of construction for the new work.
14. Add a labeled symbol to the new building that is depicted on both
drawings titled site plan that identifies the location of the handicap
accessible entrance door to the building. Show and label the same door
on the drawing titled 1st floor plan.
15. Add a labeled symbol to both drawings that are titled site plan. The
symbol shall represent and delineate the path of travel ofthe accessible
route that is required between the new accessible parking spaces and the
accessible entrance door to the building. Identify on the plan the width
of the accessible route (Note: The minimum width required by the code
is forty-four (44) inches). Add text that would indicate that the symbol
represents the accessible route and the route is designed in compliance
with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger
Loading Zones) of the Florida Accessibility Code for Building
Construction. The symbol represents the location of the path of travel,
not the location of the detectable warning or other pavement markings
that are required to be installed along the path. Please note that at time
of permit review, the applicant shall provide detailed documentation on
the plans that will verify that the accessible route is in compliance with
2'(\ J (&v .
~
Page 2
J;:lllmpton Inn - ~~rk
File No.: MSPM 00-001 .-
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments: NONE
UTILITIES
Comments:
1. All utilities easements shall be shown on the rectified landscaping
drawings so that we may determine which trees may interfere with
utilities. In general, palm trees will be the only tree species allowed
within utility easements. Canopy trees may be planted outside of the
easement so that roots and branches will not impact those utilities within
the easement in the foreseeable future. LDR Sec. 7.5 1 8. 1 gives public
utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
2. Comp Plan policy 3C.3.4 requires the conservation of potable water.
City water may not, therefore, be used for irrigation where other sources
are readily available.
3. A building permit for this project shall not be issued until this office has
approved the plans for the water and/or sewer improvements required to
serve the project. (Sec. 26- 1 5)
FIRE
Comments:
4. No part of the structure may be more than 200 feet from a hydrant. LDR
6-16
5. A water distribution system plan is required and was not provided. LDR
6-16
POLICE
Comments: NONE
ENGINEERING DIVISION
Comments:
6. On the site plan add a general note that all plans submitted for specific .
permits shall meet the City's code requirements at time of application.
These permits include, but are not limited to the following: site lighting, OU(
paving, drainage, curbing, landscaping and irrigation. Permits required
Project name: HAMPTON INN - QUANTUM PARK
File number: MSPM 00-001
Reference: 1st Review, Maior site plan modification. File # MSPM 00-001 with a Januarv 11, 2000 Planning
and Zoning QepartmenJdme_stamp marking.
1 st REVIEW COMMENTS
I DEPARTMENTS I INCLUDE I REJECT I
PUBLIC WORKS
Comments: NONE
UTILITIES
Comments:
1. All utilities easements shall be shown on the rectified landscaping
drawings so that we may determine which trees may interfere with
utilities. In general, palm trees will be the only tree species allowed
within utility easements. Canopy trees may be planted outside of the
easement so that roots and branches will not impact those utilities within
the easement in the foreseeable future. LOR Sec. 7.518.1 gives public
utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
2. Comp Plan policy 3C.3.4 requires the conservation of potable water.
City water may not, therefore, be used for irrigation where other sources
are readily available.
3. A building permit for this project shall not be issued until this office has
approved the plans for the water and/or sewer improvements required to
~serve the project. (Sec. 26-15)
"vpIRE ) ~IkA~ 7'1 z... -~&, ~D
... ~men~s:
4. No part of the structure may be more than 200 feet from a hydrant. LOR V".
6-16
,9 A water distribution ~stem plan is required and was not provided. LOR /
6-16 J(lc/4..cl2 eu:d:e;n... trf -r.D.CD1-)t161?-),'o".
POLICE
Comments: NONE
ENGINEERING DIVISION
Comments:
6. On the site plan add a general note that all plans submitted for specific
permits shall meet the City's code requirements at time of application.
These permits include, but are not limited to the following: site lighting,
paving, drainage, curbing, landscaping and irrigation. Permits required
Project name: Jjd.MPTON INN - QUANTUM PARK
Pile number: MSPM 00-00 I .~
Reference: I st Review, Major site plan modification. File # MSPM 00-001 with a January II, 2000 Planning
and ZoningDepartment date stamp marking.
nf~~
1st REVIEW COMMENTS
... .._.... .._.. ................... .I."'" "''''' "'''''... ./
DEPARTMENTS INCLUDE REJECT
20. Identify on both drawings that are titled site plan the actual distance that
the building is setback from the north, east and west property lines.
Please note that overhangs, covered walkways, canopies, awnings or
other appurtenances that are attached to the building shall be considered
when identifying building setbacks. Therefore, identify the width of the
overhangs, covered walkways, canopies, awnings, etc. The building
setbacks shall comply with setback regulations specified in the Zoning
Code. Identify whether the area located on the west side of the building
is covered. Also, indicate the use of the area.
21. At time of permit submittal, provide a completed and executed City unity
of title form. The form shall describe all lots, parcels or tracts combined
as one lot. A copy of the deed with legal descriptions of each property
that is being unified is required to process the form. The property owner
that is identified on each deed shall match.
PARKS AND RECREATION
Comments: NONE
FORESTER/ENVIRONMENT ALIST
Comments:
22. The applicant should indicate on the landscape plans where all of the ~
removed existing trees will be replaced on the site.
23. The applicant must submit for a separate clearing and grubbing permit ~
for the site in reference to the existing trees.
24. The applicant should indicate if any of the adjacent lake plantings would ~
be altered as part of the site plan.
PLANNING AND ZONING
Comments: The following comments relate to the requirements in Chapter 4
- Site Plan Review
25. Provide a current survey of the adjacent property (Lot 1) showing the
connection between the existing building and the addition, a portion of
which is located on Lot 1.
26. Provide a north arrow on the site plan sheet SP-2.
27. Indicate on the elevation drawings the building colors and materials to
be used.
28. The elevation drawings do not show the connection between the
I DEPARTMENTS I INCLUDE I REJECT I
PUBLIC WORKS
Comments: NONE
UTILITIES
Comments:
1. All utilities easements shali be shown on the rectified landscaping
drawings so that we may determine which trees may interfere with
utilities. In general, palm trees will be the only tree species aliowed
within utility easements. Canopy trees may be planted outside of the
easement so that roots and branches will not impact those utilities within
the easement in the foreseeable future. LDR Sec. 7.518.1 gives public
utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
2. Comp Plan policy 3C.3.4 requires the conservation of potable water.
City water may not, therefore, be used for irrigation where other sources
are readily available.
3. A building permit for this project shall not be issued until this office has
approved the plans for the water and/or sewer improvements required to
serve the project. (Sec. 26- I 5)
FIRE
Comments:
4. No part of the structure may be more than 200 feet from a hydrant. LDR
6-16
5. A water distribution system plan is required and was not provided. LDR
6-16
POLICE
Comments: NONE
ENGINEERING DIVISION
Comments:
6. On the site plan add a general note that all plans submitted for specific
permits shall meet the City's code requirements at time of application.
These permits include, but are not limited to the following: site lighting,
paving, drainage, curbing, landscaping and irrigation. Permits required
Project name: HAMPTON INN - QUANTUM PARK
File number: MSPM 00-001
Reference: 1st Review, Maior site plan modification. File # MSPM 00-001 with a January 1 L 2000 Planning
and Zoningj2epartment date stamp marking.
1st REVIEW COMMENTS
I DEPARTMENTS I INCLUDE I REJECT I
from other permitting agencies, such as FDOT, PBC, SFWMD, DERM,
L WDD, DEP and any others, shall be included with the permit request.
7. Combine Lots 1 & 2 with a Unity of Title.
8. Add engineer's certification to sheet C-1 that the drainage system shall
conform to all rules, regulations and codes of the City's Land
Development Regulations. [LDR Chapter 4, Section 7.F.] Also add a
general note that the exfiltration system shall comply with City Standard
Drawing B-91 007.
9. On the site and civil plan add the general note that all striping, markings
and signage shall conform to City Standard drawing. B-98001.
10. The addition of 64 new spaces shall require a minimum of three
handicap stalls per 4.1. of the Florida Accessibility Code.
11. On the sheet S-P-1, correct the length of the "Typical Handicap Stall" to
18' .
12. Any fill operation shall require an excavation/fill permit.
BUILDING DIVISION
Comments:
13. Add a symbol to both site plan drawings that represents the perimeter
limits of construction for the new work.
14. Add a labeled symbol to the new building that is depicted on both
drawings titled site plan that identifies the location of the handicap
accessible entrance door to the building. Show and label the same door
on the drawing titled 1 st floor plan.
IS. Add a labeled symbol to both drawings that are titled site plan. The
symbol shall represent and delineate the path of travel o{the accessible
route that is required between the new accessible parking spaces and the
accessible entrance door to the building. Identify on the plan the width
of the accessible route (Note: The minimum width required by the code
is forty-four (44) inches). Add text that would indicate that the symbol
represents the accessible route and the route is designed in compliance
with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger
Loading Zones) of the Florida Accessibility Code for Building
Construction. The symbol represents the location of the path of travel,
not the location of the detectable warning or other pavement markings
that are required to be installed along the path. Please note that at time
of permit review, the applicant shall provide detailed documentation on
the plans that will verify that the accessible route is in compliance with
Page 2
Hampton Inn - Quantum Park
File No.: MSPM 00-001
I DEPARTMENTS I INCLUDE I REJECT I
the regulations specified in the Florida Accessibility Code for Building
Construction.
16. Within the site data found on both sheets titled site plan, identify the
proposed finish floor elevation of the building (lowest floor elevation).
Verify that the proposed elevation complies with regulations of the code
by adding specifications and notes to the site data that address the
following issues:
a) From the FIRM map, identify the title of the flood zone that the
building is located within. Where applicable, specify the base
flood elevation. If there is no base flood elevation, indicate that
on the plans.
b) As the design professional-of-record for the project, state that
the proposed floor elevation is above the highest 100-year base
flood elevation applicable to the building site, as determined by
the South Florida Water Management District's surface water
management construction development regulations. [Section
3107.1.2, Chapter 3 1 of the Boynton Beach amendments to the
1997 edition of the Standard Building Code]
c) Identify the floor elevation that the design professional has
established for the new building within the footprint of the
building that is shown on site plans, 1 st floor plan and civil
plan. Also, identify the finish floor elevation of the existing
building.
17. Add to both site plan drawings a labeled symbol that represents the
location of the proposed site lighting poles. Add the following notes to
the plan:
a) Indicate that the locations of the site lighting poles are
conceptual.
b) Site lighting will be evaluated at time of permit review.
c) The proposed site lighting fixtures will illuminate the site
consistent with the specifications identified in the Parking Lot
Code.
d) Identify the overall height dimension of the site lighting pole
and fixture. (Note: The overall height of the pole/fixture shall
not exceed the height limitations of the Zoning Code.)
Omit the pole lighting photometric information and drawing. This
information is required at time of permit submittal, not at site plan
review.
18. On both drawings titled site plan, identify the symbol that represents the
property line.
19. Add to the drawing titled site plan (sheet SP-1) all of the easements that
are shown on the survey. The location, type and size of the easement(s)
shall be shown and identified on the site plan. Where applicable, amend
the plans so that structures do not encroach into an easement.
Page 3
Hampton Inn - Quantum Park
File No.: MSPM 00-001
I DEPARTMENTS I INCLUDE I REJECT I
20. Identify on both drawings that are titled site plan the actual distance that
the building is setback from the north, east and west property lines.
Please note that overhangs, covered walkways, canopies, awnings or
other appurtenances that are attached to the building shall be considered
when identifying building setbacks. Therefore, identify the width of the
overhangs, covered walkways, canopies, awnings, etc. The building
setbacks shall comply with setback regulations specified in the Zoning
Code. Identify whether the area located on the west side of the building
is covered. Also, indicate the use of the area.
21. At time of permit submittal, provide a completed and executed City unity
of title form. The form shall describe all lots, parcels or tracts combined
as one lot. A copy of the deed with legal descriptions of each property
that is being unified is required to process the form. The property owner
that is identified on each deed shall match.
PARKS AND RECREATION
Comments: NONE
FORESTER/ENVIRONMENT ALIST
Comments:
22. The applicant should indicate on the landscape plans where all of the
removed existing trees will be replaced on the site.
23. The applicant must submit for a separate clearing and grubbing permit
for the site in reference to the existing trees.
24. The applicant should indicate if any of the adjacent lake plantings would
be altered as part of the site plan.
PLANNING AND ZONING
Comments: The following comments relate to the requirements in Chapter 4
- Site Plan Review
25. Provide a current survey of the adjacent property (Lot 1) showing the
connection between the existing building and the addition, a portion of
which is located on Lot 1.
26. Provide a north arrow on the site plan sheet SP-2.
27. Indicate on the elevation drawings the building colors and materials to
be used.
28. The elevation drawings do not show the connection between the
Page 4
Hampton Inn - Quantum Park
File No.: MSPM 00-001
I DEPARTMENTS I INCLUDE I REJECT I
addition and the existing building. Provide this view.
29. Indicate and label the location of the site lighting on the site plan and
landscape plan. Provide a site lighting detail with the height dimension.
30. Provide a colored elevation drawing showing all elevations of the
building for the Planning and Development Board meeting.
31. Provide and engineer's certification in writing that drainage will
conform with all rules, regulations and codes of the City of Boynton
Beach.
32. The parking calculations are not consistent between Site plan sheets SP-
1 and SP-2. At a minimum, parking is calculated at 1.25 spaces per
bedroom which translates into 68 required spaces (1.25 x 54 units =
68). The handicapped requirement is three(3) spaces. If existing parking
will be used to supplement the parking required for the addition, please
note this on the site plan calculations.
33. Indicate the dimension of the setback from the west property line.
34. Indicate the location of the sidewalk on site plan sheets SP-l and SP-2.
35. Indicate on the landscape plan the method of irrigation and the source of
water to be used on site.
The following comments relate to the requirements of Chapter 23 -
Parking Lots
36. Provide a dimension for the parking lot drive aisle width on the site
plan.
37. Provide the typical parking space details on Sheet SP-2 showing them to
scale. Indicate the dimension between the wheelstop and the front of the
parking stall. Indicate whether continuous raised curbing will be used
between the sidewalk and parking lot in front of the building.
38. Provide a detail of the required handicapped parking sign.
Thefollowing comments relate to the requirements of Chapter 7.5,
Article II - Landscape Code:
39. Indicate the number of trees required and the number of trees provided
to meet the parking area interior landscaping requirement.
40. Cypress mulch is not permitted. Change the note on the landscape plan
accordingly.
41. At least 50% of the required planting material must be native species.
Page 5
Hampton Inn - Quantum Park
File No.: MSPM 00-001
J:\SHRDATAIPLANNlNG\SHAREDlWPIPROJECTS\QUANTUM 2000IHAMPTON INN MSPM OO-OOI\IST REVIEW COMMENTS.DOC
I DEPARTMENTS I INCLUDE I REJECT I
42. Provide the appropriate note on the landscape plan to address this
requirement. (Comp. Plan Policy 4.4.5)
43. The proposed building addition must match the character and design of
the existing building. Indicate this on the elevation drawings. (Ch. 9,
Sec. 2)
44. Additional signs were not submitted for approval with this site plan.
Signs must meet the requirements of Chapter 23 and be reviewed by the
P&D Board and approved by the City Commission.
45. Approval for this project is required from the Quantum Design Review
Committee (QDR).
Page 6
Hampton Inn - Quantum Park
File No.: MSPM 00-001
,
Facsimile
TRANSMITTAL
CITY OF BOYNTON BEACH
100 E. BOYNTON BEACH BOULEVARD
POBOX 310
BOYNTON BEACH. FLORIDA 33425-0310
FAX. (561) 742-6259
PLANNING AND ZONING DIVISION
TO' John Vaughen
FAX #. 561-997-6709
DATE. 2/1/00
RE: 1 st REVIEW COMMENTS FOR HAMPTON INN - QUANTUM
PARK
Please find attached the first review comments for your project. To stay on the
current review schedule, please do the following steps listed below, and bring all
documents to the TRC meeting scheduled for February 22, 2000
1 Revise your plans incorporating all comments listed herein, including the addition
of notes on plans to confirm response to general statements/comments, and
bring 10 copies to the TRC review meeting (full sets including all pages originally
submitted),
2 Submit the additional information as requested within the attached comments,
(i e traffic analysis, engineering certification, etc.)
3 Prepare a written response (7 copies) consisting of a list briefly summarizing how
each comment has been addressed on the revised plans or with the
supplemental information including location on the plans (this promotes an
expeditious 2nd review by staff and your project representatives during the TRC
meeting), and
4 Submit reductions (8 % x 11) for the proposed site plan, elevations and
landscaping plan (this is required for the final report and public presentation)
The applicant should not attend a TRC meeting (2nd review) until all documents have
been revised and copied for staff review
Page 1 of
Planning and Zoning Division
City of Boynton Beach
Boynton Beach, Florida 33425
742-6260
Fax: 742-6259
If plans will not be fully revised and brought to the scheduled TRC meeting, contact
Doris Marttila (742-6268) in this office by the Thursday prior to the schedule meeting
date Projects deviating from the original schedule are eligible for review at subsequent
meetings, which are held every Tuesday To reschedule, contact Doris Marttila by the
Thursday prior to the Tuesday TRC meeting that you desire to attend The remainder of
the review schedule will be adjusted accordingly If you have questions on the attached
comments, please contact the respective reviewer using the attached list of TRC
representatives
If the plans are reasonably complete and all significant comments are addressed
following TRC (2nd review), the project is forwarded to the Planning and Development
Board meeting that falls approximately 2 to 3 weeks following the TRC meeting An u*"
by any comment identifies a comment that must be addressed prior to moving forward to
the Planning and development board.
Note Items recognized by staff as typically outstanding at this point include a traffic
report and/or confirmation of the traffic concurrency approval from Palm Beach
County, drainage certification by a licensed engineer, and colored elevations of
the proposed project. This information is necessary for the project to proceed. If
you have submitted this information, please disregard this note
TRC MEMBERS
BOB BORDEN, ASSISTANT FIRE MARSHAL
KEVIN HALLAHAN, FORESTER/ENVIRONMENTALIST
LEE THOMPSON, POLICE DEPARTMENT
PETE MAZZELLA, UTILITIES DEPARTMENT
MICHAEL HAAG, BUILDING DIVISION
LARRY QUINN, PUBLIC WORKS DEPARTMENT
MARK LIPS
JOHN WILDNER, PARKS DIVISION
JACK CASLER, ACTING CITY ENGINEER
KEN HALL
MICHAEL RUMPF, PLANNING AND ZONING
JIM NGUYEN, PLANNING DIVISION
LUSIA GALAV, PLANNING DIVISION
FRANTZ LAFONTANT, ENGINEERING DIVISION
742-6602
742-6227
742-6105
742-6404
742-6352
742-6202
742-3208
742-6226
742-6280
742-6283
742-6260
742-6367
742-6262
742-6757
1 st REVIEW COMMENTS
PrOject name HAMPTON INN - QUANTUM PARK
File number' MSPM 00-001
Reference: 1st RevIew, MaJOr site plan modIficatIOn. File # MSPM 00-001 with a January I L 2000 Planmng
and Zoning Department date stamp marking
I DEPARTMENTS I INCLUDE I REJECT I
PUBLIC WORKS
Comments. NONE
UTILITIES
Comments
I All utIlitIes easements shall be shown on the rectIfied landscapmg
drawings so that we may determine whIch trees may mterfere with
utIlitIes. In general, palm trees will be the only tree species allowed
wlthm utIlIty easements. Canopy trees may be planted outSIde of the
easement so that roots and branches will not Impact those utilitIes withm
the easement m the foreseeable future LDR Sec. 7.518.1 gives publIc
utIlItIes the authorIty to remove any trees that mterfere wIth utilIty
servIces, eIther m utilIty easements or publIc rIghts-of-way
2 Comp Plan polIcy 3C.3 4 reqUIres the conservation of potable water
CIty water may not, therefore, be used for irngatIOn where other sources
are readIly available.
3 A buildmg permit for thIS project shall not be Issued untIl thIS office has
approved the plans for the water and/or sewer Improvements reqUIred to
serve the project. (Sec 26-15)
FIRE
Comments.
4 No part of the structure may be more than 200 feet from a hydrant. LDR
6-16
5 A water distribution system plan IS reqUIred and was not prOVIded. LDR
6-16
POLICE
Comments NONE
ENGINEERING DIVISION
Comments.
6 On the SIte plan add a general note that all plans submItted for specific
permits shall meet the City's code reqUIrements at tIme of applIcation.
These permIts include, but are not limIted to the following: site lIghting,
pavmg, dramage, curbmg, landscapmg and IrngatIOn. PermIts reqUIred
--~---- ~----~----~- --"------ ----
Page 2
Hampton Inn - Quantum Park
File No MSPM 00-001
DEPARTMENTS INCLUDE REJECT
from other permittmg agencies, such as FDOT, PBC, SFWMD, DERM,
L WDD, DEP and any others, shall be mcluded wIth the permIt request.
7 Combine Lots 1 & 2 wIth a UnIty of Title
8 Add engineer's certificatIOn to sheet C-l that the drainage system shall
conform to all rules, regulatIOns and codes of the CIty'S Land
Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F ] Also add a
general note that the exfiltratIon system shall comply wIth CIty Standard
Drawmg B-91 007
9 On the sIte and CIVIl plan add the general note that all striping, markings
and signage shall conform to City Standard drawing. B-9800 1
10 The addItIOn of 64 new spaces shall reqUIre a mInImUm of three
handicap stalls per 4 1 of the Florida AccessibilIty Code
11 On the sheet S-P-l, correct the length of the "TypIcal HandIcap Stall" to
18'
12. Any fill operation shall require an excavatIOn/fill permIt.
BUILDING DIVISION
Comments.
13 Add a symbol to both sIte plan drawmgs that represents the perimeter
lImIts of construction for the new work.
14 Add a labeled symbol to the new bUIldmg that IS depIcted on both
drawmgs titled site plan that identifies the location of the handIcap
accessible entrance door to the building. Show and label the same door
on the drawmg titled 1st floor plan.
15 Add a labeled symbol to both drawmgs that are tItled site plan. The
symbol shall represent and delmeate the path of travel ofthe accessible
route that IS reqUIred between the new accessible parkmg spaces and the
accessible entrance door to the buildmg. Identify on the plan the WIdth
of the accessible route (Note The mInImUm WIdth required by the code
IS forty-four (44) inches) Add text that would indIcate that the symbol
represents the accessible route and the route IS deSIgned m complIance
WIth SectIOn 4.3 (Accessible Route) and 4 6 (Parkmg and Passenger
Loadmg Zones) of the Florida Accessibility Code for BUIldmg
ConstructIOn. The symbol represents the locatIOn of the path of travel,
not the location of the detectable warnIng or other pavement markings
that are required to be mstalled along the path. Please note that at tIme
of permIt review, the applIcant shall provide detailed documentation on
the plans that wIll verify that the accessible route IS m complIance with
Page 3
Hampton Inn - Quantum Park
File No MSPM 00-001
I DEPARTMENTS I INCLUDE I REJECT I
the regulations specified in the Florida Accessibihty Code for Buildmg
ConstructIOn.
16 Withm the site data found on both sheets tItled site plan, IdentIfy the
proposed finish floor elevatIOn of the buIlding (lowest floor elevation).
Verify that the proposed elevation complies with regulatIOns ofthe code
by addmg speCificatIOns and notes to the site data that address the
following issues.
a) From the FIRM map, identIfy the title of the flood zone that the
building is located wlthm. Where apphcable, specify the base
flood elevatIOn. If there is no base flood elevatIOn, indicate that
on the plans.
b) As the deSign professlOnal-of-record for the project, state that
the proposed floor elevatIon IS above the highest 100-year base
flood elevatIOn applicable to the bUlldmg Site, as determmed by
the South Flonda Water Management Dlstnct's surface water
management construction development regulatIOns. [Section
3107 1.2, Chapter 31 of the Boynton Beach amendments to the
1997 editIon of the Standard Building Code]
c) IdentIfy the floor elevatIOn that the design profeSSIOnal has
estabhshed for the new bUlldmg Within the footprint of the
bUIlding that IS shown on site plans, I st floor plan and Civil
plan. Also, identify the fimsh floor elevatIOn of the eXlstmg
building.
17 Add to both site plan drawmgs a labeled symbol that represents the
locatIOn of the proposed site hghtmg poles. Add the followmg notes to
the plan.
a) Indicate that the locatIons ofthe site hghtmg poles are
conceptual.
b) Site hghtmg will be evaluated at tIme of permit review
c) The proposed site hghtmg fixtures wllllllummate the site
consistent With the speCificatIOns IdentIfied m the Parkmg Lot
Code.
d) Identify the overall height dimenSIOn of the site hghtmg pole
and fixture (Note The overall height of the pole/fixture shall
not exceed the height limitations of the Zoning Code.)
Omit the pole lighting photometric information and drawing. This
information is required at time of permit submittal, not at site plan
review
18 On both drawmgs tItled site plan, identify the symbol that represents the
property line
19 Add to the drawmg tItled site plan (sheet SP-l) all of the easements that
are shown on the survey The location, type and size of the easement(s)
shall be shown and Identified on the site plan. Where apphcable, amend
the plans so that structures do not encroach mto an easement.
Page 4
Hampton Inn - Quantum Park
File No MSPM 00-001
DEPARTMENTS INCLUDE REJECT
20 IdentIfy on both draWIngs that are tItled site plan the actual distance that
the bUIldIng IS setback from the north, east and west property hnes.
Please note that overhangs, covered walkways, canopIes, awnIngs or
other appurtenances that are attached to the building shall be consIdered
when Identifying bUIldIng setbacks. Therefore, identify the width of the
overhangs, covered walkways, canopIes, awmngs, etc The buildIng
setbacks shall comply WIth setback regulatIOns specIfied in the Zomng
Code Identify whether the area located on the west side of the building
IS covered. Also, IndIcate the use of the area.
21 At tIme of permIt submittal, provIde a completed and executed CIty umty
of title form. The form shall describe all lots, parcels or tracts combIned
as one lot. A copy of the deed WIth legal descriptions of each property
that IS beIng umfied IS reqUIred to process the form. The property owner
that is Identified on each deed shall match.
PARKS AND RECREATION
Comments. NONE
FORESTER/ENVIRONMENT ALIST
Comments.
22. The apphcant should IndIcate on the landscape plans where all of the
removed eXIsting trees WIll be replaced on the SIte
23 The apphcant must submit for a separate clearIng and grubbIng permIt
for the site In reference to the eXIstIng trees.
24 The applicant should Indicate If any of the adjacent lake plantings would
be altered as part of the SIte plan.
PLANNING AND ZONING
Comments The following comments relate to the requirements in Chapter 4
- Site Plan Review
25 Provide a current survey of the adjacent property (Lot 1) shOWIng the
connectIOn between the eXIstIng bUIldIng and the addItion, a portion of
whIch is located on Lot I
26 PrOVIde a north arrow on the site plan sheet SP-2
27 IndIcate on the elevation draWIngs the bUIlding colors and materials to
be used.
28 The elevatIOn draWIngs do not show the connectIOn between the
Page 5
Hampton Inn - Quantum Park
File No MSPM 00-001
DEPARTMENTS INCLUDE REJECT
addItion and the eXlstmg buildmg. Provide thIS VIew
29 IndIcate and label the location of the sIte IIghtmg on the sIte plan and
landscape plan. ProvIde a sIte lightmg detaIl with the heIght dImension.
30 ProvIde a colored elevatIOn drawing showmg all elevations of the
bUIldmg for the Plannmg and Development Board meetmg.
31 ProVIde and engineer's certificatIOn m wrItmg that dramage wIll
conform with all rules, regulatIOns and codes of the CIty of Boynton
Beach.
32. The parkmg calculations are not consistent between SIte plan sheets SP-
1 and SP-2. At a mInImUm, parking is calculated at 1.25 spaces per
bedroom which translates into 68 reqUired spaces (1.25 x 54 units =
68) The handIcapped reqUirement IS three(3) spaces. If eXlstmg parkmg
wIll be used to supplement the parkmg reqUired for the addItIOn, please
note thIS on the SIte plan calculations.
33 IndIcate the dimenSIOn of the setback from the west property Ime.
34 IndIcate the location of the sidewalk on SIte plan sheets SP-l and SP-2
35 IndIcate on the landscape plan the method of lITIgation and the source of
water to be used on site
The following comments relate to the requirements of Chapter 23 -
Parking Lots
36 ProVIde a dImenSIOn for the parkmg lot drIve aisle WIdth on the SIte
plan.
37 Provide the typical parking space details on Sheet SP-2 showmg them to
scale. IndIcate the dImension between the wheelstop and the front of the
parking stall IndIcate whether contmuous raIsed curbmg will be used
between the sidewalk and parking lot in front of the buIldmg.
38 PrOVIde a detaIl of the required handIcapped parkmg SIgn.
The following comments relate to the requirements of Chapter 75,
Article II - Landscape Code:
39 IndIcate the number of trees reqUired and the number of trees proVIded
to meet the parkmg area mterior landscapmg reqUirement.
40 Cypress mulch IS not permItted. Change the note on the landscape plan
accordmgly
41 At least 50% of the reqUired plantmg materIal must be natIve species.
Page 6
Hampton Inn - Quantum Park
File No MSPM 00-001
I DEPARTMENTS I INCLUDE I REJECT I
42. Provide the appropnate note on the landscape plan to address this
reqUIrement. (Comp Plan Pohcy 4 4 5)
43 The proposed buildmg addition must match the character and deSign of
the eXlstmg buildmg. Indicate thiS on the elevation drawmgs. (Ch. 9,
Sec. 2)
44 AdditIOnal signs were not submitted for approval with thiS site plan.
Signs must meet the reqUIrements of Chapter 23 and be reviewed by the
P&D Board and approved by the City Commission.
45 Approval for this project is reqUIred from the Quantum DeSign Review
Committee (QDR).
J:\SHRDATAIPLANNING\SHAREDlVlPIPROJECTS\QUAr-."TUM 2000IHAMPTON INN MSPM OO-OOI\IST REVJEW COMMENTS.DOC
Facsimile
TRANSMITTAL
CITY OF BOYNTON BEACH
100 E. BOYNTON BEACH BOULEVARD
POBOX 310
BOYNTON BEACH. FLORIDA 33425-0310
FAX. (561) 742-6259
PLANNING AND ZONING DIVISION
TO. Richard Carlson
FAX #. 433-0874
DATE. 2/1/00
RE. 1 st REVIEW COMMENTS FOR HAMPTON INN - QUANTUM
PARK
Please find attached the first review comments for your project. To stay on the
current review schedule, please do the following steps listed below, and bring all
documents to the TRC meeting scheduled for February 22,2000
1 Revise your plans incorporating all comments listed herein, including the addition
of notes on plans to confirm response to general statements/comments, and
bring 10 copies to the TRC review meeting (full sets including all pages originally
submitted),
2 Submit the additional information as requested within the attached comments,
(i e traffic analysis, engineering certification, etc.)
3 Prepare a written response (7 copies) consisting of a list briefly summarizing how
each comment has been addressed on the revised plans or with the
supplemental information including location on the plans (this promotes an
expeditious 2nd review by staff and your project representatives during the TRC
meeting) and
4 Submit reductions (8 % x 11) for the proposed site plan, elevations and
landscaping plan (this is required for the final report and public presentation)
The applicant should not attend a TRC meeting (2nd review) until all documents have
been revised and copied for staff review
Page 1 of
Planning and Zoning Division
City of Boynton Beach
Boynton Beach. Florida 33425
742-6260
Fax: 742-6259
If plans will not be fully revised and brought to the scheduled TRC meeting, contact
Doris Marttila (742-6268) in this office by the Thursday prior to the schedule meeting
date Projects deviating from the original schedule are eligible for review at subsequent
meetings, which are held every Tuesday To reschedule, contact Doris Marttila by the
Thursday prior to the Tuesday TRC meeting that you desire to attend The remainder of
the review schedule will be adjusted accordingly If you have questions on the attached
comments, please contact the respective reviewer using the attached list of TRC
representatives
If the plans are reasonably complete and all significant comments are addressed
following TRC (2nd review), the project is forwarded to the Planning and Development
Board meeting that falls approximately 2 to 3 weeks following the TRC meeting An "*,,
by any comment identifies a comment that must be addressed prior to moving forward to
the Planning and development board
Note Items recognized by staff as typically outstanding at this point include a traffic
report and/or confirmation of the traffic concurrency approval from Palm Beach
County, drainage certification by a licensed engineer, and colored elevations of
the proposed project. This information is necessary for the project to proceed. If
you have submitted this information, please disregard this note
TRC MEMBERS
BOB BORDEN, ASSISTANT FIRE MARSHAL
KEVIN HALLAHAN, FORESTER/ENVIRONMENTALIST
LEE THOMPSON, POLICE DEPARTMENT
PETE MAZZELLA, UTILITIES DEPARTMENT
MICHAEL HAAG, BUILDING DIVISION
LARRY QUINN, PUBLIC WORKS DEPARTMENT
MARK LIPS
JOHN WILDNER, PARKS DIVISION
JACK CASLER, ACTING CITY ENGINEER
KEN HALL
MICHAEL RUMPF, PLANNING AND ZONING
JIM NGUYEN, PLANNING DIVISION
LUSIA GALAV, PLANNING DIVISION
FRANTZ LAFONTANT, ENGINEERING DIVISION
742-6602
742-6227
742-6105
742-6404
742-6352
742-6202
742-3208
742-6226
742-6280
742-6283
742-6260
742-6367
742-6262
742-6757
Facsimile
TRANSMITTAL
CITY OF BOYNTON BEACH
100 E. BOYNTON BEACH BOULEVARD
~gy~~~J~OEACH. FLORIDA 33425-0310 ftlJ liFT
FAX. (561) 742-6259 ..,~
PLANNING AND ZONING DIVISION
TO. Richard Carlson
FAX #. 433-0874
DATE. 1/28/00
RE: COMMENTS FOR HAMPTON INN - QUANTUM PARK
Please find attached the first review comments for your project. To stay on the
current review schedule, please do the following steps listed below, and bring all
documents to the TRC meeting scheduled for February 22, 2000
1 Revise your plans incorporating all comments listed herein, including the addition
of notes on plans to confirm response to general statements/comments, and
bring 10 copies to the TRC review meeting (full sets including all pages originally
submitted),
2 Submit the additional information as requested within the attached comments (
i e traffic analysis, engineering certification, etc.)
3 Prepare a written response (7 copies) consisting of a list briefly summarizing how
each comment has been addressed on the revised plans or with the
supplemental information including location on the plans (this promotes an
expeditious 2nd review by staff and your project representatives during the TRC
meeting), and
4 Submit reductions (8 % x 11) for the proposed site plan, elevations and
landscaping plan (this is required for the final report and public presentation)
The applicant should not attend a TRC meeting (2nd review) until all documents have
been revised and copied for staff review
Page 1 of <0
Planning and Zoning Division
City of Boynton Beach
Boynton Beach, Florida 33425
DRAFT
742-6260
Fax: 742-6259
If plans will not be fully revised and brought to the scheduled TRC meeting, contact
JoAnn Alea in this office by the Thursday prior to the schedule meeting date Projects
deviating from the original schedule are eligible for review at subsequent meetings,
which are held every Tuesday To reschedule, contact JoAnn Alea by the Thursday
prior to the Tuesday TRC meeting that you desire to attend. The remainder of the
review schedule will be adjusted accordingly If you have questions on the attached
comments, please contact the respective reviewer using the attached list of TRC
representatives.
If the plans are reasonably complete and all significant comments are addressed
following TRC (2nd review), the project is forwarded to the Planning and Development
Board meeting that falls approximately 2 to 3 weeks following the TRC meeting An u*"
by any comment identifies a comment that must be addressed prior to moving forward to
the Planning and development board
Note Items recognized by staff as typically outstanding at this point include a traffic
report and/or confirmation of the traffic concurrency approval from Palm Beach
County, drainage certification by a licensed engineer, and colored elevations of
the proposed project. This information is necessary for the project to proceed If
you have submitted this information, please disregard this note
TRC MEMBERS
BOB BORDEN, ASSISTANT FIRE MARSHAL
KEVIN HALLAHAN, FORESTER/ENVIRONMENTALIST
LEE THOMPSON, POLICE DEPARTMENT
PETE MAZZELLA, UTILITIES DEPARTMENT
MICHAEL HAAG, BUILDING DIVISION
LARRY QUINN, PUBLIC WORKS DEPARTMENT
MARK LIPS
JOHN WILDNER, PARKS DIVISION
JACK CASLER, ACTING CITY ENGINEER
KEN HALL
MICHAEL RUMPF, PLANNING AND ZONING
JIM NGUYEN, PLANNING DIVISION
LUSIA GALAV, PLANNING DIVISION
FRANTZ LAFONTANT, ENGINEERING DIVISION
742-6602
742-6227
742-6105
742-6404
742-6352
742-6202
742-3208
742-6226
742-6280
742-6283
742-6260
742-6367
742-6262
742-6757
l:it REVIEW COMMENTS
Project name: HAMPTON INN - QUANTUM PARK
Ftle number' MSPM 00-001
Reference 1st RevIew, Maior sIte plan modIfication. File # MSPM 00-001 wIth a Januarv 1 L 2000 Planmng
and Zoning Deoartment date stamp markmg
I DEPARTMENTS I INCLUDE I REJECT I
PUBLIC WORKS
Comments. NONE
UTILITIES
Comments
1 All utilItIes easements shall be shown on the rectified landscapmg
drawmgs so that we may determine which trees may interfere with
uttlities. In general, palm trees wIll be the only tree specIes allowed
wIthm utilIty easements. Canopy trees may be planted outsIde of the
easement so that roots and branches will not Impact those utilItIes wIthm
the easement in the foreseeable future LDR Sec. 7.518 1 gIves public
utilIties the authonty to remove any trees that interfere WIth utility
services, eIther m utility easements or publIc nghts-of-way
2. Comp Plan polIcy 3C.3 4 requires the conservatIOn of potable water
CIty water may not, therefore, be used for lITigatIOn where other sources
are readily available
3 A bUIldmg permIt for thIS project shall not be Issued until thIS office has
approved the plans for the water and/or sewer Improvements reqUired to
serve the project. (Sec. 26-15)
FIRE
Comments.
1 No part of the structure may be more than 200 feet from a hydrant. LDR
6-16
2 A water dIstributIOn system plan is reqUired and was not proVIded. LDR
6-16
POLICE
Comments. NONE
ENGINEERING DIVISION
Comments.
1 On the SIte plan add a general note that all plans submItted for speCIfic
permIts shall meet the CIty'S code reqUirements at time of applIcation. These
permIts mc1ude, but are not lImIted to the followmg: SIte lightmg, pavmg,
dramage, curbmg, landscapmg and lITigatIOn. PermIts reqUired from other
Page 2
Hampton Inn - Quantum Park
FIle No MSPM 00-00 I
I DEPARTMENTS I INCLUDE I REJECT I
perrmttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and
any others, shall be mcluded wIth the permIt request.
2. Combine Lots I & 2 wIth a Unity of Title.
3 Add engineer's certIficatIon to sheet C-I that the dramage system shall
conform to all rules, regulatIOns and codes of the CIty'S Land Development
Regulations. [LDR Chapter 4, SectIOn 7.F] Also add a general note that
the exfiltratIon system shall comply wIth CIty Standard Drawing B-91 007
4 On the SIte and cIvil plan add the general note that all stnpmg, markmgs
and signage shall conform to City Standard drawmg. B-9800 I
5 The addItIOn of 64 new spaces shall reqUIre a mmImum of three
handicap stalls per 4 I of the Flonda AccessibIlIty Code
6 On the sheet S- P-I, correct the length of the "TypIcal HandIcap Stall" to
18'
7 Any fill operation shall reqUIre an excavatIon/fill permit.
BUILDING DIVISION
Comments.
PARKS AND RECREATION
Comments. NONE
FORESTER/ENVIRONMENT ALIST
Comments.
I The applIcant should indIcate on the landscape plans where all of the
removed eXIstmg trees will be replaced on the site
Page 3
Hampton Inn - Quantum Park
Ftle No MSPM 00-001
I DEPARTMENTS I INCLUDE I REJECT I
2. The apphcant must submit for a separate clearmg and grubbing permIt
for the SIte m reference to the existmg trees.
3 The applicant should mdlcate if any of the adjacent lake plantmgs would
be altered as part of the SIte plan.
PLANNING AND ZONING
Comments.
The followmg comments relate to the reqUIrements m Chapter 4 - Site Plan
ReVIew'
- ProvIde a current survey of the adjacent property (Lot 1) showmg the
connectIon between the eXIsting building and the additIon, a portIOn of
WhICh IS located on Lot 1
- Provide a north arrow on the site plan sheet SP-2.
- IndIcate on the elevatIOn drawmgs the bUIldmg colors and materials to be
used.
- The elevatIOn drawmgs do not show the connectIOn between the addItIOn
and the existmg bUIld mg. ProvIde thIS VIew
- Indicate and label the locatIOn ofthe SIte lightmg on the SIte plan and
landscape plan. ProvIde a SIte lightmg detail with the heIght dImension.
- Provide a colored elevatIOn drawmg showmg all elevatIOns of the buildmg
for the P&D Board meetmg.
- ProvIde and engmeer's certIficatIOn in wntmg that dramage will conform
WIth all rules, regulatIOns and codes of the CIty of Boynton Beach.
- The parkmg calculatIons are not consistent between sSIte plan sheets SP-1
and SP-2 At a mmlmum, parkmg IS calculated at 1.25 spaces per bedroom
whIch translates mto 68 reqUIred spaces (1.25 X 54 umts = 68) The
handIcapped reqUIrement IS three(3) spaces. If eXlstmg parkmg wtll be used
to supplement the parkmg reqUIred for the addItIOn, please note thIS on the
SIte plan calculatIOns.
- Indicate the dimenSIOn of the setback from the west property hne
- IndICate the locatIon of the SIdewalk on SIte plan sheets SP-I and SP-2
- IndIcate on the landscape plan the method of lITIgation and the source of
water to be used on SIte.
The followmg comments relate to the reqUIrements of Chapter 23 - Parkmg
Lots.
- ProvIde a dimension for the parking lot drive aisle WIdth on the site plan.
- ProvIde the typical parking space details on Sheet SP-2 showing them to
scale IndIcate the dimenSIOn between the wheelstop and the front of the
parkmg stall. Indicate whether contmuous raised curbmg wtll be used
between the sidewalk and parkmg lot in front of the bUIldmg.
- ProVIde a detaIl of the reqUIred handIcapped parkmg SIgn.
The followmg comments relate to the reqUIrements of Chapter 7 5, ArtIcle II -
Landscape Code'
- Indicate the number oftrees required and the number of trees provided to
meet the parkmg area mtenor landscapmg reqUIrement.
Page 4
Hampton Inn - Quantum Park
FIle No MSPM 00-001
DEPARTMENTS INCLUDE REJECT
- Cypress mulch is not permItted. Change the note on the landscape plan
accordingly
- At least 50% of the reqUired plantmg matenal must be native speCIes.
Provide the appropnate note on the landscape plan to address thIS
requirement. (Comp Plan PolIcy 4 4.5)
The proposed bUIldmg addItIOn must match the character and desIgn of the
eXIstmg bUIldmg. IndIcate thIS on the elevatIOn drawings. (Ch. 9, Sec 2)
AddItIOnal SIgns were not submItted for approval wIth thIS SIte plan. SIgns must
meet the reqUirements of Chapter 23 and be revIewed by the P&D
Board and approved by the CIty Commission.
Approval for thIS project IS reqUired from the Quantum DesIgn RevIew
CommIttee(QDR).
nSHRDATAIPLANNINGISHAREDlWPIPROJECTSIQUANTtJM 2000IHAMPTO:-l f.'r.'l !\"WSP 00-00211ST REVIEW COMMENTS. DOC
4. Within the site data found on both sheets titled site plan, identify the proposed finish ftoor
elevation of the building (lowest ftoor elevation). Verify that the proposed elevation
complies with regulations of the code by adding specifications and notes to the site data
that address the following issues:
3. Add a labeled symbol to both drawings that are titled site plan. The symbol shall represent
and delineate the path of travel of the accessible route that is required between the new
accessible parking spaces and the accessible entrance door to the building. Identify on the
plan the width of the accessible route (Note: The minimum width required by the code is
forty-four (44) inches). Add text that would indicate that the symbol represents the
accessible route and the route is designed in compliance with Section 4.3 (Accessible
Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida Accessibility Code
for Building Construction. The symbol represents the location of the path of travel, not the
location of the detectable warning or other pavement markings that are required to be
installed along the path. Please note that at time of permit review, the applicant shall
provide detailed documentation on the plans that will verify that the accessible route is in
compliance with the regulations specified in the Florida Accessibility Code for Building
Construction.
2. Add a labeled symbol to the new building that is depicted on both drawings titled site plan
that identifies the location of the handicap accessible entrance door to the building. Show
and label the same door on the drawing titled 1st floor plan.
1. Add a symbol to both site plan drawings that represents the perimeter limits of construction
for the new work.
Buildin!! Division (Permit & Site Specific Comments) - Michael E. Haag (561) 742-6352
We have reviewed the plans for the above-referenced project. The applicant must acknowledge
and address the below listed comments before the project is presented to the Board for their
revIew.
Hampton Inn @ Quantum Park - Major Site Plan Modification
(MSPM 00-001) 1st review comments
RE:
January 31, 2000
DATE:
Michael E. Haag, Building Code Administrator
FROM:
Michael Rumpf, Planning and Zoning Director
TO:
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-027
8. Identify on both drawings that are titled site plan the actual distance that the building is
setback from the north, east and west property lines. Please note that overhangs, covered
walkways, canopies, awnings or other appurtenances that are attached to the building shall
be considered when identifying building setbacks. Therefore, identify the width of the
overhangs, covered walkways, canopies, awnings, etc. The building setbacks shall comply
with setback regulations specified in the Zoning Code. Identify whether the area located on
the west side of the building is covered. Also, indicate the use of the area.
7. Add to the drawing titled site plan (sheet SP-l) all of the easements that are shown on the
survey. The location, type and size of the easement(s) shall be shown and identified on the
site plan. Where applicable, amend the plans so that structures do not encroach into an
easement.
6. On both drawings titled site plan, identify the symbol that represents the property line.
5. Add to both site plan drawings a labeled symbol that represents the location of the
proposed site lighting poles. Add the following notes to the plan:
a) Indicate that the locations of the site lighting poles are conceptual.
b) Site lighting will be evaluated at time of permit review.
c) The proposed site lighting fixtures will illuminate the site consistent with the
specifications identified in the Parking Lot Code.
d) Identify the overall height dimension of the site lighting pole and fixture. (Note: The
overall height of the pole/fixture shall not exceed the height limitations of the Zoning
Code.)
Omit the pole lighting photometric information and drawing. This information is
required at time of permit submittal, not at site plan review.
a) From the FIRM map, identify the title of the flood zone that the building is located
within. Where applicable, specify the base flood elevation. If there is no base flood
elevation, indicate that on the plans.
b) As the design professional-of-record for the project, state that the proposed ftoor
elevation is above the highest 1 OO-year base ftood elevation applicable to the building
site, as determined by the South Florida Water Management District's surface water
management construction development regulations. [Section 3107.1.2, Chapter 31 of
the Boynton Beach amendments to the 1997 edition of the Standard Building Code]
c) Identify the ftoor elevation that the design professional has established for the new
building within the footprint of the building that is shown on site plans, 1 st floor plan
and civil plan. Also, identify the finish floor elevation of the existing building.
Building Division Memo No. 00-027 to Michael Rumpf
RE: Hampton Inn @ Quantum Park - Major Site Plan Modification - 1 st review comments
January 31, 2000
Page Two
J:\SHRDATA\Development\Building-6870\Documents\TRC\MSPM 00-001 1st review Hampton Inn @ Quantum Park. doc
MEH:bg
9. At time of permit submittal, provide a completed and executed City unity of title form.
The form shall describe all lots, parcels or tracts combined as one lot. A copy of the deed
with legal descriptions of each property that is being unified is required to process the
form. The property owner that is identified on each deed shall match.
Building Division Memo No. 00-027 to Michael Rumpf
RE: Hampton Inn @ Quantum Park - Major Site Plan Modification - 1 st review comments
January 31, 2000
Page Three
FIRE & LIFE SAFETY DIVISION
Memorandum No 2000-7
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to
TO
FROM
Mike Rumpf, Director
Planning & Zoning
DIC Gale ~Z/
Fire & Life Safety C---./ 0
January 24, 2000
r;'"""\
j f'; ~
~ ~ fS -!~ '~-r-N-~
Ill") C~"'11 ~ i
JAN ') 5 2000
DATE
SUBJECT MSPM 00-001
Hampton Inn Quantam Park
1475 West Gateway Blvd
No part of the structure may be more than 200 feet from a hydrant. LOR 6-16
A water distribution system plan is required and was not provided LOR 6-16
Project should not go forward until a water distribution plan is provided
cc File
DEPARTMENT OF ENGINEERING
MEMORANDUM
NO 00-015
TO
Michael Rumpf, DIrector of Plannmg and z~ ~
John GUIdry, Intenm DIrector of Engmeenng t \J \f\
January 24, 2000
FROM.
DATE
RE
HAMPTON INN - QUANTUM PARK (MSPM 00-001)
MAJOR SITE PLAN MODIFICATION 1sT REVIEW COMMENTS
1 On the SIte Plan add a general note that all plans submItted for specIfic permIts shall meet the CIty'S
code reqUIrements at tIme of applIcatIOn. These permIts mclude, but are not lImIted to the followmg
SIte lIghtmg, pavmg, dramage, curbmg, landscapmg and lITIgatIOn. PermIts reqUIred from other
permlttmg agenCIes, such as FDOT PBC SFWMD DERM, L WDD, DEP and any others, shall be
mcluded WIth the permIt request.
2. Combme Lots 1 & 2 WIth a Umty of Title
3 Add engmeer's certIficatIOn to sheet C-l that the dramage system shall conform to all rules,
regulatIOns and codes ofthe CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F ]
Also add a general note that the exfiltratIon system shall comply WIth CIty Standard Drawmg B-
91007
4 On the SIte and CIVIl Plan add the general note that all stnpmg, markmgs and sIgnage shall conform
to CIty Standard Drawmg. B-9800 1
5 The addItIOn of 64 new spaces shall reqUIre a mlmmum of three handIcap stalls per 4 1 of the
Flonda AccessibIlIty Code
6 On sheet S-P-1, correct the length of the "TYPIcal HandIcap Stall" to 18'
7 Any fill operatIOn shall reqUIre an excavatIOn/fill permIt.
If there are any questIOns please contact Jack Casler, CIvIl Engmeer at 742-6282 or Ken Hall at 742-6283
~~~f
JAG/ck
C \My Documents\Hampton Inn Quantum Park Major Site Plan Mod. 1st Review.doc
ENGINEERING RATIONALE
SHEET
CITY OF BOYNTON BEACH
ENGINEERING DEPARTMENT
City Hall, West Wing
100 E. Boynton Beach Blvd.
Boynton Beach, Florida 33425
(561) 742-6280
(561) 742-6285 Fax
TO FIle
FROM. Ken Hall, Engmeermg Techmclan
SUBJECT HAMPTON INN - QUANTUM PARK (MSPM 00-001) 1 ST REVIEW COMMENTS
MEMO NO 00-015
Comment:
1 Genenc for all Site Plans.
2 To msure owners cannot sell remammg parcel without City approval.
3,4 & 5 Code reqUIrements.
6 CorrectIOn.
7 To put applIcant on notIce.
Hotel must be domg well - good additIOn to Quantum
KRH/ck
C\My Documents\Hampton Inn-Quantum Park MSPM 1st- Rationale Sheet.dot
~SfM @o~ B-C-I
CITY uF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO
MIchael Rumpf
FROM
Ofc M. Lane
DATE
SUBJECT
REFERENCES
ENCLOSURES
01/24/00
FILE
1 st ReVIew of Hampton Inn, AddItIon
Mr Rumphf, I've looked over the sIte plans for the Hampton Inn SIte Plan ModIficatIOn, They do meet WIth
State and CIty code and there are no comments or recommendatIOns from the polIce department at thIS tIme.
-'tAt '5 PM 00 -~ t
Parks Division Memorandum- TRC
To
Mike Rumpf, DIrector of Planmng and Zomng
Kart
From.
KevIn J Hallahan, Forester I EnvIronmentalIst
Subject
Hampton Inn-Quantum Park
Major SIte Plan ModIficatIon -1 st RevIew
Date
January 21,2000
1 The applIcant should IndIcate on the landscape plans where all of the removed eXIstIng trees
wIll be replaced on the SIte
2 The applIcant must submit for a separate cleanng and grubbmg permit for the site In reference
to the eXlstmg trees.
3 The applIcant should Indicate If any of the adjacent lake plantmgs would be altered as part of
the site plan.
The project should contmue m the normal review process
Kjh
File
-
~-\1 ~ \'
,
,-~
.. ~:I
i\;d
.J
- ,
. l. -
PUBLIC WORKS DEPARTMENT
MEMORANDUM #00-017
TO
Mike Rumpf, DIrector of Plannmg & Zonmg
VIA.
Chnstme Roberts, Intenm PublIc Works DIrector
FROM
Mark A. LIps, Forman III
DATE
January 20,2000
SUBJECT
15t ReVIew -
Project -
LocatIOn -
Agent -
FIle No -
New SIte Plan
Hampton Inn - Quantum Park
1475 West Gateway Blvd
RIchard W Carlson, Jr, Esq
MSPM 00-001
The PublIc Works Department has no comments or ObjectIOns to thIS project at thIS tIme.
We recommend thIS proj ect to go forward.
If you have any questIOns please contact me at (561) 742-6200
dfL~
I'
ML/dc
Attachment
--
r
r--
,
t..I L \ LU\.lU
)~\"
.1
.-J
..--..
.--:----
..-1.Nt sf M o-fJ - C-o (
LEISURE SERVICES. PARKS DIVISION MEMORANDUM
TO
Michael W Rumpf
Director ofPlanmng & Zomng
FROM.
John Wildner, Parks Director > u.:: I (5.R,~
v
RE.
HAMPTON INN -- QUANTUM PARK
DATE
January 18, 2000
I have no comments on the above-named project. This project should contmue m the normal
review process.
JW\bal
r-...- _.
i r-., R L&
II ,,; ,~
'I ;' _.~-, ~__f)
JAN , 8 2CXXJ
i
J !
1.
._<~
uAND
DEPT.
3. Each comment shall reference the section of the code that is incorrectly depicted on the
documents.
2. The documents submitted for the project were determined to be substantially complete with the
exception of traffic data, however, if the data provided to meet the submittal requirements is
insufficient to properly evaluate and process the project based on the review standards or the
documents show code deficiencies, additional data and/or corrections should be requested by
the reviewer by contacting Lusia Galav, or myself.
1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review
and the applicable code sections of the Code of Ordinances to review and formulate comments.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval:
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments or e-mail to JoAnn Alea and I no later
than January 25.20005:00 P.M. on When preparing your comments, please separate them into
two categories; code deficiencies with code sections referenced and recommendations that you
believe will enhance the project.
File No. - MSPM 00-001
Agent - Richard W. Carlson, Jr., Esq.
Location - 1475 West Gateway Blvd.
Project - Hampton Inn - Quantum Park
1 ST Review - Major Site Plan Modification
SITE PLAN REVIEW PROCEDURES
RE:
January 14, 2000
DATE:
TRC MEMBERS
Bob Borden, Assistant Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Lee Thompson, Police Chief
Pete Mazzella, Utilities Department
Michael Haag, Building Division
Ken Hall, Engineering Division
Larry Quinn, Public Works Department
John Wildner, Parks Division
Jack Casler, Acting City Engineer
Michael W. Rumpf cJ 13 r
Director of Planning and Zoning
FROM:
TO:
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 99-009
J:ISHRDATA\PLANNINGlSHAREDlWPIPROJECTS\QUANTUM 2000\HAMPTON INN MSPM 00-001\1STREVIEW-PLANS.DOC
xc: Steve Gale, Fire Marshal
Marshall Gage, Police Department
John Guidry, Utilities Director
Don Johnson, Building Division
Larry Roberts, Public Works Director
Central File
Attachment
MWR:jma
All comments shall be typed, addressed and transmitted or e-mailed to JoAnn Alea and I for distribution to
the applicant. Please include the name and phone number of the reviewer on this memorandum or e-
mail. Scott Barber will be the Planning and Zoning staff member coordinating the review of the project.
First review comments will be transmitted to the applicant along with a list of Technical Review Committee
(TRC) members.
6. If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above, to me. The memorandum shall state that the plans are approved and that
they do not have any comments on the plans submitted for review and that they recommend the
project be forwarded through the approval process.
5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name
of the appropriate TRC Member that is responsible for the review specified.
4. Technical Review Committee member(s) shall identify in their comments when the plans depict or
when the location and installation of their departmental required improvements may conflict with
other departmental improvements.
Page 2
JLt1t.-v
91-001
f+o IMp fOIA
Nh)~r
xc: Central File
S:\PLANN INGISHARED\WPIPROJECTSIHAMPTONIREPORTSP .WPD
The Planning and Zoning Department recommends approval of this site plan request,
subject to the comments included in Exhibit C - Conditions of Approval. The Technical
Review Committee recommends that the deficiencies identified in this exhibit be
corrected on the set of plans submitted for building permit.
RECOMMENDATION:
The submittal contains limited information regarding signage and
does not allow staff to evaluate whether proposed signs will fully
'meet the requirements of the sign program approved for Quantum
Corporate Park. Therefore, staff recommends that all signs be
approved administratively at time of permit review, if the sign plans
comply with both the Quantum Corporate Park sign program and
the sign code.
Signage:
The other building proposed on the premises is a small office
building separate from the hotel. The exterior finish of this
building and the colors are the same as those of the main hotel.
The proposed structure is characteristic of a hotel facility. It is a
four story structure with a symmetrical layout for both floor plans
and elevations. Hotel rooms are entered from the interior
circulation system. The main entrance to the building is
emphasized with a canopy over the drop-off area. The exterior
finish of the building is a combination of beige and cream stucco.
The canopy is covered with roof tiles.
:ommunity
>esign Plan:
Building and site regulations will fully meet code requirements
when staff comments are incorporated.
luilding and Site
tegulations:
The landscaping of the site will fully meet code requirements when
staff comments are incorporated.
andscaping:
There are 115 on-site parking spaces to be provided. With
anticipated total employment of 9 persons for the hotel and office
building, the City's Land Development Regulations, Chapter 2 -
Zoning requires 7 parking spaces in addition to parking spaces for
visitors (the number of spaces is not regulated by code, but is
determined by the petitioner). To date, the amount of parking
spaces for visitors has not been specified; however, the 108
parking spaces proposed is, arguably, a reasonable number for
visitor parking. Therefore, it is recommended that the total of 115
parking spaces for the 107 room, 4-story hotel and 1,656 square
feet office building be accepted.
Th~ ~'~~
ccz.16J 0-h~ '2S a-+
~l 0.9
C{..A i ~'l (4' f!- vJ ~ Ia/)
r 'eJLIS-h t'J 1~)0t.f).k'0
-Dr. .
~~GLGV' ~~'7
,~.
C 4J Ct,{~ c""-
'arking Facility:
11. SEE SP-1
12. WILL COMPLY
13. WILL REVISE ON SP-1
14. REVISED SP-1
15. ADDED NOTE ON SP-1
16. WILL PUT ON CIVIL DRAWINGS
17. SEE NOTE #5 ON SP-1
18. WILL COMPLY
19. HAVE REVISED - SEE SP-l
.
20. HAVE COMPLIED SEE SP-l
21. WILL COMPLY
22. WILL COMPLY
SEE CIVIL
8.
~ COMPLre!;> cd "H- 'OR-I
9. COMiOL-I C
-.wI1.L COUFLY I
10.
7. WILL COMPLY.
6. SEE NOTE ON SP-1
5. WILL COMPLY
4. ADDED A FIRE HYDRANT
3. WILL COMPLY
2. IRRIGATION IS OFF THE ATTACHED LAKE.
1. HAVE PUT ON LANDSCAPE DRAWINGS
PUBLIC WORKS
HAMPTON INN
TRC COMMENTS 2.22.2000
CITY OF BOYNTON BEACH
100 E. BOYNTON BEACH BLVD
.BOYNTON BEACH, FLORIDA 33425
23. WILL COMPLY
24. WILL NOT BE ALTERED
25. WILL COMPLY
26. WILL COMPLY
27. WILL COMPLY- MATCH EXISTING
28. HAVE COMPLIED - SEE A-2
29. SEE SP-1 FOR LIGHTING NOTE Jv c.:."
30. WILL PROVIDED
31. WILL PROVIDED
32. REVISED HC PARKING
33. WILL COMPLY
I 34. HAVE COMPLIED
'-
35. IRRIGATION IS OFF THE LAKE
36. HAVE SHOWN - SEE SP-1
37. CURB IN FRONT OF HOTEL SEE SP-1
38. WILL PROVIDE
39. WILL COMPLY
40. HAVE COMPLIED - SEE LA-1
41. WILL COMPLY
42. WILL PROVIDE
43. SEE A-2
44, OK.
45. SEE ATTACHED LETTER
..-.... 22. WILL COMPLY
15. ADDED NOTE ON SP-1
~6. WILL PUT ON CIVIL DRAWINGS H..:J.' {;(.N ,L~
l--f I < 2. ~I J:...-e
17 . SEE NOTE #5 ON SP-1
118. WI.LL COl1PLY
19. HAVE REVISED - SEE SP-1
,
20. HAVE COMPLIED SEE SP-l
/21. WILL COMPLY
14. REVISED SP-1
'? 13. WILL REVISE ON SP-1
WILL COMPLY
~.
11. SEE SP-1
8. SEE CIVIL
, / (.)Ci.~ 5 I I . .
t..1'J.- W.lLL CO~Lr n. r C ~ I
~. ~. eOI.'ll'Ltr:tJ 00-"-<. rtJ .rp'2
6. SEE NOTE ON SP-1
v( WILL COMPLY.
4. ADDED A FIRE HYDRANT
~. WILL COMPLY DD~- )tJe-t
vi. WILL COMPLY
2. IRRIGATION IS OFF THE ATTACHED LAKE.
1. HAVE PUT ON LANDSCAPE DRAWINGS
PUBLIC WORKS
HAMPTON INN
TRC COMMENTS 2.22.2000
CITY OF BOYNTON BEACH
100 E. BOYNTON BEACH BLVD
'BOYNTON BEACH, FLORIDA 33425
45. SEE ATTACHED LETTER
44. OK.
43. SEE A-2
~ 42. WILL PROVIDE
40. HAVE COMPLIED - SEE LA-l
~l. WILL COMPLY
~ 39. WILL COMPLY
~ 38. WILL. PROVIDE
37. CURB IN FRONT OF HOTEL SEE SP-l
36. HAVE SHOWN - SEE SP-l
~ 35. IRRl;',GATION IS OFF THE LAKE
34. HAVE COMPLIED
.~ 33. WILL COMPLY
32. RSVISED HC PARKING
30. WILL PROVID~
~. WIU PRe).e!:5.1!lD- Do"v
29,. SEE SP-l FOR LIGHTING NOTE
28. HAVE COMPLIED - SEE A-2
~ 27. WILL COMPLY- MATCH EXISTING
~ 26. WILL COMPLY
. ~ 25. WILL COMPLY
24. WILL NOT BE ALTERED
23. WILL COMPLY
11. SEE SP-1
12. WILL COMPLY
13. WILL REVISE ON SP-l
14. REVISED SP-l
15. ADDED NOTE ON SP-l
16. WILL PUT ON CIVIL DRAWINGS
17. SEE NOTE #5 ON SP-l
18. WILL COMPLY
19. HAVE REVISED - SEE SP-1
.
20. HAVE COMPLIED SEE SP-l
21. WILL COMPLY
22. WILL COMPLY
8. SEE CIVIL
9. ~fti6-C0f~/LJ eel
10. WILL Cel1P~ c~fJL.4t1d-S6+ Sf..}
7. WILL COMPLY.
6. SEE NOTE ON SP-l
5. WILL COMPLY
4. ADDED A FIRE HYDRANT
3. WILL COMPLY
2. IRRIGATION IS OFF THE ATTACHED LAKE.
1. HAVE PUT ON LANDSCAPE DRAWINGS
PUBLIC WORKS
HAMPTON INN
TRC COMMENTS 2.22.2000
CITY OF BOYNTON BEACH
100 E. BOYNTON BEACH BLVD
.BOYNTON BEACH, FLORIDA 33425
23. WILL COMPLY
24. WILL NOT BE ALTERED
25. WILL COMPLY
26. WILL COMPLY
27. WILL COMPLY- MATCH EXISTING
28. HAVE COMPLIED - SEE A-2
29. SEE SP-1 FOR LIGHTING NOTE
30. WILL PROVIDED
31. WILL PROVIDED
32. REVISED HC PARKING
33. WILL COMPLY
34. HAVE COMPLIED
35. IRRIGATION IS OFF THE LAKE
36. HAVE SHOWN - SEE SP-1
37. CURB IN FRONT OF HOTEL SEE SP-1
38. WILL PROVIDE
39. WILL COMPLY
40. HAVE COMPLIED - SEE LA-1
41. WILL COMPLY
42. WILL PROVIDE
43. SEE A-2
44. OK.
45. SEE ATTACHED LETTER