REVIEW COMMENTS { 6. Comments: Comments: NONE ENGINEERING DIVISION A water distribution system plan is required and was not provided. LDR 6-16 In d..J.A.de loczAc(in f#.. F. 0._ {]{fYl1l! cJr.~ . POLICE x /\ Comments: x A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements required to serve the project. (Sec. 26-15) (,>t. Dt He~ peerY/its WI -- --- /... '",. .J '$I2W.e.J!!. $LtS.Jef'i>'; ytf!ui ;\ Comp Plan policy 3C.3.4 requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. K All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. LDR Sec. 7.518.1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way. Comments: Comments: NONE UTILITIES Project name: HAMPTON INN - QUANTUM PARK File nu er MSP 00-001 Referen. eview Ma'or site Ian modification. and Zoning -Department date stamp marking. ;1 DEPARTMENTS I PUBLIC WORKS I INCLUDE I REJECT I 1ci. ;2-2- File # MSPM 00-001 with a Jamrarv 11, lOOO Plannin 1 st REVIEW COMMENTS (11~1Z/tL ;( x ~ x INCLUDE I REJECT 15. Add a labeled symbol to both drawings that are titled site plan. The symbol shall represent and delineate the path of travel of the accessible route that is required between the new accessible parking spaces and the accessible entrance door to the building. Identify on the plan the width of the accessible route (Note: The minimum width required by the code is forty-four (44) inches). Add text that would indicate that the symbol represents the accessible route and the route is designed in compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida Accessibility Code for Building Construction. The symbol represents the location of the path of travel, not the location of the detectable warning or other pavement markings that are required to be installed along the path. Please note that at time of permit review, the applicant shall provide detailed documentation on the plans that will verify that the accessible route is in compliance with 14. Add a labeled symbol to the new building that is depicted on both drawings titled site plan that identifies the location of the handicap accessible entrance door to the building. Show and label the same door on the drawing titled 1st floor plan. 13. Add a symbol to both site plan drawings that represents the perimeter limits of construction for the new work. wo.;j- ~JA ~ +1C4'. (~~JvJ,) Comments: BUILDING DIVISION (Pv iSpJ Any fill operation shall require an excavation/fill permit. II. 10. 9. 8. Combine Lots I & 2 with a Unity of Title. DEPARTMENTS from other permitting agencies, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be included with the permit request. Page 2 Hampton Inn - Quantum Park File No.: MSPM 00-001 Page 3 DEPARTMENTS INCLUDE REJECT the regulations specified in the Florida Accessibility Code for Building Construction. 16. Within the site data found on both sheets titled site plan, identify the proposed finish floor elevation of the building (lowest floor elevation). Verify that the proposed elevation complies with regulations of the code by adding specifications and notes to the site data that address the following issues: a) From the FIRM map, identify the title of the flood zone that the building is located within. Where applicable, specify the base flood elevation. If there is no base flood elevation, indicate that on the plans. b) As the design professional-of-record for the project, state that the proposed floor elevation is above the highest I DO-year base flood elevation applicable to the building site, as determined by the South Florida Water Management District's surface water management construction development regulations. [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the 1997 edition of the Standard Building Code] c) Identify the floor elevation that the design professional has established for the new building within the footprint of the building that is shown on site plans, 1 st floor plan and civil plan. Also, identify the finish floor elevation of the existing building. 17. Add to both site plan drawings a labeled symbol that represents the location of the proposed site lighting poles. Add the following notes to the plan: a) Indicate that the locations of the site lighting poles are conceptual. b) Site lighting will be evaluated at time of permit review. c) The proposed site lighting fixtures will illuminate the site consistent with the specifications identified in the Parking Lot Code. d) Identify the overall height dimension of the site lighting pole and fixture. (Note: The overall height of the pole/fixture shall not exceed the height limitations of the Zoning Code.) Omit the pole lighting photometric information and drawing. This information is required at time of permit submittal, not at site plan review. 18. On both drawings titled site plan, identify the symbol that represents the property line. 19. Add to the drawing titled site plan (sheet SP-l) all of the easements that are shown on the survey. The location, type and size of the easement(s) shall be shown and identified on the site plan. Where applicable, amend the plans so that structures do not encroach into an easement. Page 3 Hampton Inn - Quantum Park File No.: MSPM 00-001 ~ K c{ )( X Y< Indicate on the elevation drawings the building colors and materials to be used. Provide a north arrow on the site plan sheet SP-2. Provide a current survey of the adjacent property (Lot 1) showing the connection between the existing building and the addition, a portion of which is located on Lot 1. Comments: The following comments relate to the requirements in Chapter 4 - Site Plan Review PLANNING AND ZONING lake el 24. the 23. 22. NO}J 1- Comments: FORESTER/ENVIRONMENT ALIST Comments: NONE PARKS AND RECREA nON 21. At time of permit submittal, provide a completed and executed City unity oftide form. The form shall describe all lots, parcels or tracts combined as one lot. A copy of the deed with legal descriptions of each property that is being unified is required to process the form. The property owner that is identified on each deed shall match. 20. Identify on both drawings that are titled site plan the actual distance that the building is setback from the north, east and west property lines. Please note that overhangs, covered walkways, canopies, awnings or other appurtenances that are attached to the building shall be considered when identifying building setbacks. Therefore, identify the width of the overhangs, covered walkways, canopies, awnings, etc. The building setbacks shall comply with setback regulations specified in the Zoning Code. Identify whether the area located on the west side of the building is covered. Also, indicate the use of the area. I INCLUDE I REJECT I DEPARTMENTS Page 4 Hampton Inn - Quantum Park File No.: MSPM 00-001 fl\' ~ ~ L./' K L>( - K - V 'X I c/ I ;( I IX - Y REJECT INCLUDE D( Thefollowing comments relate to the requirements of Chapter 7.5, Article ll- Landscape Code: 37. Indicate the dimension of the setback from the west property line. a.Nl\a\)e\ ~~~ Indicate'\he location of the sidewalk on site plan sheets SP-l and SP-2. 0.....-/ @ IEdicate on the landscape plan the method of irrigation and the source of water to be used on site. The following comments relate to the requirements of Chapter 23 - Parking Lots 31. vIew. buil" Provide a colored elevation drawing showing all elevations of the building for the Planning and Development Board meeting. Indicate and label the location of the site lighting on the site plan and landscape plan. Provide a site lighting detail with the height dimension. DEPARTMENTS Page 5 Hampton Inn - Quantum Park File No.: MSPM 00-001 \X REJECT ~ J( INCLUDE J-ISHRDA T AIPLANNlNGISHAREDlWPIPROJECTS\QUANTUM 2000IHAMPTON INN MSPM 00-0011] ST REVIEW COMMENTS.DOC @ The proposed building addition must match the character and design of the existing building. Indicate this on the elevation drawings. (Ch. 9, Sec. 2) DEPARTMENTS Page 6 Hampton Inn - Quantum Park File No.: MSPM 00-00 I "'J 1" -,,1/1 . II u 4. The number of new accessible parking spaces that are shown on site plan SP-l does not match the number shown on site plan SP-2. The number shown on both plans shall match. 3. Add a labeled symbol to the site plan drawing (SP-l). The symbol shall represent and delineate the path of travel of the accessible route that is required between the new accessible parking spaces and the accessible entrance door to the building. Identify on the plan the width ofthe accessible route (Note: The minimum width required by the code is forty-four (44) inches). Add text that would indicate that the symbol represents the accessible route and the route is designed in compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading Zones) ofthe Florida Accessibility Code for Building Construction. The symbol represents the location of the path of travel, not the location of the detectable warning or other pavement markings required to be installed along the path. Please note at time of permit review, the applicant shall provide detailed documentation on the plans verifying that the accessible route is in compliance with the regulations specified in the Florida Accessibility Code for Building Construction. 2. Show and label the handicap accessible entrance doors on the drawing titled 1 st floor plan. The location of the accessible entrance doors shall match those that are shown on the site plan. 1. Add a symbol to the site plan drawings (SP-l and SP-2) that represents the perimeter limits of construction for the proposed new work. Buildine Division (Permit & Site Specific Comments) We have reviewed the subject plans and recommend the request be forwarded for Board review, with the understanding that all remaining comments will be shown in compliance on the working drawings that are submitted for permits: Michael Rumpf, Planning and Zoning Director ~~ Michael E. Haag, Building Code AdministralOf"\tJ March 2, 2000 V Hampton Inn @ Quantum Park - Major Site Plan Modification (MSPM 00-001) 2nd Review Comments TO: RE: DATE: FROM: ., PI';U .D~PT. -\ R (iLl 1.-..' . 0) l!; ~'l ! . r-t'-~"' I~ r" ~ ~ :1. :i MAR - 2 ' DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO. 00-055 9. Identify on both drawings that are titled site plan the actual distance that the building is setback from the north, east and west property lines. Please note that overhangs, covered walkways, canopies, awnings or other appurtenances that are attached to the building shall be considered when identifying building setbacks. Therefore, identify the width of the overhangs, covered walkways, canopies, awnings, etc. The building setbacks shall comply with setback regulations specified in the Zoning Code. Identify whether the area located on the west side of the building is covered. Also, indicate the use of the area. 8. Add to site plan (SP-I) all of the easements that are shown on the survey. The location type and size ofthe easement(s) shall be shown and identified on the site plan. Where applicable, amend the plans so that structures do not encroach into an easement. 7. On site plan (SP-l and SP-2), identify the symbol that represents the property line. 6. On site plan (SP-2), label the symbol that represents the location of the proposed site lighting poles. 5. Within the site data found on both sheets titled site plan, identify the proposed finish floor elevation of the building (lowest floor elevation). Verify that the proposed elevation complies with regulations of the code by adding specifications and notes to the site data addressing the following issues: a) From the FIRM map, identify the title of the flood zone the building is located within. Where applicable, specify the base flood elevation. Ifthere is no base flood elevation, indicate this on the plans. b) As the design professional-of-record for the project, state that the proposed floor elevation is above the highest 1 OO-year base flood elevation applicable to the building site, as determined by the South Florida Water Management District's surface water management construction development regulations. [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the 1997 edition of the Standard Building Code] c) Identify the floor elevation the design professional has established for the new building within the footprint of the building showing on the site plans, 1st floor plan and civil plan. Also, identify the finish floor elevation of the existing building. Building Division Memo No. 00-055 Re: Hampton Inn @ Quantum Park-Major Site Plan Modification (MSPM 00-001) 2nd Review Comments March 2, 2000 Page Two S:\Development\Building-6870\Documents\TRC\MSPM 00-001 2nd review Hampton Inn @ Quantum Park.doc 13. Permits are required to construct the improvements shown on the approved site plan. Permit application forms are available in the Building Division of the Development Department. A permit submittal checklist is available in the Building Division. The list identifies the basic documents the Plans Analyst checks for when an applicant submits for permit review. 12. Compliance with the Building Codes will be evaluated at time of permit review. The permit fee, water and sewer facility fees, Fire and Life Safety fees, County fees and State fees will be determined at time of permit review. 11. Before permit review, submit a current survey ofthe subject site. 10. At time of permit submittal, provide a completed and executed City Unity of Title form. The form shall describe all lots, parcels or tracts combined as one lot. A copy of the recorded deed for each property being unified is required to process the form. Each recorded deed shall include a legal description and the owner identified on each deed shall match. Building Division Memo No. 00-055 Re: Hampton Inn @ Quantum Park-Major Site Plan Modification (MSPM 00-001) 2nd Review comments March 2, 2000 Page Three 1 Thank you Peter Mazzella "Dept. of Health permits will be required for the water and sewer systems serving this project. (Sec. 26-12). " Please add the following comment to our original comments. Note that none of the original comments were satisfactorily addressed from the first review. Mazzella, Pete Tuesday, February 22,20008:34 PM Galav Lusia; Rumpf, Michael Guidry, John Hampton Inn MSPM- 2nd review From: Sent: To: Cc: Subject: Galav Lusia DEPARTMENTS INCLUDE REJECT from other permitting agencies, such as FOOT, PBC, SFWMD, DERM, D\jl__ L WDD, DEP and any others, shall be included with the permit request. (7) "'-- Combine Lots 1 & 2 with a Unity of Title. IN ../ 8. Add engineer's certification to sheet C-l that the drainage system shall conform to all rules, regulations and codes of the City's Land Development Regulations. [LOR Chapter 4, Section 7.F.] Also add a o U'T , general note that the exfiltration system shall comply with City Standard Drawing B-91 007. 9. On the site and civil plan add the general note that all striping, markings (j IJT. and signage shall conform to City Standard drawing. B-9800 1. 10. The addition of 64 new spaces shall require a minimum of three CJ\JT, handicap stalls per 4.1. of the Florida Accessibility Code. 11. On the sheet S-P-l, correct the length of the "Typical Handicap Stall" to OJT, 18' . ~ Any fill operation shall require an excavation/fill permit. eN - -- I BUILDING DIVISION Comments: 13. Add a symbol to both site plan drawings that represents the perimeter limits of construction for the new work. 14. Add a labeled symbol to the new building that is depicted on both drawings titled site plan that identifies the location of the handicap accessible entrance door to the building. Show and label the same door on the drawing titled 1st floor plan. 15. Add a labeled symbol to both drawings that are titled site plan. The symbol shall represent and delineate the path of travel ofthe accessible route that is required between the new accessible parking spaces and the accessible entrance door to the building. Identify on the plan the width of the accessible route (Note: The minimum width required by the code is forty-four (44) inches). Add text that would indicate that the symbol represents the accessible route and the route is designed in compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida Accessibility Code for Building Construction. The symbol represents the location of the path of travel, not the location of the detectable warning or other pavement markings that are required to be installed along the path. Please note that at time of permit review, the applicant shall provide detailed documentation on the plans that will verify that the accessible route is in compliance with 2'(\ J (&v . ~ Page 2 J;:lllmpton Inn - ~~rk File No.: MSPM 00-001 .- DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments: NONE UTILITIES Comments: 1. All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. LDR Sec. 7.5 1 8. 1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way. 2. Comp Plan policy 3C.3.4 requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. 3. A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements required to serve the project. (Sec. 26- 1 5) FIRE Comments: 4. No part of the structure may be more than 200 feet from a hydrant. LDR 6-16 5. A water distribution system plan is required and was not provided. LDR 6-16 POLICE Comments: NONE ENGINEERING DIVISION Comments: 6. On the site plan add a general note that all plans submitted for specific . permits shall meet the City's code requirements at time of application. These permits include, but are not limited to the following: site lighting, OU( paving, drainage, curbing, landscaping and irrigation. Permits required Project name: HAMPTON INN - QUANTUM PARK File number: MSPM 00-001 Reference: 1st Review, Maior site plan modification. File # MSPM 00-001 with a Januarv 11, 2000 Planning and Zoning QepartmenJdme_stamp marking. 1 st REVIEW COMMENTS I DEPARTMENTS I INCLUDE I REJECT I PUBLIC WORKS Comments: NONE UTILITIES Comments: 1. All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. LOR Sec. 7.518.1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way. 2. Comp Plan policy 3C.3.4 requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. 3. A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements required to ~serve the project. (Sec. 26-15) "vpIRE ) ~IkA~ 7'1 z... -~&, ~D ... ~men~s: 4. No part of the structure may be more than 200 feet from a hydrant. LOR V". 6-16 ,9 A water distribution ~stem plan is required and was not provided. LOR / 6-16 J(lc/4..cl2 eu:d:e;n... trf -r.D.CD1-)t161?-),'o". POLICE Comments: NONE ENGINEERING DIVISION Comments: 6. On the site plan add a general note that all plans submitted for specific permits shall meet the City's code requirements at time of application. These permits include, but are not limited to the following: site lighting, paving, drainage, curbing, landscaping and irrigation. Permits required Project name: Jjd.MPTON INN - QUANTUM PARK Pile number: MSPM 00-00 I .~ Reference: I st Review, Major site plan modification. File # MSPM 00-001 with a January II, 2000 Planning and ZoningDepartment date stamp marking. nf~~ 1st REVIEW COMMENTS ... .._.... .._.. ................... .I."'" "''''' "'''''... ./ DEPARTMENTS INCLUDE REJECT 20. Identify on both drawings that are titled site plan the actual distance that the building is setback from the north, east and west property lines. Please note that overhangs, covered walkways, canopies, awnings or other appurtenances that are attached to the building shall be considered when identifying building setbacks. Therefore, identify the width of the overhangs, covered walkways, canopies, awnings, etc. The building setbacks shall comply with setback regulations specified in the Zoning Code. Identify whether the area located on the west side of the building is covered. Also, indicate the use of the area. 21. At time of permit submittal, provide a completed and executed City unity of title form. The form shall describe all lots, parcels or tracts combined as one lot. A copy of the deed with legal descriptions of each property that is being unified is required to process the form. The property owner that is identified on each deed shall match. PARKS AND RECREATION Comments: NONE FORESTER/ENVIRONMENT ALIST Comments: 22. The applicant should indicate on the landscape plans where all of the ~ removed existing trees will be replaced on the site. 23. The applicant must submit for a separate clearing and grubbing permit ~ for the site in reference to the existing trees. 24. The applicant should indicate if any of the adjacent lake plantings would ~ be altered as part of the site plan. PLANNING AND ZONING Comments: The following comments relate to the requirements in Chapter 4 - Site Plan Review 25. Provide a current survey of the adjacent property (Lot 1) showing the connection between the existing building and the addition, a portion of which is located on Lot 1. 26. Provide a north arrow on the site plan sheet SP-2. 27. Indicate on the elevation drawings the building colors and materials to be used. 28. The elevation drawings do not show the connection between the I DEPARTMENTS I INCLUDE I REJECT I PUBLIC WORKS Comments: NONE UTILITIES Comments: 1. All utilities easements shali be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities. In general, palm trees will be the only tree species aliowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. LDR Sec. 7.518.1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way. 2. Comp Plan policy 3C.3.4 requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. 3. A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements required to serve the project. (Sec. 26- I 5) FIRE Comments: 4. No part of the structure may be more than 200 feet from a hydrant. LDR 6-16 5. A water distribution system plan is required and was not provided. LDR 6-16 POLICE Comments: NONE ENGINEERING DIVISION Comments: 6. On the site plan add a general note that all plans submitted for specific permits shall meet the City's code requirements at time of application. These permits include, but are not limited to the following: site lighting, paving, drainage, curbing, landscaping and irrigation. Permits required Project name: HAMPTON INN - QUANTUM PARK File number: MSPM 00-001 Reference: 1st Review, Maior site plan modification. File # MSPM 00-001 with a January 1 L 2000 Planning and Zoningj2epartment date stamp marking. 1st REVIEW COMMENTS I DEPARTMENTS I INCLUDE I REJECT I from other permitting agencies, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be included with the permit request. 7. Combine Lots 1 & 2 with a Unity of Title. 8. Add engineer's certification to sheet C-1 that the drainage system shall conform to all rules, regulations and codes of the City's Land Development Regulations. [LDR Chapter 4, Section 7.F.] Also add a general note that the exfiltration system shall comply with City Standard Drawing B-91 007. 9. On the site and civil plan add the general note that all striping, markings and signage shall conform to City Standard drawing. B-98001. 10. The addition of 64 new spaces shall require a minimum of three handicap stalls per 4.1. of the Florida Accessibility Code. 11. On the sheet S-P-1, correct the length of the "Typical Handicap Stall" to 18' . 12. Any fill operation shall require an excavation/fill permit. BUILDING DIVISION Comments: 13. Add a symbol to both site plan drawings that represents the perimeter limits of construction for the new work. 14. Add a labeled symbol to the new building that is depicted on both drawings titled site plan that identifies the location of the handicap accessible entrance door to the building. Show and label the same door on the drawing titled 1 st floor plan. IS. Add a labeled symbol to both drawings that are titled site plan. The symbol shall represent and delineate the path of travel o{the accessible route that is required between the new accessible parking spaces and the accessible entrance door to the building. Identify on the plan the width of the accessible route (Note: The minimum width required by the code is forty-four (44) inches). Add text that would indicate that the symbol represents the accessible route and the route is designed in compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida Accessibility Code for Building Construction. The symbol represents the location of the path of travel, not the location of the detectable warning or other pavement markings that are required to be installed along the path. Please note that at time of permit review, the applicant shall provide detailed documentation on the plans that will verify that the accessible route is in compliance with Page 2 Hampton Inn - Quantum Park File No.: MSPM 00-001 I DEPARTMENTS I INCLUDE I REJECT I the regulations specified in the Florida Accessibility Code for Building Construction. 16. Within the site data found on both sheets titled site plan, identify the proposed finish floor elevation of the building (lowest floor elevation). Verify that the proposed elevation complies with regulations of the code by adding specifications and notes to the site data that address the following issues: a) From the FIRM map, identify the title of the flood zone that the building is located within. Where applicable, specify the base flood elevation. If there is no base flood elevation, indicate that on the plans. b) As the design professional-of-record for the project, state that the proposed floor elevation is above the highest 100-year base flood elevation applicable to the building site, as determined by the South Florida Water Management District's surface water management construction development regulations. [Section 3107.1.2, Chapter 3 1 of the Boynton Beach amendments to the 1997 edition of the Standard Building Code] c) Identify the floor elevation that the design professional has established for the new building within the footprint of the building that is shown on site plans, 1 st floor plan and civil plan. Also, identify the finish floor elevation of the existing building. 17. Add to both site plan drawings a labeled symbol that represents the location of the proposed site lighting poles. Add the following notes to the plan: a) Indicate that the locations of the site lighting poles are conceptual. b) Site lighting will be evaluated at time of permit review. c) The proposed site lighting fixtures will illuminate the site consistent with the specifications identified in the Parking Lot Code. d) Identify the overall height dimension of the site lighting pole and fixture. (Note: The overall height of the pole/fixture shall not exceed the height limitations of the Zoning Code.) Omit the pole lighting photometric information and drawing. This information is required at time of permit submittal, not at site plan review. 18. On both drawings titled site plan, identify the symbol that represents the property line. 19. Add to the drawing titled site plan (sheet SP-1) all of the easements that are shown on the survey. The location, type and size of the easement(s) shall be shown and identified on the site plan. Where applicable, amend the plans so that structures do not encroach into an easement. Page 3 Hampton Inn - Quantum Park File No.: MSPM 00-001 I DEPARTMENTS I INCLUDE I REJECT I 20. Identify on both drawings that are titled site plan the actual distance that the building is setback from the north, east and west property lines. Please note that overhangs, covered walkways, canopies, awnings or other appurtenances that are attached to the building shall be considered when identifying building setbacks. Therefore, identify the width of the overhangs, covered walkways, canopies, awnings, etc. The building setbacks shall comply with setback regulations specified in the Zoning Code. Identify whether the area located on the west side of the building is covered. Also, indicate the use of the area. 21. At time of permit submittal, provide a completed and executed City unity of title form. The form shall describe all lots, parcels or tracts combined as one lot. A copy of the deed with legal descriptions of each property that is being unified is required to process the form. The property owner that is identified on each deed shall match. PARKS AND RECREATION Comments: NONE FORESTER/ENVIRONMENT ALIST Comments: 22. The applicant should indicate on the landscape plans where all of the removed existing trees will be replaced on the site. 23. The applicant must submit for a separate clearing and grubbing permit for the site in reference to the existing trees. 24. The applicant should indicate if any of the adjacent lake plantings would be altered as part of the site plan. PLANNING AND ZONING Comments: The following comments relate to the requirements in Chapter 4 - Site Plan Review 25. Provide a current survey of the adjacent property (Lot 1) showing the connection between the existing building and the addition, a portion of which is located on Lot 1. 26. Provide a north arrow on the site plan sheet SP-2. 27. Indicate on the elevation drawings the building colors and materials to be used. 28. The elevation drawings do not show the connection between the Page 4 Hampton Inn - Quantum Park File No.: MSPM 00-001 I DEPARTMENTS I INCLUDE I REJECT I addition and the existing building. Provide this view. 29. Indicate and label the location of the site lighting on the site plan and landscape plan. Provide a site lighting detail with the height dimension. 30. Provide a colored elevation drawing showing all elevations of the building for the Planning and Development Board meeting. 31. Provide and engineer's certification in writing that drainage will conform with all rules, regulations and codes of the City of Boynton Beach. 32. The parking calculations are not consistent between Site plan sheets SP- 1 and SP-2. At a minimum, parking is calculated at 1.25 spaces per bedroom which translates into 68 required spaces (1.25 x 54 units = 68). The handicapped requirement is three(3) spaces. If existing parking will be used to supplement the parking required for the addition, please note this on the site plan calculations. 33. Indicate the dimension of the setback from the west property line. 34. Indicate the location of the sidewalk on site plan sheets SP-l and SP-2. 35. Indicate on the landscape plan the method of irrigation and the source of water to be used on site. The following comments relate to the requirements of Chapter 23 - Parking Lots 36. Provide a dimension for the parking lot drive aisle width on the site plan. 37. Provide the typical parking space details on Sheet SP-2 showing them to scale. Indicate the dimension between the wheelstop and the front of the parking stall. Indicate whether continuous raised curbing will be used between the sidewalk and parking lot in front of the building. 38. Provide a detail of the required handicapped parking sign. Thefollowing comments relate to the requirements of Chapter 7.5, Article II - Landscape Code: 39. Indicate the number of trees required and the number of trees provided to meet the parking area interior landscaping requirement. 40. Cypress mulch is not permitted. Change the note on the landscape plan accordingly. 41. At least 50% of the required planting material must be native species. Page 5 Hampton Inn - Quantum Park File No.: MSPM 00-001 J:\SHRDATAIPLANNlNG\SHAREDlWPIPROJECTS\QUANTUM 2000IHAMPTON INN MSPM OO-OOI\IST REVIEW COMMENTS.DOC I DEPARTMENTS I INCLUDE I REJECT I 42. Provide the appropriate note on the landscape plan to address this requirement. (Comp. Plan Policy 4.4.5) 43. The proposed building addition must match the character and design of the existing building. Indicate this on the elevation drawings. (Ch. 9, Sec. 2) 44. Additional signs were not submitted for approval with this site plan. Signs must meet the requirements of Chapter 23 and be reviewed by the P&D Board and approved by the City Commission. 45. Approval for this project is required from the Quantum Design Review Committee (QDR). Page 6 Hampton Inn - Quantum Park File No.: MSPM 00-001 , Facsimile TRANSMITTAL CITY OF BOYNTON BEACH 100 E. BOYNTON BEACH BOULEVARD POBOX 310 BOYNTON BEACH. FLORIDA 33425-0310 FAX. (561) 742-6259 PLANNING AND ZONING DIVISION TO' John Vaughen FAX #. 561-997-6709 DATE. 2/1/00 RE: 1 st REVIEW COMMENTS FOR HAMPTON INN - QUANTUM PARK Please find attached the first review comments for your project. To stay on the current review schedule, please do the following steps listed below, and bring all documents to the TRC meeting scheduled for February 22, 2000 1 Revise your plans incorporating all comments listed herein, including the addition of notes on plans to confirm response to general statements/comments, and bring 10 copies to the TRC review meeting (full sets including all pages originally submitted), 2 Submit the additional information as requested within the attached comments, (i e traffic analysis, engineering certification, etc.) 3 Prepare a written response (7 copies) consisting of a list briefly summarizing how each comment has been addressed on the revised plans or with the supplemental information including location on the plans (this promotes an expeditious 2nd review by staff and your project representatives during the TRC meeting), and 4 Submit reductions (8 % x 11) for the proposed site plan, elevations and landscaping plan (this is required for the final report and public presentation) The applicant should not attend a TRC meeting (2nd review) until all documents have been revised and copied for staff review Page 1 of Planning and Zoning Division City of Boynton Beach Boynton Beach, Florida 33425 742-6260 Fax: 742-6259 If plans will not be fully revised and brought to the scheduled TRC meeting, contact Doris Marttila (742-6268) in this office by the Thursday prior to the schedule meeting date Projects deviating from the original schedule are eligible for review at subsequent meetings, which are held every Tuesday To reschedule, contact Doris Marttila by the Thursday prior to the Tuesday TRC meeting that you desire to attend The remainder of the review schedule will be adjusted accordingly If you have questions on the attached comments, please contact the respective reviewer using the attached list of TRC representatives If the plans are reasonably complete and all significant comments are addressed following TRC (2nd review), the project is forwarded to the Planning and Development Board meeting that falls approximately 2 to 3 weeks following the TRC meeting An u*" by any comment identifies a comment that must be addressed prior to moving forward to the Planning and development board. Note Items recognized by staff as typically outstanding at this point include a traffic report and/or confirmation of the traffic concurrency approval from Palm Beach County, drainage certification by a licensed engineer, and colored elevations of the proposed project. This information is necessary for the project to proceed. If you have submitted this information, please disregard this note TRC MEMBERS BOB BORDEN, ASSISTANT FIRE MARSHAL KEVIN HALLAHAN, FORESTER/ENVIRONMENTALIST LEE THOMPSON, POLICE DEPARTMENT PETE MAZZELLA, UTILITIES DEPARTMENT MICHAEL HAAG, BUILDING DIVISION LARRY QUINN, PUBLIC WORKS DEPARTMENT MARK LIPS JOHN WILDNER, PARKS DIVISION JACK CASLER, ACTING CITY ENGINEER KEN HALL MICHAEL RUMPF, PLANNING AND ZONING JIM NGUYEN, PLANNING DIVISION LUSIA GALAV, PLANNING DIVISION FRANTZ LAFONTANT, ENGINEERING DIVISION 742-6602 742-6227 742-6105 742-6404 742-6352 742-6202 742-3208 742-6226 742-6280 742-6283 742-6260 742-6367 742-6262 742-6757 1 st REVIEW COMMENTS PrOject name HAMPTON INN - QUANTUM PARK File number' MSPM 00-001 Reference: 1st RevIew, MaJOr site plan modIficatIOn. File # MSPM 00-001 with a January I L 2000 Planmng and Zoning Department date stamp marking I DEPARTMENTS I INCLUDE I REJECT I PUBLIC WORKS Comments. NONE UTILITIES Comments I All utIlitIes easements shall be shown on the rectIfied landscapmg drawings so that we may determine whIch trees may mterfere with utIlitIes. In general, palm trees will be the only tree species allowed wlthm utIlIty easements. Canopy trees may be planted outSIde of the easement so that roots and branches will not Impact those utilitIes withm the easement m the foreseeable future LDR Sec. 7.518.1 gives publIc utIlItIes the authorIty to remove any trees that mterfere wIth utilIty servIces, eIther m utilIty easements or publIc rIghts-of-way 2 Comp Plan polIcy 3C.3 4 reqUIres the conservation of potable water CIty water may not, therefore, be used for irngatIOn where other sources are readIly available. 3 A buildmg permit for thIS project shall not be Issued untIl thIS office has approved the plans for the water and/or sewer Improvements reqUIred to serve the project. (Sec 26-15) FIRE Comments. 4 No part of the structure may be more than 200 feet from a hydrant. LDR 6-16 5 A water distribution system plan IS reqUIred and was not prOVIded. LDR 6-16 POLICE Comments NONE ENGINEERING DIVISION Comments. 6 On the SIte plan add a general note that all plans submItted for specific permits shall meet the City's code reqUIrements at tIme of applIcation. These permIts include, but are not limIted to the following: site lIghting, pavmg, dramage, curbmg, landscapmg and IrngatIOn. PermIts reqUIred --~---- ~----~----~- --"------ ---- Page 2 Hampton Inn - Quantum Park File No MSPM 00-001 DEPARTMENTS INCLUDE REJECT from other permittmg agencies, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be mcluded wIth the permIt request. 7 Combine Lots 1 & 2 wIth a UnIty of Title 8 Add engineer's certificatIOn to sheet C-l that the drainage system shall conform to all rules, regulatIOns and codes of the CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F ] Also add a general note that the exfiltratIon system shall comply wIth CIty Standard Drawmg B-91 007 9 On the sIte and CIVIl plan add the general note that all striping, markings and signage shall conform to City Standard drawing. B-9800 1 10 The addItIOn of 64 new spaces shall reqUIre a mInImUm of three handicap stalls per 4 1 of the Florida AccessibilIty Code 11 On the sheet S-P-l, correct the length of the "TypIcal HandIcap Stall" to 18' 12. Any fill operation shall require an excavatIOn/fill permIt. BUILDING DIVISION Comments. 13 Add a symbol to both sIte plan drawmgs that represents the perimeter lImIts of construction for the new work. 14 Add a labeled symbol to the new bUIldmg that IS depIcted on both drawmgs titled site plan that identifies the location of the handIcap accessible entrance door to the building. Show and label the same door on the drawmg titled 1st floor plan. 15 Add a labeled symbol to both drawmgs that are tItled site plan. The symbol shall represent and delmeate the path of travel ofthe accessible route that IS reqUIred between the new accessible parkmg spaces and the accessible entrance door to the buildmg. Identify on the plan the WIdth of the accessible route (Note The mInImUm WIdth required by the code IS forty-four (44) inches) Add text that would indIcate that the symbol represents the accessible route and the route IS deSIgned m complIance WIth SectIOn 4.3 (Accessible Route) and 4 6 (Parkmg and Passenger Loadmg Zones) of the Florida Accessibility Code for BUIldmg ConstructIOn. The symbol represents the locatIOn of the path of travel, not the location of the detectable warnIng or other pavement markings that are required to be mstalled along the path. Please note that at tIme of permIt review, the applIcant shall provide detailed documentation on the plans that wIll verify that the accessible route IS m complIance with Page 3 Hampton Inn - Quantum Park File No MSPM 00-001 I DEPARTMENTS I INCLUDE I REJECT I the regulations specified in the Florida Accessibihty Code for Buildmg ConstructIOn. 16 Withm the site data found on both sheets tItled site plan, IdentIfy the proposed finish floor elevatIOn of the buIlding (lowest floor elevation). Verify that the proposed elevation complies with regulatIOns ofthe code by addmg speCificatIOns and notes to the site data that address the following issues. a) From the FIRM map, identIfy the title of the flood zone that the building is located wlthm. Where apphcable, specify the base flood elevatIOn. If there is no base flood elevatIOn, indicate that on the plans. b) As the deSign professlOnal-of-record for the project, state that the proposed floor elevatIon IS above the highest 100-year base flood elevatIOn applicable to the bUlldmg Site, as determmed by the South Flonda Water Management Dlstnct's surface water management construction development regulatIOns. [Section 3107 1.2, Chapter 31 of the Boynton Beach amendments to the 1997 editIon of the Standard Building Code] c) IdentIfy the floor elevatIOn that the design profeSSIOnal has estabhshed for the new bUlldmg Within the footprint of the bUIlding that IS shown on site plans, I st floor plan and Civil plan. Also, identify the fimsh floor elevatIOn of the eXlstmg building. 17 Add to both site plan drawmgs a labeled symbol that represents the locatIOn of the proposed site hghtmg poles. Add the followmg notes to the plan. a) Indicate that the locatIons ofthe site hghtmg poles are conceptual. b) Site hghtmg will be evaluated at tIme of permit review c) The proposed site hghtmg fixtures wllllllummate the site consistent With the speCificatIOns IdentIfied m the Parkmg Lot Code. d) Identify the overall height dimenSIOn of the site hghtmg pole and fixture (Note The overall height of the pole/fixture shall not exceed the height limitations of the Zoning Code.) Omit the pole lighting photometric information and drawing. This information is required at time of permit submittal, not at site plan review 18 On both drawmgs tItled site plan, identify the symbol that represents the property line 19 Add to the drawmg tItled site plan (sheet SP-l) all of the easements that are shown on the survey The location, type and size of the easement(s) shall be shown and Identified on the site plan. Where apphcable, amend the plans so that structures do not encroach mto an easement. Page 4 Hampton Inn - Quantum Park File No MSPM 00-001 DEPARTMENTS INCLUDE REJECT 20 IdentIfy on both draWIngs that are tItled site plan the actual distance that the bUIldIng IS setback from the north, east and west property hnes. Please note that overhangs, covered walkways, canopIes, awnIngs or other appurtenances that are attached to the building shall be consIdered when Identifying bUIldIng setbacks. Therefore, identify the width of the overhangs, covered walkways, canopIes, awmngs, etc The buildIng setbacks shall comply WIth setback regulatIOns specIfied in the Zomng Code Identify whether the area located on the west side of the building IS covered. Also, IndIcate the use of the area. 21 At tIme of permIt submittal, provIde a completed and executed CIty umty of title form. The form shall describe all lots, parcels or tracts combIned as one lot. A copy of the deed WIth legal descriptions of each property that IS beIng umfied IS reqUIred to process the form. The property owner that is Identified on each deed shall match. PARKS AND RECREATION Comments. NONE FORESTER/ENVIRONMENT ALIST Comments. 22. The apphcant should IndIcate on the landscape plans where all of the removed eXIsting trees WIll be replaced on the SIte 23 The apphcant must submit for a separate clearIng and grubbIng permIt for the site In reference to the eXIstIng trees. 24 The applicant should Indicate If any of the adjacent lake plantings would be altered as part of the SIte plan. PLANNING AND ZONING Comments The following comments relate to the requirements in Chapter 4 - Site Plan Review 25 Provide a current survey of the adjacent property (Lot 1) shOWIng the connectIOn between the eXIstIng bUIldIng and the addItion, a portion of whIch is located on Lot I 26 PrOVIde a north arrow on the site plan sheet SP-2 27 IndIcate on the elevation draWIngs the bUIlding colors and materials to be used. 28 The elevatIOn draWIngs do not show the connectIOn between the Page 5 Hampton Inn - Quantum Park File No MSPM 00-001 DEPARTMENTS INCLUDE REJECT addItion and the eXlstmg buildmg. Provide thIS VIew 29 IndIcate and label the location of the sIte IIghtmg on the sIte plan and landscape plan. ProvIde a sIte lightmg detaIl with the heIght dImension. 30 ProvIde a colored elevatIOn drawing showmg all elevations of the bUIldmg for the Plannmg and Development Board meetmg. 31 ProVIde and engineer's certificatIOn m wrItmg that dramage wIll conform with all rules, regulatIOns and codes of the CIty of Boynton Beach. 32. The parkmg calculations are not consistent between SIte plan sheets SP- 1 and SP-2. At a mInImUm, parking is calculated at 1.25 spaces per bedroom which translates into 68 reqUired spaces (1.25 x 54 units = 68) The handIcapped reqUirement IS three(3) spaces. If eXlstmg parkmg wIll be used to supplement the parkmg reqUired for the addItIOn, please note thIS on the SIte plan calculations. 33 IndIcate the dimenSIOn of the setback from the west property Ime. 34 IndIcate the location of the sidewalk on SIte plan sheets SP-l and SP-2 35 IndIcate on the landscape plan the method of lITIgation and the source of water to be used on site The following comments relate to the requirements of Chapter 23 - Parking Lots 36 ProVIde a dImenSIOn for the parkmg lot drIve aisle WIdth on the SIte plan. 37 Provide the typical parking space details on Sheet SP-2 showmg them to scale. IndIcate the dImension between the wheelstop and the front of the parking stall IndIcate whether contmuous raIsed curbmg will be used between the sidewalk and parking lot in front of the buIldmg. 38 PrOVIde a detaIl of the required handIcapped parkmg SIgn. The following comments relate to the requirements of Chapter 75, Article II - Landscape Code: 39 IndIcate the number of trees reqUired and the number of trees proVIded to meet the parkmg area mterior landscapmg reqUirement. 40 Cypress mulch IS not permItted. Change the note on the landscape plan accordmgly 41 At least 50% of the reqUired plantmg materIal must be natIve species. Page 6 Hampton Inn - Quantum Park File No MSPM 00-001 I DEPARTMENTS I INCLUDE I REJECT I 42. Provide the appropnate note on the landscape plan to address this reqUIrement. (Comp Plan Pohcy 4 4 5) 43 The proposed buildmg addition must match the character and deSign of the eXlstmg buildmg. Indicate thiS on the elevation drawmgs. (Ch. 9, Sec. 2) 44 AdditIOnal signs were not submitted for approval with thiS site plan. Signs must meet the reqUIrements of Chapter 23 and be reviewed by the P&D Board and approved by the City Commission. 45 Approval for this project is reqUIred from the Quantum DeSign Review Committee (QDR). J:\SHRDATAIPLANNING\SHAREDlVlPIPROJECTS\QUAr-."TUM 2000IHAMPTON INN MSPM OO-OOI\IST REVJEW COMMENTS.DOC Facsimile TRANSMITTAL CITY OF BOYNTON BEACH 100 E. BOYNTON BEACH BOULEVARD POBOX 310 BOYNTON BEACH. FLORIDA 33425-0310 FAX. (561) 742-6259 PLANNING AND ZONING DIVISION TO. Richard Carlson FAX #. 433-0874 DATE. 2/1/00 RE. 1 st REVIEW COMMENTS FOR HAMPTON INN - QUANTUM PARK Please find attached the first review comments for your project. To stay on the current review schedule, please do the following steps listed below, and bring all documents to the TRC meeting scheduled for February 22,2000 1 Revise your plans incorporating all comments listed herein, including the addition of notes on plans to confirm response to general statements/comments, and bring 10 copies to the TRC review meeting (full sets including all pages originally submitted), 2 Submit the additional information as requested within the attached comments, (i e traffic analysis, engineering certification, etc.) 3 Prepare a written response (7 copies) consisting of a list briefly summarizing how each comment has been addressed on the revised plans or with the supplemental information including location on the plans (this promotes an expeditious 2nd review by staff and your project representatives during the TRC meeting) and 4 Submit reductions (8 % x 11) for the proposed site plan, elevations and landscaping plan (this is required for the final report and public presentation) The applicant should not attend a TRC meeting (2nd review) until all documents have been revised and copied for staff review Page 1 of Planning and Zoning Division City of Boynton Beach Boynton Beach. Florida 33425 742-6260 Fax: 742-6259 If plans will not be fully revised and brought to the scheduled TRC meeting, contact Doris Marttila (742-6268) in this office by the Thursday prior to the schedule meeting date Projects deviating from the original schedule are eligible for review at subsequent meetings, which are held every Tuesday To reschedule, contact Doris Marttila by the Thursday prior to the Tuesday TRC meeting that you desire to attend The remainder of the review schedule will be adjusted accordingly If you have questions on the attached comments, please contact the respective reviewer using the attached list of TRC representatives If the plans are reasonably complete and all significant comments are addressed following TRC (2nd review), the project is forwarded to the Planning and Development Board meeting that falls approximately 2 to 3 weeks following the TRC meeting An "*,, by any comment identifies a comment that must be addressed prior to moving forward to the Planning and development board Note Items recognized by staff as typically outstanding at this point include a traffic report and/or confirmation of the traffic concurrency approval from Palm Beach County, drainage certification by a licensed engineer, and colored elevations of the proposed project. This information is necessary for the project to proceed. If you have submitted this information, please disregard this note TRC MEMBERS BOB BORDEN, ASSISTANT FIRE MARSHAL KEVIN HALLAHAN, FORESTER/ENVIRONMENTALIST LEE THOMPSON, POLICE DEPARTMENT PETE MAZZELLA, UTILITIES DEPARTMENT MICHAEL HAAG, BUILDING DIVISION LARRY QUINN, PUBLIC WORKS DEPARTMENT MARK LIPS JOHN WILDNER, PARKS DIVISION JACK CASLER, ACTING CITY ENGINEER KEN HALL MICHAEL RUMPF, PLANNING AND ZONING JIM NGUYEN, PLANNING DIVISION LUSIA GALAV, PLANNING DIVISION FRANTZ LAFONTANT, ENGINEERING DIVISION 742-6602 742-6227 742-6105 742-6404 742-6352 742-6202 742-3208 742-6226 742-6280 742-6283 742-6260 742-6367 742-6262 742-6757 Facsimile TRANSMITTAL CITY OF BOYNTON BEACH 100 E. BOYNTON BEACH BOULEVARD ~gy~~~J~OEACH. FLORIDA 33425-0310 ftlJ liFT FAX. (561) 742-6259 ..,~ PLANNING AND ZONING DIVISION TO. Richard Carlson FAX #. 433-0874 DATE. 1/28/00 RE: COMMENTS FOR HAMPTON INN - QUANTUM PARK Please find attached the first review comments for your project. To stay on the current review schedule, please do the following steps listed below, and bring all documents to the TRC meeting scheduled for February 22, 2000 1 Revise your plans incorporating all comments listed herein, including the addition of notes on plans to confirm response to general statements/comments, and bring 10 copies to the TRC review meeting (full sets including all pages originally submitted), 2 Submit the additional information as requested within the attached comments ( i e traffic analysis, engineering certification, etc.) 3 Prepare a written response (7 copies) consisting of a list briefly summarizing how each comment has been addressed on the revised plans or with the supplemental information including location on the plans (this promotes an expeditious 2nd review by staff and your project representatives during the TRC meeting), and 4 Submit reductions (8 % x 11) for the proposed site plan, elevations and landscaping plan (this is required for the final report and public presentation) The applicant should not attend a TRC meeting (2nd review) until all documents have been revised and copied for staff review Page 1 of <0 Planning and Zoning Division City of Boynton Beach Boynton Beach, Florida 33425 DRAFT 742-6260 Fax: 742-6259 If plans will not be fully revised and brought to the scheduled TRC meeting, contact JoAnn Alea in this office by the Thursday prior to the schedule meeting date Projects deviating from the original schedule are eligible for review at subsequent meetings, which are held every Tuesday To reschedule, contact JoAnn Alea by the Thursday prior to the Tuesday TRC meeting that you desire to attend. The remainder of the review schedule will be adjusted accordingly If you have questions on the attached comments, please contact the respective reviewer using the attached list of TRC representatives. If the plans are reasonably complete and all significant comments are addressed following TRC (2nd review), the project is forwarded to the Planning and Development Board meeting that falls approximately 2 to 3 weeks following the TRC meeting An u*" by any comment identifies a comment that must be addressed prior to moving forward to the Planning and development board Note Items recognized by staff as typically outstanding at this point include a traffic report and/or confirmation of the traffic concurrency approval from Palm Beach County, drainage certification by a licensed engineer, and colored elevations of the proposed project. This information is necessary for the project to proceed If you have submitted this information, please disregard this note TRC MEMBERS BOB BORDEN, ASSISTANT FIRE MARSHAL KEVIN HALLAHAN, FORESTER/ENVIRONMENTALIST LEE THOMPSON, POLICE DEPARTMENT PETE MAZZELLA, UTILITIES DEPARTMENT MICHAEL HAAG, BUILDING DIVISION LARRY QUINN, PUBLIC WORKS DEPARTMENT MARK LIPS JOHN WILDNER, PARKS DIVISION JACK CASLER, ACTING CITY ENGINEER KEN HALL MICHAEL RUMPF, PLANNING AND ZONING JIM NGUYEN, PLANNING DIVISION LUSIA GALAV, PLANNING DIVISION FRANTZ LAFONTANT, ENGINEERING DIVISION 742-6602 742-6227 742-6105 742-6404 742-6352 742-6202 742-3208 742-6226 742-6280 742-6283 742-6260 742-6367 742-6262 742-6757 l:it REVIEW COMMENTS Project name: HAMPTON INN - QUANTUM PARK Ftle number' MSPM 00-001 Reference 1st RevIew, Maior sIte plan modIfication. File # MSPM 00-001 wIth a Januarv 1 L 2000 Planmng and Zoning Deoartment date stamp markmg I DEPARTMENTS I INCLUDE I REJECT I PUBLIC WORKS Comments. NONE UTILITIES Comments 1 All utilItIes easements shall be shown on the rectified landscapmg drawmgs so that we may determine which trees may interfere with uttlities. In general, palm trees wIll be the only tree specIes allowed wIthm utilIty easements. Canopy trees may be planted outsIde of the easement so that roots and branches will not Impact those utilItIes wIthm the easement in the foreseeable future LDR Sec. 7.518 1 gIves public utilIties the authonty to remove any trees that interfere WIth utility services, eIther m utility easements or publIc nghts-of-way 2. Comp Plan polIcy 3C.3 4 requires the conservatIOn of potable water CIty water may not, therefore, be used for lITigatIOn where other sources are readily available 3 A bUIldmg permIt for thIS project shall not be Issued until thIS office has approved the plans for the water and/or sewer Improvements reqUired to serve the project. (Sec. 26-15) FIRE Comments. 1 No part of the structure may be more than 200 feet from a hydrant. LDR 6-16 2 A water dIstributIOn system plan is reqUired and was not proVIded. LDR 6-16 POLICE Comments. NONE ENGINEERING DIVISION Comments. 1 On the SIte plan add a general note that all plans submItted for speCIfic permIts shall meet the CIty'S code reqUirements at time of applIcation. These permIts mc1ude, but are not lImIted to the followmg: SIte lightmg, pavmg, dramage, curbmg, landscapmg and lITigatIOn. PermIts reqUired from other Page 2 Hampton Inn - Quantum Park FIle No MSPM 00-00 I I DEPARTMENTS I INCLUDE I REJECT I perrmttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be mcluded wIth the permIt request. 2. Combine Lots I & 2 wIth a Unity of Title. 3 Add engineer's certIficatIon to sheet C-I that the dramage system shall conform to all rules, regulatIOns and codes of the CIty'S Land Development Regulations. [LDR Chapter 4, SectIOn 7.F] Also add a general note that the exfiltratIon system shall comply wIth CIty Standard Drawing B-91 007 4 On the SIte and cIvil plan add the general note that all stnpmg, markmgs and signage shall conform to City Standard drawmg. B-9800 I 5 The addItIOn of 64 new spaces shall reqUIre a mmImum of three handicap stalls per 4 I of the Flonda AccessibIlIty Code 6 On the sheet S- P-I, correct the length of the "TypIcal HandIcap Stall" to 18' 7 Any fill operation shall reqUIre an excavatIon/fill permit. BUILDING DIVISION Comments. PARKS AND RECREATION Comments. NONE FORESTER/ENVIRONMENT ALIST Comments. I The applIcant should indIcate on the landscape plans where all of the removed eXIstmg trees will be replaced on the site Page 3 Hampton Inn - Quantum Park Ftle No MSPM 00-001 I DEPARTMENTS I INCLUDE I REJECT I 2. The apphcant must submit for a separate clearmg and grubbing permIt for the SIte m reference to the existmg trees. 3 The applicant should mdlcate if any of the adjacent lake plantmgs would be altered as part of the SIte plan. PLANNING AND ZONING Comments. The followmg comments relate to the reqUIrements m Chapter 4 - Site Plan ReVIew' - ProvIde a current survey of the adjacent property (Lot 1) showmg the connectIon between the eXIsting building and the additIon, a portIOn of WhICh IS located on Lot 1 - Provide a north arrow on the site plan sheet SP-2. - IndIcate on the elevatIOn drawmgs the bUIldmg colors and materials to be used. - The elevatIOn drawmgs do not show the connectIOn between the addItIOn and the existmg bUIld mg. ProvIde thIS VIew - Indicate and label the locatIOn ofthe SIte lightmg on the SIte plan and landscape plan. ProvIde a SIte lightmg detail with the heIght dImension. - Provide a colored elevatIOn drawmg showmg all elevatIOns of the buildmg for the P&D Board meetmg. - ProvIde and engmeer's certIficatIOn in wntmg that dramage will conform WIth all rules, regulatIOns and codes of the CIty of Boynton Beach. - The parkmg calculatIons are not consistent between sSIte plan sheets SP-1 and SP-2 At a mmlmum, parkmg IS calculated at 1.25 spaces per bedroom whIch translates mto 68 reqUIred spaces (1.25 X 54 umts = 68) The handIcapped reqUIrement IS three(3) spaces. If eXlstmg parkmg wtll be used to supplement the parkmg reqUIred for the addItIOn, please note thIS on the SIte plan calculatIOns. - Indicate the dimenSIOn of the setback from the west property hne - IndICate the locatIon of the SIdewalk on SIte plan sheets SP-I and SP-2 - IndIcate on the landscape plan the method of lITIgation and the source of water to be used on SIte. The followmg comments relate to the reqUIrements of Chapter 23 - Parkmg Lots. - ProvIde a dimension for the parking lot drive aisle WIdth on the site plan. - ProvIde the typical parking space details on Sheet SP-2 showing them to scale IndIcate the dimenSIOn between the wheelstop and the front of the parkmg stall. Indicate whether contmuous raised curbmg wtll be used between the sidewalk and parkmg lot in front of the bUIldmg. - ProVIde a detaIl of the reqUIred handIcapped parkmg SIgn. The followmg comments relate to the reqUIrements of Chapter 7 5, ArtIcle II - Landscape Code' - Indicate the number oftrees required and the number of trees provided to meet the parkmg area mtenor landscapmg reqUIrement. Page 4 Hampton Inn - Quantum Park FIle No MSPM 00-001 DEPARTMENTS INCLUDE REJECT - Cypress mulch is not permItted. Change the note on the landscape plan accordingly - At least 50% of the reqUired plantmg matenal must be native speCIes. Provide the appropnate note on the landscape plan to address thIS requirement. (Comp Plan PolIcy 4 4.5) The proposed bUIldmg addItIOn must match the character and desIgn of the eXIstmg bUIldmg. IndIcate thIS on the elevatIOn drawings. (Ch. 9, Sec 2) AddItIOnal SIgns were not submItted for approval wIth thIS SIte plan. SIgns must meet the reqUirements of Chapter 23 and be revIewed by the P&D Board and approved by the CIty Commission. Approval for thIS project IS reqUired from the Quantum DesIgn RevIew CommIttee(QDR). nSHRDATAIPLANNINGISHAREDlWPIPROJECTSIQUANTtJM 2000IHAMPTO:-l f.'r.'l !\"WSP 00-00211ST REVIEW COMMENTS. DOC 4. Within the site data found on both sheets titled site plan, identify the proposed finish ftoor elevation of the building (lowest ftoor elevation). Verify that the proposed elevation complies with regulations of the code by adding specifications and notes to the site data that address the following issues: 3. Add a labeled symbol to both drawings that are titled site plan. The symbol shall represent and delineate the path of travel of the accessible route that is required between the new accessible parking spaces and the accessible entrance door to the building. Identify on the plan the width of the accessible route (Note: The minimum width required by the code is forty-four (44) inches). Add text that would indicate that the symbol represents the accessible route and the route is designed in compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and Passenger Loading Zones) of the Florida Accessibility Code for Building Construction. The symbol represents the location of the path of travel, not the location of the detectable warning or other pavement markings that are required to be installed along the path. Please note that at time of permit review, the applicant shall provide detailed documentation on the plans that will verify that the accessible route is in compliance with the regulations specified in the Florida Accessibility Code for Building Construction. 2. Add a labeled symbol to the new building that is depicted on both drawings titled site plan that identifies the location of the handicap accessible entrance door to the building. Show and label the same door on the drawing titled 1st floor plan. 1. Add a symbol to both site plan drawings that represents the perimeter limits of construction for the new work. Buildin!! Division (Permit & Site Specific Comments) - Michael E. Haag (561) 742-6352 We have reviewed the plans for the above-referenced project. The applicant must acknowledge and address the below listed comments before the project is presented to the Board for their revIew. Hampton Inn @ Quantum Park - Major Site Plan Modification (MSPM 00-001) 1st review comments RE: January 31, 2000 DATE: Michael E. Haag, Building Code Administrator FROM: Michael Rumpf, Planning and Zoning Director TO: DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO. 00-027 8. Identify on both drawings that are titled site plan the actual distance that the building is setback from the north, east and west property lines. Please note that overhangs, covered walkways, canopies, awnings or other appurtenances that are attached to the building shall be considered when identifying building setbacks. Therefore, identify the width of the overhangs, covered walkways, canopies, awnings, etc. The building setbacks shall comply with setback regulations specified in the Zoning Code. Identify whether the area located on the west side of the building is covered. Also, indicate the use of the area. 7. Add to the drawing titled site plan (sheet SP-l) all of the easements that are shown on the survey. The location, type and size of the easement(s) shall be shown and identified on the site plan. Where applicable, amend the plans so that structures do not encroach into an easement. 6. On both drawings titled site plan, identify the symbol that represents the property line. 5. Add to both site plan drawings a labeled symbol that represents the location of the proposed site lighting poles. Add the following notes to the plan: a) Indicate that the locations of the site lighting poles are conceptual. b) Site lighting will be evaluated at time of permit review. c) The proposed site lighting fixtures will illuminate the site consistent with the specifications identified in the Parking Lot Code. d) Identify the overall height dimension of the site lighting pole and fixture. (Note: The overall height of the pole/fixture shall not exceed the height limitations of the Zoning Code.) Omit the pole lighting photometric information and drawing. This information is required at time of permit submittal, not at site plan review. a) From the FIRM map, identify the title of the flood zone that the building is located within. Where applicable, specify the base flood elevation. If there is no base flood elevation, indicate that on the plans. b) As the design professional-of-record for the project, state that the proposed ftoor elevation is above the highest 1 OO-year base ftood elevation applicable to the building site, as determined by the South Florida Water Management District's surface water management construction development regulations. [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the 1997 edition of the Standard Building Code] c) Identify the ftoor elevation that the design professional has established for the new building within the footprint of the building that is shown on site plans, 1 st floor plan and civil plan. Also, identify the finish floor elevation of the existing building. Building Division Memo No. 00-027 to Michael Rumpf RE: Hampton Inn @ Quantum Park - Major Site Plan Modification - 1 st review comments January 31, 2000 Page Two J:\SHRDATA\Development\Building-6870\Documents\TRC\MSPM 00-001 1st review Hampton Inn @ Quantum Park. doc MEH:bg 9. At time of permit submittal, provide a completed and executed City unity of title form. The form shall describe all lots, parcels or tracts combined as one lot. A copy of the deed with legal descriptions of each property that is being unified is required to process the form. The property owner that is identified on each deed shall match. Building Division Memo No. 00-027 to Michael Rumpf RE: Hampton Inn @ Quantum Park - Major Site Plan Modification - 1 st review comments January 31, 2000 Page Three FIRE & LIFE SAFETY DIVISION Memorandum No 2000-7 NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire Protection Association codes, and the City Fire code shall be adhered to TO FROM Mike Rumpf, Director Planning & Zoning DIC Gale ~Z/ Fire & Life Safety C---./ 0 January 24, 2000 r;'"""\ j f'; ~ ~ ~ fS -!~ '~-r-N-~ Ill") C~"'11 ~ i JAN ') 5 2000 DATE SUBJECT MSPM 00-001 Hampton Inn Quantam Park 1475 West Gateway Blvd No part of the structure may be more than 200 feet from a hydrant. LOR 6-16 A water distribution system plan is required and was not provided LOR 6-16 Project should not go forward until a water distribution plan is provided cc File DEPARTMENT OF ENGINEERING MEMORANDUM NO 00-015 TO Michael Rumpf, DIrector of Plannmg and z~ ~ John GUIdry, Intenm DIrector of Engmeenng t \J \f\ January 24, 2000 FROM. DATE RE HAMPTON INN - QUANTUM PARK (MSPM 00-001) MAJOR SITE PLAN MODIFICATION 1sT REVIEW COMMENTS 1 On the SIte Plan add a general note that all plans submItted for specIfic permIts shall meet the CIty'S code reqUIrements at tIme of applIcatIOn. These permIts mclude, but are not lImIted to the followmg SIte lIghtmg, pavmg, dramage, curbmg, landscapmg and lITIgatIOn. PermIts reqUIred from other permlttmg agenCIes, such as FDOT PBC SFWMD DERM, L WDD, DEP and any others, shall be mcluded WIth the permIt request. 2. Combme Lots 1 & 2 WIth a Umty of Title 3 Add engmeer's certIficatIOn to sheet C-l that the dramage system shall conform to all rules, regulatIOns and codes ofthe CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F ] Also add a general note that the exfiltratIon system shall comply WIth CIty Standard Drawmg B- 91007 4 On the SIte and CIVIl Plan add the general note that all stnpmg, markmgs and sIgnage shall conform to CIty Standard Drawmg. B-9800 1 5 The addItIOn of 64 new spaces shall reqUIre a mlmmum of three handIcap stalls per 4 1 of the Flonda AccessibIlIty Code 6 On sheet S-P-1, correct the length of the "TYPIcal HandIcap Stall" to 18' 7 Any fill operatIOn shall reqUIre an excavatIOn/fill permIt. If there are any questIOns please contact Jack Casler, CIvIl Engmeer at 742-6282 or Ken Hall at 742-6283 ~~~f JAG/ck C \My Documents\Hampton Inn Quantum Park Major Site Plan Mod. 1st Review.doc ENGINEERING RATIONALE SHEET CITY OF BOYNTON BEACH ENGINEERING DEPARTMENT City Hall, West Wing 100 E. Boynton Beach Blvd. Boynton Beach, Florida 33425 (561) 742-6280 (561) 742-6285 Fax TO FIle FROM. Ken Hall, Engmeermg Techmclan SUBJECT HAMPTON INN - QUANTUM PARK (MSPM 00-001) 1 ST REVIEW COMMENTS MEMO NO 00-015 Comment: 1 Genenc for all Site Plans. 2 To msure owners cannot sell remammg parcel without City approval. 3,4 & 5 Code reqUIrements. 6 CorrectIOn. 7 To put applIcant on notIce. Hotel must be domg well - good additIOn to Quantum KRH/ck C\My Documents\Hampton Inn-Quantum Park MSPM 1st- Rationale Sheet.dot ~SfM @o~ B-C-I CITY uF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM TO MIchael Rumpf FROM Ofc M. Lane DATE SUBJECT REFERENCES ENCLOSURES 01/24/00 FILE 1 st ReVIew of Hampton Inn, AddItIon Mr Rumphf, I've looked over the sIte plans for the Hampton Inn SIte Plan ModIficatIOn, They do meet WIth State and CIty code and there are no comments or recommendatIOns from the polIce department at thIS tIme. -'tAt '5 PM 00 -~ t Parks Division Memorandum- TRC To Mike Rumpf, DIrector of Planmng and Zomng Kart From. KevIn J Hallahan, Forester I EnvIronmentalIst Subject Hampton Inn-Quantum Park Major SIte Plan ModIficatIon -1 st RevIew Date January 21,2000 1 The applIcant should IndIcate on the landscape plans where all of the removed eXIstIng trees wIll be replaced on the SIte 2 The applIcant must submit for a separate cleanng and grubbmg permit for the site In reference to the eXlstmg trees. 3 The applIcant should Indicate If any of the adjacent lake plantmgs would be altered as part of the site plan. The project should contmue m the normal review process Kjh File - ~-\1 ~ \' , ,-~ .. ~:I i\;d .J - , . l. - PUBLIC WORKS DEPARTMENT MEMORANDUM #00-017 TO Mike Rumpf, DIrector of Plannmg & Zonmg VIA. Chnstme Roberts, Intenm PublIc Works DIrector FROM Mark A. LIps, Forman III DATE January 20,2000 SUBJECT 15t ReVIew - Project - LocatIOn - Agent - FIle No - New SIte Plan Hampton Inn - Quantum Park 1475 West Gateway Blvd RIchard W Carlson, Jr, Esq MSPM 00-001 The PublIc Works Department has no comments or ObjectIOns to thIS project at thIS tIme. We recommend thIS proj ect to go forward. If you have any questIOns please contact me at (561) 742-6200 dfL~ I' ML/dc Attachment -- r r-- , t..I L \ LU\.lU )~\" .1 .-J ..--.. .--:---- ..-1.Nt sf M o-fJ - C-o ( LEISURE SERVICES. PARKS DIVISION MEMORANDUM TO Michael W Rumpf Director ofPlanmng & Zomng FROM. John Wildner, Parks Director > u.:: I (5.R,~ v RE. HAMPTON INN -- QUANTUM PARK DATE January 18, 2000 I have no comments on the above-named project. This project should contmue m the normal review process. JW\bal r-...- _. i r-., R L& II ,,; ,~ 'I ;' _.~-, ~__f) JAN , 8 2CXXJ i J ! 1. ._<~ uAND DEPT. 3. Each comment shall reference the section of the code that is incorrectly depicted on the documents. 2. The documents submitted for the project were determined to be substantially complete with the exception of traffic data, however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Lusia Galav, or myself. 1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments or e-mail to JoAnn Alea and I no later than January 25.20005:00 P.M. on When preparing your comments, please separate them into two categories; code deficiencies with code sections referenced and recommendations that you believe will enhance the project. File No. - MSPM 00-001 Agent - Richard W. Carlson, Jr., Esq. Location - 1475 West Gateway Blvd. Project - Hampton Inn - Quantum Park 1 ST Review - Major Site Plan Modification SITE PLAN REVIEW PROCEDURES RE: January 14, 2000 DATE: TRC MEMBERS Bob Borden, Assistant Fire Marshal Kevin Hallahan, Forester/Environmentalist Lee Thompson, Police Chief Pete Mazzella, Utilities Department Michael Haag, Building Division Ken Hall, Engineering Division Larry Quinn, Public Works Department John Wildner, Parks Division Jack Casler, Acting City Engineer Michael W. Rumpf cJ 13 r Director of Planning and Zoning FROM: TO: DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 99-009 J:ISHRDATA\PLANNINGlSHAREDlWPIPROJECTS\QUANTUM 2000\HAMPTON INN MSPM 00-001\1STREVIEW-PLANS.DOC xc: Steve Gale, Fire Marshal Marshall Gage, Police Department John Guidry, Utilities Director Don Johnson, Building Division Larry Roberts, Public Works Director Central File Attachment MWR:jma All comments shall be typed, addressed and transmitted or e-mailed to JoAnn Alea and I for distribution to the applicant. Please include the name and phone number of the reviewer on this memorandum or e- mail. Scott Barber will be the Planning and Zoning staff member coordinating the review of the project. First review comments will be transmitted to the applicant along with a list of Technical Review Committee (TRC) members. 6. If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time frame stated above, to me. The memorandum shall state that the plans are approved and that they do not have any comments on the plans submitted for review and that they recommend the project be forwarded through the approval process. 5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 4. Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. Page 2 JLt1t.-v 91-001 f+o IMp fOIA Nh)~r xc: Central File S:\PLANN INGISHARED\WPIPROJECTSIHAMPTONIREPORTSP .WPD The Planning and Zoning Department recommends approval of this site plan request, subject to the comments included in Exhibit C - Conditions of Approval. The Technical Review Committee recommends that the deficiencies identified in this exhibit be corrected on the set of plans submitted for building permit. RECOMMENDATION: The submittal contains limited information regarding signage and does not allow staff to evaluate whether proposed signs will fully 'meet the requirements of the sign program approved for Quantum Corporate Park. Therefore, staff recommends that all signs be approved administratively at time of permit review, if the sign plans comply with both the Quantum Corporate Park sign program and the sign code. Signage: The other building proposed on the premises is a small office building separate from the hotel. The exterior finish of this building and the colors are the same as those of the main hotel. The proposed structure is characteristic of a hotel facility. It is a four story structure with a symmetrical layout for both floor plans and elevations. Hotel rooms are entered from the interior circulation system. The main entrance to the building is emphasized with a canopy over the drop-off area. The exterior finish of the building is a combination of beige and cream stucco. The canopy is covered with roof tiles. :ommunity >esign Plan: Building and site regulations will fully meet code requirements when staff comments are incorporated. luilding and Site tegulations: The landscaping of the site will fully meet code requirements when staff comments are incorporated. andscaping: There are 115 on-site parking spaces to be provided. With anticipated total employment of 9 persons for the hotel and office building, the City's Land Development Regulations, Chapter 2 - Zoning requires 7 parking spaces in addition to parking spaces for visitors (the number of spaces is not regulated by code, but is determined by the petitioner). To date, the amount of parking spaces for visitors has not been specified; however, the 108 parking spaces proposed is, arguably, a reasonable number for visitor parking. Therefore, it is recommended that the total of 115 parking spaces for the 107 room, 4-story hotel and 1,656 square feet office building be accepted. Th~ ~'~~ ccz.16J 0-h~ '2S a-+ ~l 0.9 C{..A i ~'l (4' f!- vJ ~ Ia/) r 'eJLIS-h t'J 1~)0t.f).k'0 -Dr. . ~~GLGV' ~~'7 ,~. C 4J Ct,{~ c""- 'arking Facility: 11. SEE SP-1 12. WILL COMPLY 13. WILL REVISE ON SP-1 14. REVISED SP-1 15. ADDED NOTE ON SP-1 16. WILL PUT ON CIVIL DRAWINGS 17. SEE NOTE #5 ON SP-1 18. WILL COMPLY 19. HAVE REVISED - SEE SP-l . 20. HAVE COMPLIED SEE SP-l 21. WILL COMPLY 22. WILL COMPLY SEE CIVIL 8. ~ COMPLre!;> cd "H- 'OR-I 9. COMiOL-I C -.wI1.L COUFLY I 10. 7. WILL COMPLY. 6. SEE NOTE ON SP-1 5. WILL COMPLY 4. ADDED A FIRE HYDRANT 3. WILL COMPLY 2. IRRIGATION IS OFF THE ATTACHED LAKE. 1. HAVE PUT ON LANDSCAPE DRAWINGS PUBLIC WORKS HAMPTON INN TRC COMMENTS 2.22.2000 CITY OF BOYNTON BEACH 100 E. BOYNTON BEACH BLVD .BOYNTON BEACH, FLORIDA 33425 23. WILL COMPLY 24. WILL NOT BE ALTERED 25. WILL COMPLY 26. WILL COMPLY 27. WILL COMPLY- MATCH EXISTING 28. HAVE COMPLIED - SEE A-2 29. SEE SP-1 FOR LIGHTING NOTE Jv c.:." 30. WILL PROVIDED 31. WILL PROVIDED 32. REVISED HC PARKING 33. WILL COMPLY I 34. HAVE COMPLIED '- 35. IRRIGATION IS OFF THE LAKE 36. HAVE SHOWN - SEE SP-1 37. CURB IN FRONT OF HOTEL SEE SP-1 38. WILL PROVIDE 39. WILL COMPLY 40. HAVE COMPLIED - SEE LA-1 41. WILL COMPLY 42. WILL PROVIDE 43. SEE A-2 44, OK. 45. SEE ATTACHED LETTER ..-.... 22. WILL COMPLY 15. ADDED NOTE ON SP-1 ~6. WILL PUT ON CIVIL DRAWINGS H..:J.' {;(.N ,L~ l--f I < 2. ~I J:...-e 17 . SEE NOTE #5 ON SP-1 118. WI.LL COl1PLY 19. HAVE REVISED - SEE SP-1 , 20. HAVE COMPLIED SEE SP-l /21. WILL COMPLY 14. REVISED SP-1 '? 13. WILL REVISE ON SP-1 WILL COMPLY ~. 11. SEE SP-1 8. SEE CIVIL , / (.)Ci.~ 5 I I . . t..1'J.- W.lLL CO~Lr n. r C ~ I ~. ~. eOI.'ll'Ltr:tJ 00-"-<. rtJ .rp'2 6. SEE NOTE ON SP-1 v( WILL COMPLY. 4. ADDED A FIRE HYDRANT ~. WILL COMPLY DD~- )tJe-t vi. WILL COMPLY 2. IRRIGATION IS OFF THE ATTACHED LAKE. 1. HAVE PUT ON LANDSCAPE DRAWINGS PUBLIC WORKS HAMPTON INN TRC COMMENTS 2.22.2000 CITY OF BOYNTON BEACH 100 E. BOYNTON BEACH BLVD 'BOYNTON BEACH, FLORIDA 33425 45. SEE ATTACHED LETTER 44. OK. 43. SEE A-2 ~ 42. WILL PROVIDE 40. HAVE COMPLIED - SEE LA-l ~l. WILL COMPLY ~ 39. WILL COMPLY ~ 38. WILL. PROVIDE 37. CURB IN FRONT OF HOTEL SEE SP-l 36. HAVE SHOWN - SEE SP-l ~ 35. IRRl;',GATION IS OFF THE LAKE 34. HAVE COMPLIED .~ 33. WILL COMPLY 32. RSVISED HC PARKING 30. WILL PROVID~ ~. WIU PRe).e!:5.1!lD- Do"v 29,. SEE SP-l FOR LIGHTING NOTE 28. HAVE COMPLIED - SEE A-2 ~ 27. WILL COMPLY- MATCH EXISTING ~ 26. WILL COMPLY . ~ 25. WILL COMPLY 24. WILL NOT BE ALTERED 23. WILL COMPLY 11. SEE SP-1 12. WILL COMPLY 13. WILL REVISE ON SP-l 14. REVISED SP-l 15. ADDED NOTE ON SP-l 16. WILL PUT ON CIVIL DRAWINGS 17. SEE NOTE #5 ON SP-l 18. WILL COMPLY 19. HAVE REVISED - SEE SP-1 . 20. HAVE COMPLIED SEE SP-l 21. WILL COMPLY 22. WILL COMPLY 8. SEE CIVIL 9. ~fti6-C0f~/LJ eel 10. WILL Cel1P~ c~fJL.4t1d-S6+ Sf..} 7. WILL COMPLY. 6. SEE NOTE ON SP-l 5. WILL COMPLY 4. ADDED A FIRE HYDRANT 3. WILL COMPLY 2. IRRIGATION IS OFF THE ATTACHED LAKE. 1. HAVE PUT ON LANDSCAPE DRAWINGS PUBLIC WORKS HAMPTON INN TRC COMMENTS 2.22.2000 CITY OF BOYNTON BEACH 100 E. BOYNTON BEACH BLVD .BOYNTON BEACH, FLORIDA 33425 23. WILL COMPLY 24. WILL NOT BE ALTERED 25. WILL COMPLY 26. WILL COMPLY 27. WILL COMPLY- MATCH EXISTING 28. HAVE COMPLIED - SEE A-2 29. SEE SP-1 FOR LIGHTING NOTE 30. WILL PROVIDED 31. WILL PROVIDED 32. REVISED HC PARKING 33. WILL COMPLY 34. HAVE COMPLIED 35. IRRIGATION IS OFF THE LAKE 36. HAVE SHOWN - SEE SP-1 37. CURB IN FRONT OF HOTEL SEE SP-1 38. WILL PROVIDE 39. WILL COMPLY 40. HAVE COMPLIED - SEE LA-1 41. WILL COMPLY 42. WILL PROVIDE 43. SEE A-2 44. OK. 45. SEE ATTACHED LETTER