July 16, 1991
Attn: Mr. Tim Gietz
5197 Canal Drive
Lake Worth, Florida 33463
RE: Hunter's Run, Tract J. Bristol - Administrative Site Plan
Modification - File No. 618
Dear Mr. Gietz:
Please be advised that on Thursday, July 11, 1991, the Technical
Review Board approved the above-referenced administrative site
plan modification, subject to staff comments, copies of which are
attached.
The plans must now be modified to incorporate the approval
stipulations prior to final sign-off. To initiate your sign-off
procedure, please submit two (2)" sets of modified plans to the
Office of the Site Development Division of the Building
Department, which will record the required identification
markings on each set of the modified plans.
After both sets of modified plans have the appropriate markings,
you should proceed with your sign-off to obtain signatures on
both sets of plans from each Technical Review Board member who
had comments. The sign-off procedure requires that the
Engineering Department sign-off first (if comments were made),
followed by all other departments with the exception that the
Planning Department sign off next-to-last (if comments were made)
and the Building Department sign-off last (whether comments were
made or not). The Zoning << Site Development Administrator will
provide the BUilding Department sign-off. One (1) set of final
signed-off plans will remain with the Building Department and the
other set of plans will be returned to you to be retained at the
job site.
.9lmerica's gateway to tfie gu(fstream
TO:
Mr. Tim Gietz
-2-
July 16, 1991
To help facilitate the sign-off process, appointments should be
made to' meet with each Technical Review Board member to allow
them sufficient time to review and sign-off the modified plans.
After securing all the required Technical Review Board member
signatures and completing processing by the Site Development
Division, you may apply for building permits by submitting the
appropriate documents and fee to the Plan Review and Permitting
Division of the BUilding Department. The Building Department
will advise you as to any additional permits which may be
required, such as Palm Beach Health Department (water and sewer),
clearing/grubbing, excavation/fill, drainage, paving, site
lighting, landscaping and irrigation.
The approval of the City entitles you to construct only the
improvements shown on the site plan and is valid until July 11,
1992 within which time application for a permit must be made.
The site plan will be viewed procedurally as an as-built or
record drawing. If you have any questions concerning this
matter, please do not hesitate to contact me.