FIRE PREVENTION MEMORANDUM NO. 94-299 WDC
TO:
Planning Department
FROM:
Fire Department
DATE:
November 21, 1994
RE:
Quantum Park Master Plan Modifications
CatalfumojMotorola
Lots 12 - 14
There are no objections to this plan being forwarded at this time,
Estimate of cost to review as follows:
Review by FPO I William Cavanaugh
3 hrs @ $24.08jhr x 35% = $ 97,52
Secretarial support by Lisa Morales
1 hr @ $8.70jhr x 35% = $ 11.75
Total Expenses
= $109,27
4{~D. ~f!{;fh' FPO
Boynton Beach Fire Dept.
00
mO\VJrn
rn
NOV 2 I 1994
PlANNING AND
NING DEPT.
TO;
FROM:
DATE:
RE:
/
()I.. } oYt> k-w
~
5~ ~~%:
t- 4%7/t /
PLANNING AND ZONING DEPARTMENT MEMORANDUM
TECHNICAL REVIEW COMMITTEE
Robert Elchorst, PubllC works Dlrector /1, [6 ~ ~~ 1-1.p1.1
..,....r'Wllllam. Cavanaugh, Flre Preventlon Offlcel) f) d Ar-L_ J.1~
Lt. Jim Cummings, Police Department 8'1. q-f ~ fI.;V<.J (}fJY r'"
~John Wildner, Parks superlntendent 0 .
- ~eVln Hallahan,_Forester(Environ~e~ta~l~tV ,~?~~~
~clyde "~kJ.P" Milo.r, Utlllt~es Chlet~leld I 5"~.rJ < :~'L~
Bi~l H.. uJnll, Development Dlrector . q -r ~,-".~1f~~'
Mike Haag, Plannl~~g ~, . ~ '6Q.. \~
TambrJ. J, Heyden ~ C;XVD ,~
Planning and zoning Director _.J)~ _ V~ C I
~ 1,~3 .~ .t "'~
November 10, 1994 _ I ~ ;;\(
Quantum Park Master Plan Modlfication
(Lots 12-14, Motorola) Estimate of Cost for Staff
Review Time - MPMD 94-007
There is no set application fee for master plan moqificatlons for
DRI's, such as Quantum Park. This is due to the large variation
in staff time necessary to reVlew such requests and the State law
requirement of advertising which is not required of other master
plan modlflcations.
Historically, fees for processing this type of request have been
billed, Therefore, please provide, in writing to this office by
Thursday, November 17, 1994, an estimate of the total cost of
your review of the above request for Quantum Park. In
calculating this figure, please remember to include 35% for cost
of employee benefits, i.e. determine number of hours spent
reviewing project/preparing correspondence, multiply this by your
hourly wage and then finally multiply this figure by 35% for the
total cost to review. You need not itemize the amount of time
spent, however, please keep a record of your calcu~tions in the
event the cost is dlsputed by the applicant. A '\~lcfj D ~
ai ....)' \11" "'~ e14"
'" t-r" e .{ ~c
;( ~ ~1- /) s . ~ S flE"""'"
{Zt" tX ( fb
L.- ta'> 1
/(01 ~ ~q'" r;o tY:ii' fQ4i
M rPl 0 r:t)4 f
r
~ - ~
Tam~He,,~L n
Planning and Zoning Director
(. 11,,70 f"~
~ /q.1C>
~.6< ~
~a s~j- $-
TJH/jm ..
......~/)~'- (I"""
f1G-'. f.,A/,;T;
gptP. PiO
r (0...
Technical ReVlew Cornmlttee - Quantum Park
cc: Floyd Jordan, Flre Chief
Charles Frederick, Recreation & Parks Director
Thomas Dettman, Police Chief
John GUldry, Utilities Director
Pete Mazzella, Assistant to Utilities Dlrector
Steve Campbell, Fire Department
Bob Gibson, Public Works
Central File
Project File
Chronological File
A: QUANTTRC.JM
arw
Page 2
BOYNTON BEACH POLICE DEPARTMENT
Office of Professional Standards
To:
From:
Date:
Re:
i
-~
Tambri Heyden / Direc~
Lt. James Cummings ~
18 November 1994
Quantum Park, Lots 12, 13, and 14/ Second Review
TRC Memo # 94-01 05
I have reviewed the modifications to the original print and find them to be acceptable.
The cost of review to include the 35% multiplier is $89.41.
ill ~ I~ J ~I : 1:94~ ~!
Q~
PLANNING AND
ZONING OEPl
PUBLIC WORKS DEPARTMENT
MEMORANDUM #94-273
TO: Tambri J. Heyden, Planning & Zoning Director
FROM: Robert Eichorst, Public Works Director
SUBJ: Quantum Park Master Plan Modification - Estimate of Staff
Cost
DATE: November 15, 1994
The estimated staff cost for the above project is $17.l5. If you
have any questions please give me a call.
RElcr
Eichorst
Works Director
ill
mrn~~\Yl~
~\r. "
fl.
\ ~ , ,
, 7 'n9"
! !,'"~' it
PLANNING AND
ONING DEPT.
rn
BUILDING DEPARTMENT
MEMORANDUM NO. 94-271
November 16, 1994
To:
Tambri J. Heyden, Planning & zoning Director
From:
Al Newbold, Deputy Building Official
Re:
Cost for Building Department Review
Quantum Park Master plan Modification
The cost for the Building Department handling the review of
Quantum Park Master Plan Modification, is $40.72 plus $14,25 (35%
fringe benefits) for a total of $54.97 representing one hour each
for the two emloyees involved.
If you need additional information, please let me know.
AN:mh
cc: William V. Hukill, P.E.
ill
m@rnnwrn
NOV t.I \994
rn
J<:QUJ<NTUM,CST
~
ENGINEERING DIVISION MEMORANDUM NO. 94-360
TO:
Tambri Heyden
Planning & Zoning Director
~m ~ukill, P.E.
{;tlIQA Englneer
FROM:
DATE:
November 15, 1994
RE:
QUANTUM PARK LOTS l2,l3 & l4 REVIEWS
I have spent approximately 5~ hours reviewing subject project, and
Mrs. Kribs has spent approximately 1 hour. Actual cost for that
time is $193.17. Adjusting for benefits results in a gross cost of
$260.78.
WVH/ck
C:QUANTUM.CST
w
~ 0 \YJ ~
NOV I '1994
@
MEMORANDUM
UTILITIES DEPT. NO. 94 - 364
Tambri Heyden, Planning & Director
John A. Guidry, Utilities Dire~
November 15, 1994
TO:
FROM:
DATE:
SUBJECT: Quantum Park Master Plan Modification
Our total cost for reviewing the subject master plan modification is as follows:
Assistant to the Director - 1 hour @ $25.04
Chief Field Inspector - 1 hour @ $18.70
sub-total $43.74
fringe benefits $15.31
TOTAL $59.05
JAG/PVM
xc: Skip Milor
File
m
~
NOVI'.
rn
.,
,
I
PLANNING AND ZONING DEPARTMENT MEMORANDUM
TECHNICAL REVIEW COMMITTEE
TO:
Robert Eichorst, Public Works Director
William Cavanaugh, Fire Prevention Officer
Lt. Jim Cummings, Police Department
John Wildner, Parks superintendent
Kevin Hallahan, Forester/Environmentalist
Clyde "Skip" Milor, Utilities Chief Field Insp.
Bill Hukill, Development Director
Mike Haag, Planning & Zoning
FROM:
Tambri J. Heyden
Planning and Zoning Director
DATE:
November 10, 1994
RE:
Quantum Park Master Plan Modification
(Lots 12-14, Motorola) Estimate of Cost for Staff
Review Time - MPMD 94-007
There is no set application fee for master plan moqifications for
DRI's, such as Quantum Park, This is due to the large variation
in staff time necessary to review such requests and the State law
requirement of advertising which is not required of other master
plan modifications.
Historically, fees for processing this type of request have been
billed. Therefore, please provide, in writing to this office by
Thursday, November 17, 1994, an estimate of the total cost of
your review of the above request for Quantum Park. In
calculating this figure, please remember to include 35% for cost
of employee benefits, i.e. determine number of hours spent
reviewing project/preparing correspondence, multiply this by your
hourly wage and then finally multiply this figure by 35% for the
total cost to review. You need not itemize the amount of time
spent, however, please keep a record of your calculations in the
event the cost is disputed by the applicant.
J - ~
Tarn~He2n
Planning and Zoning Director
TJH/jm
Technical Review Committee - Quantum Park
cc: Floyd Jordan, Fire Chief
Charles Frederick, Recreation & Parks Director
Thomas Dettman, Police Chief
John Guidry, Utilities Director
Pete Mazzella, Assistant to Utilities Director
Steve Campbell, Fire Department
Bob Gibson, Public works
Central File
Project File
Chronological File
A: QUANTTRC.JM
aI'W
Page 2
RECREATION & PARK MEMORANDUM 194-404
TO:
Tambri Heyden, Planning & Zoning Director
Kevin J. Hallahan, Forester/Environmentalist A<r#/~
Quantum Park PID - Master Plan Modification
New Site Plan
FROM:
RE:
DATE:
November 8, 1994
There are no comments pertaining to the master plan modification.
The following comments pertain to the existing trees shown on lots
#12, #13, and #14.
1. The existing Slash Pine trees that must be removed because of
grade changes greater than 6" must be quantified and replaced.
They can be replaced with native trees on portions of the site
that are in excess of the minimum landscape requirements.
Please show these locations on the landscape plan.
2. The three (3) existing Oak trees and one (1) Sabal Palm tree
must be relocated to a green space on the site.
3. The existing trees in the road R.O.W. must be relocated for
access through the ingress/egress locations.
4. The applicant must submit a comment that the site will not be
applying towards microsite consideration.
5. The road R.O.W. must receive irrigation from the existing
system or the system on site.
KH:ad
~ U W ~
~
8 \994
PUBLIC WORKS DEPARTMENT
MEMORANDUM #94-265
TO: Tambri Heyden, Planning & Zoning Director
FROM: Robert Eichorst, Public Works Director ----
SUBJ: Quantum Park Master Plan
DATE: November 8, 1994
The Public Works Department has no problem with the plans for the
~ite listed above.
62/d r5;.~L>-I-~
Robert Eichorst
Public Works Director
~E/cr
1~~
FIRE PREVENTION MEMORANDUM NO. 94-291 WDC
TO:
Planning Department
FROM:
Fire Department
DATE:
November 7, 1994
RE:
Master Plan Modifications
Quantum Park PID
Change from office to R & D
Lots 12, l2A, 12B, 13, l3A, 14, 14A
There are no objections to this change,
/l{Jt~~
William D. Ca anaugh, FPO
Boynton Beach Fire Dept,
m
",.,
. - '>;':,,'
.,,"'
NeW ~7 '.
rn.
PLANNiNG A <I'..
ZONING OE
'..
BUILDING DIVISION
MEMORANDUM NO. 94-257
November 4, 1994
To:
Tambri J. Heyden, Planning & Zoning Director
From:
Al Newbold, Deputy Building Official
TRC COMMENTS - Modification of Land Use
Quantum Park Master Plan, Lots 12, 13 and 14
Re:
and
Site Plan
Per your request, the Building Division has reviewed the plans
for modification of land use and has no comments.
With reference to the Site Plans, however, plans for signs should
be site approved prior to submittal for permitting.
We support forwarding this project through the approval process.
~p
AN: mh
Atts.
cc: William V. Hukill, P. E.
A:QUANTUM.TRC
==
o
.s-
1-1
o
--
~
~
Q..
Q..
'CIJ
~
=
~
=
1-1
~
New deVice .
0,
to merge
t~hnologies
MOTOROLA
From 1 A
port-sized files because it is based
on software, not hardware,
Hector Ruiz, general manager
of Motorola'l> paging group, said
the software-driven devices offer
the best oppoItunity to expand the
, company's popular messaging
, products. "
Already, the company has
been'moving beyond its alphanu-
; fl)eric pager that can receive short;
~~essages from computers via mo-
. dems to cards that enable a <;om~
puter to receive wireless stre;mts
of news and financial il1fonnation.
"You have a technology trend
that is merging computers with
communications products. Per-
'sonal' communicators are on the
,edge of this convergence," Page
Said.
. Iflast week was any indication,
personal communicators stand to
:be as popular a technology as
. {lJlging.
.... . By last Friday, many of the
nation's major telecommunica-
!ions and technology companies,
jncluding Cox Enterpri~es which
,Q)Vl1s The Palm Beach Pos~ had
fotmed last-minute alliances to
meet a federal deadline to apply
'. for licenses to provide personal
communications services or na-
, tfunwide wireless networks.
~,' However, Motorola hopes to
. ~e the lead in manufacturing the
: actual devices.
;': , To l10use the new division, it is
.. ~xpanding its 546,OOO-square-foot
~ta<;ility'in. Boynton Beach by
VID,OOOsquare feet, building new'
~~f6ce and manufacturing space in a '
~ieparatebuilding on the north, side
'It>lJiateway Boulevard in Quantum
~CQrpprate Park. Construction Will
:~completed by May.
:.: :.. The new building also will con-
"lain part of the Deriyative Tech-
: 1lQlogies Division; which serves as
: ~ research arm for testing new
4!Wlications for paging technology. I
~< Doug Kraul, director of Paging ,
'"Products Group research and de-
i;idopment, will head the new divi-
sion. Engineering, product design,
marketing and sales, light manu-
facturing' and distribution will be
'handled at '.. the, Boynton Beach
plant.. .
TIle building expansion is the
second tllis year, The company is
coInP.4~' ~ ,~fJ~fIl!J:liQn.,~d~tion
to the south SIde of ItS bwlding to
cope ~th the growing market for
pagers m North and South Ameri-
ca. Completion is expected by the
end of December.
~ ~ ~ _;i ~ g ~ ~ ~ ~ J.f
~.= ~-~ O'~!3 g-i:3 ~ ~
~ ~~~~:u~~.r~ h
~~ r2~ 8~ g.t~~o ~~
'< ~ g.~ '8 &fi7l g.l>> () Z !a~,
~[(")i- ~gg.~~[~~~
l>> S ~ (b ~ ~ :i..g ~ "'l:l ~ ~ ~
OQo SL<"t i5 g. - ~ .tt e: I!;. (") !!l
0"'<;- (b....CD;;r:i!3::t
~~!3p. 8e..S"~~;:~
if S'e.!~' !3 ~.o (b = ~ I
=.tt0"g. "Ol>>~~=-g.~
-;;r(b() 1>>.... (b;;::..
!a(b g ~~~~~(")O
(brl)~rI) '< ~,Qo""
~ ~ g.S ;.~~ ~.~,~ ~
I ,..,- HI' I Q....... I j;;I I '<; S>>
!3 ~~.@ g,!3~ ~ S' 'g. ~~.
S ~(b"O""0-"1= ~rI)o
~'~g ~ it~'I'[~.~~i ~
"1 == t::l:l 0 - l:t'= rI) 0 ~
en 0' (b - g ~ ~ g. 8 ~ (b = S'
~ (b ~ !3 g.~ (b!3 ~ g. ~ (b
~ ~ ?" e:: (b ~ g-"O 'g ~ s' 8 ~
!3(b ll';"!3Q. ~~ OQ !3!:;l'
rI) Q. (b l>> _'."0 (b "1 _-en "0;;::"
g."1 ....~ "1 ~ ~ = ~
~~ OQ ~a ~~g-3.:~ ii ~
en"'l:l ~ ::S.S'~ = S'(b ~ m
~ ~ !:;l' Ii. ~ s". 3.:8.q- _. ft. Q.
~ CIl ;;::"Q. rI) l>> Z 0 = (b
e:: g g ~ S" = ~ S" = ~ s:' ~.
(b ~ "1 a g' ~ a S' I>> ~ =
H (") ~ '"d < Q. ~ S"OQ ~ ~ 8-
;:1".0 l>>(bl>>(b.tt ~
:i. !3 '1:l'~"1 C/) ';f Ii';;r 0 0 g. -- .
I I ..~ "'<;c/)w I (b_ =(b ......
-.-=.... = .....3="0 rI) =
a.m 0 0 0 c;:'(b - ~_.
o(/)O'!3 ~!3~,!D ~g
ii~'~ ~[2 3:[~~~ ~
o'() ~ (b::r'l>> (/) CIl "0 ~l>> Q. 'WW
=: ~~.~ ~ ~g'iir~ ~ ~ 0
3! (/)oo=!Q.o' ~ ~s:-==
m g.~ ~.~~*~~~ a;FO" ~
~ ~ ~.OQ ~ is: ~ (b S" (b ~~. (b ~
f/) C/) ~ l>> ~ Ii' ~ ~ [ g g,OQ ~ =.
m ~ ~ '2 Q.:i. 0 ~ l>> ~ l>> ~ ~
(b~OQ()()-....f/)p~8. ~
.3: ~~(bgm~o='g'g.-==a 0
~ CIlfP";'Ps>>O ll';"O::r'n
=- "1 CIl "0 .., = ~ (b '< l=i'!if s-
o ~ < (:S' = (b .... (b ~ W (b (b =
~ fit ~8-g,~ S"~ 0 8~G;~
r- s~ OQ"O$C::r'!3 ~oo
~ ~ m ~. ft a ;5'g. ~ S'''O.a ~
0) ~ =!()(b I>>_g.(b.....
)> I g, <J>.:r Q. :a E!.(b 9 g
CIl
,);!
:n
G'l
.~
:I:
('5
TRACKING LUG - ~IT~ PLAN
~)i~k
NEW SITE PLAN
I(-I-~j/ AMOUNT:
,
HEV~EW ~UUMI~rAL
C'l' '1' 1'1' LE :
tlIP'l'ION:
ilLE NO. : Nf111t1' fV~~D7
.e RECIO:
MAJOR SITE PLAN MODIFICATION
RECEIPT NO.:
.
, .
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
~WELVE (12) SETS SUBMITTED:
COLORED ELEVATIONS REC'D:
(Plans shall be pre-assembled. The Planning & Zoning Dept. will number each
sheet of their set. The planning Dept. set will be used to check the
remaining sets to ensure the number and type of sheets match.)
* ~ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
APPLICATION & SUBMITTAL:
DATE:
ACCEPTED
---DENIED
DATE:
DATE OF LET'PER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
2nd SUBMIT'l'AL :
DATE:
ACCEPTED
DENIED
DATE:
DATE OF SUBMITTAL ACCEPTANCE LETTER:
REVIEWER'S NAME:
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
(Label TRC Departments on each set of plans)
DATE AND MEMO NUMBER OF MEMO SENT TO TRC TO PERFORM INITIAL REVIEW.
DATE SENT:
RETURN DATE: / ( - f - ''I
MEMO NUMBER:
1st REVIEW COMMENTS RECEIVED
/1/)
*=
PLANS MEMO # I DATE I IIGJ'
I I tI
r'l-2-I,{' 11(-9' I 'vJ'
It-f:.."i'll !/-'j' / Ah
91...J~1 I (/-7 1...4-
/ 11- f' /-J/k..
9 Y-tJ!CO 11-(" ~o
VARIANCE(S)
PLANS
MEMO # / DATE I "C"
/ I
9Y~.<.:;1 / //-r;{/ All;
7Y'~ I 11- I 4iI V'"
, q / l-z;r
1'1"<I~t,I I 11.j'-7~/ ~_
I '
Util.
P.W.
Parks
Fire
Police
I(
PlanninC"T
Building
Engineer
Engineer
Forester
=!=
J/()
'l'YPE OE'
DATE OF MEETING:
DATE OF LETTER SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS:
(Aesthetic Review App., dates of board mtgs. & checklist sent out wI comments)
NINETY DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE 12 COMPLETE SETS OF AMENDED PLANS SUBMITTED FOR 2nd REVIEW:
(Must be assembled. Reviewer shall accept amended plans & support documents)
COLORED ELEVATIONS REC' D:
MEMO SENT TO TRC TO PERFORM 2nd REVIEW.
DA'l'E SENT: MEMO #:
RETURN DATE:
2nd REVIEW RECOMMENDATION/DENIAL
PLANS MEMO # I DATE I"R/DII PLANS MEMO # I DATE I"R/D"
Util. I / planning / /
P. W. I / Building I I
Parks / I Engineer I /
Fire / I Engineer / I
police / I Forester I /
LETTER TO APPLICANT REGARDING TRC APPROVAL/DENIAL AND LAND DEVELOPMENT SIGNS
PLACED AT THE PROPERTY DATE SENT/SIGNS INSTALLED:
SCHEDULE OF BOARD MEETINGS: PAD
CC/CRA
DATE APPROVAL LETTER SENT:
A:TRACKING.SP