Loading...
Property info1 LIGHTING PLAN 1/4" = 1'-0"NOTE: GENERAL NOTES:LIGHTING SCHEDULE CEILING LEGEND MUSIC SYSTEM NOTES: THE MUSIC SYSTEM IS A REQUIREMENT OF THE BRAND AND NO LONGER OPTIONAL. ARCHITECTS TO UPDATE ARCHITECTURAL DRAWINGS PER GUIDELINES DIRECTLY BELOW. 1.MUSIC SYSTEM IS REQUIRED IN ALL NEW AND REMODEL STORES. MUSIC SYSTEM TO USE DBI APPROVED PROGRAMMING 2.ALL CEILING SPEAKERS TO BE FLUSH MOUNTED WHITE. ALL EXTERIOR SPEAKERS TO BE BLACK, WITH EXTERIOR GRADE CONSTRUCTION. 3.ONE SPEAKER IN EACH BATHROOM TO BE FLUSH MOUNTED WHITE. 4.A MINIMUM OF TWO SPEAKERS IN THE SEATING AREA (NO SPEAKERS IN THE SERVICE AREA). 5.A MINIMUM OF TWO SPEAKERS AT EXTERIOR SEATING AREAS WHERE APPLICABLE. 6.SPEAKER AT EXTERIOR OF BUILDING ADJACENT TO ENTRY. 7.PROVIDE AND INSTALL SEPARATE VOLUME CONTROLS FOR EACH AREA (RESTROOMS, SEATING AREA, EXTERIOR) 8.HARDWARE TO BE INSTALLED IN THE OFFICE. FIELD VERIFY AND COORDINATE WITH FRANCHISE FOR THE EXACT LOCATION OF THE UNIT AND VOLUME CONTROLS. KEYED NOTES: 1.INTERLOCK TOILET ROOM LIGHT WITH EXHAUST FAN. 2.PROVIDE SWITCHES WITH PILOT LIGHTS FOR WALK-IN REFRIGERATOR AND FREEZER. 3.CIRCUIT EXTERIOR SIGNS THROUGH TIMECLOCK. VERIFY QUANTITY AND LOCATION WITH ARCHITECTURAL DRAWINGS. 4.SPEAKER AND SOUND SYSTEM TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. LOCATE VOLUME CONTROL IN THE OFFICE. SEE ARCHITECTURAL CEILING PLAN FOR EXACT LOCATION AND CONTROL. 5.ALL EXIT/EMERGENCY LIGHTS TO BE AHEAD OF SWITCH. A.ALL WORK SHALL COMPLY WITH ALL LOCAL AND STATE CODES AND AUTHORITIES HAVING JURISDICTION. B.THE CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS AND ARRANGE ALL REQUIRED INSPECTIONS. C.THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER CONTRACTORS AND TRADES. D.THESE DRAWINGS, AS PREPARED, ARE DIAGRAMMATIC BUT SHALL BE FOLLOWED AS CLOSELY AS CONSTRUCTION OF THE PROJECT AND THE WORK OF THE TRADES WILL PERMIT. EQUIPMENT LOCATIONS INDICATED ARE APPROXIMATE. COORDINATE EXACT LOCATIONS AND REQUIRED CLEARANCES WITH EQUIPMENT SUPPLIER AND ALL TRADES PRIOR TO INSTALLATION. E.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL THE EQUIPMENT INDICATED WITHIN THESE DRAWINGS UNLESS OTHERWISE NOTED. VERIFY LOCATION AND DIMENSIONS IN THE FIELD PRIOR TO FABRICATION AND / OR INSTALLATION. F.ALL ROOF PENETRATIONS SHALL BE AT THE CONTRACTOR'S EXPENSE. COORDINATE WITH OWNER'S ROOFING CONTRACTOR SO AS NOT TO VOID ANY EXISTING ROOF WARRANTIES. G.THE ENTIRE INSTALLATION SHALL BE GUARANTEED FREE OF DEFECTS AND CONTRACTOR SHALL REPAIR AND / OR REPLACE ANY DEFECTIVE MATERIALS OR EQUIPMENT AT NO COST TO THE OWNER FOR A MINIMUM PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE BY ARCHITECT OR ENGINEER. H.ALL WORK SHALL BE SUBJECT TO THE ACCEPTANCE AND APPROVAL OF THE ARCHITECT AND OWNER. THE ARCHITECT SHALL BE NOTIFIED OF ANY AND ALL DISCREPANCIES BETWEEN FIELD CONDITIONS AND THE CONTRACT DOCUMENTS BEFORE PROCEEDING WITH THAT PORTION OF THE WORK. FAILURE OF PROPER NOTIFICATION DOES NOT RELIEVE THE CONTRACTOR. THE CONTRACTOR SHALL CORRECT ANY AND ALL WORK ARISING FROM SUCH FAILURE TO COORDINATE DISCREPANCIES TO THE SATISFACTION OF THE ARCHITECT WITHOUT ADDITIONAL COST TO THE OWNER. I.COORDINATE ALL EQUIPMENT UTILITY INFORMATION SHOWN ON THIS SHEET WITH THE DUNKIN' BRANDS EQUIPMENT SCHEDULE AND EQUIPMENT MANUFACTURER'S CUT SHEETS. J.ALL EXTERIOR LIGHTS TO BE TIMECLOCK CONTROLLED. K.ALL 15 AND 20 AMP, 120 VOLT RECEPTACLES IN KITCHEN AND PREP AREAS SHALL BE GFI TYPE. L.ALL JUNCTION BOXES SHOWN ON THIS PLAN ARE TO BE INSTALLED ABOVE THE FINISHED CEILING. M.ALL EMERGENCY AND EXIT FIXTURES SHALL BE CONNECTED TO LOCAL LIGHTING CIRCUIT AHEAD OF ANY SWITCHING. PROVIDE ADDITIONAL FIXTURES AS NEEDED TO MEET THE CODE REQUIREMENTS PER LOCAL REQUIREMENTS. N.PROVIDE WOOD BLOCKING BEHIND ALL EXTERIOR LIGHTING FIXTURES COORDINATE WITH GENERAL CONTRACTOR. O.THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE LATEST KITCHEN PLANS AND EQUIPMENT CUTS SHEETS FOR PROPER EQUIPMENT LOCATIONS AND CONNECTION REQUIREMENTS PRIOR TO STARTING WORK. EGREES LIGHT NOTES 1.ALL EGREES ILLUMINATION SHALL BE A MINIMUM AVERAGE OF 1 FOOT CANDLE. 2.EMERGENCY AND EXIT LIGHTS TO BE POWERED BY 90 MINUTES BATTERY BACKUP. 3.ALL EMERGENCY AND EXIT LIGHTS TO BE POWERED BY LIGHTING CIRCUIT SERVING SAME AREA. 4.EMERGENCY AND EXIT LIGHTS TO BE CONNECTED AHEAD OF SWITCHES. 5.ALL EGREES ILLUMINATION TO COMPLYWITH FBC 1006, 1008. LIGHTING NOTES 1.LIGHTING TO COMPLY WITH FBC SECTION 505.5.3 FOR LIGHT DENSITY 2.50% OF LIGHTING FIXTURES TO BE HIGH EFFICIENCY LIGHTS.LIGHTING PLAN NOT USED E-2REMODELd a t e : r e v i s i o n s :Boynton Beach FL 33483 2728 N Federal Hwy.1 3 . 0 6 . 2 0 2 5 PC # 3 1 0 2 8 7ventura-architecture.com phone : (954) 423-1362 davie, florida 33325 11870 w state rd 84 #C14 A R 0 0 1 6 1 5 2 michael a. ventura VENTURA development inc architectureA A 0 0 0 3 1 2 3 Fabian Morales Drawn by: project # : 2 5 0 3 2 1 AR0016152MICHAEL VEN T URASTAT E O F FLOR I D AREGI S TERED A R C H ITECTDUNKIN' - BUILDING COMMENTS 07.23.2025 - fm1 1 LED LIGHT FIXTURE DESIGN NOTE: ALTHOUGH FLUORESCENT LIGHT FIXTURES ARE SHOWN AS THE STANDARD DESIGN OPTION, IT IS HIGHLY RECOMMENDED THAT LED LIGHT FIXTURES BE CONSIDERED. ALL FLUORESCENT FIXTURES SHOWN HAVE LED ALTERNATES AVAILABLE THROUGH VILLA LIGHTING, AND QUOTES CAN BE OBTAINED FOR BOTH LIGHT PACKAGE TYPES. LED-3 LED-4 LED-6 BACKROOM OPTION ELECTRICIAN TO VERIFY EXISTING CONDITIONS OF ELECTRIC PANELS TO REMAIN OR REDEVELOP ELECTRIC CIRCUITS. SUBMIT TO ARCHITECT CHANGES TO UPDATE AS BUILT. GC TO CONFIRM IF EXISTING CONDUITS ARE IN GOOD CONDITIONS ADEQUATELY SI=E FOR NEW DIGITAL BOARD REQUIREMENTS. GC TO COORDINATE WITH SIGN VENDOR FOR REQUIRED ELECTRIC ACCESS TO EXISTING NEW LOCATIONS FOR SIGN INSTALLATION PROVIDE AUTOMATIC LIGHTING CONTROLS FOR ENERGY CONSERVATION KIOSKKIOSKSTORAGE ElectricalPanelBACK OF HOUSE REMAIN AS IS R2  R2  RRR R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 R2 RRRRRR R2 R2 A AA A WSCX-2WSCX-2WSCX-2GWT-2WT-2 LROD RRRR R A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7 A-7A-7A-7 A-7 A-7 A-7 A-7 A-38 A-38 A-25CLGA-25CLGA-25CLG A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 A-9 B-8 B-8 B-8 B-8 B-8 B-8 A-25 A-23 A-23 A-23 A-23A-23A-23A-23 A-23 A-13 EXIST. CIRCUIT FOR SIGN A-13 EXIST. CIRCUIT FOR SIGN A-25 A-25 A-25 A-25 A-23 PENDANT LIGHT FIXTURE (LED) C INTERIOR FLUSH CEILING SPEAKER 2x2 LAY-IN LED LIGHT FIXTURE (NO OVERLAY) TYP. WSC-1 EXTERIOR UP / DOWN SCONCE LIGHT WSCX-2 V EXTERIOR SPEAKER ADJUSTABLE SPEAKER VOLUME CONTROLS SUSP. CLNG GRID SYSTEM W/ ACOUSTICAL OR VINYL CLAD CEILING TILES- SEE PLAN FOR TYPES AND LOCATIONS RECESSED CAN DOWN LIGHT FIXTURE (LED) RECESSED CAN EXTERIOR DOWN LIGHT FIXTURE (LED) G LED-1 LED-2 HANGING PENDANT LIGHT SUPPLY AIR DIFFUSER- 4 WAY P EXTERIOR WALL MOUNT STEM LIGHT TRACK HEAD & LED LAMP FLUE EXTERIOR WALL PACK LIGHTPENDANT LIGHT FIXTURE EXIT SIGN RETURN / CEILING EXHAUST REGISTER GYPSUM BOARD CEILING P3 P4 WITHIN HANGING SOFFIT 2x4 LAY-IN LED LIGHT FIXTURE (W/ ACRYLIC LENS) TYP. BL BATHROOM WALL SCONCE EXIT/EMERGENCY LIGHT WITH BATTERY BACKUP EMERGENCY LIGHT WITH BATTERY BACKUP V VAPORPROOF LINEAR FIXTURE LED-4 LED-6 NIGHT LIGHT 2x2 LAY-IN LED LIGHT FIXTURE (NO OVERLAY) TYP.LED-4 NIGHT 2x4 LAY-IN LED LIGHT FIXTURE (W/ ACRYLIC LENS) TYP. LED-6 S S OCCUPANCY SENSOR