HomeMy WebLinkAboutEnlarged Refrigeration Plans - R1.1BEL0400AG6AEAB
(NEW)
BS09 GLY
1 2 3 4
E
BEC0750AG7AEAB
(NEW)
BS08 GLY
8FT -BMD-R
(NEW)
BS17 GLY
8FT -PF-54-R
(NEW)
BS18 GLY
8FT -DX6LD
(NEW)
BS20 GLY
12FT -DX6XN
(NEW)
BS19 GLY
24FT -DR6LD
(NEW)
BS07 GLY
32FT -DX6LD
(NEW)
BS01 GLY
24FT -DX6LD
(NEW)
BS02 GLY
36FT -DX6LD
(NEW)
BS03 GLY
28FT -DX6LD
(NEW)
BS04 GLY
32FT -DX6LN
(NEW)
BS05 GLY
24FT -DX6LN
(NEW)
BS06 GLY
CO
CO1.3BS GLYTYP
15.616
1.31BS GLY
1.4BS GLYBS07 GLY
1.5BS GLY1.51BS GLY
1.6BS GLY1.61BS GLY
1.7BS GLY1.7BS GLY1.71BS GLY1.8BS GLY 1.53BS GLY1.53BS GLY
1.52BS GLY
BS09 GLYBS08 GLY
(DTBS GLY
BYPASS)
5
R3.2
1.9BS GLY
2
R3.2
(TYP OF CIRCUITS
BS01 GLY -BS06 GLY)
15.624
15.691
1
R3.2
(TYP OF CIRCUITS
BS19 GLY -BS20 GLY)
15.624
15.691
1
R3
15.603
TYP
15.693
1
R3
15.603
TYP
15.693
6
R3.2
(TYP OF GLYCOL
FAN COIL UNITS)
15.611
TYP
15.612
15.610
3
R3.2
PROVIDE DRAIN
FITTING AT BOTTOM
OF PIPE DROP. (TYP)
3
R3.2
PROVIDE DRAIN
FITTING AT BOTTOM
OF PIPE DROP. (TYP)
1
R3.1
(TYP OF ALL
SECONDARY
PIPING)
2
R3.1
7
R3TYP
15.615
1
R3.2
1
R3.2
15.623
15.692
(TYP OF CIRCUITS
BS17 GLY -BS20 GLY)
15.623
15.692
15.624
15.691
15.624
15.691
INSTALL NEW GLYCOL
CHARGING STATION.
10
R3.2
NEW WALL PENETRATION.
REFER TO ARCHITECTURAL
AND STRUCTURAL.15.608
INSTALL NEW TCO2
CHARGING STATION.
4
R3.3
DTB GLY GLYCOL
CHARGING STATION
PIPING. (TYP)
CU5 TCO2 CHARGING
STATION PIPING. (TYP)
CU5 TCO2 CHARGING
STATION PIPING. (TYP)
1
R3
TYP
15.603
1 2 3
F
G
H
36FT -DX6LD
(NEW)
BS14 GLY
NEW REFRIGERATION ROOF PENETRATION. REFER
TO ARCHITECTURAL AND STRUCTURAL. REFER TO
REFRIGERATION ROOF PLAN FOR CONTINUATION.
DRAIN PAN
DTB CONN: 1
DTB CONN: 2
1BS GLY
1.1BS GLY
1.2BS GLY
DTB GLY GLYCOL
CHARGING STATION
PIPING. (TYP)BS14 GLY1.3BS GLY1.10BS GLY
1.11BS GLY
1
R3
15.603
TYP
15.693
2
R3
8
R3.2
15.609
6
R3.1
4
R3.2
3
R3.2
PROVIDE DRAIN
FITTING AT BOTTOM
OF PIPE DROP. (TYP)
1
R3.2
15.697
15.624
15.691
15.616
CO
CDCD
PIPING FROM DTB GLY ROOF
PENETRATION DRAIN PAN END ROOF PENETRATION
DRAIN PIPING OVER
CASE FLOOR DRAIN.
SHEET:
DRAWN BY:
CHECKED BY:
PROTO CYCLE:
DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
DOCUMENTS WITHOUT
SIGNATURE AND REQUIRED
SEAL OF AOR/EOR ARE NOT
FOR CONSTRUCTION
R1.1
ENLARGED
REFRIGERATION
PLANS
DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.COMPLY WITH CLEAN AIR ACT, TITLE VI, SECTION 608
AND CODE OF FEDERAL REGULATION TITLE 40, PART 82
WHEN ADDING OR REMOVING REFRIGERATED
EQUIPMENT. RECORD ALL EQUIPMENT IDENTIFICATION
NUMBERS, MODEL AND SERIAL NUMBERS, THE AMOUNT
OF REFRIGERANT RECOVERED FROM EACH UNIT, THE
DATE OF DECOMMISSIONING, COMPANY NAME AND
SIGNATURE OF ON-SITE SUPERVISOR.
EPA CLEAN AIR ACT
11.02.15
24 HOURS PRIOR TO SHUTTING DOWN ANY
REFRIGERATION SYSTEMS, HVAC SYSTEMS OR ENERGY
MANAGEMENT CONTROLS SYSTEMS, SEND EMAIL TO
NSRM@WALMART.COM. THE E-MAIL SHALL STATE WHAT,
WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG
IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A
FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE
WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND
RUNNING.
KEYNOTES
15.603 SUPPORT HORIZONTAL RUNS OF REFRIGERANT
LINES ON 1-5/8" X 1-5/8" UNISTRUT CHANNELS.
REFER TO SPECIFICATIONS FOR PIPE HANGER
SPACING.
15.608 COORDINATE REFRIGERATION LINE ROUTING
THROUGH THE EXTERIOR WALL. WALL
REINFORCEMENTS, PENETRATION, AND HOOD
SUPPLIED BY OTHERS. COORDINATE EXACT SIZE
AND LOCATION OF WALL PENETRATIONS WITH
ARCHITECTURAL AND STRUCTURAL DRAWINGS.
COORDINATE WITH WALMART CONSTRUCTION
MANAGER AND OTHER TRADES UTILIZING
PENETRATION FOR SPACE ALLOCATION.
15.609 COORDINATE REFRIGERATION LINE ROUTING
THROUGH ROOF. ROOF REINFORCEMENTS,
PENETRATION, AND HOOD SUPPLIED BY
OTHERS. COORDINATE EXACT SIZE AND
LOCATION OF ROOF PENETRATIONS WITH
ARCHITECTURAL AND STRUCTURAL DRAWINGS.
COORDINATE WITH OTHER TRADES UTILIZING
PENETRATION FOR SPACE ALLOCATION.
15.610 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING
AND BOLT PENETRATIONS THROUGH
COOLER/FREEZER BOX WALLS OR CEILINGS.
REFER TO FAN COIL UNIT DETAIL.
15.611 SUPPORT UNIT COOLERS WITH BOLTS THROUGH
ROOF TO 1-5/8" X 1-5/8" X 10' LONG 14 GA.
GALVANIZED UNISTRUT SPANNING THREE ROOF
PANELS. PROVIDE DOUBLE NUTS ON EACH BOLT.
15.612 SEE SCHEDULES FOR UNIT COOLER TYPES,
SIZES, AND CAPACITIES; CONTROL METHOD; AND
ALL REFRIGERATION PIPING SIZES, ETC.
15.615 CONDENSATE DRAIN; PITCH DRAIN LINES DOWN
APPROXIMATELY 1/8" PER 12" TOWARD DRAIN.
PROVIDE COPPER PIPING WITH ELECTRIC HEAT
TAPE AND INSULATION ON ALL CONDENSATE
LINES EXPOSED TO FREEZING TEMPERATURES.
15.616 END CONDENSATE LINE OVER RECEPTOR W/AIR
GAP. CONTRACTOR SHALL ENSURE FLOOR
DRAIN(S) AND DRAIN LINE(S) SERVING WALK-IN
ARE FREE OF OBSTRUCTIONS AND FUNCTION
PROPERLY. WHERE EXTENSIVE DAMAGE EXISTS
AND/OR PROPER DRAINAGE CANNOT BE
OBTAINED COORDINATE WITH WALMART
MECHANICAL CONSTRUCTION MANAGER.
15.623 ROUTE REFRIGERATION LINES IN BASE OF CASE
FOR ALL BOTTOM FED CONNECTED CASES.
SLOPE BACK TO LEAD CASE AT 1" PER 20'-0" OF
RUN.
15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE
FOR ALL TOP FED CONNECTED CASES. SLOPE
BACK TO LEAD CASE AT 1" PER 20'-0" OF RUN.
REFER TO TOP FED PIPING DETAIL.
15.691 REFRIGERATION CONTRACTOR SHALL INSTALL
GLYCOL SUPPLY AND RETURN SHUT-OFF BALL
VALVES IN A SERVICE ACCESSIBLE LOCATION
ON TOP OF CASE.
15.692 REFRIGERATION CONTRACTOR SHALL INSTALL
GLYCOL SUPPLY AND RETURN SHUT-OFF BALL
VALVES IN A SERVICE ACCESSIBLE LOCATION
INSIDE CASE DRAIN PAN.
15.693 SLOPE GLYCOL REFRIGERANT LINES DOWN
TOWARD DRAIN LOCATIONS AT 1" PER 20' OF
RUN. PROVIDE MANUAL AIR VENT AT HIGHEST
POINT IN SYSTEM. REFER TO M.T. GLYCOL
PIPING VENT AND DRAIN INSTALLATION DETAIL.
LOCATE HIGHEST POINT OF REFRIGERATION
LINES JUST BELOW BOTTOM CHORD OF JOIST
OR BEAM. COORDINATE TO AVOID CONFLICTS
WITH DUCTWORK, LIGHTING, SKYLIGHTS, PIPING,
ETC. REFER TO PIPING DETAILS AND
SPECIFICATIONS.
15.697 PROVIDE SPARE STUB WITH ISOLATION BALL
VALVE AND CAP OFF FOR FUTURE USE.
REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL
FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO
REFRIGERATION EQUIPMENT.
SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE-SKIN
OF EXISTING REFRIGERATED CASES TO REMAIN.
ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A
WALMART APPROVED CONTRACTOR.
REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW
CASES BEING INSTALLED FOR CONNECTION LOCATION OF
UTILITIES. (TOP FED VS BOTTOM FED)
VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES
WITH FINAL MERCHANDISE PLAN.
COORDINATE LOCATION OF REFRIGERATED CASES WITH
PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR
AND SETTING DRAINS.
REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED
FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT
LIMITED TO): REFRIGERATED CASES, WALK-IN COILS,
ASSOCIATED VALVES, REFRIGERATION AND
CONDENSATE PIPING, HANGERS AND SUPPORTS, AND
CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL
OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH
PENETRATIONS TO MATCH EXISTING. REFER TO
ARCHITECTURAL DRAWINGS.
ALL EXISTING REFRIGERATED CASES ARE TO REMAIN
UNLESS NOTED OTHERWISE.
PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING
RACK PARAMETERS, REFRIGERATION CONTRACTOR
SHALL REQUEST A SUCTION GROUP REPORT FOR ALL
RACKS AND SUCTION GROUPS WHERE WORK IS
PERFORMED. REQUEST VIA EMAIL AT
B.PTEAM1@WAL-MART.COM
REFRIGERATION SYMBOLS
RM-09.25.18
XXX
XXX
CIRCUIT NUMBER
MODEL NUMBER (CIRCUIT INFO)
CO CLEANOUT (CO)
CONDENSATE DRAIN LINE (CD)
CONNECT TO EXISTING
CONTINUATION
X
XX
DETAIL NUMBER
SHEET NUMBER
(DETAIL REFERENCE)
EVAPORATOR COIL
ISOLATION VALVE
ELBOW - TURNED DOWN
ELBOW - TURNED UP
XX.XXX REFRIGERATION KEYNOTE REFERENCE
REFRIGERATION PIPING (ABOVE)
REFRIGERATION PIPING (BELOW)
REFRIG PIPING CASE CONNECTION
ETR
(TYP)
EXISTING TO REMAIN
TYPICAL
*MODIFY CIRCUIT OR PIPE LENGTH
**NEW CASE, COIL, CIRCUIT OR VALVE
****CHANGE EXISTING PIPE SIZE AS INDICATED OR
NEW PIPE
^RISER SIZE IS SHOWN EVEN WHERE A RISER IS
NOT EXPECTED. THIS IS FOR REFERENCE ONLY
AND IS TO BE USED IN THE EVENT THAT A PIPING
CONFLICT CAUSES THE NEED FOR A RISER. IF
THE RISER LENGTH EXCEEDS 4 FEET, IT MUST BE
APPROVED BY ENGINEER OF RECORD.
#CONTRACTOR TO FIELD VERIFY EXISTING RISER
SIZE. IF EXISTING PIPE SIZE DOES NOT MATCH
SCHEDULE, REPLACE EXISTING RISER WITH NEW
SIZE AS SHOWN.
PIPING AND REFRIGERATION
SCHEDULE SYMBOLS
RM-10.06.20
GENERAL NOTES
1. PLANS INDICATE GENERAL ROUTING OF
REFRIGERANT LINES, WITH A SINGLE LINE
SHOWN INDICATING BOTH SUCTION AND LIQUID
LINE ROUTING FOR EACH SYSTEM.
2. REFRIGERATION SYSTEM INSTALLATION SHALL
BE IN COMPLETE CONFORMANCE WITH
SPECIFICATIONS, AND WITH ALL REQUIREMENTS
OF REFRIGERATION EQUIPMENT
MANUFACTURER.
3. REFRIGERATION DRAWINGS ARE PROVIDED AS
AN AID TO BIDDERS AND TO INDICATE DESIRED
ROUTING OF REFRIGERATION LINES;
CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR CORRECT INSTALLATION
OF PIPING AND ACCESSORIES TO PROVIDE A
COMPLETE AND FULLY OPERATING SYSTEM.
4. REFER TO SPECIFICATION 15600 FOR
INSULATION THICKNESS. INSIDE DIAMETER OF
INSULATION SHALL MATCH PIPE DIAMETER TO
MINIMIZE AIR GAPS BETWEEN PIPING AND
INSULATION. PROVIDE FACTORY PRE-
MANUFACTURED FITTINGS AT ALL TRAPS AND
ELBOWS. WHERE PRE-MANUFACTURED
FITTINGS ARE UNAVAILABLE MITER CUT ALL
FITTINGS TO ENSURE PROPER SEAL BETWEEN
INSULATION SEGMENTS.
5. PIPE INSULATION SHALL BE BLACK, UNLESS
OTHERWISE STATED ON PLANS OR
SPECIFICATIONS.
6. COORDINATE REFRIGERATION DEMOLITION
ISSUES WITH THE ARCHITECTURAL DRAWINGS.
REFER TO ARCHITECTURAL PLANS FOR
REFRIGERATION EQUIPMENT DEMOLITION AND
COOLER REPAIR AND REMODELING.
7. REFRIGERATION SYSTEM SHALL REMAIN
OPERATIONAL DURING REMODELING. DURING
THE PHASING OF OLD TO NEW SYSTEMS, BOTH
NEW AND OLD REFRIGERATION SYSTEMS MAY
BE REQUIRED TO OPERATE AT THE SAME TIME
FOR A SHORT PERIOD.
8. WHERE NEW REFRIGERATED EQUIPMENT IS
INDICATED ON THE DRAWINGS, PROVIDE
DEMOLITION, REMOVAL, AND TEMPORARY
STORAGE OF OLD EQUIPMENT PER WALMART
MECHANICAL SERVICES CONSTRUCTION
MANAGER'S INSTRUCTIONS, AND
REFRIGERATION DEMO NOTES.
9. COORDINATE REMOVAL AND DISPOSAL OF
EXISTING EVAPORATORS, REFRIGERATED
CASES, AND CONDENSING UNITS, WITH
WALMART MECHANICAL SERVICES
CONSTRUCTION MANAGER.
10. REMOVE COPPER LINES, EVAPORATORS, AND
CONDENSATE LINES FROM COOLERS/
FREEZERS BEING REMOVED FROM SITE.
COORDINATE WITH WALK-IN PANEL VENDOR
FOR TIME LINE OF REPLACEMENT. REFERENCE
SPECIFICATION FOR CONTACT INFORMATION.
11. WALK-IN PANEL VENDOR SHALL PROPERLY
PREPARE ALL COOLER/FREEZER PANELS,
GLASS DOORS, SLIDER OR SWING DOORS,
PALLETIZE, AND PREPARE THE EQUIPMENT TO
SHIP OFF SITE.
12. COORDINATE WITH FIRE PROTECTION
CONTRACTOR FOR THE REMOVAL OF
SPRINKLERS FOR ALL REMOVED
COOLER/FREEZER BOXES.
13. COORDINATE WITH ELECTRICAL CONTRACTOR
FOR THE REMOVAL OF ALL REMOVED
COOLER/FREEZER BOXES ELECTRICAL WIRING
DEVICES.
14. COORDINATE WITH BAS CONTRACTOR FOR THE
REMOVAL OF ALL REMOVED COOLER/FREEZER
BOXES BAS WIRING AND DEVICES.
15. EXISTING REFRIGERATION PIPING MAY BE RE-
USED UNLESS OTHERWISE NOTED ON PLANS.
REFER TO SCHEDULES FOR PIPE SIZE
REQUIREMENTS.
16. BUILDING COMPONENTS ABANDONED BY THE
SCOPE OF WORK SHALL BE SECURED TO
PREVENT FALLING, LOOSENING, OR CREATING
DAMAGE OF ANY KIND IN THE FUTURE.
17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD
OR REPLACE CASES, EVAPORATORS, ETC. THEN
24 TO 48 HOURS AFTER THE WORK IS
COMPLETED AND ALL FINAL ADJUSTMENTS
HAVE BEEN MADE, PROVIDE AND CHANGE
LIQUID LINE FILTER CORES, OIL SYSTEM FILTER
USING SPORLAN OF STYLE FILTER, AND
REPLACE SUCTION FILTERS. FILTERS ARE TO BE
RATED FOR WAX REMOVAL. CONTRACTOR TO
PROPERLY DISPOSE OF OIL AND COMPONENTS
REPLACED. REFER TO SPECIFICATION 15600.
18. REFER TO GROCERY ARCHITECTURAL
DRAWINGS FOR ADDITIONAL WORK BY
REFRIGERATION CONTRACTOR.
19. INSTALL ASSET TAGS ON ALL NEW
REFRIGERATED CASES AND COMPLETE THE
DATA COLLECTION INFORMATION. DELETE
DEMOED ASSETS FROM ASSET TAGGING
APPLICATION. REFER TO SPECIFICATIONS.
20. UPON START-UP OF ALL NEW REFRIGERATED
EQUIPMENT, CONSTRUCTION MANAGER SHALL
REQUEST THE BUILDING PERFORMANCE
REPORT FOR ALL RACKS AND SUCTION GROUPS
WHERE WORK IS PERFORMED. ANY DEVIATIONS
NOTED ON THE REPORT MUST BE CORRECTED
PRIOR TO PROJECT CLOSE OUT. REQUEST VIA
EMAIL AT B.PTEAM1@WAL-MART.COM
07.31.20
1/8" = 1'-0"1 ENLARGED REFRIGERATION PLAN FRONT
1/8" = 1'-0"2 ENLARGED REFRIGERATION PLAN REAR
ISSUE BLOCK
FLORI D
No. 63660
L
A
STATE OFM YICHAE L J AMES AM
E
S
TOPRROF
ESSIONAL E N G INEEEICENSVOID