Loading...
HomeMy WebLinkAboutEnlarged Refrigeration Plans - R1.1BEL0400AG6AEAB (NEW) BS09 GLY 1 2 3 4 E BEC0750AG7AEAB (NEW) BS08 GLY 8FT -BMD-R (NEW) BS17 GLY 8FT -PF-54-R (NEW) BS18 GLY 8FT -DX6LD (NEW) BS20 GLY 12FT -DX6XN (NEW) BS19 GLY 24FT -DR6LD (NEW) BS07 GLY 32FT -DX6LD (NEW) BS01 GLY 24FT -DX6LD (NEW) BS02 GLY 36FT -DX6LD (NEW) BS03 GLY 28FT -DX6LD (NEW) BS04 GLY 32FT -DX6LN (NEW) BS05 GLY 24FT -DX6LN (NEW) BS06 GLY CO CO1.3BS GLYTYP 15.616 1.31BS GLY 1.4BS GLYBS07 GLY 1.5BS GLY1.51BS GLY 1.6BS GLY1.61BS GLY 1.7BS GLY1.7BS GLY1.71BS GLY1.8BS GLY 1.53BS GLY1.53BS GLY 1.52BS GLY BS09 GLYBS08 GLY (DTBS GLY BYPASS) 5 R3.2 1.9BS GLY 2 R3.2 (TYP OF CIRCUITS BS01 GLY -BS06 GLY) 15.624 15.691 1 R3.2 (TYP OF CIRCUITS BS19 GLY -BS20 GLY) 15.624 15.691 1 R3 15.603 TYP 15.693 1 R3 15.603 TYP 15.693 6 R3.2 (TYP OF GLYCOL FAN COIL UNITS) 15.611 TYP 15.612 15.610 3 R3.2 PROVIDE DRAIN FITTING AT BOTTOM OF PIPE DROP. (TYP) 3 R3.2 PROVIDE DRAIN FITTING AT BOTTOM OF PIPE DROP. (TYP) 1 R3.1 (TYP OF ALL SECONDARY PIPING) 2 R3.1 7 R3TYP 15.615 1 R3.2 1 R3.2 15.623 15.692 (TYP OF CIRCUITS BS17 GLY -BS20 GLY) 15.623 15.692 15.624 15.691 15.624 15.691 INSTALL NEW GLYCOL CHARGING STATION. 10 R3.2 NEW WALL PENETRATION. REFER TO ARCHITECTURAL AND STRUCTURAL.15.608 INSTALL NEW TCO2 CHARGING STATION. 4 R3.3 DTB GLY GLYCOL CHARGING STATION PIPING. (TYP) CU5 TCO2 CHARGING STATION PIPING. (TYP) CU5 TCO2 CHARGING STATION PIPING. (TYP) 1 R3 TYP 15.603 1 2 3 F G H 36FT -DX6LD (NEW) BS14 GLY NEW REFRIGERATION ROOF PENETRATION. REFER TO ARCHITECTURAL AND STRUCTURAL. REFER TO REFRIGERATION ROOF PLAN FOR CONTINUATION. DRAIN PAN DTB CONN: 1 DTB CONN: 2 1BS GLY 1.1BS GLY 1.2BS GLY DTB GLY GLYCOL CHARGING STATION PIPING. (TYP)BS14 GLY1.3BS GLY1.10BS GLY 1.11BS GLY 1 R3 15.603 TYP 15.693 2 R3 8 R3.2 15.609 6 R3.1 4 R3.2 3 R3.2 PROVIDE DRAIN FITTING AT BOTTOM OF PIPE DROP. (TYP) 1 R3.2 15.697 15.624 15.691 15.616 CO CDCD PIPING FROM DTB GLY ROOF PENETRATION DRAIN PAN END ROOF PENETRATION DRAIN PIPING OVER CASE FLOOR DRAIN. SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. DOCUMENTS WITHOUT SIGNATURE AND REQUIRED SEAL OF AOR/EOR ARE NOT FOR CONSTRUCTION R1.1 ENLARGED REFRIGERATION PLANS DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.COMPLY WITH CLEAN AIR ACT, TITLE VI, SECTION 608 AND CODE OF FEDERAL REGULATION TITLE 40, PART 82 WHEN ADDING OR REMOVING REFRIGERATED EQUIPMENT. RECORD ALL EQUIPMENT IDENTIFICATION NUMBERS, MODEL AND SERIAL NUMBERS, THE AMOUNT OF REFRIGERANT RECOVERED FROM EACH UNIT, THE DATE OF DECOMMISSIONING, COMPANY NAME AND SIGNATURE OF ON-SITE SUPERVISOR. EPA CLEAN AIR ACT 11.02.15 24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, HVAC SYSTEMS OR ENERGY MANAGEMENT CONTROLS SYSTEMS, SEND EMAIL TO NSRM@WALMART.COM. THE E-MAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING. KEYNOTES 15.603 SUPPORT HORIZONTAL RUNS OF REFRIGERANT LINES ON 1-5/8" X 1-5/8" UNISTRUT CHANNELS. REFER TO SPECIFICATIONS FOR PIPE HANGER SPACING. 15.608 COORDINATE REFRIGERATION LINE ROUTING THROUGH THE EXTERIOR WALL. WALL REINFORCEMENTS, PENETRATION, AND HOOD SUPPLIED BY OTHERS. COORDINATE EXACT SIZE AND LOCATION OF WALL PENETRATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. COORDINATE WITH WALMART CONSTRUCTION MANAGER AND OTHER TRADES UTILIZING PENETRATION FOR SPACE ALLOCATION. 15.609 COORDINATE REFRIGERATION LINE ROUTING THROUGH ROOF. ROOF REINFORCEMENTS, PENETRATION, AND HOOD SUPPLIED BY OTHERS. COORDINATE EXACT SIZE AND LOCATION OF ROOF PENETRATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. COORDINATE WITH OTHER TRADES UTILIZING PENETRATION FOR SPACE ALLOCATION. 15.610 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING AND BOLT PENETRATIONS THROUGH COOLER/FREEZER BOX WALLS OR CEILINGS. REFER TO FAN COIL UNIT DETAIL. 15.611 SUPPORT UNIT COOLERS WITH BOLTS THROUGH ROOF TO 1-5/8" X 1-5/8" X 10' LONG 14 GA. GALVANIZED UNISTRUT SPANNING THREE ROOF PANELS. PROVIDE DOUBLE NUTS ON EACH BOLT. 15.612 SEE SCHEDULES FOR UNIT COOLER TYPES, SIZES, AND CAPACITIES; CONTROL METHOD; AND ALL REFRIGERATION PIPING SIZES, ETC. 15.615 CONDENSATE DRAIN; PITCH DRAIN LINES DOWN APPROXIMATELY 1/8" PER 12" TOWARD DRAIN. PROVIDE COPPER PIPING WITH ELECTRIC HEAT TAPE AND INSULATION ON ALL CONDENSATE LINES EXPOSED TO FREEZING TEMPERATURES. 15.616 END CONDENSATE LINE OVER RECEPTOR W/AIR GAP. CONTRACTOR SHALL ENSURE FLOOR DRAIN(S) AND DRAIN LINE(S) SERVING WALK-IN ARE FREE OF OBSTRUCTIONS AND FUNCTION PROPERLY. WHERE EXTENSIVE DAMAGE EXISTS AND/OR PROPER DRAINAGE CANNOT BE OBTAINED COORDINATE WITH WALMART MECHANICAL CONSTRUCTION MANAGER. 15.623 ROUTE REFRIGERATION LINES IN BASE OF CASE FOR ALL BOTTOM FED CONNECTED CASES. SLOPE BACK TO LEAD CASE AT 1" PER 20'-0" OF RUN. 15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE FOR ALL TOP FED CONNECTED CASES. SLOPE BACK TO LEAD CASE AT 1" PER 20'-0" OF RUN. REFER TO TOP FED PIPING DETAIL. 15.691 REFRIGERATION CONTRACTOR SHALL INSTALL GLYCOL SUPPLY AND RETURN SHUT-OFF BALL VALVES IN A SERVICE ACCESSIBLE LOCATION ON TOP OF CASE. 15.692 REFRIGERATION CONTRACTOR SHALL INSTALL GLYCOL SUPPLY AND RETURN SHUT-OFF BALL VALVES IN A SERVICE ACCESSIBLE LOCATION INSIDE CASE DRAIN PAN. 15.693 SLOPE GLYCOL REFRIGERANT LINES DOWN TOWARD DRAIN LOCATIONS AT 1" PER 20' OF RUN. PROVIDE MANUAL AIR VENT AT HIGHEST POINT IN SYSTEM. REFER TO M.T. GLYCOL PIPING VENT AND DRAIN INSTALLATION DETAIL. LOCATE HIGHEST POINT OF REFRIGERATION LINES JUST BELOW BOTTOM CHORD OF JOIST OR BEAM. COORDINATE TO AVOID CONFLICTS WITH DUCTWORK, LIGHTING, SKYLIGHTS, PIPING, ETC. REFER TO PIPING DETAILS AND SPECIFICATIONS. 15.697 PROVIDE SPARE STUB WITH ISOLATION BALL VALVE AND CAP OFF FOR FUTURE USE. REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO REFRIGERATION EQUIPMENT. SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE-SKIN OF EXISTING REFRIGERATED CASES TO REMAIN. ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A WALMART APPROVED CONTRACTOR. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW CASES BEING INSTALLED FOR CONNECTION LOCATION OF UTILITIES. (TOP FED VS BOTTOM FED) VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES WITH FINAL MERCHANDISE PLAN. COORDINATE LOCATION OF REFRIGERATED CASES WITH PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR AND SETTING DRAINS. REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT LIMITED TO): REFRIGERATED CASES, WALK-IN COILS, ASSOCIATED VALVES, REFRIGERATION AND CONDENSATE PIPING, HANGERS AND SUPPORTS, AND CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH PENETRATIONS TO MATCH EXISTING. REFER TO ARCHITECTURAL DRAWINGS. ALL EXISTING REFRIGERATED CASES ARE TO REMAIN UNLESS NOTED OTHERWISE. PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING RACK PARAMETERS, REFRIGERATION CONTRACTOR SHALL REQUEST A SUCTION GROUP REPORT FOR ALL RACKS AND SUCTION GROUPS WHERE WORK IS PERFORMED. REQUEST VIA EMAIL AT B.PTEAM1@WAL-MART.COM REFRIGERATION SYMBOLS RM-09.25.18 XXX XXX CIRCUIT NUMBER MODEL NUMBER (CIRCUIT INFO) CO CLEANOUT (CO) CONDENSATE DRAIN LINE (CD) CONNECT TO EXISTING CONTINUATION X XX DETAIL NUMBER SHEET NUMBER (DETAIL REFERENCE) EVAPORATOR COIL ISOLATION VALVE ELBOW - TURNED DOWN ELBOW - TURNED UP XX.XXX REFRIGERATION KEYNOTE REFERENCE REFRIGERATION PIPING (ABOVE) REFRIGERATION PIPING (BELOW) REFRIG PIPING CASE CONNECTION ETR (TYP) EXISTING TO REMAIN TYPICAL *MODIFY CIRCUIT OR PIPE LENGTH **NEW CASE, COIL, CIRCUIT OR VALVE ****CHANGE EXISTING PIPE SIZE AS INDICATED OR NEW PIPE ^RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR REFERENCE ONLY AND IS TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES THE NEED FOR A RISER. IF THE RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED BY ENGINEER OF RECORD. #CONTRACTOR TO FIELD VERIFY EXISTING RISER SIZE. IF EXISTING PIPE SIZE DOES NOT MATCH SCHEDULE, REPLACE EXISTING RISER WITH NEW SIZE AS SHOWN. PIPING AND REFRIGERATION SCHEDULE SYMBOLS RM-10.06.20 GENERAL NOTES 1. PLANS INDICATE GENERAL ROUTING OF REFRIGERANT LINES, WITH A SINGLE LINE SHOWN INDICATING BOTH SUCTION AND LIQUID LINE ROUTING FOR EACH SYSTEM. 2. REFRIGERATION SYSTEM INSTALLATION SHALL BE IN COMPLETE CONFORMANCE WITH SPECIFICATIONS, AND WITH ALL REQUIREMENTS OF REFRIGERATION EQUIPMENT MANUFACTURER. 3. REFRIGERATION DRAWINGS ARE PROVIDED AS AN AID TO BIDDERS AND TO INDICATE DESIRED ROUTING OF REFRIGERATION LINES; CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR CORRECT INSTALLATION OF PIPING AND ACCESSORIES TO PROVIDE A COMPLETE AND FULLY OPERATING SYSTEM. 4. REFER TO SPECIFICATION 15600 FOR INSULATION THICKNESS. INSIDE DIAMETER OF INSULATION SHALL MATCH PIPE DIAMETER TO MINIMIZE AIR GAPS BETWEEN PIPING AND INSULATION. PROVIDE FACTORY PRE- MANUFACTURED FITTINGS AT ALL TRAPS AND ELBOWS. WHERE PRE-MANUFACTURED FITTINGS ARE UNAVAILABLE MITER CUT ALL FITTINGS TO ENSURE PROPER SEAL BETWEEN INSULATION SEGMENTS. 5. PIPE INSULATION SHALL BE BLACK, UNLESS OTHERWISE STATED ON PLANS OR SPECIFICATIONS. 6. COORDINATE REFRIGERATION DEMOLITION ISSUES WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL PLANS FOR REFRIGERATION EQUIPMENT DEMOLITION AND COOLER REPAIR AND REMODELING. 7. REFRIGERATION SYSTEM SHALL REMAIN OPERATIONAL DURING REMODELING. DURING THE PHASING OF OLD TO NEW SYSTEMS, BOTH NEW AND OLD REFRIGERATION SYSTEMS MAY BE REQUIRED TO OPERATE AT THE SAME TIME FOR A SHORT PERIOD. 8. WHERE NEW REFRIGERATED EQUIPMENT IS INDICATED ON THE DRAWINGS, PROVIDE DEMOLITION, REMOVAL, AND TEMPORARY STORAGE OF OLD EQUIPMENT PER WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER'S INSTRUCTIONS, AND REFRIGERATION DEMO NOTES. 9. COORDINATE REMOVAL AND DISPOSAL OF EXISTING EVAPORATORS, REFRIGERATED CASES, AND CONDENSING UNITS, WITH WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. 10. REMOVE COPPER LINES, EVAPORATORS, AND CONDENSATE LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. COORDINATE WITH WALK-IN PANEL VENDOR FOR TIME LINE OF REPLACEMENT. REFERENCE SPECIFICATION FOR CONTACT INFORMATION. 11. WALK-IN PANEL VENDOR SHALL PROPERLY PREPARE ALL COOLER/FREEZER PANELS, GLASS DOORS, SLIDER OR SWING DOORS, PALLETIZE, AND PREPARE THE EQUIPMENT TO SHIP OFF SITE. 12. COORDINATE WITH FIRE PROTECTION CONTRACTOR FOR THE REMOVAL OF SPRINKLERS FOR ALL REMOVED COOLER/FREEZER BOXES. 13. COORDINATE WITH ELECTRICAL CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES ELECTRICAL WIRING DEVICES. 14. COORDINATE WITH BAS CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES BAS WIRING AND DEVICES. 15. EXISTING REFRIGERATION PIPING MAY BE RE- USED UNLESS OTHERWISE NOTED ON PLANS. REFER TO SCHEDULES FOR PIPE SIZE REQUIREMENTS. 16. BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. 17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD OR REPLACE CASES, EVAPORATORS, ETC. THEN 24 TO 48 HOURS AFTER THE WORK IS COMPLETED AND ALL FINAL ADJUSTMENTS HAVE BEEN MADE, PROVIDE AND CHANGE LIQUID LINE FILTER CORES, OIL SYSTEM FILTER USING SPORLAN OF STYLE FILTER, AND REPLACE SUCTION FILTERS. FILTERS ARE TO BE RATED FOR WAX REMOVAL. CONTRACTOR TO PROPERLY DISPOSE OF OIL AND COMPONENTS REPLACED. REFER TO SPECIFICATION 15600. 18. REFER TO GROCERY ARCHITECTURAL DRAWINGS FOR ADDITIONAL WORK BY REFRIGERATION CONTRACTOR. 19. INSTALL ASSET TAGS ON ALL NEW REFRIGERATED CASES AND COMPLETE THE DATA COLLECTION INFORMATION. DELETE DEMOED ASSETS FROM ASSET TAGGING APPLICATION. REFER TO SPECIFICATIONS. 20. UPON START-UP OF ALL NEW REFRIGERATED EQUIPMENT, CONSTRUCTION MANAGER SHALL REQUEST THE BUILDING PERFORMANCE REPORT FOR ALL RACKS AND SUCTION GROUPS WHERE WORK IS PERFORMED. ANY DEVIATIONS NOTED ON THE REPORT MUST BE CORRECTED PRIOR TO PROJECT CLOSE OUT. REQUEST VIA EMAIL AT B.PTEAM1@WAL-MART.COM 07.31.20 1/8" = 1'-0"1 ENLARGED REFRIGERATION PLAN FRONT 1/8" = 1'-0"2 ENLARGED REFRIGERATION PLAN REAR ISSUE BLOCK FLORI D No. 63660 L A STATE OFM YICHAE L J AMES AM E S TOPRROF ESSIONAL E N G INEEEICENSVOID