Loading...
HomeMy WebLinkAboutRefrigeration Demo Plan - RD136FT -O5DM (DEMO) BS14 CONTRACTOR TO DEMO PIPING UP TO PENETRATION. AT PENETRATION, DEMO ALL PIPING BEFORE AND AFTER PENETRATION EXCEPT SMALL SECTION OF PIPING THROUGH PENETRATION. PINCH BOTH SIDES OF THE SMALL SECTION OF PIPING. FILL AND SEAL PENETRATION IF NEEDED TO AVOID WATER/PEST INTRUSION. IF ALL PIPING THROUGH PENETRATION HAS BEEN ABANDONED, THEN REMOVE ALL PIPING AND SEAL THE ENTIRE PENETRATION. 1 2 3 4 E F G H 24FT -DR6XN (DEMO) BS07 8FT -O5DM (DEMO) AS09 8FT -E2V (DEMO) CU-1 8FT -E2V (DEMO) AS06 12FT -ESBDS (DEMO) AS05 SM-134 (DEMO) BS08 ADT-090 (DEMO) BS09 32FT -DX6XN (DEMO) BS01 24FT -DX6XN (DEMO) BS02 36FT -DX6XN (DEMO) BS03 28FT -DX6XN (DEMO) BS04 32FT -O5DM (DEMO) BS05 24FT -O5DM (DEMO) BS06 TYP 15.625 TYP 15.625 DELI COOLER BAKERY COOLER CU-1 DX (DEMO) CU-1 MOUNTED ON ROOF. COORDINATE WITH WALMART CONSTRUCTION MANAGER FOR INSTRUCTIONS TO SALVAGE OR ABANDON IN PLACE. REFER TO GENERAL REFRIGERATION DEMO NOTES. PATCH ROOF PENETRATION FOR CU-1 ACCORDING TO SPECS AND WALMART CONSTRUCTION MANAGER. DEMO REFRIGERATION PIPING FOR CIRCUITS AS05 AND AS06 FROM CASES BACK TO SUB- LOOP 1.13AS AT TRENCH OPENING. CAP TRENCH PIPING AND ABANDON IN PLACE. 1.3AS 1.2AS DEMO REFRIGERATION PIPING FOR CIRCUIT AS09 FROM CASE BACK TO MAIN LOOP. CONNECT EXISTING PIPING 1.2AS TO 1.3AS. BS14 BS14BS142BS2.1BS DEMO REFRIGERATION PIPING FOR CIRCUIT BS14 FROM CASES BACK TO MAIN LOOP. CONNECT EXISTING PIPING 2BS TO 2.1BS. DEMO REFRIGERATION PIPING FOR CIRCUIT BS14 FROM CASES BACK TO MAIN LOOP. CONNECT EXISTING PIPING 2BS TO 2.1BS. 1.13AS DEMO ALL PIPING ASSOCIATED WITH LOOP 1BS IN ACCORDANCE WITH PHASED INSTALLATION OF NEW EQUIPMENT. ABANDON REFRIGERATION PIPING AND SEAL PIT AS NECESSARY. CAP TRENCH PIPING AND ABANDON IN PLACE. SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. DOCUMENTS WITHOUT SIGNATURE AND REQUIRED SEAL OF AOR/EOR ARE NOT FOR CONSTRUCTION RD1 REFRIGERATION DEMO PLAN DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.1/8" = 1'-0"1 REFRIGERATION DEMO PLAN GENERAL REFRIGERATION DEMO NOTES 1. COORDINATE REFRIGERATION DEMOLITION ISSUES WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL PLANS FOR REFRIGERATION EQUIPMENT DEMOLITION AND COOLER REPAIR AND REMODELING. 2. REFRIGERATION SYSTEM SHALL REMAIN OPERATIONAL DURING REMODELING. DURING THE PHASING OF OLD TO NEW SYSTEMS, BOTH NEW AND OLD REFRIGERATION SYSTEMS MAY BE REQUIRED TO OPERATE AT THE SAME TIME DURING CHANGEOVER. 3. WHERE NEW REFRIGERATED EQUIPMENT IS INDICATED ON THE DRAWINGS, PROVIDE DEMOLITION, REMOVAL, AND TEMPORARY STORAGE OF OLD EQUIPMENT PER WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER'S INSTRUCTIONS, AND REFRIGERATION DEMO NOTES. ENSURE ALL NEW EQUIPMENT AND PARTS NEEDED TO COMPLETE THE INSTALLATION OF THE NEW EQUIPMENT IS AT THE JOB SITE BEFORE REMOVING ANY EXISTING EQUIPMENT. 4. COORDINATE REMOVAL AND DISPOSAL OF EXISTING EVAPORATORS, REFRIGERATED CASES, AND CONDENSING UNITS, WITH WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. 5. REMOVE COPPER LINES, EVAPORATORS, AND CONDENSATE LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. COORDINATE WITH WALK-IN PANEL VENDOR FOR TIME LINE OF REPLACEMENT. REFERENCE SPECIFICATION FOR CONTACT INFORMATION. 6. WALK-IN PANEL VENDOR SHALL PROPERLY PREPARE ALL COOLER/FREEZER PANELS, GLASS DOORS, SLIDER OR SWING DOORS, PALLETIZE, AND PREPARE THE EQUIPMENT TO SHIP OFF SITE. 7. COORDINATE WITH FIRE PROTECTION CONTRACTOR FOR THE REMOVAL OF SPRINKLERS FOR ALL REMOVED COOLER/FREEZER BOXES. 8. COORDINATE WITH ELECTRICAL CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES ELECTRICAL WIRING DEVICES. 9. COORDINATE WITH BAS CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES BAS/LEAK DETECTION WIRING AND DEVICES. 10. BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. 11. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD OR REPLACE CASES, EVAPORATORS, ETC. THEN 24 TO 48 HOURS AFTER THE WORK IS COMPLETED AND ALL FINAL ADJUSTMENTS HAVE BEEN MADE, PROVIDE AND CHANGE LIQUID LINE FILTER CORES, OIL SYSTEM FILTER USING SPORLAN OF STYLE FILTER, AND REPLACE SUCTION FILTERS. FILTERS ARE TO BE RATED FOR WAX REMOVAL. CONTRACTOR TO PROPERLY DISPOSE OF OIL AND COMPONENTS REPLACED. REFER TO SPECIFICATION 15600. 12. INSTALL ASSET TAGS ON ALL NEW REFRIGERATED CASES AND COMPLETE THE DATA COLLECTION INFORMATION. DELETE DEMOED ASSETS FROM ASSET TAGGING APPLICATION. REFER TO SPECIFICATION 15050. 13. ALL EXISTING REFRIGERATED CASES ARE TO REMAIN UNLESS NOTED OTHERWISE. 14. 24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, HVAC SYSTEMS, OR BUILDING AUTOMATION CONTROLS SYSTEMS, SEND EMAIL TO NSRM@WALMART.COM. THE EMAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING. 01.31.25 KEYNOTES 15.625 PATCH ALL HOLES IN EXISTING WALK-IN PANELS FROM DEMOED UNIT COOLER REFRIGERANT PIPING, CONDENSATE PIPING, AND CONDUIT. REFER TO ARCHITECTURAL SHEETS. REFRIGERATION SYMBOLS RM-09.25.18 XXX XXX CIRCUIT NUMBER MODEL NUMBER (CIRCUIT INFO) CO CLEANOUT (CO) CONDENSATE DRAIN LINE (CD) CONNECT TO EXISTING CONTINUATION X XX DETAIL NUMBER SHEET NUMBER (DETAIL REFERENCE) EVAPORATOR COIL ISOLATION VALVE ELBOW - TURNED DOWN ELBOW - TURNED UP XX.XXX REFRIGERATION KEYNOTE REFERENCE REFRIGERATION PIPING (ABOVE) REFRIGERATION PIPING (BELOW) REFRIG PIPING CASE CONNECTION ETR (TYP) EXISTING TO REMAIN TYPICAL ISSUE BLOCK FLORI D No. 63660 L A STATE OFM YICHAE L J AMES AM E S TOPRROF ESSIONAL E N G INEEEICENSVOID