HomeMy WebLinkAboutRefrigeration Demo Plan - RD136FT -O5DM
(DEMO)
BS14
CONTRACTOR TO DEMO PIPING UP TO
PENETRATION. AT PENETRATION, DEMO
ALL PIPING BEFORE AND AFTER
PENETRATION EXCEPT SMALL SECTION OF
PIPING THROUGH PENETRATION. PINCH
BOTH SIDES OF THE SMALL SECTION OF
PIPING. FILL AND SEAL PENETRATION IF
NEEDED TO AVOID WATER/PEST
INTRUSION. IF ALL PIPING THROUGH
PENETRATION HAS BEEN ABANDONED,
THEN REMOVE ALL PIPING AND SEAL THE
ENTIRE PENETRATION.
1 2 3 4
E
F
G
H
24FT -DR6XN
(DEMO)
BS07
8FT -O5DM
(DEMO)
AS09
8FT -E2V
(DEMO)
CU-1
8FT -E2V
(DEMO)
AS06
12FT -ESBDS
(DEMO)
AS05
SM-134
(DEMO)
BS08
ADT-090
(DEMO)
BS09
32FT -DX6XN
(DEMO)
BS01
24FT -DX6XN
(DEMO)
BS02
36FT -DX6XN
(DEMO)
BS03
28FT -DX6XN
(DEMO)
BS04
32FT -O5DM
(DEMO)
BS05
24FT -O5DM
(DEMO)
BS06
TYP
15.625
TYP
15.625
DELI
COOLER
BAKERY
COOLER
CU-1 DX
(DEMO)
CU-1 MOUNTED ON ROOF.
COORDINATE WITH WALMART
CONSTRUCTION MANAGER FOR
INSTRUCTIONS TO SALVAGE OR
ABANDON IN PLACE. REFER TO
GENERAL REFRIGERATION DEMO
NOTES.
PATCH ROOF PENETRATION FOR
CU-1 ACCORDING TO SPECS AND
WALMART CONSTRUCTION
MANAGER.
DEMO REFRIGERATION PIPING FOR CIRCUITS
AS05 AND AS06 FROM CASES BACK TO SUB-
LOOP 1.13AS AT TRENCH OPENING. CAP
TRENCH PIPING AND ABANDON IN PLACE.
1.3AS 1.2AS
DEMO REFRIGERATION PIPING
FOR CIRCUIT AS09 FROM CASE
BACK TO MAIN LOOP. CONNECT
EXISTING PIPING 1.2AS TO 1.3AS.
BS14
BS14BS142BS2.1BS
DEMO REFRIGERATION PIPING
FOR CIRCUIT BS14 FROM CASES
BACK TO MAIN LOOP. CONNECT
EXISTING PIPING 2BS TO 2.1BS.
DEMO REFRIGERATION PIPING
FOR CIRCUIT BS14 FROM CASES
BACK TO MAIN LOOP. CONNECT
EXISTING PIPING 2BS TO 2.1BS.
1.13AS
DEMO ALL PIPING ASSOCIATED WITH LOOP
1BS IN ACCORDANCE WITH PHASED
INSTALLATION OF NEW EQUIPMENT.
ABANDON REFRIGERATION PIPING AND SEAL
PIT AS NECESSARY. CAP TRENCH PIPING AND
ABANDON IN PLACE.
SHEET:
DRAWN BY:
CHECKED BY:
PROTO CYCLE:
DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
DOCUMENTS WITHOUT
SIGNATURE AND REQUIRED
SEAL OF AOR/EOR ARE NOT
FOR CONSTRUCTION
RD1
REFRIGERATION
DEMO PLAN
DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.1/8" = 1'-0"1 REFRIGERATION DEMO PLAN
GENERAL REFRIGERATION
DEMO NOTES
1. COORDINATE REFRIGERATION DEMOLITION
ISSUES WITH THE ARCHITECTURAL DRAWINGS.
REFER TO ARCHITECTURAL PLANS FOR
REFRIGERATION EQUIPMENT DEMOLITION AND
COOLER REPAIR AND REMODELING.
2. REFRIGERATION SYSTEM SHALL REMAIN
OPERATIONAL DURING REMODELING. DURING
THE PHASING OF OLD TO NEW SYSTEMS, BOTH
NEW AND OLD REFRIGERATION SYSTEMS MAY
BE REQUIRED TO OPERATE AT THE SAME TIME
DURING CHANGEOVER.
3. WHERE NEW REFRIGERATED EQUIPMENT IS
INDICATED ON THE DRAWINGS, PROVIDE
DEMOLITION, REMOVAL, AND TEMPORARY
STORAGE OF OLD EQUIPMENT PER WALMART
MECHANICAL SERVICES CONSTRUCTION
MANAGER'S INSTRUCTIONS, AND
REFRIGERATION DEMO NOTES. ENSURE ALL
NEW EQUIPMENT AND PARTS NEEDED TO
COMPLETE THE INSTALLATION OF THE NEW
EQUIPMENT IS AT THE JOB SITE BEFORE
REMOVING ANY EXISTING EQUIPMENT.
4. COORDINATE REMOVAL AND DISPOSAL OF
EXISTING EVAPORATORS, REFRIGERATED
CASES, AND CONDENSING UNITS, WITH
WALMART MECHANICAL SERVICES
CONSTRUCTION MANAGER.
5. REMOVE COPPER LINES, EVAPORATORS, AND
CONDENSATE LINES FROM COOLERS/
FREEZERS BEING REMOVED FROM SITE.
COORDINATE WITH WALK-IN PANEL VENDOR
FOR TIME LINE OF REPLACEMENT. REFERENCE
SPECIFICATION FOR CONTACT INFORMATION.
6. WALK-IN PANEL VENDOR SHALL PROPERLY
PREPARE ALL COOLER/FREEZER PANELS,
GLASS DOORS, SLIDER OR SWING DOORS,
PALLETIZE, AND PREPARE THE EQUIPMENT TO
SHIP OFF SITE.
7. COORDINATE WITH FIRE PROTECTION
CONTRACTOR FOR THE REMOVAL OF
SPRINKLERS FOR ALL REMOVED
COOLER/FREEZER BOXES.
8. COORDINATE WITH ELECTRICAL CONTRACTOR
FOR THE REMOVAL OF ALL REMOVED
COOLER/FREEZER BOXES ELECTRICAL WIRING
DEVICES.
9. COORDINATE WITH BAS CONTRACTOR FOR THE
REMOVAL OF ALL REMOVED COOLER/FREEZER
BOXES BAS/LEAK DETECTION WIRING AND
DEVICES.
10. BUILDING COMPONENTS ABANDONED BY THE
SCOPE OF WORK SHALL BE SECURED TO
PREVENT FALLING, LOOSENING, OR CREATING
DAMAGE OF ANY KIND IN THE FUTURE.
11. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD
OR REPLACE CASES, EVAPORATORS, ETC. THEN
24 TO 48 HOURS AFTER THE WORK IS
COMPLETED AND ALL FINAL ADJUSTMENTS
HAVE BEEN MADE, PROVIDE AND CHANGE
LIQUID LINE FILTER CORES, OIL SYSTEM FILTER
USING SPORLAN OF STYLE FILTER, AND
REPLACE SUCTION FILTERS. FILTERS ARE TO BE
RATED FOR WAX REMOVAL. CONTRACTOR TO
PROPERLY DISPOSE OF OIL AND COMPONENTS
REPLACED. REFER TO SPECIFICATION 15600.
12. INSTALL ASSET TAGS ON ALL NEW
REFRIGERATED CASES AND COMPLETE THE
DATA COLLECTION INFORMATION. DELETE
DEMOED ASSETS FROM ASSET TAGGING
APPLICATION. REFER TO SPECIFICATION 15050.
13. ALL EXISTING REFRIGERATED CASES ARE TO
REMAIN UNLESS NOTED OTHERWISE.
14. 24 HOURS PRIOR TO SHUTTING DOWN ANY
REFRIGERATION SYSTEMS, HVAC SYSTEMS, OR
BUILDING AUTOMATION CONTROLS SYSTEMS,
SEND EMAIL TO NSRM@WALMART.COM. THE
EMAIL SHALL STATE WHAT, WHY, AND WHEN IT
IS BEING SHUT DOWN AND HOW LONG IT IS
ANTICIPATED TO BE SHUT DOWN. THEN SEND A
FOLLOW UP EMAIL TO NSRM@WALMART.COM
AFTER THE WORK IS COMPLETE AND THE
SYSTEM IS BACK UP AND RUNNING.
01.31.25
KEYNOTES
15.625 PATCH ALL HOLES IN EXISTING WALK-IN PANELS
FROM DEMOED UNIT COOLER REFRIGERANT
PIPING, CONDENSATE PIPING, AND CONDUIT.
REFER TO ARCHITECTURAL SHEETS.
REFRIGERATION SYMBOLS
RM-09.25.18
XXX
XXX
CIRCUIT NUMBER
MODEL NUMBER (CIRCUIT INFO)
CO CLEANOUT (CO)
CONDENSATE DRAIN LINE (CD)
CONNECT TO EXISTING
CONTINUATION
X
XX
DETAIL NUMBER
SHEET NUMBER
(DETAIL REFERENCE)
EVAPORATOR COIL
ISOLATION VALVE
ELBOW - TURNED DOWN
ELBOW - TURNED UP
XX.XXX REFRIGERATION KEYNOTE REFERENCE
REFRIGERATION PIPING (ABOVE)
REFRIGERATION PIPING (BELOW)
REFRIG PIPING CASE CONNECTION
ETR
(TYP)
EXISTING TO REMAIN
TYPICAL
ISSUE BLOCK
FLORI D
No. 63660
L
A
STATE OFM YICHAE L J AMES AM
E
S
TOPRROF