Loading...
HomeMy WebLinkAboutRefrigeration Details TCO2 - R3.3SUCTION RISER SUCTION MAIN LIQUID BRANCH LIQUID MAIN SUCTION LINES SHALL HAVE AN INVERTED TRAP REDUCE RISER SIZE AFTER BASE TRAP PROVIDE A P-TRAP AT THE BOTTOM OF THE RISER. PROVIDE AN INVERTED P-TRAP AT RISER TRANSITION TO HORIZONTAL LIQUID LINES BRANCHING FROM THE MAIN MUST EXIT FROM THE SIDE OF THE MAIN INVERTED P-TRAP SAME SIZE AS VERTICAL RISER MINIMUM DIST 6"ROOF MEMBRANE REFRIGERATION PIPING (TYP) CUSH-A-CLAMP FIRMLY CLAMPED TO PIPE (TYP) UNISTRUT P-1000 (TYP.)DURA-BLOK DB6-SERIES OR EQUIVALENT CHANNEL SUPPORT. (TYP) SIDE VIEW SECTION VIEW RUN CONDUIT ON UNISTRUT AS NEEDED REFER TO SPECIFICATIONS FOR PIPING SUPPORT SPACING REQUIREMENTS. DO NOT ATTACH BLOCK TO ROOF. PROVIDE 60 MIL WHITE TPO MEMBRANE SET ON BARE ROOF MEMBRANE FROM SYSTEM TO CASE/EVAPORATOR TO SYSTEM FROM CASE/EVAPORATOR TO SYSTEMFROM SYSTEM BALL VALVE WITH INTEGRATED PRESSURE RELIEF (TYP) RETURN/SUCTION LINE ISOLATION CHECK VALVE SUPPLY/LIQUID LINE ISOLATION CHECK VALVE TO CASE/EVAPORATOR FROM CASE/EVAPORATOR COMPONENTS INSIDE DASHED LINES ARE FIELD-ASSEMBLED.NORMAL DIRECTION OF REFRIGERANT FLOW (TYP) INSTALL PACKED LINE ANGLE VALVE FOR SERVICE. BALL VALVE. INSTALL PACKED LINE ANGLE VALVE FOR SERVICE. RETURN/SUCTION LINE ISOLATION CHECK VALVE SUPPLY/LIQUID LINE ISOLATION CHECK VALVE REFER TO REFRIGERATION PIPING AND VALVE SCHEDULES FOR VALVE LOCATIONS QUANTITIES. INTERNAL CHECK VALVE (SPORLAN MODEL EBV - REQUIRED FOR LINES 1 1/8'' AND SMALLER) EXTERNAL CHECK VALVE (FOR LINES GREATER THAN 1 1/8") REFER TO REFRIGERATION PIPING AND VALVE SCHEDULES FOR VALVE LOCATIONS QUANTITIES. NOTES: 1.PROVIDE INSULATION THAT COMPLETELY ENCAPSULATES ALL SURFACES. REFER TO SPECIFICATIONS. 2.ISOLATION CHECK VALVES MUST BE ORIENTED WITH CHECK VALVE (INTERNAL OR EXTERNAL) ALLOWING FLOW AWAY FROM UNIT COOLER AND BACK TO SECONDARY PUMP SKID OR RACK SYSTEM. 3.REFERENCE PARTS AND EQUIPMENT RESPONSIBILITY MATRIX FOR ALL LOOSE PARTS AND EQUIPMENT. PROVIDE 1/2" ISOLATION BALL VALVE. (TYP) PROVIDE 650 PSIG SERVICE PRESSURE RELIEF VALVE ON ROOF. LOCATE VALVE AT LEAST 20 FT FROM ANY RTU, AHU OR EXHAUST FAN. MOUNT VERTICALLY. (TYP) PIPE SUPPORT. REFER TO HORIZONTAL REFRIGERANT LINE SUPPORT DETAIL ROOF OPENING TO ACCOMMODATE REFRIGERATION PIPING. REFER TO ARCH AND REFRIG PLANS. REFER TO ARCHITECTURAL DETAIL FOR INSTALLATION OF MANUFACTURED METAL CURB, INSULATION, AND SHEET METAL ENCLOSURE SUPPORT PIPING ON ROOF. REFER TO REFRIGERATION PIPING SUPPORT DETAIL. VERTICAL PIPING SUPPORT. REFER TO VERTICAL REFRIGERANT LINE SUPPORT DETAIL CONTRACTOR PROVIDED FILTER DRIER TO BE USED DURING SYSTEM CHARGING. REMOVE FILTER DRIER AFTER USE. PROVIDE 1/2" FLARE MALE CONNECTION. CAP WITH CHAIN WHEN NOT IN USE. INSTALL EQUIPMENT AT 30" AFF. CONNECTION SHALL TERMINATE OUTWARD, AWAY FROM WALL. PROVIDE 1/4" FLARE ACCESS PORT. (TYP) PROVIDE 1/4" FLARE ACCESS PORT. PROVIDE 1/2" FLARE MALE CONNECTION. CONNECTION SHALL BE EQUAL TO OR HIGHER THAN THE TOP MOST SIGHT GLASS ON THE CO2 VESSEL. CAP WITH CHAIN WHEN NOT IN USE. (TYP) PROVIDE 1/2" COPPER PIPING FROM CO2 CHARGING STATION TO PUMP SKID. PROVIDE RIGID PVC SIGN WITH PRINT TEXT, MINIMUM 2" TEXT HEIGHT. SIGN SHALL BE LOCATED NEXT TO THE CO2 CHARGING STATION AND READ: "ALWAYS CHARGE SECONDARY CO2 SYSTEMS THROUGH A FILTER DRIER. DO NOT TRAP LIQUID BY CLOSING CHARGING STATION AND ISOLATION VALVES WHEN SERVICING. ALWAYS VACUUM CHARGING LINE AFTER CHARGING IS COMPLETE. CHARGE SECONDARY CO2 SYSTEMS WITH 99.99% PURE OR HIGHER FOOD AND BEVERAGE GRADE CO2" PROVIDE SPARE AND CAP END FOR FUTURE USE. (TYP) REFERENCE UNISTRUT PIPING SUPPORT DETAIL. TYPICAL OF EACH CHARGING LINE TO PUMP SKID, PACK, OR CU. PROVIDE PIPE LABELS AT EACH CONNECTION WITH SYSTEM NAME TO BE CONNECTED. LABEL CO2 CHARGING LINE. REFER TO PIPE LABEL DETAIL FOR LABELING REQUIREMENTS. (TYP) 6" REFERENCE PARTS AND EQUIPMENT RESPONSIBILITY MATRIX FOR ALL LOOSE PARTS AND EQUIPMENT. SIDE VIEW NEW CHARGING STATION PIPING. (TYP) PROVIDE RIGID PVC SIGN WITH PRINT TEXT, MINIMUM 2" TEXT HEIGHT. SIGN SHALL BE LOCATED NEXT TO THE CO2 CHARGING STATION AND READ: "ALWAYS CHARGE TRANSCRITICAL CO2 SYSTEMS THROUGH A FILTER DRIER. DO NOT TRAP LIQUID BY CLOSING CHARGING STATION AND ISOLATION VALVES WHEN SERVICING. ALWAYS VACUUM CHARGING LINE AFTER CHARGING IS COMPLETE. CHARGE TRANSCRITICAL CO2 SYSTEMS WITH 99.99% PURE OR HIGHER REFRIGERANT GRADE R-744" BOLLARD. REFER TO ARCH. (TYP) ROUTE PIPING THROUGH NEW OR EXISTING WALL PENETRATIONS. REFER TO ARCH AND STRUCTURAL. CU CHARGING BRANCH LINES. SUCTION LINE LIQUID LINE ROUTE LIQUID AND SUCTION HEADERS ON TOP OF CASES WHERE POSSIBLE. SPACE AT 4' INTERVALS. (TYP) ADJUST LOCATION OF DROPS AS REQUIRED. (TYP) PROVIDE TRAP AT BASE. (TYP) REFRIGERATED CASE MANUFACTURER TO PROVIDED TOP CONNECTED CASES, AND NSF INSULATION FOR EACH CASE. REF SPECIFICATIONS. FRONT OF REFRIGERATED CASE. INSTALL CIRCUIT LIQUID AND SUCTION ISOLATION CHECK VALVES. REFER TO CO2 ISOLATION CHECK VALVES DETAIL. (TOP OF CASE) 1" EXPANDED POLYSTYRENE OR EQUAL. TYP VALANCE FURNISHED BY CASE MANUFACTURER, INSTALLED BY REFRIGERATION CONTRACTOR. REAR HALF OF REFRIGERATED CASE DESIGNATED FOR PIPING AND VALVES. FRONT HALF OF REFRIGERATED CASE DESIGNATED FOR ELECTRICAL AND BAS COMPONENTS. DO NOT BLOCK BAS COMPONENTS OR COVERS. INSTALL CASE SUCTION PIPING TO ALLOW GRAVITY DRAINAGE OF OIL BACK TO THE BASE TRAP AT THE BOTTOM OF THE SUCTION RISER. INSTALL LIQUID PIPING TO ALLOW REQUIRED ROUTING OF CASE SUCTION PIPING. SUCTION SUB-LOOP BRANCH LIQUID SUB-LOOP BRANCH DROP CIRCUIT SUCTION LINE INTO TOP OF SUCTION SUB-LOOP BRANCH. REF CO2 PIPING DETAILS INSTALL LIQUID AND SUCTION SUB-LOOP ISOLATION CHECK VALVES. REFER TO PLANS FOR LOCATIONS. 6" MINIMUM WIDTH. LENGTH AS REQUIRED. TYP CONTINUES TO ADDITIONAL CIRCUITS ON SUB-LOOP SUCTION AND LIQUID LINES FOR SECOND CIRCUIT ON SUB-LOOP MAIN SUCTION AND LIQUID BRANCH CONTINUES TO RACK INSTALL ISOLATION CHECK VALVES APPROXIMATELY 2' ABOVE TOP OF CASE TYP REFERENCE PARTS AND EQUIPMENT RESPONSIBILITY MATRIX FOR ALL LOOSE PARTS AND EQUIPMENT. INSTALL LIQUID LINE WITH BULLHEAD TEES AT CASES PER SPECIFICATIONS. (TYP) NTS1PIPING DETAILS (TCO2) NTS2REFRIGERATION PIPING SUPPORT (ON ROOF)(DX)(TCO2) SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. DOCUMENTS WITHOUT SIGNATURE AND REQUIRED SEAL OF AOR/EOR ARE NOT FOR CONSTRUCTION R3.3 REFRIGERATION DETAILS TCO2 DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.NTS3ISOLATION CHECK VALVES (TCO2) NTS4CHARGING STATION (CO2) NTS5CASE PIPING (TCO2) (VERTICAL OPTION) ISSUE BLOCK FLORI D No. 63660 L A STATE OFM YICHAE L J AMES AM E S TOPRROF ESSIONAL E N G INEEEICENSVOID