HomeMy WebLinkAboutRefrigeration Overall Plan (Roof Mounted) - R1SSLSSLSSL
BBB
B B B
BB
AWS
1 2 3 4 5
C
D
E
F
G
H
I
J
REFRIGERATION
ROOF PENETRATION
NEW
CU5 TCO2
ELECTRICAL ROOF
PENETRATION
ETR
DTB DX
REFRIGERATION
ROOF PENETRATION
ETR
DTA DX
NEW
DTB GLY
GLYCOL
EMERGENCY
CHILLER
CONNECTION
R1.3
2
R1.3
1
1 2 3 4 5
C
D
E
F
G
H
I
J
DRAIN PAN
NEW
CU5 TCO2
ELECTRICAL ROOF
PENETRATION
ETR
DTB DX
REFRIGERATION
ROOF PENETRATION
ETR
DTA DX
NEW
DTB GLY
NEW CO2
CHARGING STATION
GLYCOL EMERGENCY
CHILLER CONNECTION
(ON ROOF)
R1.1
2
R1.1
1
NEW GLYCOL
CHARGING STATION
REFRIGERATION WALL
PENETRATION
SHEET:
DRAWN BY:
CHECKED BY:
PROTO CYCLE:
DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
DOCUMENTS WITHOUT
SIGNATURE AND REQUIRED
SEAL OF AOR/EOR ARE NOT
FOR CONSTRUCTION
R1
REFRIGERATION
OVERALL
PLANS
(ROOF
MOUNTED)
DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL
FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO
REFRIGERATION EQUIPMENT.
SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE-SKIN
OF EXISTING REFRIGERATED CASES TO REMAIN.
ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A
WALMART APPROVED CONTRACTOR.
REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW
CASES BEING INSTALLED FOR CONNECTION LOCATION OF
UTILITIES. (TOP FED VS BOTTOM FED)
VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES
WITH FINAL MERCHANDISE PLAN.
COORDINATE LOCATION OF REFRIGERATED CASES WITH
PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR
AND SETTING DRAINS.
REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED
FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT
LIMITED TO): REFRIGERATED CASES, WALK-IN COILS,
ASSOCIATED VALVES, REFRIGERATION AND
CONDENSATE PIPING, HANGERS AND SUPPORTS, AND
CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL
OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH
PENETRATIONS TO MATCH EXISTING. REFER TO
ARCHITECTURAL DRAWINGS.
ALL EXISTING REFRIGERATED CASES ARE TO REMAIN
UNLESS NOTED OTHERWISE.
PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING
RACK PARAMETERS, REFRIGERATION CONTRACTOR
SHALL REQUEST A SUCTION GROUP REPORT FOR ALL
RACKS AND SUCTION GROUPS WHERE WORK IS
PERFORMED. REQUEST VIA EMAIL AT
B.PTEAM1@WAL-MART.COM
REFRIGERATION SYMBOLS
RM-09.25.18
XXX
XXX
CIRCUIT NUMBER
MODEL NUMBER (CIRCUIT INFO)
CO CLEANOUT (CO)
CONDENSATE DRAIN LINE (CD)
CONNECT TO EXISTING
CONTINUATION
X
XX
DETAIL NUMBER
SHEET NUMBER
(DETAIL REFERENCE)
EVAPORATOR COIL
ISOLATION VALVE
ELBOW - TURNED DOWN
ELBOW - TURNED UP
XX.XXX REFRIGERATION KEYNOTE REFERENCE
REFRIGERATION PIPING (ABOVE)
REFRIGERATION PIPING (BELOW)
REFRIG PIPING CASE CONNECTION
ETR
(TYP)
EXISTING TO REMAIN
TYPICAL
GENERAL NOTES
1. PLANS INDICATE GENERAL ROUTING OF
REFRIGERANT LINES, WITH A SINGLE LINE
SHOWN INDICATING BOTH SUCTION AND LIQUID
LINE ROUTING FOR EACH SYSTEM.
2. REFRIGERATION SYSTEM INSTALLATION SHALL
BE IN COMPLETE CONFORMANCE WITH
SPECIFICATIONS, AND WITH ALL REQUIREMENTS
OF REFRIGERATION EQUIPMENT
MANUFACTURER.
3. REFRIGERATION DRAWINGS ARE PROVIDED AS
AN AID TO BIDDERS AND TO INDICATE DESIRED
ROUTING OF REFRIGERATION LINES;
CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR CORRECT INSTALLATION
OF PIPING AND ACCESSORIES TO PROVIDE A
COMPLETE AND FULLY OPERATING SYSTEM.
4. REFER TO SPECIFICATION 15600 FOR
INSULATION THICKNESS. INSIDE DIAMETER OF
INSULATION SHALL MATCH PIPE DIAMETER TO
MINIMIZE AIR GAPS BETWEEN PIPING AND
INSULATION. PROVIDE FACTORY PRE-
MANUFACTURED FITTINGS AT ALL TRAPS AND
ELBOWS. WHERE PRE-MANUFACTURED
FITTINGS ARE UNAVAILABLE MITER CUT ALL
FITTINGS TO ENSURE PROPER SEAL BETWEEN
INSULATION SEGMENTS.
5. PIPE INSULATION SHALL BE BLACK, UNLESS
OTHERWISE STATED ON PLANS OR
SPECIFICATIONS.
6. COORDINATE REFRIGERATION DEMOLITION
ISSUES WITH THE ARCHITECTURAL DRAWINGS.
REFER TO ARCHITECTURAL PLANS FOR
REFRIGERATION EQUIPMENT DEMOLITION AND
COOLER REPAIR AND REMODELING.
7. REFRIGERATION SYSTEM SHALL REMAIN
OPERATIONAL DURING REMODELING. DURING
THE PHASING OF OLD TO NEW SYSTEMS, BOTH
NEW AND OLD REFRIGERATION SYSTEMS MAY
BE REQUIRED TO OPERATE AT THE SAME TIME
FOR A SHORT PERIOD.
8. WHERE NEW REFRIGERATED EQUIPMENT IS
INDICATED ON THE DRAWINGS, PROVIDE
DEMOLITION, REMOVAL, AND TEMPORARY
STORAGE OF OLD EQUIPMENT PER WALMART
MECHANICAL SERVICES CONSTRUCTION
MANAGER'S INSTRUCTIONS, AND
REFRIGERATION DEMO NOTES.
9. COORDINATE REMOVAL AND DISPOSAL OF
EXISTING EVAPORATORS, REFRIGERATED
CASES, AND CONDENSING UNITS, WITH
WALMART MECHANICAL SERVICES
CONSTRUCTION MANAGER.
10. REMOVE COPPER LINES, EVAPORATORS, AND
CONDENSATE LINES FROM COOLERS/
FREEZERS BEING REMOVED FROM SITE.
COORDINATE WITH WALK-IN PANEL VENDOR
FOR TIME LINE OF REPLACEMENT. REFERENCE
SPECIFICATION FOR CONTACT INFORMATION.
11. WALK-IN PANEL VENDOR SHALL PROPERLY
PREPARE ALL COOLER/FREEZER PANELS,
GLASS DOORS, SLIDER OR SWING DOORS,
PALLETIZE, AND PREPARE THE EQUIPMENT TO
SHIP OFF SITE.
12. COORDINATE WITH FIRE PROTECTION
CONTRACTOR FOR THE REMOVAL OF
SPRINKLERS FOR ALL REMOVED
COOLER/FREEZER BOXES.
13. COORDINATE WITH ELECTRICAL CONTRACTOR
FOR THE REMOVAL OF ALL REMOVED
COOLER/FREEZER BOXES ELECTRICAL WIRING
DEVICES.
14. COORDINATE WITH BAS CONTRACTOR FOR THE
REMOVAL OF ALL REMOVED COOLER/FREEZER
BOXES BAS WIRING AND DEVICES.
15. EXISTING REFRIGERATION PIPING MAY BE RE-
USED UNLESS OTHERWISE NOTED ON PLANS.
REFER TO SCHEDULES FOR PIPE SIZE
REQUIREMENTS.
16. BUILDING COMPONENTS ABANDONED BY THE
SCOPE OF WORK SHALL BE SECURED TO
PREVENT FALLING, LOOSENING, OR CREATING
DAMAGE OF ANY KIND IN THE FUTURE.
17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD
OR REPLACE CASES, EVAPORATORS, ETC. THEN
24 TO 48 HOURS AFTER THE WORK IS
COMPLETED AND ALL FINAL ADJUSTMENTS
HAVE BEEN MADE, PROVIDE AND CHANGE
LIQUID LINE FILTER CORES, OIL SYSTEM FILTER
USING SPORLAN OF STYLE FILTER, AND
REPLACE SUCTION FILTERS. FILTERS ARE TO BE
RATED FOR WAX REMOVAL. CONTRACTOR TO
PROPERLY DISPOSE OF OIL AND COMPONENTS
REPLACED. REFER TO SPECIFICATION 15600.
18. REFER TO GROCERY ARCHITECTURAL
DRAWINGS FOR ADDITIONAL WORK BY
REFRIGERATION CONTRACTOR.
19. INSTALL ASSET TAGS ON ALL NEW
REFRIGERATED CASES AND COMPLETE THE
DATA COLLECTION INFORMATION. DELETE
DEMOED ASSETS FROM ASSET TAGGING
APPLICATION. REFER TO SPECIFICATIONS.
20. UPON START-UP OF ALL NEW REFRIGERATED
EQUIPMENT, CONSTRUCTION MANAGER SHALL
REQUEST THE BUILDING PERFORMANCE
REPORT FOR ALL RACKS AND SUCTION GROUPS
WHERE WORK IS PERFORMED. ANY DEVIATIONS
NOTED ON THE REPORT MUST BE CORRECTED
PRIOR TO PROJECT CLOSE OUT. REQUEST VIA
EMAIL AT B.PTEAM1@WAL-MART.COM
07.31.20
1" = 20'-0"2 REFRIGERATION OVERALL ROOF PLAN
1" = 20'-0"1 REFRIGERATION OVERALL GROCERY PLAN
ISSUE BLOCK
FLORI D
No. 63660
L
A
STATE OFM YICHAE L J AMES AM
E
S
TOPRROF
ESSIONAL E N G INEEEICENSVOID