HomeMy WebLinkAboutRefrigeration Plans - RD1, R1, R1.1, R3.2, R3.336FT -O5DM (DEMO) BS14 CONTRACTOR TO DEMO PIPING UP TO PENETRATION. AT PENETRATION, DEMO ALL PIPING BEFORE AND AFTER PENETRATION EXCEPT SMALL SECTION OF PIPING THROUGH PENETRATION. PINCH BOTH SIDES OF THE SMALL SECTION OF PIPING. FILL AND SEAL PENETRATION IF NEEDED TO AVOID WATER/PEST INTRUSION. IF ALL PIPING THROUGH PENETRATION HAS BEEN ABANDONED, THEN REMOVE ALL PIPING AND SEAL THE ENTIRE PENETRATION. 1 2 3 4 E F G H 24FT -DR6XN (DEMO) BS07 8FT -O5DM (DEMO) AS09 8FT -E2V (DEMO) CU-1 8FT -E2V (DEMO) AS06 12FT -ESBDS (DEMO) AS05 SM-134 (DEMO) BS08 ADT-090 (DEMO) BS09 32FT -DX6XN (DEMO) BS01 24FT -DX6XN (DEMO) BS02 36FT -DX6XN (DEMO) BS03 28FT -DX6XN (DEMO) BS04 32FT -O5DM (DEMO) BS05 24FT -O5DM (DEMO) BS06 TYP 15.625 TYP 15.625 DELI COOLER BAKERY COOLER CU-1 DX (DEMO) CU-1 MOUNTED ON ROOF. COORDINATE WITH WALMART CONSTRUCTION MANAGER FOR INSTRUCTIONS TO SALVAGE OR ABANDON IN PLACE. REFER TO GENERAL REFRIGERATION DEMO NOTES. PATCH ROOF PENETRATION FOR CU-1 ACCORDING TO SPECS AND WALMART CONSTRUCTION MANAGER. DEMO REFRIGERATION PIPING FOR CIRCUITS AS05 AND AS06 FROM CASES BACK TO SUB- LOOP 1.13AS AT TRENCH OPENING. CAP TRENCH PIPING AND ABANDON IN PLACE. 1.3AS 1.2AS DEMO REFRIGERATION PIPING FOR CIRCUIT AS09 FROM CASE BACK TO MAIN LOOP. CONNECT EXISTING PIPING 1.2AS TO 1.3AS. BS14 BS14BS142BS2.1BS DEMO REFRIGERATION PIPING FOR CIRCUIT BS14 FROM CASES BACK TO MAIN LOOP. CONNECT EXISTING PIPING 2BS TO 2.1BS. DEMO REFRIGERATION PIPING FOR CIRCUIT BS14 FROM CASES BACK TO MAIN LOOP. CONNECT EXISTING PIPING 2BS TO 2.1BS. 1.13AS DEMO ALL PIPING ASSOCIATED WITH LOOP 1BS IN ACCORDANCE WITH PHASED INSTALLATION OF NEW EQUIPMENT. ABANDON REFRIGERATION PIPING AND SEAL PIT AS NECESSARY. CAP TRENCH PIPING AND ABANDON IN PLACE. SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. DOCUMENTS WITHOUT SIGNATURE AND REQUIRED SEAL OF AOR/EOR ARE NOT FOR CONSTRUCTION RD1 REFRIGERATION DEMO PLAN DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.1/8" = 1'-0"1 REFRIGERATION DEMO PLAN GENERAL REFRIGERATION DEMO NOTES 1. COORDINATE REFRIGERATION DEMOLITION ISSUES WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL PLANS FOR REFRIGERATION EQUIPMENT DEMOLITION AND COOLER REPAIR AND REMODELING. 2. REFRIGERATION SYSTEM SHALL REMAIN OPERATIONAL DURING REMODELING. DURING THE PHASING OF OLD TO NEW SYSTEMS, BOTH NEW AND OLD REFRIGERATION SYSTEMS MAY BE REQUIRED TO OPERATE AT THE SAME TIME DURING CHANGEOVER. 3. WHERE NEW REFRIGERATED EQUIPMENT IS INDICATED ON THE DRAWINGS, PROVIDE DEMOLITION, REMOVAL, AND TEMPORARY STORAGE OF OLD EQUIPMENT PER WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER'S INSTRUCTIONS, AND REFRIGERATION DEMO NOTES. ENSURE ALL NEW EQUIPMENT AND PARTS NEEDED TO COMPLETE THE INSTALLATION OF THE NEW EQUIPMENT IS AT THE JOB SITE BEFORE REMOVING ANY EXISTING EQUIPMENT. 4. COORDINATE REMOVAL AND DISPOSAL OF EXISTING EVAPORATORS, REFRIGERATED CASES, AND CONDENSING UNITS, WITH WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. 5. REMOVE COPPER LINES, EVAPORATORS, AND CONDENSATE LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. COORDINATE WITH WALK-IN PANEL VENDOR FOR TIME LINE OF REPLACEMENT. REFERENCE SPECIFICATION FOR CONTACT INFORMATION. 6. WALK-IN PANEL VENDOR SHALL PROPERLY PREPARE ALL COOLER/FREEZER PANELS, GLASS DOORS, SLIDER OR SWING DOORS, PALLETIZE, AND PREPARE THE EQUIPMENT TO SHIP OFF SITE. 7. COORDINATE WITH FIRE PROTECTION CONTRACTOR FOR THE REMOVAL OF SPRINKLERS FOR ALL REMOVED COOLER/FREEZER BOXES. 8. COORDINATE WITH ELECTRICAL CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES ELECTRICAL WIRING DEVICES. 9. COORDINATE WITH BAS CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES BAS/LEAK DETECTION WIRING AND DEVICES. 10. BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. 11. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD OR REPLACE CASES, EVAPORATORS, ETC. THEN 24 TO 48 HOURS AFTER THE WORK IS COMPLETED AND ALL FINAL ADJUSTMENTS HAVE BEEN MADE, PROVIDE AND CHANGE LIQUID LINE FILTER CORES, OIL SYSTEM FILTER USING SPORLAN OF STYLE FILTER, AND REPLACE SUCTION FILTERS. FILTERS ARE TO BE RATED FOR WAX REMOVAL. CONTRACTOR TO PROPERLY DISPOSE OF OIL AND COMPONENTS REPLACED. REFER TO SPECIFICATION 15600. 12. INSTALL ASSET TAGS ON ALL NEW REFRIGERATED CASES AND COMPLETE THE DATA COLLECTION INFORMATION. DELETE DEMOED ASSETS FROM ASSET TAGGING APPLICATION. REFER TO SPECIFICATION 15050. 13. ALL EXISTING REFRIGERATED CASES ARE TO REMAIN UNLESS NOTED OTHERWISE. 14. 24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, HVAC SYSTEMS, OR BUILDING AUTOMATION CONTROLS SYSTEMS, SEND EMAIL TO NSRM@WALMART.COM. THE EMAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING. 01.31.25 KEYNOTES 15.625 PATCH ALL HOLES IN EXISTING WALK-IN PANELS FROM DEMOED UNIT COOLER REFRIGERANT PIPING, CONDENSATE PIPING, AND CONDUIT. REFER TO ARCHITECTURAL SHEETS. REFRIGERATION SYMBOLS RM-09.25.18 XXX XXX CIRCUIT NUMBER MODEL NUMBER (CIRCUIT INFO) CO CLEANOUT (CO) CONDENSATE DRAIN LINE (CD) CONNECT TO EXISTING CONTINUATION X XX DETAIL NUMBER SHEET NUMBER (DETAIL REFERENCE) EVAPORATOR COIL ISOLATION VALVE ELBOW - TURNED DOWN ELBOW - TURNED UP XX.XXX REFRIGERATION KEYNOTE REFERENCE REFRIGERATION PIPING (ABOVE) REFRIGERATION PIPING (BELOW) REFRIG PIPING CASE CONNECTION ETR (TYP) EXISTING TO REMAIN TYPICAL ISSUE BLOCK FLORI D No. 63660 L A STATE OFM YICHAE L J AMES AM E S TOPRROF ESSIONAL E N G INEEEICENS Not part of this application. A permit application shall be submitted for interior remodeling. SSLSSLSSL BBB B B B BB AWS 1 2 3 4 5 C D E F G H I J REFRIGERATION ROOF PENETRATION NEW CU5 TCO2 ELECTRICAL ROOF PENETRATION ETR DTB DX REFRIGERATION ROOF PENETRATION ETR DTA DX NEW DTB GLY GLYCOL EMERGENCY CHILLER CONNECTION R1.3 2 R1.3 1 1 2 3 4 5 C D E F G H I J DRAIN PAN NEW CU5 TCO2 ELECTRICAL ROOF PENETRATION ETR DTB DX REFRIGERATION ROOF PENETRATION ETR DTA DX NEW DTB GLY NEW CO2 CHARGING STATION GLYCOL EMERGENCY CHILLER CONNECTION (ON ROOF) R1.1 2 R1.1 1 NEW GLYCOL CHARGING STATION REFRIGERATION WALL PENETRATION SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. DOCUMENTS WITHOUT SIGNATURE AND REQUIRED SEAL OF AOR/EOR ARE NOT FOR CONSTRUCTION R1 REFRIGERATION OVERALL PLANS (ROOF MOUNTED) DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO REFRIGERATION EQUIPMENT. SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE-SKIN OF EXISTING REFRIGERATED CASES TO REMAIN. ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A WALMART APPROVED CONTRACTOR. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW CASES BEING INSTALLED FOR CONNECTION LOCATION OF UTILITIES. (TOP FED VS BOTTOM FED) VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES WITH FINAL MERCHANDISE PLAN. COORDINATE LOCATION OF REFRIGERATED CASES WITH PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR AND SETTING DRAINS. REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT LIMITED TO): REFRIGERATED CASES, WALK-IN COILS, ASSOCIATED VALVES, REFRIGERATION AND CONDENSATE PIPING, HANGERS AND SUPPORTS, AND CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH PENETRATIONS TO MATCH EXISTING. REFER TO ARCHITECTURAL DRAWINGS. ALL EXISTING REFRIGERATED CASES ARE TO REMAIN UNLESS NOTED OTHERWISE. PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING RACK PARAMETERS, REFRIGERATION CONTRACTOR SHALL REQUEST A SUCTION GROUP REPORT FOR ALL RACKS AND SUCTION GROUPS WHERE WORK IS PERFORMED. REQUEST VIA EMAIL AT B.PTEAM1@WAL-MART.COM REFRIGERATION SYMBOLS RM-09.25.18 XXX XXX CIRCUIT NUMBER MODEL NUMBER (CIRCUIT INFO) CO CLEANOUT (CO) CONDENSATE DRAIN LINE (CD) CONNECT TO EXISTING CONTINUATION X XX DETAIL NUMBER SHEET NUMBER (DETAIL REFERENCE) EVAPORATOR COIL ISOLATION VALVE ELBOW - TURNED DOWN ELBOW - TURNED UP XX.XXX REFRIGERATION KEYNOTE REFERENCE REFRIGERATION PIPING (ABOVE) REFRIGERATION PIPING (BELOW) REFRIG PIPING CASE CONNECTION ETR (TYP) EXISTING TO REMAIN TYPICAL GENERAL NOTES 1. PLANS INDICATE GENERAL ROUTING OF REFRIGERANT LINES, WITH A SINGLE LINE SHOWN INDICATING BOTH SUCTION AND LIQUID LINE ROUTING FOR EACH SYSTEM. 2. REFRIGERATION SYSTEM INSTALLATION SHALL BE IN COMPLETE CONFORMANCE WITH SPECIFICATIONS, AND WITH ALL REQUIREMENTS OF REFRIGERATION EQUIPMENT MANUFACTURER. 3. REFRIGERATION DRAWINGS ARE PROVIDED AS AN AID TO BIDDERS AND TO INDICATE DESIRED ROUTING OF REFRIGERATION LINES; CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR CORRECT INSTALLATION OF PIPING AND ACCESSORIES TO PROVIDE A COMPLETE AND FULLY OPERATING SYSTEM. 4. REFER TO SPECIFICATION 15600 FOR INSULATION THICKNESS. INSIDE DIAMETER OF INSULATION SHALL MATCH PIPE DIAMETER TO MINIMIZE AIR GAPS BETWEEN PIPING AND INSULATION. PROVIDE FACTORY PRE- MANUFACTURED FITTINGS AT ALL TRAPS AND ELBOWS. WHERE PRE-MANUFACTURED FITTINGS ARE UNAVAILABLE MITER CUT ALL FITTINGS TO ENSURE PROPER SEAL BETWEEN INSULATION SEGMENTS. 5. PIPE INSULATION SHALL BE BLACK, UNLESS OTHERWISE STATED ON PLANS OR SPECIFICATIONS. 6. COORDINATE REFRIGERATION DEMOLITION ISSUES WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL PLANS FOR REFRIGERATION EQUIPMENT DEMOLITION AND COOLER REPAIR AND REMODELING. 7. REFRIGERATION SYSTEM SHALL REMAIN OPERATIONAL DURING REMODELING. DURING THE PHASING OF OLD TO NEW SYSTEMS, BOTH NEW AND OLD REFRIGERATION SYSTEMS MAY BE REQUIRED TO OPERATE AT THE SAME TIME FOR A SHORT PERIOD. 8. WHERE NEW REFRIGERATED EQUIPMENT IS INDICATED ON THE DRAWINGS, PROVIDE DEMOLITION, REMOVAL, AND TEMPORARY STORAGE OF OLD EQUIPMENT PER WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER'S INSTRUCTIONS, AND REFRIGERATION DEMO NOTES. 9. COORDINATE REMOVAL AND DISPOSAL OF EXISTING EVAPORATORS, REFRIGERATED CASES, AND CONDENSING UNITS, WITH WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. 10. REMOVE COPPER LINES, EVAPORATORS, AND CONDENSATE LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. COORDINATE WITH WALK-IN PANEL VENDOR FOR TIME LINE OF REPLACEMENT. REFERENCE SPECIFICATION FOR CONTACT INFORMATION. 11. WALK-IN PANEL VENDOR SHALL PROPERLY PREPARE ALL COOLER/FREEZER PANELS, GLASS DOORS, SLIDER OR SWING DOORS, PALLETIZE, AND PREPARE THE EQUIPMENT TO SHIP OFF SITE. 12. COORDINATE WITH FIRE PROTECTION CONTRACTOR FOR THE REMOVAL OF SPRINKLERS FOR ALL REMOVED COOLER/FREEZER BOXES. 13. COORDINATE WITH ELECTRICAL CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES ELECTRICAL WIRING DEVICES. 14. COORDINATE WITH BAS CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES BAS WIRING AND DEVICES. 15. EXISTING REFRIGERATION PIPING MAY BE RE- USED UNLESS OTHERWISE NOTED ON PLANS. REFER TO SCHEDULES FOR PIPE SIZE REQUIREMENTS. 16. BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. 17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD OR REPLACE CASES, EVAPORATORS, ETC. THEN 24 TO 48 HOURS AFTER THE WORK IS COMPLETED AND ALL FINAL ADJUSTMENTS HAVE BEEN MADE, PROVIDE AND CHANGE LIQUID LINE FILTER CORES, OIL SYSTEM FILTER USING SPORLAN OF STYLE FILTER, AND REPLACE SUCTION FILTERS. FILTERS ARE TO BE RATED FOR WAX REMOVAL. CONTRACTOR TO PROPERLY DISPOSE OF OIL AND COMPONENTS REPLACED. REFER TO SPECIFICATION 15600. 18. REFER TO GROCERY ARCHITECTURAL DRAWINGS FOR ADDITIONAL WORK BY REFRIGERATION CONTRACTOR. 19. INSTALL ASSET TAGS ON ALL NEW REFRIGERATED CASES AND COMPLETE THE DATA COLLECTION INFORMATION. DELETE DEMOED ASSETS FROM ASSET TAGGING APPLICATION. REFER TO SPECIFICATIONS. 20. UPON START-UP OF ALL NEW REFRIGERATED EQUIPMENT, CONSTRUCTION MANAGER SHALL REQUEST THE BUILDING PERFORMANCE REPORT FOR ALL RACKS AND SUCTION GROUPS WHERE WORK IS PERFORMED. ANY DEVIATIONS NOTED ON THE REPORT MUST BE CORRECTED PRIOR TO PROJECT CLOSE OUT. REQUEST VIA EMAIL AT B.PTEAM1@WAL-MART.COM 07.31.20 1" = 20'-0"2 REFRIGERATION OVERALL ROOF PLAN 1" = 20'-0"1 REFRIGERATION OVERALL GROCERY PLAN ISSUE BLOCK FLORI D No. 63660 L A STATE OFM YICHAE L J AMES AM E S TOPRROF ESSIONAL E N G INEEEICENS Not part of this application. A permit application shall be submitted for interior remodeling. BEL0400AG6AEAB (NEW) BS09 GLY 1 2 3 4 E BEC0750AG7AEAB (NEW) BS08 GLY 8FT -BMD-R (NEW) BS17 GLY 8FT -PF-54-R (NEW) BS18 GLY 8FT -DX6LD (NEW) BS20 GLY 12FT -DX6XN (NEW) BS19 GLY 24FT -DR6LD (NEW) BS07 GLY 32FT -DX6LD (NEW) BS01 GLY 24FT -DX6LD (NEW) BS02 GLY 36FT -DX6LD (NEW) BS03 GLY 28FT -DX6LD (NEW) BS04 GLY 32FT -DX6LN (NEW) BS05 GLY 24FT -DX6LN (NEW) BS06 GLY CO CO1.3BS GLYTYP 15.616 1.31BS GLY 1.4BS GLYBS07 GLY 1.5BS GLY1.51BS GLY 1.6BS GLY1.61BS GLY 1.7BS GLY1.7BS GLY1.71BS GLY1.8BS GLY 1.53BS GLY1.53BS GLY 1.52BS GLY BS09 GLYBS08 GLY (DTBS GLY BYPASS) 5 R3.2 1.9BS GLY 2 R3.2 (TYP OF CIRCUITS BS01 GLY -BS06 GLY) 15.624 15.691 1 R3.2 (TYP OF CIRCUITS BS19 GLY -BS20 GLY) 15.624 15.691 1 R3 15.603 TYP 15.693 1 R3 15.603 TYP 15.693 6 R3.2 (TYP OF GLYCOL FAN COIL UNITS) 15.611 TYP 15.612 15.610 3 R3.2 PROVIDE DRAIN FITTING AT BOTTOM OF PIPE DROP. (TYP) 3 R3.2 PROVIDE DRAIN FITTING AT BOTTOM OF PIPE DROP. (TYP) 1 R3.1 (TYP OF ALL SECONDARY PIPING) 2 R3.1 7 R3TYP 15.615 1 R3.2 1 R3.2 15.623 15.692 (TYP OF CIRCUITS BS17 GLY -BS20 GLY) 15.623 15.692 15.624 15.691 15.624 15.691 INSTALL NEW GLYCOL CHARGING STATION. 10 R3.2 NEW WALL PENETRATION. REFER TO ARCHITECTURAL AND STRUCTURAL.15.608 INSTALL NEW TCO2 CHARGING STATION. 4 R3.3 DTB GLY GLYCOL CHARGING STATION PIPING. (TYP) CU5 TCO2 CHARGING STATION PIPING. (TYP) CU5 TCO2 CHARGING STATION PIPING. (TYP) 1 R3 TYP 15.603 1 2 3 F G H 36FT -DX6LD (NEW) BS14 GLY NEW REFRIGERATION ROOF PENETRATION. REFER TO ARCHITECTURAL AND STRUCTURAL. REFER TO REFRIGERATION ROOF PLAN FOR CONTINUATION. DRAIN PAN DTB CONN: 1 DTB CONN: 2 1BS GLY 1.1BS GLY 1.2BS GLY DTB GLY GLYCOL CHARGING STATION PIPING. (TYP)BS14 GLY1.3BS GLY1.10BS GLY 1.11BS GLY 1 R3 15.603 TYP 15.693 2 R3 8 R3.2 15.609 6 R3.1 4 R3.2 3 R3.2 PROVIDE DRAIN FITTING AT BOTTOM OF PIPE DROP. (TYP) 1 R3.2 15.697 15.624 15.691 15.616 CO CDCD PIPING FROM DTB GLY ROOF PENETRATION DRAIN PAN END ROOF PENETRATION DRAIN PIPING OVER CASE FLOOR DRAIN. SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. DOCUMENTS WITHOUT SIGNATURE AND REQUIRED SEAL OF AOR/EOR ARE NOT FOR CONSTRUCTION R1.1 ENLARGED REFRIGERATION PLANS DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.COMPLY WITH CLEAN AIR ACT, TITLE VI, SECTION 608 AND CODE OF FEDERAL REGULATION TITLE 40, PART 82 WHEN ADDING OR REMOVING REFRIGERATED EQUIPMENT. RECORD ALL EQUIPMENT IDENTIFICATION NUMBERS, MODEL AND SERIAL NUMBERS, THE AMOUNT OF REFRIGERANT RECOVERED FROM EACH UNIT, THE DATE OF DECOMMISSIONING, COMPANY NAME AND SIGNATURE OF ON-SITE SUPERVISOR. EPA CLEAN AIR ACT 11.02.15 24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, HVAC SYSTEMS OR ENERGY MANAGEMENT CONTROLS SYSTEMS, SEND EMAIL TO NSRM@WALMART.COM. THE E-MAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING. KEYNOTES 15.603 SUPPORT HORIZONTAL RUNS OF REFRIGERANT LINES ON 1-5/8" X 1-5/8" UNISTRUT CHANNELS. REFER TO SPECIFICATIONS FOR PIPE HANGER SPACING. 15.608 COORDINATE REFRIGERATION LINE ROUTING THROUGH THE EXTERIOR WALL. WALL REINFORCEMENTS, PENETRATION, AND HOOD SUPPLIED BY OTHERS. COORDINATE EXACT SIZE AND LOCATION OF WALL PENETRATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. COORDINATE WITH WALMART CONSTRUCTION MANAGER AND OTHER TRADES UTILIZING PENETRATION FOR SPACE ALLOCATION. 15.609 COORDINATE REFRIGERATION LINE ROUTING THROUGH ROOF. ROOF REINFORCEMENTS, PENETRATION, AND HOOD SUPPLIED BY OTHERS. COORDINATE EXACT SIZE AND LOCATION OF ROOF PENETRATIONS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. COORDINATE WITH OTHER TRADES UTILIZING PENETRATION FOR SPACE ALLOCATION. 15.610 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING AND BOLT PENETRATIONS THROUGH COOLER/FREEZER BOX WALLS OR CEILINGS. REFER TO FAN COIL UNIT DETAIL. 15.611 SUPPORT UNIT COOLERS WITH BOLTS THROUGH ROOF TO 1-5/8" X 1-5/8" X 10' LONG 14 GA. GALVANIZED UNISTRUT SPANNING THREE ROOF PANELS. PROVIDE DOUBLE NUTS ON EACH BOLT. 15.612 SEE SCHEDULES FOR UNIT COOLER TYPES, SIZES, AND CAPACITIES; CONTROL METHOD; AND ALL REFRIGERATION PIPING SIZES, ETC. 15.615 CONDENSATE DRAIN; PITCH DRAIN LINES DOWN APPROXIMATELY 1/8" PER 12" TOWARD DRAIN. PROVIDE COPPER PIPING WITH ELECTRIC HEAT TAPE AND INSULATION ON ALL CONDENSATE LINES EXPOSED TO FREEZING TEMPERATURES. 15.616 END CONDENSATE LINE OVER RECEPTOR W/AIR GAP. CONTRACTOR SHALL ENSURE FLOOR DRAIN(S) AND DRAIN LINE(S) SERVING WALK-IN ARE FREE OF OBSTRUCTIONS AND FUNCTION PROPERLY. WHERE EXTENSIVE DAMAGE EXISTS AND/OR PROPER DRAINAGE CANNOT BE OBTAINED COORDINATE WITH WALMART MECHANICAL CONSTRUCTION MANAGER. 15.623 ROUTE REFRIGERATION LINES IN BASE OF CASE FOR ALL BOTTOM FED CONNECTED CASES. SLOPE BACK TO LEAD CASE AT 1" PER 20'-0" OF RUN. 15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE FOR ALL TOP FED CONNECTED CASES. SLOPE BACK TO LEAD CASE AT 1" PER 20'-0" OF RUN. REFER TO TOP FED PIPING DETAIL. 15.691 REFRIGERATION CONTRACTOR SHALL INSTALL GLYCOL SUPPLY AND RETURN SHUT-OFF BALL VALVES IN A SERVICE ACCESSIBLE LOCATION ON TOP OF CASE. 15.692 REFRIGERATION CONTRACTOR SHALL INSTALL GLYCOL SUPPLY AND RETURN SHUT-OFF BALL VALVES IN A SERVICE ACCESSIBLE LOCATION INSIDE CASE DRAIN PAN. 15.693 SLOPE GLYCOL REFRIGERANT LINES DOWN TOWARD DRAIN LOCATIONS AT 1" PER 20' OF RUN. PROVIDE MANUAL AIR VENT AT HIGHEST POINT IN SYSTEM. REFER TO M.T. GLYCOL PIPING VENT AND DRAIN INSTALLATION DETAIL. LOCATE HIGHEST POINT OF REFRIGERATION LINES JUST BELOW BOTTOM CHORD OF JOIST OR BEAM. COORDINATE TO AVOID CONFLICTS WITH DUCTWORK, LIGHTING, SKYLIGHTS, PIPING, ETC. REFER TO PIPING DETAILS AND SPECIFICATIONS. 15.697 PROVIDE SPARE STUB WITH ISOLATION BALL VALVE AND CAP OFF FOR FUTURE USE. REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO REFRIGERATION EQUIPMENT. SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE-SKIN OF EXISTING REFRIGERATED CASES TO REMAIN. ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A WALMART APPROVED CONTRACTOR. REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW CASES BEING INSTALLED FOR CONNECTION LOCATION OF UTILITIES. (TOP FED VS BOTTOM FED) VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES WITH FINAL MERCHANDISE PLAN. COORDINATE LOCATION OF REFRIGERATED CASES WITH PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR AND SETTING DRAINS. REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT LIMITED TO): REFRIGERATED CASES, WALK-IN COILS, ASSOCIATED VALVES, REFRIGERATION AND CONDENSATE PIPING, HANGERS AND SUPPORTS, AND CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH PENETRATIONS TO MATCH EXISTING. REFER TO ARCHITECTURAL DRAWINGS. ALL EXISTING REFRIGERATED CASES ARE TO REMAIN UNLESS NOTED OTHERWISE. PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING RACK PARAMETERS, REFRIGERATION CONTRACTOR SHALL REQUEST A SUCTION GROUP REPORT FOR ALL RACKS AND SUCTION GROUPS WHERE WORK IS PERFORMED. REQUEST VIA EMAIL AT B.PTEAM1@WAL-MART.COM REFRIGERATION SYMBOLS RM-09.25.18 XXX XXX CIRCUIT NUMBER MODEL NUMBER (CIRCUIT INFO) CO CLEANOUT (CO) CONDENSATE DRAIN LINE (CD) CONNECT TO EXISTING CONTINUATION X XX DETAIL NUMBER SHEET NUMBER (DETAIL REFERENCE) EVAPORATOR COIL ISOLATION VALVE ELBOW - TURNED DOWN ELBOW - TURNED UP XX.XXX REFRIGERATION KEYNOTE REFERENCE REFRIGERATION PIPING (ABOVE) REFRIGERATION PIPING (BELOW) REFRIG PIPING CASE CONNECTION ETR (TYP) EXISTING TO REMAIN TYPICAL *MODIFY CIRCUIT OR PIPE LENGTH **NEW CASE, COIL, CIRCUIT OR VALVE ****CHANGE EXISTING PIPE SIZE AS INDICATED OR NEW PIPE ^RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR REFERENCE ONLY AND IS TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES THE NEED FOR A RISER. IF THE RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED BY ENGINEER OF RECORD. #CONTRACTOR TO FIELD VERIFY EXISTING RISER SIZE. IF EXISTING PIPE SIZE DOES NOT MATCH SCHEDULE, REPLACE EXISTING RISER WITH NEW SIZE AS SHOWN. PIPING AND REFRIGERATION SCHEDULE SYMBOLS RM-10.06.20 GENERAL NOTES 1. PLANS INDICATE GENERAL ROUTING OF REFRIGERANT LINES, WITH A SINGLE LINE SHOWN INDICATING BOTH SUCTION AND LIQUID LINE ROUTING FOR EACH SYSTEM. 2. REFRIGERATION SYSTEM INSTALLATION SHALL BE IN COMPLETE CONFORMANCE WITH SPECIFICATIONS, AND WITH ALL REQUIREMENTS OF REFRIGERATION EQUIPMENT MANUFACTURER. 3. REFRIGERATION DRAWINGS ARE PROVIDED AS AN AID TO BIDDERS AND TO INDICATE DESIRED ROUTING OF REFRIGERATION LINES; CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR CORRECT INSTALLATION OF PIPING AND ACCESSORIES TO PROVIDE A COMPLETE AND FULLY OPERATING SYSTEM. 4. REFER TO SPECIFICATION 15600 FOR INSULATION THICKNESS. INSIDE DIAMETER OF INSULATION SHALL MATCH PIPE DIAMETER TO MINIMIZE AIR GAPS BETWEEN PIPING AND INSULATION. PROVIDE FACTORY PRE- MANUFACTURED FITTINGS AT ALL TRAPS AND ELBOWS. WHERE PRE-MANUFACTURED FITTINGS ARE UNAVAILABLE MITER CUT ALL FITTINGS TO ENSURE PROPER SEAL BETWEEN INSULATION SEGMENTS. 5. PIPE INSULATION SHALL BE BLACK, UNLESS OTHERWISE STATED ON PLANS OR SPECIFICATIONS. 6. COORDINATE REFRIGERATION DEMOLITION ISSUES WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL PLANS FOR REFRIGERATION EQUIPMENT DEMOLITION AND COOLER REPAIR AND REMODELING. 7. REFRIGERATION SYSTEM SHALL REMAIN OPERATIONAL DURING REMODELING. DURING THE PHASING OF OLD TO NEW SYSTEMS, BOTH NEW AND OLD REFRIGERATION SYSTEMS MAY BE REQUIRED TO OPERATE AT THE SAME TIME FOR A SHORT PERIOD. 8. WHERE NEW REFRIGERATED EQUIPMENT IS INDICATED ON THE DRAWINGS, PROVIDE DEMOLITION, REMOVAL, AND TEMPORARY STORAGE OF OLD EQUIPMENT PER WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER'S INSTRUCTIONS, AND REFRIGERATION DEMO NOTES. 9. COORDINATE REMOVAL AND DISPOSAL OF EXISTING EVAPORATORS, REFRIGERATED CASES, AND CONDENSING UNITS, WITH WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. 10. REMOVE COPPER LINES, EVAPORATORS, AND CONDENSATE LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. COORDINATE WITH WALK-IN PANEL VENDOR FOR TIME LINE OF REPLACEMENT. REFERENCE SPECIFICATION FOR CONTACT INFORMATION. 11. WALK-IN PANEL VENDOR SHALL PROPERLY PREPARE ALL COOLER/FREEZER PANELS, GLASS DOORS, SLIDER OR SWING DOORS, PALLETIZE, AND PREPARE THE EQUIPMENT TO SHIP OFF SITE. 12. COORDINATE WITH FIRE PROTECTION CONTRACTOR FOR THE REMOVAL OF SPRINKLERS FOR ALL REMOVED COOLER/FREEZER BOXES. 13. COORDINATE WITH ELECTRICAL CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES ELECTRICAL WIRING DEVICES. 14. COORDINATE WITH BAS CONTRACTOR FOR THE REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES BAS WIRING AND DEVICES. 15. EXISTING REFRIGERATION PIPING MAY BE RE- USED UNLESS OTHERWISE NOTED ON PLANS. REFER TO SCHEDULES FOR PIPE SIZE REQUIREMENTS. 16. BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN THE FUTURE. 17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD OR REPLACE CASES, EVAPORATORS, ETC. THEN 24 TO 48 HOURS AFTER THE WORK IS COMPLETED AND ALL FINAL ADJUSTMENTS HAVE BEEN MADE, PROVIDE AND CHANGE LIQUID LINE FILTER CORES, OIL SYSTEM FILTER USING SPORLAN OF STYLE FILTER, AND REPLACE SUCTION FILTERS. FILTERS ARE TO BE RATED FOR WAX REMOVAL. CONTRACTOR TO PROPERLY DISPOSE OF OIL AND COMPONENTS REPLACED. REFER TO SPECIFICATION 15600. 18. REFER TO GROCERY ARCHITECTURAL DRAWINGS FOR ADDITIONAL WORK BY REFRIGERATION CONTRACTOR. 19. INSTALL ASSET TAGS ON ALL NEW REFRIGERATED CASES AND COMPLETE THE DATA COLLECTION INFORMATION. DELETE DEMOED ASSETS FROM ASSET TAGGING APPLICATION. REFER TO SPECIFICATIONS. 20. UPON START-UP OF ALL NEW REFRIGERATED EQUIPMENT, CONSTRUCTION MANAGER SHALL REQUEST THE BUILDING PERFORMANCE REPORT FOR ALL RACKS AND SUCTION GROUPS WHERE WORK IS PERFORMED. ANY DEVIATIONS NOTED ON THE REPORT MUST BE CORRECTED PRIOR TO PROJECT CLOSE OUT. REQUEST VIA EMAIL AT B.PTEAM1@WAL-MART.COM 07.31.20 1/8" = 1'-0"1 ENLARGED REFRIGERATION PLAN FRONT 1/8" = 1'-0"2 ENLARGED REFRIGERATION PLAN REAR ISSUE BLOCK FLORI D No. 63660 L A STATE OFM YICHAE L J AMES AM E S TOPRROF ESSIONAL E N G INEEEICENS Not part of this application. A permit application shall be submitted for interior remodeling. SUPPLY AND RETURN AS SPECIFIED IN PIPING SCHEDULE SPACE AT 4' INTERVALS TYP 1" EXPANDED POLYSTYRENE OR EQUAL 6" MINIMUM WIDTH. LENGTH AS REQUIRED TYP ROUTE SUPPLY AND RETURN HEADERS ON TOP OF CASES SUPPLY AND RETURN SHUT- OFF VALVES FURNISHED AND INSTALLED BY REFRIGERATION CONTRACTOR. ADJUST LOCATION OF DROPS AS REQUIRED. IF ROUTED IN WALL, EXIT WALL 6" ABOVE TOP OF CASE HEIGHT TYP PROVIDE TEMPERATURE/PRESSURE TEST WELLS AT LAST CASE IN LINEUP. REFRIGERATION CASE MANUFACTURER TO FURNISH AND INSTALL TOP FED CASES WITH FACTORY INSTALLED SHUT-OFF VALVES, SUPPLY SOLENOID VALVES, AND RETURN AUTOFLOW BALANCE VALVES FOR EACH CASE. REF SPECIFICATIONS REAR HALF OF REFRIGERATED CASE DESIGNATED FOR PIPING AND VALVES. FRONT HALF OF REFRIGERATED CASE DESIGNATED FOR ELECTRICAL AND BAS COMPONENTS. RETURN SUB-LOOP BRANCH SUPPLY SUB-LOOP BRANCH PROVIDE SUPPLY AND RETURN SUB-LOOP SHUT-OFF VALVES . REFER TO PLANS FOR LOCATIONS. CONTINUES TO ADDITIONAL CIRCUITS ON SUB-LOOP MAIN SUPPLY AND RETURN BRANCH PIPING SUPPLY AND RETURN LINES FOR SECOND CIRCUIT ON SUB-LOOP CONTINUES TO SECONDARY PUMP SKID REFER TO SPECIFICATION SECTION 15181 FOR PIPE LABELING REQUIREMENTS. (TYP OF ALL SECONDARY GLYCOL SUPPLY AND RETURN PIPING) TEMPORARY U-BEND BYPASS TO BE REMOVED BEFORE FINAL CONNECTION. REFER TO U- BEND BYPASS DETAIL. SUPPLY AND RETURN AS SPECIFIED IN PIPING SCHEDULE SPACE AT 4' INTERVALS TYP 1" EXPANDED POLYSTYRENE OR EQUAL 6" MINIMUM WIDTH. LENGTH AS REQUIRED TYP ROUTE SUPPLY AND RETURN HEADERS ON TOP OF CASES SUPPLY AND RETURN SHUT-OFF VALVES FURNISHED AND INSTALLED BY REFRIGERATION CONTRACTOR. ADJUST LOCATION OF DROPS AS REQUIRED. IF ROUTED IN WALL, EXIT WALL 6" ABOVE TOP OF CASE HEIGHT TYP PROVIDE TEMPERATURE/PRESSURE TEST WELLS AT LAST CASE IN LINEUP. REFRIGERATION CASE MANUFACTURER TO FURNISH AND INSTALL TOP FED CASES WITH FACTORY INSTALLED SHUT-OFF VALVES, SUPPLY SOLENOID VALVES, AND RETURN AUTOFLOW BALANCE VALVES FOR EACH CASE. REF SPECIFICATIONS REAR HALF OF REFRIGERATED CASE DESIGNATED FOR PIPING AND VALVES. FRONT HALF OF REFRIGERATED CASE DESIGNATED FOR ELECTRICAL AND BAS COMPONENTS. RETURN SUB-LOOP BRANCH SUPPLY SUB-LOOP BRANCH PROVIDE SUPPLY AND RETURN SUB-LOOP SHUT-OFF VALVES . REFER TO PLANS FOR LOCATIONS. CONTINUES TO ADDITIONAL CIRCUITS ON SUB-LOOP MAIN SUPPLY AND RETURN BRANCH PIPING SUPPLY AND RETURN LINES FOR SECOND CIRCUIT ON SUB-LOOP CONTINUES TO SECONDARY PUMP SKID REFER TO SPECIFICATION SECTION 15181 FOR PIPE LABELING REQUIREMENTS. (TYP OF ALL SECONDARY GLYCOL SUPPLY AND RETURN PIPING) APPROXIMATELY 2' ABOVE TOP OF CASE TYP TEMPORARY U-BEND BYPASS TO BE REMOVED BEFORE FINAL CONNECTION. REFERENCE U- BEND BYPASS DETAIL. FULLY INSULATE PIPING BEFORE PHASING. SUPPLY LINE FROM RACK PROVIDE NORMALLY OPEN GLYCOL ISOLATION VALVES IN AN ACCESSIBLE LOCATION. REFER TO SPECIFICATIONS. INSULATION RETURN LINE TO RACK CONTRACTOR PROVIDED BLIND FLANGE CONNECTION. (TYP) PROVIDED ISOLATION VALVE FIELD INSTALLED. (TYP BOTH SUPPLY AND RETURN) EMERGENCY CHILLER CONNECTION TO PUMP SKID. MATCH MAIN SUPPLY AND RETURN PIPE SIZE. SUPPLY FROM PUMP SKID RETURN TO PUMP SKID SUPPLY TO CASES/COILS RETURN FROM CASES/COILS SUPPORT EMERGENCY CHILLER CONNECTION. REFER TO REFRIGERATION PIPING SUPPORT DETAIL. (TYP) GLYCOL RETURN GLYCOL SUPPLY INSTALL BYPASS VALVE IN LOCATION SHOWN ON PIPING PLANS. CONNECT BYPASS LINE TO MAIN PIPING; MAIN PIPING TO BE SAME SIZE OR LARGER THAN BYPASS VALVE SIZE. BYPASS LINE SIZE TO MATCH BYPASS VALVE SIZE INSTALL OWNER FURNISHED SECONDARY GLYCOL BYPASS VALVE, SEE REFRIGERATION SECONDARY PUMP SKID SCHEDULE FOR SIZE. ENSURE VALVE DIRECTION ALLOWS FLOW FROM SUPPLY TO RETURN. LABEL GLYCOL PIPING PER SPECIFICATION SECTION 15181 REFRIGERATION CONTRACTOR SHALL FURNISH AND INSTALL FULL PORT ISOLATION BALL VALVES ON BOTH SIDES OF BYPASS VALVE. REFER TO GLYCOL REFRIGERATION ISOLATION VALVES DETAIL. FLOW DIRECTION BYPASS LINE MAIN CLOSE VALVES DURING INITIAL SYSTEM FLUSH, OPEN DURING NORMAL OPERATION. VENT & DRAIN 1.PROVIDE 1/2" VENT VALVES AT ALL HIGH POINTS OF THE PIPING TO REMOVE AIR DURING INSTALLATION AND MAINTENANCE. HIGH POINTS ARE ANY PLACE ON A REFRIGERATION LINE THAT AIR POCKETS COULD FORM. PROVIDE DROP- DOWN LINE FOR CONVENIENT ACCESS TO THE VALVE AS REQUIRED. 2.PROVIDE 3/4" DRAIN VALVES AT ALL LOW POINTS IN MAINS, RISERS, AND BRANCH LINES. LOW POINTS ARE DEFINED AS ANY PLACE ON A REFRIGERATION LINE THAT CAN POOL GLYCOL AS SYSTEM IS DRAINED. 3.THE VENT AND DRAIN VALVES TO HAVE THREADED CONNECTIONS FOR HOSES OR PIPES. THEY SHALL REMAIN CAPPED DURING NORMAL OPERATION. 4.AVOID CHANGE IN ELEVATION FOR THE PIPE RUN. 5.REFERENCE SPECIFICATION SECTION 15181. MINIMUM 1/2" TEE INSULATION AND VAPOR BARRIER PER SPECIFICATIONS INSTALL VENT AT HIGHEST POINT OF PIPING 1/2 " MANUAL AIR VENT WITH THREADED NIPPLE AND CAP. NORMALLY CLOSED. OBSTRUCTIONS (TYP) MAINTAIN INSULATION AROUND NIPPLE (TYP) INSULATION PER SPECIFICATIONS MINIMUM 3/4" TEE FITTING. 3/4" DRAIN VALVE WITH THREADED NIPPLE AND CAP. NORMALLY CLOSED INSTALL DRAIN PER SPECIFICATION 15181. CIRCUIT LEVEL SUPPLY AND RETURN ISOLATION VALVES. SUPPLY FROM PUMP SKID RETURN TO PUMP SKID LEAVE SUFFICIENT SPACE TO ALLOW REMOVAL OF U-BEND AND EXTENSION OF PIPING DURING PHASING OF FINAL CONNECTION. REFERENCE SPEC 15181 FOR U-BEND BYPASS REQUIREMENTS AND USAGE. FULLY INSULATE PIPING AND VALVES PRIOR TO FILLING SYSTEM. 12" FROM TOP OF CASE INSTALL 1/4" MANUAL AIR VENT WITH NIPPLE AND CAP. REFER TO SPECIFICATION 15181. VALVES SHALL BE FULLY INSULATED AND HAVE EXTENDED STEM/BONNET SUITABLE FOR INSULATION THICKNESS. TOP OF CASE 24" MAX SUPPORT PIPING WITHIN 1 FOOT OF RISER. REFER TO HORIZONTAL REFRIGERANT LINE SUPPORT DETAIL. ROOF OPENING MAY CONTAIN MULTIPLE PIPING AND CONDUIT TYPES, SEE PLANS. MINIMUM 2" GAP BETWEEN ADJACENT PIPES OR CONDUITS. OWNER PROVIDED MANUFACTURED CURB, SEE ARCHITECTURAL DETAILS FOR SIZE, INSULATION, ASSEMBLY, AND SEALING REQUIREMENTS SUPPORT PIPING WITHIN 1 FOOT OF RISER USING KLO-SHURE, SEE ROOF SUPPORT DETAIL. 2'-0" WIDE, 18 GAUGE SHEET METAL DRAIN PAN WITH INTERNAL MASTIC COATING SUPPORT ROD (TYP) PROVIDE A 3/4" PVC DRAIN FOR ANY PENETRATION WHOSE WIDTH IS 16" -24". PROVIDE A 1' PVC DRAIN FOR ANY PENETRATION WHOSE WIDTH IS 30" -36", AND PROVIDE A 1 1/2" PVC DRAIN FOR ANY PENETRATIONS WHOSE WIDTH IS GREATER THAN 36". SLOPE PVC DRAIN LINE 1/8" PER 12" AND TERMINATE OVER DRAIN WITH 2" AIR GAP. DO NOT TRAP AT BOTTOM OF GLYCOL RISER. INSTALL DRAIN VALVE AT ALL LOW POINTS. REMOVABLE HOOD PROVIDED WITH CURB. INVERTED TRAP ALLOWED BUT NOT REQUIRED FOR GLYCOL PIPING. INSTALL AIR VENT ON ALL HIGH POINTS. SECURE PIPING TO UNISTRUT AT TOP OF CURB WITH KLO-SHURE CLAMP 5" CENTER OF PIPE TO TOP OF CURB. AIR VENT AT HIGH POINT IN ACCESSIBLE LOCATION. LABEL PIPING PER SPECIFICATION SECTION 15181. 1' MAX 1' MAX GLYCOL FAN/ COIL UNIT TOP OF BOX BOX WALL MOUNT COIL ACCORDING TO MANUFACTURER'S RECOMMENDATIONS (TYP). COIL DRAIN AND ISOLATION VALVE, LOCATED AT LOWER CONNECTION OF COIL PROVIDE COIL SUPPLY SHUTOFF VALVE, ONE PER CIRCUIT. INSTALL REFRIGERATION EQUIPMENT SUPPLIER-FURNISHED COIL AUTOFLOW BALANCING VALVE, ONE PER COIL. PROVIDE CIRCUIT RETURN SHUTOFF VALVE, ONE PER CIRCUIT. SUPPORT EVAPORATORS WITH BOLTS THRU CEILING PANEL TO 1 5/8" X 1 5/8" X 10 FT. LONG 14 GAUGE. GALVANIZED UNISTRUT SPANNING THREE COOLER/FREEZER CEILING PANELS. PROVIDE DOUBLE NUTS ON EACH BOLT. SEAL AROUND BOLT PENETRATIONS THRU COOLER/FREEZER BOX WALLS OR CEILINGS WITH BACKER ROD AND SEALANT. TYP SUPPLY RETURN FOAM TOPS OF BOLT PENETRATIONS. TYP DRILL HOLE IN COOLER/FREEZER BOX WALLS, CENTER PIPE IN OPENING, AND SEAL WITH EXPANDING FOAM. AFTER FOAM CURES, TRIM FLUSH TO PANEL. BUTT INSULATION TO THE BOUNDARY OF BOX PENETRATION. SEAL WHERE INSULATION BUTTS AGAINST THE PANEL AND AROUND PERIMETER OF INSULATION TO CREATE VAPOR BARRIER. TYP OF ALL PIPE PENETRATIONS THROUGH BOX WALL. INSULATED WALL SILICONE SEALANT HOLE DIAMETER 1" GREATER THAN PIPE SECONDARY OR CONDENSATE PIPE PIPE INSULATION EXPANDING FOAM MOUNT REFRIGERATION CONTROL VALVES NEAR EDGE OF WALK-IN FOR SERVICE ACCESS FROM LADDERS. COORDINATE WITH EDGE PROTECTION NET SYSTEM. REF ARCHITECTURAL COPPER TO PVC CONNECTION OUTSIDE OF WALL AS REQUIRED. INSULATE COPPER PIPE OUTSIDE COOLER WALL PER SPECIFICATIONS PVC DRAIN TRAP OUTSIDE DRAIN PAN UNION PVC TERMINATE CONDENSATE DRAIN OVER HUB DRAIN OR SERVICE SINK WITH AIR GAP. PROVIDE RUNNING TRAP FOR INTERIOR CONDENSATE HEADERS RUNNING BETWEEN MULTIPLE WALK-INS OPERATING AT TEMPERATURES ABOVE FREEZING. TEMPORARY U-BEND BYPASS TO BE REMOVED BEFORE FINAL CONNECTION. REFERENCE U-BEND BYPASS DETAIL. PROVIDE SOLENOID VALVE, ONE PER COIL. PROVIDE COPPER CONDENSATE DRAIN PIPING FULL SIZE OF COIL DRAIN PAN CONNECTION AND SLOPE 1/8" PER 1'-0" TOWARD DRAIN. REFRIGERATION CONTRACTOR FURNISHED FIELD INSTALLED 1" ISOLATION BALL VALVE (TYP) PIPE SUPPORT. REFER TO HORIZONTAL REFRIGERANT LINE SUPPORT DETAIL ROOF OPENING TO ACCOMMODATE BOTH REFRIGERATION PIPING AND ELECTRICAL CONDUIT. REFER TO ARCH AND REFRIG PLANS. REFER TO ARCHITECTURAL DETAIL FOR INSTALLATION OF MANUFACTURED METAL CURB, INSULATION, AND SHEET METAL ENCLOSURE SUPPORT PIPING ON ROOF. REFER TO REFRIGERATION PIPING SUPPORT DETAIL. 3/4" CHARGING HOSE. CAP WITH CHAIN WHEN NOT IN USE. PROVIDE 3/4" MALE CONNECTION. MOUNT 60" AFF. PROVIDE CAP WITH CHAIN AND CAP WHEN NOT IN USE. CONNECTION SHALL TERMINATE OUTWARD, AWAY FROM WALL. ALL CHARGING STATION EQUIPMENT FURNISHED AND INSTALLED BY REFRIGERATION CONTRACTOR. PROVIDE 3/4" HOSE CONNECTION. PROVIDE 1" COPPER PIPING FROM GLYCOL FEEDER STATION TO PUMP SKID. PROVIDE SPARE STUB AND CAP END FOR FUTURE USE. (TYP) REFERENCE UNISTRUT PIPING SUPPORT DETAIL. PROVIDE TAG INDICATING SKID SERVED. REFER TO SPEC 15181 FOR PIPE LABELING REQUIREMENTS. TYPICAL OF EACH CHARGING LINE TO PUMP SKID. 6" PROVIDE PIPE LABELS AT EACH CONNECTION PER SPECIFICATION SECTION 15181. LABEL GLYCOL CHARGING LINE ON ROOF AS "GLYCOL CHARGING". REFER TO SPEC 15181 FOR LABELING REQUIREMENTS. BOLLARD. REFER TO ARCH. (TYP) SIDE VIEW VERTICAL PIPING SUPPORT. REFER TO VERTICAL REFRIGERANT LINE SUPPORT DETAIL ROUTE PIPING THROUGH NEW OR EXISTING WALL PENETRATIONS. REFER TO ARCH AND STRUCTURAL. SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. DOCUMENTS WITHOUT SIGNATURE AND REQUIRED SEAL OF AOR/EOR ARE NOT FOR CONSTRUCTION R3.2 REFRIGERATION DETAILS GLYCOL DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.NTS1CASE PIPING (HORIZONTAL OPTION) (GLYCOL) NTS2CASE PIPING (VERTICAL OPTION) (GLYCOL) NTS4ISOLATION VALVES (GLYCOL) NTS7 REMOTE EMERGENCY CHILLER CONNECTION (GLYCOL) NTS5END-OF-LOOP BYPASS VALVE (GLYCOL) NTS3PIPING VENT AND DRAIN INSTALLATION (GLYCOL) NTS9TEMPORARY U-BEND BYPASS (GLYCOL) NTS10CHARGING STATION (GLYCOL)NTS8ROOF PENETRATION (GLYCOL) NTS6FAN-COIL UNIT (GLYCOL) ISSUE BLOCK FLORI D No. 63660 L A STATE OFM YICHAE L J AMES AM E S TOPRROF ESSIONAL E N G INEEEICENS Not part of this application. A permit application shall be submitted for interior remodeling. SUCTION RISER SUCTION MAIN LIQUID BRANCH LIQUID MAIN SUCTION LINES SHALL HAVE AN INVERTED TRAP REDUCE RISER SIZE AFTER BASE TRAP PROVIDE A P-TRAP AT THE BOTTOM OF THE RISER. PROVIDE AN INVERTED P-TRAP AT RISER TRANSITION TO HORIZONTAL LIQUID LINES BRANCHING FROM THE MAIN MUST EXIT FROM THE SIDE OF THE MAIN INVERTED P-TRAP SAME SIZE AS VERTICAL RISER MINIMUM DIST 6"ROOF MEMBRANE REFRIGERATION PIPING (TYP) CUSH-A-CLAMP FIRMLY CLAMPED TO PIPE (TYP) UNISTRUT P-1000 (TYP.)DURA-BLOK DB6-SERIES OR EQUIVALENT CHANNEL SUPPORT. (TYP) SIDE VIEW SECTION VIEW RUN CONDUIT ON UNISTRUT AS NEEDED REFER TO SPECIFICATIONS FOR PIPING SUPPORT SPACING REQUIREMENTS. DO NOT ATTACH BLOCK TO ROOF. PROVIDE 60 MIL WHITE TPO MEMBRANE SET ON BARE ROOF MEMBRANE FROM SYSTEM TO CASE/EVAPORATOR TO SYSTEM FROM CASE/EVAPORATOR TO SYSTEMFROM SYSTEM BALL VALVE WITH INTEGRATED PRESSURE RELIEF (TYP) RETURN/SUCTION LINE ISOLATION CHECK VALVE SUPPLY/LIQUID LINE ISOLATION CHECK VALVE TO CASE/EVAPORATOR FROM CASE/EVAPORATOR COMPONENTS INSIDE DASHED LINES ARE FIELD-ASSEMBLED.NORMAL DIRECTION OF REFRIGERANT FLOW (TYP) INSTALL PACKED LINE ANGLE VALVE FOR SERVICE. BALL VALVE. INSTALL PACKED LINE ANGLE VALVE FOR SERVICE. RETURN/SUCTION LINE ISOLATION CHECK VALVE SUPPLY/LIQUID LINE ISOLATION CHECK VALVE REFER TO REFRIGERATION PIPING AND VALVE SCHEDULES FOR VALVE LOCATIONS QUANTITIES. INTERNAL CHECK VALVE (SPORLAN MODEL EBV - REQUIRED FOR LINES 1 1/8'' AND SMALLER) EXTERNAL CHECK VALVE (FOR LINES GREATER THAN 1 1/8") REFER TO REFRIGERATION PIPING AND VALVE SCHEDULES FOR VALVE LOCATIONS QUANTITIES. NOTES: 1.PROVIDE INSULATION THAT COMPLETELY ENCAPSULATES ALL SURFACES. REFER TO SPECIFICATIONS. 2.ISOLATION CHECK VALVES MUST BE ORIENTED WITH CHECK VALVE (INTERNAL OR EXTERNAL) ALLOWING FLOW AWAY FROM UNIT COOLER AND BACK TO SECONDARY PUMP SKID OR RACK SYSTEM. 3.REFERENCE PARTS AND EQUIPMENT RESPONSIBILITY MATRIX FOR ALL LOOSE PARTS AND EQUIPMENT. PROVIDE 1/2" ISOLATION BALL VALVE. (TYP) PROVIDE 650 PSIG SERVICE PRESSURE RELIEF VALVE ON ROOF. LOCATE VALVE AT LEAST 20 FT FROM ANY RTU, AHU OR EXHAUST FAN. MOUNT VERTICALLY. (TYP) PIPE SUPPORT. REFER TO HORIZONTAL REFRIGERANT LINE SUPPORT DETAIL ROOF OPENING TO ACCOMMODATE REFRIGERATION PIPING. REFER TO ARCH AND REFRIG PLANS. REFER TO ARCHITECTURAL DETAIL FOR INSTALLATION OF MANUFACTURED METAL CURB, INSULATION, AND SHEET METAL ENCLOSURE SUPPORT PIPING ON ROOF. REFER TO REFRIGERATION PIPING SUPPORT DETAIL. VERTICAL PIPING SUPPORT. REFER TO VERTICAL REFRIGERANT LINE SUPPORT DETAIL CONTRACTOR PROVIDED FILTER DRIER TO BE USED DURING SYSTEM CHARGING. REMOVE FILTER DRIER AFTER USE. PROVIDE 1/2" FLARE MALE CONNECTION. CAP WITH CHAIN WHEN NOT IN USE. INSTALL EQUIPMENT AT 30" AFF. CONNECTION SHALL TERMINATE OUTWARD, AWAY FROM WALL. PROVIDE 1/4" FLARE ACCESS PORT. (TYP) PROVIDE 1/4" FLARE ACCESS PORT. PROVIDE 1/2" FLARE MALE CONNECTION. CONNECTION SHALL BE EQUAL TO OR HIGHER THAN THE TOP MOST SIGHT GLASS ON THE CO2 VESSEL. CAP WITH CHAIN WHEN NOT IN USE. (TYP) PROVIDE 1/2" COPPER PIPING FROM CO2 CHARGING STATION TO PUMP SKID. PROVIDE RIGID PVC SIGN WITH PRINT TEXT, MINIMUM 2" TEXT HEIGHT. SIGN SHALL BE LOCATED NEXT TO THE CO2 CHARGING STATION AND READ: "ALWAYS CHARGE SECONDARY CO2 SYSTEMS THROUGH A FILTER DRIER. DO NOT TRAP LIQUID BY CLOSING CHARGING STATION AND ISOLATION VALVES WHEN SERVICING. ALWAYS VACUUM CHARGING LINE AFTER CHARGING IS COMPLETE. CHARGE SECONDARY CO2 SYSTEMS WITH 99.99% PURE OR HIGHER FOOD AND BEVERAGE GRADE CO2" PROVIDE SPARE AND CAP END FOR FUTURE USE. (TYP) REFERENCE UNISTRUT PIPING SUPPORT DETAIL. TYPICAL OF EACH CHARGING LINE TO PUMP SKID, PACK, OR CU. PROVIDE PIPE LABELS AT EACH CONNECTION WITH SYSTEM NAME TO BE CONNECTED. LABEL CO2 CHARGING LINE. REFER TO PIPE LABEL DETAIL FOR LABELING REQUIREMENTS. (TYP) 6" REFERENCE PARTS AND EQUIPMENT RESPONSIBILITY MATRIX FOR ALL LOOSE PARTS AND EQUIPMENT. SIDE VIEW NEW CHARGING STATION PIPING. (TYP) PROVIDE RIGID PVC SIGN WITH PRINT TEXT, MINIMUM 2" TEXT HEIGHT. SIGN SHALL BE LOCATED NEXT TO THE CO2 CHARGING STATION AND READ: "ALWAYS CHARGE TRANSCRITICAL CO2 SYSTEMS THROUGH A FILTER DRIER. DO NOT TRAP LIQUID BY CLOSING CHARGING STATION AND ISOLATION VALVES WHEN SERVICING. ALWAYS VACUUM CHARGING LINE AFTER CHARGING IS COMPLETE. CHARGE TRANSCRITICAL CO2 SYSTEMS WITH 99.99% PURE OR HIGHER REFRIGERANT GRADE R-744" BOLLARD. REFER TO ARCH. (TYP) ROUTE PIPING THROUGH NEW OR EXISTING WALL PENETRATIONS. REFER TO ARCH AND STRUCTURAL. CU CHARGING BRANCH LINES. SUCTION LINE LIQUID LINE ROUTE LIQUID AND SUCTION HEADERS ON TOP OF CASES WHERE POSSIBLE. SPACE AT 4' INTERVALS. (TYP) ADJUST LOCATION OF DROPS AS REQUIRED. (TYP) PROVIDE TRAP AT BASE. (TYP) REFRIGERATED CASE MANUFACTURER TO PROVIDED TOP CONNECTED CASES, AND NSF INSULATION FOR EACH CASE. REF SPECIFICATIONS. FRONT OF REFRIGERATED CASE. INSTALL CIRCUIT LIQUID AND SUCTION ISOLATION CHECK VALVES. REFER TO CO2 ISOLATION CHECK VALVES DETAIL. (TOP OF CASE) 1" EXPANDED POLYSTYRENE OR EQUAL. TYP VALANCE FURNISHED BY CASE MANUFACTURER, INSTALLED BY REFRIGERATION CONTRACTOR. REAR HALF OF REFRIGERATED CASE DESIGNATED FOR PIPING AND VALVES. FRONT HALF OF REFRIGERATED CASE DESIGNATED FOR ELECTRICAL AND BAS COMPONENTS. DO NOT BLOCK BAS COMPONENTS OR COVERS. INSTALL CASE SUCTION PIPING TO ALLOW GRAVITY DRAINAGE OF OIL BACK TO THE BASE TRAP AT THE BOTTOM OF THE SUCTION RISER. INSTALL LIQUID PIPING TO ALLOW REQUIRED ROUTING OF CASE SUCTION PIPING. SUCTION SUB-LOOP BRANCH LIQUID SUB-LOOP BRANCH DROP CIRCUIT SUCTION LINE INTO TOP OF SUCTION SUB-LOOP BRANCH. REF CO2 PIPING DETAILS INSTALL LIQUID AND SUCTION SUB-LOOP ISOLATION CHECK VALVES. REFER TO PLANS FOR LOCATIONS. 6" MINIMUM WIDTH. LENGTH AS REQUIRED. TYP CONTINUES TO ADDITIONAL CIRCUITS ON SUB-LOOP SUCTION AND LIQUID LINES FOR SECOND CIRCUIT ON SUB-LOOP MAIN SUCTION AND LIQUID BRANCH CONTINUES TO RACK INSTALL ISOLATION CHECK VALVES APPROXIMATELY 2' ABOVE TOP OF CASE TYP REFERENCE PARTS AND EQUIPMENT RESPONSIBILITY MATRIX FOR ALL LOOSE PARTS AND EQUIPMENT. INSTALL LIQUID LINE WITH BULLHEAD TEES AT CASES PER SPECIFICATIONS. (TYP) NTS1PIPING DETAILS (TCO2) NTS2REFRIGERATION PIPING SUPPORT (ON ROOF)(DX)(TCO2) SHEET: DRAWN BY: CHECKED BY: PROTO CYCLE: DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. DOCUMENTS WITHOUT SIGNATURE AND REQUIRED SEAL OF AOR/EOR ARE NOT FOR CONSTRUCTION R3.3 REFRIGERATION DETAILS TCO2 DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.NTS3ISOLATION CHECK VALVES (TCO2) NTS4CHARGING STATION (CO2) NTS5CASE PIPING (TCO2) (VERTICAL OPTION) ISSUE BLOCK FLORI D No. 63660 L A STATE OFM YICHAE L J AMES AM E S TOPRROF ESSIONAL E N G INEEEICENS Not part of this application. A permit application shall be submitted for interior remodeling.