HomeMy WebLinkAboutRefrigeration Plans - RD1, R1, R1.1, R3.2, R3.336FT -O5DM
(DEMO)
BS14
CONTRACTOR TO DEMO PIPING UP TO
PENETRATION. AT PENETRATION, DEMO
ALL PIPING BEFORE AND AFTER
PENETRATION EXCEPT SMALL SECTION OF
PIPING THROUGH PENETRATION. PINCH
BOTH SIDES OF THE SMALL SECTION OF
PIPING. FILL AND SEAL PENETRATION IF
NEEDED TO AVOID WATER/PEST
INTRUSION. IF ALL PIPING THROUGH
PENETRATION HAS BEEN ABANDONED,
THEN REMOVE ALL PIPING AND SEAL THE
ENTIRE PENETRATION.
1 2 3 4
E
F
G
H
24FT -DR6XN
(DEMO)
BS07
8FT -O5DM
(DEMO)
AS09
8FT -E2V
(DEMO)
CU-1
8FT -E2V
(DEMO)
AS06
12FT -ESBDS
(DEMO)
AS05
SM-134
(DEMO)
BS08
ADT-090
(DEMO)
BS09
32FT -DX6XN
(DEMO)
BS01
24FT -DX6XN
(DEMO)
BS02
36FT -DX6XN
(DEMO)
BS03
28FT -DX6XN
(DEMO)
BS04
32FT -O5DM
(DEMO)
BS05
24FT -O5DM
(DEMO)
BS06
TYP
15.625
TYP
15.625
DELI
COOLER
BAKERY
COOLER
CU-1 DX
(DEMO)
CU-1 MOUNTED ON ROOF.
COORDINATE WITH WALMART
CONSTRUCTION MANAGER FOR
INSTRUCTIONS TO SALVAGE OR
ABANDON IN PLACE. REFER TO
GENERAL REFRIGERATION DEMO
NOTES.
PATCH ROOF PENETRATION FOR
CU-1 ACCORDING TO SPECS AND
WALMART CONSTRUCTION
MANAGER.
DEMO REFRIGERATION PIPING FOR CIRCUITS
AS05 AND AS06 FROM CASES BACK TO SUB-
LOOP 1.13AS AT TRENCH OPENING. CAP
TRENCH PIPING AND ABANDON IN PLACE.
1.3AS 1.2AS
DEMO REFRIGERATION PIPING
FOR CIRCUIT AS09 FROM CASE
BACK TO MAIN LOOP. CONNECT
EXISTING PIPING 1.2AS TO 1.3AS.
BS14
BS14BS142BS2.1BS
DEMO REFRIGERATION PIPING
FOR CIRCUIT BS14 FROM CASES
BACK TO MAIN LOOP. CONNECT
EXISTING PIPING 2BS TO 2.1BS.
DEMO REFRIGERATION PIPING
FOR CIRCUIT BS14 FROM CASES
BACK TO MAIN LOOP. CONNECT
EXISTING PIPING 2BS TO 2.1BS.
1.13AS
DEMO ALL PIPING ASSOCIATED WITH LOOP
1BS IN ACCORDANCE WITH PHASED
INSTALLATION OF NEW EQUIPMENT.
ABANDON REFRIGERATION PIPING AND SEAL
PIT AS NECESSARY. CAP TRENCH PIPING AND
ABANDON IN PLACE.
SHEET:
DRAWN BY:
CHECKED BY:
PROTO CYCLE:
DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
DOCUMENTS WITHOUT
SIGNATURE AND REQUIRED
SEAL OF AOR/EOR ARE NOT
FOR CONSTRUCTION
RD1
REFRIGERATION
DEMO PLAN
DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.1/8" = 1'-0"1 REFRIGERATION DEMO PLAN
GENERAL REFRIGERATION
DEMO NOTES
1. COORDINATE REFRIGERATION DEMOLITION
ISSUES WITH THE ARCHITECTURAL DRAWINGS.
REFER TO ARCHITECTURAL PLANS FOR
REFRIGERATION EQUIPMENT DEMOLITION AND
COOLER REPAIR AND REMODELING.
2. REFRIGERATION SYSTEM SHALL REMAIN
OPERATIONAL DURING REMODELING. DURING
THE PHASING OF OLD TO NEW SYSTEMS, BOTH
NEW AND OLD REFRIGERATION SYSTEMS MAY
BE REQUIRED TO OPERATE AT THE SAME TIME
DURING CHANGEOVER.
3. WHERE NEW REFRIGERATED EQUIPMENT IS
INDICATED ON THE DRAWINGS, PROVIDE
DEMOLITION, REMOVAL, AND TEMPORARY
STORAGE OF OLD EQUIPMENT PER WALMART
MECHANICAL SERVICES CONSTRUCTION
MANAGER'S INSTRUCTIONS, AND
REFRIGERATION DEMO NOTES. ENSURE ALL
NEW EQUIPMENT AND PARTS NEEDED TO
COMPLETE THE INSTALLATION OF THE NEW
EQUIPMENT IS AT THE JOB SITE BEFORE
REMOVING ANY EXISTING EQUIPMENT.
4. COORDINATE REMOVAL AND DISPOSAL OF
EXISTING EVAPORATORS, REFRIGERATED
CASES, AND CONDENSING UNITS, WITH
WALMART MECHANICAL SERVICES
CONSTRUCTION MANAGER.
5. REMOVE COPPER LINES, EVAPORATORS, AND
CONDENSATE LINES FROM COOLERS/
FREEZERS BEING REMOVED FROM SITE.
COORDINATE WITH WALK-IN PANEL VENDOR
FOR TIME LINE OF REPLACEMENT. REFERENCE
SPECIFICATION FOR CONTACT INFORMATION.
6. WALK-IN PANEL VENDOR SHALL PROPERLY
PREPARE ALL COOLER/FREEZER PANELS,
GLASS DOORS, SLIDER OR SWING DOORS,
PALLETIZE, AND PREPARE THE EQUIPMENT TO
SHIP OFF SITE.
7. COORDINATE WITH FIRE PROTECTION
CONTRACTOR FOR THE REMOVAL OF
SPRINKLERS FOR ALL REMOVED
COOLER/FREEZER BOXES.
8. COORDINATE WITH ELECTRICAL CONTRACTOR
FOR THE REMOVAL OF ALL REMOVED
COOLER/FREEZER BOXES ELECTRICAL WIRING
DEVICES.
9. COORDINATE WITH BAS CONTRACTOR FOR THE
REMOVAL OF ALL REMOVED COOLER/FREEZER
BOXES BAS/LEAK DETECTION WIRING AND
DEVICES.
10. BUILDING COMPONENTS ABANDONED BY THE
SCOPE OF WORK SHALL BE SECURED TO
PREVENT FALLING, LOOSENING, OR CREATING
DAMAGE OF ANY KIND IN THE FUTURE.
11. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD
OR REPLACE CASES, EVAPORATORS, ETC. THEN
24 TO 48 HOURS AFTER THE WORK IS
COMPLETED AND ALL FINAL ADJUSTMENTS
HAVE BEEN MADE, PROVIDE AND CHANGE
LIQUID LINE FILTER CORES, OIL SYSTEM FILTER
USING SPORLAN OF STYLE FILTER, AND
REPLACE SUCTION FILTERS. FILTERS ARE TO BE
RATED FOR WAX REMOVAL. CONTRACTOR TO
PROPERLY DISPOSE OF OIL AND COMPONENTS
REPLACED. REFER TO SPECIFICATION 15600.
12. INSTALL ASSET TAGS ON ALL NEW
REFRIGERATED CASES AND COMPLETE THE
DATA COLLECTION INFORMATION. DELETE
DEMOED ASSETS FROM ASSET TAGGING
APPLICATION. REFER TO SPECIFICATION 15050.
13. ALL EXISTING REFRIGERATED CASES ARE TO
REMAIN UNLESS NOTED OTHERWISE.
14. 24 HOURS PRIOR TO SHUTTING DOWN ANY
REFRIGERATION SYSTEMS, HVAC SYSTEMS, OR
BUILDING AUTOMATION CONTROLS SYSTEMS,
SEND EMAIL TO NSRM@WALMART.COM. THE
EMAIL SHALL STATE WHAT, WHY, AND WHEN IT
IS BEING SHUT DOWN AND HOW LONG IT IS
ANTICIPATED TO BE SHUT DOWN. THEN SEND A
FOLLOW UP EMAIL TO NSRM@WALMART.COM
AFTER THE WORK IS COMPLETE AND THE
SYSTEM IS BACK UP AND RUNNING.
01.31.25
KEYNOTES
15.625 PATCH ALL HOLES IN EXISTING WALK-IN PANELS
FROM DEMOED UNIT COOLER REFRIGERANT
PIPING, CONDENSATE PIPING, AND CONDUIT.
REFER TO ARCHITECTURAL SHEETS.
REFRIGERATION SYMBOLS
RM-09.25.18
XXX
XXX
CIRCUIT NUMBER
MODEL NUMBER (CIRCUIT INFO)
CO CLEANOUT (CO)
CONDENSATE DRAIN LINE (CD)
CONNECT TO EXISTING
CONTINUATION
X
XX
DETAIL NUMBER
SHEET NUMBER
(DETAIL REFERENCE)
EVAPORATOR COIL
ISOLATION VALVE
ELBOW - TURNED DOWN
ELBOW - TURNED UP
XX.XXX REFRIGERATION KEYNOTE REFERENCE
REFRIGERATION PIPING (ABOVE)
REFRIGERATION PIPING (BELOW)
REFRIG PIPING CASE CONNECTION
ETR
(TYP)
EXISTING TO REMAIN
TYPICAL
ISSUE BLOCK
FLORI D
No. 63660
L
A
STATE OFM YICHAE L J AMES AM
E
S
TOPRROF
ESSIONAL E N G INEEEICENS
Not part of this application. A
permit application shall be
submitted for interior remodeling.
SSLSSLSSL
BBB
B B B
BB
AWS
1 2 3 4 5
C
D
E
F
G
H
I
J
REFRIGERATION
ROOF PENETRATION
NEW
CU5 TCO2
ELECTRICAL ROOF
PENETRATION
ETR
DTB DX
REFRIGERATION
ROOF PENETRATION
ETR
DTA DX
NEW
DTB GLY
GLYCOL
EMERGENCY
CHILLER
CONNECTION
R1.3
2
R1.3
1
1 2 3 4 5
C
D
E
F
G
H
I
J
DRAIN PAN
NEW
CU5 TCO2
ELECTRICAL ROOF
PENETRATION
ETR
DTB DX
REFRIGERATION
ROOF PENETRATION
ETR
DTA DX
NEW
DTB GLY
NEW CO2
CHARGING STATION
GLYCOL EMERGENCY
CHILLER CONNECTION
(ON ROOF)
R1.1
2
R1.1
1
NEW GLYCOL
CHARGING STATION
REFRIGERATION WALL
PENETRATION
SHEET:
DRAWN BY:
CHECKED BY:
PROTO CYCLE:
DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
DOCUMENTS WITHOUT
SIGNATURE AND REQUIRED
SEAL OF AOR/EOR ARE NOT
FOR CONSTRUCTION
R1
REFRIGERATION
OVERALL
PLANS
(ROOF
MOUNTED)
DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL
FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO
REFRIGERATION EQUIPMENT.
SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE-SKIN
OF EXISTING REFRIGERATED CASES TO REMAIN.
ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A
WALMART APPROVED CONTRACTOR.
REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW
CASES BEING INSTALLED FOR CONNECTION LOCATION OF
UTILITIES. (TOP FED VS BOTTOM FED)
VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES
WITH FINAL MERCHANDISE PLAN.
COORDINATE LOCATION OF REFRIGERATED CASES WITH
PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR
AND SETTING DRAINS.
REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED
FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT
LIMITED TO): REFRIGERATED CASES, WALK-IN COILS,
ASSOCIATED VALVES, REFRIGERATION AND
CONDENSATE PIPING, HANGERS AND SUPPORTS, AND
CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL
OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH
PENETRATIONS TO MATCH EXISTING. REFER TO
ARCHITECTURAL DRAWINGS.
ALL EXISTING REFRIGERATED CASES ARE TO REMAIN
UNLESS NOTED OTHERWISE.
PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING
RACK PARAMETERS, REFRIGERATION CONTRACTOR
SHALL REQUEST A SUCTION GROUP REPORT FOR ALL
RACKS AND SUCTION GROUPS WHERE WORK IS
PERFORMED. REQUEST VIA EMAIL AT
B.PTEAM1@WAL-MART.COM
REFRIGERATION SYMBOLS
RM-09.25.18
XXX
XXX
CIRCUIT NUMBER
MODEL NUMBER (CIRCUIT INFO)
CO CLEANOUT (CO)
CONDENSATE DRAIN LINE (CD)
CONNECT TO EXISTING
CONTINUATION
X
XX
DETAIL NUMBER
SHEET NUMBER
(DETAIL REFERENCE)
EVAPORATOR COIL
ISOLATION VALVE
ELBOW - TURNED DOWN
ELBOW - TURNED UP
XX.XXX REFRIGERATION KEYNOTE REFERENCE
REFRIGERATION PIPING (ABOVE)
REFRIGERATION PIPING (BELOW)
REFRIG PIPING CASE CONNECTION
ETR
(TYP)
EXISTING TO REMAIN
TYPICAL
GENERAL NOTES
1. PLANS INDICATE GENERAL ROUTING OF
REFRIGERANT LINES, WITH A SINGLE LINE
SHOWN INDICATING BOTH SUCTION AND LIQUID
LINE ROUTING FOR EACH SYSTEM.
2. REFRIGERATION SYSTEM INSTALLATION SHALL
BE IN COMPLETE CONFORMANCE WITH
SPECIFICATIONS, AND WITH ALL REQUIREMENTS
OF REFRIGERATION EQUIPMENT
MANUFACTURER.
3. REFRIGERATION DRAWINGS ARE PROVIDED AS
AN AID TO BIDDERS AND TO INDICATE DESIRED
ROUTING OF REFRIGERATION LINES;
CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR CORRECT INSTALLATION
OF PIPING AND ACCESSORIES TO PROVIDE A
COMPLETE AND FULLY OPERATING SYSTEM.
4. REFER TO SPECIFICATION 15600 FOR
INSULATION THICKNESS. INSIDE DIAMETER OF
INSULATION SHALL MATCH PIPE DIAMETER TO
MINIMIZE AIR GAPS BETWEEN PIPING AND
INSULATION. PROVIDE FACTORY PRE-
MANUFACTURED FITTINGS AT ALL TRAPS AND
ELBOWS. WHERE PRE-MANUFACTURED
FITTINGS ARE UNAVAILABLE MITER CUT ALL
FITTINGS TO ENSURE PROPER SEAL BETWEEN
INSULATION SEGMENTS.
5. PIPE INSULATION SHALL BE BLACK, UNLESS
OTHERWISE STATED ON PLANS OR
SPECIFICATIONS.
6. COORDINATE REFRIGERATION DEMOLITION
ISSUES WITH THE ARCHITECTURAL DRAWINGS.
REFER TO ARCHITECTURAL PLANS FOR
REFRIGERATION EQUIPMENT DEMOLITION AND
COOLER REPAIR AND REMODELING.
7. REFRIGERATION SYSTEM SHALL REMAIN
OPERATIONAL DURING REMODELING. DURING
THE PHASING OF OLD TO NEW SYSTEMS, BOTH
NEW AND OLD REFRIGERATION SYSTEMS MAY
BE REQUIRED TO OPERATE AT THE SAME TIME
FOR A SHORT PERIOD.
8. WHERE NEW REFRIGERATED EQUIPMENT IS
INDICATED ON THE DRAWINGS, PROVIDE
DEMOLITION, REMOVAL, AND TEMPORARY
STORAGE OF OLD EQUIPMENT PER WALMART
MECHANICAL SERVICES CONSTRUCTION
MANAGER'S INSTRUCTIONS, AND
REFRIGERATION DEMO NOTES.
9. COORDINATE REMOVAL AND DISPOSAL OF
EXISTING EVAPORATORS, REFRIGERATED
CASES, AND CONDENSING UNITS, WITH
WALMART MECHANICAL SERVICES
CONSTRUCTION MANAGER.
10. REMOVE COPPER LINES, EVAPORATORS, AND
CONDENSATE LINES FROM COOLERS/
FREEZERS BEING REMOVED FROM SITE.
COORDINATE WITH WALK-IN PANEL VENDOR
FOR TIME LINE OF REPLACEMENT. REFERENCE
SPECIFICATION FOR CONTACT INFORMATION.
11. WALK-IN PANEL VENDOR SHALL PROPERLY
PREPARE ALL COOLER/FREEZER PANELS,
GLASS DOORS, SLIDER OR SWING DOORS,
PALLETIZE, AND PREPARE THE EQUIPMENT TO
SHIP OFF SITE.
12. COORDINATE WITH FIRE PROTECTION
CONTRACTOR FOR THE REMOVAL OF
SPRINKLERS FOR ALL REMOVED
COOLER/FREEZER BOXES.
13. COORDINATE WITH ELECTRICAL CONTRACTOR
FOR THE REMOVAL OF ALL REMOVED
COOLER/FREEZER BOXES ELECTRICAL WIRING
DEVICES.
14. COORDINATE WITH BAS CONTRACTOR FOR THE
REMOVAL OF ALL REMOVED COOLER/FREEZER
BOXES BAS WIRING AND DEVICES.
15. EXISTING REFRIGERATION PIPING MAY BE RE-
USED UNLESS OTHERWISE NOTED ON PLANS.
REFER TO SCHEDULES FOR PIPE SIZE
REQUIREMENTS.
16. BUILDING COMPONENTS ABANDONED BY THE
SCOPE OF WORK SHALL BE SECURED TO
PREVENT FALLING, LOOSENING, OR CREATING
DAMAGE OF ANY KIND IN THE FUTURE.
17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD
OR REPLACE CASES, EVAPORATORS, ETC. THEN
24 TO 48 HOURS AFTER THE WORK IS
COMPLETED AND ALL FINAL ADJUSTMENTS
HAVE BEEN MADE, PROVIDE AND CHANGE
LIQUID LINE FILTER CORES, OIL SYSTEM FILTER
USING SPORLAN OF STYLE FILTER, AND
REPLACE SUCTION FILTERS. FILTERS ARE TO BE
RATED FOR WAX REMOVAL. CONTRACTOR TO
PROPERLY DISPOSE OF OIL AND COMPONENTS
REPLACED. REFER TO SPECIFICATION 15600.
18. REFER TO GROCERY ARCHITECTURAL
DRAWINGS FOR ADDITIONAL WORK BY
REFRIGERATION CONTRACTOR.
19. INSTALL ASSET TAGS ON ALL NEW
REFRIGERATED CASES AND COMPLETE THE
DATA COLLECTION INFORMATION. DELETE
DEMOED ASSETS FROM ASSET TAGGING
APPLICATION. REFER TO SPECIFICATIONS.
20. UPON START-UP OF ALL NEW REFRIGERATED
EQUIPMENT, CONSTRUCTION MANAGER SHALL
REQUEST THE BUILDING PERFORMANCE
REPORT FOR ALL RACKS AND SUCTION GROUPS
WHERE WORK IS PERFORMED. ANY DEVIATIONS
NOTED ON THE REPORT MUST BE CORRECTED
PRIOR TO PROJECT CLOSE OUT. REQUEST VIA
EMAIL AT B.PTEAM1@WAL-MART.COM
07.31.20
1" = 20'-0"2 REFRIGERATION OVERALL ROOF PLAN
1" = 20'-0"1 REFRIGERATION OVERALL GROCERY PLAN
ISSUE BLOCK
FLORI D
No. 63660
L
A
STATE OFM YICHAE L J AMES AM
E
S
TOPRROF
ESSIONAL E N G INEEEICENS
Not part of this application. A
permit application shall be
submitted for interior remodeling.
BEL0400AG6AEAB
(NEW)
BS09 GLY
1 2 3 4
E
BEC0750AG7AEAB
(NEW)
BS08 GLY
8FT -BMD-R
(NEW)
BS17 GLY
8FT -PF-54-R
(NEW)
BS18 GLY
8FT -DX6LD
(NEW)
BS20 GLY
12FT -DX6XN
(NEW)
BS19 GLY
24FT -DR6LD
(NEW)
BS07 GLY
32FT -DX6LD
(NEW)
BS01 GLY
24FT -DX6LD
(NEW)
BS02 GLY
36FT -DX6LD
(NEW)
BS03 GLY
28FT -DX6LD
(NEW)
BS04 GLY
32FT -DX6LN
(NEW)
BS05 GLY
24FT -DX6LN
(NEW)
BS06 GLY
CO
CO1.3BS GLYTYP
15.616
1.31BS GLY
1.4BS GLYBS07 GLY
1.5BS GLY1.51BS GLY
1.6BS GLY1.61BS GLY
1.7BS GLY1.7BS GLY1.71BS GLY1.8BS GLY 1.53BS GLY1.53BS GLY
1.52BS GLY
BS09 GLYBS08 GLY
(DTBS GLY
BYPASS)
5
R3.2
1.9BS GLY
2
R3.2
(TYP OF CIRCUITS
BS01 GLY -BS06 GLY)
15.624
15.691
1
R3.2
(TYP OF CIRCUITS
BS19 GLY -BS20 GLY)
15.624
15.691
1
R3
15.603
TYP
15.693
1
R3
15.603
TYP
15.693
6
R3.2
(TYP OF GLYCOL
FAN COIL UNITS)
15.611
TYP
15.612
15.610
3
R3.2
PROVIDE DRAIN
FITTING AT BOTTOM
OF PIPE DROP. (TYP)
3
R3.2
PROVIDE DRAIN
FITTING AT BOTTOM
OF PIPE DROP. (TYP)
1
R3.1
(TYP OF ALL
SECONDARY
PIPING)
2
R3.1
7
R3TYP
15.615
1
R3.2
1
R3.2
15.623
15.692
(TYP OF CIRCUITS
BS17 GLY -BS20 GLY)
15.623
15.692
15.624
15.691
15.624
15.691
INSTALL NEW GLYCOL
CHARGING STATION.
10
R3.2
NEW WALL PENETRATION.
REFER TO ARCHITECTURAL
AND STRUCTURAL.15.608
INSTALL NEW TCO2
CHARGING STATION.
4
R3.3
DTB GLY GLYCOL
CHARGING STATION
PIPING. (TYP)
CU5 TCO2 CHARGING
STATION PIPING. (TYP)
CU5 TCO2 CHARGING
STATION PIPING. (TYP)
1
R3
TYP
15.603
1 2 3
F
G
H
36FT -DX6LD
(NEW)
BS14 GLY
NEW REFRIGERATION ROOF PENETRATION. REFER
TO ARCHITECTURAL AND STRUCTURAL. REFER TO
REFRIGERATION ROOF PLAN FOR CONTINUATION.
DRAIN PAN
DTB CONN: 1
DTB CONN: 2
1BS GLY
1.1BS GLY
1.2BS GLY
DTB GLY GLYCOL
CHARGING STATION
PIPING. (TYP)BS14 GLY1.3BS GLY1.10BS GLY
1.11BS GLY
1
R3
15.603
TYP
15.693
2
R3
8
R3.2
15.609
6
R3.1
4
R3.2
3
R3.2
PROVIDE DRAIN
FITTING AT BOTTOM
OF PIPE DROP. (TYP)
1
R3.2
15.697
15.624
15.691
15.616
CO
CDCD
PIPING FROM DTB GLY ROOF
PENETRATION DRAIN PAN END ROOF PENETRATION
DRAIN PIPING OVER
CASE FLOOR DRAIN.
SHEET:
DRAWN BY:
CHECKED BY:
PROTO CYCLE:
DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
DOCUMENTS WITHOUT
SIGNATURE AND REQUIRED
SEAL OF AOR/EOR ARE NOT
FOR CONSTRUCTION
R1.1
ENLARGED
REFRIGERATION
PLANS
DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.COMPLY WITH CLEAN AIR ACT, TITLE VI, SECTION 608
AND CODE OF FEDERAL REGULATION TITLE 40, PART 82
WHEN ADDING OR REMOVING REFRIGERATED
EQUIPMENT. RECORD ALL EQUIPMENT IDENTIFICATION
NUMBERS, MODEL AND SERIAL NUMBERS, THE AMOUNT
OF REFRIGERANT RECOVERED FROM EACH UNIT, THE
DATE OF DECOMMISSIONING, COMPANY NAME AND
SIGNATURE OF ON-SITE SUPERVISOR.
EPA CLEAN AIR ACT
11.02.15
24 HOURS PRIOR TO SHUTTING DOWN ANY
REFRIGERATION SYSTEMS, HVAC SYSTEMS OR ENERGY
MANAGEMENT CONTROLS SYSTEMS, SEND EMAIL TO
NSRM@WALMART.COM. THE E-MAIL SHALL STATE WHAT,
WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG
IT IS ANTICIPATED TO BE SHUT DOWN. THEN SEND A
FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE
WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND
RUNNING.
KEYNOTES
15.603 SUPPORT HORIZONTAL RUNS OF REFRIGERANT
LINES ON 1-5/8" X 1-5/8" UNISTRUT CHANNELS.
REFER TO SPECIFICATIONS FOR PIPE HANGER
SPACING.
15.608 COORDINATE REFRIGERATION LINE ROUTING
THROUGH THE EXTERIOR WALL. WALL
REINFORCEMENTS, PENETRATION, AND HOOD
SUPPLIED BY OTHERS. COORDINATE EXACT SIZE
AND LOCATION OF WALL PENETRATIONS WITH
ARCHITECTURAL AND STRUCTURAL DRAWINGS.
COORDINATE WITH WALMART CONSTRUCTION
MANAGER AND OTHER TRADES UTILIZING
PENETRATION FOR SPACE ALLOCATION.
15.609 COORDINATE REFRIGERATION LINE ROUTING
THROUGH ROOF. ROOF REINFORCEMENTS,
PENETRATION, AND HOOD SUPPLIED BY
OTHERS. COORDINATE EXACT SIZE AND
LOCATION OF ROOF PENETRATIONS WITH
ARCHITECTURAL AND STRUCTURAL DRAWINGS.
COORDINATE WITH OTHER TRADES UTILIZING
PENETRATION FOR SPACE ALLOCATION.
15.610 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING
AND BOLT PENETRATIONS THROUGH
COOLER/FREEZER BOX WALLS OR CEILINGS.
REFER TO FAN COIL UNIT DETAIL.
15.611 SUPPORT UNIT COOLERS WITH BOLTS THROUGH
ROOF TO 1-5/8" X 1-5/8" X 10' LONG 14 GA.
GALVANIZED UNISTRUT SPANNING THREE ROOF
PANELS. PROVIDE DOUBLE NUTS ON EACH BOLT.
15.612 SEE SCHEDULES FOR UNIT COOLER TYPES,
SIZES, AND CAPACITIES; CONTROL METHOD; AND
ALL REFRIGERATION PIPING SIZES, ETC.
15.615 CONDENSATE DRAIN; PITCH DRAIN LINES DOWN
APPROXIMATELY 1/8" PER 12" TOWARD DRAIN.
PROVIDE COPPER PIPING WITH ELECTRIC HEAT
TAPE AND INSULATION ON ALL CONDENSATE
LINES EXPOSED TO FREEZING TEMPERATURES.
15.616 END CONDENSATE LINE OVER RECEPTOR W/AIR
GAP. CONTRACTOR SHALL ENSURE FLOOR
DRAIN(S) AND DRAIN LINE(S) SERVING WALK-IN
ARE FREE OF OBSTRUCTIONS AND FUNCTION
PROPERLY. WHERE EXTENSIVE DAMAGE EXISTS
AND/OR PROPER DRAINAGE CANNOT BE
OBTAINED COORDINATE WITH WALMART
MECHANICAL CONSTRUCTION MANAGER.
15.623 ROUTE REFRIGERATION LINES IN BASE OF CASE
FOR ALL BOTTOM FED CONNECTED CASES.
SLOPE BACK TO LEAD CASE AT 1" PER 20'-0" OF
RUN.
15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE
FOR ALL TOP FED CONNECTED CASES. SLOPE
BACK TO LEAD CASE AT 1" PER 20'-0" OF RUN.
REFER TO TOP FED PIPING DETAIL.
15.691 REFRIGERATION CONTRACTOR SHALL INSTALL
GLYCOL SUPPLY AND RETURN SHUT-OFF BALL
VALVES IN A SERVICE ACCESSIBLE LOCATION
ON TOP OF CASE.
15.692 REFRIGERATION CONTRACTOR SHALL INSTALL
GLYCOL SUPPLY AND RETURN SHUT-OFF BALL
VALVES IN A SERVICE ACCESSIBLE LOCATION
INSIDE CASE DRAIN PAN.
15.693 SLOPE GLYCOL REFRIGERANT LINES DOWN
TOWARD DRAIN LOCATIONS AT 1" PER 20' OF
RUN. PROVIDE MANUAL AIR VENT AT HIGHEST
POINT IN SYSTEM. REFER TO M.T. GLYCOL
PIPING VENT AND DRAIN INSTALLATION DETAIL.
LOCATE HIGHEST POINT OF REFRIGERATION
LINES JUST BELOW BOTTOM CHORD OF JOIST
OR BEAM. COORDINATE TO AVOID CONFLICTS
WITH DUCTWORK, LIGHTING, SKYLIGHTS, PIPING,
ETC. REFER TO PIPING DETAILS AND
SPECIFICATIONS.
15.697 PROVIDE SPARE STUB WITH ISOLATION BALL
VALVE AND CAP OFF FOR FUTURE USE.
REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL
FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO
REFRIGERATION EQUIPMENT.
SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE-SKIN
OF EXISTING REFRIGERATED CASES TO REMAIN.
ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A
WALMART APPROVED CONTRACTOR.
REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW
CASES BEING INSTALLED FOR CONNECTION LOCATION OF
UTILITIES. (TOP FED VS BOTTOM FED)
VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES
WITH FINAL MERCHANDISE PLAN.
COORDINATE LOCATION OF REFRIGERATED CASES WITH
PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR
AND SETTING DRAINS.
REMOVE EXISTING REFRIGERATION EQUIPMENT NOTED
FOR DEMO OR REPLACEMENT, INCLUDING (BUT NOT
LIMITED TO): REFRIGERATED CASES, WALK-IN COILS,
ASSOCIATED VALVES, REFRIGERATION AND
CONDENSATE PIPING, HANGERS AND SUPPORTS, AND
CONTROLS NOT BEING REUSED. COORDINATE DISPOSAL
OF EQUIPMENT WITH CONSTRUCTION MANAGER. PATCH
PENETRATIONS TO MATCH EXISTING. REFER TO
ARCHITECTURAL DRAWINGS.
ALL EXISTING REFRIGERATED CASES ARE TO REMAIN
UNLESS NOTED OTHERWISE.
PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING
RACK PARAMETERS, REFRIGERATION CONTRACTOR
SHALL REQUEST A SUCTION GROUP REPORT FOR ALL
RACKS AND SUCTION GROUPS WHERE WORK IS
PERFORMED. REQUEST VIA EMAIL AT
B.PTEAM1@WAL-MART.COM
REFRIGERATION SYMBOLS
RM-09.25.18
XXX
XXX
CIRCUIT NUMBER
MODEL NUMBER (CIRCUIT INFO)
CO CLEANOUT (CO)
CONDENSATE DRAIN LINE (CD)
CONNECT TO EXISTING
CONTINUATION
X
XX
DETAIL NUMBER
SHEET NUMBER
(DETAIL REFERENCE)
EVAPORATOR COIL
ISOLATION VALVE
ELBOW - TURNED DOWN
ELBOW - TURNED UP
XX.XXX REFRIGERATION KEYNOTE REFERENCE
REFRIGERATION PIPING (ABOVE)
REFRIGERATION PIPING (BELOW)
REFRIG PIPING CASE CONNECTION
ETR
(TYP)
EXISTING TO REMAIN
TYPICAL
*MODIFY CIRCUIT OR PIPE LENGTH
**NEW CASE, COIL, CIRCUIT OR VALVE
****CHANGE EXISTING PIPE SIZE AS INDICATED OR
NEW PIPE
^RISER SIZE IS SHOWN EVEN WHERE A RISER IS
NOT EXPECTED. THIS IS FOR REFERENCE ONLY
AND IS TO BE USED IN THE EVENT THAT A PIPING
CONFLICT CAUSES THE NEED FOR A RISER. IF
THE RISER LENGTH EXCEEDS 4 FEET, IT MUST BE
APPROVED BY ENGINEER OF RECORD.
#CONTRACTOR TO FIELD VERIFY EXISTING RISER
SIZE. IF EXISTING PIPE SIZE DOES NOT MATCH
SCHEDULE, REPLACE EXISTING RISER WITH NEW
SIZE AS SHOWN.
PIPING AND REFRIGERATION
SCHEDULE SYMBOLS
RM-10.06.20
GENERAL NOTES
1. PLANS INDICATE GENERAL ROUTING OF
REFRIGERANT LINES, WITH A SINGLE LINE
SHOWN INDICATING BOTH SUCTION AND LIQUID
LINE ROUTING FOR EACH SYSTEM.
2. REFRIGERATION SYSTEM INSTALLATION SHALL
BE IN COMPLETE CONFORMANCE WITH
SPECIFICATIONS, AND WITH ALL REQUIREMENTS
OF REFRIGERATION EQUIPMENT
MANUFACTURER.
3. REFRIGERATION DRAWINGS ARE PROVIDED AS
AN AID TO BIDDERS AND TO INDICATE DESIRED
ROUTING OF REFRIGERATION LINES;
CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR CORRECT INSTALLATION
OF PIPING AND ACCESSORIES TO PROVIDE A
COMPLETE AND FULLY OPERATING SYSTEM.
4. REFER TO SPECIFICATION 15600 FOR
INSULATION THICKNESS. INSIDE DIAMETER OF
INSULATION SHALL MATCH PIPE DIAMETER TO
MINIMIZE AIR GAPS BETWEEN PIPING AND
INSULATION. PROVIDE FACTORY PRE-
MANUFACTURED FITTINGS AT ALL TRAPS AND
ELBOWS. WHERE PRE-MANUFACTURED
FITTINGS ARE UNAVAILABLE MITER CUT ALL
FITTINGS TO ENSURE PROPER SEAL BETWEEN
INSULATION SEGMENTS.
5. PIPE INSULATION SHALL BE BLACK, UNLESS
OTHERWISE STATED ON PLANS OR
SPECIFICATIONS.
6. COORDINATE REFRIGERATION DEMOLITION
ISSUES WITH THE ARCHITECTURAL DRAWINGS.
REFER TO ARCHITECTURAL PLANS FOR
REFRIGERATION EQUIPMENT DEMOLITION AND
COOLER REPAIR AND REMODELING.
7. REFRIGERATION SYSTEM SHALL REMAIN
OPERATIONAL DURING REMODELING. DURING
THE PHASING OF OLD TO NEW SYSTEMS, BOTH
NEW AND OLD REFRIGERATION SYSTEMS MAY
BE REQUIRED TO OPERATE AT THE SAME TIME
FOR A SHORT PERIOD.
8. WHERE NEW REFRIGERATED EQUIPMENT IS
INDICATED ON THE DRAWINGS, PROVIDE
DEMOLITION, REMOVAL, AND TEMPORARY
STORAGE OF OLD EQUIPMENT PER WALMART
MECHANICAL SERVICES CONSTRUCTION
MANAGER'S INSTRUCTIONS, AND
REFRIGERATION DEMO NOTES.
9. COORDINATE REMOVAL AND DISPOSAL OF
EXISTING EVAPORATORS, REFRIGERATED
CASES, AND CONDENSING UNITS, WITH
WALMART MECHANICAL SERVICES
CONSTRUCTION MANAGER.
10. REMOVE COPPER LINES, EVAPORATORS, AND
CONDENSATE LINES FROM COOLERS/
FREEZERS BEING REMOVED FROM SITE.
COORDINATE WITH WALK-IN PANEL VENDOR
FOR TIME LINE OF REPLACEMENT. REFERENCE
SPECIFICATION FOR CONTACT INFORMATION.
11. WALK-IN PANEL VENDOR SHALL PROPERLY
PREPARE ALL COOLER/FREEZER PANELS,
GLASS DOORS, SLIDER OR SWING DOORS,
PALLETIZE, AND PREPARE THE EQUIPMENT TO
SHIP OFF SITE.
12. COORDINATE WITH FIRE PROTECTION
CONTRACTOR FOR THE REMOVAL OF
SPRINKLERS FOR ALL REMOVED
COOLER/FREEZER BOXES.
13. COORDINATE WITH ELECTRICAL CONTRACTOR
FOR THE REMOVAL OF ALL REMOVED
COOLER/FREEZER BOXES ELECTRICAL WIRING
DEVICES.
14. COORDINATE WITH BAS CONTRACTOR FOR THE
REMOVAL OF ALL REMOVED COOLER/FREEZER
BOXES BAS WIRING AND DEVICES.
15. EXISTING REFRIGERATION PIPING MAY BE RE-
USED UNLESS OTHERWISE NOTED ON PLANS.
REFER TO SCHEDULES FOR PIPE SIZE
REQUIREMENTS.
16. BUILDING COMPONENTS ABANDONED BY THE
SCOPE OF WORK SHALL BE SECURED TO
PREVENT FALLING, LOOSENING, OR CREATING
DAMAGE OF ANY KIND IN THE FUTURE.
17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD
OR REPLACE CASES, EVAPORATORS, ETC. THEN
24 TO 48 HOURS AFTER THE WORK IS
COMPLETED AND ALL FINAL ADJUSTMENTS
HAVE BEEN MADE, PROVIDE AND CHANGE
LIQUID LINE FILTER CORES, OIL SYSTEM FILTER
USING SPORLAN OF STYLE FILTER, AND
REPLACE SUCTION FILTERS. FILTERS ARE TO BE
RATED FOR WAX REMOVAL. CONTRACTOR TO
PROPERLY DISPOSE OF OIL AND COMPONENTS
REPLACED. REFER TO SPECIFICATION 15600.
18. REFER TO GROCERY ARCHITECTURAL
DRAWINGS FOR ADDITIONAL WORK BY
REFRIGERATION CONTRACTOR.
19. INSTALL ASSET TAGS ON ALL NEW
REFRIGERATED CASES AND COMPLETE THE
DATA COLLECTION INFORMATION. DELETE
DEMOED ASSETS FROM ASSET TAGGING
APPLICATION. REFER TO SPECIFICATIONS.
20. UPON START-UP OF ALL NEW REFRIGERATED
EQUIPMENT, CONSTRUCTION MANAGER SHALL
REQUEST THE BUILDING PERFORMANCE
REPORT FOR ALL RACKS AND SUCTION GROUPS
WHERE WORK IS PERFORMED. ANY DEVIATIONS
NOTED ON THE REPORT MUST BE CORRECTED
PRIOR TO PROJECT CLOSE OUT. REQUEST VIA
EMAIL AT B.PTEAM1@WAL-MART.COM
07.31.20
1/8" = 1'-0"1 ENLARGED REFRIGERATION PLAN FRONT
1/8" = 1'-0"2 ENLARGED REFRIGERATION PLAN REAR
ISSUE BLOCK
FLORI D
No. 63660
L
A
STATE OFM YICHAE L J AMES AM
E
S
TOPRROF
ESSIONAL E N G INEEEICENS
Not part of this application. A
permit application shall be
submitted for interior remodeling.
SUPPLY AND RETURN AS SPECIFIED IN PIPING
SCHEDULE
SPACE AT 4' INTERVALS TYP
1" EXPANDED
POLYSTYRENE OR
EQUAL
6" MINIMUM WIDTH.
LENGTH AS
REQUIRED TYP
ROUTE SUPPLY AND
RETURN HEADERS ON
TOP OF CASES
SUPPLY AND RETURN SHUT-
OFF VALVES FURNISHED AND
INSTALLED BY
REFRIGERATION
CONTRACTOR.
ADJUST LOCATION OF DROPS AS REQUIRED.
IF ROUTED IN WALL, EXIT WALL 6" ABOVE TOP
OF CASE HEIGHT TYP
PROVIDE TEMPERATURE/PRESSURE
TEST WELLS AT LAST CASE IN LINEUP.
REFRIGERATION CASE MANUFACTURER TO
FURNISH AND INSTALL TOP FED CASES WITH
FACTORY INSTALLED SHUT-OFF VALVES, SUPPLY
SOLENOID VALVES, AND RETURN AUTOFLOW
BALANCE VALVES FOR EACH CASE. REF
SPECIFICATIONS
REAR HALF OF
REFRIGERATED CASE
DESIGNATED FOR
PIPING AND VALVES.
FRONT HALF OF
REFRIGERATED CASE
DESIGNATED FOR
ELECTRICAL AND BAS
COMPONENTS.
RETURN SUB-LOOP
BRANCH
SUPPLY SUB-LOOP
BRANCH
PROVIDE SUPPLY AND
RETURN SUB-LOOP
SHUT-OFF VALVES .
REFER TO PLANS FOR
LOCATIONS.
CONTINUES TO
ADDITIONAL CIRCUITS
ON SUB-LOOP
MAIN SUPPLY AND RETURN
BRANCH PIPING
SUPPLY AND
RETURN LINES FOR
SECOND CIRCUIT
ON SUB-LOOP
CONTINUES TO
SECONDARY PUMP SKID
REFER TO SPECIFICATION
SECTION 15181 FOR PIPE
LABELING REQUIREMENTS. (TYP
OF ALL SECONDARY GLYCOL
SUPPLY AND RETURN PIPING)
TEMPORARY U-BEND BYPASS TO BE REMOVED
BEFORE FINAL CONNECTION. REFER TO U-
BEND BYPASS DETAIL.
SUPPLY AND RETURN AS SPECIFIED IN PIPING
SCHEDULE
SPACE AT 4' INTERVALS TYP
1" EXPANDED
POLYSTYRENE OR
EQUAL
6" MINIMUM WIDTH.
LENGTH AS
REQUIRED TYP
ROUTE SUPPLY AND
RETURN HEADERS ON
TOP OF CASES
SUPPLY AND RETURN SHUT-OFF VALVES
FURNISHED AND INSTALLED BY
REFRIGERATION CONTRACTOR.
ADJUST LOCATION OF DROPS AS REQUIRED.
IF ROUTED IN WALL, EXIT WALL 6" ABOVE TOP
OF CASE HEIGHT TYP
PROVIDE
TEMPERATURE/PRESSURE TEST
WELLS AT LAST CASE IN LINEUP.
REFRIGERATION CASE MANUFACTURER TO
FURNISH AND INSTALL TOP FED CASES WITH
FACTORY INSTALLED SHUT-OFF VALVES, SUPPLY
SOLENOID VALVES, AND RETURN AUTOFLOW
BALANCE VALVES FOR EACH CASE. REF
SPECIFICATIONS
REAR HALF OF
REFRIGERATED CASE
DESIGNATED FOR
PIPING AND VALVES.
FRONT HALF OF
REFRIGERATED CASE
DESIGNATED FOR
ELECTRICAL AND BAS
COMPONENTS.
RETURN SUB-LOOP
BRANCH
SUPPLY SUB-LOOP
BRANCH
PROVIDE SUPPLY AND
RETURN SUB-LOOP
SHUT-OFF VALVES .
REFER TO PLANS FOR
LOCATIONS.
CONTINUES TO
ADDITIONAL CIRCUITS
ON SUB-LOOP
MAIN SUPPLY AND RETURN
BRANCH PIPING
SUPPLY AND
RETURN LINES FOR
SECOND CIRCUIT
ON SUB-LOOP
CONTINUES TO
SECONDARY PUMP SKID
REFER TO SPECIFICATION
SECTION 15181 FOR PIPE
LABELING REQUIREMENTS. (TYP
OF ALL SECONDARY GLYCOL
SUPPLY AND RETURN PIPING)
APPROXIMATELY 2' ABOVE
TOP OF CASE TYP
TEMPORARY U-BEND BYPASS
TO BE REMOVED BEFORE FINAL
CONNECTION. REFERENCE U-
BEND BYPASS DETAIL.
FULLY INSULATE
PIPING BEFORE
PHASING.
SUPPLY LINE FROM RACK
PROVIDE NORMALLY OPEN
GLYCOL ISOLATION VALVES IN
AN ACCESSIBLE LOCATION.
REFER TO SPECIFICATIONS.
INSULATION
RETURN LINE TO RACK
CONTRACTOR PROVIDED
BLIND FLANGE
CONNECTION. (TYP)
PROVIDED ISOLATION
VALVE FIELD
INSTALLED. (TYP BOTH
SUPPLY AND RETURN)
EMERGENCY CHILLER
CONNECTION TO PUMP
SKID. MATCH MAIN SUPPLY
AND RETURN PIPE SIZE.
SUPPLY FROM
PUMP SKID
RETURN TO
PUMP SKID
SUPPLY TO
CASES/COILS
RETURN FROM
CASES/COILS
SUPPORT EMERGENCY
CHILLER CONNECTION. REFER
TO REFRIGERATION PIPING
SUPPORT DETAIL. (TYP)
GLYCOL RETURN
GLYCOL SUPPLY INSTALL BYPASS VALVE IN
LOCATION SHOWN ON PIPING
PLANS. CONNECT BYPASS
LINE TO MAIN PIPING; MAIN
PIPING TO BE SAME SIZE OR
LARGER THAN BYPASS VALVE
SIZE.
BYPASS LINE SIZE TO MATCH
BYPASS VALVE SIZE
INSTALL OWNER FURNISHED
SECONDARY GLYCOL BYPASS
VALVE, SEE REFRIGERATION
SECONDARY PUMP SKID
SCHEDULE FOR SIZE. ENSURE
VALVE DIRECTION ALLOWS FLOW
FROM SUPPLY TO RETURN.
LABEL GLYCOL PIPING PER
SPECIFICATION SECTION 15181
REFRIGERATION CONTRACTOR
SHALL FURNISH AND INSTALL FULL
PORT ISOLATION BALL VALVES ON
BOTH SIDES OF BYPASS VALVE.
REFER TO GLYCOL REFRIGERATION
ISOLATION VALVES DETAIL.
FLOW DIRECTION
BYPASS LINE
MAIN
CLOSE VALVES DURING
INITIAL SYSTEM FLUSH, OPEN
DURING NORMAL OPERATION.
VENT & DRAIN
1.PROVIDE 1/2" VENT VALVES AT ALL HIGH POINTS
OF THE PIPING TO REMOVE AIR DURING
INSTALLATION AND MAINTENANCE. HIGH POINTS
ARE ANY PLACE ON A REFRIGERATION LINE THAT
AIR POCKETS COULD FORM. PROVIDE DROP-
DOWN LINE FOR CONVENIENT ACCESS TO THE
VALVE AS REQUIRED.
2.PROVIDE 3/4" DRAIN VALVES AT ALL LOW POINTS
IN MAINS, RISERS, AND BRANCH LINES. LOW
POINTS ARE DEFINED AS ANY PLACE ON A
REFRIGERATION LINE THAT CAN POOL GLYCOL
AS SYSTEM IS DRAINED.
3.THE VENT AND DRAIN VALVES TO HAVE THREADED
CONNECTIONS FOR HOSES OR PIPES. THEY SHALL
REMAIN CAPPED DURING NORMAL OPERATION.
4.AVOID CHANGE IN ELEVATION FOR THE PIPE
RUN.
5.REFERENCE SPECIFICATION SECTION 15181.
MINIMUM 1/2" TEE
INSULATION AND
VAPOR BARRIER PER
SPECIFICATIONS
INSTALL VENT AT
HIGHEST POINT
OF PIPING 1/2 " MANUAL AIR VENT
WITH THREADED
NIPPLE AND CAP.
NORMALLY CLOSED.
OBSTRUCTIONS (TYP)
MAINTAIN INSULATION
AROUND NIPPLE (TYP)
INSULATION
PER SPECIFICATIONS
MINIMUM 3/4" TEE FITTING.
3/4" DRAIN VALVE WITH
THREADED NIPPLE AND
CAP. NORMALLY CLOSED
INSTALL DRAIN PER
SPECIFICATION 15181.
CIRCUIT LEVEL SUPPLY
AND RETURN
ISOLATION VALVES.
SUPPLY FROM
PUMP SKID
RETURN TO
PUMP SKID
LEAVE SUFFICIENT SPACE TO
ALLOW REMOVAL OF U-BEND
AND EXTENSION OF PIPING
DURING PHASING OF FINAL
CONNECTION.
REFERENCE SPEC 15181 FOR
U-BEND BYPASS
REQUIREMENTS AND USAGE.
FULLY INSULATE PIPING
AND VALVES PRIOR TO
FILLING SYSTEM.
12" FROM TOP
OF CASE
INSTALL 1/4" MANUAL
AIR VENT WITH NIPPLE
AND CAP. REFER TO
SPECIFICATION 15181.
VALVES SHALL BE FULLY
INSULATED AND HAVE EXTENDED
STEM/BONNET SUITABLE FOR
INSULATION THICKNESS.
TOP OF CASE
24" MAX
SUPPORT PIPING WITHIN 1
FOOT OF RISER. REFER TO
HORIZONTAL REFRIGERANT
LINE SUPPORT DETAIL.
ROOF OPENING MAY CONTAIN
MULTIPLE PIPING AND CONDUIT TYPES,
SEE PLANS. MINIMUM 2" GAP BETWEEN
ADJACENT PIPES OR CONDUITS.
OWNER PROVIDED
MANUFACTURED CURB, SEE
ARCHITECTURAL DETAILS FOR
SIZE, INSULATION, ASSEMBLY,
AND SEALING REQUIREMENTS
SUPPORT PIPING WITHIN 1 FOOT OF
RISER USING KLO-SHURE, SEE ROOF
SUPPORT DETAIL.
2'-0" WIDE, 18 GAUGE SHEET METAL
DRAIN PAN WITH INTERNAL MASTIC
COATING
SUPPORT ROD (TYP)
PROVIDE A 3/4" PVC DRAIN FOR ANY
PENETRATION WHOSE WIDTH IS 16" -24".
PROVIDE A 1' PVC DRAIN FOR ANY
PENETRATION WHOSE WIDTH IS 30" -36",
AND PROVIDE A 1 1/2" PVC DRAIN FOR
ANY PENETRATIONS WHOSE WIDTH IS
GREATER THAN 36". SLOPE PVC DRAIN
LINE 1/8" PER 12" AND TERMINATE OVER
DRAIN WITH 2" AIR GAP.
DO NOT TRAP AT BOTTOM OF
GLYCOL RISER. INSTALL DRAIN
VALVE AT ALL LOW POINTS.
REMOVABLE HOOD
PROVIDED WITH CURB.
INVERTED TRAP ALLOWED BUT NOT REQUIRED
FOR GLYCOL PIPING. INSTALL AIR VENT ON ALL
HIGH POINTS.
SECURE PIPING TO
UNISTRUT AT TOP OF
CURB WITH KLO-SHURE
CLAMP
5" CENTER OF PIPE TO TOP OF CURB.
AIR VENT AT HIGH POINT IN ACCESSIBLE
LOCATION.
LABEL PIPING PER
SPECIFICATION SECTION
15181.
1' MAX
1' MAX
GLYCOL
FAN/
COIL
UNIT
TOP OF BOX
BOX WALL
MOUNT COIL ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS (TYP).
COIL DRAIN AND ISOLATION VALVE, LOCATED AT
LOWER CONNECTION OF COIL
PROVIDE COIL SUPPLY SHUTOFF VALVE,
ONE PER CIRCUIT.
INSTALL REFRIGERATION EQUIPMENT SUPPLIER-FURNISHED COIL
AUTOFLOW BALANCING VALVE, ONE PER COIL.
PROVIDE CIRCUIT RETURN
SHUTOFF VALVE, ONE PER CIRCUIT.
SUPPORT EVAPORATORS WITH BOLTS
THRU CEILING PANEL TO 1 5/8" X 1 5/8" X
10 FT. LONG 14 GAUGE. GALVANIZED
UNISTRUT SPANNING THREE
COOLER/FREEZER CEILING PANELS.
PROVIDE DOUBLE NUTS ON EACH BOLT.
SEAL AROUND BOLT PENETRATIONS THRU
COOLER/FREEZER BOX WALLS OR CEILINGS
WITH BACKER ROD AND
SEALANT. TYP
SUPPLY
RETURN
FOAM TOPS OF BOLT
PENETRATIONS. TYP
DRILL HOLE IN COOLER/FREEZER BOX WALLS, CENTER PIPE
IN OPENING, AND SEAL WITH EXPANDING FOAM. AFTER
FOAM CURES, TRIM FLUSH TO PANEL. BUTT INSULATION TO
THE BOUNDARY OF BOX PENETRATION. SEAL WHERE
INSULATION BUTTS AGAINST THE PANEL AND AROUND
PERIMETER OF INSULATION TO CREATE VAPOR BARRIER.
TYP OF ALL PIPE PENETRATIONS THROUGH BOX WALL.
INSULATED WALL
SILICONE SEALANT
HOLE DIAMETER 1" GREATER THAN PIPE
SECONDARY OR CONDENSATE PIPE
PIPE
INSULATION
EXPANDING
FOAM
MOUNT REFRIGERATION CONTROL VALVES NEAR EDGE OF
WALK-IN FOR SERVICE ACCESS FROM LADDERS. COORDINATE
WITH EDGE PROTECTION NET SYSTEM. REF ARCHITECTURAL
COPPER TO PVC CONNECTION OUTSIDE OF WALL
AS REQUIRED. INSULATE COPPER PIPE OUTSIDE
COOLER WALL PER SPECIFICATIONS
PVC DRAIN TRAP OUTSIDE
DRAIN PAN
UNION
PVC
TERMINATE CONDENSATE DRAIN OVER
HUB DRAIN OR SERVICE SINK WITH AIR
GAP.
PROVIDE RUNNING TRAP FOR INTERIOR
CONDENSATE HEADERS RUNNING BETWEEN
MULTIPLE WALK-INS OPERATING AT
TEMPERATURES ABOVE FREEZING.
TEMPORARY U-BEND BYPASS TO BE REMOVED BEFORE
FINAL CONNECTION. REFERENCE U-BEND BYPASS DETAIL.
PROVIDE SOLENOID VALVE, ONE PER COIL.
PROVIDE COPPER CONDENSATE DRAIN PIPING FULL
SIZE OF COIL DRAIN PAN CONNECTION AND SLOPE
1/8" PER 1'-0" TOWARD DRAIN.
REFRIGERATION CONTRACTOR FURNISHED FIELD
INSTALLED 1" ISOLATION BALL VALVE (TYP)
PIPE SUPPORT. REFER TO
HORIZONTAL REFRIGERANT
LINE SUPPORT DETAIL
ROOF OPENING TO
ACCOMMODATE BOTH
REFRIGERATION PIPING AND
ELECTRICAL CONDUIT. REFER
TO ARCH AND REFRIG PLANS.
REFER TO ARCHITECTURAL
DETAIL FOR INSTALLATION
OF MANUFACTURED METAL
CURB, INSULATION, AND
SHEET METAL ENCLOSURE
SUPPORT PIPING ON ROOF.
REFER TO REFRIGERATION
PIPING SUPPORT DETAIL.
3/4" CHARGING HOSE.
CAP WITH CHAIN
WHEN NOT IN USE.
PROVIDE 3/4" MALE CONNECTION. MOUNT 60"
AFF. PROVIDE CAP WITH CHAIN AND CAP
WHEN NOT IN USE. CONNECTION SHALL
TERMINATE OUTWARD, AWAY FROM WALL.
ALL CHARGING STATION EQUIPMENT
FURNISHED AND INSTALLED BY
REFRIGERATION CONTRACTOR.
PROVIDE 3/4" HOSE
CONNECTION.
PROVIDE 1" COPPER
PIPING FROM GLYCOL
FEEDER STATION TO
PUMP SKID.
PROVIDE SPARE STUB AND CAP
END FOR FUTURE USE. (TYP)
REFERENCE UNISTRUT PIPING
SUPPORT DETAIL.
PROVIDE TAG INDICATING SKID SERVED. REFER TO SPEC
15181 FOR PIPE LABELING REQUIREMENTS.
TYPICAL OF EACH CHARGING LINE TO PUMP SKID.
6"
PROVIDE PIPE LABELS
AT EACH CONNECTION
PER SPECIFICATION
SECTION 15181.
LABEL GLYCOL CHARGING
LINE ON ROOF AS "GLYCOL
CHARGING". REFER TO
SPEC 15181 FOR LABELING
REQUIREMENTS.
BOLLARD. REFER TO ARCH. (TYP)
SIDE VIEW
VERTICAL PIPING
SUPPORT. REFER
TO VERTICAL
REFRIGERANT LINE
SUPPORT DETAIL
ROUTE PIPING
THROUGH NEW OR
EXISTING WALL
PENETRATIONS.
REFER TO ARCH
AND STRUCTURAL.
SHEET:
DRAWN BY:
CHECKED BY:
PROTO CYCLE:
DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
DOCUMENTS WITHOUT
SIGNATURE AND REQUIRED
SEAL OF AOR/EOR ARE NOT
FOR CONSTRUCTION
R3.2
REFRIGERATION
DETAILS
GLYCOL
DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.NTS1CASE PIPING (HORIZONTAL OPTION) (GLYCOL)
NTS2CASE PIPING (VERTICAL OPTION) (GLYCOL)
NTS4ISOLATION VALVES (GLYCOL)
NTS7
REMOTE EMERGENCY CHILLER
CONNECTION (GLYCOL)
NTS5END-OF-LOOP BYPASS VALVE (GLYCOL)
NTS3PIPING VENT AND DRAIN INSTALLATION (GLYCOL)
NTS9TEMPORARY U-BEND BYPASS (GLYCOL)
NTS10CHARGING STATION (GLYCOL)NTS8ROOF PENETRATION (GLYCOL)
NTS6FAN-COIL UNIT (GLYCOL)
ISSUE BLOCK
FLORI D
No. 63660
L
A
STATE OFM YICHAE L J AMES AM
E
S
TOPRROF
ESSIONAL E N G INEEEICENS
Not part of this application. A
permit application shall be
submitted for interior remodeling.
SUCTION RISER
SUCTION MAIN
LIQUID BRANCH
LIQUID MAIN SUCTION LINES SHALL HAVE AN
INVERTED TRAP
REDUCE RISER SIZE
AFTER BASE TRAP
PROVIDE A P-TRAP AT THE BOTTOM OF THE RISER.
PROVIDE AN INVERTED P-TRAP AT RISER TRANSITION TO
HORIZONTAL
LIQUID LINES BRANCHING FROM THE
MAIN MUST EXIT FROM THE SIDE OF
THE MAIN
INVERTED P-TRAP SAME
SIZE AS VERTICAL RISER
MINIMUM DIST 6"ROOF MEMBRANE
REFRIGERATION PIPING
(TYP)
CUSH-A-CLAMP FIRMLY
CLAMPED TO PIPE (TYP)
UNISTRUT
P-1000 (TYP.)DURA-BLOK DB6-SERIES OR
EQUIVALENT CHANNEL
SUPPORT. (TYP)
SIDE VIEW SECTION VIEW
RUN CONDUIT ON
UNISTRUT AS
NEEDED
REFER TO SPECIFICATIONS
FOR PIPING SUPPORT
SPACING REQUIREMENTS. DO
NOT ATTACH BLOCK TO ROOF.
PROVIDE 60 MIL WHITE TPO
MEMBRANE SET ON BARE
ROOF MEMBRANE
FROM SYSTEM
TO CASE/EVAPORATOR
TO SYSTEM
FROM CASE/EVAPORATOR
TO SYSTEMFROM SYSTEM
BALL VALVE WITH
INTEGRATED
PRESSURE RELIEF
(TYP)
RETURN/SUCTION
LINE ISOLATION
CHECK VALVE
SUPPLY/LIQUID
LINE ISOLATION
CHECK VALVE
TO CASE/EVAPORATOR FROM CASE/EVAPORATOR
COMPONENTS INSIDE
DASHED LINES ARE
FIELD-ASSEMBLED.NORMAL DIRECTION
OF REFRIGERANT
FLOW (TYP)
INSTALL PACKED LINE
ANGLE VALVE FOR
SERVICE.
BALL VALVE.
INSTALL PACKED LINE
ANGLE VALVE FOR
SERVICE.
RETURN/SUCTION
LINE ISOLATION
CHECK VALVE
SUPPLY/LIQUID
LINE ISOLATION
CHECK VALVE
REFER TO REFRIGERATION PIPING AND
VALVE SCHEDULES FOR VALVE LOCATIONS
QUANTITIES.
INTERNAL CHECK VALVE (SPORLAN MODEL EBV -
REQUIRED FOR LINES 1 1/8'' AND SMALLER)
EXTERNAL CHECK VALVE (FOR
LINES GREATER THAN 1 1/8")
REFER TO REFRIGERATION PIPING AND
VALVE SCHEDULES FOR VALVE LOCATIONS
QUANTITIES.
NOTES:
1.PROVIDE INSULATION THAT COMPLETELY ENCAPSULATES ALL SURFACES. REFER TO SPECIFICATIONS.
2.ISOLATION CHECK VALVES MUST BE ORIENTED WITH CHECK VALVE (INTERNAL OR EXTERNAL) ALLOWING FLOW AWAY FROM UNIT COOLER AND
BACK TO SECONDARY PUMP SKID OR RACK SYSTEM.
3.REFERENCE PARTS AND EQUIPMENT RESPONSIBILITY MATRIX FOR ALL LOOSE PARTS AND EQUIPMENT.
PROVIDE 1/2" ISOLATION BALL VALVE. (TYP)
PROVIDE 650 PSIG SERVICE PRESSURE RELIEF
VALVE ON ROOF. LOCATE VALVE AT LEAST 20 FT
FROM ANY RTU, AHU OR EXHAUST FAN. MOUNT
VERTICALLY. (TYP)
PIPE SUPPORT. REFER TO
HORIZONTAL REFRIGERANT
LINE SUPPORT DETAIL
ROOF OPENING TO ACCOMMODATE
REFRIGERATION PIPING. REFER TO
ARCH AND REFRIG PLANS.
REFER TO ARCHITECTURAL
DETAIL FOR INSTALLATION
OF MANUFACTURED METAL
CURB, INSULATION, AND
SHEET METAL ENCLOSURE
SUPPORT PIPING ON ROOF.
REFER TO REFRIGERATION
PIPING SUPPORT DETAIL.
VERTICAL PIPING
SUPPORT. REFER
TO VERTICAL
REFRIGERANT LINE
SUPPORT DETAIL
CONTRACTOR PROVIDED FILTER DRIER TO
BE USED DURING SYSTEM CHARGING.
REMOVE FILTER DRIER AFTER USE.
PROVIDE 1/2" FLARE MALE CONNECTION. CAP
WITH CHAIN WHEN NOT IN USE. INSTALL
EQUIPMENT AT 30" AFF. CONNECTION SHALL
TERMINATE OUTWARD, AWAY FROM WALL.
PROVIDE 1/4" FLARE ACCESS PORT. (TYP)
PROVIDE 1/4" FLARE ACCESS PORT.
PROVIDE 1/2" FLARE MALE
CONNECTION. CONNECTION
SHALL BE EQUAL TO OR
HIGHER THAN THE TOP MOST
SIGHT GLASS ON THE CO2
VESSEL. CAP WITH CHAIN
WHEN NOT IN USE. (TYP)
PROVIDE 1/2" COPPER
PIPING FROM CO2
CHARGING STATION
TO PUMP SKID.
PROVIDE RIGID PVC SIGN WITH PRINT TEXT, MINIMUM
2" TEXT HEIGHT. SIGN SHALL BE LOCATED NEXT TO
THE CO2 CHARGING STATION AND READ:
"ALWAYS CHARGE SECONDARY CO2 SYSTEMS
THROUGH A FILTER DRIER. DO NOT TRAP LIQUID BY
CLOSING CHARGING STATION AND ISOLATION VALVES
WHEN SERVICING. ALWAYS VACUUM CHARGING LINE
AFTER CHARGING IS COMPLETE. CHARGE
SECONDARY CO2 SYSTEMS WITH 99.99% PURE OR
HIGHER FOOD AND BEVERAGE GRADE CO2"
PROVIDE SPARE AND CAP END FOR FUTURE USE. (TYP)
REFERENCE UNISTRUT PIPING SUPPORT DETAIL.
TYPICAL OF EACH CHARGING LINE TO PUMP SKID, PACK, OR CU.
PROVIDE PIPE LABELS AT EACH CONNECTION
WITH SYSTEM NAME TO BE CONNECTED.
LABEL CO2 CHARGING LINE. REFER TO PIPE LABEL
DETAIL FOR LABELING REQUIREMENTS. (TYP)
6"
REFERENCE PARTS AND EQUIPMENT
RESPONSIBILITY MATRIX FOR ALL LOOSE PARTS
AND EQUIPMENT.
SIDE VIEW
NEW CHARGING STATION PIPING. (TYP)
PROVIDE RIGID PVC SIGN WITH PRINT TEXT, MINIMUM
2" TEXT HEIGHT. SIGN SHALL BE LOCATED NEXT TO
THE CO2 CHARGING STATION AND READ:
"ALWAYS CHARGE TRANSCRITICAL CO2 SYSTEMS
THROUGH A FILTER DRIER. DO NOT TRAP LIQUID BY
CLOSING CHARGING STATION AND ISOLATION VALVES
WHEN SERVICING. ALWAYS VACUUM CHARGING LINE
AFTER CHARGING IS COMPLETE. CHARGE
TRANSCRITICAL CO2 SYSTEMS WITH 99.99% PURE OR
HIGHER REFRIGERANT GRADE R-744"
BOLLARD. REFER TO ARCH. (TYP)
ROUTE PIPING
THROUGH NEW OR
EXISTING WALL
PENETRATIONS.
REFER TO ARCH
AND STRUCTURAL.
CU CHARGING
BRANCH LINES.
SUCTION LINE
LIQUID LINE
ROUTE LIQUID AND SUCTION
HEADERS ON TOP OF CASES
WHERE POSSIBLE.
SPACE AT 4' INTERVALS. (TYP)
ADJUST LOCATION OF
DROPS AS REQUIRED. (TYP)
PROVIDE TRAP
AT BASE. (TYP)
REFRIGERATED CASE
MANUFACTURER TO PROVIDED
TOP CONNECTED CASES, AND
NSF INSULATION FOR EACH
CASE. REF SPECIFICATIONS.
FRONT OF REFRIGERATED CASE.
INSTALL CIRCUIT LIQUID AND SUCTION
ISOLATION CHECK VALVES. REFER TO CO2
ISOLATION CHECK VALVES DETAIL.
(TOP OF CASE)
1" EXPANDED POLYSTYRENE
OR EQUAL. TYP
VALANCE FURNISHED BY CASE
MANUFACTURER, INSTALLED BY
REFRIGERATION CONTRACTOR.
REAR HALF OF
REFRIGERATED CASE
DESIGNATED FOR PIPING
AND VALVES.
FRONT HALF OF REFRIGERATED
CASE DESIGNATED FOR
ELECTRICAL AND BAS
COMPONENTS. DO NOT BLOCK
BAS COMPONENTS OR COVERS.
INSTALL CASE SUCTION PIPING TO ALLOW GRAVITY DRAINAGE OF OIL BACK
TO THE BASE TRAP AT THE BOTTOM OF THE SUCTION RISER. INSTALL
LIQUID PIPING TO ALLOW REQUIRED ROUTING OF CASE SUCTION PIPING.
SUCTION SUB-LOOP
BRANCH
LIQUID SUB-LOOP BRANCH
DROP CIRCUIT SUCTION LINE INTO
TOP OF SUCTION SUB-LOOP
BRANCH. REF CO2 PIPING DETAILS
INSTALL LIQUID AND SUCTION SUB-LOOP
ISOLATION CHECK VALVES. REFER TO
PLANS FOR LOCATIONS.
6" MINIMUM WIDTH. LENGTH AS
REQUIRED. TYP
CONTINUES TO ADDITIONAL
CIRCUITS ON SUB-LOOP
SUCTION AND LIQUID
LINES FOR SECOND
CIRCUIT ON SUB-LOOP
MAIN SUCTION AND
LIQUID BRANCH
CONTINUES TO RACK
INSTALL ISOLATION
CHECK VALVES
APPROXIMATELY 2' ABOVE
TOP OF CASE TYP
REFERENCE PARTS AND EQUIPMENT
RESPONSIBILITY MATRIX FOR ALL
LOOSE PARTS AND EQUIPMENT.
INSTALL LIQUID LINE WITH
BULLHEAD TEES AT CASES PER
SPECIFICATIONS. (TYP)
NTS1PIPING DETAILS (TCO2)
NTS2REFRIGERATION PIPING SUPPORT (ON ROOF)(DX)(TCO2)
SHEET:
DRAWN BY:
CHECKED BY:
PROTO CYCLE:
DOCUMENT DATE:CONSULTANTSSTIPULATION FOR REUSEPROTO:JOB NUMBER:THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE AT:CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW.P (407) 661-9100F (407) 661-9101c-p.comFlorida Corporate Certificate #AA C0005262600 Maitland Center ParkwaySuite #200Maitland, FL 32751CUSHING TERRELL306 W. RAIL ROAD SUITE 104MISSOULA, MT 59802Phone: (406)728-9522Fax: (406)728-8287EXISTING CONDITIONS WERE TAKEN FROM
ORIGINAL DRAWINGS AND MAY NOT REFLECT
EXACT "AS-BUILT" CONDITIONS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR
SHALL CAREFULLY COORDINATE NEW WORK AND
DEMOLITION WITH ALL OTHER DISCIPLINES AND
EXISTING CONDITIONS.
EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
THE WORK PROPERLY. NO ADDITIONAL
COMPENSATION SHALL BE ALLOWED BECAUSE OF
CONDITIONS THAT OCCUR DUE TO FAILURE TO
FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
DOCUMENTS WITHOUT
SIGNATURE AND REQUIRED
SEAL OF AOR/EOR ARE NOT
FOR CONSTRUCTION
R3.3
REFRIGERATION
DETAILS
TCO2
DM20240347BOYNTON BEACH, FL11/07/2511/07/25STORE NO: 5911-2769006/27/25BOYNTON BEACH, FLSP3625 S FEDERAL HWY.NTS3ISOLATION CHECK VALVES (TCO2)
NTS4CHARGING STATION (CO2)
NTS5CASE PIPING (TCO2) (VERTICAL OPTION)
ISSUE BLOCK
FLORI D
No. 63660
L
A
STATE OFM YICHAE L J AMES AM
E
S
TOPRROF
ESSIONAL E N G INEEEICENS
Not part of this application. A
permit application shall be
submitted for interior remodeling.