Re: Hunters Run Racquet Sports Complex
Project Number – 2025.08.5277
The following is a response to staff and consultant comments which were provided to our office on
February 11, 2026.
Building – APPROVED
Fire- APPROVED
Police- APPROVED
Public Art- APPROVED
Engineering - APPROVED
Planning and Zoning
Landscape Plan
1. The Tree Disposition Table indicates two Live Oak trees (24" and 26" caliper = 50") to be
removed and the vegetation calculation table indicates two trees to be mitigation by
replacement. The replacement for good/fair trees is equivalent caliper inches of trees.
Therefore, 50" caliper of trees shall be installed to fulfill this requirement, or payment in lieu of
replacement paid to the tree canopy fund.
Response: The tree disposition and landscape plan have been updated to account for the
required 50” caliper replacement for the 2 live oaks being removed from the parking lot.
2. Please note that trees and palms relocated or replaced to meet the mitigation requirements
cannot be counted towards others landscape requirements. Please separate the two
requirements and reorganize the information in a way that is clearer.
Response: Acknowledged. The landscape requirements chart has been updated to separate the
mitigation requirements. All trees and palms that are provided for mitigation replacement are
not counted towards any other landscape requirements.
Hunters Run Racquet Sports Complex
Review Cycle 3 Comments – February 2026
3601 PGA Blvd. Suite 220, Palm Beach Gardens, FL 33410
www.insitestudio.com 561.249.0940
Page 2 of 4
Photometric Plan
3. Previous photometric comments have not been fully addressed:
- Illumination Levels: Provide illumination levels throughout the entire site within the scope of
work for all new proposed lighting. This includes the new tennis courts (if lighting is proposed),
event spaces, lawn areas, and along parking areas where new lighting is proposed. Currently, only
pathway illumination levels have been provided.
- Lighting Specifications: Clearly indicate the selected pole and fixture specifications. Multiple
fixture and pole details are shown on the plans; please highlight or identify the chosen ones.
- Tree Clearance: Ensure a 15-foot radius clearance between lighting poles and the trunks of trees
and palms. Include the 15-foot radius around the lighting poles on the landscape plan to confirm
compliance. Conflicts were identified by staff.
Response: A revised photometric plan has been provided with this resubmittal. The lighting plan
provides illumination levels for parking areas, paths and walkways, and ramps and stairs. The
luminaire schedule provides the final fixture specifications that can be referenced in the cutsheet
packaged provided in the previous submittal. 15’ radii have been provided around the poles on
the landscape plan to confirm there are no conflicts.
Utilities
1. Sheet C5.1 to C5.3: Explain the temporary ¾-inch water service line. If it is for a construction
meter, a 2-inch meter size is required.
Response: Temporary ¾” meter for use at temporary club membership restroom trailers. Not for
construction use.
2. Sheet C5.1 to C5.3: Clearly delineate the limits of public versus private ownership on the utility
plan profile sheets. A note shall be added stating: The sanitary sewer system from MH-01 to MH-
03, inclusive of all pipe segments and structures, shall be dedicated to the City of Boynton Beach
for ownership and maintenance.
Response: Added note to sheets C5.0, C5.1 & C5.2. Removed ‘private’ from public lines.
3. Sheet C5.1. to C5.3: Per the City of the City of Boynton Beach Utilities Engineering Design
Handbook, the size of a grease interceptor must be explicitly calculated based on the facility
type and operational volume. The maximum allowable size for a single tank is 1,250 gallons. If
your MEP calculations result in a required volume exceeding 1,250 gallons, the City requires
interceptors to be installed in multiples of 1,250-gallon tanks in series.
Hunters Run Racquet Sports Complex
Review Cycle 3 Comments – February 2026
3601 PGA Blvd. Suite 220, Palm Beach Gardens, FL 33410
www.insitestudio.com 561.249.0940
Page 3 of 4
Response: Grease trap calculations shown on the plumbing plans sheet P403, they’re specifying
a single GB-1000.
4. Sheet C5.1 to C5.3: Tapping sleeves or Tee connections should be located at a minimum of 18
inches to 24 inches from any pipe bell, coupling, or fitting.
Response: Acknowledged, all T.S. & Tee’s have 18” min. separation.
5. Sheet C5.1 to C5.3: Revise the plans to provide a minimum 12-foot wide exclusive utility
easement centered over the three water main connections. The centerline of the easement shall
coincide with the geometric center of the connection grouping to ensure equal clearance on
both sides of the outer mains.
Response: Revised easement to be geometrically centered on the lines to meter, see sheet C5.1.
6. Sheet C5.1 to C5.3: The proposed 2-inch onsite water distribution system exceeds 100 linear
feet; therefore, it is regulated under Palm Beach County Environmental Control Rule II (ECR II). A
specific Application for a Permit to Construct an Onsite Water Distribution System must be
submitted to the Florida Department of Health in Palm Beach County for review and approval.
No construction of the water system shall commence until the Health Department permit is
issued and a copy is provided to the City of Boynton Beach. Ensure all separation requirements
between water, sewer, and storm lines comply with ECR II standards.
Response: Acknowledged, an ECR 2 permit will be applied for after site plan approval.
7. Sheet C5.1 to C5.3: Clearly specify the source of water for the proposed irrigation system (e.g.,
Potable, Reclaimed, or Well Water) on the Cover Sheet and Irrigation Plan. Per City of Boynton
Beach Standards, all onsite distribution piping must be connected downstream of the meter and
a City-approved Reduced Pressure Zone (RPZ) backflow preventer. Multiple sources of water or
redundant connections to the irrigation system are strictly prohibited to prevent illegal cross-
connections. If an auxiliary well is utilized, no irrigation lines shall be connected to the City’s
potable water system.
Response: Irrigation source to be well & metered. Connection to irrigation made via a dedicated
irrigation meter and USC approved RPZ from potable water source. See sheet C5.3 for more
information.
8. Sheet C5.1 to C5.3: Clearly label the proposed lift station and the entire length of the force main
as 'private' on all plan and profile sheets. Add a prominent note to the Utility Sheet stating: The
proposed lift station and force main are private facilities and shall be owned, operated, and
maintained by the Owner. The City of Boynton Beach shall not be responsible for the
maintenance, repair, or emergency services of these private wastewater assets.
Hunters Run Racquet Sports Complex
Review Cycle 3 Comments – February 2026
3601 PGA Blvd. Suite 220, Palm Beach Gardens, FL 33410
www.insitestudio.com 561.249.0940
Page 4 of 4
Response: Note added to sheets C5.0-C5.4, private’ tags added to lift station and force main
callouts.
9. Sheet C5.1 to C5.3: In alignment with the City of Boynton Beach Utilities Engineering Standards,
the private lift stations must demonstrate technical compliance to ensure they do not adversely
impact the municipal sewer system. Provide signed and sealed Lift Station Design Calculations
and Standard Details for the proposed private lift station.
Response: Lift station report to be provided after site plan review during permitting.
10. Sheet C5.1 to C5.3: Revise the plans and sanitary sewer profile for the private force main
connection at the existing manhole. The invert elevation of the proposed force main discharge
must be a minimum of 6 inches higher than the highest existing invert elevation within that
manhole. This offset is required to ensure unobstructed flow and to prevent the force main
discharge from surcharging the existing gravity influent lines. Additionally, provide an interior
protective coating (City-approved or equivalent) for the receiving manhole to protect against
hydrogen sulfide (H2S) corrosion typical of force main discharge.
Response: Revised manhole callout on sheet C5.4 to include the specified information. See sheet
C5.5 for added sewer profiles.
Thanks for your consideration of our comment response letter. Please don’t hesitate to contact our
office if you have any questions or need further clarification.
Sincerely,
Zachary Kepler
Project Manager
Insite Studio, Inc.