Loading...
IMT Gulfstream- Exterior Paint_Architectural Elevations_2-FeedbackIMT GULFSTREAM SH-01EXTERIOR PAINT BOARDS FINISH LEGEND NOTES PT.2 SW7570 EGRET WHITE (TOP PORTION OF BUILDING) (1) CAR PORTS TO BE PT.3. (2) ALL RAILINGS TO BE PT.4 (3) ALL UTILITY DOORS TO BE PAINTED TO MATCH ADJACENT WALL. (4) ALL ROOF TRIM TO BE PAINTED P.1 (5) DO NOT PAINT WOOD UNDERSIDE OF OVERHANGS (6) DO NOT PAINT BLACK METAL SCREEN OR FRAMES AROUND BALCONIES PT.1 SW7566 WESTHIGHLAND WHITE (WINDOW & ROOF TRIM) PT.3 SW7016 MINDFUL GRAY (LOWER PORTION OF BLDG) PT.4 SW9141 WATERLOO (SHUTTERS, GARAGE DOORS, FRONT DOORS, METAL RAILING) (7) POOL PERGOLAS TO BE PT. 2- DO NOT PAINT WOOD CEILING (8) ALL PAINTS TO BE SHERWIN WILLIAMS BRAND/SATIN FINISH (9) NOT ALL ELEVATIONS ARE BEING SHOWN, BUT FOLLOW THE SAME STANDARDS AS PROVIDIED. PT.1 PT.4 PT.4PT.3 PT.1 PT.4 PT.1 PT.2PT.2 PT.4 PT.1 PT.3 PT.4 PT.4 PT.4 PT.4 PT.4 PT.3 PT.1 PT.1PT.2 PT.2 PT.2 PT.4 PT.4 PT.3 PT.3 PT.1 BUILDING TYPE 1 APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED Planning & Zoning Division Project #: ___________________________2026.03.1887 March 24, 2026 IMT GULFSTREAM SH-02EXTERIOR PAINT BOARDS FINISH LEGEND NOTES PT.2 SW7570 EGRET WHITE (TOP PORTION OF BUILDING) PT.1 SW7566 WESTHIGHLAND WHITE (WINDOW & ROOF TRIM) PT.3 SW7016 MINDFUL GRAY (LOWER PORTION OF BLDG) PT.4 SW9141 WATERLOO (SHUTTERS, GARAGE DOORS, FRONT DOORS, METAL RAILING) PT.1 PT.3 PT.3 PT.3 PT.3 PT.2PT.4 PT.4 PT.2 PT.1 PT.2PT.4 PT.4 PT.4 PT.1 PT.1 PT.1 PT.2 PT.2PT.2 PT.3 PT.3 PT.3 PT.4 PT.3 PT.3 PT.1 PT.2 (1) CAR PORTS TO BE PT.3. (2) ALL RAILINGS TO BE PT.4 (3) ALL UTILITY DOORS TO BE PAINTED TO MATCH ADJACENT WALL. (4) ALL ROOF TRIM TO BE PAINTED P.1 (5) DO NOT PAINT WOOD UNDERSIDE OF OVERHANGS (6) DO NOT PAINT BLACK METAL SCREEN OR FRAMES AROUND BALCONIES (7) POOL PERGOLAS TO BE PT. 2- DO NOT PAINT WOOD CEILING (8) ALL PAINTS TO BE SHERWIN WILLIAMS BRAND/SATIN FINISH (9) NOT ALL ELEVATIONS ARE BEING SHOWN, BUT FOLLOW THE SAME STANDARDS AS PROVIDIED. BUILDING TYPE 2 APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED Planning & Zoning Division Project #: ___________________________2026.03.1887 March 24, 2026 IMT GULFSTREAM SH-03EXTERIOR PAINT BOARDS FINISH LEGEND NOTES PT.2 SW7570 EGRET WHITE (TOP PORTION OF BUILDING) PT.1 SW7566 WESTHIGHLAND WHITE (WINDOW & ROOF TRIM) PT.3 SW7016 MINDFUL GRAY (LOWER PORTION OF BLDG) PT.4 SW 9141 WATERLOO (SHUTTERS, GARAGE DOORS, FRONT DOORS, METAL RAILING) PT.4 PT.1 PT.1 PT.2 PT.4 PT.3PT.3 PT.2 PT.2 PT.1PT.1 PT.2 PT.1 PT.1 PT.3 PT.3 PT.3 PT.3 (1) CAR PORTS TO BE PT.3. (2) ALL RAILINGS TO BE PT.4 (3) ALL UTILITY DOORS TO BE PAINTED TO MATCH ADJACENT WALL. (4) ALL ROOF TRIM TO BE PAINTED P.1 (5) DO NOT PAINT WOOD UNDERSIDE OF OVERHANGS (6) DO NOT PAINT BLACK METAL SCREEN OR FRAMES AROUND BALCONIES (7) POOL PERGOLAS TO BE PT. 2- DO NOT PAINT WOOD CEILING (8) ALL PAINTS TO BE SHERWIN WILLIAMS BRAND/SATIN FINISH (9) NOT ALL ELEVATIONS ARE BEING SHOWN, BUT FOLLOW THE SAME STANDARDS AS PROVIDIED. BUILDING TYPE ‘CLUBHOUSE 1 & 2’ APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED Planning & Zoning Division Project #: ___________________________2026.03.1887 March 24, 2026