IMT Gulfstream- Exterior Paint_Architectural Elevations_2-FeedbackIMT GULFSTREAM SH-01EXTERIOR PAINT BOARDS
FINISH LEGEND NOTES
PT.2 SW7570
EGRET WHITE
(TOP PORTION OF BUILDING)
(1) CAR PORTS TO BE PT.3.
(2) ALL RAILINGS TO BE PT.4
(3) ALL UTILITY DOORS TO BE PAINTED TO MATCH
ADJACENT WALL.
(4) ALL ROOF TRIM TO BE PAINTED P.1
(5) DO NOT PAINT WOOD UNDERSIDE OF OVERHANGS
(6) DO NOT PAINT BLACK METAL SCREEN OR FRAMES
AROUND BALCONIES
PT.1 SW7566
WESTHIGHLAND WHITE
(WINDOW & ROOF TRIM)
PT.3 SW7016
MINDFUL GRAY
(LOWER PORTION OF BLDG)
PT.4 SW9141 WATERLOO
(SHUTTERS, GARAGE DOORS,
FRONT DOORS, METAL RAILING)
(7) POOL PERGOLAS TO BE PT. 2- DO NOT PAINT
WOOD CEILING
(8) ALL PAINTS TO BE SHERWIN WILLIAMS BRAND/SATIN FINISH
(9) NOT ALL ELEVATIONS ARE BEING SHOWN, BUT FOLLOW
THE SAME STANDARDS AS PROVIDIED.
PT.1
PT.4 PT.4PT.3
PT.1
PT.4
PT.1 PT.2PT.2
PT.4
PT.1
PT.3
PT.4 PT.4 PT.4 PT.4 PT.4
PT.3
PT.1
PT.1PT.2
PT.2
PT.2
PT.4 PT.4
PT.3 PT.3
PT.1
BUILDING TYPE 1
APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED
APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED
Planning & Zoning Division
Project #: ___________________________2026.03.1887
March 24, 2026
IMT GULFSTREAM SH-02EXTERIOR PAINT BOARDS
FINISH LEGEND NOTES
PT.2 SW7570
EGRET WHITE
(TOP PORTION OF BUILDING)
PT.1 SW7566
WESTHIGHLAND WHITE
(WINDOW & ROOF TRIM)
PT.3 SW7016
MINDFUL GRAY
(LOWER PORTION OF BLDG)
PT.4 SW9141 WATERLOO
(SHUTTERS, GARAGE DOORS,
FRONT DOORS, METAL RAILING)
PT.1
PT.3 PT.3 PT.3
PT.3 PT.2PT.4 PT.4
PT.2 PT.1 PT.2PT.4
PT.4 PT.4
PT.1 PT.1
PT.1
PT.2 PT.2PT.2
PT.3
PT.3
PT.3
PT.4 PT.3
PT.3
PT.1
PT.2
(1) CAR PORTS TO BE PT.3.
(2) ALL RAILINGS TO BE PT.4
(3) ALL UTILITY DOORS TO BE PAINTED TO MATCH
ADJACENT WALL.
(4) ALL ROOF TRIM TO BE PAINTED P.1
(5) DO NOT PAINT WOOD UNDERSIDE OF OVERHANGS
(6) DO NOT PAINT BLACK METAL SCREEN OR FRAMES
AROUND BALCONIES
(7) POOL PERGOLAS TO BE PT. 2- DO NOT PAINT
WOOD CEILING
(8) ALL PAINTS TO BE SHERWIN WILLIAMS BRAND/SATIN FINISH
(9) NOT ALL ELEVATIONS ARE BEING SHOWN, BUT FOLLOW
THE SAME STANDARDS AS PROVIDIED.
BUILDING TYPE 2
APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED
APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED
Planning & Zoning Division
Project #: ___________________________2026.03.1887
March 24, 2026
IMT GULFSTREAM SH-03EXTERIOR PAINT BOARDS
FINISH LEGEND NOTES
PT.2 SW7570
EGRET WHITE
(TOP PORTION OF BUILDING)
PT.1 SW7566
WESTHIGHLAND WHITE
(WINDOW & ROOF TRIM)
PT.3 SW7016
MINDFUL GRAY
(LOWER PORTION OF BLDG)
PT.4 SW 9141 WATERLOO
(SHUTTERS, GARAGE DOORS,
FRONT DOORS, METAL RAILING)
PT.4 PT.1
PT.1
PT.2
PT.4
PT.3PT.3
PT.2 PT.2
PT.1PT.1
PT.2
PT.1
PT.1
PT.3 PT.3
PT.3
PT.3
(1) CAR PORTS TO BE PT.3.
(2) ALL RAILINGS TO BE PT.4
(3) ALL UTILITY DOORS TO BE PAINTED TO MATCH
ADJACENT WALL.
(4) ALL ROOF TRIM TO BE PAINTED P.1
(5) DO NOT PAINT WOOD UNDERSIDE OF OVERHANGS
(6) DO NOT PAINT BLACK METAL SCREEN OR FRAMES
AROUND BALCONIES
(7) POOL PERGOLAS TO BE PT. 2- DO NOT PAINT
WOOD CEILING
(8) ALL PAINTS TO BE SHERWIN WILLIAMS BRAND/SATIN FINISH
(9) NOT ALL ELEVATIONS ARE BEING SHOWN, BUT FOLLOW
THE SAME STANDARDS AS PROVIDIED.
BUILDING TYPE ‘CLUBHOUSE 1 & 2’
APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED
APPROVEDAPPROVEDAPPROVEDAPPROVEDAPPROVED
Planning & Zoning Division
Project #: ___________________________2026.03.1887
March 24, 2026