May 7, 2026
City of Boynton Beach Planning and Development, Engineering Division
100 E. Ocean Avenue
Boynton Beach, FL 33435
Attn: Luiza Pessoa Guazzelli, P.E., Engineer III
Re: Lake Worth Christian School Elementary School Phase 2 Expansion
Request for Land Development Permit
Luiza:
Please accept this cover letter that attempts to outline the items being submitted
through the City’s permitting portal. We hereby apply for a Land Development Permit.
This application contains the following items:
1. Site Development Plans (includes water/sanitary/drainage/paving/etc.)
2. Boundary Survey
3. Owner’s Consent Form
4. Drainage Statement1
5. Composite Utility Plan2
6. Copies of Utility Provider Requests and Responses
7. Landscape Plan
8. Lighting/Photometric Plan3
9. Engineer’s Opinion of Cost
10. Project Site Plan4
The following notes relate to the superscripted items above:
1 As I previously mentioned in one of our phone calls, we will not be preparing
formal surface water management calculations for the site. The proposed finished floor
elevation lies more than ten feet above the SFWMD-permitted 100-year 3-day storm
stage. Further, the net loss of soil storage expected from the construction of the
proposed building will have negligible effects on typical surface water management
elevation thresholds. We expect, much like development of the first phase, SFWMD will
issue a Minor Modification based upon this same approach.
2 The attached Composite Utility Plan is presented based upon responses
received from relevant utility providers except AT&T. As of this writing, no response has
been provided from that company. We ask that you continue review of the application
without this information. Telecommunications service will be provided through
Michael B. Schorah and Associates, Inc.
Luiza Pessoa Guazzelli, P.E.
May 7, 2026
Page 2
connection to lines in the existing Phase 1 building. When AT&T provides a response,
we will deliver a copy to your attention.
3 The provided lighting/photometric plan provided addresses down lighting at the
building’s main north entry. There are no other proposed lighting improvements.
4 We have provided a copy of the Site Plan being resubmitted simultaneously with
this application. The first round of comments has been addressed. Documentation of
final approval will be provided upon receipt.
Should you have any questions or require additional information, please do not hesitate
to contact me.
Respectfully submitted,
Michael J. LaCoursiere, P.E.