Loading...
CORRESPONDENCE rz7ie City of tJ30yntvn 'Beach 100 'E. 'Boynton 'Beam 'Bouft'1Jartf P.O. 'Bo~310 'Boynton 'Bttun.1"foritta 33425-0310 City:Jfa[[: (407) 375-6000 1"J{X: (407) 375-6090 November 10, 1994 Mr. Jeff Lis Catalfumo 1540 Latham Road West Palm Beach, FL 33409 RE: Quantum Lots 12, 13 and 14 Site Plan File No. NWSP #94-008 Dear Mr. Lis: The attached package will be presented to the Planning and Development Board on November 15, 1994 (see attached agenda) and then to the city Commission later the same evening. The applicant must understand that the permit plans shall be amended to comply with the attached staff comments and that additional comments may be generated by staff following their review for technical compliance of permit documents that are required to be submitted for development of the project. For the applicant's convenience, attached is a list of documents required for permit submittal. An approval of the site plan by the City Commission shall be valid for one (1) year, unless a building permit from the BUilding Department is secured. If the applicant fails to secure a building permit in that time, all previous approvals shall become null and void. Sincerely, r~/{J~4 ~ Haag zoning & Site Development Administrator MH/jj A:P&IlLTI\TO.QUA 2 J{tTreW S (jateway to tfte (julfttream 8 U L 0 I N G DEPARTMEN T SUBHIl"rAL DOCUMENTS Congratulations on receiving Site Approval for your proposed construction within the City of Boynton Beach. We appreciate your choosing to build within our City. In order to ensure a timely permitting process, the following documents are required to be submitted in two (2) sets. Each set must be stapled together to form a single package. Incomplete sets can not be accepted. I. A signed and sealed survey (not over six (6) months old) by a registered surveyor in the State of Florida indicating: A. All property lines B. North arrow C. Existing structures and paving D. Existing elevations E. Rights-of-way, with elevations F. Easements on or adjacent to the site G. Utilities on or adjacent to the site H. Legal description I. Number of acres to the nearest one-hWldredth (1/100) of an acre J. Location sketch of property K. Surveyor's Certificate II. A site plan properly dimensioned and to scale showing: A. All proposed structures B. All existing structures that are to remain on site C. Setback lines for all structures drawn perpendicular from the property lines to the closest vertical wall of the structures D. Use of each structure (or uses within multiple occupancies) E. Use of adjacent properties including right-of-way lines for all streets and alleys, sidewalks, turn lanes and driveways F. Elevations of the lowest finished floor of all structures on the site G. Location of existing utility lines on or adjacent to the site H. Location of fire hydrants on or adjacent to the site I. Location of dumpster enclosure and details of construction III. A paving plan in conformance with the Parking Lot Code (Chapter 5, Article X of the Boynton Beach Code of Ordinances) indicating: A. Calculations for the number of required parking stalls (see Appendix A-Zoning, Section 118) B. Cross sections indicating parking lot construction C. Raised curbing meeting City Standards D. Double striping meeting City Standards E. Conformance with the Sidewalk Ordinance (Chapter 22, Boynton Beach Code of Ordinances) F. Handicapped parking stalls in conformance with the State Handicapped Code G. Dimensions for all parking stalls, back-up areas, driveways and traffic lanes H. Traffic control devices and signs IV. A drainage plan for the entire site including: A. Finish grade and pavement elevations B. Drainage calculations C. Details of the drainage system. If total site area exceeds 25,000 square feet, plans must be prepared by a Florida registered engineer and must be sealed D. Inlets must be placed in grassy swale areas V. A landscape plan showing conformance with the Landscape Code (Chapter 7.5, Article II, Boynton Beach Code of Ordinances) showing: A. Complete final landscape construction drawings B. Automatic irrigation system plans with 100% coverage (no City water to be used) C. Plant material must be keyed according to species, size and quantity D. Site walls and fences must be indicated on the plans E. Location and contours of proposed berms VI. A lighting plan for the building exterior and site lighting including: Exterior security lighting and pedestrian lighting Lighting for drivewa~s and parking lots 1. Location of lighting 2. Fixture types l. Lamp types and sizes 4. Photometric plan showing illumination levels in footcandles 5. Lighting poles designed for wind loads in accordance with Chapter 12, Standard Building Code VII. Construction documents (all documents must, be signed, sealed and dated) A. B. A. Floor plans for each proposed structure (indicate use of space) B. Elevations for each proposed structure (indicate exterior materials and colors) c. Soil tests D. Energy calculations plus one (1) cover sheet E. Foundation plan F. Typical wall sections G. Electrical plan view drawings and riser diagram with calculations H. Plumbing riser diagram and plan view drawings I. Air conditioning plan J. truss layout K. Proposed finish floor elevation identified on the plan L. Board of Health Department stamp (where applicable) H. Copy of D.E.R. and/or D.E.R.H. permit and plans (where applicable) N. Copy of Army Corps of Engineers permit (where applicable) O. Copy of Lake Worth Drainage District permit (where applicable) P. Copy of South Florida Water Management District permit for surface water management or water use (where applicable) bh - 3/92 A: SUBHIIAL.OOC rz7ie City of 'Boynton tJ3each 100 'E. 'Boynton 'Btadt. 'Boukvarri P.O. 'B~310 'Boynton 'Betun, %nUfa. 33425-0310 City:Jfa[[: (407) 37S-6()()() 1"J{X: (407) 375-6090 November 3, 1994 Mr. Jeff Lis Daniel S. Catalfumo and/or Assigns 1540 Latham Road West Palm Beach, FL 33409 RE: Quantum Lots 12, 13 and 14 - File No. NWSP 94-008 Acceptance - site Plan Review Application & submittal Documents New Site Plan Dear Mr. Lis: On November 2, 1994, your submittal for site Plan Review of the above-referenced project was reviewed for completeness. It has been determined that the submittal is substantially complete with the exception of signed applications and accepted for further processing. A Planning & zoning Department staff member will be responsible for .the review and coordination of your site plan through the remainder of the Site Plan Review process. The next step in the review process is for the Technical Review committee to review the submittal for compliance with the review standards identified in Part III, Land Development Regulations, Chapter 4, Site plan Review, Section 8 and all applicable sections of the Boynton Beach Code of ordinances. The results of the review will be available to you on November 18, 1994. If I can be of further assistance, please do not hesitate to contact me at (407) 375-6260. Very truly yours, S,k ~^ mb i J. Heyden Ping and zoning Director TJH/jj xc: Central File Chronological File Project File A:ACCBPT.(JUA :,{me,ua s (jateway to tlie (julfstTeam ~Jrom the grourul up,.. ~r- - (!.,' .I~ '1 '/ , -----rJ.l>--tt.e- '-r'-~' ~~,' kIV~~ DEVELOPING · BUILDIN~ ~G Mrs. T ambri J. Heyden Planning and Zoning Director City of Boynton Beach 100 East Boynton Beach Boulevard Boynton Beach, Florida 33425-0310 . ....-r-: ./,' -j' .1, - I~ -' {(~.., :: I Y ;"/Al. . '/ .Nj, in, ! :J! 5/7'95' t ~ _____ .--- -- ~ Re: New Motorola Facility 3301 Quantum Boulevard Dear T ambri, We at Catalfumo Development and Construction and The Tambone Real Estate Development Corporation want to take this opportunity to Thank You and your staff for their extraordinary efforts on our behalf. Without all of your efforts we would never have been able to bring the project in on time...specifically given the compressed time frame for the project. At times we know we were a bit testy, and pushed the envelope a bit, but your patience and diligence on our behalf is very greatly appreciated. In approximately five months time, due to the cooperative effort of everyone involved, from the City Managers Office, to Planning and Zoning and the Building Department, Motorola was able to start moving in to their new 100,000 square foot facility at the end of April. We want to acknowledge the following people for their contribution to this effort. Mike Haag, Dotty Moore, Gary Lanker, Pat Berger, Jose Alfaro and Doris Marttila. Thank you all! Catalfumo Development and Construction V3rb' 1540 LATHAM ROAD. WEST PALM BEACH, FL 33409 · (407) 471-0338 · FAX (407) 471-1201 FRO" URB~~ OESIG~ STUC10 WPB 92.21.1995 171e8 NO.12 P. 1 February 21, 1995 -.......... " -- '.. .-" \'-' ',,-,," - -- -'" ,.- - ...-, ~ ..._, ...." Mr. Kevin H.allahan, City Forester City of Boynton Beach 100 E. Boynton Beach Boulevard Boynton Beach FL 33435 HE: QUANTUM LOTS 12, 13, 14 Littoral Planting Requirement Our Ref. #11085.04 Fax: (407) 375-6090 Dear Kevin: Today I was at the Motorola site to view the lake edges for the littoral planting requirement. There is in fact littoral planting along the entire perimeter of the property both emersed planting and upland planting. I believe that the requirements of the DRI littoral plantings has been met as we had suspected and discussed last week. Since the planting does exist, what response will you require of Catalfumo? If notes need to be added to the plans, please let me know and I will respond immediately. If there is any additional information you will need, please call me. Sincerely, URBAN DESIGN STUDIO :;t/J~ Debra L. North5ea Landscape Architect DLN :d1n t )~~J' r ~ @ ~ 0 WI C . ij I. _ , U FEB 2 3 19f6 ' I PLANNING AND ZONING DEPT. :- copy: Jeff Lis Hi IJrtMln ~ Urban P1afl"'ng LaMl .........1... 18l'1d1ape Arc~..". Commllnle.l1on Onptoloe MO'l'OROLA 2000 Palm BeaCll LaNs Boutevw Slill 800 "... Conco"'l8e Wesl Palm Beach. I'lorida 33409-6582 407,&89.0088 Stuart, FL 407,293./3022 san Juan Capl81rano, CA 714.489,8131 %e City of tJ3oynton tJ3eacli 100 'E. 'Boynton 'Beadi 'Boukvartf P.O. 'Bo~3iO 'Boynton. 'Buu,,", 1"foritfa 33425-0310 City:Jfafl: (407) 375..(j()()() 1"J{X: (407) 375-6090 February 7, 1995 FAX TO 471-1201 Catalfumo Attn: Jeff Lis 1540 Latham Road West Palm Beach, FL 33409 Dear Mr. Lis: This letter is to verify that the property being described as Lots 12, 12A, 13, 13A, 14 and 14A, located in Quantum Park at Boynton Beach, Plat 2 are currently zoned Planned Industrial Development (PID) and that office/research and development is a permitted use. If I can provide additional assistance with this matter, please contact me. Yours truly, ~' ~r rl j/~cbJ Tambri J. HeYd~~' planning and Zoning Director TJH:ja/dim 5t.memas (jateway to tlie (julfstream ',' r,:: rz7ie City of tJ3oynton tJ3eacli / j >,.::; '.~ 100 'E. 'Boynton 'Beadi 'Boukvanf P.O. 'Bo~310 'Boynton 'Buun, 1"Coritfa 33425-0310 City:Jfafl: (407) 375-6000 1"J{X: (407) 375-6090 November 10, 1994 Mr. Jeff Lis Catalfumo 1540 Latham Road West Palm Beach, FL 33409 RE: Quantum Lots 12, 12A, 13, 13A, 14 and 14A Open Space Section 7.H.13 of Appendix - A zoning Dear Mr. Lis: This letter is to clarify that, within Quantum Park, a project has not been approved to date which needed to use water area toward meeting the open space requirement of section 7.H.13 of the Zoning Code. However, it can be interpreted from the original Quantum Park development order,'that water can be counted towards 70% of the open space requirement (see attached Ordinance No. 84-51 for the applicability to Quantum Park of the zoning code open space requirement). It should be further noted that area required by the Landscape Code shall be accounted for separately and not included as part of the open space requirement. Landscaped area provided above that required by code may be used to meet the open space requirement. If I can be of further assistance, please contact me. Sincerely, r ~2' II . - 1.. , , d~,.~ Tambri J. Hyden Planning and Zoning Director attachment TJH/jj A:SPACESEC.QUA 6 ~merU:a's (jateway to tlie (juCfstream