November 10, 1994
Mr. Jeff Lis
Catalfumo
1540 Latham Road
West Palm Beach, FL 33409
RE: Quantum Lots 12, 13 and 14 Site Plan
File No. NWSP #94-008
Dear Mr. Lis:
The attached package will be presented to the Planning and
Development Board on November 15, 1994 (see attached agenda) and
then to the city Commission later the same evening.
The applicant must understand that the permit plans shall be
amended to comply with the attached staff comments and that
additional comments may be generated by staff following their
review for technical compliance of permit documents that are
required to be submitted for development of the project.
For the applicant's convenience, attached is a list of documents
required for permit submittal.
An approval of the site plan by the City Commission shall be
valid for one (1) year, unless a building permit from the
BUilding Department is secured. If the applicant fails to secure
a building permit in that time, all previous approvals shall
become null and void.
Sincerely,
r~/{J~4
~ Haag
zoning & Site Development Administrator
MH/jj
A:P&IlLTI\TO.QUA
2
J{tTreW S (jateway to tfte (julfttream
8 U
L 0 I N G
DEPARTMEN T
SUBHIl"rAL DOCUMENTS
Congratulations on receiving Site Approval for your proposed construction within the City of Boynton Beach. We
appreciate your choosing to build within our City.
In order to ensure a timely permitting process, the following documents are required to be submitted in two (2)
sets. Each set must be stapled together to form a single package. Incomplete sets can not be accepted.
I. A signed and sealed survey (not over six (6) months old) by a registered surveyor in the State of Florida
indicating:
A. All property lines
B. North arrow
C. Existing structures and paving
D. Existing elevations
E. Rights-of-way, with elevations
F. Easements on or adjacent to the site
G. Utilities on or adjacent to the site
H. Legal description
I. Number of acres to the nearest one-hWldredth (1/100) of an acre
J. Location sketch of property
K. Surveyor's Certificate
II. A site plan properly dimensioned and to scale showing:
A. All proposed structures
B. All existing structures that are to remain on site
C. Setback lines for all structures drawn perpendicular from the property lines to the closest vertical
wall of the structures
D. Use of each structure (or uses within multiple occupancies)
E. Use of adjacent properties including right-of-way lines for all streets and alleys, sidewalks, turn
lanes and driveways
F. Elevations of the lowest finished floor of all structures on the site
G. Location of existing utility lines on or adjacent to the site
H. Location of fire hydrants on or adjacent to the site
I. Location of dumpster enclosure and details of construction
III. A paving plan in conformance with the Parking Lot Code (Chapter 5, Article X of the Boynton Beach Code of
Ordinances) indicating:
A. Calculations for the number of required parking stalls (see Appendix A-Zoning, Section 118)
B. Cross sections indicating parking lot construction
C. Raised curbing meeting City Standards
D. Double striping meeting City Standards
E. Conformance with the Sidewalk Ordinance (Chapter 22, Boynton Beach Code of Ordinances)
F. Handicapped parking stalls in conformance with the State Handicapped Code
G. Dimensions for all parking stalls, back-up areas, driveways and traffic lanes
H. Traffic control devices and signs
IV. A drainage plan for the entire site including:
A. Finish grade and pavement elevations
B. Drainage calculations
C. Details of the drainage system. If total site area exceeds 25,000 square feet, plans must be prepared
by a Florida registered engineer and must be sealed
D. Inlets must be placed in grassy swale areas
V. A landscape plan showing conformance with the Landscape Code (Chapter 7.5, Article II, Boynton Beach Code
of Ordinances) showing:
A. Complete final landscape construction drawings
B. Automatic irrigation system plans with 100% coverage (no City water to be used)
C. Plant material must be keyed according to species, size and quantity
D. Site walls and fences must be indicated on the plans
E. Location and contours of proposed berms
VI. A lighting plan for the building exterior and site lighting including:
Exterior security lighting and pedestrian lighting
Lighting for drivewa~s and parking lots
1. Location of lighting
2. Fixture types
l. Lamp types and sizes
4. Photometric plan showing illumination levels in footcandles
5. Lighting poles designed for wind loads in accordance with Chapter 12, Standard Building Code
VII. Construction documents (all documents must, be signed, sealed and dated)
A.
B.
A. Floor plans for each proposed structure (indicate use of space)
B. Elevations for each proposed structure (indicate exterior materials and colors)
c. Soil tests
D. Energy calculations plus one (1) cover sheet
E. Foundation plan
F. Typical wall sections
G. Electrical plan view drawings and riser diagram with calculations
H. Plumbing riser diagram and plan view drawings
I. Air conditioning plan
J. truss layout
K. Proposed finish floor elevation identified on the plan
L. Board of Health Department stamp (where applicable)
H. Copy of D.E.R. and/or D.E.R.H. permit and plans (where applicable)
N. Copy of Army Corps of Engineers permit (where applicable)
O. Copy of Lake Worth Drainage District permit (where applicable)
P. Copy of South Florida Water Management District permit for surface water management or water use
(where applicable)
bh - 3/92
A: SUBHIIAL.OOC
rz7ie City of
'Boynton tJ3each
100 'E. 'Boynton 'Btadt. 'Boukvarri
P.O. 'B~310
'Boynton 'Betun, %nUfa. 33425-0310
City:Jfa[[: (407) 37S-6()()()
1"J{X: (407) 375-6090
November 3, 1994
Mr. Jeff Lis
Daniel S. Catalfumo and/or Assigns
1540 Latham Road
West Palm Beach, FL 33409
RE: Quantum Lots 12, 13 and 14 - File No. NWSP 94-008
Acceptance - site Plan Review Application & submittal Documents
New Site Plan
Dear Mr. Lis:
On November 2, 1994, your submittal for site Plan Review of the
above-referenced project was reviewed for completeness. It has been
determined that the submittal is substantially complete with the
exception of signed applications and accepted for further
processing. A Planning & zoning Department staff member will be
responsible for .the review and coordination of your site plan
through the remainder of the Site Plan Review process.
The next step in the review process is for the Technical Review
committee to review the submittal for compliance with the review
standards identified in Part III, Land Development Regulations,
Chapter 4, Site plan Review, Section 8 and all applicable sections
of the Boynton Beach Code of ordinances. The results of the review
will be available to you on November 18, 1994.
If I can be of further assistance, please do not hesitate to contact
me at (407) 375-6260.
Very truly yours,
S,k
~^
mb i J. Heyden
Ping and zoning Director
TJH/jj
xc: Central File
Chronological File
Project File
A:ACCBPT.(JUA
:,{me,ua s (jateway to tlie (julfstTeam
~Jrom the grourul up,..
~r-
- (!.,' .I~ '1 '/ ,
-----rJ.l>--tt.e- '-r'-~'
~~,'
kIV~~
DEVELOPING · BUILDIN~ ~G
Mrs. T ambri J. Heyden
Planning and Zoning Director
City of Boynton Beach
100 East Boynton Beach Boulevard
Boynton Beach, Florida 33425-0310
. ....-r-: ./,'
-j' .1, - I~
-' {(~.., :: I Y ;"/Al.
. '/ .Nj, in, ! :J! 5/7'95'
t ~ _____
.---
--
~
Re: New Motorola Facility
3301 Quantum Boulevard
Dear T ambri,
We at Catalfumo Development and Construction and The Tambone Real Estate
Development Corporation want to take this opportunity to Thank You and your
staff for their extraordinary efforts on our behalf. Without all of your efforts we
would never have been able to bring the project in on time...specifically given the
compressed time frame for the project.
At times we know we were a bit testy, and pushed the envelope a bit, but your
patience and diligence on our behalf is very greatly appreciated.
In approximately five months time, due to the cooperative effort of everyone
involved, from the City Managers Office, to Planning and Zoning and the
Building Department, Motorola was able to start moving in to their new 100,000
square foot facility at the end of April.
We want to acknowledge the following people for their contribution to this effort.
Mike Haag, Dotty Moore, Gary Lanker, Pat Berger, Jose Alfaro and Doris
Marttila.
Thank you all!
Catalfumo Development and Construction
V3rb'
1540 LATHAM ROAD. WEST PALM BEACH, FL 33409 · (407) 471-0338 · FAX (407) 471-1201
FRO" URB~~ OESIG~ STUC10 WPB
92.21.1995 171e8
NO.12
P. 1
February 21, 1995
-.......... " -- '.. .-"
\'-' ',,-,," - --
-'" ,.- - ...-, ~ ..._,
...."
Mr. Kevin H.allahan,
City Forester
City of Boynton Beach
100 E. Boynton Beach Boulevard
Boynton Beach FL 33435
HE: QUANTUM LOTS 12, 13, 14
Littoral Planting Requirement
Our Ref. #11085.04
Fax: (407) 375-6090
Dear Kevin:
Today I was at the Motorola site to view the lake edges for the littoral planting
requirement. There is in fact littoral planting along the entire perimeter of the
property both emersed planting and upland planting. I believe that the requirements
of the DRI littoral plantings has been met as we had suspected and discussed last
week.
Since the planting does exist, what response will you require of Catalfumo? If notes
need to be added to the plans, please let me know and I will respond immediately.
If there is any additional information you will need, please call me.
Sincerely,
URBAN DESIGN STUDIO
:;t/J~
Debra L. North5ea
Landscape Architect
DLN :d1n
t )~~J' r ~ @ ~ 0 WI C . ij
I. _ ,
U FEB 2 3 19f6 '
I
PLANNING AND
ZONING DEPT.
:-
copy: Jeff Lis
Hi
IJrtMln ~
Urban P1afl"'ng
LaMl .........1...
18l'1d1ape Arc~..".
Commllnle.l1on Onptoloe
MO'l'OROLA
2000 Palm BeaCll LaNs Boutevw
Slill 800 "... Conco"'l8e
Wesl Palm Beach. I'lorida
33409-6582
407,&89.0088
Stuart, FL 407,293./3022
san Juan Capl81rano, CA 714.489,8131
%e City of
tJ3oynton tJ3eacli
100 'E. 'Boynton 'Beadi 'Boukvartf
P.O. 'Bo~3iO
'Boynton. 'Buu,,", 1"foritfa 33425-0310
City:Jfafl: (407) 375..(j()()()
1"J{X: (407) 375-6090
February 7, 1995
FAX TO 471-1201
Catalfumo
Attn: Jeff Lis
1540 Latham Road
West Palm Beach, FL 33409
Dear Mr. Lis:
This letter is to verify that the property being described as
Lots 12, 12A, 13, 13A, 14 and 14A, located in Quantum Park at
Boynton Beach, Plat 2 are currently zoned Planned Industrial
Development (PID) and that office/research and development is a
permitted use.
If I can provide additional assistance with this matter, please
contact me.
Yours truly,
~'
~r rl j/~cbJ
Tambri J. HeYd~~'
planning and Zoning Director
TJH:ja/dim
5t.memas (jateway to tlie (julfstream
',' r,::
rz7ie City of
tJ3oynton tJ3eacli
/ j >,.::; '.~
100 'E. 'Boynton 'Beadi 'Boukvanf
P.O. 'Bo~310
'Boynton 'Buun, 1"Coritfa 33425-0310
City:Jfafl: (407) 375-6000
1"J{X: (407) 375-6090
November 10, 1994
Mr. Jeff Lis
Catalfumo
1540 Latham Road
West Palm Beach, FL 33409
RE: Quantum Lots 12, 12A, 13, 13A, 14 and 14A
Open Space Section 7.H.13 of Appendix - A zoning
Dear Mr. Lis:
This letter is to clarify that, within Quantum Park, a project
has not been approved to date which needed to use water area
toward meeting the open space requirement of section 7.H.13 of
the Zoning Code. However, it can be interpreted from the
original Quantum Park development order,'that water can be
counted towards 70% of the open space requirement (see attached
Ordinance No. 84-51 for the applicability to Quantum Park of the
zoning code open space requirement).
It should be further noted that area required by the Landscape
Code shall be accounted for separately and not included as part
of the open space requirement. Landscaped area provided above
that required by code may be used to meet the open space
requirement.
If I can be of further assistance, please contact me.
Sincerely,
r ~2' II . - 1.. , ,
d~,.~
Tambri J. Hyden
Planning and Zoning Director