AGENDA DOCUMENTS / ",/ PLANNING DEPT. MEMORANDUM NO. 91-243 TO: J. Scott Miller, City Manager ~ ~J:MJ FROM: Christopher cutro, Planning Director DATE: September 26, 1991 SUBJECT: Lawrence Lakes PUD Surety In August the Planning and Zoning Board and the extended for one year the period for the owners PUD to complete the infrastructure on the site, attached that a surety for the remainder of the posted by August 21, 1991. City Commission of Lawrence Lakes A condition was infrastructure be Prior to August 21st the Bank of the South Palm Beaches was taken over by the FDIC and sold to First United Bank, However, FDIC continues to hold the Lawrence Lakes PUD as an asset and has not posted surety. Recently the Planning Deparatment staff has received three phone calls on this property from potential buyers. We are unsure of what procedures to tell these potential buyers about because surety was not posted by August 21. We would suggest that the extensions of concurrency and master ~ plan to August 21, 1992 be left in place and that prior to any construction of infrastructure or homes at Lawrence Lakes that the new owner be required to do the following: 1} prepare a full engineering report for the City and request inspections of completed infrastructure if appropriate and 2} that surety for the remainder of the infrastructure be posted. We would ask that the City Commission review this item on October 1, 1991. CC:cp LAW OFFICES PERRY, SHAPIRO & MILLER, P.A. 400 AUSTRALIAN AVENUE SOUTH SUITE 300 WEST PALM BEACH. FLORIDA 33401 F MARTIN PERRY ROBERT LEE SHAPIRO JORDAN R. MILLER JILL A. JARI';ESY TELEPHONE 14071833.4404 FACSIMILE 14071 833.32!l7 August 21, 1991 VIA FACSIMILE Hr. Christopher Cutro Planning Director City o~ Boynton Beach P. o. Box 310 Boynton Beach, FL 33425-0310 Re: Bank o~ the South Palm Beaches I Lawrence Lake PUD Our File No. 3163.02 Dear Mr. Cutro: On August 20, 1991, Rossi & Kalavasi, Project Engineer for the Lawrence Lake PUD, performed the ~inal walk-through inspection with the City of Boynton Beach Utilities Department. I am currently waiting ~or the final results o~ this inspection so that we may properly revise the Cost Estimate Summary prepared by Rossi & Kalava.i. As you are aware, the Bank of the South Palm Beach.. has recently been purchased by First United Bank. Nevertheless, this asset, Lawrence Lake PUD, is presently in the ownership of the FDIC. I have had daily contact with representatives from the FDIC and have .ade them aware that a letter of credit must be posted by August 21, 1991 pursuant to the Planning & Zoning Board's approval of a time extension for concurrency exemption status. The FDIC has agreed that a letter of credit must be posted but there will be a short delay in posting the surety. I am waiting ~or an attorney to be assigned to this matter and have already sent a draft letter of credit to the FDIC ~or their review. I do not anticipate that the delay will be longer than 10 days. I will keep you updated on the status of the surety. I thank you very much for your continued cooperation in this matter. Sincerely, ~. a..j~ .Jill A. .Jarkesy .JA.J:dms cc: Mr. Craig Benson Mr. Richard Karch Ks. Dana Kilborne .-. ~. , RECEIVED : j.. AUG 22 PLANNING DEPT. .. LAW OFf"CES PERRY, SHAPIRO & MILLER, P.A. .00 ...USTR...LI...N "'VENUE SOUTH SUITE 300 , WEST P"'LM BE"'CH. FLORIO'" 33.01 F ......RTIN PERRY ROBERT LEE SH"'PI"O JORD...N R. MILLER JILL A. JARKESY TELEPHONE '.071 133-..0. f'...CSINILE '.071133-32117 Sept. ember 4, 1991 Mr. Dan Hansen FDIC P. o. Box 725003 Orlando, FL 32872-5003 Re: Bank of t.he South Palm Beaches I Lawrence Lake PUD Our File No. 3163.02 Dear Mr. Hansen: Pursuant to our conversation of today, the following is a status of the development approval for Lawrence Lake PUD. Please be advised t.hat on August 13, 1991, the Planning and Zoning Board for t.he City of Boynton Beach approved my request. for a one year t.ime extension to t.he Lawrence Lake PUD Concurrency Exempt.ion Status. This t.im. extension will be valid from August 21, 1991 to August 21, 1992. The Planning and Zoning Board conditioned this approval upon surety for the unbuilt portion of t.he required infrastructure being posted prior to August 21, 1991_ On August 21, 1991, I sent correspondence to Mr. Christopher Cutro, Planning Director of the City 01 Boynton Beach, informing him t.hat. t.here will be a short delay in posting t.~e surety for t.his project. The remaining work which needs to be completed on this file is preparing and finalizing the Letter of Credit in the amount. of $176,570.50. I am enclosing a draft copy of a Letter of Credit for your review and convenience. Furthermore, it will be necessary for the owner of Lawrence Lake PUD to execute a Bill of Sale and a Warranty to the City o:f Boynton Beach for the Water and Sewer System which is now in place. I anticipate t.hat t.he remaining work will require between three and five hours of my time. Pursuant to our earlier conversation, I would like to confirm the FDIC.s agreement to pay for my services required to finalize this development approval extension. I have previously .ent the executed :fee agreement. between this firm and the Sank o:f the South Pal. Beaches to Mr. Craia ~en.on in your department. RECEIVED SEP 5 D' ~ t,,,, . (~ n F PI. Mr. Dan Hansen Sep~ember 4, 1991 Page Tvo Thank you very much ~or your consideration of this matter. Please contact me if you should have any ques~ion8 or concerns regarding the Letter of Credit. I vill be ~orvarding to you a Bill o~ Sale and a Warranty vhich vill need to be execu~ed by the rightful owner of Lawrence Lake PUD. Sincerely, ~'aJ1~ Jill A. Jarkesy JAJ:dms cc:"'. Christopher Cutro PERRY, SHAPIRO & MILLER, P.A. PLANNING DEPARTMENT MEMORANDUM NO. 91-184 TO: Chairman and Members Planning and Zoning Board ~h~utro Planning Director THRU: FROM: Jorge L. Gonzalez Assistant City Planner DATE: August 1, 1991 SUBJECT: Lawrence Lake PUD - Concurrency Exemption Time Extension for Construction of Improvements Pursuant to the Concurrency Requirements of the City of Boynton Beach Code of Ordinances (Chapter 19, Article VI), the Concurrency Review Board (CRB) met on July 30, 1991 and unanimously recommended that a twelve (12) month time extension be granted to the Lawrence Lake PUD concurrency exemption status in order to correspond with the twelve (12) month time extension granted by the City commission for the construction of all required improvements. The Concurrency Review Board is comprised of the utilities Department, Engineering Department, Public Works Department, Parks and Recreation Department, and the planning Department. The extension will be valid from August 21, 1991 to August 21, 1992. The required improvements for the Lawrence Lake PUD are approximately seventy (70) percent complete. The Planning and Zoning Board needs to formally render a final decision on extending the concurrency exemption status of the Lawrence Lake PUD. cc: chron. file subject file a:lawlake.ext PLANNING DEPT. MEMORANDUM NO. 91-196 FROM: J. Scott Mill~1' S~ty Manager c1U?~:~~~ng Director TO: DATE: August 14, 1991 SUBJECT: Planning & Zoning Board Meeting - August 13, 1991 Please be advised that the Planning and Zoning Board met on Tuesday, August 13, 1991, and took the following action: 1. Unanimously elected an Acting Chairman, Nathan Collins, in the absence of Mr.Rosenstock and Mr. Lehnertz. 2. After conducting a public hearing, unanimously recommended approval of the request submitted by Horace Williams for the abandonment of a 20 foot wide alley at 1009 North Federal Highway, subject to proviso. The motion was made by Mrs. Greenhouse and seconded by Mr. Howard. (PM91-197) 3. After conducting a public hearing, unanimously recommended denial of the conditional use request submitted by Horace Williams to establish a used car lot to be known as Williams Auto Sales at 1009 North Federal Highway. The motion was made by Mrs. Huckle and seconded by Mrs. Greenhouse. (PM91-198) 4. After conducting a public hearing, recommended denial of the request submitted by the City, in connection with the Boynton Beach Activity Center site plan, of a variance to Section 5-138 "Scope"(a) of Article X-Parking Lots. The motion was made by Mrs. Greenhouse and seconded by Mrs. Huckle. The vote was 4-2 with Mr. Collins and Mr. Hinson dissenting. The Board unanimously approved the request of the variance to Section 5-142(h)(7) "Driveway" of Article X, Parking Lots. The motion was made by Mrs. Huckle and seconded by Mrs. Greenhouse. (PM91-200) 5. Unanimously recommended approval of the site plan request submitted by the City for the Boynton Beach Activity Center; a 6,640 square foot recreation activity center and 89 space parking lot to replace the existing Tennis Center, subject to proviso. The motion was made by Mrs. Greenhouse and seconded by Mr. Howard. (PM91-201) 6. The Board approved in part and denied in part the master plan modification submitted by Kilday and Associates for the Shoppes of Woolbright p.e.D. as follows: a) Denied the request for an additional driveway onto Woolbright Road (item #1 of Planning Department Memorandum No. 91-165). The motion was made by Mrs. Huckle and seconded by Mrs. Stevens. The vote was 5-1 with Mr. Collins dissenting. b) Unanimously approved the request to change the size, number of stories and use designation of the outparcel at the northeast corner of Woolbright Road and S.W. 8th Street from a 4,300 square foot retail building to a two story, 6,000 square foot bank (item #3 of Planning Department Memorandum Mo. 91-165). The motion was made by Mrs. Huckle and seconded by Mrs. Greenhouse. Planning Dept. Memorandum 91-196 Page 2 c) Unanimously approved the request to add another driveway onto S.W. 8th Street from the shopping center and outparcels and to relocate the approved driveway southward, subject to eliminating one of the two access aisle connections between the outparcels and Home Depot and relocating the remaining access aisle connection to behind (east) outparcel 2, (items #4 and #5 of Planning Department No. 91-165). The motion was made by Mr. Howard and seconded by Mrs. Huckle. The Board accepted the Planning Department's recommendation to require the amended plans within 3 weeks of the date of approval rather than within the time period stated in condition #1 of Planning Department Memorandum No. 91-183. The request to change the size and use designation of the outparcel at the northeast corner of Woolbright Road and S.W. 8th street (item #2 of Planning Department Memorandum No. 91-165) was withdrawn at the applicant's request. In addition, the applicant is requesting an appeal to the Planning and Zoning Board's denial of the request for an additional driveway onto Woolbright Road-(a) above. (PM91-206) 7. Unanimously made a finding of consistency with the Comprehensive Plan for the amendment to Chapter 19 to implement a new site plan review ordinance, subject to proviso. Motion was made by Mrs. Greenhouse and seconded by Mr. Howard. In addition, the Board requested that they receive a copy of the revised ordinance prior to the September 3, 1991 City Commission meeting. (PM91-202) 8. Deleted the consistency review determination of the proposed Adminstrative Procedures Ordinance from the agenda since this ordinance has not been completed by staff. This item will be placed on a future Planning and Zoning Board agenda. 9. The Board tabled action with respect to the consistency review determination of the proposed amendment to Appendix A-Zoning, Section 11.1 of the Code of Ordinances to allow for expansion of nonconforming structures, until the September 10, 1991, Planning and Zoning Board meeting to allow staff sufficient time to incorporate the changes recommended by the Board. 10. The Board accepted the Planning Department's recommendation to postpone the consistency review of the proposed amendments to Appendix B-Planned Unit Developments of the Code of Ordinances, Section 6.F - Planned Commercial Development District and Section 7 - Planned Industrial Development District of Appendix A-Zoning of the Code of Ordinances to create time extensions for master plan approvals, until the September 10, 1991 Planning and Zoning Board meeting. 11. Deleted the consistency review determination of the proposed amendment to Appendix A-Zoning to allow towing companies in the M-1, Light Industrial zoning district from the agenda. 12. Unanimously made a finding of consistency with the Comprehensive Plan for the amendment to the Zoning Code to allow wholesale/distribution of prepackaged and prepared meat and poultry in the C-4, General Commercial, zoning district, subject to proviso. Motion was made by Mrs. Greenhouse and seconded by Mr. Howard. (PM91-199) Planning Dept. Memorandum 91-196 Page 3 13. Unanimously approved the Lawrence Lake PUD 12 month time extension for exemption from concurrency, subject to posting surety for the incomplete, required improvements. The motion was made by Mrs. Stevens and seconded by Mr. Howard. 14. Unanimously recommended that the City Commission initiate a change to the minimum frontage required by the Code of Ordinances for service stations with or without major repairs from 175 feet to 240 feet. The motion was made by Mrs. Greenhouse and seconded by Mrs. Huckle. (PM91-203) 15. The Board requested a copy of the Planning Department's list of expired site plan approvals as soon as it is completed by the Planning Department. TJH/jm encls. cc: Don Jaeger, Building Director Mike Haag, Site Development PM91-196.JM PLANNING DEPT. MEMORANDUM NO. 91-203 (AGENDA MEMORANDUM) FROM: J. Scott Miller, City Manager J~. 0.. ;;L.~~ :JA ..1J?ih~ ~ Christop~r~ro: Planning Director TO: DATE: August 14, 1991 SUBJECT: Service Station Frontage Requirements - Planning and Zoning Board Recommendation Please be advised that it is the desire to postpone placement of the above-referenced item on the City Commission agenda for discussion until the September 3, 1991 City Commission meeting. Transmittal to your office of the cover memorandum outlining staff's recommendations will occur in the near future. cC/jm PM91-203.JM 8Bl LAWRENCE LAKE PUD CONCURRENCY EXEMPTION TIME EXTENSION PLANNING DEPARTMENT MEMORANDUM NO. 91-184 THRU: Chairman and Members Planning and Zoning Board ~~ Christopher cutro Planning Director TO: FROM: Jorge L. Gonzalez Assistant City Planner DATE: August 1, 1991 SUBJECT: Lawrence Lake PUD - Concurrency Exemption Time Extension for Construction of Improvements Pursuant to the Concurrency Requirements of the City of Boynton Beach Code of Ordinances (Chapter 19, Article VI), the Concurrency Review Board (CRB) met on July 30, 1991 and unanimously recommended that a twelve (12) month time extension be granted to the Lawrence Lake PUD concurrency exemption status in order to correspond with the twelve (12) month time extension granted by the City Commission for the construction of all required improvements. The Concurrency Review Board is comprised of the Utilities Department, Engineering Department, Public works Department, Parks and Recreation Department, and the Planning Department. The extension will be valid from August 21, 1991 to August 21, 1992. The required improvements for the Lawrence Lake PUD are approximately seventy (70) percent complete. The Planning and zoning Board needs to formally render a final decision on extending the concurrency exemption status of the Lawrence Lake PUD. cc: chron. file subject file a:lawlake.ext .' ROSSI AND MALAVASI ENGINEERS. INC. CONSULTING ENGINEERS ~I~ -f. t(&M+ ~I~ 580 VILLAGE BOULEVARD, SUITE 140 WEST PALM BEACH, FLORIDA 33409.1904 (407) 689.0554 FAX: (407) 689.1109 Ap r i 1 4, 19 90 ~ A"..~ C~ -~~ City of Boynton Beach P.O. Box 310 Boynton Beach, Florida 33425 ATTN: Mr. Vincent Finizio, Acting Asst. to the City Engineer RE: Lawrence Lake Request of Reduction of Surety Dear Mr. Fini zio: Enclosed is a certified Cost Estimate of work remaining to be done on the referenced project. You will note that we have retained 10% of the completed items as part of the Cost Estimate. We hereby request that, with your approval, this item be placed on the agenda for Reduction of Surety. Very truly yours, R~ MALAVASI ENGINEERS, J;U~?~~~ L' ,~n?:d(R~ssl, P. E. April 10,1990 INC. To: TRB MEMBERS Please respond with carrrents by April 30th. ER/jh cc: Leonard Kligler Thank you. LL..~A~~ RECEIVED APR 12 1990 PLANNING DEPT. 80 I\! ROSSI and MALAVASI ENGINEERS WEST PALM BEACH, FLORIDA LAWRENCE LAKE COST ESTIMATE SUMMARY A. E~)fnHWORK /""-7 B. .I *PAVING AND DRAINAGE C. *WATER DISTRIBUTION SYSTEM D. SEWAGE COLLECTION SYSTEM E. SETTING P.~.M.'s & P.C.P.'s TOT~")L ./ j..'" ~ - ..... -: -'j - * REVISED OCTOBER 14, 1988 I=O~lf;E 1 cof 8 AUGUST 24, 1988 $52,59121.4121 $13121,729.20 $58,8121121.0121 $56,112.00 $2,121121121.00 $310, 331. 51Zi /I f 0 F 3 -- It( -5)0 THIS BID PROPOSAL OF QUANTITIES MAY NOT CONSTITUTE A COMPLETE LIST OF ITEMS TO COMPLETE THE JOB. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING ALL ITEMS SHOWN ON PLANS AND SPECIFICATIONS. ANY ITEM SHOWN ON THE PLANS AND NOT COVERED BY THIS BID PROPO- SAL, SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND INCLUDED IN THIS PROPOSAL GENERAL NOTE: ./ 80N ~OSSI and MALAVASI ENGINEERS .EST PALM BEACH, FLORIDA LAWRENCE LAKE EARTHWORK T~M ESTIMATED ITEMS AND UNIT PRICES ,UMBER QUANTITY (PRICES TO BE WRITTEN IN WORDS) -A 1 1. 52 ~'I ;"0 v.~, '-' _-A 4,21121.0121 #J ,-{ r -A 17,818.121121 .S." :')/ \;)'-O/lO -A 4,287.00 ~ I .... _/ / <.0 / /\ / ;,; FOR CLEARING AND GRUBBING APPROX 11. 52 ~:ICRES @ PAGE i::: of 8 AUGUST 2't, 1 '388 UNIT PRICE DOLLARS/LUMP SUM---------------- $2,1210121.00 FOR EXCAVATING FROM HIGH AREAS, HAULING, SPREADING AND COMPACTING IN LOW AREAS, UNDER PROPOSE~ ROADS AND PADS @ DOLLARS/C.Y.--------~----------- FOR EXCAVATING FROM PROPOSED LAKES, HAULING, SPREADING AND COMPACTING IN LOW AREAS UNDER PROPOSED ROADS AND PADS @ DOLLARS/C.Y.---------~---------- FOR EXCAVATING FROM PROPOSED LAKES, HAULING, SPREADING AND COMPACTIN IN AREAS DESIGNATED BY THE OWNE R IE - -------------------------------- DOLLARS/C.Y.-------------------- TOTAL I TEtrlS II A II $1. BILl $1.81l) $1 . 81l.~ AMOUNT $23, I2ILt0. 1210 $7,578.1210 I-I I~ / $32,12172.40 $7,716.60 / ; , I ~ ",' ',- $62,6'30.4121 812IN ~DSSI and MALAVASI ENGINEERS ~EST PALM BEACH, FLORIDA LAWRENCE LAKE. PAVING AND DRAINAGE ITEM ESTIMATED ITEMS AND UNIT PRICES ~UMBER QUANTITY (PRICES TO BE WRITTEN IN WORDS) I='AGE :3 .~~, r 8 AUGUST 2Lt ~ 1988 UNIT PRICE ------------------------------------------------------------------------------ AMOUNT :::NTRANCE ROAD 1-B 1,593.00 ::-8 1, 643. 00~! "" ./ /'~ h ~ ... p-' v 3-B 1,693.00 ;2~ 70 f-8 650.00 (> -::;-B 240.00 .,~ D 1 1/2" TYPE II ASPHALTIC CONC. WEARING SURFACE ON BITUMINOUS PRIME AND TACK COAT @ DOLLARS/S.Y.-------------------- 8" SHELUmCK BASE COtr1P. TO 98 ~ MAX. DRY DENSITY @ . DOLLARS/S.Y.-------------------- 12" STABILIZED SUBGRADE TO 50 P.S. I., F.B.V. @________________ DOLLARS/S.y.-------~------------ 6" STABILIZED SHOULDER TO 50 P.S. I., F.B.V. @________________ DOLLARS/S.y.-------------------- 6" RAISED CURB (~ DOLLARS/L.F.-------------------- ~.-B* 450.00 8' ASPHALT BIKE PATH @__________ (/ ~-8 170.00 j-B 9,310.00 C. DOLLARS/L.F.-------------------- l' CONCRETE FLUSH HEADER @ DOLLARS/L.F.-------------------- SOLI D SOD I~ DOLLARS/S.F.-------------------- TOTAL THIS PAGE $3.50 $4.25 $1. 25 $1.50 $6.00 $6.50 $6.50 $. 17 $5,575.50 $6,982.75 $2, 116. 2.5 $975.00 $1,440.0121 / !_::' I. -: $2,925.00 /, ) , $1,105.00 $1,582.70 / i \ $22,702.20 :08S1 and MRLAVASI ENGINEERS EST PALM BEACH, FLORIDA LAWRENCE LAKE PAVING AND DRAINAGE TEM ESTIMATED ITEMS AND UNIT PRICES ,UMBER QUANTITY (PRICES TO BE WRITTEN IN WORDS) PAGE 4 of 8 AUGUST 2LI~ 1 '388 UNIT PRICE AMOUNT ------------------------------------------------------------------------------ -B 0-B 2. 00 0 1. 1210 b !\lTERNAL ROADS 1-B 2-8 ,3-B 4-B S-B 6,20'3.1210 ;) 6, 491. 121.0/ /' .', .1 ,1./ 6,773.00 " D o:~. / IV 2,822.00 o 25,50121.1210 C/ ECREATION AREA 5-8 255.1210 STREET/STOP SIGN @ DOLLARS/EA.--------------------- ROAD STRIPING AND MARKING @_____ , ~ $200. 0121 $400.00 DOLLARS/L.S.-------------------- $1,200.00 $1,200.00 1 1/2" TYPE II ASPHALTIC CONC. WEARING SURFACE ON BITUMINOUS PRIME AND TACK COAT @~__________ DOLLARS/S.Y.-------------------- B" SHELL ROCK BASE COMP; TO '38 ;<. MAX. DRY DENSITY @ DOLLARS/S.Y.-------------------- 12" STABILIZED SUBGRADE TO 50 P.8. I., F.B.V. @________________ DOLLARS/8.Y.-------------------- 6" STABILIZED SHOULDER T.O 50 P.5. I., F.B.V. @________________ DOLLARS/S.Y.-------------------- SOLID SOD @____________________- DOLLARS/S.F.-------------------- I. V 1" TYPE II ASPHALTIC CONCRETE WEARING SURFACE ON BITUMINOUS PRIME AND TACK COAT @ DOLLARS/S.Y.-------------------- TOTAL THIS PAGE $3. 5121 $21 , 731. 50 $4.25 $27,586.75 / $1.25 $8,456.25 $1.5121 $4,233.00 $. 17 $4,335.1210 $2.75 $731.50 $68,684.0121 qOSSI and MALAVASI ENGINEERS ~EST PALM BEACH, FLORIDA LAWRENCE LAKE PAVING AND DRAINAGE ITEM ESTIMATED ITEMS AND UNIT PRICES ~UMBER QUANTITYCPRICES TO BE WRITTEN IN WORDS) 17-8 375.0121 18-B 276.1210 tJ _9-B 375.1210 o 1 1/2" TYPE II ASPHALTIC CONC. WEARING SURFACE ON BITUMINOUS PRIME AND TACK COAT' @___________ DOLLARS/S.Y.-------------------- 6" SHELL ROCK BASE COMPo TO '38 ~ MAX. DRY DENSITY @ DOLLARS/S.Y.-------------------- v 8" SHELL ROCK BASE COMPo TO '38 ~ MAX. DRY DENSITY @ DOLLARS/S.Y.-------------------- :::12I-B 535.1210 12" STABILIZED SUBGRADE TO 50 o P. S. 1., F. B. V. I!'____~----_------ :::l-B 12.1210 ::;=:-B 178.0~ - " '"' ::3-8 385.00 6~ DOLLARS/S.Y.-------------------- WHEEL STOPS @___________________ o ________________________________ DOLLARS/EA.--------------------- 15" C . M . P. I!' DOLLARS/L.F.-------------------- 18" C. M. P. I!' DOLLARS/L.F.-------------------- TOTAL THIS PAGE PAGE 5 of 8 AUGUST 24, 1'388 UNIT PRICE AMOUNT $3.5121 $1,312.50 $4.00 $1,104.00 $4.25 $1,5'33.75 $1.25 $7'33.75 $11. 00 $132.00 $16.50 $2,'337.0121 $20.00 $7,700.1210 $15,573.121121 ROSSI and MALAVASI ENGINEERS ~EST PALM BEACH, FLORIDA LAWRENCE LAKE PAVING AND DRAINAGE iTEM ESTIMATED ITEMS AND UNIT PRICES ~UMBER QUANTITY (PRICES TO BE WRITTEN IN WORDS> ::4-B 23121.121121 OYl \ :e:J-B 1. 00 Of( ~5-B 9.00V 9,cf~ .::S-B 1.0121 OJ( :::7-B 3.0121 V .::'3-B* 1. 121121 ~ 24" C. M. P. l~ DOLLARS/L.F.-------------------- TYPE "C" INLET I~ DOLLARS/EA.--------------------- TYPE "c" INLET W/CONCRETE APRON (# PAGE 6 of 8 AUGUST 24, 1988 UNIT PRICE $24.121121 $'3121121.00 DOLLARS/EA.--------------------- $1,0121121.0121 OUTFALL CONTROL STRUCTURE @ DOLLARS/EA.--------------------- $2,6121121.121121 RIP-RAP HEADWALL @ DOLLARS/C.Y.-------------------- ENTRANCE ROAD LIGHTING @ $25121.0el DOLLARS/L.S.-------------------- $5, 121121121. I2IQI TOTAL THIS PAGE TOTAL I TEtr1S "B II AMOUNT $5,52121.1210 $'3121121.121121 $'3,01210.0121 $2,600.1210 $750.0121 $5,12100.1210 $23,770.0121 $13121,72'3.20 80N ROSSI and MALAVASI ENGINEERS WEST PALM BEACH, FLORIDA LAWRENCE LAKE WATER DISTRIBUTION SYSTEM iTEM ESTIMATED ITEMS AND UNIT PRICES NUMBER QUANTITY (PRICES TO BE WRITTEN IN WORDS) l-C* 2,740.00 c.1t( c:;:-C 1. 00 ,,1'\ 3-C* 5.00 01( t-L.; 3.00 4'11-( 5-C 5.00 "k' l-C 15.0121 Ok' 3-C* 2.00 "J( 9-C* 1. 00 trl( 6" D. I. P. WATER f'r1AIN I~ DOLLARS/L.F.-------------------- E," GATE VALVE & VALVE BOX @ DOLLARS/EA.--------------------- FIRE HYDRANTS W/l-6" GATE VALVE AND VALVE BOX (~ PAGE 7 clf 8 AUGUST 24, 1988 UNIT PRICE AMOUNT $11 . 510 $31,510.00 $395. tZl!Zt $395.00 DOLLARS/EA.--------------------- $1,300.00 $6,500.0121 SAMPLING POINT @ DOLLARS/EA.--------------------- 1" SINGLE SERVICE @ DOLLARS/EA.--------------------- 1" DOUBLE SERV I CE I~ DOLLARS/EA.--------------------- E," x 15" C. 1. M. J. TAPPING TEE WITH 2 - 6" GATE VALVES @ $140.00 $420.00 $200.00 $1,0121121.00 $325. 0121 $4,875.1210 DOLLARS/EA.--------------------- $2,550.00 $5,100.00 AERIAL CROSSING OVER LWDD CANAL L-21 COMPLETE, TO INCLUDE 80 LF OF 8" D. 1. P. WATER t1'fAIN WITH ALL ATTACHf'r1ENTS Il:l DOLLARS/L.S.-------------------- $9,000.00 $9,000.00 TOT{:"~L ITEMS "e" $58,800.0121 80N ROSSI and MALAVASI ENGINEERS WEST PALM BEACH, FLORIDA LAWRENCE LAKE SANITARY SEWER COLLECTION SYSTEM ITEM ESTIMATED ITEMS AND UNIT PRICES ~UMBER QUANTITY (PRICES TO BE WRITTEN IN WORDS) l-D 1,305.00 ok-. .:::-D 11121.0121 o.K 3-D 95121.0121 Dt\ +-D 255.00 'p< 5-D 7.00 aR( ;-D 7.00 ~K 7-D 5.00 ~K: 3-D 14.00 &)( 8" V. C. P. (0' -5' DEEP) l!t________ DOLLARS/L.F.-------------------- 8" POLYLINED D. I.P. (0'-6' DEEP) @------------------------------- DOLLARS/L.F.-------------------- 8" V. C. P. (5' -8' DEEP) @ ------------------~------------- DOLLARS/L.F.-------------------- 8" POL YLINED D. I. P. (5' -8' DEEP) @------------------------------- DOLLARS/L.F.-------------------- MANHOLE (0'-5' DEEP) @__________ DOLLARS/EA.--------------------- MANHOLE (6'-8' DEEP) @__________ PAGE 8 c.f 8 AUGUST 24, 1988 UNIT PRICE $11. 00 $15.00 $14.50 $17.5121 $925.0121 DOLLARS/EA.--------------------- $1,100.0121 5" SINGLE SERVICE @_____..:._______ DOLLARS/EA.--------------------- 5" DOUBLE SE RV I CE l!t _____________ -------------------------------- DOLLARS/EA._____________________ TOTAL ITEMS "0" $325.00 $390.00 AMOUNT $14,355.0121 $1,750.0121 $13,775.00 $4,537.50 $6,475.00 $7,700.00 $1,950.00 $5,460.0121 $55,112.5121