LAWRENCE GROVE
(Phase 1)
MASTER PLAN MODIFICATION
PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 92-060
TO: Chairman and Members
P~ a~ning Board
FROM: Christopher Cutro, Planning and Zoning Director
DATE: April 9, 1992
SUBJECT:
Lawrence Grove PUD Master Plan Modification
The developer of Lawrence Grove PUD has requested a master plan
modification to alter the lot configurations away from the
present lot mixture of zero lot lines and Z-lots, to a mix of
zero, Z-lots, and standard setback lots.
The Planning and Zoning Department has reviewed this request and
has determined that no greater impacts would be generated by this
amendment to the master plan. The overall number of units that
was approved in the original master plan will remain the same.
This request was reviewed by the City Commission at its meeting
of 4/7/92 and determined to be a minor modification and forwarded
to the Board for final disposition.
Staff recommends approval of the modification subject to the
staff comments included in the backup.
CC/cmc
C:LAWGR
PLANNING AND ZONING MEMORANDUM NO. 91-052
TO: J. Scott Miller, City Manager
~~ '. ~q,'~"J ~c:r( ~ 1
FROM: Christopher Cutro, Planning and Zoning Director
DATE: April 2, 1992
SUBJECT: Lawrence Grove PUD Master Plan Modification
Urban Design Studio, acting as the agent for the Houvnanian
Companies has requested a master plan modification for Lawrence
Grove PUD.
The proposed modification would allow for the restructuring of
the present lot layout which favors zero lot lines and Z-lots to
be altered to a more conventional rectangular freestanding lot
which would have conventional setbacks.
The applicant has not asked for a change in the overall density
of the site and we do not see that any increase in impact will be
generated by this change. The applicant has indicated they will
replat the development if this modification is approved by the
City.
The Technical Review Committee reviewed this petition at its
meeting on March 12, 1992 and the comments of the various
departments are included in the backup. All of the comments can
be complied with at the time of plat review.
Appendix B, Section 12 "Changes in Plans" prescribes the
procedure to be followed in reviewing master plan modifications.
The City Commission has sole discretion as to whether or not the
proposed modification is major or minor. A minor modification
shall be forwarded to the Planning and Zoning Board for
consideration. A major change must follow the full procedure for
a PUD zoning amendment.
Staff analysis of the proposal shows that there will be no
increased traffic, water, sewer, drainage, or recreation impacts
because of this amendment. We would ask that the City Commission
forward this modification to the Planning and zoning Board with a
finding that the modification is minor and with the applicable
staff comments.
CC/cmc
C:LAWGRMPM
CC/cmc
STAFF COMMENTS
LAWRENCE GROVE
(Phase 1)
MASTER PLAN MODIFICATION
BUILDING DEPARTMENT:
FIRE DEPARTMENT:
ENGINEERING DEPARTMENT:
UTILITIES DEPARTMENT:
POLICE DEPARTMENT:
PUBLIC WORKS DEPARTMENT:
PLANNING AND ZONING DEPARTMENT:
PARKS AND RECREATION DEPARTMENT:
FORESTER/HORTICULTURIST
See attached memorandum
See attached memorandum
See attached memorandum
See attached memorandum
No comments
See attached memorandum
No comments
See attached memorandum
No comments
'- {' '" ,.
,~~I<.,..,.'L'~" ,'.i,jr"'?if:,." ~'4Ii~.;,;i"" ,
~" . '. W.,p;.1,"~;:~~~.;,~ ,-:,' '
_ ',; J~. ~~:'''~'~~~..". ..' ~ ~
March 2, 1992
City of Boynton Beach
Planning Department
P.O. Box 310
Boynton Beach, FL 33425
Attn
Mr. Chris Cutro, Planning Director
RE
LAWRENCE GROVES POD - OUR REF. '11173.02
Dear Chris:
Please accept this letter, and the accompanying $500.00 filing fee,
as our request, on behalf of K. Hovnanian, Inc., for approval of
a minor amendment to the Master Plan of the Lawrence Groves Planned
Unit Development.
Pursuant to our discussions, the Lawrence Groves PUD was approved
by the City in 1987. The 48.23 acre project was to consist of 210
units, (a density of 4.35 units per acre), developed with patio
homes (both straight lot line and Z-lot, zero lot line). Plan
elements included three separate recreation areas, over 5 acres of
lakes, and a substantial preservation of the citrus grove which was
existing on the site.
Phase One of the project is partially developed, with 48 lots sold.
All of the units constructed to date have been patio houses (both
straight lot line and Z-lot line). Sixty-four lots remain to be
developed in Phase One.
As with many projects developing in the current economic climate,
absorption has been somewhat below initial projections. Absorption
of this particular project has also been hampered somewhat by
changes in the housing market, with a lessened demand for patio
homes in favor of conventional, single family detached houses.
The purpose of this requested amendment is to allow a larger mix
of housing types in the development. Housing types would include
the approved straight lot line and Z-lot patio homes, and
conventional detached homes. Some of the conventional lots are
proposed for development for 40 feet wide units, and some 35 feet
wide units. All of the housing types would be single family
detached units.
RECEIVED
MAR 2 1992
~
Urban Design
Urban Planning
Land Planning
Landscape ArChitecture
Communication Graphl'
SITE DEV':.
BOYNTON BEACH. FLOMIJ>>.
2000 Palm Beach Lakes Boulevard
Suite 600 The Concourse
West Palm Beach, Florida
33409-6582
4076890066
Stuart. FL 407.283.0022
Newport Beach, CA 714.642.1090
Chris Cutro
March 2, 1992
Page Two
The addition of alternative housing
reconfiguration of some of the lots.
is detailed on the revised Master
attached.
types will require a slight
The reconfiguration proposed
Plan, a copy of which is
There is no proposed change in the total number of units from that
approved, nor in the primary design elements of the plan. Our
review of the impacts associated with this proposed development
plan indicates no changes in projected traffic generation rates or
traffic distribution, and no changes in demand for any City
service, including solid waste disposal, potable water or sewer
service. There is no change in the drainage system design in place
in Phase One of the project, or planned in future phases.
We understand that the review of this change will be as follows:
1) Technical Review Board meeting;
2) City Commission Public Hearing;
3) (assuming approval as a minor amendment), Planning and
Zoning Board Public Hearing.
If our understanding of this process is incorrect, please advise
us. Otherwise we expect, and would very much appreciate, this
request being considered on the first possible agendas for each of
these required meetings.
Please let us know what, if any, further materials or documents you
need to process this request. As always, please feel free to call
if you have any questions or comments on this plan and the proposed
changes.
Sincerely,
URBAN DBSIGN STUDIO
r ~ ." () ()
"~-~~
Anna Cottrell
Project Planner
cc: Steve Bovio, K. Hovnanian, Inc.
(fiP~~
'~,~ Companies -'"
"- ~
_ -.--. . _ -- --.-.---- .-- . --..----. -- ---
1800 SOUTH AUSTRALIAN AVE., SUITE 400, WEST PALM BEACH, FL 33409 (407) 478-0060
March 2, 1992
City of Boynton Beach
P.o. Box 310
Boynton Beach, FL 33425
RE: Iawrence Grove P.U.D. Modification
'!his letter will serve as our authorization for UrlJan Design to
act as agent for K. Hovnanian on our behalf regardi.rg amendment
to the Iawrence Grove P.U.D. ll'Odification to the Master Plan.
If you have arry questions please feel free to call.
en v. DM~
Director of Residential Prcperties
c
~
! ~
H '"
;.. ..
I
I
I
.
i
I
I
J 0
N
i
i
------.-
w
Ij
i-
J)
!t
P80H eOU8JMe,
...!!
,
~ -\ ~
~
ell
1
~
t
.
~~
soi
~....
cl
\~
ilia
.-a.
\
!
...
1
III
Ii
!
\
!
,
---11--
...
*---~~
d.
?:
()
II)
d.
?:
()
II) - .-
d.
?:
~
Q)
g.;
?:
Q)
(1)
::s
o i
~:a
"0 g
~N
N "(I)
0)(0
.~ 1
1n~
";( l6
UJO
; c4
.~ ~
a. ~
t'tl
.s
~-B
sa
~ 5"a.
i c s
~ I~
1 III i
t :.t
~ Q)
\
\\
-iq i
cs.lil
~1 Ii
\1 1
~ 9;' ~I
I >> { ab
! ! lS ils::'.,
b ILft-- E'::--
o ~ s
~i' . \ It\~~
-oQ. \ i 1&1 - J
CDe: ....
~o ~\ L--1r-- -'
e: L--.- ......... .- "OM;GO\.
CD
o
....
Q)
(1)
::s
~ i
:a
Q)
:9 g
fl/b
~~
N=
I
.=1
1n'5
";< i
uJO
t
,\
t !
1 ils ::. ~
l~ \\t~f~
~. l~_!L
L-. - - ~.oo\.
li 1"01
cs 1\ .. t , ..
1\1 h~\
9 \ ) 1.\ \ I
1!1 ~tta
--~.~.--
b
\t)
C') ils
"Ii ..
-oQ.
Sa
i
o
uS
..:
%
(1)
Q)
Q.
~~
o
']:
10
c
o
~
c
Q)
~
o
(.)
"
Q)
(1)
o
%
'-
0..
---------
-~--
t
\
11
rt
ib
iIt::"
.- z._..., ~
- --
\ 19lb ~ \
~. \ 1 i 1 ~ ~ \
~~--=- ::t.::=- - ~
-dA\ .oo\.
\
!.
t\
.~
at
~.
si
I.
1 9;
! I~
.
I.
b
c
~
-en c!
<<s.!!
-oQ.
SC
00
C
Q)
o
en
~
z
f/)
Q)
Q.
~
i Q)
f/)
\ 6
11 X
16
1 I !
c
:: : iIt ::.. 0
0 .-
t.n I C
p Q)
. :>
enC
<<sS 5
-00-
sc (.)
00 "
C
CD Q)
0 - f/)
0
I s Q.
. 0 i 0
ili\ ...
0-
iN 15 !
si
1-1 \ i
~tta
-~~---"--~ ----------
.,-,---
BUILDING DEPARTMENT
MEMORANDUM NO. 92-067
March 11, 1992
TO: Chris Cutro
Planning Director
THRU: Don Jaeger~~
Building olficial
FROM: Al Newbold
Deputy Building Official
RE: mc COMMENTS - LAWRENCE GROVE PUD
MASTER PLAN MODIFICATION
Please be advised that the Building Department has issued
permits for approximately 47 single family houses with zero lot
lines in Plat 1. In order to comply with the note on the plans
that 10 feet will be maintained between buildings, the applicant
needs to show the location of the existing buildings on these
lots and the distance between them and the proposed structures.
Please note that at permit time, the buildings will be required
to comply with Table 600 of the Standard Building Code.
Al~4/
AN: bh
RECEIVED
. f'
,."0 ;-oJ
N'N" ,_.
PLAN N H~ G D E.Pl ·
-
LAWRENCE. DOC
-
FIRE DEPARTMENT MEMORANDUM NO. 92-210 WDC
TO:
CITY PLANNER
FROM:
FIRE DEPARTMENT
DATE:
MARCH 18, 1992
RE:
LAWRENCE GROVES
RECONFIGURATION OF LOTS
APPLICANT HAS DEMONSTRATED THAT 10 FOOT BUILDING SEPARATION
WILL NOT CONFLICT WITH FIRE DEPARTMENT OPERATIONS.
,.,
~~~tZ~
FIRE DEPARTMENT TRC REPRESENTATIVE
19roves.wdc
pg
. J
RECEIVED
'1~
MAR 18
PLANN\NG DEPT.
-
ENGIHEERDlG DEPARTMENT MEMORANDUM NO. 92-057
TO: Christopher Cutro
Planning & Zoning Director
FROM:
Michael E. Kazunas
City Engineer
,AlE c;--
DATE: March 17, 1992
RE: LAWRENCE GROVE P. U . D.
TECHNICAL REVIEW COMMITTEE COMMENTS
We have reviewed this project and can approve subject to the following conditions:
Reconfiguration of the lots is best addressed by a replatting of the existing
subdivision. Consideration must be given to the previously sold lots in as much
as their approval may be a requirement of replatting. To accomplish replatting,
6 copies of the preliminary plat must be submitted to the City Engineer for review
by the Technical Review Committee and forwarded to the City Commission for approval.
Fee for this submittal is $500 + $l.OO/Dwellings = $612. Following preliminary
plat approval, a final plat shall be submitted to the City Engineer, conforming to
Appendix C - Article VIII, Section 6. With the City Engineerts approval this will
again be presented by the City Planner to the City Commission for approval after
which, when approved, it will be signed and returned to the developer for recording.
-The cost for this submission of final plat is $300.
---
MEK/ ck
RECEIVED
MAR 1f ..
PLANNiNG D~PT~,
l:'.~""'"
-
.M&fORANOOM
UTILITIES DEPAR'lMENr NO. 92 - 107
~: John A. Guidry, utilities Director
TO: Christopher cutro, Planning and Z
DATE: March 12, 1992
SUBJECT: Master Plan Modification - Lawrence Grove POD
We can approve this project subject to the following conditions:
1) Revised building locations may result in driveways conflicting with
existing water meters, fire hydrants, or sanitary sewer cleanouts. The
applicant rrust provide assurance that the driveways will not inpact the
existing utilities, or assume "responsibility for relocating said
utilities.
Please refer any questions an this matter to Peter Mazzella at 738-7460,
ext, 332,
15" )1111 rV u"(C ~ - -eE.l//eW
I ~ 1M I IJ vTE.') - SEC~E7;.4WCf,J\Tf.D
-r E- S -:::: ..1- /-fov K.. 10
G, 0 fVlltUJ1. ~ .-
~NlNG DS'1.
~
JAG/PVM
be: Peter Mazzella
xc: File
.,.--'-
PUBLIC WORKS MEMORANDUM NO. 92-034
TO: DOROTHY MOORE - ZONING & SITE PLAN REVIEWER
FROM: ROBERT EICHORST - PUBLIC WORKS DIRECTOR
DATE: MARCH 10, 1992
SUBJ: MASTER PLAN MODIFICATION
RE: LAWRENCE GROVE PUD
The proposed cul-de-sac does not provide proper turn-around
for sanitation vehicle.
RE : he
cc: file
RECEIVED
MAR 1 1 1992
SITE DEVEL.
IOYNI"CW lEACH. R..CRIDft
::- ;
;
RECREATION & PARK MEMORANDUM 192-098
FROM:
Chris Cutro
Planning and Zoning Director
John Wildner, Parks Superintendent ~
Masterplan Modification: Lawrence~~ve P.U.D.
TO:
RE:
DATE:
March 17, 1992
The Recreation & Park Department has reviewed the masterplan
modification request for the Lawrence Grove P.U.D. The following
recreation-related comments are submitted:
1.
The full recreation
already been paid.
number of dwelling
impact fee.
impact fee for this project has
Since there is no change in the
uni ts there is no change in the
2. No other recreation-related issues appear to effect
this project.
JW: ad
RECEIVED
- J7
PLANNING DEPT.
--
PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 92-051
TO:
J. Sqott Miller, City Manager
~{;~~~h~r~ro, Planning and Zoning Director
FROM:
DATE:
April 2, 1992
SUBJECT: Lawrence Grove Agenda Item
Please list the following item for the April 7, 1992 City
Commission meeting under Development Plans Other:
Master Plan Modification - Request to modify the lot layouts and
setbacks from a zero lot line and 2-1ot configuration to a
conventional lot layout in the Lawrence Grove PUD.
If you should have any questions on this matter please feel free
to call me.
CC/cmc
\(
~
". ,.'
-' :...-: :i.,
.' PLANNING AND ZONING MEr.lORANDUM NO. 91-052
TO: J. Scott Miller, City Manager
~ ~ .. i... ~ ,..',.J fcr~ '. \
FROM: Christopher Cutro, Planning and Zoning Director
DATE: April 2, 1992
SUBJECT: Lawrence Grove PUD Master Plan Modification
Urban Design Studio, acting as the agent for the Houvnanian
Companies has requested a master plan modification for Lawrence
Grove PUD.
The proposed modification would allow for the restructuring of
the present lot layout which favors zero lot lines and Z-lots to
be altered to a more conventional rectangular freestanding lot
which would have conventional setbacks.
The applicant has not asked for a change in the overall density
of the site and we do not see that any increase in impact will be
generated by this change. The applicant has indicated they will
replat the development if this modification is approved by the
City.
The Technical Review Committee reviewed this petition at its
meeting on March 12, 1992 and the comments of the various
departments are included in the backup. All of the comments can
be complied with at the time of plat review.
Appendix B, Section 12 "Changes in Plans" prescribes the
procedure to be followed in reviewing master plan modifications.
The City Commission has sole discretion as to whether or not the
proposed modification is major or minor. A minor modification
shall be forwarded to the Planning and Zoning Board for
consideration. A major change must follow the full procedure for
a PUD zoning amendment.
Staff analysis of the proposal shows that there will be no
increased traffic, water, sewer, drainage, or recreation impacts
because of this amendment. We would ask that the City Commission
forward this modification to the Planning and Zoning Board with a
finding that the modification is minor and with the applicable
staff comments.
CC/cmc
C:LAWGRMPM
CC/cmc
March 2, 1992
City of Boynton Beach
Planning Department
P.O. Box 310
Boynton Beach, FL 33425
Attn
Mr. Chris Cutro, Planning Director
RE
LANRBNCB GROVES POD - OUR RBF.111173.02
Dear Chris:
Please accept this letter, and the accompanying $500.00 filing fee,
as our request, on behalf of K. Hovnanian, Inc., for approval of
a minor amendment to the Master Plan of the Lawrence Groves Planned
Unit Development.
Pursuant to our discussions, the Lawrence Groves PUD was approved
by the City in 1987. The 48.23 acre project was to consist of 210
units, (a density of 4.35 units per acre), developed with patio
homes (both straight lot line and Z-lot, zero lot line). Plan
elements included three separate recreation areas, over 5 acres of
lakes, and a substantial preservation of the citrus grove which was
existing on the site.
Phase One of the project is partially developed, with 48 lots sold.
All of the units constructed to date have been patio houses (both
straight lot line and Z-lot line). Sixty-four lots remain to be
developed in Phase One.
As with many projects developing in the current economic climate,
absorption has been somewhat below initial projections. Absorption
of this particular project has also been hampered somewhat by
changes in the housing market, with a lessened demand for patio
homes in favor of conventional, single family detached houses.
The purpose of this requested amendment is to allow a larger mix
of housing types in the development. Housing types would include
the approved straight lot line and Z-lot patio homes, and
conventional detached homes. Some of the conventional lots are
proposed for development for 40 feet wide units, and some 35 feet
wide units. All of the housing types would be single family
detached units.
RECEIVED
MAR 2 1992
SITE DEV ~l
BOYNTON BEACH, FLORIDA
Ii
Urban Design
Urban Planning
Land Planning
Landscape Archltectul
Communication Grap~
2000 Palm Beach Lakes Boulevard
Suite 600 The Concourse
Wesl Palm Beach. Florida
33409-6582
4076890066
Sluar\' FL 407.283.0022
Newport Beach. CA 714.642.1090
Chris Cutro
March 2, 1992
Page Two
The addition of alternative housing
reconfiguration of some of the lots.
is detailed on the revised Master
attached.
types will require a slight
The reconfiguration proposed
Plan, a copy of which is
There is no proposed change in the total number of units from that
approved, nor in the primary design elements of the plan. Our
review of the impacts associated with this proposed development
plan indicates no changes in projected traffic generation rates or
traffic distribution, and no changes in demand for any City
service, including solid waste disposal, potable water or sewer
service. There is no change in the drainage system design in place
in Phase One of the project, or planned in future phases.
We understand that the review of this change will be as follows:
1) Technical Review Board meeting;
2) City Commission Public Hearing;
3) (assuming approval as a minor amendment), Planning and
Zoning Board Public Hearing.
If our understanding of this process is incorrect, please advise
us. Otherwise we expect, and would very much appreciate, this
request being considered on the first possible agendas for each of
these required meetings.
Please let us know what, if any, further materials or documents you
need to process this request. As always, please feel free to call
if you have any questions or comments on this plan and the proposed
changes.
Sincerely,
ORBAN DBSIGH STUDIO
(~-- ." () II')
\~.~~
Anna Cottrell
Project Planner
cc: Steve Bovio, K. Hovnanian, Inc.
(;ifovnanian
.~,~ Companies
"'- - -- .. - --- ------ --- --.. --- -, - ~
1800 SOUTH AUSTRALIAN AVE., SUITE 400. WEST PALM BEACH, FL 33409 (407) 478-0060
March 2, 1992
City of Boynt:al Beach
P.O. Box 310
Boynt:al Beadl, FL 33425
RE: Iawrence Grove P. U. D. M:xtificaticn
1his letter will serve as our authorization for Urban Design to
act as agent for K. Hovnanian al our behalf regar:dirg amerrlment
to the Iawrence Grove P.U.D. JIDdificatioo to the Master Plan.
If you have any questioos please feel free to call.
S en V. PDvk>~
Director of Residential Properties
ENGINEElUHG DEPARTMENT MEHOlWIDUH NO. 92-057
TO: Christopher Cutro
Planning & Zoning Director
FROM:
Michael E. Kazunas
City Engineer
/YE U--
DATE: March 17, 1992
RE: LAWRENCE GROVE P.U.D.
TECHNICAL REVIEW COHHITTEE COMMENTS
We have reviewed this project and can approve subject to the following conditions:
--
Reconfiguration of the lots is best addressed by a replatting of the existing
subdivision. Consideration must be given to the previously sold lots in as much
as their approval may be a requirement of replatting. To accomplish replatting,
6 copies of the preliminary plat must be submitted to the City Engineer for review
by the Technical Review Committee and forwarded to the City Commission for approval.
Fee for this submittal is $500 + $l.OO/Dwellings = $612. Following preliminary
plat approval, a final plat shall be submitted to the City Engineer, conforming to
Appendix C - Article VIII, Section 6. With the City Engineer's approval this will
again be presented by the City Planner to the City Commission for approval after
which, when approved, it will be signed and returned to the developer for recording.
-The cost for this submission of final plat is $300.
MEK/ck
RECEIVED
MAR 1f ,.
PLANNING D~PT,!,
4<'.~.~"'" '
~
+-
BUILDING DEPARTMENT
MEMORANDUM NO. 92-067
March 11, 1992
TO: Chris Cutro
Planning Director
THRU: Don Jaeger~~
Building olficial
FROM: Al Newbold
Deputy Building Official
RE: TRC COMMENTS - LAWRENCE GROVE PUD
MASTER PLAN MODIFICATION
Please be advised that the Building Department has issued
permits for approximately 47 single family houses with zero lot
lines in Plat 1. In order to comply with the note on the plans
that 10 feet will be maintained between buildings, the applicant
needs to show the location of the existing buildings on these
lots and the distance between them and the proposed structures.
Please note that at permit time, the buildings will be required
to comply with Table 600 of the Standard Building Code.
Al~~
(
AN: bh
RECEIVED
4 ('\
~&"O ; oJ
"'Inn ,'"
p\.AN\,U\~G DE-Pl.
-
-
LAWRENCE. DOC
J-
PUBLIC WORKS MEMORANDUM NO. 92-034
TO: DOROTHY MOORE - ZONING & SITE PLAN REVIEWER
FROM: ROBERT EICHORST - PUBLIC WORKS DIRECTOR
DATE: MARCH 10, 1992
SUBJ: MASTER PLAN MODIFICATION
RE: LAWRENCE GROVE PUD
The proposed cul-de-sac does not provide proper turn-around
for sanitation vehicle.
RE : he
cc: file
RECEIVED
MAR 1 1 1992
SITE DEYEL.
IOYNrCIN IEAaf, FL.ORD
~
UTILITIES DEPAR'IMEm' NO. 92 - 107
FRCM:
Christopher cutro, Planning and Z
John A. Guidry, utilities Director
TO:
DATE :
March 12, 1992
SUBJECT: Master Plan Modification - Lawrence Grove POD
We can approve this project subject to the following conditions:
1) Revised building locations nay result in driveways conflicting with
existing water meters, fire hydrants, or sanitary sewer cleanouts. The
applicant RIlSt provide assurance that the driveways will not iIrpact the
existing utilities, or assune"responsibility for relocating said
utilities.
Please refer any questions on this natter to Peter Mazzella at 738-7460,
ext. 332.
15 jVI,,vur&~ - J:EvIEW
If; fr1 / A.J uTE 5 - SeC-ILc7/4ii.1iC"EJVE.D
TE. s ~ .1- J-fov~ G
6, 0 fr11 t1.JJ 1NI ~.
~~lNG DEPt-
~--------
JAG/PVM
be: Peter Mazzella
xc: File
RECREATION , PARK MEMORANDUM '92-098
FROM:
Chris Cutro
Planning and Zoning Director
John Wildner, Parks Superintendent ~
Masterplan Modification: Lawrence~~ve P.U.D.
TO:
RE:
DATE:
March 17, 1992
The Recreation & Park Department has reviewed the masterplan
modification request for the Lawrence Grove P.U.D. The following
recreation-related comments are submitted:
1.
The full recreation
already been paid.
number of dwelling
impact fee.
impact fee for this project has
Since there is no change in the
uni ts there is no change in the
2. No other recreation-related issues appear to effect
this project.
JW: ad
RECEIVED
MAR J~
PLANNING DEPT.
-
FIRE DEPARTMENT MEMORANDUM NO. 92-210 WDC
TO:
CITY PLANNER
FROM:
FIRE DEPARTMENT
DATE:
MARCH 18, 1992
RE:
LAWRENCE GROVES
RECONFIGURATION OF LOTS
APPLICANT HAS DEMONSTRATED THAT 10 FOOT BUILDING SEPARATION
WILL NOT CONFLICT WITH FIRE DEPARTMENT OPERATIONS.
..
~a:.-'
WILLIAM D. C ANAUGH, FPO I
FIRE DEPARTMENT TRC REPRESENTATIVE
19roves.wdc
pg
. J
RECEIVED
'f a...
MAR 18
PLANN\NG DEPT.
-
is''
~~. Road
~lI!
\\
.~
'l...___
.(..
---
.
, ~
i
1
\
, I
\ ;
'---.
\ t
1 J
'"
:r~:},\ \~
1i=~ I:
Li~-~~. r 1\:
.- ~ =
\I. ~_J P Ii
fi. 0 I
L~_jJ' ~ \
~l~ _J CD
- 1
'i~ I ! 1
.:;~-" !!. \
~~ =]i 1
.. -7~ 1
,i~ I. \
1
\
1
1
S 02" 08' 27" W 1341.71'
~ -;
i i
I
"
..
o
"0
o
(I)
ct
C-
O
o
~
ct
a.
-.
o
::s
9!.
:J:
o
c
(I)
CD
~
"0
CD
(I)
~
~
100'
~>>Q !fXI
~\h i
"
- - -1 .~
r ? ~l J \ I
~ UJ
q I
J I
\
!
51
::s
09.
::S.
a.
11>>
, "'!! en
..r-.
as ~
I (II
I Q
i
Z=-:'~ ::s
100' tvo. -.
.- _- -I )! 09.
r = I '.. ;&
\ ~ ~iJ\ ~.J~
\ q . ... C
. , CI!
, - - -r - --=. I q
--.~
Une ~CI! 91 f
i\l li t
Ii
! gi
- i4
"\
! ~"
90 !.
B.S-
.
N~
~~
o -"
::s a.
"0 CD
J~
c
(I)
CD
~
ct ~
'PI
-!
1-
il
~ ;
in .
0",
i ~.
i~
~=
I>>ca
en. N
.
· r-
g 9-
'9.:J:
, 0
C
(I)
ct
~
"0
CD
~
_ is
~
l'
I
i
:..-G,=--
~.=--
~~--~
i
I
I
I
\
I
\
,
I
..'
1
..
\
li
i~
..,~
iDe
~i
i
r
!
n
!
III
~ 1jI
~
-0
..
.g
o
en
CD
a-
n
o
~
a
-.
o
=
9!.
:t
o
c
en
CD
~
-c
CD
en
~
-4
Y>>
Ht-" HI
taal ~io
rqi JH
I t l.t cD: ~
lat =i
101l' t _ r 14
.---, 0
r _- - I !
\ ~~II,l .~ g~
~ 0 tr \ "2,0.
. = . 0)=
L- ;;: ? ·
- w
.........., ..... I Ul
... 0
~. ~ f-
.. , 1-
, i Jr
\ I
!
.100' tVP- .
r - -"j.. - -;\1!l
. \. ~ 8t!r,\ \
.\ ~ q tr I
~~-.~- . i
ii t! I
{t 11
I If
! p;i
I'
'i
i
o
G
:J
02
::SG
-00.
-'"
~U)
. -
.Ii
o
n
=
PLANNING & ZONING DEPARTMENT MEMORANDUM *92-046
FROM:
J. Scott Miller
City Manager
ft' ~~
'-~lJ..-- l -... ' .
Christopher Cutro
Planning & Zoning Director
TO:
DATE:
March 25, 1992
RE:
Lawrence Groves P.U.D
Please place the above-referenced item on the April 7, 1992 City
Commission agenda as a master plan modification to an already
approved P.U.D.
CC/jm