Loading...
REVIEW COMMENTS FIRE DEPARTMENT MEMORANDUM NO. 92-210 WDC TO: CITY PLANNER FROM: FIRE DEPARTMENT DATE: MARCH 18, 1992 RE: LAWRENCE GROVES RECONFIGURATION OF LOTS APPLICANT HAS DEMONSTRATED THAT 10 FOOT BUILDING SEPARATION WILL NOT CONFLICT WITH FIRE DEPARTMENT OPERATIONS. .. ~ch-' WILLIAM D. C ANAUGH, FPO I FIRE DEPARTMENT TRC REPRESENTATIVE 19roves.wdc pg ., RECEIVED 'f "'- MAR 18 PLANNING DEPT. - ENGINEERING DEPARTMENT MEMORANDUM NO. 92-057 TO: Christopher Cutro Planning & Zoning Director FROM: Michael E. Kazunas City Engineer /VE cr- DATE: March 17, 1992 RE: LAWRENCE GROVE P.TI.D. TECHNICAL REVIEW COMMITTEE COMMENTS We have reviewed this project and can approve subject to the following conditions: .----- Reconfiguration of the lots is best addressed by a replatting of the existing subdivision. Consideration must be given to the previously sold lots in as much as their approval may be a requirement of replatting. To accomplish replatting, 6 copies of the preliminary plat must be submitted to the City Engineer for review by the Technical Review Committee and forwarded to the City Commission for approval. Fee for this submittal is $500 + $l.OO/Dwellings = $612. Following preliminary plat approval, a final plat shall be submitted to the City Engineer, conforming to Appendix C - Article VIII, Section 6. With the City Engineer's approval this will again be presented by the City Planner to the City Commission for approval after which, when approved, it will be signed and returned to the developer for recording. The cost for this submission of final plat is $300. MEK/ck R~ ~"""'~,--'T""VED: r'.; I, '.<," 'I ;L.. '\-,.i-i .Ii. - MAR ~! .-: PLANNING DEPT~ \ ".-4 n'f.. --q RECREATION & PARK MEMORANDUM 192-098 FROM: Chris Cutro Planning and Zoning Director John Wildner, Parks Superintendent ~ Masterplan Modification: Lawrence~~ve P.U.D. TO: RE: DATE: March 17, 1992 The Recreation & Park Department has reviewed the masterplan modification request for the Lawrence Grove P.U.D. The following recreation-related comments are submitted: 1. The full recreation already been paid. number of dwelling impact fee. impact fee for this project has Since there is no change in the uni ts there is no change in the 2. No other recreation-related issues appear to effect this project. JW:ad R.ECEIVED MAR l?' PLANNING DEPT. -- Mm<<>RANroM UTILITIES DEPAR'lMENT NO. 92 - 107 FRCM: John A. Guidry, utilities Director TO: Christopher cutro, Planning and Z DATE: March 12, 1992 SUBJECT: Master Plan Modification - Lawrence Grove PUD We can approve this project subject to the following conditions: 1) Revised building locations rray result in driveways conflicting with existing water meters, fire hydrants, or sanitary sewer cleanouts. The applicant nust provide assurance that the driveways will not inpact the existing utilities, or assume responsibility for relocating said uti li ties. Please refer any questions on this rratter to Peter Mazzella at 738-7460, ext. 332. JAG/PVM be: Peter Mazzella xc: File 15 J1'1/1V v(E ~ - eEl//eW ~ ,- '\ _ (' CJ)ET/lj'2 JrrJC~'I~1~D / 5 ,/VI I t.J uTe. -) _)C c.. /' R"E. ,J) - "i ,l.:A --- - s-:::- 1 /-fov K.. ~ Q J!t'11.{jJTc - ~ ~a ~~N~NG oa'l. ---------- .--~~- PUBLIC WORKS MEMORANDUM NO. 92-035 '. \ (. TO: DOROTHY MOORE - ZONING & SITE PLAN REVIEWER FROM: ROBERT EICHROST - PUBLIC WORKS DIRECTOR DATE: MARCH 12, 1992 SUBJ: PLAN REVIEW, TIME SPENT Public Works spent approximately 30 minutes reviewing and providing comments on the master plan modification for LAWRENCE GROVE PUD. RE:HE cc: file pcrJ~)j.-o \.\\ _. ~~\~ ~~~~\~G. \) BUILDING DEPARTMENT MEMORANDUM NO. 92-068 March 11, 1992 FROM: Chris cutro Planning Director Don Jaeger LA./ Building Of~ial Al Newbold Deputy Building Official TO: THRU: RE: LAWRENCE GROVE MASTER PLAN MODIFICATION - TIME SPENT FOR REVIEW Please be advised that it took a Plans Analyst 1 hour to verify the number, type and locatiop of the permitted homes. I spent 2 1/2 hours to review all the notes and plan layouts for code compliance before submitting comments to be typed, for a total time of 3 3/4 hours including typing. ~ Al New-bol AN: bh .. RECEIVED' MAR 12 PLANNlNG DE.PT~ \ - TIME. DOC BUILDING DEPARTMENT MEMORANDUM NO. 92-067 March 11, 1992 TO: Chris Cutro Planning Director THRU: Don Jaeger~~ Building olficial FROM: Al Newbold Deputy Building Official RE: TRC COMMENTS - LAWRENCE GROVE PUD MASTER PLAN MODIFICATION Please be advised that the Building Department has issued permits for approximately 47 single family houses with zero lot lines in Plat 1. In order to comply with the note on the plans that 10 feet will be maintained between buildings, the applicant needs to show the location of the existing buildings on these lots and the distance between them and the proposed structures. Please note that at permit time, the buildings will be required to comply with Table 600 of the Standard Building Code. Al ~&/-- AN : bh RECEIVED . " .aA.O :,.~ \'''I"U' ,'" ~ PLANN\NG DE-Pl. - - LAWRENCE. DOC PUBLIC WORKS MEMORANDUM NO. 92-034 TO: DOROTHY MOORE - ZONING & SITE PLAN REVIEWER FROM: ROBERT EICHORST - PUBLIC WORKS DIRECTOR DATE: MARCH 10, 1992 SUBJ: MASTER PLAN MODIFICATION RE: LAWRENCE GROVE PUD The proposed cul-de-sac does not provide proper turn-around for sanitation vehicle. RE:he cc: file RECEIVED MAR 1 1 1992 SaTE DEVEL. IOYNrCW BEACH. FlORIM