Loading...
CORRESPONDENCE .."".,..... ..", 'lJii City of 'Boynton 'Beach ~ 100 'E. 'Boynton 'BefUfi 'Boulevanl (P.O. '130;\.310 'Boynton 'BCfUh, Jlorilla 33425.0310 City :HaIf: (Wi) 734.8111 :J5tX: (40i) i38.7459 OFFICE OF THE PLANNING DIRECTOR July 15, 1991 Attn: Mr. Dan Weisberg, Senior Engineer Palm Beach County Department of Engineering and Public Works - Traffic Division 160 Australian Avenue - Suite 303 West Palm Beach, FL 33406 RE: Sea Mist Center - File No. 626 Traffic Study Dear Mr. Weisberg: Attached you will find a traffic study for a new mixed-use bUilding at an existing marina located at 700 Casa Loma Boulevard (see attached location map). An existing 1,380 square foot dive shop will be razed to accommodate the new four-story mixed-use buil~ing to be occupied by thirteen residential townhouse units, 4,~t square feet of retail and 6,620 square feet of office. The two- drift-fishing boats at the existing marina will continue to operat. since no change is proposed. since the City has elected the County to review traffic impact studies for projects generating between 200 and 1,000 daily trips, please review this project for compliance with Palm Beach county Traffic Performance Standards Ordinance No. 90-40. If you have any questions concerning the above, please do not hesitate to contact me. Yours very truly, ~p.~ TAMaRI J. HEYDEN Senior Planner TJH: cp Encs. .5'lmerica's gateway to the gulfstream . . .. ."-- ,,~_. J6-100-6703 Traffic Imp-act Study Seemi st Centre 700 eaS8 Lorna Blvd. Boynton Beach FL A. Introducti on. The project wll1 consist of a f?ur story mixed-use structure, aPDroximate1~ 276' 10nq and 22' 'iv'ide. .A retail store (diye shop) which '- '- now occupi es e portion of the sHe wi 11 be rezed to meke room for the new building. Six retail unHs end one rental office will be located on the first floor. Thirteen office/studio units .....ii1l be on U'"le second floor. Thirt.een tow.nl.,ouse renta I units will be located on the thf rd and fourth fl oars. The ground floor retei) consists of 4356 squere feet. The ground floor office ,~gSl space, together with the second floor olfficel studio comprise 6620 square ~ feet, The e>{isting dive shop conteins 1350 square feet. Two drift fishing 5 1 tloats currently operate out of Hie niarina, generating 112 trips. No addHional trips will arise out of the drift boat operation. The existing trips resulting from the ongoing drift boet operetion have been e><:cluded for tr,e purposes of this analysis, Because this pt-oject is iocated in the central business district of Boynton Beacl', and rnany of Hie Searnfst Centre patrons '"vi 11 be shared vv'fth tile ed j acent L i ght.rlouse ~,quar-e Mar-i n~ complex the number of trips generated by the retail portion of this pr-oject is probably exaggerated.The Centre v..li11 be constructed in a single phase. 'v'l'e have attached a location rnap as Figure 1 and a site and utilHy plan as ExhibH A. B. Listing_Q.f.J~roject generation rates: 1. Townhouse apertments generate 7 trips/dey. 2. Retail trip generetion rete ere genereted by the formula 1n(T) = .65 1 n(A) + 5.92 (A is aree in 1000s) 3. Office trip generation rate are generated by the formule . 1n(T) = .75 In(A) + 3.77 (A is area in 1000s) C. Calculations of Total Traffic Generated Based on Typ-e of Land Use 1. Townhouses 13 * 7 = :2. Retail 3. Removal of Retai 1 4. Offi ce Gross Total Tri p pass-by trips Net trips D. Existing Traffic: 91 969 -459 ' 179 780 %pass-by = 45.1 -.0225(A) = 44.9~ 350 (Gross tri ps * %pass by) 430 Figure 2 shows the exi sti ng traffi c vol ume taken from the 1990 edition of the Palm Beach County MPO Traffic volume map. E. Background Traffi c Determi nation: Typically, growth factors that would produce significant background traffic are not present in the radius of influence for this project (1 mile) which is totally east of 1-95, and in an area act;o.,.'ely seeking downtown redevelopment. CI-eat i ng nevy' stt-uctures in suct'l redevelopment areas generally requires the removal of some existing st.ructuresand U'le net increase in trip generation shou1rj be based only on the net increase in fl oor area. F. Assured Construction Five year assured road improvements are factored into the Palm Beach County Traffic Volume t'1ap. G. Trio Distribution: Trips have been distributed as shown in Figure 3 and 4. Figure 3 was computed using 780 trips and Figure 4 using 430 trips. H. Traffic Assignment Traffi c volume after pro j ect compl et i on together wi th the Level of Sen.'; ce for the roadway 1 i nle is shown in Fi gures 5 and 6. I. Deter-minat; on of Comp-l; ance -With Standard: This pro j ect is in compl i ance witrl all appltcable traffi c perfor-rnance standards as outlined in Ordinance 90-40, the 1990 Countywide Traffic Performance Code of Palm Beech County, Flori de. J. Professi anal Servi ces Regui rement Revi ewed and epprove1j ~A~ 6~/3:3/ John ,':A., Grant..111 Regi ster-elj Engi neer No. 22232 ~3tate of Fl or; da .... Q ~ 0L BLVD ~ r-:~ Vl l.u N\'V V) 1 N -~ ..J z ~ OCEAI\: Z AVE - 'i f- ~ ~ SVV v; V) v;. - SW 2 r-: N ~ ~ lfi U ^ \If l- I- l- V. U v. :1 \ l- v: v. "" <;: 5 ? 113 N /. NE w z NE NE :::: tj ~ \..> o + ~ \..> ...... ~ s::: J:1 ~ ~ M sw o :> --.J ClJ (i)OOl PH U6P I':n 'WI': I'!. figurt: 1 Vie; nity Msp- Prepared by: JOHN A. GRANT I JR" I NC 3333 North Federal High-way BoCIJ Raton, fL 33431 SEAMIST MARINA APARTMENTS 700 Cese Lorna Blvd. &ynton Beach" fl 13294 17992 BOYNTON BCH Bl VO 20470 PROJECT 1 19554 I OCE AN 13774 6393 SEACREST FEDER AL 28414 28662 15TH AVE 18316 23356 Existing TrEiffic mi Ie redius of influence From 1990 M.P.O. Traffic Volume Map Figure 2 8622 A-1 -A 8790 ( +65) (+ 130) BOYNTON BCH 8l YD (+780) ( +65) (+130) PROJECT I (+260)\ OCE AN ( +520) ( +260) Sf ACREST FEDER AL (+33) (+260) (+64) (+130) 15TH AVE ( +33) (+130) Addition~l Tr~ffic 780 total trips Figure 3 (+ 130) A-1-A (+130) I (+36) ( + 72) BOYNTON BCH Bl YD (+430 ) (+35) (+71 ) PROJECT I ( + 143) r OCEAN (+287) (+143) SEACREST FEDER Al (+24) (+144) (+24) (+72) 15TH AVE ( +24) ( + 72) ( +12) ,11.-1 -A (+71) Additional Traffic 430 total net trips One mi 1 e radi us of i nfl uence Figure 4 133~9 LOS A 18122 BOYNTON BCH Bl\o'D LOS A 20600 PROJECT I LOSS 198141 LOS A OCE AN SEACREst FEDER o4.L 7213 6653 LOS A LOS A 13807 LOS B 28668 Lose 28726 15TH AYE LOS D 18349 23486 B 8752 LOS A A-1-o4. 8920 LOS A LOSS LOS Traffic Volume After Project 780 total trips 1 mlle radius of influence From 1990 M.P.O Treffic Volume Mep Figure 5 , .. 13330 LOS A 10064 BOYNTON BCH BLVD LOS A 20541 PROJECT I LOS B 196971 LOS A OCEAN SEACREST FEDERAL 6680 6536 LOS A LOS A 13398 LOS B 28558 LOS C 28686 15TH AYE LOS D , 8340 23428 8694 LOS A A-I-A 8861 LOS A lOSS LOS B Traffic Volume After Project 430 total net trips 1 mile radius of influence . -.-. - ----------- From 1990 M.P.O Traffic Volume Map Figure 6 J., CITY of BOYNTON BEACH c:-= ~ ~ 100 E. 80ynton Beach Blvd. P. O. 80lC 310 80)'nton Beach, Flo,lda 33435.0310 14071734.8111 August 7, 1991 Mr. craig Livingston 323 North Federal Highway, suite C Boynton Beach, FL 33435 RE: Sea Mist Centre and Marina - File No. 626 Conditional Use Dear Mr. Livingston: Please be advised that the plans submitted for review of the above-referenced request cannot be processed further as the plans submitted are incomplete and do not meet the City's codes (see attached comments for details). sixteen sets (plus one for the City Clerk equals 17 sets) of revised plans addressing the comments below, as well as the attached comments from other departments (excludes comments from community Improvement Director and Public works Director - contact them directly for their comments); the conditional use application, amended to reflect the information on the revised plans; and the $250 resubmittal fee, will need to be submitted to the Planning Department no late~ than 5:00 P.M. on August 16, 1991 for public hearings to occur in september. 1. A draft lease arrangement covering the leasing of Barnett Bank's surplus parking must be submitted for review and recommendation by the Technical Review Board and must be approved by the Community Redevelopment Agency. Based on the results of the revised parking data discussed in #3 below, a lease arrangement may be desired with the Ligthouse Square Marina project also, to lease their proposed surplus spaces. 2. Amend the site plan, conditional use application, traffic study (see ~4 below) and conceptual parking documentation (see #3 below) so that all square footages correspond. 3. The conceptual parking documentation submitted must be revised and resubmitted to address the following issues: a) pg.1 - Footprint size of the building will change as a result of the setback issues discussed in the Building Department memorandum and must correspond to the site plan. b) pg.l - For purposes of parking and traffic, the use of the second floor must be stated without flexibility of use. c) pg.l - The number of boat slips stated for the Sea Mist Centre differs from the number shown on the site plan. d) pg.1 - listed active seats), Instead seats) . site. Two boats with a total seating capacity of 67 is for Sea Mist Centre. occupational licenses are for four boats; the Splash Down (less than 10 the Little Beeper (less than 50 seats), the Of (less than 10 seats), and the Sea Mist (59 Indicate which boats are still moored at the e) pg.l - The final sign-off plans on record indicate that the Lighthouse Square Marina includes 45,228 square feet of retail/office. The two 175 seat restaurants were lumped within this total and the retail parking rate was applied. f) pg.1 - Two Georges is currently licensed for only 50 restaurant seats. This can be increased through occupational Licenses if the parking documentation proves there is parking to accommodate the additional 110 seats. Also, occupational licenses are active for three boats; the Geno III (6 seats), the Wesley (10 or less seats) and the Two Georges (43 seats). Indicate which boats are still moored at the site. g) pg.1 - The square footages listed for the Sea Mist centre, within the table provided, do not correspond to the site plan. Also, the square footages listed for the Lighthouse square Marina do not correspond to the final sign-off plans on record ((see e) above)). h) pg.2 - The 11 (or 9?) wet slips must be listed at the rate of one parking space per slip. i) pg.2 - with respect to the parking requirements table for the Sea Mist Centre, two bedroom townhouse units require two parking spaces per unit. office and retail square footage shall be combined and the office/retail complex rate of 1/200 shall be applied. Drift boats require 1 space for ever 3 seats. Therefore, the total parking spaces for this project, which is subject to change when a), c), d), g) and h) above are addressed, is 110. j) pg.2 - The available parking table needs to be revised. No off-street parking is provide for this project or Two Georges. On-street parking cannot be credited to meet off-street parking requirements. The code recognizes this by allowing a 35% reduction in the required off-street parking. For the Lighthouse Square Marina, the final sign-off plans show 286 spaces provided, however the 229 figure may be accurate if it takes into consideration the spaces lost when addressing the mangrove comments from outside agencies. This cannot be verified since a revised final sign-off plan has not yet been submitted to the Building Department. In addition, Barnett Bank has a surplus of 80 parking spaces that can be leased. These spaces are 800 feet away from the farthest point of the mixed used building, as measured along the pedestrian walkway. Therefore, these spaces can be leased for use by the Sea Mist centre, but not Two Georges, which is over 800 feet away (statistically, Two Georges could lease spaces from Lighthouse square Marina). Using the 229 space figure for the marina, 309 spaces are available. k) pg.2 - Regarding the overall parking requirement table, the parking requirement information for Two Georges must be revised to include any additional boats, as discussed in d) and f) above, the retail stand and outside grill that exist. The Lighthouse Square Marina information must be revised to reflect the final sign-off plans on file (unless these plans are superseded by revised sign-off plans) which include 45,228 square feet of office/ retail (includes restaurants, office and first floor of the harbor master) and 1,837 square feet of storage on the second floor of the harbor master at the rate of 1/800. The table does not take into consideration the 35% reduction in parking spaces allowed by code for projects located in the C.B.D., nor the additional 10% reduction allowed by code for projects with shared parking facilities. (I've attached a handwritten table with my version of the calculations partially addressing these comments.) I) pg.3 - Delete page 3 and Table 1 from this documentation. This is not intended to be a shared parking study since the code already allows an additional 10% reduction for projects with shared parking facilities located within the C.B.D. as discussed in k) above. In addition, several of the statements made in the conclusion are inaccurate, the required 10% buffer has not been incorporated and shared parking studies must be prepared by a certified traffic consultant evidenced by his seal on the study. 4. Attached is a copy of Palm Beach County's response to the traffic study submitted. Three copies of the revised study reflecting the County's comments must be submitted. 5. No surface parking is permitted in the front yard of any bUilding along a major public pedestrian streetscape system as designated in the community redevelopment plan. Appendix A - Zoning, Section 6.E.4.c(1). 6. License agreements to allow parking and improvements in both the Orange Avenue and the Casa Lorna Boulevard public right-of-ways must be submitted to the Planning Department for review by the legal staff. (If Fire Department and Public Works Department comments regarding fire and dumpster access are addressed by eliminating the dumpster in Casa Lorna Boulevard and all landscape amenities in Orange Avenue, and all improvements within Casa Lorna Boulevard, shown on the Lighthouse Square Marina plans are to be done by the Lighthouse Square Marina, then license agreements will not be necessary.) 7. A cross access and cross parking agreement with the owner of the Lighthouse square Marina must be submitted to the Planning Department for review by the legal staff. 8. Approval of this project is contingent upon the construction of the Lighthouse Square Marina project since the subject property is dependent upon the Lighthouse Square Marina project for infrastructure including utilities, access, parking, etc. 9. Amend the site data table on the site plan to summarize number of residential units, square footages, uses, required and provide parking and site information from pages 3 and 4 of the site plan application. Sincerely, ,..-- / ,1. 'I '} / /' ~ d rrl.'[vi<. )+-0. ~ e:1d:i?~ Tambri J. HeydenL: Senior Planner A:SeaMtRej fA-~1 t-.J ~ 12r'Qwf2BvfE3--Ll0 FOf2- /,-~ ~i-fTH-c::tLSE. SQ-} SEA- M l5T Cl:N.TI2-.E- <1 -r K/ 0 Q Eo ~~ SEAM I Sf CbJ-nze..: "* ~idermtJ - [I ~) 2- fblZ- un; +~ * (2e.+~-; tjalli c e, - q1\P~ 12..,/4-4 ~~..Ph f) /:200 i \ 0 JG ~r"v( (CoVlPI i e-t!:> LV / p~ ~ ~~j tJ ~'c. ~j :'-( Of M'. .d<oy. fz ;?j-h tf 411f(, cd.. +/C"'- wh,c4 .s tt.r\ V'\ /2 _ "'dS (::? rlJ^-- {(qf lJe.--r- 61 ip? (J I) f) I: I ::::. I ( (to~iC-+~ Wi fA.rlL-i~ 5tw<,~:P -k~ ~-t-s~ 0'g~t-~ ';i) /: 3> (A.I I liceV\~ bv~ no+ IVlc.lu..J_ul) ':"fl-..!, ~"'V'\ LiO) L..;H1c. f>::e.per LSV, L1::>t-~.....A of <: 10, ~fv't"'b-j- =,~1>5 ,.J " \ - I .... 5 ...- z ( ".le v..; '~\Qr' ,~? -3r.; ( aJ 2 ~~/UYli+- ~ Zb ;:::. fa { . ( /v jJ' .-' ''i"~' ,I ?>J I (CJ.) I, ,-' S v () .' ! 1 (,5,. ~ j(N'...... , I ,-/r -;..ro...) ~j :::. 2.. P '7 I 2-/ I?l'; "L,- Two Gw~s: lZe-6'f-tX...u..rdJ'1T - I(PO 5~ ;iJ I: 2.5 ~e- +-/?..~ I (~A ~ ~Y-i II) - ? s~. f+; tv I: 1-00 (~J,' CA.V1 + -fn ~lft de.. ) n'..} i"'Cl..ut.ul ;"" ~ tv1ttY"; ntl - lVeA-- 5J; ps (21) tj) / : I **~..f-?, 44f ~5 f) I: 3 (4J I UC~I'I~ bo()...f'S no+- iV1cl~) , .d; uVl'f /-<'<\"<'<, ...-.- ~o JI[ :b) ~5tl:)< I-t>) (tAlO G.u,""j~?~+3 _ 100 ? fo4- ? -- nel/~;-- . f"'c v; (~ A- 2( - - v5 17 10 z Ll ~-H-lttoU-se SQ~E-: JLe to-i I jo-PH'ce..- 4-5. 22 8 ~~. -P+. f) I: zOO ) (j",c.l..u4S r-/!~~",,,,,,"'d--sl I~ -AoO'r r\0Jb[W"'~) - Mo-.r-intt- - "Dnj bott-1- ~""-j~ (2.2.0 ~oo--t-s) f) I ~ 4- _ We-+- -sl"P'5 (31) ~ (. I - S+t>~e.. [Z"'~ ./2jfX)1"'" .J..inblJ..... fvt.o..ste-r) J .p (.") I '. 4.00 ;:::. I) [) 3/ $~. +. AI V t> 221 55 31 g. ? 2- 2- _~ L ;; 7D+~::: 54 3 ~ 5-11 . 55 '1 X (;,5% == '?53. ;;;C1 ') (?it-- >( q 0 k--:---27+t7-' ...-- Gf2AND loTAL -5-1-8-- Board of County Commissioners Karen T. Marcus. Chair Carole Phillips. Vice Chair Carol A. Roberts Carol]. Elmquist Mary McCarty Ken Foster Maude Ford Lee County Administrator Jan Winters July 23, 1991 Ms. Tambri J. Heyden City of Boynton Beach 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Fl 33425-0310 RE: SEAMIST CENTER - FILE NO. 626 Department of Engineering and Public Works Dear Ms. Heyden: The Palm Beach County Traffic Division has reviewed the traffic impact study for the project entitled Seamist Center pursuant to the 1990 Traffic Performance Standards Code (Ord. No. 90-40). The project consists of increasing retail space from 1,380 square feet to 4,356 square feet, 6620 square feet of office and 13 townhouse units. The traffic study contains inaccurate information in two sections. It is missing information in one section. They are as follows: C. Ca 1 cul at i on of Total Traffi c Generated Based on Tvpe of land Use The calculations in this section assumes townhouse and office uses derive some of their trips from pass-by traffic. This assumption is incorrect. Correcting the calculation results in an increase of net trips from 430 trips to 551 trips. This will have an effect on the impact fees assessed to the project. This does not change the conclusion of the study. E. Background Determination A buildout date for the project is not included. F. Assured Construction The report states that the five year assured road improvements are factored into the Palm Beach County Traffic Volume Map. The Traffic volume map has no relationship to assured construction. If you have any questions regarding the determination of the County Traffic Division, please feel free to contact Dan Weisberg at 684-4030. Sincerely, OFFICE OF THE COUNTY ENGINEER ~ J-f~ Pit Charles R. Walker, Jr., P.E. Acting Assistant County Engineer RECEIVED JUL II PLANNING DEPT. CRW:DW File: TPS - Mun. - Traffic Study Review H:\diw\Boyn5 "An Equal opportunity - Afflnnatlve Action Employer" Box 21229 WEST PALM BEACH. FLORIDA 33416-1229 (407) 684-4000 ~. oflnled on recvr:led oaoer .- RECEIVED MEMORANDUM Utilities #91-410 AU61:;a: PlANNING DEPT. -, - DATE: Christopher Cutro, Planning Director . John A. Guidry, ~ Director of Utilities ~~ July 31, 1991 TO: FROM: SUBJECT: TRB Review - Seamist Centre and Marina In lieu of approval, we offer the following comments on this project: Owner shall provide fire flow calculations and details of fire protection system. We suggest the 2" service be tapped off the existing water main to eliminate the need for K-Copper Piping and that a valve box to grade be installed over the Corporation stop. The R.P.B.F. shall be installed between the meter and the building and we suggest it be hard pipe above ground to reduce the risk of damage. Dual units are also recommended so service will not be interrupted during testing. We reserve the right to revisit the utility review pending revisions required by other department comments. xc: Mike Kazunas j;'; , p MEMORANDUM POLICE #91-065 . -- r-OOLl/r " , .9.... " ,-I "'.~ ~.~ .~ .,j ,'-.1 ~ L...) TO: Tambri Heyden IlUL3 1 )991 to FROM: Lt. Dale S. Hammack DATE: July 30, 1991 RE: Seamist Centre As per our discussion at the Technical Review Board meeting of 30 July 1991, I am recommending the following: 1. Bottom floor rear stairwell to be closed off. Safety) (Public 2. Lighting details of stairwells. (Public Safety) .p {)cd/ L-- Lt. Dale S. Hammack DSH/cgm