Loading...
REVIEW COMMENTS PLANNING DEPT. MEMORANDUM NO. 90-270 (AGENDA MEMORANDUM) TO: J. Scott Miller, City Manager FROM: James J. Golden, Interim Planning Director DATE: August 16, 1990 SUBJECT: Lighthouse Square Marina The revised site plan reviewed by the Technical Review Board included the following changes to the previously approved site plan: 1. Significant changes to the parking lot layout and design within the future right-of-way for Boynton Beach Boulevard. These changes were made in connection with a permit issued by the Florida Department of Environmental Regulation to mitigate destruction of mangrove habitat. NOTE: Conversations with FDOT indicate that the new design of the parking lot within the bridge right-of-way would not be compatible with the future bridge design and that the original design is subj ect to change. Therefore, it appears likely that most, if not all, of these parking spaces would be lost if a bridge is built at this location. The loss of these parking spaces would result in a deficiency of parking spaces that would be required by the City's zoning ordinance, as this plan provides for only two surplus parking spaces. 2. Changes to the approved Conditional Use for the dry boat storage building which include an increase in square footage from 35,089 to 36,450, an increase in the east/west dimension from 260 to 275 feet and a westward shift in the footprint of this building by approximately 20 to 25 feet. lIO'I'E: Although the measured dimension on the new plan is 275 feet, the architect shows this dimension as 270 feet. It was also assumed that the scale of the site plan remains one (1) inch equals 40 feet, as a scale was not provided on the revised site plan drawing. 3. Increase in square footage of the retail on the south side of the dry boat storage building from 6, 313 to 6,750. 4. Change in the layout and design of the harbormaster building and an increase in square footage from 3,750 to 4,000. 5. Changes in the layout and design of the restaurant including the addition of a second floor and an increase in seating by 25. NOTE: Although the addition of the second floor appears to have increased the square footage of this building, the exact increase cannot be determined, as the square footage for this building has not been shown on the site plan. 6. A change in the layout and design of the entire retail frontage on the north side of Casa Lorna Boulevard. These changes include the creation of two buildings of nearly equal size instead of the larger and smaller retail buildings previously approved and the elimination of the freestanding raw bar. The seating in the raw bar was increased from 50 to 200. PM90-270 -2- August 16, 1990 7. A change in the layout and design of the retail lighthouse, including a request for a 20 foot height exception, as outlined in the attached correspondence in Exhibit "A". 8. Elimination of 3 boat slips on the north side of the inlet. However, the total number of slips is still shown as 37. Copies of the approved and proposed site plans are provided in Exhibit "B". The Technical Review Board determined at the August 6th meeting that the revised site plan was incomplete and should not be forwarded to the Downtown Review Board until the applicant was able to submit the missing items. The items which were missing included, but were not limited to, the following: 1. Amended Conditional Use application 2. Details on project signs 3. Landscape plan 4. Revised elevations for the dry boat storage building 5. Colored elevations for all buildings 6. Traffic statement pursuant to the Municipal Implementation Ordinance of the Palm Beach County Traffic Performance Standards Ordinance 7. Application fees 8. Various details concerning on-site utilities Further details concerning the above-referenced list of missing items are provided in the staff comments in Exhibit "C". It should be noted, however, that the attached "courtesy" comments have not been completed as of this date and therefore should not be construed to be conditions of approval. ~ 1- Ni ~ES ;tI. GOLDEN JJG:frb Encs A:PM90-270