CORRESPONDENCE
~
CITY of
BOYNTON BEACH
@,.>-- ~.~.
i',~':
100 E. Boynton Beach Blvd.
P. O. Box 310
Boynton Beach, Florida 33435.0310
(407) 734.8111
OFFICE OF. THE PLANNING DIRECTOR
"I.
January 18, 1990
Burns & McDonnell Engineering
Attn: Mr. Craig R. Livingston
5725 Corporate Way
West Palm Beach, Fl 33407
RE: Water's Edge. Marina Site Plan
Dear Mr. Livingston:
Please be advised that on Tuesday, January 16, 1990, the City
Commission approved a one year extension of the above referenced
site plan. This extension will expire on January 17, 1991.
If you have any questions concerning this matter, do not hesitate
to contact me.
Very truly yours,
CITY OF BOYNTON BEACH
~?/~
TIMOTHY P. CANNON
Interim Planning; Director
JJG:frb
cc: City Manager
Technical Review Board
Central File 1111
WtrsEdge
':~,!'Jru'."-'"
..
siteworks architects & planners, me.
- /~, 4r~//
~' ~;a~
October 25, 1989
Mr. Carmen S. Annunziato, AICP
Planning Director
City of Boynton Beach
P.O. Box 310
Boynton Beach, FL 33435
RE: WATER'S EDGE MARINA
Dear Carmen:
I have had numerous meetings with the owners of the Water's Edge Marina project
relative to their inability to proceed with this project and they have come
to the conclusion that for the near future a hotel does not make economic
sense on this site.
Based on their market experience, they feel the best and highest use of this
property would be for a dry boat storage facility. They are aware that as
the Central Business District Ordinance currently reads, a boat storage facility
is specifically excluded. I have been directed to apply to the City Commission
to amend the CBD language to allow a boat storage building as a conditional
use thereby allowing an opportunity for a responsible development that would
provide the Commission with a review process and input.
Please review this request and advise me of the necessary steps that would
be required to amend this language. I appreciate your cooperation and attention
in this matter.
Sincerely,
cc: E. Garcia
H. Thompson
liS ~'()itlht'u..,t -1tii '-"trcl't /1(I.1/1/ln1l !ll'd("ll !hn"idu 3J.13~1
,10- ~.i -,eI(,OC
'--'
CITY of
BOYNTON BEACH
~'L
,
....
,
~
"--
200 N. Seacrest Blvd.
Post Office Box 310
Boynton Beach, FL 33435
(407) 738-7.490
OFFICE OF THE PLANNING DIRECTOR
August 25, 1988
Frank T. Pilotte, Esq.
Murphy, Reid, Pilotte & Ross
340 Royal Palm Way
Palm Beach, FL 33480:4307
Re: J&J Ventures of Florida
Watersedge Site Plan
:Dear Mr. Pilotte:
Please be advised that on Tuesday, August 16, 1988, the City
Commission granted your request for a six-month extension to
begin construction of the Watersedge Marina. This extension
will expire on February 17, 1989.
If you have any questions, please do not hesitate to call.
Yours very truly,
CITY OF BOYNTON BEACH
~~
CARMEN S. ANNUNZIATO,
PLANNING DIRECTOR
CSA:ro
cc City Manager
Technical Review Board
Central File
'"
-'--'_.~-
LAW OFFIGES OF
MURPHY, REID, PILOTTE & Ross, P.A.
340 ROYAL PALM WAY
PALM BEAGH, FLORIDA 33460-4307
LINDA O. MAGLAREN
EUGENE W. MURPHY, JR.
FRANK T. PILOTTE
PffiLIP H. REID, JR.
ROBERT G. ROSS
JAMES S. TELEPMAN
P. O. BOX 2~2~
PALM BEAGH, FLORIDA 33460-2~2~
TELEPHONE (407) 6~~-4060
FAX (407) 632-~436
PLEASE REPLY TO:
PLANTATION PLAZA
6606 20TH STREET
VERO BEAGH, FLORIDA 32966-6613
P. O. DRAWER M
VERO BEAGH, FLORIDA 32961-3012
TELEPHONE (407) ~67-6460
P~lm Beach Office
August II, 1988
HAND DELIVERED
Carmen S. Annunziato, AICP
Planning Director
City of Boynton Beach
200 N. Seacrest Boulevard
Post Office Box 310
Boynton Beach, FL 33435
RE: J&J Ventures of Florida,
Waters Edge Site Plan
Our File No. HA030l0
Dear Mr. Annunziato:
Please consider this letter a request on behalf of my clients, J&J
Ventures of Florida, a Florida General partnership, for a further
six month extension of the approval for the site plan for the
development of their marina project in Boynton Beach. As you are
no doubt aware, my clients have failed within the past six months
to begin construction of the proposed project. This has been
occasioned by an inabili ty to obtain proper financing. After a
review of the project wi th several proposed lender s, my clients
have determined that it is not economically feasible to construct
the project as originally proposed. It will be necessary for the
site plan to be modified in order to take into account the
uncertainties regarding the proposed Boynton Beach bridge and the
market condition of East Boynton Beach.
My client does not wish to lose the momentum already existing with
respect to the development of the site. An approved site plan is
an essential element of any request for financing. I fear that if
the request for extension is denied the ultimate development of
the project will be delayed significantly. Existing financing
requests would have to be resubmi tted as it could no longer be
represented that an approved site plan exists.
2842L
. CITY of
B'OYNTON BEACH
"
&-;.
~,
....
.
200 N. Seacrest Blvd.
Post Office Box 310
Boynton Bea~h, FL 33435
(305) 738-7490
.- .-.. --... ....-- ....,..ll"'.~.
:~~;"c;~Q-~F:= -=_~ I t~J.J..'~i' ;-._ ,. ""; J
, . ...::----:.:- -. '0_. '_ - ~ 0.4"=_ , ~ .~''7
. :", fu~!i~;;;.i;;;-;_~:-':;~ 'r.-'~ H:! -L.. ." :!' ~
..",'"~h _1.&.-... #,:~.JI :,...~'.;l. "I'~~".~"".';I'
...:.-.-:::-. ~..~~_ "'-. . ....-;.M"'~.{1: '. ..~,
. ~ ===-- ~ .. 1. ...~ :-",,-, ";:.l4. \:; .
............... '::::;"~ .... :. -. ....~_.. /
- ,,- . ~~~~,~~~
=:..;.;p.:i.~",:" ~'-.__.........~
.-..
'.--
.....
OFFICE OF THE PLANNING DIRECTOR
May 24, 1988
Frank T. Pilotte, Esq. .
Murphy, Reid, Pilotte & Ross, P.A.
340 Royal Palm Way
Palm Beach, FL 33480-4307
Re: Waters Edge Development
Your file #: HA03010
Dear Mr. Pilotte:
In response to your letter dated May 19, 1988, attached you will
find 'a copy of the authorization for extension of the site plan
for the above-referenced project.
If you have any questions, please do not hesitate to call.
Yours very truly,
CITY OF BOYNTON BEAC~
c?-cL-~_ . _ /~
CARMEN S. ANNUNZIATO, AICP
PLANNING DIRECTO~
CSA:ro
Attachment
cc. Central File
./.
Carmen S. Annunziato, AICP
page 2
August II, 1988
Please note that my client's failure to construct the proposed
development has not been occasioned by a lack of cooperation on
the part of the ci ty of ficials. Rather, the problems stern from
uncertainties related to the proposed bridge and the viability of
the proposed hotel. My client, in order to address this primary
problem must change plans wi thout any further significant
developmental delays.
In particular, my client now contemplates developing the project
in stages. The first stage would be the construction of the
mar ina facili ties. This would be a general improvement of the
facility, construction of marine slips and renovation of the
existing marine store and fuel dispensing outlets. It is
contemplated that construction of stage one improvements could
commence within the next four to six months. The second stage of
development would be the construction of a restaurant and shops on
the southern port ion of the property. The thi rd stage would be
the construction of shops along the western edge of the water
(inlet) . The fourth and final stage would be the construction of
the hotel, parking garage and associated retail space. This four
stage project also includes some design changes. In particular,
the outlet for fuel would remain in its present location rather
than being moved to a location near the proposed bridge. This
change has been occasioned by uncertainties wi th respect to the
ability to construct fuel pumps in the vicinity of the bridge.
Furthermore, the restaurant would have to be moved to the west
about 20 feet or so in order to permit construction of the marine
store and fuel outlets. Other modest changes are also
contemplated by the Developer. Because of the staging of the
project and the change in location of structures, it is
anticipated that the entire site plan may have to undergo a
renewed review. This review could not be accomplished within the
original six month extension nor is it possible to make the
requisite submission within the next 60 days. Accordingly, a six
month extension of the exist ing si te plan is requested wi th the
understanding that within the next 60 to 90 days revisions to the
site plan will be submitted in accordance with review standards.
Please note that the "staging" of this project may also require an
approval of a site plan providing for a phased development of the
site. For instance, in a "phased" development, stages one and two
may be combined to represent a single phase with the hotel being a
final phase in and to itself. The staging and phasing of the
project presently is under review. Discussions regarding the
makeup of the phases should be completed within the time period of
60 - 90 days required to develop revised plans.
2842L
Carmen S. Annunziato, AICP
Page 3
August II, 1988
My client continues to be committed to the construction of the
project in the Town of Boynton Beach. Long term prospects for the
area are quite good. In order for the project to be successful
the cooperation of city government will be essential. This
cooperation includes not only the granting of the requested
extension, but also rapid review of proposed revisions to the site
plan and execution of necessary supporting agreements.
It is in this spirit of cooperation that my clients wish to
conf i rm, in wr i ting, the ir desi re to donate to the Ci ty for its
new municipal building the stand of 9 to IS Royal Palms presently
on the marina property. It is my understanding that the City will
be solely responsible for the relocation of the trees. I trust
that this responsibility includes not only the removal of the
trees but also the filling of any holes occasioned by their
removal. If there is anything that I or my clients may do in
order to facilitate this gift, then please let us know.
I look forward to working with you
revised site plan is developed.
questions or require additional
hesitate to call.
over the next few months as a
If at any time you have any
information, please do not
FTP/sjm
Enclosures
cc J&J Ventures of Florida,
c/o James Hall
Craig Livingston, AIA
Peter Cheney, City Manager
2842L
,. 5
CITY of
BOYNTON BEACH
-;
,
;-to
200 N. Seacrest Blvd.
Post Office Box 310
Boynton Bea~h, FL 33435
:f ( 3 0 5 ) .7 3 8 - 7 4 9 0
OFFICE OF THE PLANNING DIRECTOR
February 29, 1988
. .
Craig Livingston, AlA
Siteworks Architects & Planners, Inc.
1301 ,No. Congress Avenue, Suite 320
Boynton Beach, FL 33435
Re: Water's Edge Marina-Extension of Site Plan Approval
Dear Mr. Livingston:
Please be advised that on Tuesday, February 16, 1988, the City
Commission granted a six month extension to expire on August 17,
1988 for site plan approval of the Water's Edge Marina.'.. This
approval is predicated upon the attached comments.
If....you have any questions concerning this matter, please do not
hesitate to contact me.
Very truly yours,
CITY OF BOYNTO~ BEACH
~r3:
CARMEN S. ANNUNZIATO,
PLANNING DIRECTOR
Iro
Attachments
CC City Ma~ager
Tech<<ical.Review Board
Central Ffle
IJ
0:
..
\
II;
I'
MEMORANDUM
~.
.
-4
February 12, 1988
.~
TO: 'CARMEN S. ANNUNZIATO, PLANNING DIRECTOR
FROM: JAMES J. GOLDEN, SENIOR CITY PLANNER
RE: WATER'S EDGE MARINA-SITE PLAN EXTENSION
The above-referenced site plan is due for expiration on February
17, 1988.
.
.
If the developer is proposing to construct only a portion of the
proposed improvements (i.e., eliminate the hotel and parking
garage), it may be necessary for the developer to apply for a
site plan modification if certain changes to the approved plan
become necessary. Examples of changes that ~ay be. required could
include the construction of additional paved parking areas,
changes involving traffic circulation and access, changes to
utility service, and changes to parking lot landscaping.
Considering that the original site plan approval did not provide
for any phased construction, any changes to the 'approved plan to
allqw for phased construction should be evaluated by the
Technical Review Board to determine if a site plan modif1cation
would be necessary to provide for proper coordination of .proposed
improvements.
~j~~
ES JV. GOLDEN
JJG:ro
cc Central File
:>
00
o
I.J
,
,
,
I
I
I .
i
i
I
I
I
I
I
. ~
4.
UNDA O. K....CL....REN
EUGENB W. KURPHY, JR.
FRANK T. PlLOTTB
PHIUP H. RBID, JR.
J....KBS S. TEt,IllPKAN
KEVIN D. WIUUNSON
~
. : I ; LAW OF1"ICES OF
MURPHY, M.A.CL.A.REN, PILOTTE & WILKINSON, E A.
two ROY....L P....LK W....y
P. O. BOX aoao
PALK BEACH, FLORID.... 0G480
TELEPHONE 000'4060
.A.REA CODE 000
VERO BEACH O:nrICB
P. O. DJU.WBR K .
.
VBRO BEACH, FLORIDA OeQ01.0012
TBLEPHONB (000) 1S01.0480
February 11; ~988
HAND DELIVERY
Carmen Annunciatio,
Director of Planning City of Boynton Beach
200 North Seacrest BOUlevard
Boynton Beach, Florida 33435
Re: J & J Ventures of Florida, Site plan Approval
Our File No. ~A030l0
.
Dear Mr. Annunciatio:
Our Firm represents J & J Ventures of Florida, a Florida
general partnership. J & J ventures, previously had obtained from
the City of Boynton Beach the City's approval for a site plan for
development of a project at the old Sea Mist Mar ina. This site
plan approval expires shortly. My client has. requested that they
be granted a one year extension on the approval.
, The aforementioned extension is being requested because
th~ partnership has experienced delays in getting the required
financing and developmental permits. These' delays ~have been
occasioned, in part, because of uncertainties relating to the
br~dge that is to be built on the north side of the subject
property and because of the concommitent effects on permits for
th~ bulkheading on the north side of the property and for mangrove
relocation. My client anticipates a sucessful resolution of these
problems and looks forward to providing the City an attractive and
successfu~ development.
Mr. James Hall, the spokesman for the partnership, would
like. to attend the public hearing on the extension in order to
respond to any inqUiries. Would you please let me know when this
hearing witl take place.
If you have any questions or require additional
information~ then please do not hesitate to call me.
&~1~~
::)
00
o
LI
0070L
FTP/brs
cc: James Hall
Craig Livingston
LAW OFFIGES OF
MURPHY t REIDt Pn.OTTE & Rosst P .A.
340 ROYAL PALM WAY
PALM BEACH, FLORIDA 33480-4307
LINDA O. MACLAREN
EUGENE W. MURPHY, JR.
FRANK T. PILOTI'E
PIDLIP H. REID, JR.
ROBERT C. ROSS
JAMES S. TELEPMAN
P. O. BOX 2~2~
PALM BEACH. FLORIDA 33480-2~2~
TELEPHONE (407) 8~~-4060
PLANTA.TION PLAZA
6606 20TH STREET
VERO BEACH, FLORIDA 32966-8613
PLEASE REPLY TO:
P. O. DRAWER M
VERO BEACH. FLORIDA 32961-3012
TELEPHONE (407) ~67-6480
Palm Beach Office
May 19, 1988
Mr. Carmen Annunciatio
Director of Planning City of Boynton Beach
200 North Seacrest Boulevard
Boynton Beach, Florida 33435
Re: Waters Edge Development
Our File No. HA03010
Dear Mr. Annunciatio:
In reviewing my files, I note that I do not have a
of the authorization for the extension to August, 1988 of the
plan for the above referenced project. Would you please send
copy of the extension together with any comments that
applicable. Your prompt attention to this request will
appreciated as it is required to complete our financing package.
copy
site
me a
are
be
If you have any questions or require
information, then please do not hesitate to call me.
additional
VetQ1:iOf}/i&
~k T. Pilotte
FTP/brs
cc: James Hall
Ronald E. Spruill
1458L
Q)--~ 120 E. Boynton
.,,---- . .
"':: P. O. Box 310
. ~~" Boynton Beach,
'.v~ 1"'1 ~
~. .L:;t. /~
1-
r -- -.-J:::::;-- ~.n'rl~
. 1'=......""~"'........"Id; . I - ':"';; I ~
Beach Blvd. ~~~:~~~'{ 'L-- .
Florida 33425-0310 ;g. ~ ~._.""-
(305) 734-8ll1
"CITY of
BOYNTON BEACH
March 9, 1988
Mr. Craig Livingston
Siteworks Architects & Planners, Inc.
1301 Congress Avenue, Suite 320
Boynton Beach, FL 33435
SUBJECT: Water's Edge Marina & Hotel
Dear Mr. Livingston:
I have attached a copy of'a letter from South Florida Water
Management District that was sent to Shalloway Incorporated.
This letter indicates that Water's Edge Marina and Hotel pro-
ject has not submitted information that was requested by South
Florida Water Management District on February 12, 1987, and
that there are only thirty days left to submit such infor-
mation or the application will be processed for denial.
I would appreciate receiving some information concerning the
impact of this Water Management District letter on the deve-
lopment timing and potential of water's Edge Marina and Hotel.
r2s~n..cerelY ,
/1 I"'" ," ~/
, - .
". / ( "<.
C r ~
L eter L. Cheney
City Manager
PLC : j c
Attachment
cc: Mayor & City Commission
Carmen Annunziato
.
RECEIVED
MAR J 0 ,~A'y..
PLANNl;'~G Dc:F'f.
South .=Iorida
Water Management District '
Post Office Box 24680 3301 Gun Club Road './ C/ Ii
West Palm Beach, Florida 33416-4680 ~r fJ\ /' "~)
Telephone (305) 686-8800 I (\ (}-I
Florida WA TS Line 1-800-432-2045 {; \..,. ~I. . _
IN REPLY REFER TO: nof' \<" ~O ,,' j, ,:
File No'. 86-36 V ~ \",\J(l'.
Application No. 01l37~A ~t~ .
Resource Control Department L'\, )\~,}.:,
.J ;. I~
\.i t> '11 ~tJ '
John R. Wodrllka. Executive DirK10r
Tilford C. Creel, Deputy Executive Di~or
February 21, 1988
"
Mr. Jay Foy
Shall~way Incorporated
1201 Belvedere Road
West Palm Beach, Fl 33405
Dear Mr. Foy:
RECEIVED
/'
MAR /I 198F
CITY MANAGER'S OFFICE
Subject: WATER'S EDGE MARINA AND HOTEL
City of Boynton Beach, Palm Beach County
S27/T45S/R43E
/
On February 12, 1987 the District requested specific technical information from
you concerning the above referenced project (copy of letter enclosed). At the
close of the letter it stated that .in accordance with Rule 40E-l.603(5) FAC, if
a response is not received within 90 days, the application may be processed for
denial if not withdrawn by the applicant". As of this date, no response has been
received and the 90 day deadline has passed. If a response indicating your
intentions is not received within 30 days from the date of this letter, your
application will be processed for denial. Should you have any questions, please
call Karin landers.
Sincerely,
M~~$~
Karin B. landers
Water Management Engineer
KBL/kbl
cc:
DER
Palm Beach County Engineer
Palm Beach land Development Division
City of Boynton Beach Engineer
RECEIVED
\^~R 10 198?-
. .. ".' (' DEPT.
PLf\,il'4l\ 1:.1
---------
Nancy H. Roen
Chairman - Plantation
J.D, York
Vice Chairman - Palm City
Nathaniel P. Reed Oscar M. Corbin. Jr.
Hobe Sound Ft. Myers
Arsenio Milian
Miami
Fritz Stein
Belle Glade
Jame. F. Garner
Ft. Myers
Mike Stout
Windermere
Doran A. Jason
Key BiJCayne
5
CITY of
BOYNTON BEACH
~:;
,
....
.
200 N. Seacrest Blvd.
Post Office Box 310
Boynton Bea~h, FL 33435
( 305 ) .738 -7 4 9 0
:: -;---.. . -~.
r: ---.'- .-. --. - .~- '~'I.II''''''l'
:rL--c;~"-__F__:::_=_Q, , ~.u~l' ~._ I" "'; J
. '~.r~~1~~~~~~;~~;:~ '.'r~.~i; ~"I!~IY,,;;'"
~~~.- -~~:!c '" ,~'-:'~~'~JI~' ..~
-. Ut _~ == 11M . .c.~.. '-.~ \; .
.---:: . ~. .~.. . .-: -:.. ~~" ~'.
.-r -.~ . --..- - -.'
~~,?J;a~~
---.. ..;-;.....7 ~
.!
OFFICE OF THE PLANNING DIRECTOR
February 29, 1988
Craig Livingston, AIA
Siteworks Architects & Planners, Inc.
1301 No. Congress Avenue, Suite 320
Boynton Beach, FL 33435
Re: Water's Edge Marina-Extension of Site Plan Approval
Dear Mr. Livingston:
Ple~se be advised that on Tuesday, February 16, 1988, the City
Commission granted a six month extension to expire on August 17,
1988 for site plan approval of the Water's Edge Marina. This
approval is predicated upon the attached comments.
If you have any questions concerning this matter, please do not
hesitate to contact me.
Very truly yours,
CITY OF BOYNTON BEACH
~a.
CARMEN S. ANNUNZIATO,
PLANNING DIRECTOR
Iro
Attachments
cc City Manager
Technical Review Board
Central File
t:
..
1
:\
MEMORANDUM
~.
"
February 12, 1988
.!
TO: CARMEN S. ANNUNZIATO, PLANNING DIRECTOR
FROM: JAMES J. GOLDEN, SENIOR CITY PLANNER
RE: WATER'S EDGE MARINA-SITE PLAN EXTENSION
The above-referenced site plan is due for expiration on February
17, 1988.
If the developer is proposing to construct only a portion of the
proposed improvements (i.e., eliminate the hotel and parking
garage), it may be necessary for the developer to apply for a
site plan modification if certain changes to the approved plan
become necessary. Examples of changes that ~ay be required could
include the construction of additional paved parking areas,
changes involving traffic circulation and access, changes to
utility service, and changes to parking lot landscaping.
Considering that the original site plan approval did not provide
for any phased construction, any changes to the approved plan to
allqw for phased construction should be evaluated by the
Technical Review Board to determine if a site plan modification
would be necessary to provide for proper coordination of proposed
improvements.
~ i~ >>l.-
ES JI. GOLDEN
JJG:ro
cc Central File
..
\
, : I LAW OF7ICES 01"
MURPHY, MAcLAREN, PILOTTE & WILKINSON, :Po A.
G40 BOYAL PAL)( WAY
P. O. BOX 2C20
LINDA. O. XACLABEN
EUOENB W. KUBPHY, .JR.
FRANK T. PILOTTE
PHILIP H. REID, .JB.
JAKES S. TBt,i!:PKAN
KEVIN D. WILJl:INSON
'" PAL)( BEACH, FLOBIDA 013480
TELEPHONE 15CC-40\50
AREA CODE OOlS
February ll~ 1988
VEBO BEACH 01"l"ICE
P. O. DRAWBR K
VEBO BEACH, FLORIDA 02961- 0012
TBLEPHONE (0015) 1557 - \5480
HAND DELIVERY
Carmen Annunciatio,
Director of Planning City of Boynton Beach
200 North Seacrest Boulevard
Boynton Beach, Florida 33435
Re: J & J Ventures of Florida, Site plan Approval
Our File No. HA03010
Dear Mr. Annunciatio:
Our Firm represents J & J Ventures of Florida, a Florida
general partnership. J & J ventures, previously had obtained from
the City of Boynton Beach the City's approval for a site plan for
development of a project at the old Sea Mist Marina. This site
plan approval expires shortly. My client has requested that they
be granted a one year extension on the approval.
, The aforementioned extension is being requested because
th~ partnership has experienced delays in getting the required
financing and developmental permits. These' delays have been
occasioned, in part, because of uncertainties relating to the
bridge that is to be built on the north side of the subject
property and because of the concommitent effects on permits for
th~ bulkheading on the north side of the property and for mangrove
relocation. My client anticipates a sucessful resolution of these
problems and looks forward to providing the City an attractive and
successful development.
Mr. James Hall, the spokesman for the partnership, would
like to attend the public hearing on the ext'ension in order to
respond to any inquiries. Would you please let me know when this
hearing witl take place.
If you have any questions or require
information, then please do not hesitate to call me.
&~1!2N
additional
0070L
FTP/brs
cc: James Hall
craig Livingston
'CITY of
BOYNTON BEACH
~
~Q)
120 N.E. 2nd AVENUE
P.O. BOX 310
BOYNTON BEACH. FLORIDA 33435-<1310
(305) 734-8111
OFFICE OF THE PLANNING DIRECTOR
February 25, 1987
Mr. Craig Livingston
Siteworks Architects & Planners, Inc.
1301 Congress Avenue, Suite 320
Boynton Beach, FL 33435
RE: Water's Edge Marina
Dear-Mr. I-Livingston:
Please be advised that on Tuesday, February 17, 1987, the City'
Commission approved the site plan for the proposed Wqter's Edge
Marina, subject to comments received from the City Staff, and
restrictions and agreements resulting fro~review of the project by
the Downtown Review Board and the Community Redevelopment Agency. In
addition to the comments and agreements made generally by the
Downtown Review Board, the Board approved variances and exceptions to
the following sections of the Code of Ordinances.
1. Section 5-141(h)(2) of the Parking Lot Regulations
"Maneuvering and Access Areas";
2. Section 5-141(m) of the Parking Lot Regulations "Fire Lanes",
and,
3. Section 7.5 - 57(1)(a) of the Environmental Regulations
"Perimeter-Strip Landscaping".
After you have amended your plans to reflect the staff comments,
please have the appropriate Department Heads initial the attached
check-off sheet, prior to your submission to the Building Department
for permits.
Page Two.
The approval of the City entitles you
improvements shown on the site plan.
procedurally as an as-built or record
facilities fees and road impact fees,
the time of permit.
to construct only the
The site plan will be viewed
drawing. Also, all capital
if applicable, are payable at
If you have any questions concerning this matter, please do not
hesitate to contact me.
Yours very truly,
CITY OF BOYNTON BEACH
C-'" ,
.I~
Carmen S. Annunziato, AICP
Planning Director
flat
cc:
City Manager
Dianne Lawes, Executive
Technical Review Board
Central File
Director CRA
Attachments
.' ,
.
\
,
:CITY of\
BOYNTON BEACH
~
,
,...
,
~lo
.
--
. -..
,'II".
200 N. Seacrest Blvd.
Post Office Box 310
Boynton Beach, FL 33435
(305) 734-8111
OFFICE'OF THE PLANNING 'DIRECTOR
.-"
6 August 1987
Mr. Terry Klitzkie
Department of the Army
Jacksonville District
Corps of Engineers
PO Box 4970
Jacksonville, FL 32232-0019
Dear Mr. Klitzkie:
The City of Boynton Beach is in receipt of a PUBLIC NOTICE for
Permit Application No. 87IPJ-20391 which provides for the
maintenance dredging of an existing marina basin and construction
of a 490 foot long bulkhead and associated finger piers.
This project was submitted to the City for site plan review in
December.1986 and approved by the City Commission in February
1987. As proposed, this project is of primary importance to the
City in its efforts toward redevelopment of the downtown area of
Boynton Beach, and it is consistent with the City's policies as
enunciated in the Community Redevelopment Plan and with the
City's Comprehensive Plan. Approval is recommended.
Thank you for the opportunity to comment on this application.'
Yours very truly,
CITY OF BOYNTON BEACH
c'"
-.L
~ . ...,) '------?- ~
Carmen S. Annunziato, AICP
Planning Director
jbks
cc:
City Manager
Executive Director Community
Waters Edge Marina, Inc.
central File
Redevelopment Agency
MEMORANDUM
13 March 1987
TO:
Bill DeBeck, Construction Manager
FROM:
Carmen S. Annunziato, Planning Director
RE:
Proposals to Remove Trees/Wat==~~~ge Marina
As requested, Mr. Hallahan has secured proposals for the
relocation of trees from the Waters Edge Marina to City
facilities, or to an interim location, and thence to City
facilities (see attached). Also included is a list of trees
which are available as a result of the construction of the
Bethesda Hospital office building.
Please advise Mr. Hallahan directly as to what direction to take
to complete this project.
'-
{' ~ -----...- ,/( ~
CARMEN S. ANNuNZIATO
jbks
cc: City Manager
Recreation and Parks Director
John Wildner
Kevin Hallahan
MEMORANDUM
13 March 1987
TO:
Bill DeBeck, Construction Manager
FROM:
Carmen S. Annunziato, Planning Director
RE:
Proposals to Remove Trees/Wa~er3edge Marina
As requested, Mr. Hallahan has secured proposals for the
relocation of trees from the Waters Edge Marina to City
facilities, or to an interim location, and thence to City
facilities (see attached). Also included is a list of trees
which are available as a result of the construction of the
Bethesda Hospital office building.
Please advise Mr. Hallahan directly as to what direction to take
to complete this project.
...
r~~ ~'"" ./( ~
CARMEN S. ANN~IATO
/bks
cc:
City Manager
Recreation and Parks Director
John Wildner
Kevin Hallahan
. "<J)
l'
RECET. V17D
'J..l ..#.-4,,,,"'-'
LAW OFFICES OF
~AR 1 1 198-/
PLAI'if\jil'i\.J \Jt:..r'L
MURPHY AND MACLAREN, P. A.
341 ROYAL POINCIANA PLAZA
PALMBEACH,FLO~DA 33480
EUGENE W. MURPHY. JR.
LINDA O. MACLAREN
PHILIP E. BALAS
FRANK T. PILOTTE
KEVIN D. WILKINSON
P. 0, BOX 2525
March 5, 1987
TELEPHONE 655-4060
AREA GODE 305
Mr. William D. Cavanaugh, Fire Inspector
150 East Boynton Beach Boulevard
Boynton Beach, Florida 33435
Re: ::-Wc:lte.rs Edge
Our File i HA03010
Dear Mr. Cavanaugh:
I am writing to follow-up a recent proposal to you concerning a
proposed name change for the Waters Edge Marina project. This
change would be in compl iance wi th the condi tions imposed at the
time of site approval. It is proposed that the overall project name
be changed from Waters Edge to .WATERSIDE.. It is anticipated that
in conjunction with this name the marina would be operated under the
name of .WATERSIDE MARINA-. It also is possible that other tenants
of the project will incorporate the name .WATERSIDE. into their
individual names.
Please let me know as quickly as possible if 'the above name is
acceptable to you. If you have any questions or require any
additional information, then please do not hesitate to call me.
v~ours:
U:k T. Pilotte
FTP/blh/1658P
cc: Craig Livingston
J & J Ventures of Florida
Carmen Annunziato
oLl -J8C\\<j&'1
City of Boynton Beach
CENTRAL BUSINESS DISTRICT (CBD)
PROJECT APPROVAL APPLICATION
D""R~Si 3"crtU.~-e. SOhee::t
CV\j ~
Project or
Business Name L0c'\-tex" 5 f'~(?--/ .M;)r; l)r""'J)
Site Address
Contact tI1
Contact il2
Phone
Phone
Must be filled out in duplicate. When complete, submit both copies to the City of
Boynton Beach Planning Department along with Planning and/or Building Department's
application.
Check the boxes below to indicate the type of work involved and/or specify in space
provided after "Other":
~ New Development Sil~ Man 'ReVll:'::::"uJ
[] Major Renovation
[] Repair/Maintenance -- Describe:
[] Signage
[] Painting -- Colors:
[] Other -- Specify:
Intended use of site:
The attached application [] does [] does 'not conform to the requirements of CBD
Ordinance #35-27, CBD Guidelines, CBD Specifications, and City Building Codes.
~ varianc,(Requested or [] Conditional Use Requested
Specify: :\E'r~(''1trl;:;''- (-41 (h) (~) J1.~h
~e(' ~()n 5 -11/ 'Cm) 11.6
.aM 'Rel;pf frnm 8'1\J\'r-,?(lm9Afi~/1 ~I1J0liltJf'G~di"'(1 '/.5 -S7 (I) (a)#"
[] Attached is the application fee receipt received from the Cashier's Office.
Ordinance #35-27 regarding fees for this application:
"All applicants submitting an application for project plan review shall
be required to pay the following fees at such time as said application
is submitted to the City for review:
A. For applications involving construction costs of one hundred
thousand dollars ($100,000.00) or greater -- three hundred
dollars ($300.00)
B. For applications involving construction costs of less than
one hundred thousand dollars ($100,000.00) -- on hundred
dollars ($100.00)."
CERTIFICATION:
(I) (We) understand that this application and all papers and plans submitted here-
with become a part of the permanent records of the Community Redevelopment Agency.
(I) (We) hereby certify that the above statements and any statements in any papers
or plans submitted herewith are true to the best of (my) (our) knowledge and belief.
Signature
Date
Owner, Trustee, or Authorized Principal
if property is owned by a business entity
AUTHORIZATION OF AGENT:
Signature
Date
(I) (We) hereby designate the above signed person as (my) (our) authorized agent in
regard to this project.
Signature
Date
Owner, Tru8.tee, or Authorized Principal
CRA-816
~
CENTRAL BUSINESS DISTRICT (CBD)
-2-
..",.,
PROJECT APPROVAL APPLICATION~
o 6 for TRB
[J 2 for Bldg. Dept.
6 for DRB
of work:
D 8 for CRA
Attach the following number of
It has been approved by:
[] Technical Review Board (TRB)
[] Downtown Review Board (DRB)
[] Community Redevelopment Agency (CRA)
[] City Council
Date
Date
Date
Date
Stipulations of final approval:
Remarks:
APPROVAL SIGNATURES:
TECHNICAL REVIEW BOARD (TRB):
Utilities Director
Public Works Director
Recreation & Parks Department
Asst. to the City Manager
Building Official
Fire Chief
Police Department
City Engineer
Forester/Horticulturist
CRA Director
Chairman
DOWNTOWN REVIEW
Member (Regular)
Member (Regular)
Member (Regular)
Member (Alternate)
Member (Alternate)
Member (Alternate)
Dateo(ll J'oh r::;81
COMMUNITY REDEVELOPMENT AGENCY (CRA):
Chairman
Vice Chairman
Commissioner
Commissioner
Commissioner
Commissioner
Commissioner
Date
/'
.,.,~.
---
)lV"-
~" """'",,----
.,' 'iii."~'
_ .'~' :i~~~~i(,ti _'~
......''>,,~',
0" .' -it "~~'''v '~/
.....
MEMORANDUM
January 13, 1987
TO:
Dianne Lawes, Executive Director
Community Redevelopment Agency
FROM:
James J. Golden
Assistant City Planner
RE:
Water's Edge Marina -
Technical Review Board recommendations
Please be advised that this memorandum constitutes the official
report from the Technical Review Board (TRB) concerning the
above-referenced project.
On Tuesday, January 6, 1987 the TRB met to review the parking lot
variances and the site plan submitted and to formulate a
recommendation to the Downtown Review Board with regard to the
two variances requested and the request for site plan approval.
After review and discussion, the TRB recommended that both
variances be approved in part and denied in part as outlined in
the attached memorandum. Concerning the request for site plan
approval, the TRB recommended approval of the site plan subject
to the staff comments which accompany this memorandum as follows:
Building Department
Fire Department
Engineering Department
Utilities Department
Police Department
Public Works Department
Planning Department (2 memos)
Recreation and Parks Department (2 memos)
Forester/Horticulturist
If you have any questions concerning these comments, please do
not hesitate to contact me.
1
~f~~
j1 AMES . GOLDEN
flat
cc:
City Manager
Technical Review Board
Central File
Craig Livingston
Attachments
MEMORANDUM
January 13, 1987
TO:
Chairman and Members
Downtown Review Board
FROM:
James J. Golden
Assistant City Planner
RE:
Water's Edge Marina - Parking Lot Variance
Section 5-144(c)(4) of the Code of Ordinances requires that when
a variance to Section 5, Article X, Parking Lots is requested,
the Technical Review Board must forward to the Downtown Review
Board a recommendation, and that the recommendation forwarded is
to be made part of the public hearing proceedings. To that end,
this memo is forwarded, consistent with Section 5-144(c)(4).
Craig Livingston, agent for J & J Ventures of Florida, has
requested two such variances: (1) A variance to Section 5-141(m)
"Fire Lanes", of the Parking Lot Regulations which requires that
all shopping centers, retail-office complexes, and retail
establishments for which the gross floor area is fifteen thousand
(15,000) square feet or greater shall have fire lanes along the
front of all buildings which shall allow efficient access to the
fronts of all buildings by fire protection vehicles. In this
instance, the applicant is requesting relief from the requirement
for fire lanes along the fronts of the buildings on the north
side of Cas a Lorna Boulevard and the retail building that fronts
on Ocean Avenue; (2) A variance to Section 5-141(H)(2)
"Maneuvering and Access Areas", which requires that maneuvering
and access areas shall be of sufficient size to permit vehicles
to enter and exit the parking lot in a safe and efficient manner.
More specifically, the design standards within the Parking Lot
Regulations require that a 27 foot wide access aisle be provided
adjacent to a row of parking stalls set at a 90 degree angle.
The Water's Edge Marina is proposed to be located on the
Intracoastal Waterway between Ocean Avenue and East Boynton Beach
Boulevard extended. For an explanation of the code requirement,
the nature of the variance requested, and the variance
justification, please refer to the attached Notice of Public
Hearing and application.
1
On Tuesday, January 6, 1987 the Technical Review Board (TRB) met
to review the plans and documents submitted, and to formulate a
recommendation with regard to the variances requested. After
review and discussion, the TRB recommended that both variances be
approved in part and denied in part. With respect to the
recommendation for approval of a variance to Section 5-141(M),
the TRB made findings that requiring the applicant to construct a
fire lane along the front of all the buildings would impose an
unreasonable hardship owing to the overall configuration of the
parcel, particularly the narrowness of the area between the
right-of-way for Casa Lorna Boulevard and the seawall on the south
side of the inlet. Therefore, the TRB recommended approval of
this variance request subject to the condition that fire
sprinklers and standpipes be provided for all buildings that are
inaccessible to fire apparatus.
With respect to recommending approval for a variance to Section
5-141(H)(2), the TRB made findings that requiring the applicant
to provide the required 27 foot wide access aisle would also
impose an unreasonable hardship for the reason previously stated;
that the overall configuration of the parcel, particularly the
narrowness of the area between the right-of-way for Casa Lorna
Boulevard and the inlet, poses a severe constraint on the
developability of this area with respect to the requirements of
the City's Parking Lot Regulations. Therefore, the TRB
recommended approval of this variance request subject to the
following conditions:
1. That the T-turnaround be eliminated in favor of a cul-de-sac
with a minimum diameter of 73 feet, extending from the
southern right-of-way line for Casa Lorna Boulevard north to
the boardwalk in front of the restaurant. This will require
elimination of at least four parking spaces and the westward
relocation of the restaurant stairway. It was the consensus
of the TRB that providing a cul-de-sac as opposed to a
T-turnaound would serve as a much more effective mechanism
in maintaining traffic flow and mitigating congestion on
Casa Lorna Boulevard, particularly at times of peak hour use.
2. That a detail be included in the plans submitted for
sign-off showing the integration of the cul-de-sac and the
Casa Lorna Overlook park to meet the approval of the
Recreation Department and the City Engineer.
~ t. .lJ.iL
. ES ~. GOLDEN
flat
cc: City Manager
Technical Review Board
Central File
2
siteworks architects & planners, inc.
Suite 320
1301 Congress Avenue
Boynton Beach, Florida 33435 305-737-9606
0~
j1~
.....
Letter of Transmittal
120 Boynton Beach Blvd.
Boynton Beach, Florida 33435
Date: Jan 31, 1987 Job No.: 8615
Attention: Carmen Annunziato
Re : Water's Edge
To:
Carmen Annunziato
WE ARE SENDING YOU
E3 attached 0 under separate cover via
o Shop drawings 0 Prints
o Copy of letter 0 Change order
o Plans
o Samples
the following items :
o Specifications
o
~lail
copies date description reimb.
shts.
1 /30/87 Dredge & Fill Permitting
THESE ARE TRANSMITTED as checked below :
o Approved as submitted 0 For approval
o Approved as noted 0 For your use
o Returned for corrections ti As requested
o For review and comment 0
o FOR BIDS DUE 19 -
o Resubmit _ copies for approval
o Return _ corrected prints
o Submit _ copies for distribution
o PRINTS RETURNED AFTER LOAN TO US
Remarks
Copy to
Signed Craig Livingston
If enclosures are not as noted. kindly notify us at once.
..
E rJ(>INE FIlS, PI ANNE:nS, SURVEYORS
lFLEPHONE 305 fiS5 1151
!!!~~!!!I!!I :;1~~~,~~~':~~;'i:::) "'"
RECEIVED
December 15, 1986
FEB 4 1981
PLANNING DEPT.
F" ,
i' ';- r--.... ! ~ ~
, i,J
! '
craig Livingston
Siteworks Architects & Planners, Inc.
Suite 320
1301 Congress Avenue
Boynton Beach, Fl. 33435
, I
: ',f! }I l
I . \ ir ~. (-,
'Ill ".' 1 I,. '
RE: WATER'S EDGE - DREDGE & FILL PERMITTING
#86036
Dear Craig,
Per your request, the following is a summary of the
permit status on Water's Edge:
1) South and West side: A permit was issued by the
Dept. of Environmental Regulation (#501239526) for the
construction of a new bulkhead and 146 pilings. A Corps of
Engineers permit (Nationwide Permit Ref.#86NW302l2) was
issued for the same work.
2) Isolated wet area on West side: McDevitt and Street
is applying to the Palm Beach County Health Dept. to remove
the few mangrove plants which exist there. The area is
isolated and is not within Dept. of Environmental Regulation
jurisdiction.
3) North side: A joint Dredge & Fill application is
being prepared for the north side and should be turned in
within the next 10 days.
I hope this information is sufficient for the city. If
you would like for me to meet with them, please call.
very truly Yo~r~/J;,
/]/ /J) (I / IJl
';11 Cf/ l>{1~ ryel
K. Dan Shalloway P
KDS:saw
Board. ,f County Commissioners
K~~' Marcus, Chair
Jerry L. Owens, Vice Chairman
,- Ken Spillias
,...- Dorothy Wilken
Kenneth M. Adams
County Administrator
Jan Winters
Department of Engineering
and Public Works
H, F. Kahlert
County Engineer
December 24, 1986
Dee 30 1988
PLANN~"G ro',
p,~~~' ~.~ Ul_"-
~ .~
~
Mr. Carmen S. Annunziato
Planning Director
City of Boynton Beach
120 N.E. 2nd Avenue
P.O. Box 310
Boynton Beach, FL 33435-0310
4fi
SUBJECT: WATER'S EDGE MARINA
Dear Mr. Annunziato:
As you have requested, this office has reviewed the traffic impact study and
site plan for the subject project and offers the following comments:
1) The dedication of right-of-way for the future construction of Boynton
Beach Boulevard should be required in accordance with the County's
Thoroughfare Protection Plan. The Department of Transportation should be
consulted regarding their requirements for right-of-way to accommodate
fill slopes for the future Intracoastal Waterway Bridge.
2) Turn lane improvements should be required as recommended in the traffic
impact study.
3) This project should be required to pay the Fair Share Impact Fee as
required by the County's Fair Share Impact Fee Ordinance.
As always, the opportunity to comment is sincerely appreciated.
If you have any questions or required additional information, please do not
hesitate to contact this office.
Sincerely,
OFFICE OF THE COUNTY ENGINEER
~-A-//;t/J'~#
Charles R. Walker, Jr.', P.E.
Director, Traffic Division
CRW/ASH/jhd
File: Municipality - Boynton Beach
"An Equal Opportunity - Affirmative Action Employer
BOX 2429 WEST PALM BEACH, FLORIDA 33402-1989 (305) 684-4000
;P
MEMORANDUM
17 December 1986
TO: Peter L. Cheney, City Manager
FROM: Carmen S. Annunziato, Planning Director
RE: Water's Edge Marina Proposed Review Schedule
Accompanying this memo you will find an approval schedule
for the proposed Water's Edge Marina project. This
schedule has been coordinated with the Redevelopment Agency
Executive Director and the variance requests have been
forwarded to the City Clerk for advertising.
Please advise if there are any problems with this schedule
from your perspective. Under separate cover you will find
the requested height exception for the Council meeting of
January 6, 1987.
C.CARMEN i~ AN~~TO
/bks
cc:
Dianna Lawes
Central File
J
.'
-~
MEMORANDUM
December 15, 1986
TO:
Carmen S. Annunziato, Planning Director
FROM:
James J. Golden, Assistant City Planner
RE:
water's Edge Marina
Proposed Review Schedule
Please be advised that I have prepared the following schedule
of review for the above-referenced project which has been approved
by the Executive Director of the Community Redevelopment Agency:
Tuesday, December 16, 1986
Preliminary TRB meeting (a special meeting of TRB to distribute
plans and documents and to provide an overview of the site plan
and variances).
Tuesday, January 6, 1987
Formal TRB review of site plan and variances.
- City Council consideration of height exception.
Thursday, January 22, 1987
Downtown Review Board review of the site plan and the following
three variance requests:
I. Section 5-141(h) (2) of the Parking Lot Regulations
"Maneuvering and Access Areas".
2. Section 5-141(m) of the Parking Lot Regulations "Fire Lanes".
3. Section 7.5 - 57(1) (a) of the Environmental Regulations
"Perimeter-Strip Landscaping".
Thursday, February 5. 1987
Community Redevelopment Agency review of the site plan.
Tuesday, February 17, 1987
City Council review and approval of the site plan.
Please advise if any changes are recommended.
~ j. J;JL
IJAMES ;$. GOLDEN
/lat
.'
~
12-14-1986
PROJECT : WATER'S EDGE
Cl = 0.80 C2 = 0.00 C3 = 0.00
STORM FREQ. = 3
ZONE = 10
: DRAINAGE AREA :
STRUCT (ACRES)
FROM LENGTHIINCR SUB. SUB.T:
TO (FT): TOT. (CAl:
TOTAL
TOC TOF INTEN. TOTAL R,O.
(MINi (MINi (CAi (CFS)
: ELEV. OF H.G. :
INLET: INVERT El.
ELEV :UPPER lOWER FALL:
(FT) : END END (FT) :
: HYD.
: PHV.
DrA.: SLOPE: VEL.
(P!i: '!. : IFF'S)
CAP.
rCFS)
N
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
1 0.39 0.39 0.31 1.86 1.66 0.20 0.139
2 145 10.00 2.01 6.81 0.31 2.12 5.37 3.12 2.25 0.87 18 0.602 1.20 2.1 0.024
2 0.21 0.60 0.48 1.66 1.37 0.28 0.290
3 98 12.01 0.94 6.39 0.48 3.07 5.37 2.25 1.66 0.59 18 0.602 !.74 3.1 0.024
3 0.09 0.69 0.55 1.37 0.85 0.52 0.3b4
6 142 12.95 1.22 6.22 0.55 3.43 5.37 1.66 0.81 0.86 18 0.602 1.94 3.4 0.024
4 0.90 0.90 0.72 3.18 1.47 1.71 0.742
5 230 10.00 1.38 6.B! 0.72 4.90 4.55 2.43 1.04 1.39 18 0.602 ? 77 4.9 0.024
5 0.52 1.42 1.14 1.47 0.85 0.62 0.396
b 156 12.49 0.64 6.30 1.14 7.16 5.84 !.04 0.81 0.23 18 0.151 4.05 7.2 0.012
b 0.13 2.24 1.79 0.85 0.75 0.10 (J.b:.
7 54 14.17 0.26 6.01 1.79 10.77 5.37 0.81 0.75 0.06 Lq 0.103 3.43 10.8 0.012
12-14-1986
PROJECT: WATER'S EDGE
Cl = 0.80 C2 = 0.00 C3 = 0.00
STORM FREQ. = 3
ZONE = 10
: DRAINAGE AREA :
STRUCT (ACRES)
FROM LENGTHiINCR SUB. SUB. Tl
TO (FT): TOT. (CAi:
TOTAL
Toe TOF INTEN. TOTAL R,O.
(MIN) (MINi (CAi (CFS)
: ElEV. OF H.G. :
INLET: INVERT EL.
ELEV :UPPER LOWER FALL:
IFH : END END (FT! :
: H't!).
: PH'!.
DIA.: SLOPE: VEL.
(IN): I. : iFF'S)
CAP.
[eFS)
N
=====================================================================================================-===========================
1 1.28 1.28 1.02 3.22 0.85 2.37 1.500
2 158 10.00 0.67 6.81 1.02 6.97 4.55 1.83 0.88 0.95 18 0.602 3.94 7.0 0.024
----------------------------------------------------------------------------_._---------------------------~.----------------------
2 0.10 1.38 1.10 0.85 [1.75 0.10 0.083
3 122 12.01 0.91 6.39 1.11) 7.05 4.50 0.88 0.75 0.13 24 0.103 2.25 7.10.012
--------------------------------------------------------------------------------------------------------------------------------
}JvIJ .
r' \ fl. .~AJ
~Ij
J
,
12..14-1986
PROJECT: WATER'S EDGE
Cl = 0,80 C2 = 0.00 [3 = 0,00
STORM FREQ, = 3
. ZONE = 10
: DRAINAGE AREA :
STRUCT (ACRES)
FROM LEN6TH:INCR SUB. SUB.T:
TO IFTl: TOT. ICAl:
TOTAL
TOC TOF INTEN. TOTAL R,O.
(MHn IMINi (eAl (CFS)
: ELEV. OF H.G. :
INLET: iNVERT El,
ELEV :UPPER LOWER FALL:
(FTl : END END 1FT! :
: HYD.
: F'HY,
D 1 A.: SLOPE: VEL.
(IN): '/. : iFPS)
CAP.
ICFS)
N
==================================================~=============================================================================
1 0.3.3 0.33 0.2b 4.80 4,bl 0.19 (j,INI
2 188 10.00 3.08 6.81 0.26 1.80 5.66 3,51 2.38 1.13 18 0,602 1.02 1.8 0.024
2 0.33 O,bb 0.53 4.61 4.22 0.39 0.330
3 119 13.08 1.07 6.19 0.53 3.27 5.66 2.38 1.66 0.72 18 0.602 1.85 3.3 0.024
3 0.31 0.97 0.7B 4.22 3.29 0.93 0.673
b 138 14.15 0.87 6.01 0.78 4.67 6.26 1.66 0.83 0,83 18 0.602 2,64 4,7 0.024
4 0.51 0.51 0.41 3.603.32 0.28 0.238
5 117 10.00 1.24 6.81 0.41 2.78 4.10 1,62 0.92 1),70 18 0.602 1.57 2.8 0.024
5 0.01 0.52 0,42 3..32 3.29 0.03 1),053
b 58 12.49 0.65 6.30 0.42 2.62 5.34 0.92 0.83 0.09 1B 0,151 1.48 2.6 0,012
6 0.27 1.76 1.41 3.29 3.20 0.09 0,114
7 79 15.02 0.50 5.88 1.41 8.28 4.55 0.83 0.75 0.08 24 0.103 2.64 8.3 0.012
12-14-1986
PROJECT: WATER'S EDGE
Cl = 0.80 C2 = 0.00 C3 = 0.00
5TOR11 FREQ. = 3
ZONE = 10
: DRAINAGE AREA :
STRUCT IACRES)
FROM LEN6THiINCR SUB. SUB.T:
TO (FTl: TOT. (CAl:
TOTAL
TOC TOF INTEN. TOTAL R,O.
(MINi tMIN) (CM !CFS!
: ELEV. OF H.G. :
INLET: INVEHT EL.
ELEV :UPPER LOWER FALL:
iFT) : END nm 1FT! :
: Hy[.
: PHY,
DIA.: SLOPE: VEL.
(IN): '/. : IFPS)
CAP.
rCFSi
N
================================:===============================================================================================
1 0.70 0.70 0.56 1.07 0.75 0.32 0.449
2 71 10.00 0.55 6.81 0.56 3.81 2.60 1.18 0.76 0.43 18 0.602 2.16 3.B 0,024
---;----------~~~~--~~;~--~~~;-------------------_._------_._------------~~;;--;~;;--;~;;--------;~;;~------------------. ---------.-~
3 5 13.0B 0.07 6.19 0.57 3.52 5.00 0.76 0.75 0.01 24 0.103 1.12 3.50.012 '
----------- ---- ---- --
PROJECT NAME: WATER'S EDGE
EXFILTRATION TRENCH DESIGN
PROJECT DATA :
DRAINAGE AREA (ACRES)
RATIONAL METHOD 'C'
DESIGN RAINFALL (IN)
TRENCH WIDTH (FT)
UNSATURATED TRENCH DEPTH (FT) -
SATURATED TRENCH DEPTH (FT)
DEPTH TO WATER TABLE (FT)
CALCULATION RESULTS :
TEST CONDUCTIVITY (K)
= .0002
TRENCH LENGTH REQUIRED (FT) =
1002.8
"
=
4.60
o. 7::i
:;~. 5()
=
6.00
1 . ~50
2.00
::::;.00
=
11-"OFJ--1986
'~
.
MEMORANDUM
December IS, 1986
TO:
Carmen S. Annunziato, Planning Director
FROM:
James J. Golden, Assistant City Planner
RE:
Water's Edge Marina
Proposed Review Schedule
Please be advised that I have prepared the following schedule
of review for the above-referenced project which has been approved.,
by the Executive Director of the Community Redevelopment Agency:
Tuesdav. December 16. 1986
Preliminary TRB meeting (a special meeting of TRB to distribute
plans and documents and to provide an overview of the site plan
and variances).
Tuesdav. Januarv 6, 1987
Formal TRB review of site plan and variances.
- City Council consideration of height exception.
Thursday, January 22, 1987
Downtown Review Board review of the site plan and the following
three variance requests:
1. Section 5-141(h) (2) of the Parking Lot Regulations
"Maneuvering and Access Areas".
2. Section 5-141(m} of the Parking Lot Regulations "Fire Lanes".
3. Section 7.5 - 57(1} (a) of the Environmental Regulations
"Perimeter-Strip Landscaping".
Thursday: February 5. 1987
Community Redevelopment Agency review of the site plan.
Tuesday, February 17, 1987
City Council review and approval of the site plan.
Please advise if any changes are recommended.
~ f. /ML-
(JAMES ~. GOLDEN
flat
-_._--~
MEMORANDUM
December IS, 1986
TO:
Carmen S. Annunziato, Planning Director
FROM:
James J. Golden, Assistant City Planner
RE:
Water's Edge Marina
Proposed Review Schedule
Please be advised that I have prepared the following schedule
of review for the above-referenced project which has been approved
by the Executive Director of the Community Redevelopment Agency:
Tuesday, December 16, 1986
Preliminary TRB meeting (a special meeting of TRB to distribute
plans and documents and to provide an overview of the site plan
and variances).
Tuesday, January 6, 1987
Formal TRB review of site plan and variances.
- City Council consideration of height exception.
Thursday, January 22, 1987
Downtown Review Board review of the site plan and the following
fhree variance requests:
I. Section 5-141(h) (2) of the Parking Lot Regulations
"Maneuvering and Access Areas".
2. Section 5-141(m) of the Parking Lot Regulations "Fire Lanes".
3. Section 7.5 - 57(1) (a) of the Environmental Regulations
"Perimeter-Strip Landscaping".
Thursday, February 5. 1987
Community Redevelopment Agency reVlew of the site plan.
Tuesday, February 17, 1987
City Council review and approval of the site plan.
please advise if any changes are recommended.
~ f. /ML-
IJAMES ~. GOLDEN
jlat
.'
----~-_......_--"._-_.
r ~, i~ ;rr:rl c r. r~' _.- r' "1 /."T" Ii:' 1
~. ..;.,... ",(.t'~ l'{~t.. q . r'i Cv. ) 1';~-f..~1:;, r ;' 1...',
;,.,.......' "i ;~ ,') L'~'l f)" 1...._,. :""!l .!:; /'; ,I..r :.t. ,'; " I: I (i " i
r, I ~ t. \, ..' .,' I . t
.. ......,. ~ ._._ ....,,_......fIOo.... .......... ........_.. . :, r -, ~ _. .'
~11.:r.,o
To: City of Boynton Beach
From: K. DCl\l ShallowClY, r.E.
Re: DERjCorps Permit status
November 6, 1986
SOUTI I & \ooJEST S 11)/;:S -
r e r 111 it!'; fro 111 U I P. ,-11:- 10 y Co q'l S 0 fEll gin P. e r!; an cl F lor i ,1 a
Department of l;:nvirolllllcnL,l Hcgllli1tion h.-.vr.:' heen received to
replace the sea\~a 11 rt long the 501] th and wes t S ides and to
replace the existing docks with the new clocks.
NORTH SIDES -
Prel iminary meetings have been held wi th Dl':R t1\ld Corps of
Bngineers personnel. Substantii'll infor.matioll wil.1 need to
be campi led be fore a per. mi t is is slIed tor. the nor th side.
'l'hiR is currently ut1l1erway and an application will be
tiubmitted in the \lear future.
. .' 1
/} /
.' .'
/
I .
t
___.L---_ ____
K. Dan Shalloway, P.E.
Pesident ~
l . L
J.. . \
( ,\
i ~ '
.
.',
,-"
. "J
1\,
I.
\ I
l. '..
"
"'.('
Tt~,r" "~~;~:,;~'~
siteworks
architects &
planners inc.
,~ov
',,,, le8/")
2. {~ 0
PLA~~Nii~G DEPT.
November 3, 1986
Mr. Carmen Annunziato
Director of Planning
City of Boynton Beach
Technical Review Board
120 N.E. 2 Avenue
Boynton Beach, Florida
33435
Re: Water's Edge Marina
Our Project # 8615
Gentlemen:
Pursuant to Boynton Beach Zoning Code Section 22-25 B "Sidewalks
Required ", we hereby petition for administrative waiver of this requirement
for above referenced project along Casa Loma Blvd. for the following reasons:
a. Adequate pedestrian circulation is provided by boardwalks, stairs and
ramps for the handicapped directly in front of the proposed retail and
restaurant buildings in a location adjacent and to the North of the
required sidewalk. See Drawing A-1.
b. We have located 36 parking spaces for the convenience of shoppers and
patrons to the restaurant along the north right-of-way of Casa Loma Blvd.
These 36 parking spaces are also needed to meet the City of Boynton Beach
Zoning Code Parking Requirements for this project.
Cars parked along the north right-of-way of Casa Loma Blvd. will need to
back out directly into this public right-of-way, therefore a sidewalk along
the north right-of-way line would be in total conflict with this parking
facility.
An application for variance to parking lot regulations has been submitted,
as part of this site plan review package, for approval of above mentioned
parking spaces.
Awai ting for your favorable response to this petition we thank you for your
continued cooperation in this project.
Sincerely,
& PLANNERS, ~.
CLI'
enc
SUite 320
1301 Congress Avenue
Boynton Beach, FL 33435
305-737-9606
GENE MOORE
TELEPHONE (305) 134.2424
LA WYER
FIRST FINANCIAL PLAZA. SUITE 409
6J9EASTOCEAN AVENUE
BOYNTON BEACH. FLORIDA 3343S
MAILING ADDRESS: P.O. BOX 910
""r"~ ;."....~ ,t~~"> ...7......., ~
...- .F1"....".D...
! . .~~}~
October 22, 1986
.:;\t!
lS6~
PLF"
'.~ ~~~L.i.~T,
Craig Livingston
Siteworks Architects
1301 N. Congress Avenue
Suite 320
Boynton Beach, FL 33435
Re: Waters Edge Development
Dear Craig;
I am writing to you in my capacity as Secretary of the First Financial
Plaza Condominium Association, Inc. We have reviewed proposed plans
for development of Waters Edge Lighthouse Marina directly to the East
of the Association's property, and we are concerned with the location
of the proposed four-story parking garage.
I would appreciate the consideration of the Developer in relocating
the parking garage to the furthest point south on your property, to-wit
fronting on East Ocean Avenue, in order to minimize to the greatest
possible extent interference with our existing view of the marina
project. If the above can be accomplished, the Board of Directors has
indicated that it would fully support your project. In the alterna-
tive, if,our request is rejected, the Bo~d has determined to oppose
your pro] ect. /
I
GM/avm
Moore
cc: Dennis Sutton
Hank Thompson
Diane Laws
Carmen Annunziato
1//
I tJGINL[HS. 1'1 MJNr n,) SllHVrYORS
lfl~_PHONE 30:l f'~~,1151
~ nJl r\~ (1,(l,@~ ~~' rv1
f,:;91J tlfrr) -, ,_,I" <8,;</..:-',.,. :.'~'~!r;1.~.:',.H 1:'''lllfl'JIIIIHIIH'i\11
............... ' ""'- ---./"........... ~ ...... -~. - .'
~-^=.7 ---=-,~-..2lnC ",' WI',l '^!'}HIAfH IIH.W',
Summary
of
Hardy Cross Analysis
for
Water's Edge Hotel & Marina
The analysis was based on peak hour flows plus a fire at
Water's Edge which would require 3,100 gpm. The peak hour
flows were taken from a study done by Russel & Axon in 1983
for the City of Boynton Beach Utilities.
Three analysis were run to determine what size pipe would be
required to serve this project. It was determined that a
10" line would be needed down N.W. 2nd Avenue and down
through the project. It would then need to be connected to
the existing 10" line on S.E. 6th Avenue.
-::'
/7/2'/
:d;~J
( {II'
/
OCT 2,4.1986
.
*** S/ll\'-' ()WT\Y INC. C()N~,lJLTIN'-, DH;INEI::I<S *
HAHDY CHOSS ANALYSIS
WATER'S EDGE CASE II 8-14-86
CI RCUIT PIPE NO. LENGTH,FT. DIAMETER 0 S 0/00 !l,FT. B/O OC
1 1 860.00 10.00 1869.25 31.88 n.42 .0147 -.20
1 2 1160.00 6.00 -38.24 .29 -.33 .0087 -.20
1 3 1040.00 10.00 -1765.75 28.69 -29.84 .0169 -.20
1 4 1290.00 24.00 4351.25 2.14 2.77 .0006 -.20
SUM .02 .0409
2 2 1160.00 6.00 38.24 .29 .33 .0087 -.79
2 5 70.00 10.00 1892.48 32.62 2.28 .0012 -.79
2 6 630.00 6.00 185.36 5.31 3.35 .0181 -.79
2 7 530.00 6.00 -223.92 7.54 -4.00 .0178 -.79
2 8 70.00 10.00 -1712.52 27.11 -1. 90 .0011 -.79
SUM .07 .0469
3 6 630.00 6.00 -185.36 5.31 -3.35 .0181 -.83
3 9 325.00 10.00 1702.12 26.80 8.71 .0051 -.83
3 10 630.00 6.00 137.55 3.0b 1. 93 .0140 -.83
3 11 320.00 6.00 -404.27 22.52 -7.21 .0178 -.83
SUM .08 .0550
4 10 630.00 6.00 -137.55 3.06 -1. 93 .0140 -.73
4 12 350.00 10.00 1559.57 22.80 7.98 .0051 -.73
4 13 630.00 10.00 1085.57 11. 65 7.34 .0068 -.73
4 14 350.00 6.00 -536.83 38.07 -13.33 .0248 -.73
SUM .07 .0507
5 7 530.00 6.00 223.92 7.54 4.00 .0178 -.74
5 11 320.00 6.00 404.27 22.52 7.21 .0178 -.74
5 14 350.00 6.00 536.83 3!L07 13.33 .0248 -.74
5 15 540.00 10.00 -1477.60 20.63 -11. 14 .0075 -.74
5 16 640.00 10.00 -1482.60 20.76 -13.28 .0090 -.74
SUM .11 .0770
I
}~)1t
OCI 2 ~ _1986
.
. .
0529B/l
101386
TRI-PARTY AGREEMENT
This
agreement
entered
into
this
day of
October,
1986,
by and among the Florida Department of
Transportation (DOT), City of Boynton Beach, a Municipal
Corporation located in palm Beach County, Florida (BOYNTON),
and J&J Ventures of Florida, a Florida General partnership
(J& J ) .
WHEREAS, DOT intends to construct a four lane bridge
over the Intracoastal Waterway connecting BOYNTON with the Town
of Ocean Ridge.
The new bridge would replace the existing
bridge between BOYNTON and Ocean Ridge and would be located
approximately 700 feet north of the existing bridge and the
proposed si te of the br idge in BOYNTON would be the extension
of Boynton Beach Boulevard to the Intracoastal Waterway; and
WHEREAS, DOT prepared and recorded in the Official
Records of Palm Beach County, Florida, the right-of-way map
extending State Road 804 to Highway AlA and including the
right-of-way for the construction of the four lane bridge over
the Intracoastal Waterway; and
WHEREAS,
BOYNTON
included
the
right-of-way
map
prepared by DOT and recorded in the Official Records of Palm
Beach County, Florida, in its comprehensive plan; and
4
WHEREAS, palm Beach county included the right-of-way
map prepared by DOT and recorded in the Official Records of
palm Beach County, Florida, in its comprehensive plan; and
WHEREAS, In accordance with the procedures of DOT, the
location of the bridge was referred to a hearing officer for
his determination. The hearing officer determined that the
bridge could not be located at the si te proposed by DOT and
that the bridge should be located at the existing site of the
present bridge. The recommendation or ruling of the hearing
officer was appealed to DOT and DOT rejected his recommendation.
The action of DOT was appealed to the Fourth District Court of
Appeal and the Appellate Court held that the action of DOT was
erroneous and constituted an abuse of discretion and reversed
and remanded the question for a full hearing. In rendering its
decision, the Fourth District Court of Appeal recognized the
great public importance of the decision and certified several
issues raised in its decision to the Supreme Court. The
Supreme Court has not rendered a decision on the certified
questions; and
WHEREAS, J&J purchased a tract of real property
located in BOYNTON, and more particularly described on Exhibit
wAw. The northern part of the real property of J&J falls
wi thin the area DOT intends to acquire in order to construct
the four lane br idge. J&J is in the process of prepar ing and
submitting to BOYNTON a site plan wherein J&J intends to
deve lop the real proper ty as a hotel/motel mar ina complex wi th
commercial buildings, boat docks, and other ancillary uses; and
-2-
.
WHEREAS, the real property described in Exhibit wAw is
within the Municipal limits of BOYNTON and BOYNTON must approve
the site plan before the property may be developed by J&J.
NOW, therefore, in consideration of Ten Dollars
($IO.OO) and other good and valuable consideration, the receipt
and sufficiency of which each party acknowledges receiving, the
parties agree as follows:
I. J&J agrees to perform the following obligations:
a) J&J, at its expense, will cause to be
prepared engineering plans which will provide for the
reduction of the right-of-way on the south side of the
bridge and the construction of a retaining wall on the
south side of the bridge. Attached hereto as Exhibit
WBW is a copy of said plans.
b) In the event the bridge over the Intracoastal
Waterway is finally located at the extension of State
Road 804/Boynton Beach Boulevard, J&J agrees to
transfer to DOT that portion of the real property of
J&J which is described on Exhibit wCw.
The real
property described on Exhibit wCw includes the fee
title to a portion of the real estate and the fee
title to a portion of the air rights but not the
.
underlying ground which J&J wi II retain for its use.
The parties to this agreement recognize that J&J is
obligated to transfer the real property described in
Exhibi t WCW to DOT and that the consideration which
J&J shall receive for the transfer of the real
property will be determined at a later date.
-3-
. ,
c) J&J agrees to convey to DOT construction and
maintenance easements which will enable DOT to
construct the bridge in accordance with its plans and
specifications and to maintain the bridge after it is
constructed. A description of the easements is
attached hereto as Exhibit wDw.
d) In the event the bridge over the Intracoastal
Waterway is not finally located at the extension of
state Road 804/Boynton Beach Boulevard, J&J shall
donate to BOYNTON that portion of the real property
described on Exhibit wAw which will enable BOYNTON to
complete an 80 foot right-of-way to the Intracoatal
Waterway.
2. DOT agrees to complete the following obligations:
a) DOT shall bulkhead that portion of its
property which is adjacent to the Intracoastal
Waterway.
b) DOT shall construct a retaining wall on the
south side of the bridge in accordance with the plans
and specifications set forth on Exhibit wBw and DOT
shall maintain the retaining wall.
c) DOT shall enter into a lease agreement wi th
J&J wherein DOT will agree to lease to J&J the real
property descr ibed on Exhibi t W EW and in accordance
wi th the terms set forth on Exhibit wEw. Said real
property is located within the bridge right-of-way and
under the bridge.
-4-
3.
resolutions
obligations:
BOYNTON agrees
obligating BOYNTON
to
to
enact a
undertake
resolution or
the following
a) Attached hereto as Exhibit .F. is a copy of
the plans and specifications of DOT to construct the
bridge as modified by the engineering plans prepared
by J&J, and attached hereto as Exhibit .B.. BOYNTON
has reviewed said plans, as modified, and approves
them.
b) BOYNTON recognizes that the site plan which
will be submitted by J&J to BOYNTON for approval does
not provide for access to Boynton Beach Boulevard.
BOYNTON shall authorize J&J to use that portion of its
real property as depicted on Exhibit .Gw as an access
route for emergency vehicles through the development
pending final resolution of issues relating to the DOT
extention of state Road 804.
c) I. In the event DOT is not authorized to
construct the bridge at the proposed site, BOYNTON
shall extend Boynton Beach Boulevard/804 east to the
Intracoastal Waterway and along the northern boundary
of the real property described on Exhibit .A..
2. In the event DOT is authorized to
construct the bridge on the proposed site, BOYNTON
shall authorized J&J to use that track of ground
located at the east end of Casa Loma Boulevard.
-5-
.
Dated this
Signed, sealed and delivered
in the presence of:
Attest:
Attest:
City Clerk
day of
, 198
J&J VENTURES OF FLORIDA
A Florida General partnership
under the laws of the State of
Florida
By:
James W. Hall,
General partner
FLORIDA DEPARTMENT OF
TRANSPORTATION
By:
CI TY OF BOYNTON BEACH, A
MUNICIPAL CORPORATION
By:
Mayor
-6-
.
LEGAL DESCRIPTION
REAL PROPERTY OF J&J LOCATED IN
BOYNTON MUNICIPAL LIMITS
EXHIBIT wA.
, '.
.
ENGINEERING PLANS
PREPARED BY J&J
REDUCING RIGHT-OF-WAY AND
CONSTRUCTING A RETAINING WALL
EXHIBIT .B.
.
.
LEGAL DESCRIPTION
J&J TRANSFER TO DOT
EXHIBIT wCw
,
.
CONSTRUCTION AND MAINTENANCE EASEMENTS
CONVEYED BY J&J TO DOT
EXHIBIT wDw
t ~
,
LEASE AGREEMENT
WHEREIN DOT LEASES REAL PROPERTY
TO J&J LOCATED WITHIN RIGHT-OF-WAY
EXHIBIT wEw
.
DOT PLANS AND SPECIFICATIONS
FOR BRIDGE CONSTRUCTION
EXHIBIT wFw
,
PARTIAL SITE PLAN
&
LEGAL DESCRIPTION
OF PROPERTY USED BY J&J
FOR EMERGENCY VEHICLES
EXHIBIT wGw
slteworks
architects &
planners Inc.
November 3, 1986
n T;(~~~~~
.....i '"'.,'
Mr. Carrren Annunziato
Director of Planning
City of Boynton Beach
Technical Review Board
120 N.E. 2 Avenue
Boynton Beach, Florida 33435
l-
----,-----~-
Re: Water I s Edge Marina
OUr Project # 8615
Gentlenen:
Pursuant to Boynton Beach Zoning Code Section 22-25 B "Sidewalks
Required", we hereby petition for administrative waiver of this requirerrent
for above referenced project along Casa Lama Blvd. for the following reasons:
a. Adequate pedestrian circulation is provided by boardwalks, stairs and
ramps for the handicapped directly in front of the proposed retail and
restaurant buildings in a location adjacent and to the North of the
required sidewalk. See Drawing A-l.
b. We have located 36 parking spaces for the convenience of shoppers and
patrons to the restaurant along the north right-of-way of Casa Lama Blvd.
These 36 parking spaces are also needed to rreet the City of Boynton Beach
Zoning Code Parking Requirerrents for this project.
Cars parked along the north right-of-way of Casa Lama Blvd. will need to
back out directly into this public right-of-way, therefore a sidewalk along
the north right-of-way line would be in total conflict with this parking
facility.
An application for variance to parking lot regulations has been submitted,
as part of this site plan review package, for approval of above rrentioned
parking spaces. .
Awaiting for your favorable response to this petition we thank you for your
continued cooperation in this project.
Sincerely,
& ~, DC.
CLI'
enc
SUIte 320
1301 Congress Avenue
Boynton Beach. FL 33435
305.737-9606