CORRESPONDENCE
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-137
TO:
Michael W Rumpf, Director of Planning and Zoning
Jack Casler, P.E., P.L.S., Acting City Engineer ~ t t
November 2,1999 0
FROM:
DATE:
RE:
Boynton Commerce Center-Master Plan
Modification-Second Review
1. All plans submitted for specific permits shall meet the city's code requirements at time of
application. These permits include, but are not limited to, the following: site lighting, paving,
drainage, curbing, landscaping and irrigation. Permits required from other permitting agencies,
such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be included with your
permit request.
2. Provide a statement that all utilities are available and will be provided by the appropriate agencies.
[Chapter 3, Article IV, Section 3P]
3. Provide a traffic impact analysis, which includes: LOWES, Buildings "A" & "B", and the
southernmost building shown on 5H M2 of 13 as "proposed future" which is now complete.
[Chapter 3, Article IV, Section 35.]
4. On sheet M2 of 13, remove the wording "proposed future" and "future development" and identify
building as parcel "G".
5. On sheets Ml and M2 of 13, change the words "site plan" to "master plan".
JHC/kr
C:\My Documents\boynton commerce center 2nd review 99-137.doc
DEP ARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 99-257
TO:
Michael Rumpf, Planning & Zoning Director Jt6
DC,
Michael E. Haag, Deputy Building Official
November 4, 1999
Boynton Commerce Center - Master Plan Modification (MPMD 99-004)
1st Submittal Review Comments
FROM:
DATE:
RE:
We have reviewed the subject plans and offer the following comments that are required to be
incorporated into the approved master plan drawing following City Commission approval of the
request.
Buildin~ Division (Permit & Site Specific Comments) - Michael E. Haag (561) 742-6352
1. Submit a current survey ofthe PID.
2. Create a drawing titled Master Plan Boynton Commerce Center Pill. Illustrate on the new
drawing the proposed configuration of the PID. Clearly identify the property line border of
the PID. Place all of the site data that is shown on sheet M2 of 13 on the new drawing.
Also, add all building designations and parking spaces that are identified on sheet M2 of 13
to the new drawing. Sheet M2 of 13 does not properly identify the existing parking spaces
that are located along the east property line south of the building 1900. The building that is
shown located at the south end ofthe project is an existing building, not for future
development. Prepare a new drawing and correct the inconsistencies with respect to
existing conditions.
3. Show, dimension and label on the new master plan drawing the peripheral greenbelt that is
required around the perimeter of the PID.
4. Add a note indicating that the required handicap accessible routes will be designed and
constructed in compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and
Passenger Loading Zones) ofthe Florida Accessibility Code for Building Construction.
Please note that at time of site plan review and permit review, the applicant shall provide
detailed documentation on the plans that will verify the design of the accessible routes are
in compliance with the specifications identified in the Florida Accessibility Code for
Building Construction.
Building Division Memo No. 99-257 to Michael Rumpf
RE: Boynton Commerce Center - Master Plan Modification - 1 st submittal review comments
November 4, 1999
Page Two
5. Within the site data, identify the proposed finish floor elevation of building "A" and "B"
(lowest floor elevation). Verify that the proposed elevation complies with regulations of
the code by adding specifications and notes to the site data that address the following
Issues:
a) From the FEMA map, identify the title ofthe flood zone that the building is located
within. Where applicable, specify the base flood elevation. If there is no base flood
elevation, indicate that on the plans.
b) As the design professional-of-record for the project, state that the proposed floor
elevation is above the highest 100-year base flood elevation applicable to the building
site, as determined by the South Florida Water Management District's surface water
management construction development regulations. [Section 3107.1.2, Chapter 31 of
the Boynton Beach amendments to the 1997 edition ofthe Standard Building Code]
c) Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the site plan and required civil
plan.
6. Add a note to the master plan indicating that "No site or building signage will be allowed
without receiving site plan approval for signage."
7. Identify on the master plan whether Corporate Drive is a public or private road.
MEH:bg
J :\SHRDA T A \Development\Building-6870\Documents\TRC\MPMD 99-004 I st review Boynton Commenrce Center.doc
TOTAL DEVELOPMENT DATA
Total New Sui/ding Sq. Ft.
Total New Parking Spaces Required
Total New Parking Spaces Provided
Total New Handicap Spaces Required
Total New Handicap Spaces Provided
Total Existing Building Sq. Ft.
Total Existing Parking Spaces
Total Existing Parking Spaces Lost
DEVELOPMENT TOTALS
BOYNTON C
NEW DEVELOPMENT DATA
228.523 OPERATIONS CENTER "A" Sq. Ft. Spaces
463 30% Office 23.859.9 80 (1 per 300 sq.ft.)
556 20% Manufacturing 15,906.6 32 (1 per 500 sq .ft.)
14.54 (501-1000) 50% Warehouse 39.766.5 50 (1 per 800 sq.ft.)
18 2% of Total TOTALS 79.533 161
244,215 Handicap Required 6 (101-150)
580 Handicap Provided 8
(86)
OPERATIONS CENTER 'B' Sq. Ft. Spaces
472.738 957 30% Office 23,731.5 79 (1 per 300 sq.ft.)
20% Manufacturing 15.821.0 32 (1 per 500 sq.ft.)
50% Warehouse 39.552.5 49 (1 per 800 sq.ft.)
TOTALS 79,105 160
Handicap Required 6 (151-200)
Handicap Provided 8
OPERATIONS CENTER 'c' Sq. Ft. Spaces
30% Office 20,965.5 70 (1 per 300 sq .ft.)
20% Manufacturing 13,977.0 28 (1 per 500 sq.ft.)
50% Warehouse 34,942.5 44 (1 per 800 sq .ft.)
TOTALS 69,885 142
Handicap Required 5 (101-150)
Handicap Provided 8
77r
dotJTlWL .p L-ArJ
BOYNTON COMMERCE CENTER II SITE DATA
EXISTING DEVELOPMENT DATA Sq. Ft.
Spaces Building 1900 81,350
BO (1 per 300 sq.ft.) Building 2000 67,150
32 (1 per 500 sq.ft.) Building 2100 60,000
50 ( 1 per 800 sq .ft.) Parcel 3G 35,715
161 TOTALS 244.215
6 (101-150)
8 Sq.Ft.
Gross Project Area 896.184-
Spaces Net Buildable Land Area 867,051
79 (1 per 300 sq.ft.)
32 (1 per 500 sq.ft.) Floor Area:
49 (1 per 800 sq.ft.) 307. Office 68,556.9
160 20% Manufacturing 45,704.6
6 (151-200) 50% Warehouse 114.261.5
8 TOTALS 228.523
Spaces Landscape Open Space 230.879
70 (1 per 300 sq.ft.) Vehicular Use Area 298,455
28 (1 per 500 sq. ft.) Other Paved Area 35,549
44 (1 per 800 sq.ft.) Building Coverage 228,523
142 ....
5 (101-150) Required Off Street Parking
8 307. Office 228.52
207. Manufacturing 91.41
507. Warehouse 142.83
TOTALS 462.76
Provided r)ff Street Parking 727
Loading Spaces Provided 50
Building Height 32 Ft
Handicap Required 14.54
Handicap Provided 24
~
. ~/>,. ~~"?;~7'r-~..
. / / '':---,---. .
~
Spaces
170
169
169
72
580
Acres
20.57
19.90
5.30
6.85
0.81
5.25
(501 -1 000)
Existing
Existing
Existing
(1 per 500 sq.n.)
Percentages
100.0
96.75
25.76
33.30
15.36
25.50
(1 per 300 sq.ft)
(1 per 500 sq.ft.)
(1 per 800 sq.n.)
2% of Total
rnplW\l> cw- 00'1
~ ~'"
o ~~
IX. ,.,t"<IM
~ "'..!.'I'
~ ~~~~
o !!5~~~
1= li:!~~g
w ~:ll<.l
~ ~..--~
~o~~~~
~"'Q::I::i~
m!gg~\3~
;!:1Am\:!:!~:J
z
'"'
in
u.J
c
~
iE
\:!:!
;!;
oij
~
....
U
l:W
....
~
u
r...
~
~
l:W
~
u.J
Q:
~
<.>
t!!
:;:
<.l
'"
<
l:W
~
E-..
l..J..J ~
~;
::r: ~
<(~
:2E
O~
Ocll
t--i
t--i
~
W
~E-i
<cZ~
o :: ~::> <r:
z ~~
~~U~~
~~ 0
.....:lE-i~ -
SZu~G
~r3~~<r:
.....:l ~~W
....J Ul ~ 9 II)
"
:::
l- 1_
"RANSMISSION VERIFICATION REPORT
TIME 10/29/1999 09:04
NAME BOYNTON BEACH P & Z
FAX 5613756259
TEL 5613756260
DATE,TIME
FAX NO./NAME
DURATION
PAGE(S)
RESULT
MODE
10/29 09:02
91561220788185085
00:02:02
04
OK
STANDARD
ECM
L- "RANSMISSION VERIFICATIOt~ REPORT L
TIME 10/28/1999 17:11
NAME BOYNTON BEACH P & Z
FAX 5613756259
TEL 5613755260
DATE,TIME
FAX NO./NAME
DURATION
PAGE(S)
RESULT
MODE
10/28 17:09
91551220788185085
00:02:03
04
m<
STANDARD
ECM