CORRESPONDENCE
100 E BOYNTON BEACH BLVD.
P.O. BOX 310
BOYNTON BEACH, FLORI DA 33425 -0 31 0 ,
(407) 738-7490
'CITY of
BOYNTON BEACH
OFFICE OF THE PLANNING DIRECTOR
July 19, 1989
Mr. Bill Free
4301 Oak Circle Drive, #18
Boca Raton, Florida 33431
RE: Bedding Barn - New Site Plan - File No 253
Dear Mr. Free:
Please be advised that on Tuesday, July 18, 1989, the City
Commission approved the referenced site plan SUbject to staff
comments, copies of which are attached.
These plans were approved subject to your compliance with the
attached stipulations. After you have amended your plans to
reflect these stipulations, please submit two copies 'of final
plan drawings with the changes incorporated to the Building
Department for permitting purposes.
The approval of the City entitles you to construct only the
improvements shown on the site plan. The site plan will be
viewed procedurally as an as-built or record drawing. If you
have any questions concerning this matter, please do not hesitate
to contact me.
Very truly yours,
CITY OF BOYNTON BEACH
c:-!l-~(th..
CARMEN S. ANNUNZIATO, AICP
Planning Director
CSA:frb
Encs
cc: City Manager
Technical Review Board
Central File
rF'-"W~ . ._-~...~--~_.""..'..,-,_._~---.-.,._-----_.- --- ,',-
.. --'~---~.'. ...---__--~~~-~.--.-~~-.11
FROM 1"HE DESK ...r,.u. FREE '
.... .CMic 'ar..<r.IM'~'
..*JCA .~.'~....
(..It.II.1
,;~"
,
i
f
i
J
TO:
Tambri Heyden
Assistant City Planner
Boynton Beach
DATE 7/18/89
SUBJECT: BEDDING BARN
ear Miss Heyden:
I appreciate your quick response and attention to all the matters pertaining
--to the above subject project (you have been very helpful and kind). As
requested, I have attached another signed copy of the authorization form
page 9; giving permission to Bill Free to act as Owner's Agent with
regard to the site plan approval process.
Once again, thank you.
Sincerely,
~~
Bill Free
President
Encl.
BF/ns
MLCC BOO 2
or
BILL FREE L GENERAL CONTRACTOR
4301 OAK CIRCLE DRIVE, #18
BOCA RATON, FLORIDA 33431
(407) 395-4039
May 24, 1989
Mr. James J. Golden
Senior City Planner
CITY OF BOYNTON BEACH
200 North Seacrest Boulevard
Boynton Beach, Florida
SUBJECT: Bedding Barn Project
RE: Submittal of Revised Plans as Required by T.R,B.
Dear Mr, Golden:
Attached you will find six (6) sets of plans with all the
revisions, deletions, modifications and additions as required
by the various Departments in the T.R.B.
Also included you will find our individual response to each
Department's memorandum.
If you have any questions, please do not hesitate
also want to take this opportunity to thank you
for your attention to this matter and continued
in the resolution of same.
to call. I
in advance
cooperation
Sincerely,
~~~
Bill Free
President
Encs.
BF/ns
BILL FREE L GENERAL CONTRACTOR
4301 OAK CIRCLE DRIVE, #18
BOCA RATON, FLORIDA 33431
(407) 395-4039
May 24, 1989
James J. Golden
Senior City Planner
CITY OF BOYNTON BEACH
200 North Seacrest Boulevard
Boynton Beach, Florida
SUBJECT:
Bedding Barn Project
RE: Your Memorandum dated April 5, 1989
1. We received approval by the Variance Board on May 8,
1989 to allow a 20' rear setback.
2. A 6' CBS wall as required, will be installed. (How-
ever, please note that the buffer wall will be located
8' from the rear property line to allow access for the
L.W.D.D. easement, and not as shown on the site plan.)
3, A variance was permitted on Item 1, a variance on Item
2 will not be requested.
4. The trees encroaching the canal maintenance easement
have been relocated.
5. Six (6) sets of fully detailed plans of the sign are
provided herein.
6. The building setback has been changed to absolve the
roof encroachment problem.
7. Parking lot lighting plan is attached with this package.
Sincerely,
~~
'1 ~
B1. 1 Free
President
BILL FREE ~ GENERAL CONTRACTOR
4301 OAK CIRCLE DRIVE, #18
BOCA RATON, FLORIDA 33431
(407) 395-4039
May 24, 1989
Carmen Annuziato
Planning Director
CITY OF BOYNTON BEACH
200 North Seacrest Boulevard
Boynton Beach, Florida
SUBJECT:
Bedding Barn Project
RE: Your Memorandum dated April 5, 1989
1. All existing utilities easements are shown as requested.
2. We have noted that the 8" water main is not yet
installed.
3. We are providing access covers for cleanouts in
pavement.
If you have any questions concerning the above subject
project, please do not hesitate to contact this office.
Sincerely,
~~
Bill Free
President
BILL FREE ~ GENERAL CONTRACTOR
4301 OAK CIRCLE DRIVE, #18
BOCA RATON, FLORIDA 33431
(407) 395-4039
May 24, 1989
Kelvin J. Hallahann
Forester/Horticulturist
CITY OF BOYNTON BEACH
200 North Seacrest Boulevard
Boynton Beach, Florida
SUBJECT:
Bedding Barn Project
RE: Your Memorandum dated April 7, 1989
1. Landscape plans for the median is included in the
landscape plans, as submitted with this package.
2. Ficus benjamina hedge has been replaced with another
species as required.
Thank you for your attention to this matter, and if you have
any questions, please feel free to direct them to this
office.
Sincerely,
~~~
Bill Free
President
BILL FREE L GENERAL CONTRACTOR
4301 OAK CIRCLE DRIVE, #18
BOCA RATON, FLORIDA 33431
(407) 395-4039
May 24, 1989
Lt. Dale S. Hammack
CITY OF BOYNTON BEACH
200 North Seacrest Boulevard
Boynton Beach, Florida
SUBJECT:
Bedding Barn Project
RE: Your Memorandum dated April 6, 1989
1. Parking lot lighting plans are herein attached.
2. Exit door near trash pickup has been relocated
as required.
Please feel free to direct any questions you may have to the
undersigned. Thank you.
Sincerely,
~ '-:t-LDQ_
Bill Free
President
BILL FREE ~ GENERAL CONTRACTOR
4301 OAK CIRCLE DRIVE, #18
BOCA RATON, FLORIDA 33431
(407) 395-4039
May 24, 1989
Vincent A. Finizio
Engineering Department
CITY OF BOYNTON BEACH
200 North Seacrest Boulevard
Boynton Beach, Florida
SUBJECT:
Bedding Barn Project
RE: Your Memorandum dated April 4, 1989
1. Handicap parking stall #18 has been revised as
requested.
2. Revised as requested
3.
Provision
included.
for ingress/egress approach is herein
Permit application to the State is in progress.
4. Revised as requested
5. Revised as requested
6. Compliance noted and agreed
7. Details for the catch basis are included in revised
plans. Also drainage calculations and associated
geotechnical test data as required.
8. Parking lot light plans are included.
9. Parking lot section drawings related to Note #5
are herein included.
Sincerely,
~~
l/~!J!SoJ....~ ~~
"'? I h 'H (~A '-H ~""l..E-
:2.CR -::;.Q, f:=-r.-) 'n' . ,.
(:pl. 0"