REVIEW COMMENTS p~r:uG ,s~~ ;:;;> d...tL ,~ L~~~ PLANNING AND ZONING DEFARTNENT MENORANDUM NO. 93-117 TO: FROH: J. Scott Niller, City Manager ~~utro, Planning and Zoning Director DATE: May 13, 1993 SUBJECT: Boynton Beach Promenade Site Plan Review and Landscape Appeal Max Developers has requested a major site plan review for the Boynton Beach Promenade. The reason for the review is the increase of the floor area from 75,130 to 79,318 square feet. This increase is caused by the desire of the owners to keep the second floor portion of the old structure and not remove it as originally planned. Since it was approved in June of 1992, the site plan has been altered under a series of minor plan changes to shift the bulk of the building to the Office Max structure, move that structure to the south because of conflicts with an electrical transformer and the height of the Office Max facade was increased by four feet. The site meets the parking requirements and the design guidelines of the modern district. The applicant has also requested a landscape appeal to allow the use of existing material instead of replacing with native species both on the site and along the right of way. The site plan and the landscape appeal were reviewed by the Planning and Development Board and both were forwarded to the City Commission with a recommendation of approval. A condition was attached to the landscape appeal to plant additional palm trees along the east elevation at the south end of the structure which the applicant has agreed to do. These requests have been scheduled for City Commission review and final determination on May 18, 1993. CC:cp \ \ , \' \ \\ \ \ -- \ \ 8B2 BOYNTON BEACH PROMENADE MAJOR SITE PLAN MODIFICATION SITE PLAN REVIEW STAFF REPORT FOR PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION April 29, 1993 Project Name: Boynton Beach Promenade Applicant: Max Developers, Inc. Agent: Max Developers, Inc. Location: 901 North congress Avenue Land Use Plan Designation: Local Retail zoning Designation: C-3, Community commercial Type of Use: Shopping Center Number of Units: N/A Square Footage: site: 6.52 acres Building: 79,318 square feet DESCRIPTION OF PROJECT: In June of 1992, the City Commission approved a new site plan for the Boynton Beach Promenade. Shortly after that approval, demolition of the old structure began and the construction of the Office Max structure now being built on site commenced. In addition, early this year the owners received approval for a conditional use for the site for a Motorola training facility. This facility occupies the second floor of the old Promenade structure. Finally, during the permitting process some changes were made to the site plan that increased the height of the Office Max structure and rearranged parking and landscaping at the rear of the main building. The original site plan called 75,130 square feet of floor space with 396 parking spaces. However, the parking calculations were computed based on separate uses. The new site plan shows 79,318 square feet of floor area with 397 parking spaces calculated using the shopping center ratio of 1 space for 200 square feet. The increase in square footage is because the second floor has been left on the old structure and at the same the new structure has been reduced in size. As mentioned earlier, the structure has increased in height to 26 feet from 22 feet. This increase is acceptable and gives the building better visibility from Congress Avenue. However, the overall wall surface has been increased by removal of windows along the first floor elevation. Some attempts to soften the surface have been made by the addition of vertical elements around the entrance to Office Max. From a distance the east elevations will be softened by the vegetation at the front of the site as well as the Red Lobster outparcel. REVIEW OF DEPARTMENTAL COMMENTS: Attached are the comments from the reviewing departments. These comments can be addressed at time of building permit. staff Report Boynton Beach Promenade Page Two RECOMMENDATION: staff recommends forwarded to the approval. CC:ald C:PROMENAD.P&D that City Boynton Beach Promenade site plan Commission with a recommendation be for PARKING DETAIL ~ (., ,AJiIH " " I I I r-a.;!~~ ! ,~ '- b~ I I . Z ~~ o SHOWN ON pi.AA. ""Co,,!:. STRIPPING TYP. FA. SPACE 12'-0" NOT TO SCALE tJJ > c:r: o If) (f) W U U -::1.: _J <l 2 PROJECT DATA: SITE AREA "" 284,523 SF / 6.52 ACRES ZONING DISTRICT - C3 MAXIMUM BLOG HEIGHT - 45'-rt BUILDING AREA/PARKING REQ'D BY CODE retail - 51,994 sf . 1/200 = 259.97 SP. restaurant 8,336 sf 0 1/100 - 83.38 SP. J bonk - 5,000 sf 0 1/250 - 20.00 SP. office 9.600 If . 1 /300 - 32.67 SP. total 75.130 SF ~ 396 sp, parking provided = 396 spaces HANDICAP SPACES REQUIRED ... 8 spaces HANDICAP SPACES PROVIDED = 8 spaces PROPOSED BUILDING AREA MODIFICATIONS: , , '. -----J -r 1,- IOTAl EXISTING BUILDING AREA = 76,940 SF. -~/.... TOTAL APPROVED BUILDING AREA "" 71,629 SF. TOTAL PROPOSfD BUILDING AREA = 75,130 SF, REPRESENrs A PROPOSED DECREASE OF 3,501 SF. (4.9~) ABOVE THE APPROVED BUILDING AREA. SURFACE COVER.: AREA (ACRES) % OF TOTAL GROUNO Ft., BLOG 1.45 AC. 22,2 ~ WA rER 0 AC, 0,0 " IMPERVIOUS (WALKS/DRIVES) ._..i,_Q~~_21.9 " _'_ TO r AL IMPERVIOUS 5.49 AC, 84.2 " "- -,--, .~--_._--- AREA (ACRES) % OF TOTAL 0,36 AC, 5.6 ~ 0,67 AC. 10.3 " 1,03 AC. 15.9 lI: LANDSCAPE-INTERIOR LAtmscAPE- OTHER TOl AL PERVIOUS GENERAL NOTES: 1, PROPOSED BUILDINGS SHALL MATCH THE EXISnNG BUILDINGS IN ARCHITECTURAL DESIGN AND COLOR COMBINA nONS 2 ALL SIGN AGE SHALL COMPLY WITH THE BOYNTON BEACH SIGN CODE. 3, THE PARKING LOT AND ACCESS DRIVES SHALL CONTAIN TRAFFIC CONTROL MARKINGS AS REQUIRED TO MEET CITY CODES, ORDINANCES AND S T ANDAROS. THE FIRE LANES SHALL BE MARKED WITH SIGN AGE AS REQUIRED rOMEET CITY CODES, ORDINANCES AND STANDARn~ ~_.SIn.Q.__n..AJ2.~., .-C.LL.A--t...J...___.c...- ~. .. 1iI'..-d! ~ ~ ~ ~ ~'-()" tz-o" PARKING DETAIL W.1J~ Ll: / > L}~ ' ! C) ! Cf) Ul \ \ i \ --./ C) <t PRO.JEC r OAT A: $1 fE AREA = 284,523 SF j 6,52 ACRES ZONING DISTRICT -- C.3 MAXIMUM BLOG HEIGHT = 4S'-Q" BUILDING AREA/PARKING REQ'D BY CODE SHOPPING CENTER 79,318 S.F. PARKING REQUIRED 1/200 = 397 SPACES par-king provided = 397spoces II~Ji[\C/\F' :;PACES r~[QUIRED = 8 spacc~ \ 1ft 1\I\U\f)_';~)!E_~-~__~~~()_~~~!J,)_~~,_,SP~_________ I i..J()f~USE L" HUlL U'i'JG ARf:J\ MODiFICATiONS: ! ~. ,,- o C) i ,,' r AL ~ X '): 'NG Bull_')I~~G Af~EA '" 76.940 SF, ~7 IurA' PROPOSfO 8UILDIl~G AREA 79 318 S F " .. \ \ \ SUR~-ACE COVER.: GflOL'ND Fl Sl DG WA fER ,W-'EfNiOUS (WAL KSjDRIVES) rUI/..1 iMI'ERVIOUS AREA (ACRES) % OF TOTAL 145 AC. 222 % o AC. 0,0 % 4,04 AC. 61.9 % -------_.. ~-- ---.---"-.--- 5.49 AC, 84 2 % I ,t.,~JI)S(.;,~,n: INTFRI'JR I NmSCAI.J[ " 0 fllEf! I01'\L ~'EfNIOUS AREA (ACRES) % or TOTAL o ,~6 AC, 5,6 % 0.67 AC, 10.3 % --~_."---_.._-,.. --~- ---_._------ 103 AC, 15.9 % -1 GH.ER,<\I.. 1)0IF5: \. PRCF'l)SEiJ BL"LD:NGS SHALL MATCH THE ['<I<;TI~JG BUIL(llNGS IN I'-RCHI rEcruRAL DE:S'GN AND COLOR COMBINA liONS :2 t,Ll.. SiGN AGE SHALL COMPLY WITH mE FjU'f'IHON BEACH SIGN COflF ".__.,--~._--_.- . ~ . - - - - - I- \.. File: AMENDMENT TO SITE PLAN Project Title (f.k.a.): ~ e>Ft=/CG )1 A- 'f 0...8~~ l;cll 1ta~;;~) Address: 90/).,). c..oU~.e..ESS A-Ub' Date Received: (,-7-9"3 Date Reviewed:'-"- 9'3 Brief Description: E)/ M, A I A- T I ,t...J G::, s' 1':) E WiAo\ \.( ALcJI.J(D S;Jt~7 S I~e () 1= .' t:;1=FIC-E:- V\. A-')I." R.4M., ,S;:sv7# ~N~ of -rll€ Sri) I!-e: FlC.6 ~ T u.J \ ~ ~ 0 w ~ Fe l- 11ft; E:~ II RE- . J....E., ), T'" c..1.J~ " 1..., U I ~ ~ ~~T"HrAJ A-~b Type of Review :_~eu\~1 o~ ~ :P€f't."""-~' Permit No.: cr2..-1-'571 TRC 1st Review Police Forester Parks Bldg. Members TRC: Eng. Fire Util. Pub.Wks. Planning Variance Required: ~ V Date Received Amended Plans: 2nd Review: Date Reviewed: Date rec.amended plans 2nd review: Date Reviewed: Planning & Zoning Dept. Review Approved Request: Date Administrative approval letter sent: ~ \ A ***************************************************************** BOARD: DATE: Conditions: Date board approval letter sent to applicant: A:AMEND.AP PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 93-122 TO: Don Jaeger, Building Official ~~ FROM: Christopher cutro, planning and Zoning Director DATE: May 20, 1993 RE: TRANSMITTAL OF APPROVED SITE PLAN FROM THE MAY 18, 1993, CITY COMMISSION MEETING Accompanying this memorandum you will find the approved site plan package for the project(s) listed below. The site plan package will include the following items: 1. A copy of the City issued approval letter 2. A copy of the comments made by the Technical Review Committee (TRC) 3. A set of plans reviewed by the TRC Ambulatorv surqical and Endoscopv Center: One story medical office building that includes associated parking and landscaping. The site plan was approved with conditions by the city Commission at their regular meeting held on May 18, 1993. Bovnton Beach Promenade: Increase of previously approved floor area from 75,130 square feet to 79,318 square feet. The Site Plan was approved with conditions by ~he city Commission at their regular meeting held on May 18, 1993. CC:ald Attachments xc: (Memo only) Al Newbold central File Project File A:MAY18.CC --,.,-----..--.----- ,-.-' I ~---- ' - ~i \ \!I~~~~ ~\ i\~ \\l ~ \\t~i ~l \~\ \~ \\ . \ ~ ~ ~\Ul 'it t.\iu ~ \ \\\ \ il i it t~. t ",.,- , "it .1'. \ '.2, , ~;\ in a; ~;\ ~ t Z 4: -------..---- ~----,-,~ / ::::;:::::::::- ... - -~~----- /' i '\. -, ,t \, ~\ '!z .----- . . .-' . ~. ::J ~ -\ , , ~] @ \17' .- \" \" . , ---: I~ ,...'_ ; _~: ~ \ I ~... .\,11 '1~' f\ _V't~ 0 .It~" :i~~ u:. )<. .<. ~~~ ~u. <t - r' r~50~ ~i - - - - - ': .".1 , ' ~ ,. ,r ' \ \ ~ -.. \ \ r"-' ..-.-' ,/ :-- "'0\10 snJO~ ,,'110'1 ...~"\o'" ~'- .~_.. - ----..-..----' .' -----,---,.. " . ... )<.4 o eta: o ..I 2... ltU W~ .J- ;~\W QlU \ \1\ 1-111 t , ~i~~ <u \ ..II <( .. WG 4 OW 1II .- ::~ ~~ 1 N . .. ...... ....... ""lot ... ~ '" Ot t pi ' i~.( 41 ~ i ~ , ~, ~ ~, I ~ SS' a. ~. ~ I , 1 . \ ~ ~';. E'i ~' ~' ~ 5\~ ~ .f" I. ' 'J'\ .$.,' -' r' ~l ,. !: 2 -- ..- ~--,.-' ." ----~--_. ---' .------ . '\ TT · ~ tn~,.,J:UY)~'~ "~NI'~" ~U~~';T;' ,:- CG)} W i' I { ,. '1 " \ ~. r I . I ~, ~ ' l' Jj ,- r:::--' '. ,l"I "\....,', \ _ "\ ," 1U- ~ ...o-itl....O.... tJL~-rrJn. lj.~ \\\3'.' ,-- '.f' .,.-.,.-' '1 \. \. / r--\f ,"'n -,-r 'l".~i~ \.~ OJJ\ 11. "\OJW r-1r-:r ., \ =-\ 1_ \~-l-\ . ~ . . r==='-"\ -' . -, -- ~ Ok \----., ..~C... L-J <0 \fc- )Q?~ ~, \ <>\9r.::: ~\..?~'_ \_.I1~.r -'-. ~ \'\ \ 1-' J. -.\:., \.N....:.1L_ ~ : ~ . I ' " '~\. I~ Jr ~C ~f~' i '\ iifI 'ft S ~ f\ ;, I 1=~.\~ ,.J ~O'_ ' f: · \ . '. -- ",t'" , ~ . C\ ~-( \1 _ .I._ 5 ~'\ P. P4 11)\ \1\\ \l <. \!) "C~ ~ 1 \ ~3 -,Tn I \ 1\ '1l _l~ T1.~' '.......It: l'l'f'" ,1 ~\ 1 I I NO" .\N C,"," I - , -l ....' O:::-u.., _" ,\I \'!c.O ..".. c.."; C"~~EI~ . ~ ~ 00:2 ' '. ;.., .ifJ;r- Ll .... ~ .' \ " ,- I'':: P -' \ \. ~\~E .. .... . \.-." l---' \ ,- , I \ ~ ,:::,.; ,-- ENGINEERING DEPARTMENT MEMORANDUM NO. 93-108 TO: Christopher Cutro Planning & Zoning Director FROM: vincent A. Finizio Deputy City Engineer DATE: April 27, 1993 RE: Technical Review Committee Comments Major Site Plan Modification Office Max/Boynton Beach Promenade Planning Department File No. 739 ~v The Engineering Department has no objection to the above referenced ~ plan moving forward conditioned upon your office performing a _~\.~comprehensive review and analysis of building elevations. Please ~.~incorporate the attached Memo No. 93-099, dated April 19, 1993, into ~~your Planning & Development Board/Community Redevelopment Advisory ~Board and City Commission agenda packages. c~ -R- Jk.L .~ v~ r. Vincent . Finizio/ VAF/ck cc: J. Scott Miller, City Manager w. Richard Staudinger, P.E., City Engineer RECF'\,fED APR 2 7 1993 BUILDING DEPARTMENT MEMORANDUM NO. 93-093 April 27, 1993 THRU: Chris Cutro Planning Director Don Jaeger rlJ.....- Building o~cial TO: FROM: Al Newbold Deputy Building Official RE: TRC COMMENTS - BOYNTON BEACH PROMENADE The Building Department has no comments on the above referenced project. Al~~ / AN: bh ..~' PROMENAD RECEIVED APR 2tj PLANNh'lG DEPT. MEMORANDUM Utilities #93-154 FROM: John A. Guidry, Director of Utilitie TO: Chris Cutro, Planning and DATE: March 7, 1993 SUBJECT: Boynton Beach Promenade Site Plan Modification File #739 First Review AIVO ~,~o ';~eJ~ /11 c/C Utility staff has reviewed the plans submitted and have no objection to this plan proceeding through the review process. The applicant should be aware that additional capital facility charges (Sec. 26-34) may become due prior to the issuance of the building permit due t~ the increase in size or change of use ~f the proposed project compared to the previous site use. 19b Attachment xc: Mike Kazunas Peter Mazzella File Utility Engineer - 1.5 hours Admin. Assistant - .5 hour, RECEIVED APR 29 PLANNING DEPT. - ~ ATTEN: APRILLE DAY MEMORANDUM TO: Chrstopher cutro, Planning and Zoning Director FROM: Kevin Hallahan, ForesterjEnvironmentalist ~~~ DATE: 4-27-93 RE: Site Plan Review - Major Site Plan Modification - 2ND 1/fiti Review Project: BOYNTON BEACH PROMENADE I have no objections concerning the plans submitted for the above referenced project. Original comments pendlng completion by applicant. C:FORSTER.MSP RECF1\fF:D APR '2 8 1993 RECREATION & PARK MEMORANDUM #93-169 FROM: Chris Cutro, Planning & Zoning Director Kevin J. Hallahan, Forester/Environmentalist ~~ TO: RE: Boynton Beach Promenade Major Site PIan Modification DATE: April 14, 1993 The applicant has not yet submitted a landscape pIan for the Congress Avenue median abutting the site. There is a comment on the landscape plan and I will coordinate completion of this comment with the applicant. We will attempt to use the seven principles of xeriscape design as a demonstration for commercial/ industrial application of this water saving landscape plan. KH:ad R RCEI\,TED W .1,1 ...... PLANNif'~G DEPT~ - - v MEMORANDUM TO: Chrstopher Cutro, Planning and Zoning Director FROM: Fire Department , ~- 3o~ 93 DATE: RE: Site Plan Review - Major site Plan Modification - ~~;j:~~~ew bO'//VioAJ 8~{y ?!2tJ/l1tfi}/J!JC;- The Fire Department has no obj ections concerning the plans submitted for the above referenced project. r- ~4Ck- ' ~~( William D. C vanaugh, FPO I Fire Department Representative C:FIRE.MSP f\€.CEJ\J€'O ~~\l. ~ \) \~~~ TO: FROM: RE: PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 93-081 April 23, 1993 Robert Eichorst, Public Works Director Vince Finizio, Engineering Department Richard Staudinger, Gee & Jenson Al Newbold, Deputy Building Official Bill Cavanaugh, Fire Prevention Officer Mike Kazunas, Utility Engnieer sgt. Mike Kirrman, Police Department John Wildner, Parks Superintendent Kevin ~lahan, Forester/Environmentalist - -h ~f ~ hPo(2. . t I . 'Z . D . t C ri~p er cu ro, P annlng & onlng lrec or second Review - Major Site Plan Modification Project - Boynton Beach Promenade Location - 901 - 1101 N. Congress Avenue Applicant - Max Developers, Inc. File No. - 739 Attached is the amended site plan for the above referenced development for your final review and recommendation. We would ask that you review this amended site plan to determine if the plans have been adjusted to satisfy comments made previously by your department. If the comments have been satisfied or if your comments can be met at time of building permit, please advise the Planning and Zoning Department in writing. If your comments have not been met or must be met by correcting the site plan again, please advise the Planning and Zoning Department in writing. Finally we would ask that you recommend to us if the plan should be forwarded to the Planning and Development Board/community Redevelopment Advisory Board for review or held for further revisions by the applicant. All correspondence shall be received by the Planning and Zoning Department per the following: Please return your memo and the amended plans to the Planning and Zoning Department by 12:00 P.M. on April 29, 1993. If you should have any questions regarding this plan, please feel free to call Dotty Moore at 260 who is coordinating the review of this development. XC: (Memo Only) Don Jaeger Ed Allen Charlie Frederick Tom Dettman John Guidry Project File Chronological File C:PROMENAD.2RV TECHNICAL REVIEW COMMITTEE MEMORANDUM TO: Robert Eichorst, Public Works Director Al Newbold, Deputy Building Official William Cavanaugh, Fire Prevention Officer Sgt. Mike Kirrman, Police Department John Wildner, Parks Superintendent Kevin Hallahan, Forester/Environmentalist Mike Kazunas, utilities Engineer Vincent Finizio, Engineering Department Richard staudinger, Gee & Jenson Consulting Engineers FROM: Dorothy Moore, Zoning & Site Plan Reviewer DATE: April 20, 1993 RE: Technical Review Committee Meeting Tuesday, April 27, 1993 Please be advised that the Technical Review Committee will meet on Tuesday, April 27, 1993, at 9:00 A.M. in Conference Room "e" (West Wing) to discuss the following: NOTE: Written comments are to be directed to the Planning and Zoning Director. DISCUSSION 1. Review of the following site plans for inter-departmental conflicts: a. Boynton Beach Promenade OTHER 1. Time extension for conditional use, Exxon, convenience store with gasoline sales. S.E. corner of Congress Avenue and S.E. corner of Woolbright Road. 2. Names for new developments. 3. Submi ttal of amended plans, department comments, and returning plans to the Planning and Zoning Department. 4. Review of comments at BUilding permit time. ~af/~ ) Dorothy Moore DM/jm Att. MEMORANDUM TO: Christopher cutro, planning and Zoning Director FROM: Dorothy Moore, zoning and site Plan Reviewer DATE: April 16, 1993 RE: site Plan Project: Location: Applicant: File No.: Review - New site plan Boynton Beach Promenade 1101 N. Congress Avenue Max Developers, Inc. 722 The following comments are in response to the submittal of the site plan for the above referenced project. The comments for the project will be discussed at the April 27, 1993, Technical Review Committee meeting. The site plan was reviewed for consistency with the review standards specified in Section 8 of Chapter 4, site plan Review, Part III, Land Development Regulations of the code of ordinances. The applicant shall amend the drawings and documents to show compliance with the following comments: 1. There are inconsistencies between the total gross square footage as shown for the shopping center on the site plan drawings, Sheet #1, and the project data table as shown on the site plan. Summation of the total square footage of all buildings shown on the site drawings equals 79,381 square feet. summation on the total square footage for the shopping center as shown on the project data equals 79,318 square feet. please correct the inconsistencies. Re-submit and show on the project data on the amended site plans the new gross square footage including first floor and, where applicable, the second floors of all buildings located on the shopping center site. 2 . Please show on the amended site plan the gross square footage for the applicable, show the gross square floor. Identify floors as such. at each building location first floor and, where footage for the second 3. The information as shown on the site plan, Sheet #1, project data sheet for the total existing building area (before the proposed building area modifications) is given as 76,940 square feet. This information is incorrect. The most recent minor site plan modification, approved october 29, 1992, allowed an increase from 71,629 square feet to 75,130 square feet. The 75,130 square feet figure should still be the total existing building area. Please confirm and correct the information shown on the project data sheet on the amended plans. 4. There are inconsistencies between the site plan, sheet #1, site layout plan, sheet #2A of 6, paving and drainage plan, sheet #2 of 6 and the landscape plan, sheet #5. The parking spaces and space count varies from sheet to sheet and do not match. please provide on the amended plan information that matches and is consistent throughout the plans. 5. The note on the landscape plan, sheet #5, "specific site code requirements 11 indicates 205 interior parking spaces. upon reviewing the plan the count shows 214 interior parking spaces. Please correct any inconsistencies and provide the correct number on the amended site plans. 04. 1 9. 93 02:46 PM *GEE &. .,JENSON 1"'01 n / aEe & JENSON ~I\gi r1$(l,s-.!>,rchiteCls.l:laI1n0rs I nL: MEMORANDUM 0.111 Harva'd CI'C'~ West Palm el:l3Ch, 'L J3<lOIl Te1epl10ne (.je71 683-3301 ~e~ (4071666-7446 TO: Mr. Chris Cutrot Planning & Zoning Director FROM: DATE: W. Richard Staudinger, PE, City Engineer April 16. 1993 RE: Boynton Beach Promenade - 1 st Review We have reviewed the referenced project plans (Malar Site Plan Modification) and have the following comments: 1. The parking lot striping doe~ not conform to the standard deta,lI tor striping (6- 90012) with regard to striping. 2. Parking lot landscape islands are not in accordance with City Standard Detail (891003). :;, All draInage structures require sumps and weepholes. Gate elevations in Ia.ndscape islands should be raised to provide innitlal detention and water quality treatment. 4. Frenoh drain detail does not conform to standard drawing 8..91007. 5. Caulfield and Wheeler plans still show the dumpster pad by the bank. This does not agree with the site plan. 6. Parking lot typioal section does not reflect pavement CrO$5 slopes as noted on paving plan. 7. No drainage calculations submitted. e. Change 50 ft. minimum designation between fire I,ane signs to a 50 ft. maximum deSIQ;/ .. fv~:-s/L · W. Richard StaudingGr, pe City EngIneer 93-049 lU1CEIVEP p\f\\ "~I p\,J\NN\N~ ot.?l~,~, ., .,,", ,- -,.,,~ ..........- ~ ENGINEERING DEPARTMENT MEMORANDUM NO. 93-099 TO: Christopher Cutro Planning Director April 19, 1993 FROM: Vincent A. Finizio Deputy City Engineer Re: Technical Review Committee Comments Office-Max I do not have any objections relative to this project moving forward, but do offer the following recommendation to the reviewing City Boards via this memorandum: 1. Staff be directed to re-evaluate the architectural characteristics of the structure now under construction in order to determine if anything can be done to enhance the structures appearance as a condition of approval. Should you require any additional information, please contact me at extension 488. Thank you. l '1":' ~ __-::r t::. :i- ':":0 cc: J. Scott Miller, City Manager w. Richard Staudinger, P.E., City Engineer Engfile r~"'~ ..~,,,~ :~JED A?~ 1 9 1993 BUILDING DEPARTMENT MEMORANDUM NO. 93-085 April 13, 1993 TO: Chris Cutro Planning Director Don Jaeger t Building Of . ial Al Newbold Deputy Building Official THRU: FROM: RE: MAJOR SITE PLAN MODIFICATION - BOYNTON BEACH PROMENADE The Building Department has reviewed the submitted plans for the above described project and has no comments at this time. AN: bh PROMENAD RECEIVED APR 1 3 1993 TO: FROM: DATE: RE: pg FIRE DEPARTMENT MEMORANDUM NO. 93-231 WDC PLANNING DEPARTMENT FIRE DEPARTMENT APRIL 7/ 1993 SITE PLAN REVIEW BOYNTON BEACH PROMENADE 901 N CONGRESS AVENUE FILE #739 WE HAVE NO OBJECTIONS TO THE CHANGES SHOWN. - ~ ~U%~. , WILLIAM D CA~~UGH' FPQ BOYNTON BEACH FIRE DEPARTMENT REceIVED APR U 7 1993 .. MEMORANDUM Utilities #93-154 DATE: March 7, 1993 TO: Chris Cutro, Planning and FROM: John A. Guidry, Director of Utili tie SUBJECT: Boynton Beach Promenade Site Plan Modification File #739 First Review Ut'lity staff has reviewed the plans submitted and have no objection to this plan proceeding through the review process. The applicant should be aware that additional capital facility charges (Sec. 26-34) may become due prior to the issuance of the building permit due to the increase in size or change of use of the proposed project compared to the previous site use. 19b Attachment xc: Mike Kazunas Peter Mazzella File Utility Engineer - 1.~ hours Admin. Assistant .5 hour RECEIVED APR 9 1993 MEMORANDUM TO Christopher Cutro Planning & Zoning Director DATI! April 14, 1993 ,.IL. ~.O" Sergeant Michael Kirrman SUejlfCT Site Plan Review Re: Project - Boynton Beach Promenade File: , 739 Sir: I have reviewed the site plans and make the following recommendations: 1. Furthest west exit/entrance drive onto south mall access drive, right turn arrow and appropriate signage for exit. 2. Farthest east exit/entrance drive onto north mall access drive, right turn arrow and appropriate signage for exit. Sincerely, ,?/, ,A.-..-- MK:m RECEIVED APR 1 9 1993 RECREATION & PARK MEMORANDUM #93-169 TO: FROM: Chris Cutro, Planning & Zoning Director Kevin J. Hallahan, Forester/Environmentalist ~~ RE: Boynton Beach Promenade Major Site Plan Modification DATE: April 14, 1993 The applicant has not yet submitted a landscape plan for the Congress Avenue median abutting the site. There is a comment on the landscape plan and I will coordinate completion of this comment with the applicant. We will attempt to use the seven principles of xeriscape design as a demonstration for commercial/industrial application of this water saving landscape plan. KH:ad RECEIVED Wj4 "'... PLANNING DEPT! - - ATTEN: APRILLE DAY MEMORANDUM TO: Chrstopher cutro, Planning and Zoning Director John Wildner, Parks Superintendent A)l '/- 5- q 3 I FROM: DATE: RE: Site Plan Review - Major Site Plan Modification - 1st Review Project: 15()'ji1lfoY\J I3r:Ac,)-1 PIP~i'11e/ll4-hf The Recreation and Parks Department has reviewed the above referenced project. There are no outstanding recreation related issues on this project. C:PARKS.MSP RECEIVED APR 7 1993 PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 93-061 TO: Robert Eichorst, Public Works Director Vince Finizio, Admin. Coordinator of Engineering Richard Staudinger, Gee & Jenson Al Newbold, Deputy Building Official Bill Cavanaugh, Fire Prevention Officer Michael Kazunas, Utilities Engineer Lt. Don Thrasher, Police Department John Wildner, Parks Superintendent Kevin Hallahan, Forester/Environmentalist ~~.:)~ FROM: Christopher Cutro, Planning & Zoning Director DATE: April 2, 1993 RE: SITE PLAN REVIEW PROCEDURES Major Site Plan Modification Project Boynton Beach Promenade Location 901-1101 N. Congress Avenue Applicant - Max Developers, Inc. File No. 739 Find attached for your review the plans and exhibits for the above referenced project. Site Plan Review approval for this project will be granted by the City Commission/Community Redevelopment Agency. To ensure that the project stays on line with the review time frame, I request that the plans and exhibits be reviewed and formal written comments transmitted to the Director of the Planning and Zoning Department no later than 5:00 P.M. on April 16. 1993. Do not return plans and exhibits. Retain same for the review of the amended plans (2nd review). Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part III, Land Development Regulations, Chapter 4, Site Plan Review, Section 8 to review and formulate comments. (See Planning & Zoning Department memo #92-020) 2. The documents submitted for the project were determined to be substantially complete based on the submittal requirements identified in Section 7 of the Site Plan Review Ordinance. However, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards, additional data should be requested by the reviewer through the Planning and Zoning Department. To: TRC Members Re: Planning & Zoning Memo, #93-061 Page Two of Two 3. Each comment shall reference the code section and include the language of the submittal requirements and review standards that require the data to be submitted for review. 4. Technical Review Committee member (s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. 5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 6. If a TRC member finds the plans acceptable, he/she shall forward a memo, within the time frame stated above, to the Planning and Zoning Director stating that the plans are approved and they do not have any comments on the plans submitted for review. All comments shall be typed, addressed and transmitted to the Director of the Planning and Zoning Department for distribution to the applicant. Please include the name and phone number of the reviewer on this memo. Dotty Moore will be the Planning and Zoning Department staff member coordinating the review of the project. The Planning and Zoning Department will send to the applicant a cover letter which includes the comment(s) and directions to amend the plans to comply with the comments and the procedures for resubmission. When the Planning and Zoning Department receives the amended plans, they will distribute the plans with a cover memo to all TRC Members for review and approval. Attachment xc: (Memo only) Don Jaeger, Building Official Ed Allen, Fire Chief Charlie Frederick, Parks & Recreation Director Thomas Dettman, Acting Police Chief John GUidry, utilities Director Project File Chronological File A:1REVIEW.WP5 M ~t-r~ PUBLIC WORKS DEPARTMENT MEMORANDUM #93-106 TO: Christopher Cutro, Planning & Zoning Director FROM: Robert Eichorst, Public Works Director SUBJ: Boynton Beach Promenade - Final Review DATE: April 27, 1993 All dumpster locations are acceptable. However, the plans for the dumpster enclosure must be shown. If you have any questions please give me a call. Eichorst Works Director REier RECEIVED AP2 i 7 1993 MEMORANDUM TO: Christopher cutro, Planning and Zoning Director FROM: Dorothy Moore, Zoning and Site Plan Reviewer DATE: April 28, 1993 RE: Site plan Review - Major Site Plan Modification Second Review Project: Boynton Beach Promenade Location: 1101 N. Congress Avenue Applicant: Max Developers, Inc. File No.: 722 The amended plans for the above referenced project have been submitted and reviewed. The following comments are either comments from the original set of comments that were not satisfactorily corrected on the amended plans or were generated as a result of the review of amended plans. All comments shall be corrected. However, it is acceptable to show compliance with the outstanding comments on the plans that are required to be submitted to the BUilding Department for permit review. The applicant must understand that the following comments are comments generated for Site Plan Review and that additional comments may be forth coming as a result of the review of the working drawings and documents submitted to the BUilding Department for permits. All permit documents are reviewed for compliance with the requirements specified in the Boynton Beach Code of Ordinances. 1. The note on the landscape plan, sheet #5, "specific site code requirements" indicates 205 interior parking spaces. Upon reviewing the plan the count shows 213 interior parking spaces. Please correct any inconsistencies and provide the correct number on the amended site plans. 2. The "Note" on the landscape plans, sheet #5, states "all existing landscape planting and irrigation within this designated area is to remain. Any code violation will be brought into compliance. All new planting shall be irrigated us ing current water supply wi th underground automatic system." Further review revealed the "designated areaH as the full perimeter of the property where the required landscaping shall be provided for the on-site parking area. The landscaping that presently exists there, as shown on the plans compiles of: black olive trees and surinam cherry - four foot continuous hedge. These are not native species. The code requires that a minimum of 50% of all plant material shall be of a variety that is native to Florida. Submit amended plan showing compliance with this requirement and the requirements specified within Appendix III of the Community Design Plan for design district III or a landscape appeal may be applied for requesting relief from this landscape code requirement. 3. Since there is not an active permit for the proposed restaurant outparcel site, it is recommended that the site be graded and covered with lawn grass that is irrigated with an automatic water supply system if no permit is pUlled within 120 days of the approval of the site plan. ~~~ ...J Dorothy Moore.. C:PROMENAD.ALD ENGINEERING DEPARTMENT MEMORANDUM NO. 93-099 TO: Christopher Cutro Planning Director April 19, 1993 FROM: Vincent A. Finizio Deputy City Engineer Re: Technical Review Committee Comments Office-Max I do not have any objections relative to this project moving forward, but do offer the following recommendation to the reviewing City Boards via this memorandum: 1. Staff be directed to re-evaluate the architectural characteristics of ~~. the structure now under construction in order to determine if anything -\~.~~an be done to enhance the structures appearance as a condition of ~ approval. ~:\J' Should you require any additional information, please contact me at ~xtension 488. Thank you. l \. ~".~~~ ~O cc: J. Scott Miller, City Manager w. Richard Staudinger, P.E., City Engineer Engfile M E M 0 RAN DUM Police Department #93-077 TO: Christopher cutro Planning and Zoning FROM: Lt. Chris Yann Police Departmen DATE: April 30, 1993 SUBJECT: Boynton Beach Promenade File No. 739 Upon my review of both the resubmitted plans and the comments made on the original ones, I have discovered that the issues raised in that memo were not addressed. Addi tionally, I discovered that the memo itself contains a comment, #2, that has the wrong compass direction. Therefore, please find below the issues still in dispute. ~~ t\'~ ~~ ,,. \> 1. The western-most driveway exit onto South Mall Access Drive needs a right-turn only sign and an arrow painted on the pavement. 2. The western-most driveway exit onto North Mall Access Drive needs a right-turn only sign and an arrow painted on the pavement. (The original memo indicated this was the eastern- most driveway. That was in error.) I recommend that these plans move ahead and that the above issues be addressed at the permit stage. The Planning Department has my authorization to review the plans to confirm that my comments have been addressed and then to sign-off for me. f3;.cf:- \'\Jf:-O ~ 'e\~ ~~~ ~.,. i _~_,--.l_ _ __,_,~ _~ PUBLIC WORKS DEPARTMENT MEMORANDUM #93-089 TO: Christopher Cutro, Planning & Zoning Director FROM: Robert Eichorst, Public Works Director SUBJ: Site Plan Review - Boynton Beach Promenade DATE: April 6, 1993 The Public Works Department has no problems with the above referenced project. ~~ Public Works Director REier RECEIVE1) -, PLANNING DEPT. /- TECHNICAL REVIEW COMMITTEE April 27, 1993 PAGE 2 cc: J. Scott Miller, City Manager city Commission (5) Don Jaeger, Building Official Ed Allen, Fire Chief Charles Frederick, Recreation & Parks Director Thomas Dettman, Police Chief John GUidry, utilities Director Steve Campbell, Fire Department Bob Gibson, Public Works Central File Christopher Cutro, Planning & Zoning Director Tambri Heyden, Senior Planner Mike Haag, Zoning and Site Development Administrator Project File Chronological File A:TRCTUES2.JM