CORRESPONDENCE
.--.~.
~
..\1
i
,
. "'~---~-:----"---:'-:--.':----- ".!fl."
. . l. : '. __ ,~.."l .
C. MICHAEL OLlVER,...A.s.LA., P.A;' LANDSCAPE ARCHITECTS
September 16, 1995
Mr. Kevin Hallahan, Urban Forester
City of Boynton Beach
P.O. Box 310
Boynton Beach, Florida 33435-0310
Phase I as installed:
Total native trees w/ Tamarind as native
Total native trees w/ Tamarind as non-native
Total trees installed
Phase II as submitted for Permit:
Total native trees w/ Tamarind as native
Total native trees w/ Tamarind as non-native
Total trees shown on plan ~
HODS Restaurant as submitted for Permit:
Total native trees
Total trees
Total Pro;ect:
Total native trees w/ Tamarind as native
Total native trees w/ Tamarind as non-native
Total trees
<~t.~ ''i,,~fJ '
Otv.
74
66
94
Oty.
136
108
234
otv.
7
15
Otv.
217
181
343
% Native
78%
70%
% Native
58%
46%
% Native
47%
% Native
63%
53%
~
1210 N. UNIVERSITY DR.. PLANTATION, FLORIDA 33322' (305) 472-6750 / FLA. REG. #354
..J
~
~l~
).ii'"
~ ~ ~
~ ~,~
'<.I 'l' ~'
'-J ~ ~
<."l 0..) c.~ 1
'.0 ...., ~ '.,
~ ~ ~ Re: Tamarind trees Phase I & II, Boynton Festive Center, 'Boynton
'." ~ ~ ~ Beach, Florida
~~~~
\...: ~ \l;t' ~
" ':g ~ "Dear Kevin:
~ ~ ~ ~ursuant to our phone conversation of yesterday on the above re-
, ~ ~ "ferenced this letter is to confirm the following native tree
~ ~~ ~ percentages under the various options. Please note that the
~ ~ ) rqandscape plan for Hops Restaurant was prepared by my of f ice and
~ k ~ has been filled with Boynton Beach, therefore I can confirm the
~ ~ figures as presented below.
'~ ~
d ~t (~
~ t'-~ ~
~ ~ ~ ~
~ ~ ~ ~
~ ,,'S S
~ ~~
'- \..: '-- '\J
~ ~ ~ ~
~ ~ :j ~
\j J'~ ~
,) \ij
{.~ ~ ~ .t.
R ~ ft <:\$
X ~ l' As you can see from the above comparisons e~len if all Tamarinds
~ were counted as non-native, the overall project holds to the min-
~ imum 50% native requirement. Phase II or Hops may not reach the
t -, 50% minimum but because this project was approved as an ov'erall
~ ~ite the totals are what should be the governing statistics.
~ ~~ ~ Additionally I woa1d like to point out that the Hops Restaurant
~ '" is a pad only. If the parking areas were added to it, the per-
.~ .....~ ~ ~ centage would be .et. Secondly you should note that the City of
~ 1 Boynton Beach required 19 trees along Old Boynton Road to be
~J l~hanged from a native tree (Silver ButtonwOOd),. which were ac-
, cepted on Phase I, to a non-native tree (Chinese Fan). Without
\ ithis change, Phase II native percentage would be 54%. Since
~ l this change was not a code requirement, the project's total
~ .
-
~~
~
,
~
-
F, MARTIN PERRY
ROBERT LEE SHAPIRO'
JORDAN R. MILLER"
JILL A. JARKESY
SANDRA DURLOO ADAMS
n..~
~i--d~-
~~
9~, J~, ~ &~, 9S1f
/6'.l/5.%k .9IJeed ~ !J81vo(
./ ude O(J(J
-'Ye.tt.9ak ::;geed. ST~ SS.I/(J/
k~
June 6, 1995
TELEPHONE (407) 684-4500
FAX (407) 684-1008
.BOARD CERTIFIED IN REAL PROPERTY LAW
.. ADMITTED IN FLORIDA AND DISTRICT OF COLUMBIA
Ms. Tambri Heyden
Planning and Zoning Director
City of Boynton Beach
100 E. Boynton Beach Blvd.
P.O. Box 310
Boynton Beach, Florida 33425-0310
Re: McMillen Development company/Borders Book store Elevations
Our File No.: 3246.01
Dear Ms. Hayden:
On May 19, 1995, Jeffrey Roncone, the architect for Borders Books
and Music, delivered to your office elevations for the proposed
Borders Book store revised pursuant to your comments made at our
meeting held in your offices on May 1, 1995. I spoke to Michael
Haag nearly two weeks ago. At that time, he indicated that he had
reviewed the elevations and had submitted them for your review.
For the last two weeks I have been attempting to contact you to
discuss the status of the approval of these elevations.
As you know, Borders Book store has already submitted construction
plans to the Building Department and is ready for permits to be
issued. They are only being held up on the approval of the
elevations by your Department.
I feel that Borders has compromised significantly and has made
every attempt to coordinate their elevation with that of circuit
city's. I hope that in light of this, you will be able to
administratively approve these elevations at your earliest
convenience. It is imperative that I hear from you as ~oon as
possible.
JUN-06-1995 16:34 FROM PSMJ
TO 1055514073756090600 P,02
,/,;,,, ~~",.
r- MA.~TlN ?ERRY
R~"'IlERT l.H ~KArJRO'
j()RDM: R, ~ULl.E..~"
flU, A lARKES"I:
,A".JDK.. PCRLrJ(' ADAMS
~- .;J .// ac / CAn ,-,. d
/j47<~~. ._A.a~e-*. e,4re/&"., &, (/a'7f.;t..c~?'. ..'7.~'xftf.
/6:QS..:J1./_ ..:lt~r"hLJ ..'j9/t../
, /';,0#- if;.'t"
;y..;,....'~/... ::11..",,(, jJ,,,,;,'# IJ'.J?Y TELEJ:'~fONf (407) €.114-4511J
FAX (407) !lK4-Hl\1il
.....,...a.~ ~~nS\m N 1U.Al,. 'P1h."'\l'DT\' L.A.W
-Ac.m"n!O IN t't('llllID.~ ANOOlS1lllCTCfCOlUMllltl
June 6, 1995
Ms. T~ri Heyden
Planning and Zoning Director
city of Boynton Beach
100 E. Boynton Beach Blvd.
P.O. Box 310
Boynton Beach, Florida 33425-0310
Re: McMillen Development Company/Borders Book Store Elevations
Our File No.: 3246.01
Dear ~o. H>:\yden:
On May 19, 1995, Jeffrey Roncone, the architect for Borders Books
and Music, delivered to your office elevations for the proposed
Borders Book store revised pursuant .~o your comments made at our
meeting held in your offices on May 1~~995' I spoke to Michael
Haag nearly two weeks ago. At that tim p he indicated that he had
reviewed the elevations and had submi ted them for your review.
For the last t~o weeks I have been at emptinq to contac~ you to
discuss the status of the approval of t~~s~ eleva~ions.
As you know, Borders Book Store has alri'adY submitted construction
plans to the Building Department and .~ ready for permits to be
issued. They are only being held ~p on thQ approval of the
elevations by your Depart~ent. ~'
I feel that Borders has compromis/d ~ignificantly and has l'I'll1d.e
every attempt to coordinate thgir/elQvation with that of Circuit
C.ity~s. I hope that in liqht/of this, you 'Will be able to
administratively approve thgS~ elevations at your earliest
convenience. It i~ imperativ~ ~hat r hear from you n~ ~oon as
possible. /
/
.II
/
j,
\
~~
&t; stz Lj C?S,
'W!2df~~
i l6V cnrt ( if'df
'0
\.
JUN-06-1995 16:35 FROM PSMJ
TO 1055514073756090600 P,03
Hs. Tambri Heyden
.:Tune 6, 1995
P.age 2
Th~nk you very ~uch for your consideration or this matter. I look
forw~rd ~o hearing from you.
5incere~y yours,
.-1' .a..-/ j
7!>>- U(j__tK.u.J--
Jill A. Jarkesy
JAJ:psp
CC: Doug MdIll Hen
JoHrtrf II_one
. /J'..~ - /L",/." iX//'..{. l%"[ff/' .'::r-',('v'
TOTAL p.03
rz1ie City of
'Boynton 'Beacli
100 'E. 'Boynton 'Beadi 'Boulevard
P.O. 'Bo'{310
'Boynton 'Bead;', ~loritfa 33425-0310
City:Jfa[[: (407) 375-6000
~JitX: (407) 375-6090
September 26, 1994
Mr. Douglas McMillen
P.o. Box 772530
Coral springs, FL 33077-2530
RE: Boynton Festive Center
File No. 792/MSPM 94-005
Dear Mr. McMillen:
Attached is the cost breakdown by department for the two reviews of
the Boynton Festive Center, as you requested.
APRIL REVIEW: 3rd Submittal Review - Initial Site Plan
Department Cost
Public Works
Parks & Recreation
Forester
Fire
Utility
Engineering
Police
Building
Planning & Zoning
$ 10.98
.00
26.10
57.57
43.70
85.00
67.59
32.21
445.62
Total for April Review: $768.77
$ 768.77
5lmerica's ljateway to tfie ljulfstream
Engineering
Police
Building
Planning & ZoniQg
85 .' 00
67.59
32.21
445.62
'"
m_....A" $__ .,J__.:, I"'\___..s ~.77
.....,,.'" ....
: +,~~,_,~ :0:''7>':''
... _..,."
I~
63-243/670
FLORIDA RETAIL PROPERTIES. INC.
P,O, BOX 772530
CORAL SPRINGS. FLORIDA 33077-2530
[
563
DOLLAR:
PAY
CHECK NO.
CHECK AMOUt
fJ1ie City of
'Boynton 'Beacft
100 iE. 'Boynton 'Beadi. 'Bou1evartf
P.O. ~310
'Boynton 'Beadi., %nitfa. 33425-0310
City 9laf[: (407) 375-6000
~jU: (407) 375-6090
September 16, 1994
Mr. Douglas McMillen
P.O. Box 772530
Coral Springs, FL 33077-2530
RE: Boynton Festive Center
File No. 792/MSPM 94-005
Dear Mr. McMillen:
This letter is an invoice for payment for review ,of development
plans for the Boynton Festive Center project. Consistent with
resolution R92-211, fees are based on actual time expended by
city employees.
Time Period
Total
April
June
$ 768.77
1065.24
Total for these reviews
$1834.01
~Si:7p4-
ike Haag
ng & Site Development Administrator
MH/jj
XC: C::~:"~JTR..1l C,{6
~:revt....me.fe5
jfmero.:a's (jateway to tlie (juifstream
p~ fI
~r
'h'2. V;2.. I' , ~~
FIb
J.
....(")
J\-R c '-
..>
h,.. s
, ~~ 2q/~O
BVI1)
hR II ~~
3 CfD. 6D 1~C'l
?ad~
~ 7, Ii
1. ?>. ~C\
f?or 1-(15+' ""
hr f 711i
%. 11/'15
iZl r-e.~
nr- Ii -71;." (
4 10 ~q4-
41. 25 h-r.s
f(}J
h,--..- ~1
- 10 /;:J~ '8
,2.:>
1$04./9 35t c~~~;J J 0 <is 0.
~-t --:? to 4. 5'1~
-
~d Fe f'V',~t'e ..- FtR.lZ' ~
"'CI'"" II ~V" /1 h
~,... fI ,
I 32.1{ 1~ j.{P.tO .l~ 67.S '7 2
2 ~ . 1.5
@1"11.7. 6'3
~L714~
~ ~ s tJ INV'{ 35'1
A}.gi pV ~l~J-t. ~
IV h....e,,^-e ^ t9'T
fcA~^Tlfl-ev{
b5"3. '2.~ -t- 35',%- C.2'2"6.1."~) -=
cr
t) R ~&t 1t/4rL-
~('('"'1:
I l6 b 4 010 {
a. 55vV"\- e- ~I ~ ~ , 7 2-
36& (lU'elvJotvt f f '" r,.4 "2-
~.A'e ^&i'r t-cl e-'VT\ ~t,,:1
-
-
---------
~
""""
ro\,ee ~ ~;z-
G: (IY& ~." ...It'!> he \$"'10 .
hr ti "Vt 'b 'J , aDZ. "'I i:lS''f A
~ \ . 10 0 ' ,'.). · ;,l
I 4 A /l5tS&..'l \
~ '1.. hI. ..../~.b ~~!> \
t ·
I \
~
~:).10
~,v tb
~r ff
1 ca5
pJ \e.c
\0'1"" II
J.. 1;2. (p1 i1l
p~"2-
~... $
l~ ~~.oG\
-t'3.f Jl f ,S' ~
~<"6\.4 I
2-
~/<. SIll%' x>t.kAJ
op~15(Jo
~'j..~
~~oD
r{)
I~.{ r Aub}~!) l~ 1'1+G C'tJ51 BREiA-kDbU/AJ
Ib l [J C? P/.}A.T J.Av~( r-~ ~ rH-~ TW ()
'~ G:-v J ii'V S 0 F= T K~ 13 e YAJreAJ"F-{;ro r ( v i7 C-C;-.(/'r;
A-S 'd otJ R.i? QUl?S-reD.
APRiL R.~V,G:~
D~f>k~1 f'Vl,CLliI C~-:,(
P l) i> Ll ~ LA.) 0 ~ l< S
PA-R~~ ~ Rl:'CR~kT/f) /lJ
F()R~S7~~
FtC? tE'
U-rJL-II{'
IE' tV GIN ~ G:'R I 1J -c;...
PDL-f c.~
/3uat..bJI\)~
p t.....A-";N . rU 6- tl Zo N' N '--
ID.q~
o
ZG, , /0
-57 -7
,.j
43. 70
<is. DC)
b 7. s-q
"'3 ::2 . '2. I
44 -5', ~ 2.
7 6<J. 7 7
JUIlJe- R G U I~..u
o a: P A- R:r M.. e:?'.u T
p () ~ hIe tI\.J t> A::.. \::. ~
f AR.l<'S ~ ~~~L?'A--rl e>
Fe~ ~.sIC:-R
FIRC2
VTll....IT (
~N t,./N.-i3R. (,0 (,.
-
f D '- { G- t,:::'
BVl L " I ^-l (y
"p "-.4- /AJ N 'V G..
CoSt-'
22."'<=f
40 , 0 (
/1. Cf 0
loq.1.7
3Cf I~ 7
-5 7 . 5-~
40. -00
-
l' L e ~ a '" 0 '( r;; ,. c+- kl II c. {t\' /} <::: <:" e 0 I\J 6' ;.U&- S -t s T t.:: "'Vl
~ b~~~ 11.>0'1"" ,4-L-.L-oLtl F-~ A-uro,...."../~y' ~ R &TRlJ;;'V ~ ~ ,-z:.
,l""",,-e ;:'-01"- I Nbc,v.i)IJA---\..... PRD:r~cr6 A-~b T~~6t?'"'
y\vv\'e YDI"- 1I'JlhV.bvA--'t- PRD::r~CI~ A-A.JO TU-~6t?'"""
,
N v ~ B J::f" ~ ~ R (?' Pt....!? c.T ~ rH-t?' t.::i;....,., f LtJ '( ~s;s- ~
~l?'C-D Lt;pr~Ttl9 AJ e F- r'~",;r 5 PE'i\..iT
f' v 10 \ \ e.- \..V 0 r \<.. =>
(j U \ l J vv' ~
(()-/,r.a-t::Jf"..t-
p <fr \L- '?
r ( r ..e.--
v-r\\\"t~
t:=- tV' ~
P o\\c-~
, \ 0 vv '^' ' /\.- .-1
Job~
I )(,
- ---
~,,?"?J ~ 0':::>
A5Av 0""2-
~
k(~5'%>
"].. '7 f.,. II
10 105 .0..A
~J517-4.
TO:
FPOH:
I:P.TE :
RE:
PLANNING AND ZONING DEPARTMENT MEMORANDUM #94-201
Robert Eichorst, Public Works Director
Al NE'wb8ld, deputy Building Official
William Cavanaugh, Fire Prevention Officer
Sgt. Jim Cummings, Police Department
John Wildner, Parks Superintendent
Kevin Hallahan, Forester/Environmentalist
Clyde "S}np" Hilc:-, utilitis chief Field Insp.
Vince Finizio, Deputy 2ity Engineer
?on Last, city En~ille2~ (Lawson, Noble & Assoc., Inc.)
Michael Haag, Zoning & Site Development Administrator
.]une 17, 1994
Boynton Festive Center - Major Site Plan Modification
At the request of the Director of the Planning and Zoning
Department, by separate numbered memo or speed memo, please
~dentify the d~llar value and review time spent on the review of
the BoyntJn Festive Center Major Site Plan Modification plan
review. The dollar value shall include all department staff time
involved with the review and preparation of documents for the
pr~ject. The dollar value s11all include the thirty-five (?5)
percent fringe benefit factor. Please respond before 5:" p.m.
Friday July 1, 1994.
TRC COMMENTS -
____ Original Comments
____ Copy of Comments __
Reviewing Departments: /t" " ,
I,~
,I", . /'
}I'~
-7-
-r
-r
-r
planning & Zoning D~..pt.__.
Public Works Dep~____:~)
City Engineer
Engineering Dept.
Building Dept.
Fire Dept, , i '
utilities Dept.
Police Dept.
Parks & Rec. Dept.
Forester/Environmentalist
PUBLIC WORKS DEPARTMENT
MEMORANDUM #94-171
TO: Michael Haag, Zoning & Site Development Administrator
FROM: Robert Eichorst, Public Works Director
SUBJ: Staff Time - Boynton Festive Center
DATE: June 22, 1994
staff time spent on the review and preparation of paperwork for the
Boynton Festive Center was 15 minutes for the Director and 15
minutes for the Administrative Assistant for a total cost of
$16.88.
Eichorst
Works Director
, RE/ cr
,;~ ...
BUILDING DEPARTMENT
MEMORANDUM NO. 94-164
June 29, 1994
FROM:
Tambri Heyden
Planning~ D" ctor
Don Jaeger
Building icia1
Al Newbold
Deputy Building Official
TO:
THRU:
RE:
REVIEW TIME - BOYNTON FESTIVE CENTER
The Building Department spent 3 hours on the review of the
Boynton Festive Center Major Site Plan Modification. The dollar
value amounts to $90.60 including the 35% fringe benefits.
~
Al N~ 0
AN: bh
00
@,
FESTlVE2
5 PE ED LETTfR~
TO
Tambri Heyden, Direc Jr
Planning & Zoning Department
FROM
KeVln J. Hallahan
Forester/Envlronmentalist
SUBJECT Boynton Festl ve Cp-ntp-r
-- rOlD NO. <} or 10
MESSAGE
Tlme:
1/2 hr. = $11.36 - Kevln J. Hallahan, Forester/Environmentalist
TOTAL:
$14.74
--- -----...,... -8-------"'-- ,
JUL I 1994 '
15 min. = $ 3.38 - Secretary
DATE
-
...-ff ~ PJ.::Rf.!!O -- . ......
_:;=-~~~=G::~> -.]j~~J~
REPLY
-- fOLD fOR NO. 9
-- fOLD FOR NO. 10
...____ DATE...__,_______________ SIGNED_,__,._,._____
~
WllsonJon.. . eon.on_ . MADE IN U.S.A.
44-902 Triplicate. e WllsonJones, 1989
RECIPIENT: RETAIN WHITE COPY, RETURN PINK COPY
--~.,_._--_.,-,.-----
SPEED LETTER~
TO
Tambri Heyden, DirectoL
Planning & Zonlng vepartment
FROM JOhn \f......Ldner
Parks Superintendent
SU~Ecr BoyntOn Festive Center
- FOLD NO. 9 or 10
MESSAGE
15 mln. Secretary
= $ 3.38
~ @ rn
Time:
1 hr. Parks superintendent = $26.32
TOTAL:
$29.70
;; n
;' 'j ---ft-t-3_-
PLANNING AND
ZONING DEP[
DATL_ 7-:::-18-94
~:!~/..", '
7--;;1--
REPLY
- FOLD toR NO. 'I
- fOLD fOR f',KJ. 10
DATE
____ SIGNED_____,___,
WllsonJones . "-- . MADE IN U.S.A
44-902 Tri~icate. () WilsonJones, 1989
RECIPIENT: RETAIN WHITE COPY, RETURN PINK COPY
FIRE PREVENTION MEMORANDUM NO. 94-254 WDC
TO:
PLANNING DEPARTMENT
FROM:
FIRE DEPARTMENT
DATE:
July 18, 1994
RE:
Expenses to Review Boynton Festive Center
Plan review by FPO William Cavanaugh:
3 hrs. @ $24.08jhr
Totals $72.24
secretarial support by Lisa Morales:
1 hr. @ $8.70jhr
Expenses Total: $80.94
4i~~
Boynton Beach Fire Dept.
ffOJ ~ & ~ II WI ~ Iii)
WI JUL I 9 1994 ~j
Boynton Festive Center 2.
September 16, 1995
native percentages should not be penalized.
There are 28 Tamarinds slated for the Phase II project. We will
endeavor to insure that they all will be native. However if they
are not, then it is my professional opinion that the above cal-
culations prove that the project meets the native tree percent.
I will be available to discuss this with you by phone or in a
meeting. If this letter is sufficient to finalize this matter,
please respond in writing to me and I will forward copies to my
client and the Landscape Subcontractor. Thank you for your at-
tention to this matter.
Sincerely,
fV4~~
<:::...,../'/- ~
C. Michael Oliver, A.B.L.A.
Landscape Architect
cc: Mr. Doug McMillen
Tropicare, Inc.
,.
J'tmerU:a's (jateway to t~ (julfstream
%e City of
'Boynton 'Beacli
100 'E. 'Boynton 'Beadi 'Boulevara
P.O. 'Bo~310
'Boynton 'Beacli, ~Coritfa 33425-0310
City 9faIl: (407) 375-6000
~.9lX: (407) 375-6090
September 26, 1994
Mr. Douglas McMillen
P.O. Box 772530
Coral Springs, FL 33077-2530
RE: Boynton Festive Center
File No. 792/MSPM 94-005
Dear Mr. McMillen:
Attached is the cost breakdown by department for the two reviews of
the Boynton Festive Center, as you requested.
APRIL REVIEW: 3rd Submittal Review - Initial Site Plan
Department Cost
Public Works
Parks & Recreation
Forester
Fire
Utility
Engineering
Police
Building
Planning & Zoning
$ 10.98
.00
26.10
57.57
43.70
85.00
67.59
32.21
445.62
Total for April Review: $768.77
$ 768.77
5tmerica's (jateway to tlU (julfstream
.",YlV"".......
..
.~ "'~- ~- 'Il.i. 1 '~,'l,~,.""""""""""",u,~
%e City of
'Boynton 'BeQ(;n
,.oY~i
(t.1~
,...,,1,1')'
-.II .:. " ':' v- '
100 'E. '.Boynton '.BUl& 1JoufetJarti
'2.0. ~JIO
lJJoynton 1Jt"'~ 7WrU1a 334~5.(J310
City:Jla1f: (407) 375-6lioo
,
~!JtX; (407) 375.609li.
September 26, 1994
Mr. Douglas McMillen
P.o. Box 772530
Coral Springs, FL 33077-2530
RE: Boynton Festive Cente~
File No. 792/MSPM 94-POS
I
Dear Mr. McMillen:
Attached is the cost breakqown by department for the two reviews of
the Boynton Festive Center:, as you requested.
APRIL REVIEW: 3rd Submitt~al Review - Initial Site Plan
Department ~
publi9 Works
l?arks.& Recreat~on
Forester .
Fire
Utility
Engineering
Police
Building
Planning & Zoni~g
$ 10.98
.00
26.10
57.57
43.70
85.00
67.59
32.21
445.62
m.......A..'
$__ .,.j--~..
'I"'\___..l ~+--
........ft ....,
::-::,;-:::- co:
... -,^
IIl~ I ~
63-243{670
PAY
f
563
FLORIDA RETAIL PROPERTIES. INC.
p,O, BOX 772530
CORAL SPRINGS. FLORIDA 33077-2530
OLLAR
CHECK NO.
CHECK AMOU
5~S
NatIonsIIank
NauQns8ank or FlorlCia. N.A
c>1du 0f 57;d/kJ
t r r"" r: '- :. "t .. n C. ,., n n J!. J, S I: ~ b 0 ~ 0 g ? 0 ~ ~ III
Page 2
Letter to Mr. McMillen
September 26, 1994
JUNE REVIEW: Major site Plan Modification
(eliminating one restaurant)
Department
Cost
Public Works
Parks & Recreation
Forester
Fire
Utility
Engineering
Police
Building
Planning & Zoning
$ 22.79
40.01
19.90
109.27
39.87
57.59
40.50
122.31
613.00
Total for June Review:
$1065.24
$1065.24
$1834.01
Total for Two Reviews:
Please note that the City Accounting System does not allow for
automatic retrieval of time for individual projects and these
numbers reflect the employees' recollection of time spent.
Administrator
XC: Central File
a:macmille.ltr
%e City of
'Boynton 'BetUh
100 'E. 'Boynton 'Bead.. 'Boukvara
P.O. 'BOi(310
'Boynton 'Bead.., :FCoriaa 33425-0310
City 9fa1[: (407) 375-6()()(J
:F}U: (407) 375-6090
October 5, 1995
Mr. Douglas A. McMillen, President
Florida Retail Properties, Inc.
P.O. Box 772530
Coral Springs, FL 33077-2530
Dear Mr. McMillen,
This letter is to acknowledge and accept the correspondence of September 16, 1995 from the office
of C. Michael Oliver, A.S.L.A. in reference to the landscape at Boynton Festive Center.
..
I have forwarded a copy of this same correspondence to Mike Haag, Site Plan Coordinator.
Thank you for your cooperation in this endeavor.
Sincerely,
/(~ ~ !I~
Kevin J. Hallahan
F oresterlEnvironmentalist
Mike Haag, Site Plan Coordinator ./
File
xc:
;I~rU;a's (jateway to tlU (julfttrtam
ENGINEERING DEPARTMENT MEMORANDUM NO. 94-200
FROM:
Tambri J. Heyden
Planning & Zoning Director
~~ ~ukill, P.E.
~Englneer
July 13, 1994
TO:
DATE:
RE:
BOYNTON FESTIVE CENTER
Regarding your inquiry concernlng time spent revlewlng Boynton
Festive Center, please be advised that Mr. Finizio reports 0.25
hrs. of his time and I estimate 0.75 hrs. of my time have been
utilized reviewing this matter. That converts to $31.60 total w/o
benefits or $42.66 total with 35% benefits added on.
WVH/ck
C:FESTCENT.AMT
Boynton Beach Police Department .
TraffIC Unit Memorandum
To: Tambri Heyden
Director
Date:
13 July 94
From:
Re:
Boynton Festive Center
Sgt. James Cummings
This is to advise that the review cost to the police department has
been approximately It hours or thirty dollars.
...-----------
~
Jl. \3"
rn
PLANNING AND :ONING DEPARTMENT MEMOP~NDUM ~94-201
Robert Eichorst, Public Works Director
Al Newbold, deputy Building Official
William Cavanaugh, Fire Prevention Officer
Sgt. Jim Cummings, Police Depar~ment
John Wildner, Parks Superintendent
Kevin Hallahan, Forester/Environmentalist
C_:'yde "8kipfl l1ilc,-, utili tis Chief Field Insp.
Vince Finizic, Deputy city Engineer
Ron Last, City Engineer (Lawson, Noble & Assoc., Inc.)
TO:
FROM;
Michael Haag, Zoning & Site Development Administrator
DATE:
June 17, 1994
RE;
Boynton Festive Center - Major Site Plan Modification
I'\t the request of the Director of the Planning and Zoning
Der:artment, by separate numbered memo or speed memo, please
iJentify the dollar value and review time spent on the review 0=
the Eoynton Festive Center Major Site Plan Modification plan
review. The dollar value shall include all department staff time
involved with the review and preparation of documents for the
project. The dollar value shall include the thirty-five (35)
percent fringe benefit factor. Please respond before 5:00 p.m.
Friday July 1, 1994.
(. /~7
'" ./.
I~/ ~ct
~/~J
~'-'-
b ( J.. ":;
b 12... Czr
'- /2. ~
fsJl ~ 0
7( (
7/ ,
7/ ""
7/ ?
7/q
G
-
-
'2..
,
"3
3
I
'2 L C. 0" tj L 0\/'- \~4 v-
~l~
2~ J .eGt/.g, \
M,\, \( €/
3
('
'b
PI.
I'L.
2.
14,-
C,
I
~
?.,"L
O/Jtt
!tI <- /lit i( 6- v
jV!(2- J~ - --
.---
----'
J. [errtA fkJD
v}'rY
7\f;~L (J}-Jb: < k. !M;H(;vr Dlls
{./ ~..------ /-> ~rI /~/i)&<- I
~'t €!!JIIl'lYf ,. ~ iV,j,..
fiJ/> lJ!I!#o U,,-.., S,rt- fL,,-J ft.v1G-~ ~
(Colt.- ('~ ~N~<- /'. [p;ff" f /,,'!f'd' >"'_ k- ,bCi/CSSf:;
h#f7>.-'y~/'P (7 OJ?.. - "d-I{ rc'~ r
-~ /I,-b,. ,_ ~~ 1>-'
~~~ ~ aIL H
/)'iJ A ~ Q"'
,1 Le
~ \v~
14? 0 ~
=::::' 1 0 ,'f v po-t'l7 c
!' ._ = \ 'nr@. 0.-
~ g ,:::>' ~L <6'\
~ j; '3 ).. ~I ,40t-t- 1(., ",l'S ,Ol\~;;;
=. <i-,;;7 . ~7 ..
~ ' 3,) j
if~,76>
-
~ =- G ~ 5;
-::- d t.o _ IT:>
&'
"'"3~s ,15
lJx~tb~ '
-;r'i'.7'I
P.uJ
t3:;.tX> .
t>r-PG-
'FIt:::
(
~
J
'1
s- J-rf L.- rtr--'1
<- ffJ.-t, Ed::;
7 _ /k::-vt:-rJ
R --::
. f !Ji!:rM>
~-"--
I \,
-----
it'
T"\TT~'T" "r"'" "_"""'~T'''''' T"\'r."I'T"Il "" ~f"'I"fttW,"'Trrr
ruo~~~ ~U~~~ u~r~~~~~~
",,'rt1ll""""'" '7l ..T"'-'TT",,, II n If ...... r
~~~U~~~uU~ ff~~-~~o
1T"l__..':.-._..:I\
\~t;:v~o::.t;:uJ
......... '
~u;
Tahibri
...
lJ .
T"r.-__..:I___
nt;:yut;:u,
Acting Planning & Zoning Director
T"'IT"'\ ,...,"'" ~
r: ~Ul'l ;
T"'\ __ 1.-. _ _... .1.... T""I':..-.1.-..- __ _ .L..
~U1.Jt;:l.L. .c.~~UUl.o::.L.,
Public Works Director
,....",.T"'\ "T _
.:>UOlJ;
Site Plan Review - Boynton Festive
"" .- __ L __ __
~t;:UL.t;:l.
.,.... "'" rT1T"'t _
u~~.c.;
""'_u_':" ., n ... nl""\"
~.tJl.~~ ~O, ~~~~
The Public Works Department has uu problem with
plan. Total time spent reviewing these plans was
1... __. . ..... ~ __ _... .-. L __ .1- _ .,- __ ~ ,....,,, n n .c __ __ .-. L __ ..r:: ~ ...l...': ____ .-
UUUl. .l..Ul. Cl. L.UL.Cl.~ U.l.. ;p~u.~o .l..Ul. ;::;L.Cl.l..1. L.~1iIt;:.
Lt....-. .-.'1-___...... -..':...l..._
L.ut;: Cl1.JU V t;: ;::; ~ L.t;:
a quarter of an
I would like to review the permit docwuents and recorrroend that
plans be forwarded to the Planning and Development Board
rev~ew.
L.... _
L.ut;:
~.......-
.l..Ul.
" ,,___ .._,.. .-. T'"\': __.- _...l... ...... __
~Ul.h.;::; U~l.t;:~L.Ul.
T'"l,... f.-..........
~~j~l.
00
00:
ENGINEERING DEPARTMENT MEMORANDUM NO. 94-123
TO:
Tambri J. Heyden
Planning & Zoning Director
FROM:
vincent A. Finizio
Deputy City Engineer
DATE:
April 29, 1994
RE:
Technical Review Committee - Tracking Man Hours
Boynton Festive Center
Please be advised that the City Engineer expended 1 hour @ $85.00
per hour for the review of the above referenced project.
VAF/ck
C:BFESTIVE.MHR
__~__ __1
BUILDING DEPARTMENT
MEMORANDUM NO. 94-102
April 29, 1994
THRU:
Tambri Heyden
Planning D~'r ctor
Don Jaeger
Building 0 icial
TO:
FROM:
Al Newbold
Deputy Building Official
RE:
SITE PLAN REVIEW - BOYNTON FESTIVE CENTER
The review time spent by me on the above was one hour for a total
of $32.21.
Al~
AN: bh
FESTIVE
2.
PlANNING AND
ZONING DEPT.
FIRE DEPARTMENT MEMORANDUM NO. 94-222 WDC
TO:
PLANNING DEPARTMENT
FROM:
FIRE DEPARTMENT
DATE:
May 2, 1994
RE:
Boynton Festive Center
Fire requirements were regularly met during submission by the
developer. The approximate three reviews were conducted in the
minimum amount of time.
Review Time
Secretarial Support:
1 1/2 hrs
3/4 hrs
$48.76
8.81
ficcifa- '
William D. cavanaugh, FP
Boynton Beach Fire Dept.
,(
/lm
LN~
. . . . . . . . . . ......
Law...., N..... a Aaocl.... Inc.
M
I
'ft
Q
TO: Mr. Mike Haag. City of Boynton Beach Planning Department
fROM: Ronald W. Lact, P.E.~ ,,/t:t/Q4
DATE: June 27, 1994
RE: SITE PlAN REVIEW COMMENTS
l.N. & A, Project No. 94-174
PROJECT: BOYNTON fESTIVE CENTER
APPUCANT: McMillen Dev.&lopment. Inc. and Cutro and Assoc.
Yout File No. 792
The concerns outlined in our April :21, 1994 memo have been addresSed with the
exception of the 100 foot throat variance (E.O.M. 93--3901 and considerations of
payment of street Iightil'9 fees.
The above comments should not deter the project and r&commend favorable approval
at this time.
cc: William Hukill, P .E., City Engineer, Boynton Beach
VIncent FinlzlO, Deputy City Engineer, Boynton Beach
ue.tO\OOYNTQN.0211
ENGINEERING DEPARTMENT MEMORANDUM NO. 94-182
TO:
Tambri J. Heyden
Planning & Zoning Director
FROM:
vincent A. Finizio
Deputy City Engineer
DATE:
June 22, 1994
RE:
Technical Review Committee Comments
Boynton Festive Center
Attached for your review and consideration, please find a copy of
the City Engineer's June 17, 1994 comments which represent the
Engineering Department's review of the above referenced project.
Should you require any additional information, please contact the
undersigned at ext. 6282.
~ +'A~ .
Vincent A. Fin~
VAF/ck
C:BFESTIVE.TRC
attachment: Ron W. Last, P.E., City Engineer comments dated 6/17/94
--
L 1 '1,1 _, I." ~. :,111 tJL t
H _U
! F ~ ; d', I ," u I:~ :~: 4 1 :-, ] ~
J u r, t;" ':1 4
11 : if: No Jill P. (J 2./ Ci 3
LN~
. . . . . . . . . . .....
LII_._, Noble. Associat.., Inc.
N
I
........
...
'0
I'=ROM:
Mr. James Cherof, City Attorney I Boynton Beach
Ronald W. Lest, P.E., City Engineer Boynton Beagh 1-
r&I,"\I4i~
June 17, 1994 '
TO:
DATE:
RE:
SITE PLAN REVIEW COMMENTS
L.N. & A. Project No. 94-174
PROJECT:
BOYNTON FESTIVE CENTER
Pursuant to a request by the Developer. J have researched the necessity for platting
tha above mentioned parcel. My findings aro as follows:
1. CItY Code requires plats :f more than 3 contiguous parcels:
. Site contains 3 parcels.
2. Palm Beach County will now accept 3 fgeOrded Boundary Survey with Site plan
in lieu of platting for commercia! parcels.
Your opinion of the necessity to plat, from a legal standpoint, would be greatly
apprf)(~iated. Please see eJ'lclasf!d Site Plan-
cc: Vincent Fininzio, Deputy City Engineer, Boynton ~ach
MEftl0\60YN":'OH.01 ;
'. I ,1.', . ' i' " 1,1..<1):_ t.
H.: '~.U
I t_ ~_: ~_~l.; I --~_,,::,,+-'1
-' u n ~," '; 4
.' I '
~. .l ,
v ,
at Ill,
:# 2J &:111 <l) ;
&I f
~ oil ~ ~
f} ~ r" :a t'
~D
4... ~Q
.~ ...:.~ "oIl
...~
! '51 i!i
:. ~~
') ~ i !~
..
T - < r' ~.
lJ . ..-Q :l'"
'< ~ :< t'; 8 .r. -- ..-
ft ~ :.t 01\
."{ I'L
---.\
I , "
I :1
I i:
Ii
I
I !
.
,
: !
I
11 : 1 :~: 1',lo.l.ill F. U?,,'IJ-:,
I -;---;~l
I lIS I..
I ~ I
~12 I
I U1~~! I
, :!: It
I l-
I G') .
wCt:r
I 1L6~
\ -Ill
!
~l
. I
-iU'
~~1I1
IHU
d'li
~
':..
~
;r;x, .J 0'r\
0- Q=
\ 0 I
W '~
~
;J
I;
; i
: I [fl
I, ,
: i
I I I
;:~ I
; '() .~
I II? '1
; 1:R i!
I : III .
, !~ :
I !'~ n
'I
"I~ U
, !}-
; i::t: i
,IU .0
~ :it "'!
: ~ Ii t) (
I I 'I-i: ,
I t;i.';. ...,
, 'v I . ""
i ~ill~~ll'
; ri...~
~ j:".~i
; ij~~I'
, III: r.
~ I ;\~~ll
, 1 ~ ~ 4~ ,
. :!a '
z
f!
..
...
-
-
,
11'1/" H0't'39 NO.l.NAOe
RECREATION & PARK MEMORANDUM 194-239
TO: Tambri Heyden, Director
Planning & Zoning Department
FROM:
Kevin J. Hallahan, Forester/Environmentalist f<~ Hr
Boynton Festive Center
Major Site Plan Modification
RE:
DATE:
June 29, 1994
The applicant has addressed all of the existing trees comments.
The project should proceed on the normal review process.
KH:ad
~
~
JUN ? 9('0'
~,
'<.<:r ."." "~;'~,~iibi.t:'i~,,
,
I
I
MEMORANDUM
--""\
TO:
'1 A;., I3fZ \'
'S ,f) I-IIN
t\ I f,-AvVWlW' bt'~,fd'Orll,..
f/ ;, i ~ tl'V' /
vv-il.-h,\Jre~ I f'r1~ f-<J S'-f..JOt---
fJ
FROM:
DATE:
~~;2'1-1l{
RE: Site Plan Review - New Site Plan - Amended Plans
Project: '49(;)'f,rVtow r~sf(vJ' CfE.,Ni1Z~
After reviewing the
referenced project
Department recommends
the Planning and
consideration.
amended plans for the ~ove
the rr pc. ~ r;.A'tl''',..J .t- PAt{ tc. .
that the project be forwarded to
Development Board for their
This department will not be required to sign-off the
permit documents associated with the subject project.
.
).
,
,,.
1i,'I\~
.'. 'L ~ \o.~A ".
..> V
c: AMEND1.ALD
~'...,..___.. ,->_"'_-.---,_.___n._ ._".._....__,~....~.~~-'...-_._.."-.".-
TO:
FROM:
DATE:
RE:
FIRE PREVENTION MEMORANDUM NO. 94-249 WDC
PLANNING DEPARTMENT
FIRE DEPARTMENT
JUNE 20, 1994
Major site Plan Modifications
Boynton Festive Center
Old Boynton Rd & Congress Ave
We have no objections to this plan.
m
JJI 2 0 199~
rn
BUILDING DEPARTMENT
MEMORANDUM NO. 94-163
June 29, 1994
TO:
Tambri Heyd
Planning Di
THRU:
Don Jaeger
Building 0
Al Newbold
Deputy Building Official
FROM:
RE:
TRC COMMENTS - MAJOR SITE PLAN MODIFICATION
BOYNTON FESTIVE CENTER
After reviewing the submitted documents, the Building Department
has no comments. We recommend that this project be forwarded to
the Planning & Development Board.
~
I ..,
Al New ld
AN : bh
mmmD\YJ1I
.: 0 1994
ill
FESTIVE
, ('1ie C' of
':.1. tty
r.Boynton r.Beacli
F,~
100 'E. 'Boynton 'Beadi. 'Bou1evartf
P.O. 'Bo~310
'Boynton 'Buun, ~foritfa 33425-0310
City!Jfa[[: (407) 375-6000
1'f4X: (407) 375-6090
July 8, 1994
Mr. Douglas McMillen
P.O. Box 772530
Coral Springs, FL 33077-2530
RE: Boynton Festive Center
Dear Mr. McMillen:
The attached package will be presented to the Planning and
Development Board on July 12, 1994 (see attached agenda) and then
to the city Commission the following week (July 19, 1994).
The applicant must understand that the permit plans shall be
amended to comply with the attached staff comments and that
additional comments may be generated by staff following their
review for technical compliance of permit documents that are
required to be submitted for development of the project.
For the applicant's convenience, attached is a list of documents
required for permit submittal.
An approval of the Eite plan by the city Commission shall be
valid for one (1) year, unless a building permit from the
Building Department is secured. If the applicant fails to secure
a bUilding permit in that time, all previous approvals shall
become null and void.
Sincerely,
!~:t!u
~ing & Site Development Administrator
l1H/jj
jIrrurica's gateway to tfie gulfstream
VII. Construction docUID8nta (aU document. .....t, be lignecl, .ealed and dated)
....~.......5 ..u..... u......5...... ..ux" w~..u I.uaus 10 accoraance With Chapter lZ, Standard Building Code
A.
B.
C.
D.
E.
F.
G.
H.
t.
J.
K.
L.
H.
N.
O.
P.
Floor plans for each proposed structure (indicate use of space)
Elevations for each proposed structure (indicate exterior materials and colors)
SoU tests
Energy calculations plus one (1) cover sheet
Foundation plan
Typical wall sections
Electrical plan view drawings and riser diagram with calculations
Plumbing riser diagraa and plan view drawings
Air conditionins plan
Truss layout
Proposed finish floor elevation identified on the plan
Board of Health Departmen~ stamp (where applicable)
Copy of D.E.R. and/or D.E.R.H. permit and plans (where applicable)
Copy of Army Corps of mlloeers pel'lDit (where applicable)
Copy of Lake Worth Drainsge District permit (where applicable)
Copy of South Florida Water Hanagement District permit for surface water management or water use
(where applicable)
bh - 3/9'1.
A!!UJRMITALIXX!
\
Iff'>. THEODORE R. MAJDIAK & ASSOCIATES
LJUo ARCHITECTS / PLANNERS
SUITE 214, 5300 NORTH FEDERAL HIGHWAY, FORT LAUDERDALE, FLORIDA 33308
305/772-1510
McMillen & Associates, Inc.
P.O. Box 772530
Coral Springs, FL 33077-2530
June 8, 1994
Att: Douglas A. McMillen
Re: Boynton Festive Center
Boynton Beach, Florida
Dear Mr. McMillen:
Pursuant to your request, we have analyzed the approved site
plan, with the intent of providing additional east/west landscape
strips in some of the existing parking rows.
For efficient traffic flow, the proposed east/west drive on the
approved site plan, was aligned with the existing east/west drive
that is accessing Congress Avenue. Applying the code required
dimensions for parking bays and drives, from this fixed position,
results in the layout as shown on the approved plan. Any revision
to this configuration would result in a loss of an entire double
row of parking spaces, in critical locations.
If we can be of further help regarding this matter, please do not
hesitate to call.
Very truly yours,
TheOre ~~k :::;Ciates,
T~ore R. Majdia~, NCARB, AlA
TRM/fr
Grayarc'
P.o. Box 2t;44
Hartford, CT 06104 - 2944
CALL TOLL FREE ',-800-243-5250
REPLY MESSAGE
At (.) To Fit Grayare Window Envelope # EW10P
r
TO M/I1&/ /lFrJfP~
?k"...v",,,,, I Za,.JIN; Vr/{et:: ~ ~
FROM
:JohtJ ~n/~'t)
tJ 1/~ /1/i5's ]),II!I2C- ~~
-,
SUBJECT:_~6~d..'[j_rJ H:5r1l1e. ce~.~~ / 11~f' RGu/42-J
FOLD.
REORDER ITEM # F269
DATE:._L/ -;Jt?..._~~_
t!1/L,lr1 5(/1;::,;:, ;;~(/ 6),J /k"Je~J" ~/EW:
?et:e ~,az;z.6'2.LA: . SA~$ ~sljs;~o ~~ ~irC'~
CL€Jde $KII'''~/L.~: /"s~;<s @,.1 /tf,7t!J /e~ A~~
c.c: SK IP Ap LrJl~
,r,L.e
m 0 WI I
APR L 8 1994
C1)1<:.-
PLANNING AND
PLEASE REPLY TO
SIGNED
.
REPLY
<...-
DATE:
SIGNED
Item" F269 Grayare, P,Q. Box 2944, Hartford, CT 06104-2944
C Wheeler Group, Ine, 1982
00
M E M 0 RAN DUM
POLICE DEPARTMENT NO. 93-084
TO: Planning and Zoning Department
FROM: Police Department Plan Review
DATE: April 25, 1994
PROJECT: Boynton Festive Center
1st Review of Revised Amended Plans
REVIEWER: ofc. Louis Zeitinger #467
1. All prior comments have been satisfied;
2. suggest that pedestrian crossing lanes be painted across
driveway directly in front of retail space to parking space;
3. Suggest four (4) lane entrance off of old Boynton Road: two
(2) egress lanes and two (2) ingress lanes - one (1) ingress
lane could be a traffic hazard;
4. One (1) hour of Sgt. Kirrman1s rate of pay has been spent
studying these plans for a total of $33.76;
One (1) hour of ofc. Zeitinger's rate of pay has been spent
studying these plans for a total of $27.01;
One-half (1/2) hour of Secretary Bracone's rate of pay has
been spent typing comment memos for a tota: of $6.82;
A combined salary of $67.59 was involved for this project;
5. plans should be forwarded to the Planning and Development
Board.
~~
erfc. 'L. Ze' inge ~
LZjjb
BUI LOING
DEPARTMEN T
SUBMIttAL DOCUMENTS
Congratulations on receiving Site Approval for your proposed construction within the City of Boynton Beach. We
appreciate your choosing to build within our City.
In order to ensure a timely permitting process, the following documents are required to be submitted in two (2)
sets. Each set must be stapled together to form a single package. Incomplete sets can not be accepted.
I. A signed and sealed survey (not over six (6) months old) by a registered surveyor in the State of Florida
indicating:
A. All property lines
B. North arrow
C. Existing structures and paving
D. Existing elevations
E. Rights-of-way, with elevations
F. Easements on or adjacent to the site
G. Utilities on or adjacent to the site
H. Legal description
1. Number of acres to the nearest one-hundredth (11100) of an acre
J. Location sketch of property
K. Surveyor's Certificate
II. A site plan properly dimensioned and to scale showing:
A. All proposed structures
B. All existing structures that are to remain on site
C. Setback lines for all structures drawn perpendicular from the property lines to the closest vertical
wall of the structures
D. Use of each structure (or uses within multiple occupancies)
E. Use of adjacent properties including right-of-way lines for all streets and alleys, sidewalks, turn
lanes and driveways
F. Elevations of the lowest finished floor of all structures on the site
G. Location of existing utility lines on or adjacent to the site
H. Location of fire hydrants on or adjacent to the site
I. Location of dumpster enclosure and details of construction
III. A paving plan in conformance with the Parking Lot Code (Chapter 5, Article X of the Boynton Beach Code of
Ordinances) indicating:
A.
B.
C.
D.
E.
F.
G.
H.
Calculations for the number of required parking stalls (see Appendix A-Zoning, Section 118)
Cross sections indicating parking lot construction
Raised curbing meeting City Standards
Double striping meeting City Standards
Conformance with the Sidew8lk Ordinance (Chapter 22, Boynton Beach Code of Ordinances)
Handicapped parking stalls in conformance with the State I~dicapped Code
Dimenslons for all parking :stalls, back-up areas, driveways and traffic lanes
traffic control devices and signs
IV. A drainage plan for the entire site including:
A. Finish grade and pavement elevations
B. Drainage calculations
C. Details of the drainage system. If total site area exceeds 25,000 square feet, plans Ialst be prepared
by a Florida registered engineer and .ust be sealed
D. Inlets IlU8t be placed in grus, swale areas
V. A landscape plan showillJ conformance with tbe Landscape Code (Chapter 7.5, Article II, Boynton Beach Code
of Ordinances) showingl
A. Complete final landscape construction drawings
B. Automatic irrigation system plans with 100% coverage (no City water to be used)
C. Plant material must be keyed according to species, size and quantity
D. Site walls and fences must be indicated on the plans
E. Location and contours of proposed berms
VI. A lighting plan for the building exterior and site lighting including:
Exterior security lighting and pedestrian lighting
Lighting for driveways and parking lots
1. Location of lighting
2. Fixture types
3. Lamp types and sizes
4. Photometric plan showing illumination levels in footcandles
5. Lighting poles desi~ed for wind loads in accordance with Chapter 12, Standard Building Code
Vll. Construction docUlllents (all documents IlU8t. be signed, sealed and dated)
A.
B.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
H.
N.
O.
P.
Floor plans for each proposed structure (indicate use of space)
Elevations for each proposed structure (indicate exterior ~terials and colors)
Soil tests
Energy calculations plus one (1) cover sheet
Foundation plan
Typical wall sections
Electrical plan view drawings and riser diagram with calculations
Plumbing riser diagraa and plan view drawings
Air conditionina plan
truss layout
Proposed finish floor elevation identified on the plan
Board of Health Departmen~ stamp (where applicable)
Copy of D.E.R. and/or D.E.R.H. permit and plans (where applicable)
Copy of Army Corps of Engineers permit (where applicable)
Copy of Lake Worth Drainage District pe~it (where applicable)
Copy of South Florida Water Management District permit for surface water management or water use
(where applicable)
bh - 3/92
A:SUBHltAL.DOC
(~)
RECREATION & PARK MEMORANDUM 194-166
TO:
Tarnbri Heyden, Planning & Zoning Director
F8~
FROM:
Kevin J. Hallahan, Forester/Environmentalist
RE:
Boynton Festive Center
New ~ite Plan - 2nd Review
DATE:
April 25, 1994
The landscape plan indicates the existence of:
1. 20 Coastal willow trees
2. 11 Wax Myrtle trees (large shrubs)
3. The plans do not indicate the 1-3 Coastal Willow trees which
exist on both the west perimeter and the north perimeter.
The plans should indicate the total of the two types of trees and
the replacement of these trees on the site. . The plans should
proceed on the normal review process.
KH:ad
Forester:
Clerical:
~22.72 (per hour)
3.38 (15 min.)
$26.10 TOTAL COST
00