CORRESPONDENCE ~_. 7Al BOYNTON SEACREST (fka Cedar Grove) MASTER PLAN PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 93-100 TO: Chairman and Members Planning and Development Board ~~ THRU: Christopher cutro Planning and Zoning Director FROM: Tambri J. Heyden Senior Planner DATE: May 5, 1993 SUBJECT: Boynton Seacrest (f.k.a. - Cedar Grove) Master Plan (subdivision) - File No. 697 At the February 9, 1993 Planning and Development Board meeting, the action taken by the Planning and Development Board with respect to the above-referenced request was to remand the request to the Technical Review Committee due to extensive number of serious, unresol ved issues. The applicant came to this meeting with a revised master plan that had not yet been submitted and reviewed by the Technical Review Committee. Therefore, remanding the request required the applicant to submit revised master plans to the Technical Review Committee. Since the February Planning and Development Board, the applicant has submitted two revisions to staff. The latest revision, reviewed by staff for concurrency certification and compliance with unresolved subdivision master plan requirements, is being forwarded to you for action. with respect to concurrency, Chapter 19, Section 19-85 of the Code of ordinances states that "no development order shall be approved, unless public facilities are or will be available to serve the development project, such that the minimum levels of service set forth in section 19-84 are maintained, concurrent with the impacts of the development project". Approval shall include simultaneous issuance of a concurrency exemption determination, certification of concurrency, or conditional certification of concurrency for each public facility. Subdivision master plans are defined by Section 19-83(b)(3) as a category C3 development order. In reviewing this category of development orders to determine adequacy of public facilities, roads, drainage and neighborhood parks facilities must be certified or conditionally certified for concurrency with the adopted levels of service, consistent with Section 19-88(c)d.3 and 5 and Section 19-85(c). As documented in Exhibit "A" (statements from City department and service provider concurrency review) certification of concurrency can be issued for roads and drainage. It shall be noted however, that since the latest master plan does not support the number and type of units stated in the March 24, 1993 traffic concurrency certification letter from the Palm Beach County Traffic Division, this development order shall be certified for a maximum of 142 single family units and 82 dupluxes; a total of 224 dwelling units as shown on the latest master plan. This number will be reduced further if the applicant agrees to the staff recommended conditions of approval relative to preservation of environmentally sensitive land (see discussion below). Conditional certification of concurrency can be issued for neighborhood parks, consistent with Section 19-88(d)(5)c and d, simultaneously with approval of this development order if subject to the proviso contained in Planning and Zoning Department Memorandum No. 93-094, item #2 (see exhibit "B" - staff recommended conditions of approval). Item #2 states that no building permits shall be issued for the final 50% of the total number of units within the subdivision until construction of either Girl Scout Park or the minimum 4.032 acre dedicated park site commences. TO: Planning and Development Board -2- May 5, 1993 With regard to compliance of the master plan with Appendix C - "Subdivisions, Platting" of the Code of Ordinances, exhibit II B" contains a recommendation from Richard Staudinger, City Engineer and coordinator of the subdivision master plan review process, as well as staff recommended conditions of approval. Mr. staudinger recommends that this request be approved, subject to staff comments. Staff comments will be addressed at the next step in the subdivision process; submittal of a preliminary plat. However, due to the impact resolution of the environmental comments will have on the current master plan design, Mr. staudinger is further recommending that the applicant submit a new master plan sketch prior to preparation of a preliminary plat to verify that the environmental comments have been satisfactorily addressed. r f4 ~n~' ' ct;:-/C' Tambri J. H~en , tjh Attachments xc: Central File A:BoySeaPD EXHIBIT "A" CITY DEPARTMENT AND SERVICE PROVIDER CONCURRENCY REVIEW STATEMENTS -:L - Soard of: County Commissioners Mary McCarty, Chair Ken L. Foster, Vice Chairman Karen T. Marcus Carol A. Roberts Warren H. Newell Burt Aaronson Maude Ford Lee County Administrator Robert Weisman Deparbnent of Engineering and Public Works March 24, 1993 Ms. Tambri Heyden City of Boynton Beach 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, FL 33425-0310 RE: BOYNTON SEACREST (AKA CEDAR GROVES) - FILE NO. 697 Dear Ms. Heyden: The Palm Beach County Traffi c Di vi s i on has revi ewed the Addendum No. 2 for traffic impact study for the project entitled Boynton Seacrest (aka Cedar Groves) pursuant to the Traffic Performance Standards (TPS) in Article 7.9 of the Palm Beach County Land Development Code. The addendum addresses Alternate Test 1 for Woolbright Road as was r~q.~ired in the review of th~~e~arlier traffic study. The project consists of .146 s'ingle-family units and 81 multi-family units. The build-out of the projectiis proposed for 1995. " .;.';.</. The Traffic Division has determined that the project meets the Traffic Performance Standards of Palm Beach County. If you have any questions regarding this determination, please contact me at 684-4030. Sincerely, OFFICE OF THE COUNTY ENGINEER a.:Jv4 Dan Weisberg, P.E. Senior Registered Civil Engineer DW:CRW File: TPS - Mun. - Traffic Study Review h:\traffic\diw\boyn11d -, '~rEIVED l:'.l~ ~ . ,vlAR 3 ;) PLANNli~G DEPT. ... "An Equal Opportunity - Affirmative Action Employer" @ printed on recycled paper Box 21229 West Palm Beach, Florida 33416-1229 (407) 684-4000 n GEE & JENSON MEMORANDUM RE: Christopher Cutro, Planning & Zoning Director Jt' ~ 67 /:-- W. Richard Staudinger, City Enginea1'( VI.f'7" Boynton Seacrest (F.K.A. Cedar Grove) Subdivision Master Plan TO: FROM: DATE: May 5, 1993 **************************************************************************************************** Attached are the comments from the TRC members on the referenced development. All of the subdivision master plan major comments have been addressed except those noted by the Planning & Zoning Department and the Forester/Environmentalist as discussed at the TRC meeting of April 27, 1993. I recommend this subdivision master plan be forwarded to the Planning & Development Board with a recommendation for approval, subject to the applicants acknowledgement that the environmental comments by the Planning & Zoning Department and Forester/Environmentalist will be addressed at the preliminary plat stage. This may require the applicant to submit a new master plan sketch prior to a preliminary plat to verify the environmental comments have been addressed. I also recommend the City consider waiving any fees for this sketch submittal as the costs of review would be covered by preliminary plat submission fees. 92025/200 RECEIVED tMY" , " PLANNING DEPT. MEMORANDUM TO: Tambri Heyden, Senior Planner FROM: Michael W. Rumpf, Senior Planner DATE: April 13, 1993 SUBJECT: BOYNTON SEACREST - Concurrency Analysis for Neighborhood Parks This concurrency analysis on the proposed development is being performed pursuant to Chapter 19, Article VI. Concurrency Requirements (Boynton Beach Code of Ordinances). Boynton Seacrest is located within Park Planning Area #17. According to Table 2, Neighborhood Park Needs Analysis (Recreation and Open Space Support Document, 1989 Comprehensive Plan), and the attached analysis for Planning Area #17, the current (1987) levels of service for Area #17 is 1.2 acres of park space per 1,000 persons, and a 1 mile walking distance. The acreage level of service will then change to 2.6 acres per 1,000 persons in 1995, as a result of the completion of Girl Scout Park. By the Year 2000 the acreage level of service is to change again to reflect the addition of the required park dedication in connection with the development of the S. Seacrest Boulevard Site. Boynton Seacrest consists of 224 dwelling units. By applying the persons per dwelling unit factor estimated by the Bureau of Economic and Business Research (BEBR)--2.248--a population of 513 persons is proj ected. As the attached analysis indicates, this development, when built-out, would lower the adopted acreage level of service to 1.00 acre per 1,000 persons. The walking distance level of service would not be affected by this development. The impacts from additional development within Neighborhood Park Planning Area #17 upon adopted levels of service were anticipated, and in part, formed the basis on which these levels of service issues were resolved within this planning area. Included within the city's Comprehensive Plan are the following two policies that address directly, or indirectly, the level of service condition within Neighborhood Park Planning Area #17: Policy 5.5.1 - Subsequent to Plan adoption. .all residential developments that exceed 100 dwelling units provide a private recreation area, unless however, public parks are located within one-half mile from the project. . Policy 5.5.4 - Subsequent to Plan adoption the City shall require the dedication of sufficient land for a neighborhood park site at the time that the following properties are rezoned or platted for residential use:..., S. Seacrest Boulevard, ... Policy 5.5.1 does not apply to the S. Seacrest Site, as this site is located within approximately one-half mile from the planned Girl Scout Park. with respect to the dedication of public park space, which is required by Policy 5.5.4, Boynton Seacrest is consistent with this Comprehensive Plan policy as the master plan indicates that 4.2 acres of the site is to be dedicated to the City for eventual neighborhood park development (4.032 is the minimum acreage required by code based on the number and type of units proposed. This site would be acquired according to the requirements of Appendix C. Subdivisions and Platting (Boynton Beach Code of Ordinances). The dedicated park site satisfies the specific requirement within Policy 5.5.4 of the Comprehensive Plan, however, to ensure that the adopted levels of service are met, either the Girl Scout Park or cont. Concurrency Analysis the dedicated park should be completed prior to the completion of the proposed development and, the other must be constructed prior to the Year 2000. Attachments ~:CBD~RG'2 NEIGHBORHOOD PARK ANALYSIS: PLANNING AREA 117 concurrency Analysis For CEDAR GROVI Alt. 12 - Public Recreation Provided, Proposed No. of Units... 228 - No Private Recreation Projected population.... 513 Analysis of Level of Service: 1987 11/1/92 1995 2000 2010 Population 4,983 5,496 6,224 6,261 6,289 population Served by Private Recreation Facilities 1,853 1,853 2,890 2,890 2,890 Population served only by Public Parks and Facilities 3,130 3,643 3,334 3,371 3,399 Neighborhood Park Acreage (PublicI 3.10 3.10 8.10 12.90 12.90 LOS for Acres/1000 2.50 2.50 Population 1.20 1. 00 2.60 3.80 )( 3.80 LOS for Haxillul Walking Distance (Iiles) 1. 00 1.00 1.00 0.50 0.50 Ixisting and Future Public Parks and Facilities: Forest Hills 3.1 Girl Scout 5.0 Little League IDistrict) 11 acres S. Seacrest Blvd. Site 4.2 Total Neighborhood Park Acres 3.1 3.1 8.7 (unchanged) 12.9 12.9 1980 Population Onder Age 18, and Percent of Total( I: 697 (17) ROTE: -lor current population, the 1981 population vas used since the 1990 Census includes only year>>round residents. In additiom no residential developllent has occurred in this planning area that vould significantly change the 1987 population. -The population for Cedar Grove vas estllated using BIBR's ppdu of 2.248. -~ .- J ... .... o 8 o :r ,. ,.. .... 8~8~~ .;.~~oo ::: .... ~ . ... 0- ... .. ... ~ II' \ \ f .\ ., ... t \ \ \ ~ .. ... ... ... ~ ~ ,... 8 o ~ .. ... ~ .:-. .. G- .. ~ .. <<.; .. .. ~ .. III ... .. 8 o o ~ ... 8. o g ci ? .0 g o f, 0- ... 000 "'".... ....;..; ... - ... , 8 ci $ ~ o o ... OJ ... III .. ... ... ... :\ ... ... -:,i g o 9- ... o 0- o .. ~ ... .. '1 .. . .. .... er- ... ~ o 8 o ,... ". 8~9- 8. ;. ,.... ~ - ~ .. ~ \ ~\ .... 888 ci 0 0 ~ ~ ~. .D ... ,. 8 ci ... s. '8 g B, 00:1 '" 0- ci ... .. ... .. ? 5 c .0 .:. c:i 8. o 8 o c $ 888 c:i 0 ci ,. ... 0- C ... g.~~ ~ ..:~.. c:i ... ... 'C o "J. '8 g ~ 0 0 g c:i ". 0- ci ~ ~ ~ '4 .; ~ 'i .:. ~ .:. 08' c:i 8 ci 08' o g o .D '" oj, .. ~ '" ! 011 ~ 8 8. o 0 ". ... o .. .. ... g o g o '" ... o ,... .... - ... 89.9. ~ .i-~~ pi> - ... g9.~ g .;....:.~ .. o ... .:. ~ "" g .:. o .. .:. ~ ... i g .:. ,... " ., ... ... ~9.9. 9. _~;. 0 ... .... .. ';:. ... ~9-g ..- ~..i ... 9- o 8 o ", ", ", '8 ci i '8 o 8 8. ci 0 ~. It' ,... '" .. .. .. " "!. .. ~ .;. 9, 9. 'A ~oo ... III $ '88'8 o 0 ci ,... ,... i9-?~~ ;.J;oo ... ..... -' >II $ '88'8 ci 0 0 ... ... ... .. ,.. ,... ,... .. ~ i9.~~~ ~..;.oo .. ~...." ....; 1- ... .. g g c:i 0 ,... <<j9.i ..;...~ ... - !: c:i 1- ... .. '8 g ci c:i ,... <<j9-~ .:....:. ... ... ". .. c:i 9- o ~ po . .... ~ ... '" ;! .. - ~ 9- .:. ~ g g ~ 0 0 o o g · ci 9- .:. 8. ... ~ o .. '8 5 .;. ..: ~ c:i i .. '8 o g o '8 .:. ~ 8 8 !. 0 c:i ,... 9.9.9, o~c:i - ; .. ~~~ ~ o 9. o '3 o ~ o f, g o ~ o '8 o o 8 o ... ~ ~9-~ ~ ~ -i~;' .". - o '8 o o ~ o ~ ... '8 o g o ~ .\ ... .. ~\ '. -;\ .."i" \ \ .'9.;..!'.:i. ~~~~~~~g :at,.sa...w;'''' t ." 1. ~ 0 " 0 ~ o . s:.. .. ....... .t"" ql" ..... "~'ll 'd '6 'd '4 ,:.",:&..-::\...':!:II .. g o ,... i .. .. o '" c:i g g g 000 " ,. .0 ". g g o 0 g o ... g g 'A ~ 0 <> ... ... ".. .... g 8 o 0 ". ~ ... 011 <<j9.5 9. ~ .",.... 0 ,... -:. 59-8 8. :. 4"'~ -- - J'O g <<j ~ .;. .:. .,. ... o o g.' o '8 o ... o ... g ~ o 0 .- ~9-g -j"~ 9- ci ... g 8 8 ~ 0 0 0 ~ J'O ... ,... c o ~ ... g5'-~ 0....0 .. .. ~ ,t..l\ i ~~ , i \ i ~ "~1 i~~'t!! ~ i. "q .. %i~li~~~'i \... -' ~ ii -; .'l"\! i~l':l\ii ..~ .. .. i .. r \"Z~:l:":'" .tia.. q'd~ i:.",l:~~~J .. 9 -0;-- g g ci c:i ..., \ 00 ~~~ ;..l ~ ;; !. ..-;.,\\ i ~l , i \ i'~ ..a....oi..\.., .i1\:' :~ ~t.t...~'d%~" 1:.~1:',':!'" :II to ,;, ~ .. ~ .. ~ (. ... ~ o , 9,9-~ ..00 -' ~ ... .. .... ... o 9- o g ~ c:i 0 ~ ... g . ci ~ ... o ... ". .. 8 '3. .;. ... , ,... 5\, ~ ~ ~...... ... , c:i ~ c:i .. ". ~ o g o 0;. 8 '8 ... 0 0 ,... .. 'i9.'i ~ ,;J.iJ ... ~ ... g .;. ... ~ ~ .. ~ .." <<j .:. ~ .. 'i . .. - . ~ ... .. o ~ ... 'l .. .. .l. ,~ ~.. ~ii .." j,... sa.:. 1\ ! . c~ ........ ...,~ ......~ f't . le \\~, ...,.3 i"S" ~l I : f. 5.... !l~~ "1!1 \5!.~ i \~\~ ",,"jf. ~ l \ l~ '; ,,5 \ & ...\-.. "..'i". ....., , %!~i~ !. i1l ..... \i!.! 1. "'tIl...." i'it~'i i.~'&~ ....tell .... ,.so.J ,\'i~S' "'....t "..... '1 l~\:\ \ \~ i~ ... ~ t...!. o.~-; !c ...,......,iD ..-:It"!. ,;'i!! ~!,:~ ~\~ \1 .~..... ' lt~t ~..!. .. \~i \~'iJ \;1\ .. i! ~-,1. ~"" ti . . ~ ... ~ ~ "" '.S. ... (. ... !. ... '8 ci ~ ... o .,. ~ ... ~ .;. 9- c:i ~ ; !: c:i ~ ~ o ~ 9- o .. ~ . ~l '"&~ ., tool .. i." i i ..~ EXHIBIT liB" STAFF RECOMMENDATION AND CONDITIONS OF APPROVAL 05. 06, 93 12:00 PM ""GEE &. .,JENSON POl n GEE 81 JENSON MEMORANDUM RE: Christopher Clltro, Planning & Zoning Director ;)t' . ~cO J~ W. Richard Staudinger, City Englnett1( V'I"""" Boynton Se9crest (F.K.A. Cedar Grove) Subdivision Master Plan TO: FROM: DATE: May 5, 1993 ...........*....*******..***..**..*********.**********......***************.***.*************....*.. Attached are the comments from the TRC member$ on the referenced development. All of the subdIvision master plan major comments have been addressed except those noted by the Planning & Zoning Department and the Forester/Environmentalist as discussed at the TRC meeting of April 27, 1993. t recommend this subdivision master plan be fOlWarded to the Planning & Development Board with a recommendation for approval, subject to the applicants acknowledgement that the environmental comments by the Planning & Zoning Department and Forester/Environmentalist will be addressed at the preliminary plat stage. This may require the applicant to submit a naw master plan sketch prior to a preliminary plat to verify the environmental comments have been eddressed. I also reoommend the City consider waiving any fees for thIs sketch submittal as the costs of review would be covered by preliminary plat submission fees. 92026/200 I" ....... RECEIVED MAY . ' .....; ... PlANNING DEPT~ "\ n GEE & JENSON LI1Qlneers-Arelliteets-Planners Ine April 12, 1993 One Harvard Circle West Palm Beactl, FL 33409 Te:eonone (407) 683-3301 Fax (407) 686-74.'.6 Jill A. Jarkesy I Esq. Perry, Shapiro, Miller & Jarkesy, PA 1645 Palm Beach Lakes Blvd. Suite 600 West Palm Beach, FL 33401 Re: Boynton Seacrest Subdivision Master Plan Environmental Impact Statement Dear Ms. Jarkesy: This letter is sent to confirm your verbal directive at the Boynton Beach Technical Review Committee (TRC) meeting of Thursday, April 8, 1993. At the TRC meeting you directed City Staff to utilize the environmental study previously submitted for the Cedar Grove PUD rezoning as the necessary environmental impact statement required by Chapter 7, Article IV; Section 7.5-59 of the Boynton Beach Code of Ordinances (page 628 supplement No.45). No previous environmental data had been submitted for the Subdivision Master Plan for Boynton Seacrest (Cedar Grove Tract), therefore no review as noted in 7.5-59 through 63 had been possible. The Planning & Zoning Department of the City of Boynton Beach and the City Forester will be reviewing the impact statement and generating appropriate comments to my attention in accordance with the schedule outlined in the Code of Ordinances. Please call if you have any questions, or if the contents of this letter do not accurately reflect the discussion and actions of the April 8, 1993 TRC meeting with respect to environmental issues. Very truly yours, Gee & Jenson Engineer ;;:::I~~ W. Richard Staudinger, P.E. WRS/bf 92-0255/200 cc: J. Scott Miller Chris Cutro James Cherof Tambri Heyden . RECEIVED .13 p~NN\NG DE-PT. -- - F, MARTIN PERRY ROBERT LEE SHAPIRO JORDAN R. MIllER. JIll A. JARKESY 5&-~ ~~,~,~g~,~d ~o43 .9a/m. $W~ ~ $WkI. .9'~ o()(J 1f't.9a/m. ~, 5~ J..uot TELEPHONE (407) 684-4500 FAX (407) 684-1008 . ADMIDED IN FWRlDA AND DlSTRlCf OF COLUMBIA f f~ ~~' ~_ "<;:':~i' [ (1.,;11 (3 It ~. " ,iff: ~'!:..t ...:~ tr'-~ ' APR 1 6 1993 1" r- ,.'." '''''1' . ," -., - . yC't('"" A. ~;.- 'i.~''''''~ ~;i{' '4 ........ 't"\ ~....' ~._ '-4 ...)J'tJ' i ~ April 12, 1993 Mr. W. Richard staudinger, P.E. city Engineer City of Boynton Beach Gee & Jenson One Harvard Circle West Palm Beach, FL 33409-1923 RE: Cedar Grove Investors, Subdivision Plan Our File No. 3197.01 N.V./Boynton Sea crest Master Dear Mr. Staudinger: This correspondence serves to confirm my statement at the City of Boynton Beach Technical Review Committee Meeting which was held on April 8, 1993 relative to the environmental study submitted by Cedar Grove as part of their Planned unit Development submittal in early 1992. I hereby authorize you on behalf of Cedar Grove Investments to consider the Environmental Study prepared by Donald Richardson Ph.D. of Ecological Consultants, Inc. as part of the Boyntcn Scacrest Master. Subdi vi sicn Pla:1 su;:,nd.ttal. Thank you very much for your consideration of this matter. Sincerely yours, l:.~~ JAJ:psp / L,____~_~___ ',:)NI'S::JtHd~t:toat:td3t:i , 0.' ..-... .~ ~ ...,WI"\..uU'\!'\ LOS &. a I _h._ tAWr VlJ~fo/"'l. I ({rI~ { ~t/~ C-ernre- c/12?~3 R-l-AA ZONtNG SKY RANCH ESTATES (p.eo, 26, PAGE j4) I f I i -.-- I I I \b I \~ e, Q Cl I , ~ 11903076' f t-~ t: : I BL09K ONE I J , 1~ ~ 50' R/W Q \1.. \\,) \ \ \p. "Ji(""l" 0 ..:\, I . 1~ . ,'".': ~ . . , .' .".\'~~'~\ ,. -:.~~~MteAl CQMMlnEE -'::1 SITe: PLAN It:t~~J;.~ .. :3Jd;J. De Date 4fi- ire;? ~::1'4t/~~~~ ~.te ~~~ A Cat~ ,2=.2...~ ",,' ~ Cate . ~ - N" C().~~~if P. 'N. Dt.,'C. / - II c.-te4- :-/ .:E r>"1e':r17 () ~::t.} PIa ~r ~ "cC. a" ((: ~~ ~:::!~ ~;~u :~c.: ;:Gr~ster APR -- - Fire 'Oep. Eng. Dept. Utit. Der;t. Police D,~Dt. I I /. -=f I 1D 1__- .5 ' Lt./,QLL. €~S~M6J(../ T I MA/I.I(: 6Y ~.~A. I I I f I I I -I r- 50'IR/W I I I I I I I 1}3- I I' ~ 'J.\ 'J."J f; Q ~(JJI ; II II fA --- I I ~11t j. ~ll: ~';I " II :... ,I I, -- 1 ~ ' .1 I L-J ~~_l~, \J :.. ""' {... ": - " / RECREATION & PARK MEMORANDUM #93-185 TO: Vincent A. Finizio, Deputy City Engineer FROM: Kevin J. Hallahan, Forester/Environmentalist J<>>/f RE: Master Plan Comment Reconciliation Submission Modification Of TRC Meeting Agenda Boynton Seacrest (FKA Cedar Grove) DATE: April 27, 1993 My comments as submitted at the previous TRC (Memo. #93-166) have not been addressed by the applicant. KH:ad The applicant has verbally requested that the report: ECOLOGICAL ASSESSMENT OF THE PROPOSED SEACREST BOULEVARD SCRUB, (CEDAR GROVE SITE) BOYNTON BEACH, FLORIDA, 09 JANUARY 1992 prepared by Donald Richardson, PHD Ecological Consultants, Inc. be submitted in total for the project FKA Cedar Grove. This is to meet the requirements of Article IV, ~V- environmentally sensitive lands, section 7.5-59 through 7.5-63 ~~aI ( (pages 628-631). This report does comply with section 7.5-59 M\ lJ. ~OJ through 7 .5-61(b). The applicant must also submit written "'n\i:(Ir..}. ~ documentation to comply with sections 7.5-61 c, d through f l~ section 7.5-63 (pages 630-631). " ,..l . In accordance with the City Comprehensive Plan Ordinance #89- 38, adopted November 7, 1989 policy 4.3.5 page 67, the applicant is required to designate a minimum of 25% of the native plant community as a preservation area. The ecological assessment document (#2 above) and the site data sheet (revised 2-20-92) indicated the proposed location of the Preserve 11.5 acres maintained by Cedar Grove H.O.A. will be overlayed on the Boynton Seacrest MasterPlan resubmittal. The . purpose is.to apply the comment made by the applicant at the T.R.C. meeting on April 8, 1993 (see attached memo from Chris Cutro, April ~, 1993 paragraph one) towards the location of the preserve area in conjunction with the proposed blocks, lots, and R.O.W. easements. TO: FROM: RE: DATE: 1. ~ 1r-1~~ l}~ 2. ,') ) ~ ~, ~tFJ r . ~ RECREATION & PARK MEMORANDUM #93-166 Vincent Finizio, Deputy City Engineer Kevin J. Hallahan, Forester/Environmentalist 1<:~J1L- Boynton Seacrest Master Plan Resubmittal (2nd Review) (FKA Cedar Grove Subdivision MasterPlan A Planned Residential Community) April 12, 1993 The applicant will be required to meet the Environmental Regulation Article I, Tree Preservation Sections 7.5-1 through 7.5-27 (pages 593-606). Specifically, the applicant must fulfill the requirements of section 7.5-22, page 603, natural growth to be preserved. This site has been determined to be an environmentally valuable, nearly extinct ecosystem in South Florida. Meeting these sections may affect the master plan design resubmittal, as approved by the City. '.. T:;'~~~J~{;~"'--'_.==:::----'.. <-,.}" ; . . ~t::::~I; '. "',." " < '. . . "",'.', . r~'" . ....:.,~1 .' The following areas as shown on the Boynton Seacrest MasterPlan resubmittal could not be preserved as indicated under a tree managemept plan while simultaneously developed as housing locations. The areas are: Block #1 lots 30,31,32; Block #7 lots #1-24 inclusive; Block #8 lots #1-22 inclusive; Block #9 lots #1-15 inclusive; Block #10 lots #1-6 inclusive; 50' R.O.W. easement between block seven and block eight to north/south property line; 50' R.O.W. easement between block eight and block nine to north/south property line; 10' non- access and landscape/screening easement to north/south property line. KH:ad ~ PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 93-094 TO: Richard Staudinger City Engineer ~h~tro Planning and Zoning Director THRU: FROM: Tambri J. Heyden Senior Planner DATE: April 29, 1993 SUBJECT: Boynton Seacrest (f.k.a. Cedar Grove) - File No. 697 Master Plan (subdivision) - final comments Based on review of the final revised master plan received April 23, 1993 for the above-referenced request, the following is a list of comments to be forwarded to the Planning and Development Board for their consideration. If the Planning and Development Board moves to approve this master plan, it is recommended that approval be subject to this list of conditions which the applicant will incorporate within their preliminary plat submittal; the next step in the subdivision process. 1. At the time of platting, money shall be put in escrow for a traffic light at the intersection of Seacrest Boulevard and Mission Hill Road, until project building or until the light is warranted, whichever comes first. Comprehensive Plan Policy 1.3.1. and 1.3.7. 2. No building permits shall be issued for the final 50% of the total number of units within the subdivision until commencement of construction of either Girl Scout Park or the park site (minimum 4.032 acres) dedicated to the city by the Boynton Seacrest property owner. Chapter 19, Article VI, section 19 -88 (d) ( 5) c and d of the Code of Ordinances and Comprehensive Plan Objective 9C.2 and Policies 9C.2.3, 9D.2.3 and 5.2.3. and recreation concurrency analysis dated April 13, 1993, from Michael Rumpf to Tambri Heyden. 3. No residential building permits may be issued until the developer and the School Board approve in writing an agreement which assures that public school student membership generated by the development will achieve School Board racial balance goals. Appendix C of the Code of Ordinances, Article VIII, Section 4.G and comprehensive Plan Policy 8.22.1. 4. The conflict between the fire hydrant locations and the four foot portion (located on private lots within a bike path easement) of the 8 foot wide bike path system shall be resolved by relocating one or the other and dedicating easements if appropriate. Appendix C Subdivisions, Platting, Article VIII, Section 4.C.10. 5. Block 6, Lot 1 shall require front setbacks on both street frontages. Appendix C - Subdivision, Platting, Article VIII, section 4.C.10 and Appendix A - Zoning, section 5.C.2.b. 6. To resolve the conflict on the master plan, utility plan and the drainage plan, the lift station shall be located within a dedicated tract separate from the property boundaries of Block 6, Lot 11/ rather than within an easement encumbering said lot. Appendix C - Subdivisions, platting, Article VIII, Section 4.C.I0. 7. The subject property is delineated on the Comprehensive Plan Future Land Use Map as a "Conservation Overlay District" due to an "A" (high quality) rating of the native, Florida Scrub ecosystem on the parcel. The use and development of properties delineated as a "Conservation overlay District" are / RECREATION & PARK MEMORANDUM #93-186 TO: Vincent Finizio, Deputy City Enginee FROM: John Wildner, Parks Superintendent Reconciliation RE: Boynton Seacrest MasterPlan (FKA Cedar Grove) - Revised DATE: April 29, 1993 The Recreation & Park Department has reviewed the latest MasterPlan submittal for Boynton Seacrest. The following comment is appropriate: At the TRC meeting of April 27, 1993, the applicant agreed to provide a 6' minimum paved pedestrian entrance to the public park site through the private open space tract as a condition of approval. JW:ad CC: Charles C. Frederick, Director Recreation & Park Department Chris Cutro, Planning & Zoning Director -~--.. r--:- 1"~ o S? ~ ';, :P ~ ~ "'. "Jo. i:n :P "' ~ )> ~ o II .... ... It '" ". '" o It ~ ~ j; ~ Th ;0 II ~ t o ~ OJ ~ ~ ~ i1 :::. :;... (n c '6 <0 ; ~ )> ~ (J' ~ E; m 7f, ~ ~ -< 1 ~ "j;~ ~V ~~!~ ~ ~ ~ \~ \~ il t \.:.:1<4 "," Q~i 1 .. 1; i ~ f') ~.."", ,.i~ ~~; i\ii%ii ~!~t l~~ \ '1 ~:; i .. i ;\';; ~~~ ~~ :: :~6 :t :;. 1 B ~~ . " :: t ~ ~; i ~ & ~ . \ 10 l/ ~ 9. III 9. ~ ;0 % __.........c: " ::E f~ ;l) ~ 0 '2. ~ ~ % ~ ~ (J' '-I l?, '6 ~ III <:. ffi'?l ~ 5 ~ ~ -::. ~ ~ 0 ~ 0 ". '-I 0 :l \!!~ '" - '-I o ~ '" -\I. i" ~\ ." sa ~n ;~ H ~. ;!! ~ ~ :~ ~~$lb III ;: (J' "" h,Oll"'jI ~!~% % (j) '" G'l ~ Z o a> ~ ~ ~ n <! 9 5 o 0 (J' .... ~ 'i III '-I o ~ .. J ~ ~ % III - i i~ .... ~. ~ H.. " .... 1. ~ i: i .~ ~ " ;a i ; ; i \ . ~-to ..,> '. '!r,,- . i o 11 l \ \ \ --- 'A ... . J ~~ -- ; J.. . s' :---\\l ~ ~ . a " 1 \ --- " 1ft ~ ~ .. ~ ,,~ >> . 0 ~ " ... . 'i ~ \ = ~ . " 1ft ~ ~ !4 m !" ;! !4 ~ w \: i \ \ \. ~ \ .. \~. .. \ <> -0 \II t ..;. .\ · l ~ .,. ---';:~; h\ ---; ~ 1/1 ..., ..._-:~l~ii \ ;R~'~ i i ~ ~ ~~~~\ ~~' , . \.'~~ll f"\ \ \ '... \. ':l ~ i ~ 7.~ z t ~ 1 ~; ,~~i ~i" 'i?::...::t::.~....~~ \J?"7.......~""t~ ~, ~ \tf~\~ .~ ;~~~t , 5 ii ~ ~ !>~ ~:::n ::: ~~ ~ ~ 0 'l- I ~~--:-. ;.:: -<. z:. .~~ 3:;);'-z:. 't \ ~ - ~~~z:.z.. !:~. ~ ~ U) t~. ~n\~ "",. <: -1>>..'-"" t' ~ ~~. .~ r. H SI ,Clf~ I.... - f ~ ~ t. ~ $ ~ ~ l : ~ ! ;::. ~ -j,. \ ~ \ ~ ; ;! !4 ~ ---~ \ h \ t~ --~1 1\ \. ~ ___t\ I _.:. -l -}- i ; . i o .0 , i Oceon _1. 11/lllIlllIlllI! F.E-C. I I I I , I I' I I , RALAOAD II I I I I I I 100'RIW OlD OIXE HIGHWAY 80RIW I -i \ C:.4lONItoIG \ \ \ \ I C.J ZOt*HG \ \ _~TMn~~ - ,~~ C.'lo-G COUlon C~.,y C llOWtG I \ COUlll''r I b IS C 7B1 BOYNTON SEACREST (f.k.a. Cedar Grove) MASTER PLAN (Subdivision) PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 93-019 TO: Chairman and Members Planning and Development Board ~~ THRU: Christopher cutro Planning and Zoning Director FROM: Tambri J. Heyden Senior Planner DATE: February 4, 1993 SUBJECT: Boynton Seacrest (f.k.a. - Cedar Grove) Master Plan (subdivision) - File No. 697 Chapter 19, Section 19-85 of the code of Ordinances states that "no development order shall be approved, unless public facilities are or will be available to serve the development project, such that the minimum levels of service set forth in section 19-84 are maintained, concurrent with the impacts of the development proj ect.. . Approval shall include simultaneous issuance of a concurrency exemption determination, certification of concurrency, or conditional certification of concurrency for each public facility. Subdivision master plans are defined by section 19- 83(b)(3) as a category C3 development order. In reviewing this category of development orders to determine adequacy of public facilities, roads, drainage and neighborhood parks facilities must be certified or conditionally certified for concurrency with the adopted levels of service, consistent with section 19-88(c)d.3 and 5 and Section 19-85(c). Although the Boynton Seacrest application is complete with respect to chapter 19, Article VI, "Concurrency Requirements", based on the statements from the Palm Beach county Engineering Department, the City's Engineering Department and the Planning and Zoning Department, certification nor conditional certification for roads and drainage can be issued until the areas of noncompliance are satisfactorily addressed (see exhibit "A" - statements from City department and service provider concurrency review). With respect to neighborhood parks, conditional certification of concurrency could be issued, consistent with Section 19-88(d) (5)c and d, simultaneously with approval of this development order if subject to the proviso contained in Planning and Zoning Department Memorandum No. 93-013, item #9 (see exhibit "B" staff recommendation and comments listing submittal deficiencies). Item #9 states that no building permits shall be issued for the final 50% of the total number of units within the subdivision until construction of either Girl Scout Park or the 4.2 acre dedicated park site commences. With regard to compliance of the master plan with Appendix C - "Subdivisions, Platting" of the Code of Ordinances, exhibit " B" contains a recommendation from Richard Staudinger, City Engineer and coordinator of the subdivision master plan review process, as well as staff comments listing the deficiencies of the submittal. Due to the extensive number of serious comments, it is recommended that the Boynton Seacrest subdivision master plan request be denied. ..J~!l~kJ Tambri J. Hey~n . tjh Attachments xc: central File A:BoySeaCL EXHIBIT "A" CITY DEPARTMENT AND SERVICE PROVIDER CONCURRENCY REVIEW STATEMENTS Board of County Commissioners Mary McCarty, Chair Ken L. Foster, Vice Chairman Karen T. Marcus Carol A. Roberts Warren H. Newell Burt Aaronson Maude Ford Lee County Administrator ~----- Robert Weisman Department of Engineering and Public Works January 25, 1993 Ms. Tambri Heyden City of Boynton Beach 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, FL 33425-0310 RE: BOYNTON SEACREST (AKA CEDAR GROVES) - FILE NO. 697 Dear Ms. Heyden: The Palm Beach County Traffic Division has reviewed the traffic impact study for the project entitled Boynton Seacrest (aka Cedar Groves) pursuant to the Traffic Performance Standards (TPS) in Art i c 1 e 7.9 of the Pal m Beach County Land Development Code. The project consists of 146 single-family units and 81 multi- family units. The build-out of the project is proposed for 1995. There is one problem with this traffic study. Woolbright Road between 1-95 and Seacrest Boulevard is projected to have a traffic volume that exceeds the Level of Service D volume. In order to meet the standards in TPS, the project traffic must be reduced to less than 302 trips on Woolbright Road, a 7% reduction in traffic. This would require a reduction in total project traffic from 2034 trips to 1890 trips. The reduction in trips could be accomplished by reducing the number of single-family units to 136, or reducing the number of multi-family units to 61, or some combination. It may be possible that the entire project can be approved by an Alternate Test 1 analysis of Woolbright Road. If you have any questions regarding this determination, please contact Dan Weisberg at 684-4030. Sincerely, OFFICE OF THE COUNTY ENGINEER cfr~ ~~ FiJI<. Charles R. Walker, Jr., P.E. Director - Traffic Division RECEIVED File: TPS - Mun. - Traffic Study Review JAM 27 PLANNING DEPT. CRW:DW h:\traffic\diw\boyn11c "An Equal Opportunity - Affirmative Action Employer" @ printed on ,ecycted paper Box 21229 West Palm Beach, Florida 33416-1229 (407) 684-4000 LOC~ 1\ON M~P ao"N"O~ ,,?~~~~t;S!v · ~\\\'\I\\\~ I-~ \ \ l\\~ . 0; 11 \ ,dr;;,,~~~' \ II' , ' ~~ L~~'CA ~ \\ pu,~ ~~:l1-\ ,II \ ir : \ ~ ~:=-n ~ " ~C"'" ,~ ",1..' I " \.: ~. i\ II \' \ U: .. \' , ~ ,,1 ,-'rl.H' "~ '" , ' " ~ ~ ~ ~a. ,,:1 '" ,- \ I ,Jl ~~~ I ,-,-1 ~\--l ,V r'" '. : - ~ /) H' Jt5> · : · ~ __ ~-"if'l pO ~ : \ 'GS- :' ,~ ' /_ p6C, _ 1 \\ II - ~/ C3 ! ' f l - ,\ · ;\U-"" " - j L .- .~~J:'e L " " L-';' '[. . suJ ' :: 1 ~.- : \ --.0 if!' ... : · : "'___ 1:.\- . _.; c: - --: ' ./ \ ',__ II" ---' ' == 1 .------ .~. _;<,~,1t--JJ.'~ ~; J: .~: p J =- T ....'~ .:- ~r ~ ~: #, . ..:_ ~ , ',-I: r' \' -<\ rl ~j l# I'T f ::;ccr/'~;':=- ' -- 'r; '1/ . lJ/ ~"b L ~ ~(jj ft ' ~~~; if 1':'\ L~;~ 1 I~ {._..I II)!!) _ ~ 'J.~r - " ,eB III'. :\\- \ ......? ~ I ~ ~ ~ ~ ;"AJ" \I lJ' l . ~ '/' A "Yc-Q./)I .\ ~~\\ . .-- : 1/." , '1 \::rJ .:::: II:-=-. 1 ,_ p' r ~ : l ---1V l-- ; 'l J '- ;-,--,_- " 'r' \ \,f:\ :c ~ ':l! 'J,'H ,\~::-_IJ,j!~r 1 ,\\\'\ \, ".":3 i:=l6 "J I I=' :, ~>- rA~ I" ( '~ 1\ A~ - (:' : e ~ ~ \ \ \ . \.;\ ~ :~ I ~ . 'cD:l~~~~..i6--~1I ,~\~~~ \'C=,,".,,-~' ~ '(, I J:f~1 ".- I' \ d1\:...-..J-' I ".J: HOT \.' 1 __ . I~ ,I' ' I I H{'\'\\:.' 1f[T \ \~~) -- T$\.L/ ,.... "",: 7i f II,-J{TT' L Cn - r, -- ,"' I;c: I I ::;0;" \ ~\ ,\U l-l- - .J. j, III ,: " 111l-' _\ '\ 1 ..\ _, ~ ~"(:..\.- - ftUl \ "\ ( n\ I <ll /' , ~ ' 1. U u...;' u-:.. _ ' {\ L I.,,!.- L"-' \.... " T ~ -- . . ,'" ~( " '\ 1\ \'J:: F 0' I ,', :T'\'" ,. " i:t: - :-'\. 1 ~ f' ' T >1"'" 1 - ' I ,<Ill ,,~,...... 4' ' .- . l- ~rl-- ("'" \ .....;.~ 1 ., - "V"..... ~ ' \). __ ,~. _ "c-I ,'\' -- ' ...: "" ~" \i:l. ,_ ':.. -:::L- \ '- - ~ \" l' 1(\ i [I IS ,..rr..'!L::'I...[,. \ l-I-- '"' -'-." .,,: ,.,., ~I _,.-\ ~ '::J- ~I::::' r'~ ( lJMl _ J;~f--1-n \ . -';:~:: r.c ....::\~t-f-T \ 1 \) / ~ :.-' -'_~ ' '\ __ 8:J ~.. '-I;::' -:::: \ _ . ~ ':i~ ~ ~~ C \ 1_ -~~.~' ~::~ . '0' c.... - f l' '\ ' '\ 1 ' ' - -c::: ' . ,., , 1 \ '\ '- Ill:: C1! . " ,......,;,."__"1III:IOiI. ~ "'" ,.- .- \ . ---~ --. .' "~ ~ .._.- ..--a'E n' T .\'<'-' '-' 'J ~ - ,,1 ~ """'.-~ <,::A, " '.: \' '\"\ ._\~' C!' \ r-\' ,,--,':i~ ~ ~- ~,;. l/~I .. "..,..' ~ 1 ..:...J \ -=.l. :::::-.\ _.~ - 1 \ \ ill !)'}-' \ \ ~:::..\. ::I 'i-I ';:r'f L . \, ...... . ~ , . . . ::: l' l:li c. . \. '\ \ I -~ -- \II 1.: '" ._~ \. ,C ';::',.;, LA _'36-: I P ~ L ~ "l. , ,...... ..... /- 'L' 1 .-- TO: Richard staudinger -2- April 29, 1993 ( con t rd. ) 7. subject to the recommendations contained in the Conservation and Coastal Management Elements of the City's 1989 Comprehensive Plan. Since no preservation is shown, the subject master plan is inconsistent with Comprehensive Plan Policy 4.3.5 which requires preservation of a minimum 25% of the total scrub habitat of 45.69 acres (i.e. - 11.43 acres). Operating under the same conclusions drawn in 1992 by staff and Donald Richardson, the applicant's ecologist and preparer of the January 9, 1992 ecological assessment rereviewed and applied to the current request, at minimum, the following lots (and street access to them) shall be deleted and the land area set aside for preservation. This determination was made be overlaying the vegetation mapping required in Section 7.5- 61(b)1 of the Environmentally Sensitive Lands Ordinance: a) Block 7 , Lots 1 and 13-24; inclusive b) Block 8, Lots 1-22; inclusive c) Block 9, Lots 1-15; inclusive d) Block 10, Lots 1-6; inclusive e) Block 1, Lots 30-32; inclusive 8. This request does not meet the submittal requirements of Chapter 7.5, Article IV. Environmentally Sensi ti ve Lands, Section 7.5-61 Review procedures for proposed land alterations, section 7.5-61(c) "project operation" and Section 7.5-61(d) "Project alternatives". Therefore, it is not known how loss of habitat and development impact on the endangered, threatened and rare animal and plant species and species of special concern that have been identified on the property, will be mitigated. The management plan to be submitted shall address establishment and maintenance of the preserve area and any other common areas, including as much existing vegetation as possible, employing preservation and relocation, rather than "cut and replace" techniques, outside the preserve area. It is also recommended that a transition buffer be designated as another mitigation measure. The transition buffer would be a restricted development zone to prevent significant adverse effects on the protected environmentally sensitive zone and would ensure that any portion of the transition buffer that is damaged during construction, is restored and operating within a reasonable amount of time. Comprehensive Plan Policy 4.4.2 and Chapter 7.5, Article IV, Section 7.5-61(d) of the Code of Ordinances. ~ ~ ~/~A Q ~ Tambri J. Heydafi' tjh A:BoynSeaFC xc: Central File GEE & JENSON Engineers-Architects-Planners.lnc- One Harvard Circle West Palm Beach, FL 33409 Telephone (407) 683-3301 Fax (407) 686-7446 MEMORANDUM TO: FROM: DATE: RE: Mr. Chris Cutro, Planning & Zoning Director W. Richard Staudinger, P.E., City Engineer January 21, 1993 Boynton Seacrest (formerly Cedar Grove) Subdivision Master Plan Resubmittal TRC Comments The TRC has reviewed the revised subdivision Master Plan submission. This memo is to inform you that the Master Plan will be going forward to the Planning and Development Board's February 9, 1993 meeting with negative comments concerning approval, because of the extensive number of serious comments by Staff still not addressed, including the sections of Chapter 7 of the Boynton Beach Code of Ordinances (Environmentally Sensitive Lands). We have informed the applicant by separate letter. Please be advised of the following Engineering Department comments concerning the Boynton Seacrest submission. These comments are sent to you for your files. With respect to Appendix C, Article VIII, Section 4 of the Boynton Beach Code of Ordinances, the following comments are noted: (C) (D) ~ 1 thru 7 - No comments or corrected as requested 8 - No roadway widths given for adjacent streets 9 - Survey & site has not been abstracted. Provide proper documentation with resubmittal. 10 - Entrance right-of-way and Mission Hill Rd. dimensions to property line to be added. 11 thru 16 - No comments or corrected as requested 17 - Utilities availability not addressed by applicant. Provide documentation as required by this item. 18 & 19 - No comments TIA submitted to Palm Beach County - No comments Master Stormwater Management Plan is still not acceptable, although additional information has been included. How will the drainage system be maintained? In addition, the volume calculations submitted for the exfiltration trenches cannot be fully credited for runoff storage by SFWMD criteria. This matter has not been ;addressed to my satisfaction. Article X, Section 1, Access: Access to Lots 1 & 2 (Block One) and Lots 2526 (Block Ten) violates the above section as they are less than 180 feet from Seacrest Blvd., a collector street. Modify entrance configuration to comply with this design requirement. The modifications shown do not, in my opinion, meet the requirements of' ction of the Code. IC~ w. Richard Staudinger, P.E. City Engineer WRS/bf 92-049 NEIGHBORHOOD PARK ANALYSIS: PLANNING AREA 117 Concurrency Analysis por C!DAR GROV! Alt. 12 . Public Recreation Provided, Proposed No. of Units... 228 >> Ho Private Recreation Projected population.... 513 Analysis of Level of Service: 1987 11/1/92 1995 2000 2010 Population .,983 5,(96 6,22t 6,261 6,289 Population Served by Private Recreation Facilities 1,853 1,853 2,890 2,890 2,890 Population served only by Public Parks and Facilities 3,130 3,6(3 3,334 3,311 3,399 Neighborhood Park Acreage (PublicI 3.70 3.70 8.70 12.90 12.90 LOS for Acres/l000 2.50 2.50 Population 1.20 1. 00 2.60 3.80 II 3.80 LOS for HaxiDul Walking Distance (Iiles) 1.00 1.00 1.00 0.50 0.50 Existing and Future Public Parks and Facilities: lorest Hills 3.7 Girl Scout 5.0 Little League IDistrict) 11 acres S. Seacrest Blvd. Site (,2 Total Neighborhood Park Acres 3.7 3.7 8.1 (unchangedl 12 .9 12.9 1980 Population Under Age 18, and Percent of Total( I: 697 (17) HOU: -lor current ropulation, the 1987 population vas used since the 1990 Census includes only year-round residents. In addition no residentia development has occurred in this Planning area that vould significantly change the 1987 population. -The population for Cedar Grove was estimated using BBBRls ppdu of 2.2(8. '" ... i .~ ~ I i '::1 . .. :; 'E ~IC j p "i &: I .8 ~ j ~ o ... o N ~ ~ ... .. ... .. '" .. .. .. ... .. N .. .. .. o .. ... . ... .. '" ~ ... ... .. ,., ~ -' ... o '" i ... o ... ... ... ~ .,. ... ~ ... .. ., ... N .. ... i .,. .,.. ~ CI o .. N ... .. ~ ... .. ... .. o .. - ~ 8 o - - 8~g~~ .,; ,.; ~ 0 0 ~ .... 8 g 8 o CI 0 CI .. ..; 8 o 2 .0 8 CI - ~ ~ ~ ::""-1 8 o ::! 2 8 c:i 8 c:i 8 o ~ o 8 o 8 c:i o .. ... g CI Sl ..; g CI - g CI i ... g CI ~ CI ~ CI - ~ ~~~ ~ ~ ..; N ~ .... CI CI ... ~ 8 ci 8 o 8 CI - ~ CI ~ . ~I ..... = ~ ..:"i~1I"~"1-. o."! uo - z ....c. .:.. c ... '""... ... . .u....... C:1.6<0",0c: o .&. .. 11.... .>..... 2 ... ~ ~ .. -. :a 5Q ~ ltl ... ~ L ~ ~ L ~ ... ~ ~ ] .. . L !' 'i &: 8 8 c:i on ... o 8 c:i ~ c:i ~ c:i '" N .. ~ .. o .... o ~ o ~ CI .... e- ... CI 8 o .... ... ., Cl ~I ... i ... ~ ~ Cl ... ... ... ... Cl ... 'J. ... - '" ~ ... CI CI .. ... ~ i ~ ... ... ... '" ... ~ ~ CI o ... i ". ... ~ '" ~~~ "'''''~ g CI ~ .; g CI 2 .0 8 CI 000 ":"":"": ::N4 8 o ~ ., 8 c:i 8 o 8 CI .-. Sl~~ ONO ... 8 8 o 0 ~ ~ o 0 ~~~ .,...'" 8 o 8 o gSlSl 2N. ... 8 o ~ N 8 o s .. 8 CI 8 o Sl ..: ~ CI ~ o ~ . ; ."i..J3 ..>lid::l!l. j;t€~~~i!Q ~1.a~:; 1:; r s 'i ... .."" ,^..t._~ltl~5Q~ !:~.2L:::S-:::S.i 8 ..; 8 c: ~ 3 ::> !: o 8 ci "" - o ~ ci .,.. ... .. 8 .. CI .... o 8 o '" ... ..: 8 8 o t:: ci ~ ~ ~ ... ... ~ ~ .. - - ... ... '" : .. ~ .., "II ... . ~ -J, ... .. .,.. ... ;; ... ... ... .. o ~ o N o .. on - .. '"' ... ^ ... ~ ! 8 8 o c:i ~~~ .",...~ ~Sl8 ::....... 8 8 ~ o ci 0 ~ ~~:c .;. ..00 888 c:i ci 0 ~~2~~ "''''''00 N 8 o .... SSl~ Sl ........ 0 ... ~ o 8 c:i ~ .... ~~~ 8 8 o 0 ~ ~ o 0 2 ..; '.... ... 8 ci 8 o S ... ~ SSlS Sl ~ *CI" N"; 0 ~ ~ ... '" ~ ~ o i ^ .. .., ~Sl~ :;1"~ -' s ... 8 o .E- · ~ ~!..J~ i -E 1 ~ ~ ! i ; a. -!.. .. Jll~~l:J 2Ct-~l!!~5Q~ l!SZJ:lL:::S"::S=' ... 9 .,.. ... ci 8 8 ~ o ... ... o ~ ..; Sl ..; o ." o ~ o 8 o .... ... ... ... .. o ~ o Sl o ~ '" ... ": ~ ~ ~ ,0 8 ci ~ ~~~ Ill"l N ~ li! 8 ... 2 ..; E ~ ~ ~ sr: P"I = N "" 0 ... 0- '" 8 8 8 000 .,.. ... .. ., SlSl~ NO'; ~ . .. '" ... ~ 8 8 000 ... N ... ~ ~Sl2~:C .... ..... '" to 0 N .... .... ~ ~ 8 ... 0 0 '" ~ ~ .... ~~i Sl .......; 0 N .... ~ ~ N 0 8 o o 8 o 8 ~ N '" o .. ... .... ~ SfS:~ - .,-J,..", .... ... ... 8 o 8 o ... ~ 8 o ~ o .... ~ s~s ~ ~ 0......4 ci .... ~ ~ S ~ "" '" " 0 ~ ~ ~ i '^ .., ~~~ ~ ;I"'~ 0 ....l ;: . ~ .. ';i .. J 3 ~~liili~ w ..~~ i" 6~1.8~:; :;~ 10 'i a. ...- ~:t..t~~lQ:: j ! ~ l : ~ ... ~ ~ '" N ci 8 ... 8 - .... .. o o '^ ... ~ - o ot'l o ~ ci 8 o ." N ..: ~ o .. i · ~J 'O! tJ .., .. i · CD 11i ! .. .. I: .; ~ ~ J ~ .. ... - - ~ ... .. o e i . .. .x. I~ ~.. f! .. V j." 'i... i~ !~ . c... ....... =S~ J~i ! pI z: I!"'~ i ~!IJ iL ~l~a !.s;= ~~:s >> li~] ;c..~ ~"''''.s ....:1 iJ!!J ... g .l~ .- ~ iW I g ... t ... S 8.S ! & -;i!.... .. >>. ..... g 5..J'" ~..... ... -=&".~ g:':Ji u:!.-&. -u. :5...... ~ e'S I ~ a.o .1= 'e 31'0.] ~s-u i;:....t .._ . t 8..-:] l~j~e 18..... e;!~ -~!'-': Q,%.. ! "I~": .:lJV~ '0 S 0" ~ ..:I.. ~!'I.':I li~i'2 ~8c:1.! :V-":! . .., eo c: ...z:.I:- '.i.:1 :II! · J .0.:1' I:l:lg u ~. :;eli~ .!.....~= ~g.8.. -::f.':='O , . - . 1-2.- ~!.!~j I I . . . t! - , ~ ... - 41 ... ..- ~ ... 41 ... - , ill .... ... ~ ... ill N '" ill ... ... ~ ... ,; ~ .,; ~ .; N ~ '" g N EXHIBIT "B" STAFF RECOMMENDATION AND SUBMITTAL DEFICIENCY COMMENTS n GEE & JENSON Engineers-Architects-Planners, Inc. MEMORANDUM One Harvard Circle West Palm Beach, FL 33409 Telephone (407) 683-3301 Fax (407) 686-7446 TO: Mr. Chris Cutro, Planning & Zoning Director FROM: W. Richard Staudinger, P.E., City Engineer DATE: January 21, 1993 RE: Boynton Seacrest (formerly Cedar Grove) Subdivision Master Plan Resubmittal TRC Comments The TRC has reviewed the revised subdivision Master Plan submission. This memo is to inform you that the Master Plan will be going forward to the Planning and Development Board's February 9, 1993 meeting with negative comments concerning approval, because of the extensive number of serious comments by Staff still not addressed, including the sections of Chapter 7 of the Boynton Beach Code of Ordinances (Environmentally Sensitive Lands). We have informed the applicant by separate letter. Please be advised of the following Engineering Department comments concerning the Boynton Seacrest submission. These comments are sent to you for your files. With respect to Appendix C, Article VIII, Section 4 of the Boynton Beach Code of Ordinances, the following comments are noted: (C) 1 thru 7 - No comments or corrected as requested 8 - No roadway widths given for adjacent streets 9 - Survey & site has not been abstracted. Provide proper documentation with resubmittal. 10 - Entrance right-of-way and Mission Hill Rd. dimensions to property line to be added. 11 thru 16 - No comments or corrected as requested 17 - Utilities availability not addressed by applicant. Provide documentation as required by this item. 18 & 19 - No comments (D) TIA submitted to Palm Beach County - No comments (E) Master Stormwater Management Plan is still not acceptable, although additional information has been included. How will the drainage system be maintained? In addition, the volume calculations submitted for the exfiltration trenches cannot be fully credited for runoff storage by SFWMD criteria. This matter has not bee~~ or my satisfaction. -L-I'-.J-Cl vEn JAN 27 PLAt-i f-i' '-, --p A,,,~ U4:,.' T. _ . ~"""'>':i. -- n Article X, Section 1, Access: Access to Lots 1 & 2 (Block One) and Lots 2526 (Block Ten) violates the above section as they are less than 180 feet from Seacrest Blvd., a collector street. Modify entrance configuration to comply with this design requirement. The modifications shown do not, in my opinion, meet the requirements of' ction of the Code. ~~ W. Richard Staudinger, P.E. City Engineer WRS /bf 92-049 n GEE & JENSON Engineers-Architects-Planners, Inc_ January 22, 1993 One Harvard Circle West Palm Beach, FL 33409 Telephone (407) 683-3301 Fax (407)686-7446 Julian T. Bryan III Julian Bryan Associates 3191 Leewood Terrace L 136 Boca Raton, FL 33431 Re: Boynton Seacrest (formerly Cedar Grove) Technical Review Committee Comments Revised Subdivision Master Plan Dear Mr. Bryan: The Technical Review Committee (TRC) of the City of Boynton Beach met on January 14, 1993 to discuss the revised subdivision Master Plan for Boynton Seacrest. The revised Master Plan was to address comments from the TRC meeting of October 27, 1992 concerning the original subdivision Master Plan submittal. Attached, please find the original staff comments from October and the recent staff comments on the resubmittal from the following departments: 1. Planning & Zoning . 2. Police 3. Fire 4. Building 5. Recreation & Parks 6. City Forester/Environmentalist 7. Engineering 8. Utilities Based on the extent of comments not addressed in this revised submission, I cannot forward this Master Plan to the Planning & Development Board with a recommendation to approve the plan as submitted and revised. The Code is unclear as to whether this matter can move forward with negative findings. After discussing the matter with the City Attorney, we are moving the matter forward to the Planning & Development Board, who should address these negative findings in their discussions. ----- n Julian T. Bryan, III Julian Bryan Associates January 22, 1993 - Page 2 This subdivision Master Plan will be on the agenda of the Planning & Development Board meeting ot February 9, 1993. Very truly yours, Gee & Jenson Engineers-Arc . -Planners, Inc. WRS /bt Enc/. 92-049 cc: Vince Finizio w / encl. Jim Cherat w / encl. Chris Cutro w / encl. J. Scott Miller w/encl. TRC Members TO: THRU: FROM: DATE: PLANNING & ZONING DEPARTMENT MEMORANDUM NO. 93-013 chairman and Members Planning and Development Board c~r~o Planning and Zoning Director Tambri J. Heyden Senior Planner January 21, 1993 SUBJECT: Boynton Seacrest (f.k.a. Cedar Grove) - File No. 697 Master plan (subdivision) - resubmittal Please be advised of the following list of comments which itemizes the planning and zoning deficiencies of the above-referenced submittal. Based on the extent and impact of these deficiencies, it is recommended that this request be denied by the Planning and Development Board: 01.. :"1'.\ 2. 3. 4. 5. 6. 7. ): Add a note which references the Zoning Code, "Building and Site Regulations" for the R-1AA and R-2 zoning districts. provisions. Appendix A - Zoning, Section 5.C and 5.F. Indicate the width of the required limited access easement on Lot 1, Block 1 and Lot 26, Block 10 along Seacrest Boulevard Buffering (screening) required within this easement shall be addressed on the preliminary plat plans. Appendix C of the Code of Ordinances, Article VIII, Section 4.C.10 and Article IX, Section 3 and Comprehensive Plan Policy 1.3.6. Show the location and width of a wall maintenance easement for the retaining wall indicated along the north boundary of Block 1, Lots 20 - 26 and along the west boundary of Block 10, Lots 17 - 10 of the master stormwater management plan. Provide information regarding ownership and maintenance responsibility of the wall and associated easement. Appendix C Subdivisions, Platting, Article VIII, Section 4.C.10. Palm Beach County's comments regarding the revised traffic study are expected to be received no later than February 2, 1993. Therefore, comments on the traffic study and concurrency certification for traffic levels of service will be forthcoming. It is noted however, that page 8 of the study, "Project Access", last sentence, does not mention the third access to the development, added on the revised master plan, which provides an additional connection to the surrounding street network via a link to S.E. 4th Street and indirectly to Gulfstream Boulevard. Chapter 19, Article VI, Concurrency Requirements, Section 19-87(e) and 84(e). ,Ci Add a note which references, or a detail which is consistent with, the language on page 8 of the traffic study regarding the primary access to the development from Seacrest Boulevard as a three lane, undivided section tapering to a two lane undi vided section. Appendix C of the Code of Ordinances, Article VIII, Section 4.C.10 and Comprehensive Plan Policy 1.3.1 and Objective 2.4 and 2.5. " It is recommended that money be put into escrow at the time of platting for a traffic light at the intersection on Seacrest Boulevard and Mission Hill Road, until project buildout or until the light is warranted, whichever comes first. Comprehensive Plan Policy 1.3.1 and 1.3.7. Due to the length of Block 1, 3, 7, 8 and 9 (900 feet in length or over), locate an eight feet wide crosswalk/ pedestrian path between streets (traversing lots within blocks) linking the proposed pedestrian system shown to the P & Z Memo No. 93-013 -2- January 21, 1993 (cont' d. ) 7. public park site. Include information regarding dedication and maintenance of these crosswalks/pedestrian paths. Appendix C of the Code of Ordinances, Article X, Section 3.D.2; Article IX, section 11 and Article VIII, Section 4.C.10 and Comprehensive Plan Policies 1.11.9 and 2.4.4. 8. , " t; I 9. 10. ); 11. \ " 12. " J Since there is an existing bike system on Seacrest Boulevard, it is recommended that there be designated on one side of the proposed outer-looping, local streets, a bike path connecting the Seacrest Boulevard system to S.E. 2nd Street to the north and to S.E. 4th Street to the south to further the intent of Comprehensive Plan Policies 1.11.9 and 2.4.4 and Appendix C of the Code of ordinances, Article IX, Section 11. "' " In order to ensure that there are adequate recreational facilities available to serve the proposed subdivision, concurrent with the impacts of the development, certification of concurrency for neighborhood park facilities shall be issued conditioned upon no building permits being issued for the final 50% of the total number of units within the subdivision until construction of either Girl Scout Park or the 4.2 acre dedicated park site commences. Chapter 19, Article VI, Section 19-88(d)(5)c and d of the Code of Ordinances and Comprehensive Plan Objective 9C.2 and Policies 9C.2.3, 9D.2.3 and 5.2.3. and recreation concurrency analysis dated January 21, 1993, from Michael Rumpf to Tambri Heyden. Add a note, as recommended by the Palm Beach County School Board, to the master plan which states that no residential building permits may be issued until the developer and the school Board approve in writing an agreement which assures that public school student membership generated by the development will achieve school Board racial balance goals. Appendix C of the code of Ordinances, Article VIII, Section 4.G and Comprehensive Plan Policy 8.22.1. The subject parcel is delineated on the Comprehensive Plan Future Land Use Map as a "Conservation Overlay District" due to an "A" (high quality) rating of the native, Florida Scrub ecosystem on the parcel. The use and development of properties delineated as a "Conservation Overlay District" are subject to the recommendations contained in the conservation and Coastal Management Elements of the comprehensive Plan. In addition, applications for subdivision approval involving proposed alterations of ecosites representing high quality native Florida ecosystems must meet the requirements of Chapter 7.5, Article IV of the Code of Ordinances Environmentally Sensitive Lands. The Boynton Seacrest application does not meet the submittal requirements of the Environmentally Sensitive Lands Ordinance, nor does it address detailed mitigation considerations for loss of habitat and impact on endangered, threatened and rare animal and plant species and species of special concern that are known to exist on the parcel. Also, the application submitted is not consistent with Comprehensive Plan Policy 4.3.5 in that preservation of a minimum 25% of the total scrub habitat of 45.69 acres (i.e. - 11.43 acres) is not reflected on the master plan. Include a note on the master plan that the preserve area shall be privately maintained. At the time of applying for preliminary plat approval, a management plan shall be submitted for the preserve area and any other common areas, including as much existing vegetation outside the preserve as possible, which employs preservation and relocation, rather than "cut and replace" techniques. Designation of a transition buffer is recommended as a restricted development zone to prevent significant adverse P & Z Memo No. 93-013 -3- January 21, 1993 (cont' d. ) 12. effects on the protected environmentally sensitive zone. This should be included in the management plan to ensure that any portion of this buffer that is damaged during construction, is restored and operating within a reasonable amount of time. Comprehensive Plan Policy 4.4.2. ~~:.ler4Jt4/ tjh Attachments A:BoynSea MEMORANDUM FROM: Tambri Heyden, Senior Planner Michael W. Rumpf, Senior Planner~ TO: DATE: January 21, 1993 SUBJECT: BOYNTON SEACREST - Concurrency Analysis for Neighborhood Parks This concurrency analysis on the proposed development is being performed pursuant to Chapter 19, Article VI. Concurrency Requirements (Boynton Beach Code of Ordinances). Boynton Seacrest is located within Park Planning Area #17. According to Table 2, Neighborhood Park Needs Analysis (Recreation and Open Space Support Document, 1989 Comprehensive Plan), and the attached analysis for Planning Area #17, the current (1987) levels of service for Area #17 is 1.2 acres of park space per 1,000 persons, and a 1 mile walking distance. The acreage level of service will then change to 2.6 acres per 1,000 persons in 1995, as a result of the completion of Girl Scout Park. By the Year 2000 the acreage level of service is to change again to reflect the addition of the required park dedication in connection with the development of the S. Seacrest Boulevard Site. Boynton Seacrest consists of 228 dwelling units. By applying the persons per dwelling unit factor estimated by the Bureau of Economic and Business Research (BEBR)--2.248--a population of 513 persons is projected. As the attached analysis indicates, this development, when built-out, would lower the adopted acreage level of service to 1.00 acre per 1,000 persons. The walking distance level of service would not be affected by this development. The impacts from additional development within Neighborhood Park Planning Area #17 upon adopted levels of service were anticipated, and in part, formed the basis on which these levels of service issues were resolved within this planning area. Included within the City's Comprehensive Plan are the following two policies that address directly, or indirectly, the level of service condition within Neighborhood Park Planning Area #17: Policy 5.5.1 - Subsequent to Plan adoption. .all residential developments that exceed 100 dwelling units provide a private recreation area, unless however, public parks are located within one-half mile from the project.. Policy 5.5.4 - Subsequent to Plan adoption the City shall require the dedication of sufficient land for a neighborhood park site at the time that the following properties are rezoned or platted for residential use:. .., S. Seacrest Boulevard, Policy 5.5.1 does not apply to the S. Seacrest Site, as this site is located within approximately one-half mile from the planned Girl Scout Park. With respect to the dedication of public park space, which is required by Policy 5.5.4, Boynton Seacrestis consistent with this Comprehensive Plan policy as the master plan indicates that 4.2 acres of the site is to be dedicated to the City for eventual neighborhood park development. This site would be acquired according to the requirements of Appendix C. Subdivisions and Platting (Boynton Beach Code of Ordinances). The dedicated park site satisfies the specific requirement within Policy 5.5.4 of the Comprehensive Plan, however, to ensure that the adopted levels of service are met, either the Girl Scout Park or cont. Concurrency Analysis the dedicated park should be completed prior to the completion of the proposed development and, the other must be constructed prior to the Year 2000. Attachments A:CBDARGt2 le##~o~l-;t'32 l6124 FRON ~ROWIH NAHAOENfHT CEHTER 1 U ';l i' J l;j? -4 5 ';l t. . u ~ THE SCHOOL BOARD OF PALM "eACH COUNTY, fLORIDA PLANNING. CONSTRUCTION a. REAl. ESTATE 3320 FOREST HILL BOUlEVARD WEST PALM BEACH, fL 33406-5813 (407) 434-e020 FAA (407) 434-8187 DR. C. MONICA UHLHORN SVI'!:PIJt{TI!NMHT Of 6CHOOl8 October 26, 1992 Rea Impact Analysis - Cedar Grove PUD, Boynton Bea ThIs statement iI. provided In fulfillment of Chapter 235. 93, Section 2, Florida Statut9~ to ensure that publio 9ducatlon facilities are coordinated wi plans for residential development. It addresses the concerns of the palm Beach County Soh 1 Board as they specifically relate to the antioipa.ted impact of the construction of 228 50' Ie family dwelling units located within the Cedar Crove PUD eas;t of Seacrest Bouleva and iOUth of S.E. 31Et Avenue in Boynton Beach. A study waG conducted utilizing demographic multipliers or Palm Beach CoWlty to eGtimate the number of students which would be generated from thi type of development. Information was not received regarding the number of bedrooms fo in th~e types of dwelling units, For the purpose of this analySis it is assumed that th9 22 c1nglo family units will consist of 3~ bedrooms. Planning, c.onstruction and Real Bstate est. tes 92 elementary, 39 middle and 35 high school students will be generated by the project. The geographic ares in which these propoeed dwelllog un! will be located is presently served by S.D. Spady Elementary, Carver Middle, and Atlantic H gh School (see note 1). Following is a breakdown for each school's current membership fo school yeof 1992-93 ond current penn61lent Cl1paclty. S.D. Spady Elementary Carver iddle School Atlantic f!1gh School Current MembershIp Current Perm.onent Qlpaclty 593 667 841 1,283 2,065 1,615 Students generated from this development will further ov Icrowd the assigned high school1n the area. The SChool Board places Its construction priorIties In ar as that 1acll1tate the Bch1evement of racIal balance In publlc schools. The School Boora. requests that the developer provide stra egles withIn the cedar Grove PUD to assIst 111 aChieving School BOard facial balance goals. 1 he School Boon1 w11l work with the developer to accompllSll an agreement conWlnlng strate s and steps to be taken to ensure H~ \cht3\wp50\do.:!\dte\ctdrW02.pud ! U _.J' 1 '.' .... 1 f.J . ~ ~ t r, u II <.l 1< IJ l~ I t1 II H II t1 U l.. II L t I I I... L II I L I', I J ). J r: .' .. ~ j r' . .J J Impact Analysis Cedbr Grove PUD Revised - October 26. 1992 Page Two that the occupantlJ of thl3 de..-elopDlent will be rac1ally pltllce at this tlme with the devolQpeI, we request that a condition of approval: 1. No residential bulldJng permits may be issued Wltll e developer and the School Board approve in wdtlng an agreement WhiCh assures tha publ1c school student membership generated by the development will ach1eve Schoo Board racial balance goals. ed, SInce an agreement is not in following condition be placed as The School Board will contInue to activelY pursue a po cy of provIding adequate schooi fo.clUtles for all the children oC Palm Beacl1 COunty. Note 1 Attendance ooWldaries are rev1ew~ annually and are modified to accoIl1IIlodate the openIng of new schools and/or School Board policie dealing with overcrowding and/or rac1a1 balance. cc: CIty of Boynton Beacb J. Scott Miller, CIty Manager I Christopher Cutro, Director, PJsmning & Zoning Vincent A. Flntzio, A"mintstratlve Coordinator of ~uglneering W. RIChard Staudinger, r.E., Gee & Jenson David H. wtlltAms P"Ue H;\data\wpSO\doc\dI~\~.pud TOTAL P.Q3 '\ SENT BY: ~----_.~-- - 1-21-93 :10:49AM Boynton Bch fax~ 407 686 7446:# 4 FIRE DE~ARTMENT MEMORANDUM NO. 93-202 WDC TO: ENGINEERING DEPARTMENT FROM: FIRE DEPARTMENT DATE: JANUARY 21, 1993 RE: CEDAR GROVE (BOYNTON SEACREST) ~S7 FIRE DEPARTMENT COMMENTS FROM MEMO 92~ SHALL REMAIN UNTIL SATISFIED DURING THE PROCESS. THEY MAY NOT BE TIMED CORRECTLY BUT, THEY ARE OUR CONCERNS AND SHOULD NOT BE FORGOTTEN. THE PEAK HOUR TRAFFIC COMMENT MAY BE DROPPED. ... ~yJ~~ WILLIAM D CAVANAUGH, FPO I ' BOYNTON BEACH FIRE DEPARTMENT wdc/pg ~ ----~,---'"-_._._-- " " TO: FROM: DATE: RE: , FIRE DEPARTMENT MEMORANDUM NO. 92-257 WDC PLANNING DEPARTMENT FIRE DEPARTMENT - WILLIAM D. CAVANAUGH OCTOBER 28, 1992 TRC - CEDAR GROVE MASTER PLAN IN ORDER TO FULLY EVALUATE THE PROJECT, THE FOLLOWING INFORMATION IS REQUIRED: STREET NAMES AND HOUSE NUMBERS SHOULD BE SHOWN. WITHOUT A WATER MAIN PLAN FIRE HYDRANT LOCATIONS CANNOT BE PLO'l''l'ED. THIS DEPARTMENT STILL HAS CONCERNS WITH SEACREST TRAFFIC AT PEAK HOURS. /tCf~td~tf~( BUILDING DEPARTMENT MEMORANDUM NO. 93-011 January 15, 1993 FROM: Chris Cutro Planning D~'r ctor Don Jaeger Building 0 f cial Al Newbold Deputy Building Official TO: THRU: RE: TRC COMMENTS RESUBMISSION OF BOYNTON SEACREST MASTER PLAN, FORMERLY KNOWN AS CEDAR GROVE Per your January 7, 1993 TRC memorandum, attached are the plans for the above referenced project. The Building Department made a comment at the January 14, 1993 TRC meeting that, due to the setback requirement of the Zoning Code, some lots may not be buildable. This statement should be noted and passed on to the applicant. AN : bh m~;-fj// /1 Ar;;;,-;tr';#Y ( RECEIVED JAN 1 5 1993 SEACREST 5ENl BY: l-',l-~J ; lu.~(JMi:1 , UlJylli;ul1 llcn tax'" 4UI lJulJ '....VI.. J RECREATION & PARK MEMORANDUM #93-40 FROM: RE: Richard staudinger, City Engineer John Wildner, Parks Superintendent ~ Boynton Seacrest Master Plan Resubm~:ion (Formerly known as Cedar Grove) TO: DATE: January 21, 1993 The Recreation and Park Department has reviewed the MasterPlan resubmission for Boynton Seacreat, The comments listed in Recreation and Park Memorandum #92-951 (attached) remain in effect with the following additiona~ 1, Recteation Dedication Based on 228 D. U, the 4.:2 acre recreation dedication is acceptable. 2. Location & Configuration - According to section 8, paragraph E of the sub-division regulations, the City determines land dedication or payment of fee based on: "A. Topography, geology, access and location of land in the subdivieion available for dedication; B. Size and shape of the subdivision and land available for dedication; C. The feasibility of dedication; D. Availability of previously acquired park property; E. In conformance with the recreation land uss plan.1I While the location of dedication remains acceptable, the configuration (approximately 300'x600') is not suitable for use as an open playfield, We continue to require a squarer configuration with an approximately 400' width. This will allow for fhe use as a youth softball field, etc., with sufficient buffering from both residences and traffic. 3. Entrance The plan still needs to show dietances from adjacent roadways off Seacrest Boulevard. By showing these distances I we can determine the feasibility of a vehicle entrance from Seacrest Boulevard. The revised plan shows easements from two adjacent lots as an internal pedestrian access to the Park site. This is unacceptable. Homeowners are not likely to want pedestrians walking through their property to get to the park. The developer has indicated that lot 'lines on property east of the park can be shifted so that a dedicated pedestrian entrance could be provided. This would allow an appropriate pedestrian entrance. ;KH : ad CC: Charles C. Frederick RECREATION & PARK MEMORANDUM #92-351 TO: Richard Staudinger, City Engineer FROM: John Wildner, Parks Superintendent RE: Charles C. Frederick, Director/~ ~~ Recreation & Park Department ~ C~ Sub-Division Master Plan: Cedar Grove :i1J' October 29, 1992 rf - THROUGH: DATE: The Recreation & Park Department has reviewed the latest revision of the Cedar Grove Master Plan. The following Recreation related comments are submitted: 1. Recreation Dedication - Based on 228 dwelling units 228 dwelling units X 0.0180 average acre req./D.U. = 4.104 acres. In accordance with the comprehensive masterplan intention for a neighborhood park in this area, we recommend the entire dedication be in land. The developer shows 4.2 acres on the plan which is acceptable. 2. Location and Configuration - The location of the dedication along Seacrest Boulevard is acceptable, however, the dimensions of the parcel (approximately 300' X 600') is not suitable for use as an open play field (youth softball, etc.). In order to allow for adequate buffering from residences and traffic on Seacrest Boulevard, we recommend a squarer configuration with an approximately 400' width. 3. ENTRANCE Discussions with the Engineering Department indicate that a park entrance off Seacrest Boulevard may not be possible due to distances from other roadways. In order to determine this, the plan should reflect adjacent roads entering Seacrest Boulevard and distances from the proposed park property. From a recreation standpoint, we would recommend a vehicular and pedestrian entrance on the main sub-division road relatively close to Seacrest Boulevard. This would allow for a small four to eight stall parking lot for park patrons outside the sub-division and for sub-division residents to walk into the park. ENVIRONMENTALLY SENSITIVE LAND - Preservation issues are being addressed by a separate memorandum from the City Forester/Environmentalist. JW: ad CC: Chris Cutro, Planning Director ~ 4. -c ~ r17T~vED X~;"'" ~..ul. 0~r 3CJ ...." f') :-.-_~, T. ,........' " ~ , : "; t ~ t . ~ RECREATION & PARK MEMORANDUM #93-36 FROM: Chris Cutro, Planning Director Kevin J. Hallahan, Forester/Environmentalist \l~tr Boynton Seacrest (AKA Cedar Grove) Master Plan - Resubmission TO: RE: DATE: January 20, 1993 My previous comments have not been addressed by the applicant and must be addressed. KH:ad ~ RECREATION & PARK MEMORANDUM N92-349 TO: Richard Staudinger, Engineer Gee & Jensen Consulting Engineers ~ FROM: Kevin J. Hallahan, Forester/Environmentalist RE: Cedar Grove - Subdivision Masterplan A Planned Residential Community DATE: October 29, 1992 1. The applicant will be required to meet the Environmental Regulation Article I, Tree Preservation Sections 7.5-1 through 7.5-27 (pages 593-606). Specifically, the applicant must fulfill the requirements of section 7.5-22, page 603, natural growth to be preserved. This site has been determined to be an environmentally valuable, nearly extinct ecosystem in South Florida. Meeting these sections may effect the master plan design as approved by the City. 2. the applicant will be required to meet the entirety of Article IV, environmentally sensitive lands, section 7.5-59. through 7.5-63 (pages 628-631). Meeting these sections may dramatically effect the master plan design as approved by the City. 3. In accordance with the City Comprehensive Plan Ordinance 189- 38, adopted November 7, 1989 policy 4.3.5 page 67, the applicant is required to designate a minimum of 25% of the native plant community as a preservation area. The applicant does not indicate on the master plan the location of this area. , KH:ad Time: Forester/Environmentalist: Secretary: 1/2 hour 15 minutes MEMORANDUM Utilities No. 93-015 ~[si)IE~ ~ rr~l[:rr). ~ I.... l~IIH I~ ~ I JAN 2 1 iq93 Gr."" & .,~. 'SON ' t: t.: . _: i:. !"~ TO: Richard staudinger, City Engineer , John A. Guidry, Utilities Director FROM: DATE: January 14, 1993 SUBJECT: Boynton Seacrest, AKA Cedar Grove Master Plan (Revised) - Comments TRC Meeting January 14, 1993 Utility Memorandum No. 94-409 dated October 28, 1992 listed two comments related to the initial master plan review. See copy attached. These two comments have not been addressed or rectified. Contact Mr. Mike Kazunas at 738-7465 if you need further clarification. /bks xc: Mike Kazunas Peter Mazzella File , Utility Engineer Administrative Assistant 3 hours .5 hours . MEMORANDUM Utilities #92-409 TO: Chris Cut.ro, Planning Director John A. Guidry, ~~. Dicectac af UtilitieSI\~ Oct.ober 28, 1992 U FROM: DATE: SUBJECT: ' Cedar Grove Mast.er Plan - Comments R.R.C. Meet.ing Oct.ober 27, 1992 We have reviewed the plan and, in lieu of approval, offer t.he following comment.s: 1. Locat.ion, purpose and widt.h of water and sanitary sewer easements must be shown on the Master Plan (App. C, Art. VIII, Sec. 4.C.I0). 2. The developer is required to coordinate with this utility regarding availability of both water and sewer (App. C, Art. VIII, Sec. 4.C.17). Instrumental to this coordination is the revised water, sewer, and fire protection demands of the development. , Contact Mr. Mike Kazunas at 738-7465 to discuss this matter further. 19b xc :"iJ:~M.fke'~' Ka z\in~. Peter Mazzella File Utility Engineer - Adm. Assistant 3 hrs. .5 hrs. C1rn~\\i:,n &. I\SSOciatoS. InC. ~ : \ i \~ ~ \\ \ ~,,! i\~ pt;! ~~~ \'t\ \\16 .'6" .~~ ';.'i ~.,. to; 'i ~ ~ ~ \ \ ~ ~ ~ ;. \ ~ ~ '" II' " ~ \ ~ ~ 1 !. .. " -\"i- ~ CI "l ll: i rn \~~ ~ ,~ m ~ 0 ~ "T\ ~ -I ~ ~ \ - ~ >> ; ~ t II t ~ \ ;; III ~ III ~ ~ ;1 ~ .. ... ___ _J. 5.E. 2ncI. STREET -----r ~.. · \. \, ~ 9. .,;,_. \. -- . ~ .. 'i ~ p.' ""' 6 \ e ': 0 \ ~ I i ~ -t:ciJ \ 1 ~~ . ltfl ,~~ .-1. . '-'0 ;:.... ~ i~ - ~ '" ,=,a;s\~rJJ\ r,'l I I I I I J I I I % . -c:.. ~.., I I I I I I , I I I f'" '. "..._ 100'RIW__ =l'ft~ -111----"'-- v0(15(Jlling \..-ngi{1CCrc-~~n~ ur .n en ' .., V' ::i ~t,~\;"' N~~~"'6U)O %~~~;~"l;~ ~u 2~!e(J)~}> . ~~j,))P m :ll~Cl>Il)p~ (j) ~;(OoPrn 1I)pf)o. CI ~ II ',. ~ '.. ~ p ~ \+ (,> -< f) \+ . ~ ., ~ ... ... . .~. ~ ., 1- ~ .~ , ' ~ : . \ . , ~l ~~ '. ',. ~ ~~~ ~~ ~ t\ J"il \\~\\\t~ltl ; i\ \ \~ \ \ \~i \m~\h , l! . "Q @-;l;! ~~ ~ ~ !~ m ~ % ~ ~ ~ rn. .., ~ ~ \II -;;, roo \1'1 ~ ~ ~ 0 2 ~~ ~ ~ -I -<1 o -;::,. ~ S W. r1'I .". % ~ F \~ 0 .., (J) \1'1 ~ ~ ~ ~O~~ ~Wst~ 5~~%~~~"$ ~t(J)~"'-Im~~ ... -I \lO ~ '1l (J) (J) Z \1'IO(J)~,. -I"%i'6 N?:.n~~ OG)Q i2?i\-I~ ~ so. 'w.~ c;l ~ i% .-l (J) 0 0 2 !l) ~ ~ ,. ~ ~ t; 2 ~ ~ ;!! ';1< 0 (J) ~ ~ ~ m .-l o -~. U ;\ ta ~\ H \1 , \ \ \ \ ! \ ~ \ \ \ ~ \ - 'to \ ~~ ~ ..: ,. '. --- ~ .... 'i , >> y l~ -- . ~ ~ '\ S\ --1 ~ j lI> !.. .- - -- ---j\\ \ ~\t ---\I\ --;, lI> ~ i __i_ s:;' 4th. STREET ---\--- so '" \ / I I I I I I ,. . :~..; '..- ";>~ ~ 80' RIW OIXE HIGHWAY \ \ \ \ -i \ c...4 lOtUNG \ \ \ I I \ \ c., zoo",. \ \ c""".v \ COUNl"l' COUNTY C-)20.....0 c.~ ZONING lbllit: " teaS market: LOC" -noN t.A"p 6o~tr{9~ ,,~~g~~~}v ; f3\\\l\~ ~ \ \ .\' . ,~..- ,\ ,-\' -- ,. \\ ~ ~...~ ~ \' pu (' ~ ' ,,'. \' ,II · 1 \ · t \ [ ~ _ ....rJJJ!. IT " ' · ll: '\ \\~E:-- ". ,-,\UllI.. \. - '\,.......\llic=-\.\ \\1U'... .'1n&:'" · ':~ \ \\ \ ' c.-' ... \ i'--r '\ \'. ' , --' ;... . , 6 l:S ~1 c" ~ ' ~.. -;.oC"ft?71 pu ~ \ 1 . G3- :,~ r/_ ~6C _ I l.ln---- C3! '[ ',... 11 li~ai~~ \\ ',- I i r \\---=" . c~l \ L : · : I _ l,r ~ 1;..,-'.. i "'i ~ 1 _ /' ,/L-- _ ,;"}.::l'" -- ~t ""- -Jl':' c;, ~! _=- T ' ...." ,:- ~ ,!'.J ~: _7 -,.:";-11'" L. ~ ','"~ n ~j r;; If' ..!: ~';" ^ 1f~ ~ !- - :,-1 1 __ _: r A' ,'"14 j,~;;-q/ 'i'C \.- ,;- - y:'"jli:-!- \ 1! ,;// J '-' _ l 11\ , , ~. r ~ ' 1-: : - ... .' -- I (.:; J ',"' '" I V//J /' "F.1~~f · \ ' \ e' ~ ," \ '. ,,'.' . 1::.! \ 1. :;>-0 ~~" __ t::\ffi(~'\t~, .,,:r;iU ,\. ,-.:; U;~' "'"'iif 7': '/// J fIJ. j_ . \" ~ "11"- : '.;.,.-" n- I \' ~ I: 11-1 ":._ ...) ,r- I \ I -\fl'.' ....- ! J'(I; .' "'1 ~ -;:.... /;=-.1(' 1 i f 'R ' \ I --lV '-- .. ! ~'t.h .- \ t}.~' 7J ;.,/ 'f!iJi:::j'f '\, \t ,\ ,ie, -...~ ~ 6 t "'.: '" ....--1--- ~~~F1,1 ' 'I~- 3 ~ : I'lL ': ~ ---r . ... PI ~\- ,/[1 I 1\"\ ,n ;::'I~/~'.~\' - ~ 'JII~ .:~ " ~"" I I 1 '\ II ': j ~ rlllt"[c~<,);~ _ ~f ,,'I 11\\\t:~ '\~.. - ~ T, 'II Rl' 1 f::h \~ -, .1f;s:::J' ,,-Y + , ,I -{~,~ 'iii \ \ L. _;:. ~ Li'iJ, t,.; ,'\ I: -:/i ):1\':;;;:'; ~." \ ,11-- .._::: '~"'r '(l , 1: 'r-: I ~Irf ",<., r\ \\ \ ~\ -- <. , I >i ' I ,'-I"" .~\ ,r r _ rn r '-11' l ~ '- ..- ,/ -n " ' " u L>- C..... -- cD c, ... "",J.....D r T" 'l1 ' '\ "_,:;", , ' \ , \ ,J L-- ~1~ \ I \ \ ' , :-T-, r ' ~ - PI 1 \r ",' ,'" , " '\ <<, 7"'-- r1" c-;" -., '- )--1 (1' I' _.1 .. -~: - , '" \y~-"\"'" ' '- L- .J nT' ' ..: ,~"..... F' ---<: : '\ r ~ \.- ~ ,::::;:/ \ :;..: ~ 10 "-; ., ," ~ ~)~~l ;_r \ ~........ L-, \. ",1:, mE c:. ~'~(..:(1j:I6-n' ~\ Jtf. ~ ~ . ~--1 ') 1-->-\ \ V ___ '. 1 ~ i .rt1"I1J , \ \ ,~' \\ FJ"":::~ ~ I, ~~. . ~ : ~vi~ t"rr\"'~ 'O...t.... _ __" '\ 1 1\ -.J 7, -",:. "[ ,\ \ ,f.ll __ _ ,C>;I! , C. :::'. .... ~\ "" ~. ~ ~"" .:-r-c. -r "' ~ \. - rl ::::::.-~r:: \ F'-'\~ ~,\\ t;;. U\ Ht;,:ii:--~::ci ,,; 0~ '., ~,..:..-r' \~; i'''' ~:...- ~ -~:.- ~~ ~ ,'i.-. . c\. r: I--- ---' .. ,'::I ... 0'" : ..... .... j " ':\ '\ \ \ . L ~fll . ......... 'r~T \ I. _ ~,~\ ~~ t:il\~ iC \.'\"f"',:. .,.~\\\\\"\J\8\ .,,^\L~. ~\ ;~~\Z. ~,<,1 ~ _:, :~6 \ ,I ~ik~TC~~~"~ :i~ _' " ' :h r-' - J t- --UY"" t""\ fLU \\ \ I led I TRAFFIC STUDY FOR BOYNTON SEACREST (F.K.A. CEDAR GROVE) BOYNTON BEACH, FLORIDA REVISIONS NO. DATE u,~~~ WAEL . MAJDALAWI, P. E . FLORIDA REG. NO. 42646 1?/23/q7- 1 2 3 4 5 NOVEMBER 11, 1991 JANUARY 9, 1992 FEBRUARY 24, 1992 SEPTEMBER 20, 1992 NOVEMBER 9, 1992 TABLE OF CONTENTS PAGE INTRODUCTION 1 STUDY OBJECTIVE 1 TRANSPORTATION ANALYSIS 3 STUDY AREA 3 EXISTING CONDITIONS 3 TRANSPORTATION.SYSTEM 6 FUTURE ROADWAY IMPROVEMENTS 6 PROJECT ACCESS 8 BACKGROUND TRAFFIC 9 PROJECT TRAFFIC GENERATION 9 PROJECT TRIP DISTRIBUTION AND ASSIGNMENT 12 FUTURE TRAFFIC 12 LEVEL OF SERVICE ANALYSIS 15 - TEST 1 (LINK/BUILDOUT TEST) 15 - TEST 2 (MODEL TEST) 17 CONCLUSIONS AND RECOMMENDATIONS 18 -i- LIST OF TABLES NUMBER TABLE PAGE 1 VEHICULAR TRIP GENERATION 11 2 TEST 1 ANALYSIS 16 LIST OF FIGURES NUMBER FIGURE PAGE 1 LOCATION MAP 2 2 STUDY AREA 4 (RADIUS OF DEVELOPMENT INFLUENCE) I 3 EXISTING TRAFFIC 5 4 EXISTING LANE GEOMETRY 7 5 BACKGROUND TRAFFIC 10 6 TRAFFIC ASSIGNMENT 13 7 TOTAL TRAFFIC 14 -ii- lNTRODUCI10N Michael Rubin, P.A. retained Carnahan and evaluate the traffic impact associated with residential development of Cedar Grove. The 50 Acre site is located on the east side of Seacrest Boulevard north of N.E. 8th street, east of Mission Hill Road and south of S.E. 23rd Avenue in Boynton Beach, Florida. The location map is shown in Figure 1. ' Associates to the proposed The proposed residential development will consist of 146 dwelling units of detached single family and 41 duplexes (82 attached housing units) for a total dwelling units of 228. The proj ect' s access will be on Seacrest Boulevard via a proposed entrance and a proposed connection to S. E. 2nd street adjacent to F.E.C. Railroad, west of Old Dixie Highway. The project will not have a~y proposed entrances to Old Dixie Highway across the railroad tracks, and all roadways along the northern and southern limits of the site will remain as dead end streets. Cedar Grove is proposed to be completed by 1995 based on an estimated buildout period of 3 years. STUDY OBJECTIVE This traffic impact study will be prepared in accordance with Section 7.9 (Traffic Performance Standards) which ammends the previously adopted 1990 Countywide Traffic Performance Standards Code (Ordinance 90-40). The conformance with the Standards consists of meeting both Test 1 (LinkjBuildout test) and Test 2 (Model test) as outlined in section 7.9 (I) (D) of the Standards. The following analysis is presented as outlined in Section 7.9 (I) (E) (Traffic Impact Studies) of the Standards. The traffic impact study will evaluate all roadway links or intersections within the Radius of Development Influence and Model Radius of Development I~fluence of the proposed project. The traffic impact study is also referenced as the "Level of Service Impact statement" in the Traffic Circulation Element Plan of Palm Beach County. 1 90't~1ON BEl'C,", 9\-'lO 5. E. Z3f\O A'lE ui ~ ~ ~ ~ o '3 lSl ~ We % U) ,.. ! i fA u. S11E. ,.. ul ~ ul ~ w ~ .... x e ~ .... 0 'i. ui ~ .... " i ~ ~.E. 41,", 51 A1~lC A'lE ul ~ ~ ';. ul ~ ~ '; ui ui i i IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII I I I I I I I I I" , IIII IIII IIII IIII IIII I I I , I , , , IIII IIII "" I I I I '1'1 Z I , , I "" <I: III' W "'l Itlt U "" 0 o "" > "" c6 1111 111\ i \\\\,... ~ '''' \..J o ""....... "" L- I'" I 1111 Z I" I /r "" ""-L 1111 -1 1111 L- I" I ~ "" ""-L I I I I , " I '" I I , I I \ " \ , I I I IIII 1111 IIII IIII IIII , I , I , , I , , I I I I I I I ',I, I , , \ \ \ , \ \ . fIGURE \..OCAi10~ t'\AP 1 C~~AH~ A~ ASSOC\AiES, \~C. C~SUL i\~G EtlG:~~~~ ---- ----~ ~ tI,L1'.S. TRANSPORTA.TION ANALYSIS Study A.rea The study area is based on the radius of development influence for Test 1 and Test 2, which is outlined in Table 2A of the Traffic Performance Standards. Table 2A relates the maximum radius of development influence distance to the net trips generated by the site. The net trip generation from the site, as outlined in Project Trip Generation section of this traffic study, is estimated to be 2034 daily trips. As outlined in Table 2A, the radius of development influence distance for 2034 net daily trips will be 2 miles. The 2 miles distance will be measured in road miles, not in geometric radius, beginning at the site I s access on Seacrest Boulevard, and terminatlng at the adjacent roadway links 2 miles away from the site. Based on the above the 2 mile radius of development influence distance was measured along the adjacent roadway network and the study area is shown in Figure 2. Existing Conditions Existing traffic counts for all the roadway links within the study area were obtained from the latest traffic volume counts conducted by Palm Beach County Metropolitan Planning organization. Figure 3 shows the existing Annual Average Daily Traffic (AADT) for the available 1991/1992 Traffic Volumes. 3 --.~._.. - -~"'."""''''~ ~.... I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , , , I , I I I I I I I I I I I I I I I I / / / / I / / I , , , I I I , I / I / / / I / / I / / , , I , , , I I , I I I I I I I I I / / / / I I I I I I I I I , I , I I I / / / / I / I I , ( , \ \ \ \ , / I I I 1/1/ ~ 1//1 ~ I I / / "'l:: I I I I I.: 1111 ~ I I I I :::--.J 1111 c:::s I I I I , I I , , I I , I I I I //// { ~ I I / / "--..J '(I, ~ I I I I '--- 1111 ~ II II ~ 1/// ~ //// "'- I I I I ---...J I I I I r-:::::. I I , , "'1 ~ , I I I / / / / / / / / ( \ \ I ~ I \ , BOYNTON BEACH BLVD OCEAN AVE o > ~ . UJ > 4: en i u N.E. 4TH ST ATLANTIC AVE LEGENDz UJ > 4: X I- 10 UJ > 4: ::z: l- tS) EFFECTED ROADWAY LINK V /I STUDY AREA . UJ . Z . UJ . Z STUDY AREA (RADIUS OF DEVELOPMENT INFLUENCE) CARNAHAN AND ASSOCIATES. INC. CONSULTING ENGINEERS N.T.S. FIGURE 2 BOYNTON BEACH BLVD t 0 > t I i6 I ... .. 0 (/) ~ !! ~ = . to .. UI J ~ ~ ~ ... 2,,645" UI J I (/) (/) .. 26,500 .. VOOLBR I GHT ROAD (/) UI I ~t u >- "",420 .. ~ ...J S.E. 23RD AVE .. I ~ OCEAN AVE t~ II) 0 . Z t- ('II . . Ji 1 " ~' t\i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , I I I I I I I I I I I I , I I I I I I I I I / / / / I I I , / I \ \ \ \ \ I I I I I 1111 ~ 1111 ~ 1111 ~ I I " J.: , , " ;:-'-;! "" ~ "" c:::s , , , , , I , , , I , I , , , , //// r .. / / / / '-.....;J , I I I '--.:., I I I I '--- "" ~ "" ~ "'l ~ 1111 ~ I I " ---..J , , I I J..-:::::. , I , I "" ~ , J J I I I I I I I , I , \ , \ " I \ , U1t ~ 5~ ...... z - ....... ~, SITEI ~ ... 6,176 ... N.E. 4TH ST ... -1'3,782 ... !t N.E. 8TH ST !t ATLANTIC AVE LEGENDI "'13.382'" EXISTING AADT TRAFFIC UI UI > > <t <t :t: :t: ... ... 10 (D . UJ UI . . z z EXISTING TRAFFIC FIGURE N.T.S. CARNAHAN AND ASSOCIATES. INC. CONSULTING ENGINEERS 3 Transportation System Existing lane geometry for all effected roadway links within the study area were field investigated to verify existing conditions. Seacrest Boulevard currently exists as a two lane undivided section adjacent to the site then expands to four lane undivided section north of S.E. 28th Avenue. S.E. 23rd Avenue exists as a two lane undivided section from Federal Highway (US 1) to Congress Avenue. Woolbright is a four lane divided section from Federal Highway (US 1) to Congress Avenue. Federal Highway (UB 1) exists as a four lane divided section. N.E. 4th street and N.E. 8th street are also two lane undivided sections. Figure 4 outlines the existing lane geometry within the study area. Future Roadway ImDrovements Palm Beach County "Five Year Road Program" and Florida Department of Transportation "Transportation Improvement Program" were consulted to obtain the funded roadway improvements anticipated to be completed by proj ect' s buildout year. The following outlines the status on the adjacent roadway network within the study area: Sea crest Boulevard from Woolbright Road to Boynton Canal is listed on the six Year Program of Palm Beach County for right of way acquisistion during the fiscal year 1991/1992 with no scheduled construction improvements. Therefore no future improvements are anticipated on Seacrest Boulevard by the project's buildout year. S.E. 23rd Avenue is also not listed on the Palm Beach County Five Year Road Program and therefore will remain as existing two lane undivided section. Woolbright Road is also not scheduled for construction improvements during the buildout year of the project. Federal Highway (US 1) is not listed on the Florida Department of Transportation Five Year Road Program within the project's area of influence and therefore no future improvements are anticipated during the project's buildout period. The scheduled improvements to Federal Highway are from Glades Road to Linton Boulevard during the fiscal year 1992/1993. 6 BOYNTON BEACH BLVD ~ 0 ~ ..J I- 0 CD CI) ::J 5 ..J . ..,. UJ > ~ oCt U) 4LO 4LD U) liOOLBR IGHT ROAD UJ 13 ~ u S.E. 23RD AVE 2LUD 2LUD OCEAN AVE 2LUD 2LUD 2LUD I I I I I I I I I I I I I I I I I I I I I I I I I I I I 2LUD I I I I I I I , , , , I I I I I I I I I I I I I III.J I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I r I I I I I r I I I I r I I I / I I I I I I , , I I I I I I I I I " " " " I I I , I , \ I I \ \ I I I I I 1/11 ~ 1/// :::::::::.... JIll ~ /111/;---: I I I I r:-':! I I I I ::::--J I I I I c::::s I I I , , , r , I I , , , I , I I"" l ~ IIII '--J "'1 ~ I I I I L 1I11 ~ I / I I :s:::.. /111 ~ I111 "- I I I I ---..J I I I I f....:::::. I I , I "" ~ I I I I I I I I I I I I , I I I ~ I I \ 0 ::J u.I ..J u.I > N > 4- 4- Z 0 0 0 Z I- ::J N Z - ..J . ::a N UJ U) . z z N.E. 4TH ST . N.E. 8TH ST ...J ,., 0 ..J ..,. UJ UJ > > oCt oCt :J: :J: l- I- In CD . UJ UJ . . Z Z ATLANTIC AVE LEGENDI 2LUD-2 LANE UNDIVIDED 4LD-4 LANE DIVIDED EXISTING LANE GEOMERTY FIGURE N.T.S. CARNAHAN AND ASSOCIATES, INC. CONSULTING ENGINEERS 4 Future Roadwqy Improvements(conlinued) I-95 is currently listed on the Florida Department of Transportation (FOOT) Adopted Work Program and anticipated to be constructed by 95/96 Fiscal Year. FOOT is currently proceeding with the design plans and is anticipated to be completed by 1992. The improvements consist of adding 2 HOV lanes, which will make the facility eight-lane expressway. All other roadways within the project's area of influence are not listed for future improvements on the Palm Beach County Five Year Road Program or the Florida Department of Transportation Transportation Improvements Program. Based on the above determination, future roadway improvements are not anticipated within the project's area of influence with the exception of I-95 interstate improvements. Proiect Access The primary access to Cedar Grove will be via an access roadway on Seacrest Boulevard consisting of three lanes undivided section tapering to two lanes undivided section. The three lanes will consist of one through lane for inbound traffic and two left plus through and right lanes for outbound traffic. The proposed access will align with the existing Mission Hill Road on the west side of Seacrest Boulevard. Mission Hill Road currently joins North Swinton Avenue. The back of the development can access Seacrest Road via the connection to S.E. 2nd street which eventually reaches Seacrest Boulevard through the adjacent development. 8 Background TrqfJic An investigation of background traffic growth was conducted within the study area utilizing the "Compound Growth Rate - Traffic Performance Standard (1986-1990)" as provided by Palm Beach County. the Compound Growth Rates are estimated utilizing the increase/decrease of average daily traffic over the most recent three-year period. Palm Beach County requires that Engineering judgement be exercised in the utilization of the historical growth rates. This study considersl such evaluation in determining the background traffic. In addition to the compound growth rates, the study includes all major projects that could have impact on the roadway network within the study area. Palm Beach County "Major Projects Map" was consulted to determine the location of such projects. The major projects are: (1) (Residential) Quail Lake West - located at the northwest corner of S. W. 23rd Avenue and Congress Avenue. (2) (Residential & Commercial) Woolbright Place - located at the northwest corner of Woolbright Road and I-95. The impact from such developments was incorporated in the background traffic estimation. Figure 5 outlines the total background traffic within the study area. Pro;ect Trip Generation Trips were generated for the project under morning peak hours, afternoon peak hour and daily conditions. Trip generation characteri'stics were obtained for detached single family residential and attached residential for daily conditions using the trip generation rates presented in Table 10.8-1 (Fair Share Road Impact Fee Schedule) of Article 10 (Impact Fees). The morning and afternoon peak hours were estimated using the Institute of Transportation Engineers (ITE) Trip Generation Manual, Fifth Edition. 9 BOYNTON BEACH BLVD t ~ t , ~ l- ID . (/) ~ !! ~ ~ . J ~ .. UI ~ > ~ .... 30.0'2." UI J I .... H.71l2 .. (/) (/) WOOl.8RI0I-I1 ROAD (/) ~ ~ ~t u >- .... ".,&os .. Ii ~ :r ..J <[ S.E. 23RD AVE f5 fB I.i. 1 ~'? 0 SITEI ..' ~ , , U1t t UI ~ > ,: ~ .. ~' ZII) . 0 tJi 011) N Z '" 1-. ~ N zJti 2 .... . :, - UI . Z ~ -- N.E. 4TH ST .... 13,959 .. ~t ~. .. ~240'" l~ N. E. 8TH ST 51 ATLANTIC AVE LEGEND- "'15.2~" TOTAL BACKGROUND TRAFFIC (ADT) UI UI > > ~ ~ :I: :I: l- I- It) UI . UI UI . Z Z BACKGROUND TRAFFIC CARNAHAN AND ASSOCIATES, INC. CONSULTING ENGINEERS N.T.S. OCEAN AVE I / / I I / / / / / / / / / / I I / I / I / / / / / / / / / / / I I I I I I I I / / I / / / / / / / / / / / / / / / / / / / I ( I I I I I I I I I I / I / I / / ( / / ( I I I I I I I I I I I I , I I I I I I I I I I I I I I I I I I I I I I I / / / / / / I I , I I \ \ \ I I / / / ( Jill ~ Jill ~ /1// ~ ( I , I 1.-: /11/ ~ ( I (( :::::--J (III c:::s I I ( / I I I I I I I I I I I I //// { ... ///1 ---.J , I I I '--.:, I I I I '-- 1111 ~ 1111 ~ /11/ ~ / I I I ""'- 1/// ---.J I I I I J-:::::. , I I , "I, ~ I I I ( / / I / I I / I I I I I I, \ \ \ FIGURE 5 The following peak hour trip generation rates were obtained from the ITE Trip Generation Manual: Single Family Detached Housing (ITE Code 210) (Peak hour at adjacent street) AM Peak : In(T) = PM Peak : In(T) = 0.867ln (x) + 0.398 0.9021n (x) + 0.528 Attached Housing (Residential Planned Unit Development - ITE Code 270) (Peak hour of adjacent Street) I AM Peak PM Peak In(T) = In(T) = 0.942ln (x) - 0.308 0.893ln (x) + 0.280 T = Average Vehicle Trip Ends X = Number of Dwelling Units The daily trip generation rate based on Table 10.8-1 is 10 trips/DU for single family and 7 trips/DU for attached housing. Where : The above trip generation rates were applied to the units and the projected total trip volumes were tabulated on Table 1 below. TABLE 1 VEHICULAR TRIP GENERATION TOTAL TRIPS AM PEAK PM PEAK DAILY LAND USE SIZE IN OUT TOTAL IN OUT TOTAL IN OUT TOTAL SINGLE 146 DU 29 83 112 112 40 152 730 730 1460 FAMILY ATTACHED 82 DU 10 37 47 45 23 68 287 287 574 HOUSING 101709 TOTAL = 39 120 159 157 63 220 1017 . 11 Project TriP Distribution and Assignment Distribution of new project trips was based on a review of Palm Beach County Metropolitan Planning Organization socioeconomic data and engineering knowledge of the area. The socioeconomic data are available through the attractions "ZDATA2 files" of the Florida Urban Transportation Model structure (FSUTMS) for all zones within the transportation study area. The attraction files include all commercial, industrial and service employment within the study area. Based on the available data, the following distribution was obtained: TRIPS DISTRIBUTION DIRECTION PERCENTAGE North East South West 27% 38% 10% 25% TOTAL: 100% The distribution rates were based on the premise that the percent of site traffic produced is directly proportional to the attraction size and inversely proportional to the square of the distance from the site to the attraction. The assignment of site traffic was performed assuming the shortest and fastest path that drivers would more frequently favor in their intended movement. By applying the distribution and assignment characteristics to the roadway network, the anticipated assignment rates were depicted in Figure 6. Future Trqffic The total 1995 traffic volumes for the residential development are illustrated in Figure 7. The total traffic volumes are the summation of the assigned project traffic, the projected 1995 background traffic growth and the existing 1991 traffic volumes. The future traffic volumes will be the basis for determining level of service compliance. 12 BOYNTON BEACH BLVD 28"1. t ATLANTIC AVE "'11,.1." ... ex .. OCEAN AVE N.E. 8TH ST I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , I , I I I I , I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I , I I I I I I I I I I ( I I I I , I I , I , , I I I I , , I I I I I I I I I , I I , I I I I I , , , ~ ~ ~ / I I , , I I \ \ \ \ \ I I I I I I I I I ~ I I I I -=::::::::.. I111 ~ I I I I I ,--: I1II ~ IIII ~ II11 c::s I I I I I I I I I I I I , I I , ~~/~ r ... ~~~I ---.; , I 'I '--.:, 111'1---- I J I J ~ I111 ~ 1111 ~ 111I '"'- IIII --.J I I I I J..-..:::. I , , , "" ~ I I I I I I I I I I I I I \ \ , '. ' , , . l.LI > 4: en i ... 3X ... t 0 > t a: N ~ ~ .. en J l.LI a: J u 4: ... 16""'" l.LI en WOOLBR J GHT ROAD ...'" .. ~'" ~ , S.E. 23RD AVE uJt tLLl ~ ~ a~ 0 & :t: ~ ~... (') (') ... . ~, ~i ... 2"1. .. N.E. 4TH ST "'5"" ... 2"1. .. LEGEND I . ~t ... 5" .. PROJECT TRIP ASSIGNMENT Ul ~ :t: .... \0 Ul > 4: :t: .... U) LLI . z uJ Z TRAFFIC ASSIGNMENT FIGURE N.T.S. CARNAHAN AND ASSOCIATES, INC. CONSULTING ENGINEERS 6 BOYNTON BEACH BLVD t ~ t -' II) m I I"- 0 .... ~ g en ~ UJ . 5 ,.: (0 UJ , !Jo" > ~ iii ~ "'30,337_ UJ J I .. 28.,843_ en en VOOLBR I GHT ROAD en ~ ~ ~t ~ .. 9,741 _ ~ ..J 5.E. 23RO AVE ~ w fH l&. OCEAN AVE SITE I ~1 ~ ~.. I\i , I I I I I I I I I I I I I I I I I I / I I / I I I I I I I I I / I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ( I I I I I I I I I I I I I I I I ( I / I J I I I J J I I I I I I I I J I I I J I I I I / I I I I I I I I I I I I I I I I / I I I ( I \ \ I I I I / / / / /1// ~ JIll 'S:. JIll ~ I I I I I.""""""": I I I I ~ I I I I ::::::--..J 1111 c::s I I I I J I I I I I I J J I I I 1111 r ~ 1111 '--.J I I I I "-....:; I I 'I '--- 1111 ~ 1111 ~ /111 "" "// "'- //1/ ---.J I I I / J..-:::.. ( I I I I I I J "'J::: I I I I / / I / / I / / I I I I I, I I I ~ UJt ~ "ZCI) 01/') ....- "Z - ....v ~, t~ c I/') Z co N - J~ N.E. 4TH 5T "'14,061 .. "S.Z31 .. sf t~ N.E. 8TH 5T ~t ATLANTIC AVE LEGENDI .. 14.061" TOTAL PROJECTED TRAFFIC (ADT) UJ UJ > > ~ ~ x x .... .... It) UJ . . UJ UJ . . z z TOTAL TRAFFIC FIGURE N.T.S. CARNAHAN AND ASSOCIATES. INC. CONSULTING ENGINEERS 7 Level Q( Service Analysis This traffic analysis must demonstrate compliance with the standards contained in section 7.9 of the Palm Beach Traffic Performance Standards. The Standards consist of complying with the adapted level of service for two tests: Test 1 (Link/Buildout Test) or Alternate Test 1 (Peak Hour Test) and Test 2 (Model Test) . The following outlines the analysis for each test: Test 1 fLink/Buildout Test) \ . The analysis consists of projecting the project's new trips on the major thoroughfare links within the project's radius of development influence and evaluating the level of service for the total traffic. The total traffic consists of projects traffic, existing traffic, background traffic and approved projects as of the buildout period. The standards state that the level of service may be exceeded by a total of (5%) five percent of level of service D. This (5%) five percent consists of the cumulative traffic from all projects permitted after February 1, 1990. Provided that no one project may use more than on-fifth of the five percent or one percent of the total available on any link within the project's radius of development influence. From Table 2A (Maximum Radius of Development Influence for Test 1) of the code, the net trip generation is 2034 trips/day. Therefore, the maximum radius of development influence is 2 miles and all the roadway links within the 2 miles distance must meet Test 1. Meeting Test 1 consists of relating the projected total traffic to the Level of Service D average daily traffic. This could be accomplished by evaluating the projected total traffic, as shown in Figure 7, and the average daily traffic for Level of Service D as tabulated in Table 1A of the Palm Beach Traffic Performance Standards. Table lA of the Standards relates the Level of Service D to the facility type as obtained from the FDOT Manual for group D. The comparison is outlined in Table 2 as Test 1 Analysis. Table 2 outlines that N.E. 4th Street exceeds the allowable Level of Service. The v/c ratio does not exceed 1.05 and therefore the level of service is not exceeded by the allowable 5%. However, the project's traffic of 102 vehicles per day does not exceed the allowble 1/5 of 5% tolerance, which is 137 vehicles per day and N.E. 4th Street is not a directly access link to the site. 15 TABLE 2 TEST I ANALYSIS ----------------- ROADWAY FROM TO EXIST BACKGROUNO PROJECT TOTAL EXIST PROJ. ADT GROWTH SUB-TOTAL TRAFF I C TRAFFIC LOS 0 V/C ---------------------------------------------------------------------------------------------------------------------------- SEACREST BLVD. N.E. 8 STREET S. E. 23 AVENUE i 8795 1231 10026 1159 11185 13700 .82 SEACREST BLVD. S.E. 23 AVENUE WOOLBRIGHT 17652 2560 20212 509 20721 24160 .86 SEACREST BLVD. WDLLBRIGHT OCEAN AVENUE 15824 1224 17048 102 17150 24160 .71 N.SWINTON AVE. A TLANTI C AVENUE N.E. 4 STREET 13329 476 13805 570 14375 14400 1.00 N.SWINTON AVE. N.E. 4 STREET N.E. 2 AVENUE 3557 398 3955 203 4158 13700 .30 US I (ONE WAY) N. E. 4 STREET N.E. 8 STREET 11867 1253 13120 81 13201 16900 .78 US 1 N. E. 8 STREET S.E. 23 AVENUE 23366 2268 25634 264 25898 30200 .86 - US 1 S.E. 23 AVENUE WOOL8RIGHT 26549 2554 29103 244 29347 30200 .97 US I WOOLBRIGHT OCEAN AVENUE 25842 2634 28476 142 28618 30200 .95 1-95 A TLANTI C AVENUE WOOLBRIGHT 113647 10386 124033 81 124114 110700 1.12 1-95 WOOLBRIGHT BOYNTON BEACH 120000 9892 129892 183 130075 110700 1.18 OLD DIXIE N.E. 4 STREET N.E. 8 STREET 10969 1180 12149 81 12230 16900 .72 lONE WAY) OLD DIXIE N.E. 8 STREET US 1 1558 421 1979 0 1979 13700 .14 WOOLBRIGHT CONGRESS AVENUE 1-95 26500 2282 28782 61 28843 30200 .96 WOOLBRIGHT 1-95 SEACREST BLVD. 29645 367 30012 325 30337 30200 1.00 WOOLBRIGHT SEACREST BLVD. OCEAN BLVD. 9304 231 9535 81 9616 13700 .70 S.E. 23 AVENUE CONGRESS AVENUE 1-95 9420 185 9605 142 9747 13700 .71 S. E. 23 AVENUE [-95 SEACREST BLVD. 10522 41 10563 142 10705 13700 .78 S.E. 23 AVENUE SEACREST BLVD. US I 7536 63 7599 509 8108 13700 .59 N.E. 8 STREET SWINTON BLVD. OCEAN BlVO. bllb b4 6240 41 6281 13700 .46 ILE. 4 STREET 1-95 SWINTON BLVO. 13782 177 13959 102 14061 13700 1.03 Test 1 fLink/Buildout Test)(continued) 1-95 is currently exceeding the allowable level of service. However, the project will place a maximum 183 vehicles per day of the allowable 1107 vehicles per day or 1% of level of service D. Therefore, according to the code this project will not be required to address the subject link of 1-95. I Therefore, based on the above determination the project complies with Test 1 requirements. Test 2 (Model Test) \ The analysis consists of obtaining the project's net trips as projected in Test 1, determining the model radius of development influence from Table 2B (Maximum Radius of Development Influence for Test 2) of the code, and evaluating the level of service for the total traffic. The total traffic differs from Test 1 buildout traffic and is defined as model traffic. Model traffic consists of anticipated traffic as assigned by the FSUTMS model on the future 2010 roadway network resulting from all approved (both built and unbuilt) projects. Similar to Test 1, the standard allows the level of service to be exceeded by 5% of Level of Service D pending no one project can utilize more than 1% of this 5%. In addition, Test 2 requires all projects that generate more than 7,000 net trips/day to utilize the model. for traffic assignment and Level of Service determination. Based on Table 2B of the code, the maximum radius of development influence for the generated 2034 vehicles per day is 1 mile. Therefore all roadway segments within 1 mile from the site needs to not exceed Test 2 capacity. The Palm Beach County Table (Test 5 - Projected Network Deficiencies (Model Plan) was consulted to discover that none of the roadway links within 1 mile from the site was on the list. Based on the above determination, the project complies with Test 2 requirements. 17 l (' CONCLUSIONS AND RECOMMENDATIONS Based on the transportation analysis for Test 1 and Test 2, the proposed residential development of Cedar Grove conforms with the established Traffic Performance Standards. It is acknowledged that the proposed development will utilize a portion of the 1/5 of 5% allocated on future constrained roadway segments. According to the palm Beach County Traffic'ordinance, the available capacity can be allocated for this development prior to future background developments growth based on the assumption of first-come-first- served application filed basis. In addition to compliance, the development must address the directly access link on.Seacrest Boulevard. According to the trip generation section of this study the PM peak hour entering the site is estimated to be 157 vehicles per hour. According to Figure 6 (traffic assignment) 57% of the traffic will access the site from the north and 33% will access the site from the south. Therefore, it is estimated that 89 vehicles per hour will be turning left into the site and 52 vehicles per hour will be turning right into the site. Therefore, the development will be required to provide a southbound left turn lane on Sea crest Boulevard to accommodate the left turning traffic. Based on the above compliance and the construction of the turn lane, Carnahan and Associates recommends that a transportation concurrency compliance be granted for the Cedar Grove residential development. 18 j " .. ---,-,_._-_._-_.--~._-~------ ~ ~, ! ~~~J) CITY OP BOYNTON BEACH OFFICE OF THE CITY MANAGER Date 11/3/92 Arline Weiner, Mayor Lynne Matson, Vice Mayor Edward Harmening, Commissioner Jose Aguila, Commissioner Robert Walshak, Commissioner AS REQUESTED FOR YOUR INFORMATION xxx x REMARKS: Cedar Grove Attached hereto please find a copy of a letter dated October 29, 1992 from Richard Staudinger, City Engineer, to Mr. Julian T. Bryan, regarding the recent Master Plan submitted by Julian Bryan and Associates for the pro- posed Cedar Grove Subdivision. Please recall, the Cedar Grove tract of land is commonly referred to as the Seacrest Scrub. As you are aware the proposed rezoning on this tract of land was denied by the City approximately six months ago, and they recently within the last three weeks submitted a subdivision Master Plan for this land area under the City's current zoning designation. According to the City Engineer this proposed subdivision MasterPlan submittal did not address the City's code relating to environmentally sensitive lands; therefore, said plans will not be forwarded to the Planning and Development Board for their review and comment. This letter is being forwarded to you for informational purposes only, however, should you have any questions relative to its content, please feel free to contact Chris Cutro or myself. ~ ~ott Mi 'ty Manager RECEIVED JSM:cd cc: Chris Cutro, P~nning Director Central File NOV 4 ....... PLANNING DEPT~ \ r GEE & JENSON Engl neer s. Archilects- PlannerS,lnc. October 29, 1992 Mr. Julian T. Bryan, III Julian Bryan & Associates 3191 Leewood Terrace, L 136 Boca Raton, FI33431 RECEIVED Re: Cedar Grove Subdivision Master Plan Submittal OCT 29 1992 CITY MANAGER'S OFFICE Dear Mr. Bryan: of' On October 27,1992, the Technical Review Committee of the City of Boynton Beach met to discuss the Master Plan submission by your firm of the proposed Cedar Grove Subdivision. Staff comments were made concerning code requirements in Appendix C, Article VIII, Section 4. These comments will be transmitted to you in writing on or before November 3,1992. Comments will be forthcoming from the Utilities Dept., Building Dept., Parks & Recreation Dept., Police Dept., Fire Dept., Planning & Zoning Dept., and Engineering Dept. based on Tuesday's discussions. Also, during the meeting, Chapter 7, Article IV, Section 7.5-59 through 7.5-63, of the Code of Ordinances which covers environmentally sensitive lands was discussed. Your Master Plan submittal did not address this section of the code at all. I do not believe it is in your best interests or the City's to forward this Master Plan submission to the Planning & Development Board when the environmentally sensitive lands ordinance has not been addressed. --- You will still be receiving our written comments and those of the above listed departments on the Master Plan submittal. However, I will not be recommending this subdivision Master Plan be transmitted to the Planning and Development Board. You should resubmit the Master Plan to the Engineering Dept. after you have made appropriate corrections or One Harvard Circle. West Palm Beach, Florida 33409-1923.407/683-3301 . FAX 407/686-7446 05. 27. 93 08:50 AM >t<GEE 8w JENSON P02 n GEE. JENSON EnglnIlQfS-Archllocts.Plsnnt;lrs, Inc, OM Harvllld Circle West Palm Belch, F~ 33409 Telephone (407) 1583-3301 F.~ (<407) 6&6-7'1.. May ~~7, 1993 Mr. J, Scott Milfer City Manager City of Boynton Beach P.O. EJox 310 Boyntl:m Beach, FL 33425-0310 Re: Boynton Seacrest Subdivision Master Plan EnvironmG)ntal Appeal of Planning Development Board Deolslon Dear Scott, Attached 19 the complete packet of information including staff recommendation and staff comments on the Boynton Seaerest (F.N.A. Cedar Grove) Subdivision Master Plan subml1ttal. A chronology of the pn::lcess Is detailed in the Planning and Zoning Directors' memo of May 05, 1993 which Is Included In the paCket of materials. Atthe May 11, 1993 Planning and Development Board Meeting. the applicant's request for Subdivision Master Plan approval was u"anlmously denied by the Board. In accordance wlth Section 7,5 . 63 of the Code, the applicant has appealed the PlannIng and Dl9velopment Board decision to the City Commission for revIew at It's June 01, '993 meeting. The applicant will be In attendance to present an overview of their basis for appeal on the preservation issue. VGryt:IY~ . it; u~-..~c-- w. Rlclhard Staudinger, P.E, WRSlJer attachment Q2025/200 00: Chris Cutro Vince Finizio Bill Archdeacon, PEr PLS . City Engineer James Cherof MAY 21 '93 11: 14AM PSM&J P.2 ~..ARr:;>,' I'i.'RRY ,BERT LEE SH.\i'l~() id)Al\ R. MILLE~' :.L A. J/I RKESY ~~ gu~~ ~I J'!.i/k, c1 ~1 .9.S4I rt4.5'? ~ ~ .~ .9....:4 G'(JC rIW.9'.... ~ ~ ~ HUi'HONl! (407) 6M-4~OO FAX (407) 6!J.(-100s ,:'MlTrED J:-l PWR1DA ,0 D:sr~jcr OFCOI.\!MlllA VIA FA!~SIHILE May :n, 1993 W. Richard Staudinqer, P. E. ci.t.y Engineer City of Boynton Beach Post Office Box 310 Boynton Beaoh, FIQrida 33425-0310 Re; C,edar Grove Investors, N. V . \Rez;onins 6'oynton Seacrest Subdivision Master Plan Our Pile No.: 3197.01 Dnar Mr, staud.inger: III acc.ordance with the Boynton Beach code of orClinances Chapter 7 I sE~ctlon 7.5-63 JlAppeals process", this correspondence serves to request an A~m1n1strative Appeal trom the Planning and Development Board's denial ot the Boynton seacrest SUbdivision Master plan by u~lanimous vote at the May 11, 1993 Planning and Development Board ~eeting. We hereby request that this action be reviewed by the City <:If Boynton Beach City Commission at the next regularly scheduled City Commission meeting. Thank you very much for your consideration of this matter. Since.rely yours, f'" :jl:(t. [~ y~~x~ Jill A. Jarkesy JAJ:psp cc: James Cherof J. Scott Miller Christopher Cutro JUlian Bryan c,\wp51\.aio\cedQ~a~Q\8tau~ina.ltr ~,,'.~, 1', lrt^ l\'l"(N 1'1;!l.llY ~ilEil.T LEB SHAPI1l.O JORDAN R MILLlR' JILL A. JARKESY $- tJf1- g~~ ~j ~g~/.9.s/ rN'4S .9...... !I-.J. ~ !!IkJ .9'""", t<<JP ~ ~ ~,'..n.....J.HIIf TELEPHONE (4Cf7J 684-'1:100 P...." (4el7) 684-100$ - .\DMrrr~ IN f'I.C>.IDA AND pl$'ralCT OF COLu.t1l1lo February 8, 199J w. Richard s~au~1nger, p.E. City at Boynton Beach Engineer Gee & Jensen One Harvard Circle West Palm BeaCh, Flor1aa JJ409 RE: Cedar Grove Investments, N.V. our File No. 3197.01 Dear Mr. staudinger: On January 27, 1993, we received Comments from tne Technical Review Committee of the city of Boynton Beach which met on January 12, 1993. On that date, the Technical Review Committee met to discuss the Master Plan submission for the proposed Boynton Seacrest SUbdivision. Please be advised that neither this firm nor any of the consulting planners or engineers for this project were notified that the Technical Review Committee would be meeting to discuss this Master Plan submission. Furthermore, the city of Boynton Beach Code of ordinances specifically requires that written comments for 'the Technical Review Committee be received by the developer within seven days of the date of the ~eeting. Appendix C Article VIll, Section 4.H.l, Boynton Beach Code. comments were not ,received until fifteen days after the TRC meeting. In any e.vent, we have revised the subdivision Master Plan for Boynton Seacrest in order to address and comply with comments set forth in mG~oranda submitted by the staff members on the Technical Review Committo.. Wa are herein enclosing seventeen complete sets of this rGvi~ad M.atGr Plan submittal. In respon.e to your memorandum to Mr. Chris Cutro, Planning- and Zoning Direotor I dat.ed 3anuary 21, 1993, you indicate with reuspect to Appendix a, Article VIII, Sect-ion 4.C.S of thQ Boynton Beach Code of Ordinanoes that cur submittal does not show roadway widths for adjaoent streQ~~. P1~a$e be advised that ~he subdivision M~ster Plan specifioally ~how& t.he ri~ht~ of way widths for ~ll ~djnoonb D~rO..8. .n .aQ~~~vn. .beet Qn9-Qf-Q~~ n~ r~p- Doynton De.Qcrcl3t Ma.c-cor S'bOt'1l'l Man.CJQ.$n~ P;&'an .p.~,j.f.1.t;""ll,y .h~w!ll Z'd f~WSd W~60:11 E6, 60 H3j I I w. Richard Staudinqer, P,E. February 8, 1~9J Paglil 2 the wi<1th of asphalt for each adjacent riqht-of-way. Sheet one-clf- one of the Topoqr~pbyMap of Boynton Seacre.t a150 sho~e the right- at-way widths for all adjacent streets. Your memo also state5 that the $urvey ana site ha3 not been abstracted. Your code reference 15 to Appendix C Art.icle. VIJ:I, Section 4.C.9. our submittal has specifically shown all existJ.ng property lines I easements and rights-Of-way, their purpose, emd their street on the property to be SUbdivided, and therefore, we have satisfied SUbsection 9 ot Article VIII, Section 4.C. We do not. see any reterence in the Boynton !leach code to "abstracted" survey. Please state specifically in writing what you are requiring us to submit and why we have not satistied the reterenc:ed code section. We have revised our Master Plan submission to reflect .the entrance right-af-way and Mission Hill Road dimensions to the sub~ect property line as requested. It you teel this is not sat~sfactory, please advise immediately as well as specifics as to what you desire. Article VIII, Section 4.C, Subparagraph 17 specifically requires that the Master Plan shall contain a statement that elll utilities are available and have been ooordinated with all required utili ties. Please note that sheet one-ot-ane of the Boynton Seacrest Master storm Management Plan specifically states, "WatE~r, sewer, electric, cable TV and telephone service are all available adjacent to the site. Appropriate construction plans for thE~se services will be submitted at the appropriate time." We have, thus, complied with this section of the Code, and if you feel that we have not complied with it, please immediately notifY us and state in writinq specifically what the city will reQUire for compliance. Your 1t\$1nOirandum also s'Cat... t.ha'C the Mast.er storm Mana9'antf~nt:. Plan illil still. not acoeptablo and that ~h. drainage sYlitean has not bean addrQssed to your lIiIatillilfaction. Please ~tatQ specifically what. is not. acceptable and what you delidra. WQ are making QV'llry effort to ro.ee~ the city's criteria for drainage, What: we h2lve proposed will work, and it: has been reviewed and conoeptually approved by the Sout.h Florida Water Manaqement. Dist.rict:. ~L'h$ enclosed reeubmittal epecifically addre.,6es volume oaloulat.ions j:or exfiltrat:ion t.ronchee in mor:e detail. ~our memorandum poaes 1;he question '.how will t.he drainage system be maintained?", Sheet one- of-one of the. Boynton Seaorest Master storm ManCl.goment l? lan specifically states that "Drainage oulverts and exfil~rD:t;ion 't;rencn ..9...,. ~ ~ 6 ~~.Ptf' E'd r~WSd W~01:TT S6, 60 H3j , f W. Richard Stftudin9Sr, ~.E. Pebru~ry 8, 1~93 Page 3 systems sh<<ll he loc~ted within appropriatQ width easemanta that are dedicated ~nd maintained by legal assignment to a Homaown~rs Association." At this point, X would also like to note ~h.~ the drainage system wh1ch we are proposing is sub:atantially sUPQrior to any Oralnage in the adjacent area. If you 81::ill are not satisfied with ene Master Storm Management P1an, please state 6peoifica11y wha~ !urtner intormation you will require. The last paragraph ot your memorandum references t.hat aooesses to Lots 1 ana 2, BlOCK 1, an~ Lots 25 and 26, Block 10 violates Article, Section 1 because the access is le~s than 180 feet from Seacrest BOUlevard, a collector street. This aection of the Code requires that points ot access to lots developed wi t.hin t.he subdivision shall be located a m1nimum ot 30 ~eet from intersecting \ right-ot-way lines on local streets and 180 teet rrcm intersecting I~O right-ot-way lines on all other streets o~ higher clas5Iificaticm. The Boynton Beach Code of Ordinances states that collector streets ,~ are 80 feet in width whereas local streets are 60 teet in width or ,~- 50 feet if they are curbed. Mission Hill Road which crOl':;lr'.es \~ ~ Seacrest at the entrance to the Boynton seacreat Subdivision is only 60 feat, in width and therefore 1s classified as a loc':al ,street. By !eiinitioJ1.,~~~re req\!1X'eq_~_E!a~e points...Qt ~~m:5s to lO~ a ~~-.of- ){)-- feat --from__the .lntersect1on 9! a.eacrest--.. h. t.._ . -'BoulA J;4.-an4 KiliSion--H~9ad. The subdivision Master Plan lror ~~- ~ Boynton Sea crest specifically complies with this design ~~ re""uire1l'lent. .. r <; t^- Doif.ru::dl We have reviewed Tal'l'lbry J. Hayden I s Planning and Zon'Lng it Department memorandum No. 93-013 which lists deficiencies for Lrr....;/' Boynton Seacrest Subdivision. Many of these comments are appear.inq . "<.' v-~ for, the first time and were neither referenced in the previlJus K Planninq and Zoninq Department memorandum nor discussed at either Y'JJ c#' of the Technical Review Committee meetings. Nevertheless, we have ~ ~ made every 8~fort to address each item in order to satisfy all tJ,~ ordinances; and Codas of the city of Boynton Beach. The subdivision , . 5 ,,1 j t loIa.tar Plan aubmi tted to the city of Boynton Beach on December 22, W'" t \~?-Jr ~. 1992, Qpecificall;y noted, !I~!::backs as: r~quire...clPXJ!=.2_.a.mt R-:l-:-~U ~ . ~ \)oJ t;~.. ,M.. zon!pqw. 'I'h1.SI languaqQ was previously requested at the TRC d cfl FuJ. \ c~~~ mee~inq of October 47, 1992. The city has now requested that we .~ ~'1 )(11- add a note whioh referGnc8a t.he zoning code "building and site tJJ.Jie'); o.-K regulatione" for the R-l AA and R-2 zoning- distr iot.s. We have . . revil!!led eh. SUbdivision MaateX' Plan to show this languaqe. If this lM-v\ is insufficient, plea.se state in writing speoifically what l{Ou (~_ _ _J would liKe u. ~o place on the plan. ;' ~"'~ ( ,dd--,f.~ COnt~'t1 06- 5 ~ 1Ju~ ~ 9~~~d~.?SJI' t;-'d - r~WSd W~0f:ff E6, 60 a3J .l\ ( 0)\ ~ ~J!~ ~ r 4}J ~R) ~ I, I W. R~chard stauainger, P.E. February 8, 1993 pa.ge 4 Our professional land planner, Julian BTYan, has speoifically addressed Item Two of the Hayden memox-andum by indioating the width of the required limited access easement on Lot 1, Block 1 and Lo~ 26, Block 10 along Seaccrest Bouleva~d. Our enqineera, Carnahan, Proctor and Assoc1ates have specirically addreesed Item three by indicating a location and width or a wall m~intenanoe eaeement for the retaining wall indicated along the north boundl:lry of alock 1, Lots 20 throuqh 26, and along the west boundax-y of Blook 10, Lot.Ai: 10 through 17 on the Master Storm Management Flcn. Items Four and Five of the Hayden memorandum deal with the Traffic Impact Analysis which has been subm1tteO to the Palm Beach County Enqineerinq Department for 1ts approval. we are ~ddressinq these comments directly with the Palm Beaoh county Engineering Department and hope to have their final approval prior to the FQbruary 9, 1993 Planning and Development Board Hearing. Ple~se nota that our enqineers have included in the submittal a detail of tha primary access to the development from Seacrest Boulevard as a three lane, undivided section tapering off to a two lane undivided ..ction. ItQm six X'Qcommends that money be put into escrow at the time of pla~tin9 for a traffic liqht at the intersection of Seacrest Boulovard and Mission Hill Road, until project buildout or until the light is warranted, whichever comes first. Palm Beach County haa indioateQ that a traffic li9ht is not warranted now nor will be warranted eV$n at the time of total project buildout. Therefore, t.he Boynton Saaorest Subdivision should not be required to put moniec into eSQrow for a. i::raffic liqht if the proposed proj ect dc,es no~ warrcnt the traffic ligh~. In reference to paragraph seVen of Hayden's memorandum, the SUbdivision Master Plan prQviously submitted to the City of Boynton Beach does show pedestrian oros~walks, B feet in width, between streets which: elccommoda'te the proposed peds.strian system to the pUblic park sit.e. Tbe Mast$t" Plan also specificallY shows a pedestrian crolSswe.lk and path CJoing directly t.o the pUblic park between Lots 9 and 10 of Bloak 1. These p$dest.rian crosswalks wIll be in the publicly dodicD.t.ed rightli-of-way. The appropriate siqnaqe and. crosswalk s't:ripinq "Will be inst.allQd within the right- of-way at the time the dedicelted streets ar:e oonstructed and pav4;ld. ArtiCle Xt section 3.D. t~tes thD.t in blooka 900 feat in len~Jth or over, crosswalks tw streets not less than g feet wide may be required or deems ntiQl to provide oirculation or aCOQSS to schools, playgrounds ete. There is no referenoe whatsoaver in tha Code to the requlrQ~;::;;; f- _ ~,11'~~' I . l _ ~ 06. 06. 93 09:61 AM >t<GEE &.. ..JENSON POl ,...... ,~ . n GEE . JENSO~ MEMORANDUM RE: Christopher Outre, Planning & ZOni~g ~ . CI W. Riohard Staudinger, City Engl~kI'(~ Boynton Seacrest (F.K.A. Cedar Grove) . Drainage Certification of Concurrency TO: FROM; DATE: May 5, 1993 l'he referenced subdivision meets the City of Boynton Beach concurrency requirements for drainage as represented by the master drainage plan submitted as a part of the subdivision master plan for the Boynton SeBcrest Subdivi$ion. The matter drainage plan meets the concurrency levels of service as required in Articles 19-88 and 19-84(d) Drainage of the City of Boynton Beach, Code of Ordinances. To comply with the drainage level of service reQuirements of the City of Boynton Beach, the entire master drainage plan must be constructed prior to initiation of any home conlltruclion. In addition each subdivision lot building permit must oontaln an Individual grading plan which compiles with the master drainage plan. No fenoes of any kind wiD bo allowed in the drainage 8walea located in the back yards Of residences. All swales will be maintained by a Master Association as noted on the subdivision master plan. 92025/200 RECEIVED MAY 6 1993 fl -? 'J ~ :V' Il , \ \ . '. , ~ ~ ,~~ '<.4 06. 06. 93 12: 00 PM *GEE &. JENSON :::IN...OtH.....OQ.....c · paz : , ""W'I 'UI"I .......n.,.J.Mn!'\ lOS" 8P ~ ~r (1'..1) (' b.;..e C;,e #lI"C. 1/ ./ 'f[' IT). ;. - "1IZ7,a "-~"" ,,~\?,-, ' ,. .1,',:, I:' . . ., \ ". _",.,.tot:" ~ . ~ ~ _. - ';';:~~ll eQMMrmE '.:.~ ~I TE PL'N "E'.I1~:.v . Dat!.wtt~ Date '4'/i:ri'1 - 001"1&# - ~ OatG..- t f!i.J_t!,JeIJ;tt-- ~Gte 4.. 'J AJ jlJ... ~ '" ~ . ~ - tl~ eo~"'~n ' .If :'! ..,. C ;,1':'1- ~ .j Fire 'De~r, Eng. De 1", Util. De~t. Police D I~!)r. P. \lv. 0(.1 ~.. c>.. ~l~ :": ~:C~ ai, r(..lr~sti:1 R.1.A A ZONING iKY RANCH ESTATES (P.B./26. PAGE j4) , I I I /'$03.70' , ! ,,- "'" ,~- --,. .J__~. ! I 1 , . . \~ I (\ ~; I I \t? t 1 I " I' T" -=.. T '1- . ---I i ~ ~ ! \r.1 I BLOdK ONE I r-- .:s ' (.{.lAt..t.. E~5eMt:iU 7 , , I tW"AIJ..I~ 4Y "'.0.4. I . I I I I f -I r- 50',RiW I r I 'f I --~- - ~-:--"""""- -- 1D ,.\ I l 1J,.' I /' ).~ 'JP . t' f -..L II 1.Y: II --I q'j b i "i, , I ! I , I -- &- .. -"-1 50' A/W -- ~ o <) It \'J c> v ~J ~ II II I I A : I ... I ~ It -. ~I r.--'" <'I! '1 . "'" ~ ~ 1\ \JJt. ,. " ~.. \' t fv r)J) ~ ./ 05. 06. 93 12:00 PM *GEE &.. ..JENSON P03 RECREATION ~ PARK MEMORANDUM *93-166 RE: v1ncene rln1z1o, Deputy city Enqlneer Kevin J. ~alla~an, Fora5t~r/Environment~list, I~~,~ Boynton seacrest Master plan Re~ubmi~tal (2nd Review) (FKA Cedar Grove Sunalv1sion M~sterPlon A planned Reslden~1al community) DATE: April 12, 1993 1. The applicant will be required to meet the EnviL"onrnent~l Regulat10n Article I, Tree preservation Sections 7.5-1 thI;"ough . .~ 7.5,,27 (pages 593-606). specifically, the applicant mul$t ~~ fulfill the requirements or section 7.'-22, page ~03, natuI;"al ~Vfl growth to be preserved. ThiS s1~e has been determined to be If.r'' an environmentally valuable, nearly extlnct ecosyst.em ln South Florida. Meeting these sections may affect the master plan design resubrnittal, as approved by ~he City. . ~~J' J ~/" The applicant has verbally requested that the report: ECOLOGICAL ASSESSMENT OF THE PROPOSED SEACREST BOULEVARD SCRUB, (CEDAR GROVE SITE) BOYNTON BEACH, FLORIDA, 09 JANUARY 1992 prepared by Donald Richardson, PHD Ecological consultants, Inc. be submitted in total for the project FKA Cedar Grove. This is to meet the requirements of Article IV, V environmentally sensitive lands, section 7.5-59 through 7.5-63 "\qf ( (pages 628-631). This report does comply with section 7 .5-59 M.l~~~O through 7.S-61(b). The applicant must also submit written '1'ol"A documentation to comply with sections 1.5-61 c,d through ~~. section 7.5-63 (pages 630-631). . ,,.I" . In accordance with the. City ComprehenSive Plan Ordinance #89- 38, adopted November 7, 1989 policy 4,3,5 page 67, the applicant is required to desiqnate a minimum of 25\ of the nativQ plant community as a preservation area. The ecological assessment document (J2 above) and the site data sheet (revised' 2'-20-92) indicatQd the proposed location of the Preserve 11.5 acres maintained b Cedar Grove H.Q.A. will be ove Jiayed on the Boynt.on SQ.acrest MasterPlan resubmittal. The . purpose ilil,to apply th.e comment made by thQ applicant at the T.R.C. ffigeting on April 9, 1~93 (see attachQo memo from Chris Cutro, April', 1993 p.~a9raph one) tow8rd~ the location of the preserve area in cqnjunction with the proposed blocks, lots; and R.O.W. eaeements. 2. ... I~- {Ivf 06. 06. 93 12 00 PM >t<GEE &. JENSON P04 .lr,u~'~,.IA~,,'''''', "" ',., I.. "'" "'. ".' The following areas as shown on the Boynton Seacrest MasterPlan resubll\ittal could not be preserved as indicated under .a tree managemep.t l>lan wh11e simultaneously developed as housing locations, The areas arQ: Slock 11 lots 30,31132; Block .7 lots Il-24 inclusive1 Block #8 lots '1-~2 inclusive; Block *9 lote 11-15 inclusive; Block #10 lots tl-6 inclusive; SO' R.O.W. easement between block seven and block Qiqht to north/8ou~h property line; 501 R.O.W, easement bQtw..n block ei9ht and block nine to north/south property linQj 10' non- access and land~cape/~creening easement to north/south property line, Kf{;ad Vi...... ."r....;, i . , ' I ' 'I r . \,) . '".. '. 05. 06. 93 12 00 PM *GEE &.. .,JENSON P05 f~~K DEPARTMENT MEMaRAHP~ ~~ g3.2~~ TO: ~NGIN~ERING DEPARTMENT P'ROM~ FIRE DEPARTMENT OATE: MARCH :1.'1, :I. 99:j RE; MASTER PLAN RE9UBM~SSION BDYNTON 5EACREST 5 SEACREST BOULBVARD (PLANNING OEPT. FiLE ~69?) 'l'H1;f\! ARIl: NO OBJI!:CTiON3 AT '1'1115 TIM!!:. 4j4P--'~a~ WILLIAM D CAVANAUGH, FPO I BOYNTON BEACH FIRE DEPARTMENT ,... PO' fl,,""'") . /'t. X .(V "f" , ,. t/J 06. 06. 93 12:00 PM *GEE &.. .,JENSON P06 n . GEE & JeNSON /, '~;i "::";'~ .ArOMSCis.PlilMerS 111C. April 12. '9~3 Ol'l\! l'Iarv810 CII'I;:II;I ,\I~.t j;l.In1 ElIn.e!l I=L 33040<;1 1 (!IOQllol'e (4071 653.330\ r-a~(40716ee.74~a Jill A. Jarkesy, ESQ. . Perry. Shapiro. Miller & Jarkesy, PA 1645 Palm Beach Lakes Blvd. Suite 600 West Palm Beach, FL 33401 Re: Boynton Seacreet Subdivision Ma.ster Plan Environmental Impact Statement Dear Ms, Jarkesy: This latter Is sent to confirm your verbal directive at the Boynton Beach Technical Review Committee (TRC) meeting of Thursday. April 8, 1993. At the TRC meeting you directed City Staff to utiiize the environmental studY previously submitted for the Cedar Grove PUD rezoning as the noeessary onvlronm8ntal impact statement required by Chapter 7. Article IV; Section 7.5-59 of tho Boynton SQach Code of Ordinances (page 628 supplement No.45). No previous environmental data had been submitted for the Subdivision Master Plan for Boynton Seacrest (Cedar Grove Traot), therefore no review as noted in 7.5-59 through 63 had baG" possible. The Planning & Zoning Department of the City of Boynton Beach and the City Forester will be reviewing the impact statement and generatlng approprIate comments to my attention in accordance with the schedule outlined in the Code of Ordinances. Please call if you hava any Questions, or If the contents of this letter do not accurately refleot the dlscuQsion and actions ot the April a. 1993 TRC meeting with respect to environmental issues, Very truly yours, Gee &. Jenson ~3t~ W. Richard Staudinger. P.E. WRS/bf 92-02551200 cc; J. Scott Miller Chris Cutro James Cnerot Tambri Heyden . '~ ~4" 05. 06. 93 12:00 PM *GEE &. .,JENSON PO? PtJaLIC WORKS OEPARTMENT MEMORANDUM *g3-089 TO: v1ncen~ A. Finiz1o, Deputy city Engineer FROM: Robert Eichorst, Public Works Direotor SUBJ: Boynton seacrest Master Plan Resubmittal (2nd Review) DATE: April 6, 1993 The Public Works Department has no p~oblems with the amended mast~r plan for seoond review as reterenced above. ~~ Pu~11c WorKs Director REIer ," i rfwf. ~ .... OS. 06. 93 12 00 PM *GEE 6.. ..JENSON poe P. MARonN FlZRRY ROBEIl.T L!I! SHAPIRO JOROAN It MIll.ER' JILL A, JARKESY $,.. c11t- !?~I ~1 JI.i&. c1 ~. !?d ~u ~ JI...4 ~ .!IIwI. $PUll(, fif)() . ~.9.J.. ~ ~.>>HI TEI..EPHONIi (407) ~..4SOO fAX (407) ~84.1 0<:8 . ..OMITTED IN FLOII10,l AND DIS"[i\1C!' 0' GOLUM&lA Th, . '{"'I!" ~'.;., , !. ~"J(f: ~:-," (, ~.' ~, .:: ~ I- 1":1 ",..If . "., ,;, ,:," ,,: ,::,:' '.' :-':'.\, tt ,~. .. n.......lr , .i,t ,,: IJi ;.' APR 1 6 1993 .-"' ;.. ~....... 1 .' "I' , ,~, " . '-~I-:.f,:" r.~\ ,}~:: '..~:'~~}:'.l April 12, 1993 Mr. W. RiohDrd Staudinger, P.E. City Eng'ineer city of Boynton Beaoh Gee & Jenson One Harvard Circle west Palm Beach, FL 33409-1923 RE: cedar Grove Inves~or., N.V./Boynton Seac~Q~t Mae~er Subdivision Plan O~. File No. 3197.01 Dear Mr~ sta~ainger; This correspondence servee to confirm my Bt~tement at the Ci~y of Boynton BeaCn Technical Review Committee Meetinq whioh was hQld on April 8, 199J relative to the environmentcl study submittac1 by Cedar Grove as part or their Planned Unit Development submit~al in early 1992. I hereby author1~e you on behalf of Cedar c;rove Investments to consider tne Environmental S~udy prepcred by Donald Riohardson Ph.D. of Ecological consultant5, Inc. a~ pa~~ of the BOz'r:.t.cn Soacrest Master. SUl:JdivJ s10n Pll\:'1 subrnlttal. Thank you very much for your consideration or thi~ matter. Sincerely yours, 9w-'c~~i- Jill A. Jarktsy JAJ:psp '." / t I"") // I i./' /,' .1~! /t/ U' 05. 06. 93 12:00 PM *GEE &. .JENSON P09 , h.JA..IIe. A ~'~r"'~~--~" G ENGINEERING DEPARTMENT MEMORANDUM NO. 93-105 TO: ALL TECHNICAL REVIEM C~l'rrEE MEMBERS (hand-delivered) FROM: VINCENT A.. FINIZIO DEPUTY CITY ENGINEER DATE: APRIL 22, 1993 RE: MASTER PLAN COMMBH RECONCILIATION SUBMISSION MODIFICATION OF TRC MEETING AGENDA BOYNTON SEACREST (FRA CEDAR GROVE) Provided your offices herein, plea$9 find a full 6et of MaSt9r Plans oonaidered by the City EnqinQQr as a set of plana aubrnitted by thQ applicant for the purpose of raconcilinq staff comments prior to the P & D aoard's consideration at their next monthly meeting. Ple~~e he fully prepared to discu~$ these plan~ after c~reful1y performing a comp~rative analysis against your most recent comments. By ~QPY of this roemo~andum to both Dorothy Moore and Attorney Jill Jarkesy, I am providing notice that the agenda i~ amended to inclUde 6.iscussion reference compliance with sta,ff comments on April 27, 1993 at 9:00 a.m. at the west w1nq conference Room, 2nd Floor, west wing or c~ty Hall. Thank you. ~~ , ~':' ,,;. >C".....- (A, ,_ ~ \JJ--"f-"~ -,,", ,-\'...)... I ~o::;:.C...el.~ , v~; .....n" ~A ~"".:", t13 ~ \ \\....' \ \ t'.' u~~b ~~J ; ( cc: Attorney Jill Jarkesy via FAX TRANSMISSION J. Scott Miller, City Manager . James A. Cherof, City Attorney W. Richard Staudinqer, P.E. (as directed) .. " , ,..-' ",:,~1"\..1_ "~" .,. ,I..:. ~ . .-, f:1'~,~,,-1o.J >.. f~' (. '..J;~ .;..J::;:; - \" ~ lv;~. .L 7. 3- C(~, ~ .... A\ \ ~10y' (~~i \ 05. 06. 93 12:00 PM *GEE &. .,JENSON P10 PLANNINC ANO ZONING OE:PARTMENT MEMORANDUM TO: R~ch~~a etAuQinge~ city Eng.1.nf:el.' ~~.~- Chrietopller cut1."O Planning and zoning Di~Qctor TtlRt1 : fROM: Tambri J. Heyden :senio~" Plarmel." DAT~: Ap~il 26, 1993 SUBJECT: Boynton Seacre~t (f.k,a. Decar a~OvQ) - F11Q No. 697 Master Plan (subdivision) - Eoologia~l comments Tll111 folloWil'lQ list of comment15 are those ref.r'Qt'1ced in r=omm6lnt #9 and #9 of my prevlous memorandum dated April 13/ 1993 addressed to you and are gene~atea by rereview1ng and applyi~g the 1992 ecolbg1cal 40curnentatlon submitted for the cedar Grove PUD rezQnin~ to the eUl"rent request (r-e:!vised lll~elter plan l"eceivQd March .3C I 1993) in order to comply with the city's Environmentally SQnsitiv~ lands ordinance: 1, None of the dQcumeut.ation ri.ubm1tted to meet the s1.tbmittal requirements of Chapter 7.5, Art1cle IV. Envi~onmentally Sans1tive Lands, Sect10n 7.~-61. Review proc~dures for proposed land altel-atlons, addl"eSseS ~ection 7.5-61(0) ttproject opel;ationlt a:1(~, sect10n 1.5"61 (d) "project alternativesll, Therefore, with no preservation !hown on the sUbJect master plan, it is net known now 10S5 of habitat and development illlP~.ict or. the enaallqu'ed, tlll"eatened and r&re animal and plant species and speCIes Of speclal concern that have ~een 1d~ntif1ed on the property, will b& mltig~ted. 3. 2. The subject prQPtn"ty i::; d.elineated on tl1e comptehens1v~ Pl~ll Futul-e Land Use. Nap as a HCot1serva t ion Overlay' DiS tr.:Lct" 'd'.ll: to an "P." (hi~h q'lla11ty) rating of the natlve, Fll."C1d.a Scn.to ecosustem on the parcel. The use and development of proplill"ti.es delineated as a nconsel"vation Overlay Districti. are ~ubject at the recommendatlons contained in the conservation and coutal Manac;tement Elements of the C1ty'S 1985l CornprQh~n.so1vE!. Plan. Since 110 preservation is shown} th€ subject ma,ter plan is incons1sitent with Comprehensive Plan policy 4,3.5 which requires p~eservat1on of a minimum 2S~ of the total scrub habitat of 45.69 acres (i.e. - 11.43 acres). Opel."atl1i.9 '\1l1d"l' thlii sami'. conclusions drawn in 1992 by staff ~nd Donald Richa~dson, the applicant's ecologist and preparer of the ~anuary 9, 1~92 ~cological ass~ssment ~ereviewed and appli~d to the curr~nt rQqu~st. at minimum, the fol1ow1nq lots (ana atreet accee5 to thQm) will need to be deleted from the subject maste~ plan. This determination was made be ovel-laying the vegetation mapping t"e,ql.lired in section 7.5- 61(b)1 of the Environmentally sensitive L~nds Ordinance: ,,, a) ~lock 1, Let! 1 ~~cl 13-24; inclusivQ b) Hlock 6, Lots 1-22; inclu~ive cl Slock 9, ~ots ~-l~; inclusive dl :Elock 10, ~ots 1-6; inclu5ive 4. The applicant s1jO~11d }.eep 1n mincl when addressing the abClve- referenced comments tha~ al~hough at time of p~eliminary plat apprdval a management plan shall be submitted fo~ the prQ~~~ve area and any other ocmmon areas, ~~ ~uch eXl$ting vegetation as possible I employing preservation. 6.nd l'elocation I rathel-- than llC\lt and replace" teclU'liq1.leS, \')utside the pl"eeerVe arail shall be saved. D~s:i.qnatlon of a transition buffet' on th,.. master plan and management plan is recommended a~ a reet~ict~d develClpment ::=.on.e to pl'6<Vent siglllf1cant adverlSe effects on the protected enVironmentallY sens1tive zone. Thia type of ~. 05. 06. 93 12 00 PM *GEE &.. ..JENSON P 1 1 TO: Richard staudinqa~ ...2.. April 26, 1993 ( con t ' d. ) 4. miti~atiQn consid~ration would ~nsu~e that any portion of th& t~'anf;,iti':ll'l bufEeJ.- that is dG\mC\~..d dm.-in~ (,ol1.struction, is ~esto~Qd and op~~ating within a ~~a~onabl~ amount of time_ c:ompl","hen.siv~ plan p',:Jlioy 4.4,~ and Chaptel- 7,:', ~,.l:ticl!il IV. section 7,S-Slld) of the Cod~ of O~dinance.. ... J~y.iL;dt-/ . tjh A;~oysel:lER A~ \1' ,.. a 5. 06. 93 12:00 PM *GEE &. .,JENSON P12 / RECREATION , 'ARK MEMORANDUM '93-185 DATE: Vincent A. Fin1z1o, Deputy City Engineer J / KevinJ. ~llahan, Fore.~er/Environmen~ali.t ~~ Master Plan comment Reconciliation Submission Modification Ot TRC Meeting Agenda Boynton seacrest (FKA Cedar Grove) April 27, 1993 TO: FROM: RE: My comments as submitted at the previous TRC (Memo. *93-166) have not been addressed by the applicant. KH1ad .. . . :- '/ 8}lf 05. 06. 93 12:00 PM *GEE &.. JENSON P13 / RECREATION , PA~ MEMORANDUM #93-1Se RE: V1ncene Flniz1o, Depuey c1ey !ngl~ee John W11dner, parks sup~r1ntendent ~ ' Boynton seacrest MasterPlan comme Reconciliat1on (FKA Cedar Grove) - Revi5ed April 29, 1993 TO: FROMl DATE: The Recreation & Park Department has rev1ewed the latest Mas~erplan submittal for Boynton Seacrest. The following commen~ 1s appropriate: At the TRC meeting of April 27, 1993, the appl1cant agreed to provide a 6' minimum paved ~edestrian entrance to the public park site through the prIVate open space tract as a condition of approval. JW:ad CC: Charles C. Frederick, Director Recreation & Park Department Chris Cutro, Planning , Zoning Director "" ~ OS. 06. 93 12:00 PM *GEE &.. .,JENSON P14 /+-K/., . . i ') ... .~. \"p..,-.."I t/ \ , ~ J) . t -';.....1Q.r........~-r.. ./ ENGINImJUNG DEPARTMENT MEMORANDUM. NO. 93-105 TO~ ALL TECHNICAL REVIEW COMMITTEE J!ltEMBERS (hand-delivered) FROM.: VINCENT ~. FINIZIO .. DEPUTY CITY ENGIHEER DATE ~ APRIL 22. 1993 RE: MASTER PLAN COMMENT RECONCILIATION SUBMISSION MODIFICATION OF TRC MEETING AGENDA BOYNTON SEACRBST (FKA CEDAR GROVE~ Provided your offices herein. please find a full set of Master Plans considered by the City Enqineer as a set of plans submitted by the applicant for the purpose of reconciling 5~aff oomments prior to the P & D Board's consideration at their next monthly mee~inq. Please be fully prepared to discuss these plans after carefully perfo~inq a comparative analysis against your most recent comments. By copy of ~his memorandum to both Dorothy Moore and Attorney Jill Jarke~y, I am providing notioe ~hat the agenda is amended to include discussion reference oomplianoe with a~aff comments on April 27, 1993 at 9_00 a.m. at the West Win~ Conferenoe Room. 2nd Bloor, Wast Wing of City Ball. Thank you. \ 1'" '-L-~ A ~1:>zr-- j , ( co: Attorney Jill Jarkesy via FAX TRANSMISSION J. S~ptt Miller, City Manager James A. Cherof, City Attorney W. Richard Staudinger, P.E. (as 'directed) 4 L" ~-L)Y_I~j,/ I ' '. j . . I -~ (.,) I w. Richard StaUdinger, P.E. February 8, 1993 Page !5 Paragraph Eight recommends that there be designated at one side of the proposed outer loopinq, local streets, a Dike p~th connectinq the Seacrest Boulevard system to southeast Second street to the north and to Southeast Fourth Street to the south. The submittal refleots this designation in accordanoe with Appendix c, Article IX, Section 11. Please advise immed~ately it this is not acceptable to you. We have no objeotion to paragraph Nine and Will specirically agree herein that certification of concurrency tor neiqhborhclod park facilities shall be issued conditioned upon no buildlnq permits being issued for the final fifty percent of the tot;al number of units within the subdivision until construction ot eitller the Girl Scout Park or the 4.2 acre dedicated park si te COl'l\m8nCE~S. In reference to paragraph 10, we have added a note to t:he Subdivision Master Plan that states that "No residential building permits may be issued until the developer and the School Board approve in writinq an aqreement which assures that public sch()ol student: membership generated by the development will achieve School Board racial balance goals." John R.. Guidry, Director of utilities, stated in his mGmorandum that we have not oomplied with two comments in his memorandum datQd October 28, 1992. Please be advised that in accordanoG with APP8ndi~ C, Article VIII, Section 4.C.l0, Boynton Seacrest has ehown on its submittal the location and right-of-way width of all proposed streets, alleys, rights-of-way, easements and 'their purpose along with the proposed layouts of the lots and blocks. Ple~se be fu)::"ther advised that all water and sanitary sewer ea8em.n~s will be looated within the dedicated public rights- of-wa.y. Water and aewer is available to the s;.ite and the necessary conGtruoeion plans shall be SUbmitted in acoordance with Appendix C, Article XIII, Seotion 5 of the City of Boynton Beaoh Code. As previously stDted, eheet one of the Haat.r Storm Manag.m~nt Plan containti the following note: "Wate:t", sewer, QIQotric, cable TV ;and telephone servioe are all ~vailable adjaoent to the sitQ. Appro- pr1aee construction plans for these services will ba submitted at the appropriate time." The developers or Boynton Seacrest, their attorneys, engineers and planner, have made every effort to comply with ~he requirements set forth in the COdes and ordinances of the City of Boynton Be~ch. We feel that this Master Plan resubmittal ~dequately addresses the comments of the TeChnical Review committee and complies with All applicable City Code. ana ord1nances. Wit look forwi:l~d t.o t.he ~ ~. ..AMI. 4 ~.!PJ 9'd [~WSd W~2!:rT 26, 60 ff3J . I W. Richard Staudinger, P.E. February 8, 1~g3 Paqe 6 upcoming Planninq and Development Boar" hearinq scheduled ;f4;)r February 9, 1993. :e~ FMP: 1m 001 Jama& Charof ce: ChriGtopher cutro 0.4.r'r....1r. .9'....". ~. ~ A' ~ 9!.JiL' L"d .... .. ...."... ." ..'.."...,. .,.._--,~_..._,-..l:l!k!~~~J~l.l I='~, 60 !3:3..:l ~"""~4,1 v sE:~~-JJ~qrfl: IJ !,~ PNSM 7~llN~Hl; ~~~Jc l:A}li 03 -l ~oynton Ben fax:# 2 POc2 , " ,'.. . I' _.'''''. . ".' ...,,".....,.."W...I"~. , .,' ; I ~ i CARNAHAN · PROCTOR AND ASSOCIATES tNC. ,ONuttlnO &n91"..11 ' S\Jrv.YOfl ' Plonners . Land evelopment Consultants \ ADDBND'UM RECEIVED FEB 8 1993 - BOYlft'ON DACUSI' (AKA eDU GROVE) DAme mJDY i !nnVARY I, 1B3 I 1 Due ~o oonQerns expr..._~ ~y Mr. Din W.isberq~ P.I. of Palm D.a.ah county 'rr.t~1o zng1neering N;a:rclin; projected traffic volume .K~eedin9 \the allowable ~rattio volume on the roadway ..9Dent of WoolbriCJh~ Roadbetw8en 1-95 and a..cr.st Boulevard,. a project: phaeing Pl-n h.. been 4eveloped. The phllsin; will J:). baled on cond.uctin; tut.ura 1111 tiq.tion alternati~(.) to allOW the develoPment of the .nti~. .i~.. Th~ con.truQ~lbn phaalnq will ~. .. tollow.: I DJ!l8CUP'l'IQJI ~46 SINGLE FAMILY I \ 60 .MOlil'I-PAXILY ~2 Il11LTI~rAIIILY UNITS' 23 DWELLING UNITS · I I Ht DUZ.Y no.7.OIl' IROUBCT .,'UtlrC _ l'!tlIIbIJI!)fCmK~ PImtlB TOTAL · 1810 'lID 154 '1'/D 2034 'rID ROW II, ... - The m~1~i-fam11y unit., .. provld8d in tha .ttaohe~ .it. plan, are the III lot. adjacent to FEe Railr~ad. \ ** Th8 co~nc...nt of Pb... II will ~ .tt.~ r.oe1vini approval for a mi~i9.tion alternative to~ &ooo.ao4a~ing the additional proj 8et ~.t'.tf1o of 154 T/D (o%' 21 ':/'D on the oon.t.r.lne4 roadway ..gment tt WOOlbriQht Road betw..n :1:-95 and eeagre.t aoulevard). B...d n tbe above outlin~ ph..inq, we are r.oommandin9 the approval oflthe Jlaster sit. plan of aoyni:.~ ...cJ:'e.t. i I I I I I I I I I \ I I I I' ~, I 619t Welt Adsnt\c\B1vd. . P.O. ~ 4J99 ' Mari'll,>!. fL .H(163 . (305) 972.l9~9 . FAX (305) 9'72-4118 I DuJe (30;) 949-(lltl6 . PAlm Bt~Il<:l\ (4U7~ :J64.068' ~ . ~ ~ T 6v'X Te'ecopier 7020 ; 2- 6-93 ; '~:03 SE~l-Ud~~jrr1:4~ PN\ ~~UM CA~NAHAN ASSOCIA1~S i I i I -+ . .\ BOYNTON SEACREST TRAme STUDY 4DDENDtJM ACCEPrAt~CE SHEET PREPARED FOR MICHAEL RUBIN. P.A. PltBPAllED IY CARNAHAN-PROCTOR It ASSOCIATES. INC. ev~"-" ~ ~ Wael l'Maj" .._j4.18.,,1, P.Ii. proj8ot. Man-qat' I Z/IJI/93 Dat. ACCEPJiED IiI Mr. Dan'w.~.b.rqf P.I. oat. ~alft Beach ,Count1 Traff1e Engln..r1nq I I i \ APPROV20 BY\; I I is. Tambri ~.Y4en 01 t:y of BOy ton Beach \ l~/BY~SECa'T/PRC ! DAta Boynton Bch tax;# 3 P003 ~ 05. 06. 93 12:00 PM *GEE &. .,JENSON P15 FIRE DEPARTMENT MEMORANDUM NO. 93-242 WDC / TO: ENGINEERING DEPARTMENT ,.. FROM: W. D. CAVANAUGH, FPO I FIRE DEPARTMENT DATE: APRIL 30, 1993 RE: BOYNTON SEACREST WE 'FIND THAT ALL THE ORIGINAL FIRE DEPA~TMENT REQUIREMENTS HAVE BEEN ADDRESSED. WE HAVE NO OBJECTIONS AT THIS TIME. /d1ft/dk . . D. CAVANAUGH, FPO I SOYNTON BEACH FIRE DEPARTMENT P9 ". ...--__;--"71' 7~ n GEE & JENSON Engineers-Architects-Planners, Inc One Harvard-Circle West Palm Beach, FL 33409 Telephone (407) 683-3301 Fax (407) 686-7446 May 12, 1993 Ms. Jill Jarkesy Perry, Shapiro, Miller & Jarkesy PA 1645 Palm Beach Lakes Blvd. Suite 600 West Palm Beach, FL 33401 Re: Boynton Seacrest (FNA Cedar Grove) Subdivision Master Plan Dear Ms. Jarkesy: At the May 11, 1993 Planning & Development Board Meeting of the City of Boynton Beach, the Boynton Seacrest Subdivision Master Plan was denied by a unanimous vote of the Planning and Development Board. The failure of the applicant to agree to the staff comments and conditions related to environmental regulations was cited as the basis for denial. Under Chapter 7, Section 7.5 - 63 "Appeals Process" you may appeal the Planning and Development Board decision to the City Commission by stating such intent in writing to the City Manager within ten (10) days of the date of this letter. I have enclosed a copy of this section of the Code of Ordinances for your information. If you choose not to use your administrative appeal as outlined in Section 7.5 - 63, within the time period specified, the decision of the Planning and Development Board will stand, and the Master Plan will be considered denied. Any further action on this subdivision will require the submittal of a new Master Plan, in accordance with Appendix C, Article VIII, Section 4 of the Code of Ordinances for the City of Boynton Beach. lUlCElVED MAY 14 PLANNING DEPr. ---------: W. Richard Staudinger, P.E City Engineer 92025/200 W~S/jer cc: Julian Bryan Christopher Cutro James Cherof J. Scott Miller ~1~ C'"J cD o .... ,g. :z. o ~ < .... o c ~ ~ ~ ~ '$ :z. o ~ ::>- :z. ~ d>~ g-tO' ~ ~ atD ~~ .- en p.ct) -0 . a 0 ~';Z. - ' ~-o .s-a a'-'" ~ . a Q) ~ ~ ev ~ u ~ a ~ 0 o u -o~ ev .... a u ev Q) ~p. ~ <Il Q)..... ~ 0 -Srg ~ .... "'Cl u ev ev ~ 0. ev!Jir- tlll~en a oct) ~ -.n "'Cl<ll. a .~ ~ Q)<.l--' t. Q)'O ~ ~ ~ ~-d'O ~ fu -S <Il.e ~ ~ 0 ~ a .... ~ ';>-. a 0. ~''::; 0 0 a ev }; ~.... d a::a.o'';z a "'Cl -oQ)BQ)atlll~~Q) -0 r- b u A 0 a .S p.-:S e 0 .p 0 ~ u.... d Q) .... cQ ~ ~.- tlll a ~ ..s:: -;j-" Q)~;':: a ~ t E-' ~ 0' ';>-. A u ~ .... "'Cl ~ ~ r- e~;::2~ e c.~ tlll~gs Q) ~ 0 ~ ~ ~ ~ Q) .S ~ .n .0 ~ ~ c.E-' a 'o.D~ ~ Q) ~ o a 0..... Q) 0 ,S ~ % a --' ..., ,~'Qi tfl ~ U C. ~ e ~...s ~ ~ ~ ~ E-'. g ~.~ "'Cl . ~ a ~ ~ "'Cl tn.... _ ';> Q) "'Cl to' ,... a r- ..., ~ 0. Q) .- a - et:O og ~ C. Q);: ~ evtD li ~ ~-;, 'g"a ~.. 1\ ~ ;J', Q) . ..., .... ~ ...,.s;;; <.l ~ ct) -oeva~_~"""'Cl<J)O . ~o:a~Q)a ';>-....,0 g ..., ''::; ..., ~ -0 ~ ~ ~ ~ Z ..::;';>-.~Q)Q)<Il~O ~o.-d ~.o e ~ e ~ 0..0 -; u ~ e-o ~~ a Q),S tlll tlllroo ~Q).e o~evc.<1)-'-'" ]l~:H n% ;~~ _ 0' S <Il Q).s ~-o ~-oE-' ~Q).o~"'" .....c....~ a~~(:t.O<ll~~tfl~~ .~ Q) ev E-' a ~ '0 tlll ~ .3 ~ ...,.oA o-o.....a.... '-' ::a .... ..., ~ ''::; r- ~'-a ~ ~ 0 ~ ~ '0 ...,. ~ g s c. ~.... g e ..., a ~ '-'" ~ ~ ~ g..;:; ~ ..r. .S'.S ~ t' go. 0. E-' ~ ~ ...._ ev ~ ~ ~ .... ev "'Cl'" -. ~ u ~ to'... ..... ..s:: Q) a.... ';E-' e e~-S,op.-S ~ e ::;l - ';) -e ~ ,:::. Q <IJ ~ ::;l .... ';> a ~ tD .q t- Q !h .~ -_.._..~".__...__.,._...~"- m m <1l <.) o ~ p. m --a Q) p. ~ ~ tD , ~ t:- o (h ~;; ~ ~ C. 0..... "'Cl <ll <Il '> a (f.l Q) ro ~ ev .- ~~~@ ~ -0 ~ "'Cl ~ ~~ S <ll U W e-o ur- c.Q~<) a 0 e,evc.tD 'S; ~ .... .n c. ev C. . <1) ~ ~ t- a.s~~ ~ . c. '0 (f.l~ 8''::; .~ So-! (.) t' ~~ 'tA 'c> c. '<) a 0. ~ Q) .... 0-00.... ... C. (f.l ~ p.Q)...... ~ ..., mOO u C. (f.l...... Q).... Q) ..., ;o,~.<)'tA -;j c. ev <Il tflop.a Q)utno .s ~ 'O.~ ...-o;a c. Q)c.a~ -S~~~ ev .- 'V ~~'SQ) ~ '.::; .n -S i: ~ .s p. ~ ..ci p.~ ';>-. e ~ ~ ~c.~p......Q) ..., 0 tn .... tI). p:l. c.~'S~-Sc. Q) Cl u'~ _ 0 e~Q)~~~ p.Cla(/}Q)C. o~tn .cS' ~~~.%.%p:l. ';> "'Cl ''::; ..., ..., ..... ~~uc.""o ~ 0 U Q)o~p.S~ ~.o 0. -;j 0.... ~ tlll~ ~o aa~~p.Cl o'-a c. ~ .s A "'ClOClp. .... Q)~edt..... u_a~...-oo-::;::: ~'v O' $-< tI)"'" _a~_Oc.C9 0. ~ '-;.B c. Cl l!? (/) tlll a e .... .~ ~ g .S Cl ~ ~ ~ --' ..;:; a "'Cl o:l ~ u ~ ~ac..c(/}Cl ...., o:l -;j (/}...- c._o~~~ ~ o p.tn.P Cl......<O u ~.... c. 0 .q< Q) (l) a <Il . A-S(l)~(l)Q)gs ..., 'Sp.~~. ~};~Q)--O<;:::C .%...~~c.~',Z ..., ... ~ tlll ~ .. Q) .~ "'Cl''::; ';>> --0 ., ~ ~ a.... 't: c. ( ~u~eQ)~' 8. ~ ~ ~ -d d> .S .s "C ~ ..., .... ~ ~ .c .~ ~ .......~ ~ 0 Q) ~ ,~ o~,S.o.o~~p. c. ~ "0 tlll~ tlll a 0. o ';>-....... a ~ -c. o:l ~ .... .0 tfl.... ~ .... -0 Q) ..., ';>-.a <f)~ ~~ ~c.o:lo Q)O..., .S 0 -0 ~ g ~ ~ ';>-. e ';n r- -0.... ~ o:l.o ~ .~ ';? a ~ -0 a-o (l) d '-'" o:l.... Q).... Q) ~eatlll~-;~'th --0 0 2S .S ~ ~ Q) e Q) U c. c. 8 ~ &-0 ~ .... a t) Q)-O ~ ~~ o:l ';>> tfl ~ o:l _ .<) ~ 'P.~ ';>-.- Q) ~ 3 t)'\:~.o 0. Q) ~ Q) Q) ~ p.~ p.-S Q)-S~-; p.~ ~ ~......"" tlllo:l~ ';>-..sc.o.s<ll~~ o:l ~c. ~~U e -0 e 0 -0 o:l.......... ~ ..;:; 2S ~ 0 ~ C.o~o:l~o:l~~ ~ .0 'u .S e c..S' ~ ~ ~tlll<1)d.oO~...<f) <ll a A ~ ? ';n Q) ~ Q) 0..... ~ Q) <f) tfl I-< -0 -;j C. ~..., .... '-' a 0' :?.o....lll~eo~Q) _ t-l '... -0 Cll d <Il ..., I-< ~-o ~ Cll p.~ ';>-.<f) a .... a "'Cl ~ 0. 8 ~ tlll <1) tin ~ Q) ..., o:l -o.c. ~ tlll _......... ';>-. r- ,; .... o:l tlll~ 0'0.0 0 .. ... .c. ~ .... ? -0 ~,S '> ';>-. -a Cll 0. <f) III ';>-."0 <f) a a -;j'Qi ';>-. '> to ...... ,... ...( ~ 0' U a Ill.... Cll ~ P. e e -< 'S;.-S -S .S ~ -" .....-------'-' --"- PL!\NNING AND ZONING DEPARTHENT MEMORANDUM To: Richard Staud~nger, City Eng1neer ~(l#"J~ ~- &eu.;:bnk..~ Chr1s~o~er~~, ~[a~i~a Zoning D1rector From: Dat,= : April 8, 1993 Subject: Appllcant's request for Special Planning & Development Boara. Heeting or.. April 27, 1993 Boynton Seac:.-est (Subdivision Master Plan) File No. 697 We have located the ecologlcal assessment (dated January 9, 1992) submi tted by the applicant tor the Cedar Grove P'JD rez.:mlng applicatlon. Pursuant to tne statement made by the applicant's attorr..ey, Jill JarKesy, at today I s Technical Review Committee meeting, directing statt to re-review the 1992 docurnenta~ion and apply it to the above-referenced applicat10n in an attempt to meet the submlttal requirements of the City's Env1ronrnen~ally Sensitlve Lands Crdinanc= (Chapter 7.5, Article IV), this department and 1':ev1n Hallailal1, the City Forester, HL...l be amending preV10US cornnents made relative to mi tigation ar~d scrub hani tat preservat~on. Due to the rev~ew schedule established wlthin Section 7.5-62 of tne Env1ronmenta~ly Sensitlve Lands Ordlnance, wh~ch provides ~he Technlcal Rev1ew Board 30 days upon recelpt of the above intormation wi thin whici1 to complete i ts evaluat~on 0::: environmental impacts, we respectfully request that the applican~'s request tor a speclal meet1ng ot the Planning & Development Board be denied. Ai though we anticipate being able to transmit sald comments to you pr10r to May 7, 1993 (30 days trom today), more than the 7 days gl ven for "non-envlrcmmental" comments to be su~mitted to yeu is needec. ThlS ad.ditJ.onal reVlew tJ.me wlll net effect placemem: 0:: thlS reques t cn the next regular.:...y scheduled Planning & Development: Board meeting G~ ~ay 11, 1993. Please adV1se whether or not this schedule 1S acceptable tc both parties and whether you recelved Jill Jarkesy's letter contirming stat:ements made at tne Technlca~ R~Vlew Commlttee rneetlng regarding this issue. c:c/ th cc: ~e\.1n Hall~han A: ~:;tau097 4 Wd LO:tO E690tO 11)"1\1,-:,1 '- -, ~~ g~, ~, JWk c'J~' !Jl!d 1'~4J '?.,k ..13'~ ~ ,~u ,9.;.0{, 6(1() , '!I;t.9'_ ~ ~ JJ<<J1' TEWf>BONI~ (-107) (,81.4')00 F~(-1Q7) 6&\-100& :'. MART!1'i l:'l~R!tY ,OUEH't 1.F.f. SHAPIRO \)I{l)AN R. ~I1U,ER" ilL ^ ]ARKESY Al.l:.ll'ITI!D IN fLORiD^ ..I:; DISTRI("T Of COLL)MlI~^ ~ . ''7 c~{ jJ -fP C}.IA. April 6, 1993 Mr. W. Richard Staudinger, P.E. city Engineer city of Boynton Beach Gee & Jenson One Harvard circle West Palm Beach, FL 33409-1923 RE: Cedar Grove Investors, N.V./Rezoning Our File No. 3197.01 Dear Mr. staudinger: Pursuant to our telephone conversation of today, we hereby request on behalf of Cedar Grove Investors, N.V. th~t the city of Boynton Beach specially set a Planning and Development Board hearing on April 27, 1993 to review the Subdivision Master Plan for Boynton Seacrest. This project will be reviewed by the Technical Review Committee on Thursday, April 8, 1993. This would not give staff sufficient time to prepare the necessary Staff Reports for the Planning and Development Board hearing scheduled for April 13, 1993. I appreciate your assistance in this matter. hearing from you. I look forward to Sincerely yours, 7f (,{' n 'Jo.J>..!C"7~ Jill A. Jarkesy JAJ:psp . n GEE & JENSON Englneers,Archilects-Planners. Inc. April 13, 1993 One Harvard Circle West Palm Beach FL 33409 Telephone (407\ 683-3301 Fax (407)686-7446 . Mr. J. Scott Miller, City Manager City of Boynton Beach P.O. Box 310 Boynton Beach, FI 33425-0310 Re: Boynton Seacrest Special Planning & Development Board Meeting Request Dear Scott: Attached is a memorandum from the Planning Department outlining their timing problems with reviewing the environmental impact statement from the Boynton Seacrest project, prior to this Thursday, April 15th. Because I will not be obtaining all ot the environmental comments from Planning or from the City Forester, I recommend you reconsider the appropriateness of a special meeting on April 27, 1993. I anticipate all comments can be obtained and transmitted to the applicant in time to meet the schedule of the May 11 th regular Planning & Development Board meeting. Very truly Yours, Gee & Jenson Engineer. - . ects-Pla~nners Inc. ., " ;; (Cr--Az--:J' ./~ W. Richard Staudinger, PE City Engineer WRS/bt Enc/. cc: Chris Cutro Kevin Hallihan T ambri Heyden Jim Cherot RBCB1Vf,D ~ l' p\J\\'n~\~G Dt.Pl. ~ %e City of 'Boynton 'Beach t G-.-J .~ Ct..,.i1rlJ..... \:J (I) ,l C'Ol ',j 100 'E. 13oynton 13eadr. 130uUvara P.o. 13o~310 13oynton 13eadr., :rforUfa 33425.0310 City 9fa[[: (407) 734-8111 :r.u: (407) 738.7459 March 31, 1993 John Pescatell 0 South Florida Director Nature Conservancy 319 Clematis Street Suite 611 West Palm Beach, FL 33401 Dear Mr. Pescate110: The State of Florida, Palm Beach County and the Nature Conservancy have joined together in a worthwhile partnership to purchase and preserve tracts of environmentally sensitive land. One of these tracts, the Seacrest Scrub, lies within the City limits of Boynton Beach. This particular tract ranked very high on the pri~rity list for purchase under the Environmentally Sensitive Lands Program. I would draw your attention to the enclosed newspaper article from The News on this property. I realize your staff is working on the acquisition of this property and I would strongly urge you to move as quickly as possible to consummate this transaction. If you have any particular questions as to the various proposals submitted to the City by the developer, please contact our Planning Director Chris Cutro at 738-7490. Thank you for the leadership role the Nature Conservancy is taking on these projects. Sincerely, " Mayor EH: j b Enc. cc: Chairperson Mary McCarty Palm Beach County Commissioners DERM Mayor & City Commission J. Scott Miller, City Manager /. Chris Cutro, Planning Director 5lmeTUa s gateway to tfie gulfstream RECEIVED MAR 3 1 1993 .. tit (') ~ c> s: <.) (G ~ ~ '0 II> Q) :l I- vi ~ Q) z ~ I- ~~..c:g~~~ d~<g~=~a~ ~ ~ ~ ~ U ~ J:: U .l:le ~ .l:l ~.; ~ - ~ Clu ....c:: ~ '" <U ~ e ~ 00 . '" ,,,,\ ~ ~(';14).t::"" d.\V .:::,;;- _x.\+o< u <U J::~. ,.,.~ ""o.::::::::::.'::l ~ ~ u"O c,' 6' 6..,,S.,;Q ~<l\.3,;.s~6'o ,.~1! U -;) d g c: ::: ~ N 5 ~ I:t U <u,s ~ et:I .~ ~ ~ ciS ~ ~ .::: .g .~ ~ ~ ~ -;z ... -5 .~^ ~ ~ . ~ "'" ~ ._ _ <u ... et:I 0 ...... c: 1il"Q>' a <u ::: ~ ~ <U rd.s go 3: 8 -5.... ~ c: 0 <U U ~ -5 B.e et:I e ~ ~ <u 00 <U ..;;; ~j:: o:s.e ~ ._ :::: ?; '" > c: ~ ...;e. - ~ .- rd ~ ~ ~....,.g 0::' ~ 'a .;. e ~ ,g .c:: ~ la:s;!",:g'1J0';,~ e il:s~.>g.~" 9 ~ _~.:::;~ Po ~ u_""<Uo iiPotO'Ooo S <>> ",_ ~ ~ ...,.., _'" Po c: c:~- '" Po~...~~'S~et:I~ Ic:"'s~e~ <<ue'O~ u&w ~<UtO~.!c:-....cr.; ..... -588-0 g...e ~~ 6 e go; 838- .... 11 "11 j, .!. ll.'" " 9 :!!.. ~ '" UUU~ tO~<u~ oa~c: a ~ e ~ _''''' u ::;-:> u ~ cO U OUC: ._~i7l :: ~:r.o "c: cO"" u. ~ .u ~o ~ sc:"~~ _ u ~ . <u - ....- U ~ 0. ~ 00 cO cO '0 :::: .e.~ to u ._ .sa '" c: u .c: ... u - ~ u ::l ~ l!" .~,s .!!;.- ~ ~ .ll8.~ e ~ 00 U .g U _ ;s n ",..c: U -cO <U S cO ._ e ~ 0 ~.:.Il '0 ~ .::: ~.::: c::c > 'aueo:: fI'I ""c:'" >>~o"" ~ .e.::: c: <U ~ 8. cO s 0 0 to <U'~ 0 w__ <Ilw '""lc:C::~~"'> :: en 8_a"~",iu 0 w::lC:: >>' C .- <U ~ u~ .... au ?':'.!!- i u~_ ; ~o "":'- <U -0 ._"""l "'" .P ,'" c: U 0 _ c:: ~ ~ "" =' .:::: cO...... ~cO ::l ... u"" 0. fA ~>>ouu ~-eoo ~~~~.gc: I i<Ue~-a'O;'O<u ~ ~ ~'& 8.3... g,s Ii-a 8 a~; II _ ftI 5g~ 0:s g-s~]~ g e 5'~.s~ ~.~! "" ...~.~._ 0 e'" 0 ...~. c::t. tl rd u.2. rd ~ ..... .~ a ~ oo'~ cO ~ u 'i ~.::: ._ ?;.e u...c:: u t Po~'; s ....,~ c: .... u >>.~ c: ...., >'p~U~ . U u~--'::: 3~~.Pj~~::l:g g~ t~~l?; ~<u-5"'acO~u .Du .!!!Po~~u~tO~u fI) ~ ~.;:,.:: >>~~ c: 0 c: =3 Po U S 2 .e ~ e ~ a"cOiiP-~ _~~tO- .:::"'~ -c:tO U u._>> '0- ~ >-.~ cO ..: ~ 0 c: n,g~&u=e",c:PocO~c:~n~~- ~ > !!! '" u g 0 u to ~ cO .- ::l :::: > '0 .c.;.. 'O..c: c:..;::.!:: - n e.::: S bO 2 ~ c: ~ et:I 0 0 ~ <U ::l- ~ et:I 00C: ~... ~ u ~ ~.":: ~ ._ a 8 a" 0 to ::l'- U to U '" ~,sl~6ael:EJ~i~J"ll ~u.g",::l~S~-~~~"'u'O~~u- c: !l"H~H-ge~8~<~~~nH CD - - - - ftI' -5 ~.".' ~ C u (I) ! .2: :a C,,) 9 ~U...b~~O~~'O -odAbl"'~~ u ~~~o"'- otoUUcOu ~ ~ gU-5 ,.;:8;2l :!~h~~ ~ ~ z ~c:.c::.u-ool~~ucOU 1 ].e~~~~~~~ ~5eo~ ~ u ::l'- ... 0 .... ~ - c: 0 e'" .c:: '0 ~ 0 ~ ~ to.c >>,1:).... u.. U .c: 0 ... 0 'O~<u -- zu"'~ c:....... c: .a "'~u ...c:5nu.c05 .~.,; to~~~~ .e!lgr.ll~tg~e!~~ >> u 0 U ~_ _ u ~ '" .... u I:: u ~ - '" ;;'''''il ~ ~" - .l\ '" ll'" '" '" '" ~.l! 1! ,U'c 'C",;: t '" Oc-- g ~ g:g e..... c: >. ~ <U1::C:oo~~<u ~-to otO~'O .c:: 0 et:I OIl! o,~ ';:! >.~.~.g '" ~ ~ ~to e "" "E ~u~u .........~uto~."" -...", cOcO c: <U C:.S Po....o g~ ~ ~.;t~ a 8~o t t <u""~ .::: '0 u- "",-~'" -- <uuoc:~uc:~~~c--otO~""::l~== ?; Po ._ ._ .::: .JA.Q <u co ?; u..... ~ 0 0 0 .... 0 u 00 ~ ~ -.._ rn .... ~ ~ 0 Po :7l'~ ~ ~ s >>..:1"2 ~ g b ~ .Q u ~ to > d '0 .- 0. ><.- u '0.2. c: u ~ ~ ~ 0'S'O-g"g e .-u O""OcO~ e '0 ,t:) ~ ~ I:t u::l ,I:)'O::l~ '" a<ubn~:iSu ~",...<uooe.~ . ". u....- 0 "" "" =..c:r u ~~~.c::.c:: 0 -a:a oS ~ ~ '8 u ~ to . _ 0 ~'O.!:: ._ 0. 0 r.Il a: .- .- '0 "5~.sau 'O~~oo ~~~:g~c'-.-"" ,~ '.;1 .~. ~ .:;., o..i ~ _.;_~ Oh~~ 6)0 ~.....gc:u~ -5 u g u ~ c=';; 'P$. '0 U I """" rn '" \ g-= ~.8N~~ _ ~ t e o.s 0 >-..... ~ u ~ 'C U c:iiP > u cOt08ig-~fc' \ trd'" -~g ~ .;~e~ e~ . ~:g'n e~ e< ~au-n.p . rn~.c: "::~U .- u ~ ~ '" .... uQ) .~::l::lS ~ ~,'Co. =. '" .:'. r-'\ t ;;.a::n ~ ~ ,~ ..;;. ~ a- ~ = <rdugoo""~ ..c: Q.. 'C ~ 8. c:: i I . ?- '.'i]i l ",-,~I_~<U' ,... o ':;" ~- ;;;O'..c: .... u:::_'" ~ ~ "'; in ~'n ~ n 0 .'= c= ~ ~ oo~ ~ cO aU e.c:: = .s .s - 011 f y cO '0 cO u .e % c:: ~-5 c:: 00;>: a'Oc:: "4> 8 I:Q ~ cO e cO ... ..... 00 <U ,.., - U U ~ C:,S '0 to...... Po e '0 u 0 J CIl::g~ ~ e '0 ~ ... 0.'0 ~o gu~~~ u<u -a~ C::""I:Q,I:)gg "" cO ~ e - .- ~ ::l - 'ath <U q o.~ ~ ~d u "" .?; r.Il ::;- ~ % ~ ?; ~ u ~~'n ~l ~5.!l. ~1A5~s~e .~ i 1: i~ 9.1 l ... ~ U';) ~~ ~~""O s;:l.o~ (J)~e So~ U';).~ ~ ?')..= s;:l. ~~ .~ ~ U "0"...0 I", ;:: ~ == s~ i~ ..: 5fn \ - '~ ~ .~" '. \ ~ ,.': t: \1: ..~ i "j,c ' -' ~ qpa. !?euy, ~, ~ g~' !?d '64.5 .9ak ~--' ~ !:W1wt. , .9'~ 600 TELEPHONE (407) 684.4500 '7IW.9. ~. 5~ ~ FAX (407) 684-1008 F, MARTI:-': PERRY \~OBERT LEE SHAPIRO ORDAN R. MILLER. 111. A, JARKESY . ADMmED 1:'oJ flORIDA ~NO DISTRICT OF COLUMBIA March 26, 1993 W. Richard Staudinger, P.E. City Engineer City of Boynton Beach Gee & Jenson One Harvard Circle West Palm Beach, FL 33409-1923 RE: Cedar Grove Investors, N.V./ Resubmittal of Sub Division Master Plan Our File No.: 3197.01 Dear Mr. Staudinger: After reviewing the Technical Review Committee comments submitted to Cedar Grove Investors, N.V., on March 18, 1993, our project engineers and planner have revised the Subdivision Master Plan for Boynton Seacrest in accordance with the comments set forth in the memoranda submitted by various staff members on the Technical Review Committee. We are herein enClosing 17 complete sets of this revised Master Plan and request that this item be reviewed by the Technical Review Committee on April 8, 1993. Project engineers, Carnahan, Proctor & Associates and our planner, Mr. Julian Bryan have addresses comments in the Planning & Zoning Memorandum from Tambri J. Heyden through Christopher cutro to you dated March 16, 1993. First of all, comment number 3 has been addressed by placing the following language on the Master Plan and the Master Storm Management Plan: Retaining wall system located within the 5 foot wall easements and 5 foot wall easements shall be deicated and maintained by legal assignment to a homeowners association. In addition, our engin~ers have shown the width of the proposed drainage easements on all relevant engineering plans. In reference to comment number 4, I am enclosing correspondence dated March 24, 1993, from Dan Weisburg, P.E., Office of the County Engineer. This correspondence states that the Traffic Division has determined that the Boynton Seacrest Project meets the Traffic Performance Standards of Palm Beach County. As previously stated in my correspondence to you on February 8, 1993, Palm Beach County has determined that a traffic light at the intersection of Seacrest Boulevard and Mission Hill Road is not warranted now nor will be warranted even at the time of total .-....~ RECEIVED MAR 2 6 1993 .\' W. Richard staudinger, P.E. March 26, 1993 Page 2 buildout of the Boynton Seacrest Project. Nevertheless, in the spirit of cooperation, we hereby agree to the placing of a condition of approval on the Boynton Seacrest Master Plan which would require us to post money for a traffic light in an escrow account at the time of platting. In reference to Paragraph number 7 of Heyden's memorandum, as previously stated in my February 8, 1993 correspondence to you, the Subdivision Master Plan previously submitted to the City of Boynton Beach does show a pedestrian crosswalk, 8 feet in width, between streets which accommodate the proposed pedestrian system to the public park site. After meeting with the Park's Superintendent, John Wildner, we have amended our Master Plan specifically to show a pedestrian crosswalk and path going directly to the pUblic park between a common open space area which was previously Lots 1 and 2 of Block 1. This access tract will be dedicated to the City of Boynton Beach at the time of dedication of the park. The pedestrian crosswalks will be in the publicly dedicated right of way. The appropriate signage and crosswalk striping will be installed within the right of way at the time the dedicated streets are constructed and paved. Article X, section 3.0.2 states that in blocks 900 feet in length or over, crosswalks between streets not less than 8 feet wide may be required or deemed essential to provide circulation or access to schools, play grounds, etc. There is no reference whatsoever in the Code to the requirement of pedestrian paths. In addition, the Parks Department is completely satisfied with the dedication of the access tract as referenced on the Master Plan. Our engineers and planner have amended the Master Plan and Engineering Plan~_to.show bike paths with a minimum width of 8 feet as referenced in the Code. Julian Bryan"'has"'also provided you with two typical road sections, one detailing a 4 foot wide sidewalk on both street sides and one detailing a 4 foot wide sidewalk on one side of the street and an 8 foot wide bike path on the other side of the street. Our engineers have also shown the location and width of the easement for the additional 4 feet of the bike path. Comments number 9 and 10 have been previously addressed in my correspondence to you on February 8, 1993. As previously stated, we have no objection to these two comments and will agree to appropriate conditions being placed on the Master Plan Approval. For your convenience, I'm enclosing a copy of my February 8, 1993 correspondence to you. .9'-,y. ~. JIdk c1~' !?.if W. Richard Staudinger, P.E. March 26, 1993 Page 3 - In reference to the Bui'ldirig---Oepartment memorandum number 93-057 from Al Newbold, Deputy Building Official, we acknowledge that the lots referenced in his memorandum require two 25 foot front set backs. Please be advised that on March 18, 1993, Julian Bryan and I met with John Wildner, Parks Superintendent, and Charles C. Fredrick to discuss the location and configuration of the park dedication. Mr. Wildner agreed that he would accep~ a park dedication at least 325 feet in width. We have, thus, revised our Master Plan accordingly, and the park site now has an east-west width of 330 feet. All other comments relative to the park dedication have been satisfied. In your memorandum dated March 18, 1993, Comment (C) 9 references that the survey of the site has not been abstracted and that there is no way to verify all easements without a title search. Enclosed please find title work on the subject property as well as Ownership and Encumbrance Searches which certify that there are no easements of record relative to the Boynton Seacrest property. Press Tompkins of Carnahan, Proctor & Associates has met with the City of Boynton Beach utility Department to coordinate the availability of utilities to the subject site. Enclosed please find memorandum utilities Number 93-116 from John A. Guidry, Director of utilities, stating that the developer has met with utilities staff and has provided the requested information and drawings. This memorandum confirms water and sewer availability to the site. I addition, I am enclosing correspondence from Bell South Telecommunications as well as Florida Power and Light confirming the availability of telephone facilities and electric service. Comment (D) has been previously addressed in this correspondence. In reference to Comment (E), I hereby acknowledge that the applicant has not obtained a conceptual permit from the South Florida Water Management District. The master planning stage is entirely too early in the process to begin permitting requirements with South Florida Water Management District. Nevertheless, our engineers have met with engineers in your firm to discuss the drainage for this site. Moreover, the District has agreed to perform a courtesy review of our conceptual master drainage plan. Our engineers have submitted a conceptual master drainage plan as well as storage and drainage calculations and an aerial photograph to Carlos de Rojas, Supervising Professional, at the South Florida Water Management District. We will update you relative to this matter upon hearing from the District. ~.wy,~, ~ c'!~,.9d ,ENT BY:Xerox Tel.copier 7020 3-25-83 17:07 .. 1305872.118i. 2 tel 01 County Comml..lon~... y McCarty. ChAir L Poster. Vice Chairman an T. Mareu. 01 A. Roberta :ten H. N.w~U ; ^aronson .1de Pord t.N . CoURty AdmlRlalrator Itobert Wellman Departlntenl of Ensfneertn. ..... Public Worb ";arch 24, 1"3 MI. Ta~brt Heydtn Ctty of Boynton S.ach 100 E. Boynton Beach Boulevard P.O. Box :UO Boynton B.ach, fL 33425-0310 REI 10YNTON SEACREST (AKA CEDAR IROVES) - FILE NO. 117 D.lr HI. Heyden: Th. Palm Beach County Traffic Division has reviewed the Add.ndUM No. 2 for traffic illlpact study for the project entitled Borntoi sAai....t lak.L..CaUL.CrpYt,) pursuant to the Traffic Perfor.ance Standards TPS in rt1cle 7.J~e 'alM Belch County Land D.v.lop~.nt Code. The addenduM a dresses Alternate Te.t 1 for Woolbright Road a. WI. required in the review of the earlier trafftc ItUdy, Th. project conshts of 146 linole-faMily units and 81 multt-f..ily unita. The build-out of the project i. proposed for 1995. The Traffic Division has det.~1ned that the project ...ta the Traffic P.~'o~anc. $ta"da~d. of Palm Beach County. If you have any que.tteR. ~.ga~dtng this determination, ple... contlct me at 684-4030. Sincerely, OFFICE OF THE COUNTY ENGINEER a-::>>~ Din Wlisberg. P.[. Sentor Reg1lt.red Civil Engineer DW:CRW Fill: TPS. Hun. - Traffic Study Review h:\traff1c\dtW\boynl1d --.>::.::::, _M~"" -An iqual Opportunity. Affirmative ActJon Employer- ~ ... IUB Welt Pllm Bel&:h, Floriela U416-12Zt (407) Me fOOO n'>. .. "1\.. ,~ '; fill,: 110:, I'M r. t'I;,:, certificate No. ~8,234 "__'_... --...c;~, OWNERSHIP & ENCUMBRANCE SEARCH ", SECURITY ABSTRACT & INSURANCE COMPANY, a Florida Corporation, d/b/a Stewart Title of Palm Beach County, does hereby certify that it has caused a search to be made of the records in the Office of the Clerk of the Circuit Court in and for Palm Beach County, Florida, on the following described property: SEE ATTACHED EXHIBIT "A" for a period of 20 years prior to the date of this Certificate and find the last record owner or owners to be: CEDAR GROVE INVESTMENTS N.V., a Netherlands Antilles corporation and also find that there are no unsatisfied or unreleased Mortgages, Encumbrances, Federal Tax Liens, Judgments or Claims of Liens affecting said property, other than the following: (Copies Attached) - NONE - NOTE: NO EASEMENTS ARE FOUND. We also certify that we have searched the records of the Tax Collector of Palm Beach County (only) and find that the taxes are paid through the year 1990. (No search has been made for any unpaid taxes or assessments made by any municipality, other than those collected by Palm Beach County). THIS Company, in issuing this Search, assumes no liability on account of any instrument or proceedings constituting the chain of. title herein certified to contain such defects that would render such instrument or proceedings null and void or defective, herein assuming that all instruments in the chain of title to said property are good and valid. LIABILITY for this Search is limited to the price paid the Company for this Search. Maximum liability is limited to the' customer who placed this Order with us. No one else may rely on this Search. Customer, by accepting this Search, agrees to indemnify and hold Company harmless from any Claims or Losses in excess of the amount paid for this Search. There is no express or implied warranties that this Search is reliable for title information, and, therefore, should be verified by a commitment for title insurance. IN WITNESS WHEREOF, the said SECURITY ABSTRACT & INSURANCE COMPANY, d/b/a STEWART TITLE OF PALM BEACH COUNTY, has caused these presents to be signed in its name at West Palm Beach, Florida, this 8th day of March, A.D. 1993, at 8:00 A.M. . '., ", :1: 'I, ,1" (I. . . ,y ..' . ~.- .... <. .\.." '. ' ~ 'l.. (' . J "::: ~ r. ~t.:"" ." .,.~ :" : ... ~ ....... , ... .." I ,,. :. ~ .. . _.~ ~. - . - .r.':.~ : '. .:. . ....' : . 't - ~_ ~.~) ";,!.: .... '..\ \ ~. .:~ .,." .~... , fl. ..;:! ... w..."" . l~':'" .,. /. .... .... \ ( I '.. ... I'" ~. " . .. I >1 ,'1:; ~ 0; WARRANTY DEED THIS INDENTURE, Made, this ] 'If).. day of ~ V') ex;) A.D., 1980, .... ~ BETWEEN GALLEN ENTERPRISES, INC., a Panamian corporation, .... party of the first paLt, and CEDAR G.'OVE INVESTMI:NTS N.V., a ~ co NetherlanJs Antilles corporation, having an office at 420 Zouth Dixie Highway, Suite 4B, Coral Gables, Florid" 33146, party of thf! second part, \-HTNESSETIl: That the ~\,i(l i);trt.y ("l f t.~.'\ f i !'~; t pl,rt, tor L." . i"J : ill,d in consideration of the SLlIR of '1'1::: ;,::!:.' ::0/l:..C (;::0.01>) (,o(Jr.:,;..!';., ~ lu it in h.:.;,d [~..1i(! b:' tl:c. ~':1i{~ :'Llrt'~. c:" ~~:~: f '.!: l~ ;. ,l r t. t' II . :- I (".~. i ; 1 ~ re> I v) \.,:hCLC'()f is hL'rL't,'( c:ickno.....lecgc<.!, has l"j":;::'~...:d, L~'r'jdi:.....(: tl:it! :.ul.! t/; . r"_ I . "I_ . ...... .! :' ..:. ~ ! I '; f f L !;'.' ~~,~ i l~ !' i' I.' f t ! 1 e ~~ ,- ...... c.: J ..! i':I:"~., C\"\':", t~I'::' ~,""'l'J'\'!:II':J t:'"'~;crib._~d l;i:)(1 ~~i~~:;t. :',. it 1" in f ~;., ('-.. Coullty of ",,1m Beach and State of f'lori';,l, \. . ~ ':' ~~ ! "~-': cf th.~ Soutt......,.,.... : .;~.:.~Il L.'t 2 l':'i;~'; \-lcst o~ th~ l le:..: ; : i Jl,,:.f',' ::i'jllt-of-way, together ~'iUI ':" .,;' COVCl'1Ullent L<"lt 3, the S(Hllh"d: t. 1: i~l'\'c'rll!:l' nt Lot 4, that part of the ;101 th '.~l:.\: '_~;L' ~;o~ltl''''l!st qU<trter of the Northeast qU.ll't<,C c: :;..,:' ;,':1 .1; 1yi:.g \-lest cf the Florida Eas~ Co;:st 1'."1',,...,'.. r:"",t-o(-way: and the North quarter of the SOllti1,~.'SL (iL:~rter of the Northwest quarter of Section 4,'a11 lying in Section 4, Township 46 South, R''l':le 43 East, Palm Bebch County, Florida: EXCEPTING THEREFROM that part of Government Lot 4 lying within an 80-f?ot road right- of-way as conveyed to the County of Palm Beach in Deed Book 901, Page 234; together with the improvements, if any, now situated thereon and the reversionary interest, if any, of Sellers in and to the roads and streets, if any, and other areas and/or places, if any, dedicatea to the use of the public, contiguous to and/or within the boundaries thereof. ~ '-\ ~c0 r -1'<9'~ V.o~' SUBJECT TO taxes for ~he year 1980 and subseGuent years. SUBJECT TO conditions, restrictions, and reservations of record, if ,.ny. And the said party of the fir&t part does hereby fully warrant the title to said land, and will defend the same against the lawful claims of all persons whomsoever. \'" INSTRUMENT PREPARED ilY~ICHAEL A. RUBIN, P. A. 20 South Dixie Highway, Suite 48 Coral Gables, Florid~ 33146 - -;:;'1:- ~~ i\: ,:~';;:;, ,;:'2r~:;;.~:j ~ ::: r'<"'.I.'. ,~f..,~:ll,~(.,~,......,_. .. VT\,r":7/:;\i::L.c'" . '." ~ ; [ r 'T.::1'(,:: ... ~.",' '" ! . r .:, .. ~ :-.'Lrjr,. :'):. ~ Ii. ^' , ':t. " I .; ........ ;\: :,j.... ii G l. (I (I r' (' _1_ _ ____, :_. . c---- .___ t . r-: :~',-- ':- l~ . . . t::~ ~. : ! f .,.' ~ :/.!,,' 1- t..' ,. , '"" ...: ~. ,:'. ----,..e:':;) ~:; i"' /;' 1 I- , .' ~: ,'-r- '. '- ,., .' , tH")t ~'!.'\i -(i:.;. I "-:rJ r (I --'''' , !'i.... :, f-!..l':t (.,':',~ ,/~~:-"<,I. .~. : ~~I' "'.':L~"~.:r.....;:,: ;j\jD.IJOI '. -'~ -, -,-_..-._- ,,- - - -- - ______ _.. _ , I .'. ir~ :~ C.. t..;! ~~ T!' ".' I I:.' ~. .... ?J17~i-Eu;:.-f_'_T=_c';, I L .. Deed'" ['.11' ~ J, . ~ l,..,'\'" ',. ~ '! ":':.'~ ,t....t:':..;) :~:',-~;-~: r, ;, . (','; r,~ : :,1 ..., , : ~ lito. I" ; I. ~ -:1; --- --.--. .- "-- - .-.- ;1 r; 0.00 .,. ... r'-~ .J . I ~ . '_' : t;"..; II. r.... (- -, I f -.- '- ~ -: F': I ~_I ; '. '.. ~., ," , ~, ~.:,"~ '~;~,~~~I\,Y?~ ~.~~~~ ~; -;: ;~ ,;" -7'" p , t: . , ~ . .. ... I ; c t~ ~. " .,1 ., . -:.1 r ~.~,l: , .' .. ;; il ~ tj ~. G': j.....':: ,.. ,. t. ; f .' C~I.7- FL(_f~..;: ~..1 ,:\ ~(.~'...... .:: :?'.f:..~'-"'--~. .~. t. , I .) I ~.> ~ G ('j r.. l) . \.~. '~~.'~.'''' J. .-:.-- '---..--- ...-. -';'-, ,";', [. J' " . ~:~..' . ~ , L";,";:-'o":,I I ,.t. ':'Err'~: L :,. ~.~r\.I.',! ; r..1 : ~ 0 Q r. rJ ~.-:7 --r:, L. 9 ~~I! , " "':' ..~.' . ~. "~"':'C 0 0 0 rJ ' ,,,.~ \< ';j.", OJ . I __... ....-.:.:..~_ ____ .1 IN WITNESS WHEREOF, the sai~ party of the first IMIl har; ,.-."";1 caused these presents to be signed in i ls name by its pro!."r of f ice rs, and its corporate seal to be affixed, attested by its Secretary, the day and ye5r above written. ~~~~ ATTE'iT: SECRETARY DELIVERED 51'.';'E OF FLOllID^ COUNTY ('I' O.A! 55. I IIEIU;rlY CERTIfY th..t 011 lhi" ],1 ~ doli' '" ).'1''''/-' A.D., 1980, before me personilll)' "Pi!':.ll'(":\ I~tj/,.t {:,..'J,.Jlt ~I )I"$i I r- / ...".' and l- ft>v ~t, '( ;:;., h , 1,I'res iden t and Secretary respecti ve ly of GALLEN ENTERPRISES, INC., a P<II1,'''Il;",i~ln corporation, to me known to be the persons who signed the foregoing lnstrumcnt as such officers and severally acknowledged the execution th~reof to be their free act and deed as such officers for the uses and purposes therein mentioned and that they affixed thereto the official sea! of said corporation, and that the said instrument is the act and deed of said corporation. WITNESS my hand and official seal at &:111..-( "",;)J~ P/Vt'1I.1~ County of O~ and State of the day and year last aforesaid. "'1 .J' ~ ~:: :'l1!~'Y'" '- .,.."f" . ,.'.~;~~;. If ;, , : " S~~..l,>X~'\, ~ ~ . .:f~~ :~.:~. .' .":: :~:~:t~. 'it'. "..-...c 1- '/ J'$'(I ,'4,).,.",. .,~ f.-o,..:." ;t)~1~~IV -2- R[CORO VfAlntD PALM BEACH CQ'JII:TY. Fl4 JOHN > !JU~;K IE CLERK ell CUlT COUR~ I. ........ ... .... SIO~,VSOO . d 8OOtH39 . .'" i:j..~...r:{~..,~:/;~~.;,.f...r:I.,.:~.... :~;~,"'l::~ ..~. ::;.'~' ~".'" ;~~..." . -,,' . , .. "'1"'" 1'r.!I""~"~~ ,~, ~,'. ,;J ,~..t'''l: : ..'" ,,:.' . :>.' , .~. ..: )1'" :.~..~~.,... ..>.::~. .,"::. ~~);f ~J' fi-: 1:~ ~',;l~ ".,~*t.:'i'~~-\:"'~~~::':'i1;::;J''' :7; ~~.~.~ 't;;.?;.,. . ':. t .....~ .: '/.t.'... ,'. .~...L.....(......~. "". $.,,., ...,....,. ;.'!.; '" It.~...J,..".",.&.#'""....~t...,- '. ...r...... ..~.1..... .......... ...'~ f "~ ~;l.~,..~.t 'J,"'};'" .. ""'~'::""":' I' ..:.....~::...f'~""".. ..... .:.c~" ".,'1~&......:".,.~,.r....'..,~.......- "oJ" ",,:,'~-"". .~: "~:~~""~~~~~1'.." .' :'~..' ~:;:" ;Jt;:,,;;';~.~'f/: ~~, \;~\.:~.. .. ~.,;. \;~~ :'~~~ ~ ~~:~'.:~~',:.;r~':: "'-~".t:; "K"r:~'.:; 'i 'f.j 1!'Y:~>;Il.;:~l>.jO"'; pJ .,'<,'.......";1./, '..'''''' ~~. ,r::,:,_,~:::,~~:.:.,~,~\t~':,~~\~t~~C~(., /' ~ .: : ' .,:,..,!,:".:,~'., ,:,',:.~~:~.;::;~~-~~~~-:-. ':: .i,':~~:~~:~~r\ '_' . -"",,-,(, "~..,.',r...~~..i(,p'l~"'.l ,'It ,~ . ....,'....... - ,. .....' /, . ~ ~ .1....,. '.' . lr--'........z..,...;..:.... -\.~~'f..f%..::.t'!.~..JH~~'....~'f:: q:' ~ "i""', ,..;,:. ~.". ~:::.. ..,' , :,#1....'.' .. ..... ,\... .....\:.-0....; :..', ';;""::;":!"::;':<:'~;', .~;:~.' ':;'./{O 'ih\t ;'f)l1" l..niIlt'_~f"VDWl'VI\t" . ': ,',., ';. " ...... ':': : :-;, < . ',: ";~":":~':~.;- .:;:~.;'::~::~~.::~~~'~~.~'t::~~~~~'i~~~?)l. I.l' ~"l" ~~C-'!i~..:!} " ~ l' .. ...... ..... '" . :',. ",~: "-:~.'t1aii~... " "I__"J"'~~~\""'9' .,,~ ,'~"~ :'~':!:"~~;-.u..":_'-____:'r4.D.~'!. '. '-A '. 1 . . ,..- .J" ,.....,....................___.... _............. ',: ....;..:.;,;.'. " ':: .I,'.,:....~'~,. '''''_..'''~>~ ",,,':' ..,:-;:>,' .' .._.' . - "':'~__.~." , . . _.. 11M ....-..... ... ..... .........~~ ~ ..... 7::JI,iUL=-~.:t:- "......~..,......"'...atF".l'J.,~- .....__ ~...WJL."-r_. . ..', . . ';": __ ".::s!.l.Uf:.;;;';.~""" ..:t:1~~:................ COVJftT or r.... AACII. lit :..:.,DiI~AD.""lil;j',.cr'~'.~I~~:' " ,..,: :.' ~. ,,'. .... '.#'"""""'''''''''''''':''X'f,t':t,,4' .............".:. " ".' .n~~~di.l..:....ii...;tW"'_M"""lJlIld~'""",,,,_,,'o.., '.:'. _ " . ..:',......:........,......:. '1 'fl '>>iN:......,...................... _f b L......:' . \~.i' :.:, , ,:.' '..'~.~J .....-.; .......'....."_~................ .......- .,'..... ..... .. lUll .." !. ,h:::....,: :" ..........,.,... ...'........~....... ......'.....-.-.,........... c..., .,...... ..' r ."..,': -...-. 1Ia" fill .......... -.ttt-.. -', '" ': ..,.." .- ", !INt., ....,... .,. at ... 'n~ s.,', .. .... ., _. .. -., .... 4S .., l~' wt.." 40 n. .. .1.... ,sa .t .. hlhwbl ......1..... .... "IIInlsal. 'lord" .I'na ta. a14.,.ta, .t .. ....0 liH .t -... "? ,... 6 ... MO.M "I. If. 1 .... M .sa. 00 .e. .... te .. hlllt .t o.:n., ..... nil 110.... n. III .. .n....1I' .. .~. ...1eI'~ .......,... al.... .. ..... .t .. ~ ......'we _ ... ...u.- .......I, .... ...?~ . ...... .t :aal..A 't.. .. .. ..,lat ... . ....CIa 1)..M ... _u. .... .P. _SA pe", hUe 81.... n. a. . .... a. .... " .... ... ~ .... ... "rNl' .t ..i& .... . .' ...... . . , . f . , , .. .'-;} .~ ; ....~~.~: ,''\: " ". :.. . .., 1.':'~;' ":..,. '.,. ~ . :'~."; ..~. "':,: :.,~ ",-:"., '. " . . " 01 31111 1C11:lM31S WO~~ 61:S1 (66t-91-~ 900/900 . d .- \ ;":io. ..... t ". '. , .... COOVOIlATK MAL, ." .-rAft Gr.___u!~~...__:..___, , .. 00UIfTT ~....~~.~....~.;....:"---"-'_.' .," -r. .', . ~~... ...~.. ..,..".........r~~__.________._._......_...._.._....... ......U.U...h._..._.__........._.""'t.~_..u..uu____-<l..... .... ~..... a-.. .. - .. .. ....._..-1\!!.._...ftwI...... ____J.!'.....lrtut.....u_.........., ...,....A,). ., ....._.:....DX':Iwr- ~<lt...._......_....___.._.......____... .... .-..-..... -1MI hi ... ....aw.. ~... ___., _.. ...... """"".e..._, ern..n., .... _............ ....m.11!i11....., _............ De .....ltI'l.b......... 'h_ _..............__u....._.__.... ...~:...__...AttJ...~t.-.-.--.---..... ......... ........ - .... ... ......-..1l,.... _lid 8M ... " .... _m...... h" IIlIIl . ,-".....U...OI). .........__..._...'~... -..J ...,.......... ~... ' MtMW .. "'-Jl'fl.." ...........'...._:7..........mN~ .. .... ..........,....]IlMc.' ")",' .' .. ....... ~ ~......,.,... ..'.,..,~ '. . ~~;;-.~..,.:. "UlllM.. ..... 1M ~.... Ud...~,., -,--h.l.-.-.,......_...f4~y.,.Ia.c~ ,~\ . . ; ...~~,~~p . ",' .' '.. .....11.,........ 1J'~;tt. of, ,: . " . ,'. ., ... \',nhi. ,......: . . "- . . -.~~..;..~:::~'.:~>::'~~~~;;rlfI~~t.,~i~'..;'(/~~~))::.:~..'~, : I ....... -... i ~~' j ,-:'r-:..,.,.. V7:.' '~.~I.;.";,.: '7'''7 .~:;: .-. '; '. ".: ~ ~ ~ . 'r r',:,~:.::: .:;': ':.),:!':~ .{'....".'. :~.,'.... ", ' ~ ,i ~,~I.'!..~:~ J...~:~. ..i::...'~ i tf. 1 ;..~~ , '", ':1' :: lL ~ r: I t"1'lll' ~z;.~. .; fir. p .11 I : r I .. I".:.:~, ':, >" .' l.r '.,;." f. 'iJJ~':, :-..;.~ ~}~r;:'"' ' ;'" " . u. . .<"":p. "':'~~:~J...~ ,..:,~". ;~"t.. , ~ ~ $i ~ ~ '=' & .'IL I I' ;r" 800lt89 01 3,11 1 1~31S WO~~ 0c:~l (66l-9l-~.1 w j' (. 't J j U 0 ' I I 1\)/' i ,. v "i V [I h 11/\ u/W /I, \) .J U I.J! 1\ 1 !:. \J nut. MEMORANDUM Utl11tl.s #93-116 FROM: Richard Staudlnge~, City Enqineer rd7~ John A. Guidry, &. Director of Utl11tl.S~ ~ ~ ;-b TO: OATE~ March 18, 1993 SUBJECT: Boynton 59.crest - AKA Cedar Grove Master tlan Revised A.ended Co.-.nts - March 8. 1'93 January 14, 1992 and Oetober 21, 1992 The developer has met with Utility staff and has provided the requt$ted inform_tion. drawinqs dated March 15, 1993, This reetifies our previous comments originally made in UtilIty MeMO #92-409 d&~ed September 27, 1992. Based on the inforMation p~ovided. w. are able to confirm W4t~r and sewer avallabllity ~o the site. This department hat no object1on to this project Movlnq forward ~hrouCJh the revlew--proce... '--_ ,"""" Iqb XC: Hike Kazuna. Peter M&z2:.11. Chris Cutro File .' -- .. - --- - __~_... ",4', _ ~.a.... __.. "'.''''''''''''''1'1'''1'1'''''''' '-''''';'C) n"l, I~ "1 n.t'Oll ru I'IHI: 02. 08. 93 03 : 1 7 PM *GEE &.. ..JENSON POl CARNAHAN-PROCTOR AND ASSOCIATES INC. Consultlnl;l englne.rl . Surveyors ' Planners ' Land CevelOpmer'1t Consultants lI'ebruary 3, 1993 1 P)lf.~C i il"~lrF ~'IT\ a.., ~.. ~UJJ FEB 0 g 1993 Cee .. Jenson One Harvard Circle West PAlm Beach, Florida 33409 A~tn; R. staudinger, P.E. Rs. ~oyntcn Seaorest C-P&A No. 910BO, RECE\VED fEB 8 \993 f;.r:. ~.: ~ l(;;'''",SON Dear Mr. staud1nqer: The purpose or this letter is to cont1rrn our telephone conversation ot Yebruary 2, 1993, concerning the referenced projeot. ' Xn particular our conversation centered on your memorandum of January 21, 1983, comment E. I explained to you that the volume subm1ttea to you for the exfiltratlon trenoh design was a one-hour value as required by South Florida Water Management Distriot criteria and that no attempt was made to extrapolate that volume tor a longer period of t1ma. You agreed to re-review these calculations and adjust your comment aocordingly. Additionally, you stated that your comments on water management and the computations submitted are not of a nature to delay the processinq ot the sUbdivision master plan through the city of Boynton Beach. Should I have misunderstood any part or our conversation, or inadvertently omitted any relative part. 'thsrsof, please lat me know immediatelY. PFW/prc co: Jill A. 3ark88Y, EQq. JUlian Brya.n I 20/BOYNPJ:lNSEA/PRC 6191 West Atlantic Blvd. . P.O. Box 4399 . Margare. FL 33063 . (305) 972.3959 ' FAX (305) 972.4178 Dade (305) 949,6826 . Palm Beach (407) 364-0687 rrFie City oj- t:Boynton 'Beacli Pfanning & Zcning 1Jepartment 100 'E. 'Boynton 'Becu!i. 'Boukvara P.O. 'lJo:{.31O 'Boynton 'Becu!i., :Jforidiz 33425.0310 (407) 738.7490, :J.'U: (407) 738.7459 January 5, 1993 MF. Dan Weisberg, Senior Engineer Palm Beach County Engineer's office Traffic Division 160 Australian Avenue: Suite 103 West Palm Beach, FL 33406 RE: Revised Traffic Impact Study Boynton Seacrest (fka - Cedar Grove) - File No. 697 Master Plan (resubmittal) Dear Mr. Weisberg: Attached you will find a traffic impact study for the subdivision of the R1AA/R-2 zoned, 53.69 acre parcel of land located on the east side of South Seacrest Boulevard, approximately :,200 feet north of Gulfstream Boulevard (S.E. 36th Avenue) to allow for the development of 146 single-family units and 82 duplex units (41 lots) for a total of 228 dwell'ing units. This study has been revised to address the comments discussed in your Novernter 6, 1992 letter to me. Please note that the project, formerly known as Cedar Grove, has been renamed to Boynton Seacrest. since this residential project will generate over 1,000 qross trips per day, requiring submittal of a traffic study to Palm Beach county, please review this project for compliance with Palm Beach County Traffic Performance standards Ordinance No. 90-40. This revised subdivision master plan request is planned for ~eview by the Planning and Development Board on February 9, 1993. It would be greatly appreciated if you could fax or mail your com8ents to me no later than February 2, 1993 for inclusion in the agenda materials delivered to the planning and Development Eocrd members on February 3, 1993. If you have any questions concerning the above, ple3.se do not hesitate to contact me. Sincerely, ;[~q~~~ Senior Plc:1ner tjh Encl. A:BoySeaMP .Cf.mcn'ca _,' gatea-a/} to tfie cju((stream F, MARTIN PERRY ROBERT LEE SHAPIRO JORDAN R. MILLER" JILL A, JARKESY 5&- t'Y/tf- ~~~ ~~ ~ g ~~ !?d ~6'4.5 .91. ~~ ~ ~ .9'~ 6'(}() ~gs.~y~~ TELEPHONE (407) 684-4500 FAX (407) 684-1008 . ADMITTED IN FLORIDA AND DlSTRlcr OF COLUMBIA December 22, 1992 ...."'-;~ ':,.\,": ~ ~ , " " <::>~ ~OYN70.t I "/ "' "~ i '...'.;!::: ReceIved ~ ,.., (.) ~ :. ,': DEe 2 3 1992 ~ --.\ I..' ~ ~./ \ '",' ..L1_ CITY ENGINEER i!' .. \:" "'0 ~o ~ -~ " \<' I\t aEAC~'~,':/' , . ,.---n '"" '/ , : \,:.:/ W. Richard staudinger, P.E. city Engineer city of Boynton Beach Gee & Jensen One Harvard Circle West Palm Beach, Florida 33409-1923 RE: Cedar Grove Investments, Master Plan Our File No. 3197.01 N. V ./Resubmittal of Subdivision Dear Mr. Staudinger: " . After reviewing the Technical Review Committee Comments submitted to Cedar Grove Investments, N.V. on November 4, 1992, our Project Engineers and Planner have revised the Subdivision Master Plan for Cedar Grove in accordance with the comments set forth in memoranda submitted by various staff members on the Technical Review Commi ttee. We are herein enclosing seventeen complete sets of this revised Master Plan. Project Engineers, Carnahan, Proctor & Associates, have addressed all the comments listed in your memorandum to Mr. Chris Cutro, Planning & Zoning Director, dated November 3, 1992. As requested, we have changed the name of the project to avoid any confusion with similarly named subdivisions in Palm Beach county. The new name for this project will be Boynton Seacrest. Cedar Grove has also revised its Master Plan to comply with comments number 1 and 2 on utilities Memorandum 92-409. Please note that the Water and sanitary Sewer Easements are shown within the rights-of-way on the Master-Plan:' --Furthermore, in -accordance with Appendix C, A.rticle "XIII, section 5 of the city of Boynton Beach Code, upon approval of the Master Plan by the Technical Review Committee, Cedar Grove shall submit all required construction plans, including those for water and sewerage systems. W. Richard staudinger, P.E. December 22, 1992 Page 2 Our consultants have also addressed items 2 and 5 of Memorandum 92- 204 from Lt. Donald Thrasher, Community Relations Division, Police Department. Item No. 1 recommends that we show stop bars, stop signs and turn lanes on the proposed plans in accordance with city Ordinance 5-142. This Ordinance, a portion of Article X, Parking Lots, is in the Building Code and is not required as part of a Master Plan submittal. These items will be addressed after the Master Plan has been approved by the TRC, at the time of submittal of constructions plans. Item No. 4 is specifically addressed by the Traffic Analysis prepared by Carnahan and Associates and submitted to the City of Boynton Beach as well as to the Palm Beach County Engineering Department. Please be advised that Palm Beach County has reviewed and aEProv~d this lraffic Analysis. . '---- AI 0 " We have addressed the comments referenced in Building Department Memorandum No. 92-221 from Al Newbold, Deputy Building Official, to Chris Cutro, Planning Director. Julian Bryan has placed a note on the Master Plan Resubmittal stating that each and every lot must comply with the Property Development Regulations for the applicable Zoning District. Fire Department Memorandum No. ;92-57 from William D. cavanaugh states the following: "In order to fully evaluate the project, the following information is required: street names and house numbers should be shown. without a water main plan, fire hydrant locations cannot be plotted. This Department still has concerns with Seacrest traffic at peak hours." Mr. cavanaugh's memorandum addresses matters which fall completely out of the purview of the Master Plan submittal requirements. First of all, the street names and house numbers are not required as part of the Master Plan Submittal. Appendix C, Article 8, section 4 of the Boynton Beach Code of Ordinances. street names and house numbers need not be shown until submittal of the Final Plat. See Appendix C, Article 8, section 6(7). Secondly, construction plans for water systems are also not required until the time for submittal of the Preliminary Plat. See Appendix C, Article 8, section 5(b). Third, the Fire Department's concerns relative to Seacrest traffic at peak hours has been addressed specifically by our Traffic Analysis. The Palm Beach County ~tJoJ' .9~,~, ~g~,!?M f) W. Richard Staudinger, P.E. December 22, 1992 Page 3 ~~ Engineering Department has reviewed and aeee~ our Traff ie Analysis and has granted Concurrency to the Cedar Grove Project, thus satisfying the requirements of the Palm Beach County Performance Standards Ordinance. Cedar Grove's Planning and Engineering consultants also have revised the Master Plan to bring it into compliance with comments referenced in Engineering Department Memorandum No. 92-302 and Planning & Zoning Department Memorandum No. 92-212. As requested in Item No. 20 of Tambri Heyden's Planning & Zoning Department Memorandum, enclosed please find a check payable to the city of Boynton Beach in the amount of $343.26 for processing previous Cedar Grove applications. This Master Plan resubmittal complies with all applicable codes and ordinances of the City of Boynton Beach. We look forward to the Technical Review Committee's review of this submittal and its recommendation forwarding the Master Plan on to the Planning and Zoning Board. :' Very truly yours, " , 9tu ()-9~ JILL A. JARKESY JAJ: 1m cc: James Cherof cc: Mr. Michael Rubin Enclosure .9~.~. ~c1~.!?d Board of County Commissioners Karen T. Marcus, Chair Carole Phillips, Vice Chair Carol A. Roberts Carol J. Elmquist Mary McCarty Ken L. Foster Maude Ford Lee County Administrator Robert Weisman Department of Engineering and Pub lie Works November 6, 1992 Ms. Tambri Heyden City of Boynton Beach 100 E. Boynton Beach Boulevard P.o. Box 310 Boynton Beach, FL 33425-0310 RE: CEDAR GROVE - FILE N. 697 Dear Ms. Heyden: The Palm Beach County Traffic Division received the traffic impact study for the project entitled Cedar Grove, dated September 1992. This study addresses 187 single-family dwelling units. It is my understanding, based on your cover letter, that the proposed project will consist of 146 single-family dwelling units and 82 duplex units. The study will have to be modified to address all of the proposed units. The traffic consultant, Carnahan and Associates, Inc. has been contacted regarding this issue. If you have any questions, please contact me at 684-4030. Sincerely, OFFICE OF THE COUNTY ENGINEER 09-~ :Jv~ Dan Weisberg, P.E. Senior Registered Civil Engineer File: TPS - Mun. - Traffic Study Review h:\traffic\diw\boyn11b RECEIVED "An Equal Opportunity - Affirmative Action Employer" Oil '. p\.ANNH'~(i Dt~f, -- @ printed on recycled paper Box 21229 West Palm Beach, Florida 33416-1229 (407) 684-4000 U..; J.~ ...:..; J.,",'Ul ..1.. .~."".l. _4\.'~\'~~..\~' J\\J\Jvv.4i\.lL~ ! U U (. 03. 16.93 0359 '1-'fM' *W--PALM-~CH' ENGINEERS POl BELLSOUTH ~IIU"ICA'IJOII. 0 ..lIeouth 'nl1-.commulllc_t1on. "oom 101 .1. ,..... ~. w.., ~I", ....". 'L 3t.0 1 March 16, 1993 pile 'I 240.0900 Mr. pr... Tompkine Carnahan, Proc~o~ , A..ociate. 6191 W. Atlantio Boulevard M.rq.~e, Plorid. 3306' RB t BOYH'l'OM 8BACRBS~ LOCA"l'P.D AT SEACREST DOULEVAJU) SOUTJI OF WOOL8R:IGH'l' near Mr. Tompkins I %n ra8po~.. to your r.qu..t, ~hi8 will co~fi~ that Southern Bell i. the .aurce of supplY for ~olephon. .e~"ina to the above reterenced project. T.1.phone faciliti.. wi~h adequate oapaoity can b. provided tor this projeot. It ahoulCi be nC'lted, however, that the owner will be requir.d' to provide 8outh.rn Mall with reco1"'dad ea..ments or oondu1t. Xn add.ition Sout.hern B.11 may require e)CC:~U5ive eas..enta ror structur.. that hou.. .leotronio .witching equipment (tU,.C-96 or .ub.~anti.l1y .i.ilar equipmeni:.). The recorCSed ......ent.. will ba without r..t:ric~iv. condi'tion. and ahall incur no 00.1:. 'to t.he Sout.h.rn B.l1 Company. 'l'he ability ot Southern Rell to provide racilU:ies ror this project will be contingdlnt on the conditions noted above. Your und.r.tan~ing in this matt~r 1. 9reatly appreciated. If you have any quest.t.ons please call William Sowers (407) t 837-6306. Yours truly, v'~ v. Boraani. Manaqer-En9ineerint WESln ~-,..~ n'l. 1 fo\ ", n.t. n tI fJ.f l'fHI: _ _.,_..._.,"~- ...... - -. .... __.. WP........'I"..Yrwn,.. rzhe City of 'Boynton $eacli ... ~~ PUznning & Z.oning 'Dtpartrrunt 100 'E. 'Boynton 'BttUli 'BouUvara P.O. 'Bo:t.31O 'Boynton 'BetUli, 'Jforitfa 33425.0310 (407) 738-7490, 'J.U: (407) 738-7459 October 26, 1992 Mr. Dan Weisberg, Senior Engineer Palm Beach County Engineer's Office Traffic Division 160 Australian Avenue, Suite 303 West Palm Beach, FL 33406 Re: Traffic Impact Study Cedar Grove - File No. 697 Master Plan Dear Mr. Weisberg: Attached you will find a traffic impact study for the subdivision of the R1AA/R-2 zoned, 53.69 acre parcel of land located on the east side of South Seacrest Boulevard, approximately 1,200 feet north of Gulfstream Boulevard (S.E. 36th Avenue) to allow for the development of 146 single-family units and 82 duplex units (41 lots) for a total of 228 dwelling units. Since this residential project will generate over 1,000 gross trips per day, requiring submittal of a traffic study to Palm Beach County, please review this project for compliance with Palm Beach County Traffic Performance Standards Ordinance No. 90-40. This subdivision master plan request will be reviewed by the Planning and Development Board on November 10, 1992. Due to the delay in transmitting this study to your office for review, it would be greatly appreciated if you could fax your comments to me by November 5, 1992 for inclusion in the agenda materials delivered to the Planning and Development members on November 6, 1992. If you have any questions concerning the above, please do not hesitate to contact me. Sincerely, J~0A' fJ. Jiw~' Tambri J. ~denj1 Senior Planner TJH/jm Encl. ,1 me rica .~ <;Iltt:way to tlie <;lJ~{stream 'l1ie City of 'Boynton 'Beacn 100 'E. 'Boynton 'Buu:h 'Boukvara P.O. 'Bo:t310 'Boynton 'Beam, '.Fforilfa 33435-0310 City:Jfa{[: (407) 734-8111 :J.f1IX: (407) 738-7459 OF THE CITY ENGINEER October 23, 1992 Palm Beach County School Board Planning Department (In person pick-up) Attention: Mr. Larry Zabik Re: Cedar Grove Master Plan, Boynton Beach, Florida ' Notification of Technical Review Committee Meeting, Tues. 10/27/92 Dear Mr. Zabik: In accordance with the City of Boynton Beach, Florida Code of Ordinances, specifically Appendix "C", Subdivision & Platting Regula- tions, Article VIII, Section 4. "Master Plan", Subsection 4G, the Engineering Department herein presents the master plan for the proposed Cedar Grove Subdivision situated on S. Seacrest Blvd., immediately east of Mission Hill Rd. in Boynton Beach, Florida, The City has scheduled a Technical Review Committee Meeting for Tuesday, October 27, 1992 at 9 a.m. in Conference Room "C" (West Wing, second floor) to discuss the proposed subdivision. Please submit your impact statement to my attention no later than Thursday, October 29, 1992, Thank you in advance of your anticipated cooperation in this matter. Very truly yours, CITY OF BOYNTON BEACH, FLORIDA l. \. ~ _ J .... 4-...... Vincent A. Finizio Administrative Coordinator of Engineering p r .r"T'~ T7~~ .: ,. ' ,,1 _/ ..i..~':J VAF/ck cc: J. Scott Miller, City Manager W. Richard Staudinger, P.E., Gee & Jenson Christopher Cutro, Planning & Zoning Director . r-~~.";.;~'I\:--; ncp"" -, ".,~ S { ~\ ~' ~merica's gateway to the gulfstream .. -. o;(~ ----- MEMORANDUM NO. 93-50 May 18, 1993 TO: J. Scott Miller, City Manager Jim Cherof, City Attorney FROM: RE: Cedar Grove Investments, N.V./Boynton Seacrest Attached is a letter I received from Jill Jarkesy regarding the Cedar Grove appeals process. This item was placed on the City Commission agenda with the anticipation that Cedar Grove would appeal the Planning & Development Board's denial of their master sub-division plan. At the time it was placed on the agenda, it was not known whether or not Cedar Grove would take an appeal. The matter was moved forward so that the public would have notice if an appeal was filed prior to the Commission meeting. It now appears that if an appeal is taken, that it will not be taken prior to May 22, 1993. Accordingly, the City Commission's jurisdiction in this matter has not been invoked by the applicant. The matter should be removed from the agenda. For your information, I am enclosing a copy of section of 7.5- 63 of the City Code which sets forth the appeals process. By copy of this Memo I am advising Jill Jarkesy that the matter will not be considered by the City Commission tonight. cc: Jill Jarkesy, Esq. Richard Staudinger, City Engineer Chris Cutro, City Planner , -CD R"Bct~l'l ).:4 ~~, ~~ , l'I.NN\NG Ot.?\. .::----- ENVIRONMENTAL REGULATION ~ 7.5-63 endangered, threatened or rare animal and plant spe- cies, or species of special concern. (Ord. No. 89-46, ~ 1, 12-5-89) Sec. 7.5-62. Review schedule. Any additional information determined to be required by the TRB must be requested by the TRB within thirty (30) days of receipt of the above information, Upon receipt of the above infor- mation, the TRB shall have thirty (30) days in which to complete its evaluation of environmental impacts. The TRB will then have thirty (30) days to make its determination concerning conditions of approval for the development to the planning and zoning board. The planning and zoning board shall review the determination of the TRB at its next regularly scheduled meeting. The planning and zoning board shall accept or amend, as necessary, the deter- mination of the TRB. (Ord. No. 89-46, ~ 1, 12-5-89) Sec. 7.5-63. Appeals process. Any aggrieved person may appeal the determination of the planning and zoning board to the city commission by written request filed with the city manager within ten (10) days following receipt of the determination of the planning and zoning board. Any such appeal submitted to the city commission shall be re- viewed by commission at a regularly scheduled meeting within thirty (30) days of receipt ofthe appeal request in accordance with the following standards which shall be addressed by the applicant in his written request: (a) Whether the subject property is an environmentally sensi- tive land or contains endangered, threatened and rare spe- cies and/or species of special concern in accordance with the definitions set forth in sections 7,5-60(c) and (d); and (b) Whether the conditions placed on the development appli- cation by the planning and zoning board are reasonable and represent sound environmental practices necessary to mitigate possible harmful impacts upon the subject prop- erty and are necessary in order to protect the health, safety and welfare of the citizens of the City of Boynton Beach. (Ord. No. 89-46, ~ 1, 12-5-89) Supp, No. 46 631 f / .// MAY 17 '93 03:57PM PSM&J P.2 ~. 5Sw cp. g~, ~, J(;&. c1 ~, !?sL tfSfJ 9'. ~ ~ ~ .9'.. Ql(J TELEPHONE (407i tl84-4500 ~.9... ~ ~ >><<'I FAX (-407) 6&4-100l F, MARTIN PERRY ROBERT LEE SHAPIltO J01ID^l'i JI" Mluza' Jt1.L ^. J^ itKi<:sY ^DMITUO Il"/ ~LOllf!:M \ND tll5T~It'T O~ COL1..'I'IMA .. YIA FACa:IMtLB May 17, 1993 M:r: . James Cherof ci ty JIl.ttorney Ci ty elf Boynton Beach P. O. Box 310 Boyntcm Beach, FL 33425-0310 Re: C:edar Grove Investments, N.V./Boynton Seacrest Master subdivision Our File No.: 3197.01 Dear !I[r. Cherof: '.~ It has corne to my attention that. the Boynton seacrest Master SUbdivision plan approval is scheduled for the City of Boynton Beach city commission Meeting tomorrow, May 18, 1993. The city of Boynton Beach Code, Article VIII, section 4H2 requires the Planning and Zoning Board to review the Master Plan once it is approved by thQ TQchnical Review Committee. There is no reference to the Master Plan bein9 submitted to the City Commission for its review until the preliminary plat staQ8. Furthermore, on May 12, 1993, I received correspondence from W. RiOhard Staudinger, P_~., City Engineer, informinq me that under ChaptQr 7, Section 7.5-63 "AppealS: Process", Cedar Crave has ten (10) daya from the dat.e of Mr. Studinqer's letter to appeal the Planning- and Development Board deciQion to the city Commission. CGdar Crovo d.OOQ plan to appeal the Planninq and Development Board If. denial of their M~ulter Subdivision Plan prior t.o May 22, 1993, In lil;:rht. of t.he forlilCJoin9, I do not undarat.and why t.hiSl i t9'm is sQhQd\11ed for tomorrow's city Conl.1nission hoaring_ I would apprec:::iate you faxing me the relevant poX'tions of the cit.y of Boynt.c)n Beach Codo whioh requires us to 90 bofore the cit:y Commission in the absenoe of filin9 an Administrative Appeal. In ~ny event, in ol'."der to avoid burdening our olient with additional ",1'" P~-<Yr ~ PLANNING AND ZONING DEPARTMENT MEMORANDUM #93-115 FROM: J. Scott Miller city Manager ~ ~ ~Jv.,...J""" Christopher cutro Planning and Zoning Director TO: DATE: May 13, 1993 RE: Boynton Seacrest (Cedar Grove) Julian Bryan has submitted a master plan for platting the property located on Seacrest Boulevard just south of S.E. 31st Avenue. This site is known as the Boynton Seacrest scrub. The Technical Review Committee has reviewed the master plan and found it to be in compliance with the Appendix "C" of the code of ordinances. The master plan, however, does not comply with either the Boynton Beach Comprehensive Plan or the Environmentally Sensitive Lands Ordinance (Chapter 7.5 Article iv) . Due to the fact that this master plan has been reviewed by the Technical Review Committee four times, staff created a series of conditions that would bring the master plan into compliance as part of the preliminary platting process. The Planning and Development Board reviewed this master plan at its meeting of May 11, 1993 and forwarded the master plan to the City Commission with a recommendation for denial. This item has been scheduled for City Commission review and final determination on May 18, 1993. CC/jrn A:BOYSEA.JM t/J~ ;\~~L-/ U ENGINEERING DEPARTMENT MEMORANDUM NO. 93-105 TO: ALL TECHNICAL REVIEW COMMITTEE MEMBERS (hand-delivered) FROM: VINCENT A. FINIZIO DEPUTY CITY ENGINEER DATE: APRIL 22, 1993 RE: MASTER PLAN COMMENT RECONCILIATION SUBMISSION MODIFICATION OF TRC MEETING AGENDA BOYNTON SEACREST (FKA CEDAR GROVE) Provided your offices herein, please find a full set of Master Plans considered by the City Engineer as a set of plans submitted by the applicant for the purpose of reconciling staff comments prior to the P & D Board's consideration at their next monthly meeting. Please be fully prepared to discuss these plans after carefully performing a comparative analysis against your most recent comments. By copy of this memorandum to both Dorothy Moore and Attorney Jill Jarkesy, I am providing notice that the agenda is amended to include discussion reference compliance with staff comments on April 27, 1993 at 9:00 a.m. at the West Wing Conference Room, 2nd Floor, West Wing of City Hall. Thank you. 1>../- <e-- I Vl(,.,)_~ I (2~ce:t,5' ~l.l\ Qt->-t::::. t.A 'cl--J...C; <1 '2, - i \ G , UIi ''--\~ j ~, ~~A~O ST\U~ )'+~G.~ -;--r r') h _. \ "-' -I-1....L"-0 ~ ~-I ,.Ji2l'-'~ ~ - ~A ~tL, 4 -' Z '3 ~- Ci '3 cc: Attorney Jill Jarkesy via FAX TRANSMISSION J. Scott Miller, City Manager James A. Cherof, City Attorney w. Richard Staudinger, P.E. (as directed) :; PLANNING AND ZONING DEPARTMENT MEMORANDUM To: Richard Staud~ng2r, City Eng1neer ~ ~h'-' . :(1 ~L_!A_ ~-p&1~1~bnk.~ D' , ~rom: ~ r1s~o~~, ~ ~~ ~~Q ~on1ng 1rec~or Date: April 8, 1993 Subject: Appl1cant's request for Special Planning & Development Board Heeting or... April 27, 1993 Boynton Seacrest (Subdivision Master Plan) File No. 697 ------------------------------------------------------------------- We have located tne ecolog1cal assessment (dated January 9, 1992) submi tted by the applicant :tor the Cedar Grove PUD rezon1ng appl~cat1on. Pursuant to tne statement made by the applicant's attorney, Jill JarKesy, at today I s Technical Review Committee meeting, directing statt to re-review the 1992 documenta~ion and apply it to the above-referenced application in an attempt to meet the subn1ttal requirements ot the City's Environmentally Sensitive Lands Crdinanc3 (Chapter 7.5, Article IV), this department and Kevin Hallai1an, the City Forester, wLll be amending previous comments made relat1ve to mitigation and scrub habitat preservatlon. Due to the reVlew schedule established within Section 7.5-62 of the Envlronmenta~ly Sensitive Lands ord1nance, which provides ~he Techn1cal Review Board 30 days upon receipt of the above intormatlon wi th111 whic11 to complete its evaluation 0::: environmental impacts, we respectfully request that the applicant's request tor a speclal meet1ng of the Planning & Development Board be denied. Although we anticipate being able to transmit sald comments to you prlor to May 7, 1993 (30 days trom today), more than the 7 days gl ven tor lnon-env1ronmental" comments to be su~mlttec to you is needed. ThlS actdi tlonal reV1ew tlme wlll net effect placemem: of this request en the next regularl.Y scheduled Planning & Developmem: Board meeting ot May 11, 1993. Please advise whether or not this schedule 1S acceptable to both parties and whether you recelved Jill Jarkesy's letter confirming statements made at the Technlcal R3view Committee meetlng regarding this issue. CC/th cc: Kev1D Hallahan A: 3t,auG97 p~_:;c -r ~ REVISED TECHNICAL REVIEW COMMITTEE MEMORANDUM TO: Robert Eichorst, Public Works Director Al Newb01o, Deputy Building official William Cavanaugh, Fire Prevention Officer Sgt Mike Kirrman, Police Department John Wildner, Parks Superintendent Kevin Hallahan, Forester/Environmentalist Mike Kazunas, utilities Engineer Vincent Finizio, Engineering Department Richard Staudinger, Gee & Jenson Consulting Engineers FROM: Dorothy Moore, Zoning & site Plan Reviewer DATE: April 5, 1993 RE: Technical Review Committee Meeting Thursday, April 8, 1993 Please be advised that the Technical Review Committee will meet on Thursday, April 8, 1993, at 9:00 A.M. in Conference Room "A" (City clerk's Office) to discuss the following: MASTER PLAN - RESUBMISSION Boynton Seacrest Master plan Resubmittal (2nd Review) Establishment of Technical Review Committee Meeting Date Formal comments shall be transmitted to the Engineering Department, to the attention of Vincent A. Finizio, Deputy City Engineer and be received no later than 5 p.m. on April 12, 1993. plans with your staff comments. DM/jm Att. cc: J. Scott Miller, City Manager City commission (5) Don Jaeger, Building Official Ed Allen, Fire Chief Charles Frederick, Recreation & Parks Director Thomas Dettman, Acting Police Chief John Guidry, utilities Director Steve Campbell, Fire Department Bob Gibson, Public Works Central File Christopher Cutro, Planning & Zoning Director Tambri Heyden, Senior Planner Mike Haag, Zoning and site Development Administrator Project File Chronological File A:REVTRCTH.0M !~ 2e~ TECHNICAL REVIEW COMMI'rrEE MEMORANDUM TO: Robert Eichorst, Public Works Director Al Newbold, Deputy Building Official William Cavanaugh, Fire Prevention Officer Lt. Don Thrasher, Police Department John Wildner, Parks Superintendent Kevin Hallahan, Forester/Environmentalist Mike Kazunas, Utilities Engineer Vincent Finizio, Engineering Department Richard staudinger, Gee & Jenson Consulting Engineers FROM: Dorothy Moore, Zoning & Site Plan Reviewer DATE: March 2, 1993 RE: Technical Review Committee Meeting Thursday, March 11, 1993 Please be advised that the Technical Review Committee will meet or. Thursday, March 11, 1993, at 9:00 A.M. in Conference Room "C" (West Wing) to discuss the following: MASTER PLAN - RESUBMISSION PROJECT NAME: Boynton Seacrest (f.k.a. Cedar Grove) A Planned Residential Community LOCATION: South Seacrest Boulevard APPLICATION: Julian Bryan III FILE NO. Planning Department File #697 NOTE: Please return all comments and plans distributed for this resubmissidn ENGINEERING DEPAR'l'MENT no later than Tuesday, March 16, 1993. previousl~ to thE 5:00 p.m Technical Review Committee Page 2 WAIVER - SIDEWALK PROJECT: Clifton Homes, Inc. LOCATION: 905 S.E. 3rd Street APPLICANT: Philip A. Binns FILE NO.: Planning Department File #728 DESCRIPTION: Requesting a waiver of a requirement for a sidewalk at this location. NOTE: Please coordinate review of plans and submission of written comments with BUILDING DEPARTMENT c/o Al Newbold. DISCUSSION 1. Review of the following site plans for inter-departmental conflicts: a. Lighthouse Grille Restaurant b. Red Lobster Restaurant c. 610 Industrial Avenue Do~~ -: DM/jm Att. cc: J. Scott Miller, City Manager City Commission (5) Don Jaeger, Building Official Ed Allen, Fire Chief Charles Frederick, Recreation & Parks Director Edward Hillery, Police Chief John Guidry, Utilities Director Steve Campbell, Fire Department Bob Gibson, Public Works Central File Christopher Cutro, Planning & Zoning Director Tambri Heyden, Senior Planner Mike Haag, Zoning and Site Development Administrator Project File Chronological File A: TRCAGDA.JM F, MARTIN PERRY ROBERT LEE SHAPIRO JORDAN R, MIllER. JILL A. JARKESY ~~ ~~,~,~g~,g!~ f6'M ..9. ~"'""" ~ ~ .9'~ 6'()() mJ..9.~. ~~ TELEPHONE (407) 684-4500 FAX (407) 684-1008 . ADMmED IN FLORIDA AND DISTRICT OF COLUMBIA February 25, 1993 Mr. vincent A. Finizio Assistant City Engineer City of Boynton Beach 100 E. Boynton Beach Blvd. Boynton Beach, Florida 33435 RE: Cedar Grove Investments, N.V. Boynton Sea crest Master Plan Our file No.: 3197.01 ~~o <(\y;'O"e tJoJ~ ~~<o t CO Dear Mr. Finizio: I have been informed by Jill Jarkesy ,in my law firm, of two conversations which you had with her this ~fternoon, following our transmi ttal by courier of my letter bearing todays date. My letter covered our client's check for $1,500.00, which was being paid under protest. It is my understanding from Ms. Jarkesy that you stated twice that you were refusing to accept the tendered check because of the language contained in my letter, which requested confirmation of my assumption that this matter will be scheduled for the TRC meeting on March 11, 1993. You then stated that you do not know anything about the agenda or the sCheduling of TRC meetings. I find your statement particularly interesting in light of the fact that pursuant to the city code, as set forth in Appendix C, Article V, at Page 2091, under the definition of Technical Review Board, it clearly states: "The ci tv enaineer, who shall be chairman for subdivision items, . .. ." (emphasis furnished). Secondly, I take great exception to the following two questions which you asked of Ms. Jarkesy: "Are you an attorney?" "Are you a member of the Florida Bar?" Mr. vincent A. Finizio February 25, 1993 Page 2 Please note that Ms. Jarkesy is listed as a name partner in this law firm. She has been practicing with this law firm for more than four years. She has represented clients in conjunction with the City of Boynton Beach during that period. From time to time, during all of those four years, she has dealt directly with you in this capacity on more than one occasion. You are well aware of the 'f:~ct that .Sthe if:. ;'1 !a.r.ter. I do not know whether your remarks were sexist, intended to be humorous, intended to be offensive, an indication of the prejudice which you hold toward either my client or my law firm or just generally in bad taste. In any event_Ms. Jarkesy and I find them particularly offensive. I demand an apology on behalf of Ms. Jarkesy and my law firm. By copy of this letter to the Mayor and council, I am demanding that you be reprimanded for this incident. In any event, I expect either you or the Office of The City Engineer to take immediate action in terms of accepting our tender of this filing fee in accordance with discussions which I have had with the city attorney as well as in accordance appropriate practice in these matters. We have responded to your letter of February 17th addressed to Julian T. Bryan III, which specifically states in its last paragraph: "Should the office of the city Engineer not receive the $1,500.00 submittal fee from you within ten (10) days. " r~S..J€.O ~~'~..f ~~~ ~~~ t \ .9~,~, ~c1~..9d ENGINEERING DEPARTMENT MEMORANDUM NO. 93-061 r~ ~ ~ ~ TO: James Cherof, City Attorney FROM: Vincent A. Finizio, Deputy City Engineer DATE: February 26, 1993 RE: ATTORNEY MARTIN PERRY'S LETTER DATED FEBRUARY 25, 1993 I am in receipt of the above referenced letter (attached herein for your review and consideration). Please be advised that all of the allegations set forth in Attorney Perry's letter are misrepresentations of the facts and therefore do not merit either an apology or a defense from this office. This office has at all time$ and shall continue to, perform in accordance with our City's Code of Ordinances and standard City policies. Should you wish to discuss this matter in detail, please do not hesitate to contact me at (407) 738-7487. J. ..:r..--+.A-L . Vincent A. FinizB VAF/ck cc: J. Scott Miller, City Manager Christopher Cutro, Planning & Zoning Director attachment: Attorney Perry's Letter dated February 25, 1993 ~\'\J€.O ~EC \~~~ ~~, 'L b ENGINEERING DEPARTMENT MEMORANDUM NO. 93-051 ".LL 1~ 7~~ fA--~ '~rtrC~ TO: W. Richard Staudinger, P.E. City Engineer FROM: Vincent A. Finizio Deputy City Engineer DATE: February 24, 1993 RE: Boynton Seacrest (f.k.a. Cedar Grove) Submission of Master Plan Without Benefit of Submission Fee Status Report Please be advised that on February 17, 1993, this office transmitted a Certified, Return Receipt Requested letter dated February 17, 1993, to Julian Bryan, Agent for the above referenced project, regarding the master plan submission Mr. Bryan deposited at the City without benefit of him paying the required submission fee pursuant to City Ordinance(s) . The receipt was returned to this office with the received date listed as February 19, 1993. To date, neither Mr. Bryan nor his legal counsel has contacted this office in order to provide formal direction to staff, reference this master plan submission provided to the City subsequent to the two full reviews performed by the Technical Review Committee during their most recent review(s) . At your earliest convenience, please advise this office as to how we should proceed in this matter. VAF/ck xc: J. Scott Miller, City Manager James Cherof, City Attorney Christopher Cutro, Planning & Zoning Director RECEIVED ~E8 24 PLANNING DEPT. ~ ENGINEERING DEPARTMENT MEMORANDUM NO. 93-053 TO: ALL TECHNICAL REVIEW COMMITTEE MEMBERS FROM: Vincent A. Finizio Deputy City Engineer DATE: February 25, 1993 RE: Boynton Seacrest (f.k.a. Cedar Grove) Master Plan Submission of February 24, 1993 The Engineering Department for the City of Boynton Beach, Florida is in receipt of the above referenced master plan submission and associated filing fee which was received on February 24, 1993. The master plan shall be discussed turning the Technical Review Committee meeting of March 11, 1993 (meeting start time 9 a.m., Conference Room C, 2nd Floor of West Wing) . L~ ;. .....:!- A~; "':'($ Vincent A. Finlzio VAF/ck xc: Christopher Cutro, Planning & Zoning Director (for placement on agenda) Julian Bryan, c/o Martin Perry, Esq. via FAX J. Scott Miller, City Manager W. Richard Staudinger, P.E., City Engineer James Cherof, City Attorney f?tz ~, RECEIVED FED 1J= 1993 r~ ~Ll>~- (~ <~ 4>-. jJ.)U-,;rt \ tu < -+ "J!,. TECHNICAL REVIEW COMMITTEE MEMORANDUM TO: Robert Eichorst, Public Works Director Al Newbold, Deputy Building Official William Cavanaugh, Fire Prevention Officer Lt. Don Thrasher, Police Department John Wildner, Parks Superintendent Kevin Hallahan, Forester/Environmentalist Mike Kazunas, utilities Engineer Vincent Finizio, Administrative Coordinator of Engineering Richard Staudinger, Gee & Jenson Consulting Engineers FROM: Dorothy Moore, zoning & Site Plan Reviewer DATE: January 7, 1993 RE: Technical Review Committee Meeting Thursday, January 14, 1993 Please be advised that the Technical Review Committee will meet on Thursday, January 14, 1993, at 9:00 A.M. in Conference Room "c" (West Wing) to discuss the following: MASTER PLAN Boynton Seacrest formerly known as Cedar Grove. Resubmission. NOTE: Return plans for the master plan resubmission to the Director of Planning & Zoning Department by Tuesday, January 19, 1993. Return all written staff comments wi thin same time to W. Richard Staudinger, Gee & Jenson Consulting Engineers/Vincent A. Finizio, Administrative Coordinator of Engineering, c/o Engineering Department. CONDITIONAL USE To allow Motorola to lease 7,111 square feet at the Boynton Promenade, 1101 N. Congress Avenue, for an office/training facility. (See attached application.) NOTE: Site plans are available for review in the Planning & Zoning Department, c/o Mike Haag or Dotty Moore. TECHNICAL REVIEW COMMITTEE Page 2 PARKING LOT VARIANCE Saint Mark Catholic school and church, 624 N. E. 6th Avenue, requests relief from Article X, Parking Lots, Section 5-142 required improvements. Subsection (d) Landscaping and (f) Drainage (see attached application). The site plan for the project is available for review in the Planning and Zoning Department. NOTE: Parking Lot Variance is in conjunction with required upgrade of the site due to the submittal of a conditional use site plan application for a day care building to be constructed at the northwest corner of the project. Return all written staff comments to the Director of Planning and Zoning by 5:00 p.m. Wednesday, January 20, 1993. ~~~/u~ Dorothy Moore DM/jm Atts. cc: J. Scott Miller, City Manager City Commission (5) Don Jaeger, Building Official Ed Allen, Fire Chief Charles Frederick, Recreation & Parks Director Edward Hillery, Police Chief John Guidry, Utilities Director Steve Campbell, Fire Department Bob Gibson, Public Works Central File Christopher Cutro, Planning & Zoning Director Tambri Heyden, Senior Planner Mike Haag, Zoning and Site Development Administrator Project File Chronological File A: TRCAGDA.JM ~~ 1'- - '~_ ,~u.\_ ENGINEERING DEPARTMENT MEMORANDUM NO. 92-311 J. -1 h...).~ TO: J. Scott Miller City Manager FROM: Vincent A. Finizio Administrative Coordinator of Engineering DATE: November 3, 1992 RE: Cedar Grove Master Plan Submission Technical Review Committee Master Plan Conference of 10/27/92 Please be advised that during the above referenced meeting, the applicant was represented by Attorney Martin Perry and Attorney Jill Jarkesy, at which time a Court Reporter transcribed the Master Plan Conference discussions. For your review and consideration, I have attached an attendance sheet and herein advise you that the Court Reporter was Mr. Larry J. Gluck, 319 Clematis Street, West Palm Beach, Fl, (407) 659-4155. VAF/ck cc: James Cherof, City Attorney Christopher Cutro, Planning & Zoning Director W. Richard Staudinger, P.E., Gee & Jenson Consulting Engineers attachment: City of Boynton Beach Master Plan Conference Attendance Sheet for the Technical Review Committee Meeting of 10/27/92 - - -, , RECElV1?n NOV :J PLAN N I ,'~ G DEPT. -.:. -- CITY OF BOYNTON BEACH ~, E.- ~d. b~ CHECK OFF LIST FOR - ~~~JtXOOXxot~1XX Master Plan Conference Technical Review Committee - Meeting Location Conference Room "C" DateIO/27/92 Time 9 a.m. Project Cedar Grove Design Engineer Carnahan & Associates Contractor(s) ~=f;;~""C #?~~~~:~:~;:~ . ~A~ 01~1 r ~J..) 1 RYAt) ~ou,,) ~A~-iA~C.- <=:~\J6 AO]-~~Jl..lll9S :f".'., A ..Ta.r~~ Jl-~I c,eda.~YOUC ::X:nUCSIP,. ('-l-o'f-) f&Jfs-L/-L/6lJo CI;::J'-b~~ ~ f.:-S.~b""', l~~. ~Cf5 - ~, z.... ~~"E;~ C"" J?ila'N'Jtw IJ~~~II Yl7 . 7J~" 7~ry (;7 ",.,4 ~~ ~ ~7-a6f..;.?ao (,'rId! (3oVtV10\)f3!~({i vrr.cf fA)-r ~il,r 7'~7'--'7'36c'7"iLIS I ) -StftJ. r/tl~,J .6li4. '- ";d1 .. 8?J7- 90 ~7 5aL.' 1/'0'1"" Be/I 7'C'7- 8-"1-6 ~7G 0G~ L;JErl]t'JN 6f3~o I Lff f2-(2y T. (5( u cK @(')L{ t2-r !Z~ to;2 Tef!) lect Manager (3-107)(;,::;::;-4/ s-s] ,rintendent 3/e; c I~/J'l/l /ls.sIr :ess and phone no. CU~5r /J1U/l i2e&:~I74, _ PERSONS ATTENOiNG: - N arne Organization Telephone No. . /1 i../ 77(..171(;:-'1 DJI/:vh)J /~4 / ~ ~ kJ t--l I io.J Co ~ 2c.T]o..j I J..JG - /7/2.c J>tfJ ( ,r /?{/ C. ~ /?u. e. l3?f/!J,f/~ Aw, (l ;7Y !(A-NNINA.1Zc/0i M 0' ?uJ. 7.~8 7dL?5 7:38 -7'/8"-' X Z"r"l 7-:> - ...,') :) ...) - d 2.., / L-_ r .--- 1':- I -, ~--~ t. ) <- I'~J? - /756 J J~ .. 7Y~/> 7i$'~- 7~/1l) 7 3/3 ~7 ~-<. c.J ,stration PLANNING AND ZONING DEPARTMENT MEMORANDUM FROM: w. Richard Staudinger, P.E. ~pp ~ Jens~lting Engineers ~ Chrlstopher Cutro Planning & Zoning Director TO: DATE: October 6, 1992 RE: Cedar Grove Investments 53.69 Acres, East Side Seacrest Boulevard This is to inform you that the Cedar Grove Master Plan will be reviewed by the Technical Review Committee at its meeting of October 27, 1992. CC/jm cc: Vincent A. Finizio Administrative Coordinator of Engineering Tambri J. Heyden Senior Planner A:CEDARGR.JM TO: FROM: DATE: SUBJECT: PLANNING DEPARTMENT MEMORANDUM REQUEST FOR CONCURRENCY REVIEW Vincent Finizio, Adm. Coordinator of Engineering W. Richard staudinger, City Engineer ~~ . t Christopher Cutro, Planning Dlrec or October 21, 199.1 Ah_J--.. .~~ 4f Cedar Grove Put~~~for Concurrency Review of Drainage Level of Service Standard Pursuant to Section 19-88{d){4) of the City of Boynton Beach Concurrency Management Ordinance COrd. No. 90-18), please review the proposed Cedar Grove PUD request for compliance with the adopted level of service standard for drainage and reply to our office in memorandum form (separate from the regular Engineering Department staff comments memorandum). To help facilitate the review of this application and for record-keeping purposes, the memorandum should include the following: Q (f) @ A statement that the Engineering Department has reviewed the subject project for compliance with the drainage level of service standard; and Determination of whether the drainage level of service standard can be met; and Itemization of the improvements and/or public facilities that are to be constructed in order to meet the level of service requirement, timing of construction, and responsibility for construction. For your convenience, the drainage level of service is specified in Section 19-84{d) of the Concurrency Management Ordinance which states: "Drainage Level of Service shall mean that drainage facilities for development projects shall be designed for a three (3) year design storm for a duration of the time of concentration for the watershed, for development projects which are subject to South Florida Water Management District design and/or permitting requirements, and shall mean that drainage facilities for all other development projects shall be designed to accommodate the first hour of a three (3) year storm on site." Thank you for your cooperation. U i lD'+Sl ~11 T~ 1. !~ ~-I'+S j-eJ lI'~ ---- (/) 1 ~'b \1\ ~~.~ i\~:\~!i it ~ ~ J.I p.j :a.iofl I . ti t.! [~I~\ ~J asdl11 n11 c~~ \\'~I,.~t li\ ~ li\~n i\\.J i~,' ~l\i'.\rt\\liA ~ ' ~ ~ ~ .i.:a ~ . Poofl i . A ~ . r.1 ~.b 8 ~~i · at'~,.~ i I "",oll~ ... '\ tlUjl; 1 ii\ l11!1~ ';I\ill .~ ~ !~ l~~ i11ft 1~_~.~ S1i~it 11~ .;1. ~ CARNAHAN & ASSOCIATES, INC. W P.O. Box 4399 6191 W. Atlantic Blvd. Margate. Florida 33063 Fax (305) 972-4178 (305) 972-3959 SCALE 54. J o\=- 5 " i .. i+.-J.-~-+t~--W--Y-tL+-t-im[""1 1-+-[- ;: SloRM--wt..:trE.~, MAtJNG-.SMEIV1._..c.A tJL.Allo0S: : ; . : AJ i I i !L+~ I ~+1-t++1" i~LL 21 5 A I " ITf..DA1 ----1-----0--- l'-~~- -t- --,.--..... ..."- .: . I j ! I I I I i I II I !!! ,I. I ; I I I I I I A I ,! I 1 ! ~ I l 01 I Pt~T ;- i ---I~..-i.--TI.i3-.IA"i.-.---l---lE.~~j~?~.-ff..I-- 1'-:' i:' - i !: b, ! ROAt:>.A.-!S~~"",'-.-!---I-.-7.rl-'-IA~t'--]-'--'I-1 1-1- ",.__+_.2~.5_.A~ .+~.~ __I . 1 , I 1'1 I 1 I I I I II I I I I I : c.l &RE.E;J Ae.'€~ L._L__l'C.'C..I2._,,'Ac..L__._fE~lJIOlJ.s_.. .' -I __: I! .! I !' '1 I : I r j I . I ,I I i I . dl I ~I1D(}. E.N'J6LL .JLll2J5!AcJ._-J-.--L ij____i._. .i i ! i I ! i I I I I ! ! i i ; I 1 I ; ... ~b~~-j-'-1~J-;I-'.j-'-"!~;J~-1 ~J:ll-l-T__n1'-.l..-1---1 3: ! P. ~ .-r.__.I~J_.. e.:~JE1l... ~&.JDJ-.J-.J__i,_I_.J___J_j_L._L_J___._: .." , I Ii. ! I 'ii I I i I ! 1 I I Ii: , 400 _: No._J_A'I;I\)~A~~E:.I_"_qvelf-Fu?vJ~..~'-~~.It-.tAtJ~L~-6t~1El'-4-.-! . ---' ... !~ i I I : Is: i : ' i ; Ie' ' I I Iii i i i ; ..' o!.Cot.,r:rAl.N--: i1~.-NA.1Ee__;.._OtJ.~ell€l__t_-i__!__I_!__'.___! -- _1__.__' -- I' "'I' I II II! ! I! I i I I I i I ill i .. __I. I I I ! 1 .! 1 ! . . I I ! ! ! I !! . I I I i I ; i , i i ii'" 1'---' i --.-.j.- I I i I . :". . B. r: r..:.-'. jr:.b.. ~t:.'!-f" , 't I '~! 't-.,,' ',...; . . -< J I !'l" . , .A i" . U'~~~_!..r ~o ~_'\_'_._""__!lt.).! Q.-:--.- :......, SE.r~~~TI::i LEV pl.;, .~. rf'A&lS\:\IO~ Af:.e 10 . : 5\'16-1 D~iA :S'I _ A~EiA : B~EA.r..b.C\I'J~.i,-i..-.-: --: ..: .. :.- fl' : ' . ; , '. . i ! f : I j ; i ; I ~ ~ ; . , , i . , i I I i 4' I : , . ~. \ I ""...Ai . ! : ' ,__.J__..--L-.!---i ___l_--{_+_----l.--i. _ROAI:>-. ..iSDwK-l-__+_~Eo.v J_ ,L\~--l-i..B LDb - '-i'- I I I I 1 I , , i I ! , ! I ! ! ' ' , ' ! ; I I ! ' : ' , ; I I . I I j , ~ H' I : j ; ! I ' I I r I! --'-, ""--i-.--.--...-i.-I-----:-:--l--'~.i.-- i ~-~-- :--Il---1-i--I~i--l-T-i--!----:---i--!---- . . _ _ Lo'tJSR-- _, L'E:.\lElJ. ._ AR.fiA_J-~ "" "_,..1 !_A"-__.: ____:___I__ll. ~-At" ~-'--_-' -_I Jo.4-- :A~!.""- l i I I I ' I I I I Iii ! I ! I I ! I 1 , : i R t> . J;.L .: _ltD. 6L): _____L___L _~ _-:__,__~ ---J--- --I---'~~--:---' L__ L ., --: - -: : i ~:T'" I :l Cl ~l ' i : ! Ii; ! I I Iii j : ! : I i -, c';r-.--;6t.., .19 L~i-" -i-----i---t.--j---i---,---I---i-+----i-I-----r-i--+--i---;--i -..-~ ---I :--.-!---!---! ---!---.:---.!.--!-'II..--.!--!-~ II ! 'I I _LI -~_.-!---!.-J-j-- -.I __J .: : " ,,' '1,H-tt"'~I;"I' __._TgA~6fnorJJ--.AA:e~-i-L_L-..--JL.(D-A I -~~JJ-ALJ._I_-LJ. -4-:.z... ~ Jo(,~ --.: (' R~.. ~L,! JJ.6J.j~.4-lIJ-._-!.--LJJ I I : !~-j- -!-J.--.!-J-J-.J-- ! F=: I , , !! I I I I Ij I ! i ! ! 1 I I I ! ~ ! I '~... ?L. ; lBi5.; 2 ~ :. -- i----i - "I --1---1 --T--I---i-~-- -I----i---i----' --,--- -i . -j-- , , I. ".1 _. _ .1 ,_ ._1 _ __ ___ _____I____._._._J__. _'-____ __ - 1 I, , I " Ii; I. i i i i.. I I I I I I I I I! i . .. 'I' I I " I I :'; 'I I ; lJrPE ~ . L.~\l E~ .t\.{:.tp~.! -'Ii--:e. Ol'-~(..-li-_.:- ---I. ___.;5 ,], j~~ --j '4, .0): A<J . .. I' i! 1 I I I I I I i ( RD. EL. '2.10.0 ...)....i _. ..J._-----,- 1__..._1..._.1_.__:___1____'____,..:____.; I i \ f.F. iEL :2~ .0.'_: :--:---..l--.~---I-..--~---!.-l--L.~-h..!-.-! ,l I l JOB v!:;::I-'A~ ~~\-::-,'\it"", CALCULATED BY I'l"I \ ,..., I'" .-.,.., :L. oJ ':) .~ U. T~IE.L~ OF SHEET NO D^TE h 12. )" f>_ I I CHECKED BY DATE , '1-- :dJ I l\. O)! '-~'.\. 1\0\ : PA[2.~ < I i o AL.l . i i 4.~ -'t..,. ; 1 o :A,c.)_ -rC1AL ':,._ '11 ' ' '_ Al..__'_ ~lP . ~_AL.,.. , }~. 5 A(, m. CARNAHAN & ASSOCIATES, INC. .~ P.O. Box 4399 6191 W. Atlantic Blvd. Margate, Florida 33063 Fax (305) 972-4178 (305) 972-3959 SCALE.5~. 2 of 5 , j I ! ! i ; i j' i I I I j' ! I I I I ! I J-l. I .I Ii,' i Cf !~ILll~oJ;~--I~r-~if 1-~~'~IIToLw~J 41d)~II~~IJJ::--rl- 111"~"F-I.-~~ttl'7J~.t, '. ,-;;-. t.Q; =.l=F- i-+Jln--l-~- 'i I-I' -I-+-J~f-ILIJ..J +1 R --i-I-' I DI : E F,~.:r~Al'o~ r~llJ.d. I'U: J.tll- ~A~.~ t..1f(t 1-r-r-l"-.I'---I---11 . 1----1..'1-1-+. . . I c-K....1".' \. , '1--1 1 1 I .. . , .11'lf~~~~'=++1~=1~- ~~=rr-fH+8=rl-Tl+l~~- I I ' I I.! !_! 1 ,_! . _._JEltJb<5~. .b-l.-.6-~P,~-t-l~'~-I.L~ , -~EA;t(,.O. ! · ; ,=JJ-I ;-),. i : I Ii:; i bf>~ :iI.".k^~ i i : ': :: -: 1.-4! -; '-- 8 -+--t--i--;-f- j-l--:-i --! ---II-UI~ :-:I~J;..fl /'!Livl -+-- -'1- ---:I----!-.- :! !! I . I i I I I I, ! I i I : H_' _J_ +- i 1-+ -[IT: _+J_L~+ I LT - -'-1-JJ;--H-J-1-+-J.-I-I--i . '___ i __.__ J__ _.__I_n-.l ._, _ J___.___ _ij~_.___l_ 9.1_.6L.owf:~J Ae~A)__L__ __". ._. ___ - i ! I i. I' 1" i ; I I I! I I i '1 J I I I I i I I, I . I Hi:: 10 I, 1~ PE~F; c..A P ,_ I I J J __ L. L___ __L_.J___ __I_L_ DJ ~ -u>__1 -- 1--i-!D~'Sr+_.J II~II I-j I : H I H-++-+~+ ! ! I.r ---I -l-.- ~---.-!I---.I---r--I'---: --- -- !-- -Wi'I-B.SO i (LC:W~ .Af?e~)-'-i- __-,1_- -I '--l--- i ,. [i i I I : i ! I ! I I I I Ii: i , .i -1--~' -=i-____C_-_-r=~c_~~:~_-=C~~~j.~= ___J_ L-j.--.! __L__!__J~J~___LJ____ -Dl-:-i;--l:- i i I 00 I I I ~.I I ~ I I i Ii! 1+R; · I j I! i : I I, . Ft:--'-;-.. "~l- --:-~ ~ j----.r--II-i-r' Ii ! I (Q'AI~-MffA) ! : l.i)~:-~-i----j'--i'--r---I-i~l-r-='r-l--'--i--i,!"1'~' i I I" 1-1-1--- i (r~f' i6i)-r--i---r'-!"'-r---r--ili--I'-I-ri-1 i 1i-li,-rl-r--l-r- i ')"i'; : - ..-: -J. ....-i"..~i "1 -'-'~i-~ 1-'-T:+--j--'~;J-,-~--'-r.\'-1:::~l:=7~i-ll-l-i--l-"-I----1.........-1-.... ,-' \{C!lLVtv\ 6__1 ~MP'A~l1. - .l.-~t::: . . rr_L....JdDI'-'-+-l.JS,,:~~-\"O.l:: --. ---j---1---I----,'--1-_.- --- I Ii! : ! ! I I _+ I ~ j.. I! I I I I I I I . I I I .!.1! K; --'-i c;'i?7r'l: JF---r-~E-4--} 4:L~rF-1-I-*A.,\JC:~. ~IU~Y~ ICl'~JiOr~i"c~l. S'i--i.----i-- : I II.' i- '1 i"i'.'I-1 --l-..-J--L-I-1. t--TA~~- -~1--ff,SE~~o-lE.T~}t'-lAt-)p-I---- I _.I... .... ._.____... ._.... ...... __~.__--..J I -1 I _JT.6.~tl ---,JNd~pJre[b_JjL>L.""_.i8..J}OJ$2.'i- Iii i i i i I I I l--t- .----1 I I I . .~. I I I r r, I I j .....1_..._ ! ... ! _. i i!! I ! ! I I I I I ! I I I ! Iii I I I -1-' -I. -..~ !-u..-!--i~--j-l-l-.1.Iill I : IIVI : I i I ;'-:'-{-"-i- , --;.-... SF-'NM. D.__.;robJ\~L~;__q. ~-~ -ij-~ -~.l~~-D04I2:->>lDs,::'\.-+--,..~O<.)L-~. D:.-f1VJ bu--!---. I 'i i I I I I I I I to I I 2. 0, t 1/. ..I. I I I I ". I I . I I I I I I I . 1 ! !:' r f : j I ' , I , ! I 1 , , '"!"'''''T-----i--'j -1--'1 I:: i Li ' i J \...., _ " Zo', i i ~ J" ~4 ~ i , .,-----,--,)/-..--.,- .~(~(~'l.vJ 1..2J~z.D~_'~fJ u~2.~,2.Ds:)., ,3'1-10;..\0\) DtJ) : i ; ! 1 I I i21 I I ii' I ! I i I I ! i i , --, ---I' --I . I I ' i . I ! 0., uPPE~ L!"~t.. 1i:~AJ~H!u L!~t:+j~~eil'( _; j_~~~_~ \J:: ~~: 'I- (.O~O~?7(ID~8+!Z.~\Ojh..:-~-),*- DO:DJ~G)~BJB') " ~ 1 I I i I! . I I I . ._' ; ..__.__..,.__:~..,. _.....___ ~,_...._..: ._.~_.._..! ..1.........."".1 ",. _, ~ ~.._: ,...J i l : !! \f:: )3.4-;; f...L-fT. ; SHEET NO. C'I:::' [> tl. 2' r ~ n \J E" ~ J ()~n5 (\. I~ lE.L~ OF DATE~ DATE JOB CALCULATED BY CHECKED BY ~_ . CARNAHAN & ASSOCIATES, INC. W P.O. Box 4399 6191 W. Atlantic Blvd. Margate, Florida 33063 Fax (305) 972-4178 (305) 972-3959 SHEET NO. r.t;D~i2. (....lC.tlV 2 t'\ ". 0')1 O/"")D ~ Lt IH If:. I-e: OF DATE~ DATE JOB CALCULATED BY CHECKED BY SCALE SHe ~ (}J=. ~ i i i i :'- j - .j --.-.!- ~.j_-+_J~ I I j-._l_LJ. 1._ i -- 1_ Dl zl r.1 : ~)l:~I\.i"'~~1\O~ I il~.~,lt4L uLX1eLThJtJ~14J, I .! I_ I i 1- -1"1 ~+~lr+-'_I~n~J" ~-+- I ! rfr 1~~I(.j~;4f -"- h 1. --'- ~2'~"). J ,)_8~/pJ-=I-=!~: I I... -H..' , . II.... j-I.--r+-- ,---H--I-+l+h-I-I-- :----l';! ~?i~li-it.~lfJl'-11 ' , -'-l~-]---i--II--l- ~.., .J~J~,:,~;.rl~:ci~-l~ll<. A, . ,^;:rl~!l?l~.-~v~01--r- ; , '. I , i ~ ' t' I; -' l ! i i i I i I Ii! i ! i I Iii i i i : ii' i i Ii! I 1 KE~~I- I+H. i i ! I I J i I Iii I. ~!>1~1<;--!-:-tll I t-~tll' -++t-I-i-I---i-L-j . , i I ! F'''':i-~.-I qr.P l ~)f.r.~.O --I' I--rfof-::lj;-..II- --'-"'--"'--1--'- ."-'T-.-r--t--- i '. I . T--I1-..-.---i--------'-- l:~:' _,-+Eo(-=:Z~+1 I )\i .; ~ -+ orrl~~-Lj ~ ~ _..~ .J-~,i~~J._.I__L~j~J_I_sb~_kk\LL~J-1--1- : !.: '. _ ._ ~__ ,I -.J--'.--.L--!--!-J--!,-+-~--!-!._--!._--!-!---! --L-I--,-!..-- , " "" i t;.:1 t~ I I I I i I I I i - ; _'h~ Sr..1.t~J~A'-i,-Ai€f"'\_- ~-_.-- fB ,:i-J.5~-'_':-i---:> 7. -_1_- i.---J--j---i--i-f ---I - '-:--'-'--1-1 I I r-~-J-I-I~ d-+.-:I I r-- c.~.---)JO~M:E-. :tJ9-9U~fL~H$1t[c:~b~-T9~\^1~t:Pf-+QT.~ttL.e:VE.ll I I I--- I L~Nt:.:t~ ,_ ;:; lLP5!b-\.1E_L--{JNd.WPE:-=S"-1tQd ~~-:5yJ. ALoJ'JLr_i5C~~_II__ i : !! I I I I I I , I! _JQ~L I I I I I I ';i i i i i---i--i'4t>-rl'-- -OtL{irr-I!." II i*- _.e -- I... . ;: ..: u-i--i-'-;- -j.-t--tl-ri~[. . I Iii . : : . I'lC\...--~._; -:Jl_:*-f-J~5CDI' -Lf-I~-~~.161 CLr::',-.a.l ,_A~-'J:L!---T---!I-l-i----I--.--.' i i I I' i- ii- :--i..i-LI-~~~f-t-J--=1-i-'--- .. Fr-; ~1EtT-t~r~D~Hl~ I ~At L frJtttt+dl~ .J~( d-) !. '.: REQ.:.l,D I - e., :1F.._N~..i:~.-l_L-.I.---I.--+.5{-.-J<I.--i-i~ --A-~'-YfZ-.a{':",-A'i'-_~' - I . ,LS_j.tLJ1. e~I,_.L.I-.- : ' i ! : : ~ : I ' I 'I 'I I I 'I r I'''' ! I I ~ "I: i !; I ~ I I : : i ! .1 i :: i i ! i .! "-'r--'i .---) - 1'- -, ""'1 r", '."1 I '-T' I 1- j- .. 'l.~ ~: - ) IIi 'I- .. 5~,1 A L__:.~. . :_..4. .4-B. -AL:.,f+'I---:--l--.-l----!---'.-----.-.'.-! .J...- -'I----i ... :.__!__ I. , ! i I ! I I , : I i I I I I I ! ! i i -- -; ..--I----j-:-i-f----1-r-r--i-..-: -i--i--j -i----,'- -i----I-.-.-(-- ,)3.i4-~ A~f:q_.+-:1-2~.L,,~"r f~L:-'t1--~-. :3~-,1'q.. A:<..-t;"r- 1 --1--: !- . i!: Ii' i ' . l I l I ' ! : I L,_..i. .J.__.!_._! '------'r~a'l\t>er:>-!JtJr !:'Y,f'JL1iGtrnol..) ; ! I I; I j i ; ~ : I ~ 1 : --J._-_: -:rkt~li1-----! --! ;o\<.- . II. II ! i ! ~ ! f r ; ==1 l I' _ I _ _ _! . ; , i E', , e! ~. . CARNAHAN & ASSOCIATES, INC. ~ P.O. Box 4399 6191 W. Atlantic Blvd. Margate. Florida 33063 Fax (305) 972-4178 (305) 972-3959 USDtl.~ r..~n\.l ~ l1)} nRu::; CALCULATED BY ~ . -r H 16 L.. ~ SHEET NO. JOB CHECKED BY OF DATE~ DATE 5~. + oF- 5' . .. i ; j ! i i i~iil1 .j~J. I L I j , . ! i! i i- - !--'+~-i-t-~-J ",{ ., ~)'fo~ T'-F- ---,--.-,----f-.~- -" . ~i. SrAb6! - 61oRlJ\l1E; .1__ .(F1:>~.__.. .. _~ -tl~l .0 .Y__ _~1o~m_ ~VAL.Ui :1joiJ ).__ I I I II-I--_L_I-f-J~ I l , tJ~El"! LEJiJE'j--rll"-L 1;. :r ~ I - 'j. jJ.;r A' JO _, ". _~l_~=- A~D, ~.l... ~_-~1_ ...J.. e ~ .' I --loY'J 1.-$\1 I E~ -lLiPP,-1O ----'1---- ! ' ' I I ! . . I I.. ~ .. _ I . . r-- I I , ~0w-oftLa~~lE~- to~=4~,~. 1 I .m IbA:m 11111 R=f : i . , i J I, '1 :"'l'-~l ...! . ! i ! i : '. : : ' !. e:,~A~H)c-..' e..6~.:)8V>7Aifl{)r(j I art .... :suR-t-J:j.(...c_._$Td~El__-!__LitlWER.I_ L6\J8L_J _. IJ ' ; i i I I I-+-t-t-H I I I 0 I i I I I. i I , ! -1~ll.1~~I~i--,-J 1l-1lj~]-=1:::r=I:::1-~;r~ -i--r-Tr -+-rl~ F'I"7?1-I-1-TI-"{-1- I ! , i i -=-r;~f-Y'- i----- __.L '-I -r-rL-j- --"'--r-r--j--i "-1--- i l ! - -! --. -I - ',--(--- ! -- 1-- t-T~-:1 I I I ,- ROAD,):S~W~___<_____j_ -- -;_'I~Gf:E: I _b,-~~A.l 1 -B.ukD.G1-r I~- : 'I l : ~ I; I J I I +. )- Po. ~ .. -' .... -'..' - '-- 1_._ l}~~_Aa.'--[-'__ ~__JQ.. _At-,-,_ __,--_ ,: ! :: Iii I I I I . ! I ! I I , ---'_.. '-_.' I -' - :- -, ___J _..J---'---!---i- ~! o-l I 1 ! : ..-:-._~------~-._-:-J-J-t-lll_U.J I I ~ ~ I I I . . , . I !. I I . : 1 I I.; I &I~l~~h . ~. -- ~J,Abt~ 6~O~J~~:-~oWi~-.LJ8\1fLt-i: i I i I I if ~ o OJ-inTi I . I ~~--n I r-l-lJ-lj'~I--I-~.--I-' EL. 15.16. --' '.'. - T gEi.N&J q. 0 trk. JLE\lEL,'6"Tof1.--,--..L.1 nji-I _1_4L~&L_ --j-_i_.J__J_J_j~_J ']' I I I I . I _+-[_Ll_J_ Iii i !] .1 I-t-~L " J ~ I 41~~.;l-1~ f:L. lL.'''iO_.,_;_C;"'Erw+~lSEir'' I J~r,"-~__'7nl _YI'\,lolAI-L1=tj- ,1~'r II . -I Ii' ,n!.-._:_q-I--+'-j-Jj-7-', I j- ,1 _ -l --1 -- --,- _~.._.__n. ._-t:l.._...__.LJ1~:],~__;._~.__GgE:bJ~.. ..A~, ~I"Z-i_t.. --- - ,)J~. 0 .~r'J--1. 1-58""1'l-1j- : : : , . ; I , I ' ! I ! I II I I I I I J I I ;-(---1--- iQ~I-i.-~.itt1:"-~I}'~N~I-5JI I ~I'-I-I l-t-,-l---I-- · I " i--r-il--i;-rT~-h1l I I I I I--r EL.. tB.5: . :QII~-+-':4JI)~,7~ -r1-Jl'!1~15'r~t'IA.tlt.2~--!-nT'-I-~ln-llp.l'+-'I--I---- . i ! ! . ! ! . , ; I! I I 1 I I I I . . , I i I !!,., \ I , I j I ..' ..-- ------ ~. i.-=._i~=~I-=l---I=I=!---i--'-I=[~]~.=]~]=C:~!--=]=~J-.J~:- ! ; ~ ! ! It! ! ! ; : ! I ! I ! j I ~ f : 1 : ; i ~ : I : : ' : l i --"-'1 .--1 ~r -_._.~-"~ ,----oi .---1".'---1---- !. -'--'-4i'-.-'~_hi~' "_"I_"'~W"_ L. ---1---'.! I j I ; ~ ! i !! i I I ; ''''-'''-'-'', .'---",'--'-~' ~--.,.---'-_.....-._.i.--~r--.-.--I'.-T-- --.-. ---j" : -~----l-~- ! ._____ --n.._.-----l--:-----!----.-,-..--.--...-- u_ .,.__.. ,~. ; _1._ . ; : i ! i I ! [ ',-- I -., i i SCALE Hi " . $ CARNAHAN & ASSOCIATES, INC. P.O. Box 4399 6191 W. Atlantic Blvd. Margate, Florida 33063 Fax (305) 972-4178 (305) 972-3959 JOB GEf) h~ r~'\J~ 0))()60~ CALCULATED BY ~ ~. i r]1 E L~ OF SHEET NO. DATE .' 0 )?J)O)2,. CHECKED BY DATE SCALE ~-s~ . 5" r')~ 5 i Iii i I I I i I I I i Hl ~s ~R.!- ~ [)~,k-o~I_' r-T~'-.--- -- IljllllEi-ilill I I, fAlf'J,\.~~ , _l! ~ I ' ~ 4..:s I .,!:.5'I'J- _J__I.- ....:...- !! ! ,__ .u_!_ _ -Jb~ _ I . : i i i ! i I llj-t-J- JL---H ll-l_1 F i c.3", ~?T:i~lJll-f!t:1.A1 :I~~,- (~:,~:~) 1--~-+;l1- A"'II"'lP^,....f> rtJAt..: ";'Cllt1!! .L<::" ,. ~.''': 0 +-- Ie... '! - ''5' . )l.D.l.A6 : Fi.1 I ! i I' I I I i Ii' 1.7 i ii' I I N&>J D , .,. "., I . 1 . ! I I t~~:~~t~H~b I ~~II'--- -,---- fl j~ti-tJ : i ". ..... u;hsl.':.~~i_LLrLk LJ ~ I !! I I U : : . ! ! !- 1-.-I---"li_'-'I-.m'llm /~-'~-l-~J I I E I I I !' I- i ' ; ! ! I ! I ; I ; ~ : i ~ . ; f 1 ~ I .!' . i : 1-'r-'j--J4tj-' ---,--,- I I C. RUN-Ort:__'\I~ '-_:_!_-:___,._lZ-.; ~--5~lk~-f--,_~. ..~5-iA.r..J6., .---,-H-~- sl,\"'I'''l\'b~.t>~-B~t~~ 1-~-i~'J~+~~'J 'I..'~sl :B.2.,\ 1= I ~J IT 1 - , . . . I . IITt.~~' ,\, I lJ~~.. / ffit! ! : ! !'-\ --!--+-t-li-f-i- , Ii 1.-1U~ , I' :-'nnl--i-i-1-lT . i ~ ;ia~_M~Ei--~ ''T'~-i M"'f---i_hL~"~4-I~ ~~g.K e!-$ ,,""D__!,__ : I -!- !~'!-1-:1-ttt_nJ~_L~__-----T.-,tr~ I~:'_-:. =r=~=ffi Ik I 1 I-R Illl~- ; ! '-i-'j---j--t-l1 i il1It1i--t-i-l-li' -! ""T'.--r---i--Til I I I '-rTTli-!-l-rir -' , ::.r'_J=J"~]J=]=I==[-=[]~~J'~J~']'._'.:i.J]'Tl--[ ; : i i i Ii! II i ; : .1 :.' i i i I . :.,..!! I I I . ' I I . ! , i I , ,:~: -)=:l=~~C~r-~:~-1~'.l"::T'-: --T-\'-l~J=-.i=~ I ;!,! I : I I ' I I i _n__'_____; ---^'-i -""-"-l----!n-~-,i.,-,--;-.-.---+~.'~-i-'-..-,-"- r ! i [ -"'---i"-'--~-'l-~' , . i I . I , I I ~ I !! ! f I : -! ; 1 - - ! ".-. I .-,- i i ~ I 1-- ---: ---.--1------ ! I j __~ 1 1 ' ~_ _I .._I_+.J+~_ ---.. .. +-..- -'---J-.' --' '--r-- --- ' -- --' : ; I i , I , : _. ; FRASER ENGINEERING AND TESTING, INC. FOnT PIERCE: 13(6) 461.7508 VERa BEACH: 1305; 567~167 STUART: 13051283-7711 H04 INDUSTRIAL JJrd STREET FORT PIF.RCE. FLORIDA 33450 Report of HYDRAULIC CONDUCTIVITY Client Carnaham Associates Inc. Date July 3, 1992 FET #J-1805 Contractor Client Site Cedar Grove, Boynton Beach Location #l USUAL OPEN HOLE TEST Q , '" I N.G. l "'''''''''.~'''''''''''A''- ._",.".",~""""~,, ~d '-. WATER Hz TABLE "V . 1 D s K = 4Q ~d(2H: + 4HzDs + Hzd) K Q d = HYDRAULIC CONDUCTIVITY = "STABILIZED" FLOW RATE = DIAMETER OF TEST BOLE -3 1.08xlO -2 2.37xlO 0.375 H = DEPTH TO WATER TABLE 2 D = SATURl\TED HOLE DEPTH s 6.0'** CFSjFT.2- FT.BEAD CFS FEET FEET FEET 0.0 **Used for calculations - Actuar Water Table - 28.01 i; "/ ;Fed, ALEXANDER H. FRASER, P.E. FRASER ENGINEERING AND TESTING. INC. ronT PIERCE: 13061 461.7!',os VERO BEACH: 13061567~167 STUART: 130612~1711 3504 INDUSTRIAL Hrd STREET FORT PII':RCE. flORIDA 33450 Report of HYDRAULIC CONDUCTIVITY Client Carnaham Assoicates Inc. Date Contractor Client July 6, 1992 FET #J-1805 Site Cedar Grove, Boynton Beach Location # 3 USUAL OPEN HOLE TEST Q , " , N.G. 1 "",.". .,.~"""'... . ",."""."""",,-,, I 'd I . I '-. WJ\TER Hz TABLE \7 . 1 D s K = 4Q 7t'd(2BzZ + 4HzDs + Hzd) -4 CFS/FT. z FT. HEAD K = HYDRAULIC CONDUCTIVITY 8.34xlO - -2 Q = "STABILIZED" FLOW RATE 1.82xlO CFS d = DIAMETER OF TEST BOLE 0.375 FEET Hz = DEPTH TO WJ\TER TABLE 6.0'** FEET Os = SATURATED HOLE DEPTH 0.0 FEET **Used for calculations - Actual Water Table ..- -- FRASER ENGINEERING AND TESTING, INC. 220 IllBISCUS STREET. JUPITER, FLORIDA 33458. TELEPHONE: (407) 746-7698 July 6, 1992 Carnaham Associates Inc. 6191 W. Atlantic Blvd. Site 5 Margate, Florida 33063 RE: Cedar Grove, Boynton Beach, Florida FET # J-1805 Gentlemen: As requested by the client, Fraser Engineering and Testing performed four (4) Auger Borings, two (2) Hydraulic Conductivity Tests and one (1) Double Ring Infiltrometer Test. The locations were located by the client. The boring logs and test results are attached. Based on the soil profile, the water table elevations and the soil survey of Palm Beach County, Florida, we determine that the wet season water table in the high ridge area is 8.5 MSL and the wet season water in the low area is 8.0 MSL. If you have any questions, please contact me at your convenience at my office. FRASER STING, INC. AHF/jw Client - 3 GEOTECHNICAL ENGINEERING FOUNDATION INVESTIGATIONS CONCRETE, SOIL & ASPHALT TESTING 3504 Industrial 33rd St. Fort Pierce. FL 33450 Telephone: 1-800-233-9011 1015 W. Newport Center Dr. Deerfield Beach, FL 33442 Telephone; (305) 698-6155 ~a~ \i\ -l" ... 5 l"~ \,.- ,~\ \1 -f;\ ~Cl i~ ~t \~ ~ .., ~ :II i '" '" -< -. -- ~ ~ ~ ", --- ~~ ~~ ~~ ? :sIO - "'.., '" .....,.. ... ~ "" ~ "'0 i"':II ,,::;:!-l ~- ",Cf. ~~ ~ % ? ... " " > Ie. _~~~ _./~m-/ 5CACI1<B':: ,-/ ~-~ -WEVA~U - - /__~-~~~--::::::::::~-:.- _.~_; -. OO"c_-- --------r~-..\ -- - .~.'" ,~," ~.:~~ . 1: i '~ i ~tp , 5 .' U. ~ ~ 1fI'" \}/ ~ . (fl. - .. ,t l> "'0 ;.... " If 'I ;; ~ ~'",,"" :0\ !~,;;: IS' - '" m~~~ \ I' g ,0 ;; " ,:' :b- '1 I ,i It.. if. ~ ~ -;. ........ ::L (, (p 0 ~ r, ~ ~;i\ (fl ~~ ~o g~ '" .- --- .--- -.--.-. --- J" .~\ ~ \'~ ' / ~. ~ ~ ", /--.....~k. " ", v..:. 'b~. ' ,~.;S> '\... '~~ . ~ ,~ '<:) "6v. ...~~ '\." ..,. ~ '"'"~~.'" _6'0 ~',.'l> \...l' '. '" ,. .:D t'fP ~... ~ \ _ _-- -9~ ~Jm"---"---o _--J\---- 6-~-'\ OCEAN VIEW -- ~ - ---11 \.. '/ . g~ '[, \ .~ n >>\ t H .. t ~ \ ~ \ ,,---- \ "\ ~ . \~i ~+e \k _---.l.~\"I -. 5 " .; - - - --- BuENA .,sTA \.. ".;<; ~':" ....>- _-m-- --.. - -- - ',' . ~ _--, . _rroI<EJof,1:iJ' ~t-- (fl .) r-;:~' ~.\ ~ \ n . \ 1>/' ~ .\\ '" 0> I!I - .' ~ \ ~ i % " ~ ,... .... ,-: -- :--- ~ '; " ~ ~ , 00 ~~ 1/ 1/ .' / /;- ';"- // ~I,/ / ! \ ' '. \ \ 1 J -------- .... -r------- , ; 1) /- ..... ,\ .... .'\ '\ :....... .7-~ -I .. ~ S.E. 3td. COURT I \~......._// ~ ~ -~.~ - ( ..... ...... \ .c:: ; ~ ~~:D ~~~ ~ ~ (fl v-~ 1> '" \ ~0 '\"" ",'" ~~ ~(5 o c:; ~<fJ . . ~ J" I..t I J --- -- -- ~. - ~- ---~ . J ~ .... . . /< ...-- - ...~ ,~ . " \ \ ... ... l1' ~ '0 '" ~ (5 c:; <fJ ... ... .... .. n Ii '" -0' ~ (fl m ;JJ .c. 1)1 \ __1. S E ---- . . 4th. STREET -,---- ili >> . . " , ~ " 't. ~ '0.. . I r ~..., ". ""'-.~ I' 1,- f~. .' ',~' . I I I I F E I I I , I I t252.2r . .C. 11 1 J R ^ II Dr" _ J I -:t=/ I I I I I I I I I I ----_._---~. .:r I ' ---------- ClPlH (1) (2) DESIGNA nONS (1) (7) o 1 2 3 4 5 6 7 8 9 10 11 12 13 14 IS 16 17 18 19 20 GROUND WATER ....... lOSS OF DRILliNG FlUtD C ROCK CORE ... UNDISTURBEO SAMPLE 3.5' 7 . 0 ' 20.0' t1vl'lllib lUb DE SC RIP lION White fine sand with trace of roots. Orange fine sand White fine sand BOR!NG NO.: #1 DATE DRILLED: 7/3/92 JOB NO.: J-1805 FRA~ER ENCf"EERING A~D TEST1~G. INc - ~ - -,' -,----- - .--- 1 tlPlH ( 1) (11 Dl!'CFllrtIOH 20 - 21 . . 22 - 23 - White Fine Sand 24 - 25 . 26.0' 26 . 27 - Tan fine sand 28 28.0' . 2 9 Brown fine sand - - - 30.0' 30 - . Boring Terminated 30.0' I at I - - Ground Water Table - 29.5' . - - - - A - - .. . - . - ---' r I'" l>vr.il'\b lUb GROUND WATER ...... LOSS OF ORILlING flUID C ROCK CORE "I UNDISTURBED !;t..MPLE BOR!NG NO.: #1 Continued DATE DRILLED: 7/3/92 JOB NO.: .J-1ROt) (1) (2) DESIGN~ liONS FR.....5ER ENCl""EHING .I,~D TESTING. INC - --------- ---- -- -- -.- _n_ ClPlH (1) (1l DE!>CRIPlIO.. --- 0 - .5' Grav fin P !=: rl n il tAT; t- h '" 11 ,.. -F ::l ro c> ~ ~ ~ ~ ~ ~ ~ ~ ;.J. 1 . 2 - . White fine sand with trace of roots 3 3.5' 4 - . S . Orange fine sand . 6 - . 7 7.0' - 8 - . 9 - 10 - II - A 12 - . White fine sand 13 - I - 14 - IS 16 - . 17 . - 18 18.0' . Boring Terminated at 18.0' 19 - (Done by hand - not accessible for rig) . 20 - Ground Water Table - none encountered t'Ul\IMb lUb GROUND WAlER ...... lOSS OF DRILLING flUID C ROCK CORE 't: UNDISTURBED 5AMPlE BOR!NG NO.: DATE DRILLED: JOB NO.: #2 7/3/92 J-1RO<<; (1) (2) OESIGNA liONS FR.4.SER ENCl"'EERING .4.,,0 TEST1~G. h-l( . tJ r\Jltb lUb -- ._- --,..--. ._- t'EPlH (1) {2') OESCAIPl'ON 0 - Gray fine sand with surface organics 1 1. 0' 2 - . 3 . White fine sand 4 - 5 . 5.5" 6 n O' T)rlrk . -Finp ~;:)nd . 7 - Brown fine cemented sand (Hardpan) 8 - . 9 9.0' 10 10.0' Brown fine sand II - 12 - . 13 . . 14 Boring Terminated at 10.0' - Ground Water Table - 7.0' 15 - . 16 - . 17 . . 18 - . 19 . 20 - - (1) GROUND WATER ..... lOSS OF DRilliNG flUID C ROCK CORE "I UND1STURBEO St..MPlE BOR!NG NO.: #3 DATE DRILLED: 7/3/92 JOB NO.: ,1 1 H05 (2) DESIGNA TlONS FFV'.SER ENCf'EERING :l.~D TEST1~G. INC " ~Ut\lnb lUb - ._- --...----. CLP1H C1t t1l DESCRIPTION -- 0 - . Gray fine sand with surface organics I 1. 0' Brown fine sand with trace of roots 2 ? 0' 3 - 4 - - 5 White fine sand 6 - 6 .5' 7 . 7.5' Dark brown fine sand 8 - Dark brown fine cemented sand 8.5' (Hardoan) 9 - Brown fine sand - 10 10.0' . 11 - Boring Terminated at 10.0' - 12 - Ground Water Table - 9.0' 13 . 14 - 15 16 - . 17 . 18 - 19 - 20 - C11 BOR!NG NO.: # 4 DATE DRILLED: 7/3/92 JOB NO.: J-1805 (2) DESIGNATIONS GROUND WATER .... lOSS OF DRILLING flUID C ROCK CORE 'W UNDISTURBED St..MPlE FR....SER ENCf'HRiNG ........0 TESTI~G. It FRASER ENGINEERING AND TESTING, INC. fOHT PIERCE: (3061461.7508 VERO BEACH: (306; 567~157 STUART: (305) 283-nl1 3504 INDUSTRIAL 33rd STREET FORT PIERCE, rtoRIOA 33450 Report of HYD~ULIC CONDUCTIVITY Client Carnaham Associates Inc. Date July 3, 1992 Contractor Client FET #J-1805 Site Cedar Grove, Boynton Beach Location #1 USUAL OPEN HOLE TEST Q , '. r N.G. ! "'''~'''''~''''''''~''''''''''''A''' , '..,...,.""" /..;,.. .,., , .. "",.".. '" WATER Hz TABLE "V , I d I , I I ,~ I I I I I I I I I I I I I I I , D s K = 4Q 1fd(2H/ + 4HzDs + Hzd) K Q d = HYDRAULIC CONDUCTIVITY 1.08xlO-3 CFS/FT.z- FT.HEAD = ftSTABILIZED" FLOW RATE 2.37xlO-2 CFS = DIAMETER OF TEST HOLE 0.375 FEET FEET Hz = DEPTH TO WATER TABLE 6.0'** Ds = SATUR1\TED HOLE DEPTH 0.0 FEET **Used for calculations - Actuar Water Table - 28.0! ~ J~ ; ;Jltted, ALEXANDER H. FRASER, P.E. FRASER ENGINEERING AND TESTING, INC. 220 mBISCUS STREET · JUPITER, FLORIDA 33458 JUPITER (407) 746-7698 DEERFIELD (305) 698-6155 DELRA Y (407) 265-1211 STUART (407) 283-7711 FT. PIERCE 1-800-233-9011 Report of DOUBLE RING INFILTROMETER TEST ASTM 0-3385 Client Carnaham Associates, Inc. Date July 3, 1992 Contractor C 1 i en t FET #J-1805 Site Cedar Grove, Boynton Beach Location #2 Elapsed Time (min.) Quantity of Water (ml) Infiltration Rate (cm/hr) Infiltration Rate (in./hr) 5 5110 86.8 34.3 10 5250 89.1 35.2 15 5310 90.2 35.6 SOIL PROFILE: o - 6" Gray fine sand with roots. 6" - 4' White fine sand with trace of roots 4' - 61 Orange fine sand 61 - 18' White fine sand Water table 28' Head of Water Used 5" copies: Client - 3 FRASER ENGINEERING AND TESTING. INC. runT PIERCE: (3051461.7,108 VERa BEACH; (3051567~167 STUART: (3051 283-n11 3504 INDUSTRIAL 3Jrd STREET FORT PIERCE. FLORIDA 33450 Report of HYDRl\ULIC CONDUCTIVITY Client Carnaham Assoicates Inc. Contractor Client Site Cedar Grove, Boynton Beach Location # 3 Date July 6, 1992 PET #J-1805 USUAL OPEN HOLE TEST Q , " f N.G. l ~"""'.."'''',;''''''''''' . -,""''''''';''''''';'''';' WATER Hz TJ\BLE "V I 'd I : I ,-. I I I I , I I I I I : 0 I S I K = 4Q 1fd(2n/ + 4HzDs + Hzd) K = HYDRAULIC CONDUCTIVITY = "STABILIZED" FLOW RATE = DIAMETER OF TEST BOLE Q d -4 8.34xlO -2 1.82xlO 0.375 CFS/FT.z- FT.HEAD CFS FEET FEET FEET H 2 = DEPTH TO WATER TABLE 6.0' * * Ds = SATURATED HOLE DEPTH 0.0 **Used for calculations - Actual Water Table