August 14, 1990
City of Boynton Beach
P.o. BOX 310
Boynton Beach, F~ 33435-0310
Att; 61 I I OeBeck
RE: Fire Station M3 ~nd Practice Range
Comm.N9005
Job Site Meeting Monday 13 ~ugust 1990
(I sU9gest next one be Monday August 27)
In ottendence
'-.1::1 1 ..
Las Ward - Building Official (Structural)
Jewel Jacquas - Admlntstratlve
Don Mackaravltz - FIeld Supervisor
Ann Ha$sle - Adminl5t~atlve Asst.
George Wasser - Co~structlon ConsulTant
City of Boynton
City of Boynton
S.T. 'tJlcole
S.T. Wlcole
W~scon Group
1. Hardware allowance cost breakdown Is not evelleble to the City, until
material Is delivered and In5tal led. G.W. cannot understand "Why" It
Purchase Orders by Contractor have been Issued and material ordered.
<Possible Delay).
2. Change Order Request tor additional Fire Damper costs beIng forwarded
to City
3.
Submittals Stll I Outstanding:
a. Flag Pole
b. l.endsceplng
c. IrrIgation
d. Tol let PartitIon (Re submlttel)
e. Tremco Waterproofing - Practice Range Berm Walls
t. Roof DraIn and DuctworK field changes (GW wIll Issue
when Into receIved).
g. Check on Storefront glass to City (Inspection)
h. Cabinet Standards < resubmIt)
J. Joint Sealers
Not discussed:
k. >>10441 Slgnaga
I. Nl0~08 Meta' Wardrobe Locker5
m. NI0522 FIre ExtInguishers, Cebinet5. accessories
n. *'25'2 Window Treatments
o. #0873 Weather$trlpplng and Seels
ocr 18 1990
PLANNhilG DEPT~
revised plan
RECEIVEI
-
cont. . . . . t. .
"
Aug, 2, 1990 .... coot.,.
Page 2
Bill De8acK
City of Boynton ee~ch
RE: Flr$ Station #3 and Practice Range
Comm.N 9005
9. The Contractor wll I experience delay bas$d upon necessary correction of
window and door opening construction defects. (TheIr Problem).
10. The project wi I I not be complete on November 1, 1990 no matter what the
Contractor's Superintendant says or what Is shown on Wicole's revised CPM.
My present e$ttm~te for satisfactory completion i$ February 1991.
Comp I et Ion may be further de I eyed basad upon the Contractor's I ack of
ettentlon to approprIate edmlnlstratlve detail and paperwork. Aftsr'
months the Job Is 50~ complete and stl I I not "dried In",
11. The Jobslte Is a tl Ithy mess, and should be cle~ned up and kept cle~n.
12. The Roofing Is stilI not complete on the Practice Range, and hasn't
been started on the Fire Station.
Conclusion
The Contractor' s App t I cat i on 118 tor the per I ad to 1 August 1990 I s not
a~eroved by this office, aOQ must be totally revised and resubmitted with
appropr J ate documel'ltati on wh ICh has been requ~$ted over the last 90 days
end Igoored.
Cord 1 a I I y,
If/fd /d~M,v-
~eorge Wasser, Construction Consultant
GW/gw
cc: Anita Clausen- Wlcole
.' ~
WASCON
GROUP
d..ltn
develop
construct
IllS LINDY LANE, WEsr PALM 8EACH. FLA. 33406.21304
Fax (407) 686-8460
August 2, 1990
City of Boynton Beach
P.O. BOX 310
Boynton Beach, FL ~3435-0310
AlT: Bl I I OeBeck
RE: Boynton fire Station #3 and Practice Range
Comm.N 9005
1. I Inspected the Job Aug. 1, 1990 as per our Job meeting July 23, 1990.
The Orywa II i nsta II at ion is not 30% comp I ete ~s pred i ct"ed by the
Contractor. I tis bare I y acceptab I e as the 10% or I 9 I na II y 11 sted. The
$231 charge for carpeting IS rejected, as none '5 Instal led or on job.
2. No Waivers of lien have been submitted whereas we have Notices to Owner
1 rom (25) pr i mary t secondary and pass i b I Y tert I ary Subcontractors and
Suppl leI's. This Is now beyond the critical stage.
3. We have not rfJceived recommendations tor the most economical location
of Switch controls tor"' exhaust tans for the Engine Bays from Wlcole as
agreed.
4. Wheeling Steel's Engineering Certlflc2Jtlon h~5 net been received 65
promised. The Root deck is stl I I therefore not approvediend'may have to be
rernffioved.
,. Ce I cor has been approved based UPOI) ~ invest i gat j on \1/ i th pe I m Beach
County Product Approval ~ivision.
6. Hardware allowance accounting haS not been received.
~
7. Fire damper costs have not been received.
-
8. Field Order Prlc'ng for Louvers, W.;\sher, STUCCO Finish, and GBrage
Doors has stl! I Not been received.
--
con t . . . II' . .. . .
~.
~
August 14, 1990 page 2
City of Boynton Beach
RE; Fire Sti:Stion 113 - Comm.N 9005 - Jobslte Meeting - contI
4. Trace I Roofing to be tlnlshea this week (Stili no letter on why Change
Order Request from ;0 Mil to 60 Mil)
s. Oon poInted out dralna98 problem Phase I I Area
6. Electrician h05 not recommended exhaust fen control locations for
Engine Bay~.
7. No waivers of I ien received
8. No Steel Deck CertifIcation received
9. No RevIsed Raqul$ltion receIved based on August 1, 1990 field inspection
ftnd Items #7 & M8
~ George Wasser pointed out that paper work continues to be slow and
~ incomplete whiCh wi II delay Job completion and Contractor payment If
not brought up to date. This Is a critical Itam for EverybodY'$
benefit.
, 11. <Not Discussed) TestIng Lab Reports not received on Calcor Section 0351-
1.05 (each 50 yards placed) (To Include Density Certification '8-48
pounds per cubic foot)
Field Inspection ~howed:
1. Job sIte In clean conditIon.
2. Only one Door frame found slightly out of plumb - Rest O.K.-I &tand
corredted, Window openings ore being prepared.
3. Canopy Roof on Prac'tlce Gallery stilI not complete.
4. Steel studs, exterior wal I Insulation a~d furrlns proceeding wel I. ~
5. Ductwork, el~ctrlc, and plumbing, O.K.
6. Povex preparing parking area, City Inspector on Job.
Cord I a II y ,
tk~"I(! It4I'JC'---
6eor98 Wasser, Construction Consultant
GW/gw
ee; Les Ward, Bldg. Official
O. Mackaravltz - Wicole
^. Hossle - Wicole
J. Jacques - City
(Please ~dvlse In writing If you have any corrections t9 this memorandum.]
101 n.e, third avenue, suite 300 · ft, lauderdale, florlda 33301
(305) 524-3800
G\f.R' KE1\'h
.+~ 0"",
~~ '(\~
~ ~
~ :=
to City of Boynton Beach
200 North Seacrest Blvd.
Boynton Beach, FL 33425
art, Mr. Jim Golden
re, Boynton Beach Fire Station No.3
7 ~
"f-. "
1- ~.
//. 'v~
~r' -..\~
I:~' & H.,jG\\~
TRANSMlnAL
FORM
job no. 88227
date June 5, 1989
dwg, no, copies date description and remarks
I 672 89 Site Plan Approval Application
SD-I 6 " Site Plan
M-88-12-95 6 12/30/88 Site Survey
C-l 6 5/26/89 Paving and Drainage Plan
r. -? I,; " II " "" " Derails
--
C-3 6 5/29/89 General Layout-Water and Sewer Facilities
C-4 6 " Plan & Profile (Sanitary Sewer)
C-5 6 " Standard Details-Water and SNer Facilities
L-I 6 6/2/89 Landscape Planting Plan
L' -L. :0 Lanoscape .l:'l.antlng lJer:al.LS
E-I 6 " Site Plan-Electrical
A-I 6 " Floor Plan - Fire Station
A-f.. ,.[;. ,; II Rl . ....;..."" ~.
A-14 6 " Plan and Elevations - Pistol Range
II
P-l 6 " Plumbing Plan - Fire Station
6 Drainage Calculations
By: Gundars Pakalns
"
~
transmitted via
~ our messenger
o ups
o 1 st closs mail
o express mail
o receivers messenger
o federal express
blue line prints ~
blue prints 0
shOp dwgs, 0
specifications 0
___calc~lations __ ~
r
"
i
i:~~
\, ,',
,
\
Q,
'..
,
\
<~
.
r
..-
r-
r-
/"""
~
)
..-
P~~PA~!~ I~
..-
Schwebke-Shiskin & Associates, Inc.
Shiskin & Associates, Inc.
..-
LAND PLANNERS . ENGINEERS. LAND SURVEYORS
ARCHITECTS . SOILS ENGINEERS
..-
~,
;
. !
CORPORATE HEADQUARTERS
18800 N,W, 2nd AVENUE - Phone 652-7010
SOUTH DADE OFFICE
18201 S.W. 96th AVENUE - Phon. 233.9210
BROWARD OFFICE
8631 SUNSET STRIP. Phone 742.M40
PALM BEACH OFFICE
60 SOUTH US HIGHWAY ONE - Phone 748-8886
WATER MANAGEMENT STUDY
BOYTON BEACH FIRE STATION NO. 3
PALM BEACH COUNTY, FLORIDA
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
I . LEGAL :
A portion of the Northeast quarter of Section 18, Township 45 South,
Range 45 East, City of Boynton Beach, Palm Beach County, Florida,
being more particularly described as follows: Commence at the North-
east corner of Said Section 18; thence South 88 degrees 05 minutes
52 seconds West along the North line of said Section 18, a distance
of 60.06 feet; thence South 0 degrees 34 minutes 31 seconds West along
the West Right-of-Way line of Congress Avenue, a distance of 158.15
feet to the Point of beginning; thence continue South 0 degrees 34
minutes 31 seconds West a distance of 218.00 feet; thence South 88 de-
grees 05 minutes 52 seconds West, a distance of 600.00 feet; thence
North 0 degrees 34 minutes 31 seconds East, a distance of 218.00 feet
to a point on the South Right-of-Way line of proposed Miner Road;
thence North 88 degrees 05 minutes 52 seconds East along said proposed
South Right-of-Way line, a distance of 600.00 feet to the Point of
Beginning. Containing 3.000 acres, more or less.
II. PROJECT DATA:
A. Acreage
1. Total = 3.0 Acres, more or less
2. Impervious
a) Building = 0.37 Acres, more or less
b) Parking 0.67 Acres, more or less
3. Pervious
a) Green = 1. 96 Acres, more or less
III. TOTAL SITE STORAGE:
A. Ground Storage
1. Elevation of Pervious = 12.0 feet (NGVD)
2. Elevation of Control Water (LWDD) = 8.5 feet (NGVD)
C-20 Control Elevation
3.
Available Ground Profile
3.5 Feet
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 1 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
4. Available Ground Storage = 6.6 Inches
5. Total Volume of Ground Storage = 1.08 Acre Feet
6. Equivalent Storage Over Total Site = 4.31 Inches
B. Above Ground Storage
1. Retention Area "A" - storage is vertical starting at
Elevation 10.0 feet (NGVD) and up, over an area of 0.058
Acres, more or less.
10.0
10.5
10.7
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
STORAGE (AC-FT)
0.000
0,029
0.041
0.058
0.087
0.116
0.145
0.174
0.203
0.232,
0.261
0.285
STAGE
2. Retention Area "A" Slope - storage is linear starting at
Elevation 10.0 feet (NGVD) through Elevation 11.0 feet
(NGVD) over an area of 0.029 Acres, more or less.
STAGE
STORAGE (AC-FT)
10.0
10.5
10.7
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
0.000
0.004
0.007
0.015
0.030
0.044
0.059
0.073
0.088
0.102
0.116
0.129
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 2 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
3. Retention Area "B" - storage is vertical starting at Elevation
11.0 feet (NGVD) and up. over an area of 0.007 Acres, more or
less.
STAGE
11.0
11.5
12.0
12.5
13.0
13 .5
14.0
14.5
14.92
STORAGE (AC-FT)
0.000
0.004
0.007
0.011
0.014
0.018
0.021
0.024
0.027
4. Retention Area "c" Slope - storage is vertical starting at
Elevation 10.0 feet (NGVD) and up, over an area of 0.034
Acres, more or less.
STAGE
STORAGE (AC-FT)
10.0
10.5
10.7
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
0.000
0.017
0.024
0.034
0.051
0.068
0.085
0.102
0.119
0.136
0.153
0.167
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 3 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
5. Retention Area "c" Slope - storage is linear starting at
Elevation 10.0 feet (NGVD) through Elevation 11.0 feet (NGVD)
over an area of 0.048 Acres, more or less.
10.0
10.5
10.7
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
STORAGE (AC-FT)
0.000
0.006
0.012
0.024
0.048
0.072
o . 096
0.120
o . 144
0.168
0.192
0.260
STAGE
6. Retention Area "D" - storage is vertical starting at
Elevation 11.0 feet (NGVD) and up, over an area of 0.022
Acres, more or less.
STAGE
STORAGE (AC-FT)
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
0.000
0.011
0.022
0.033
0.044
0.055
0.066
0.077
0.086
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 4 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO.3
7. Retention Area "E" - storage is vertical starting at Elevation
10.0 feet (NGVD) and up, over an area of 0.038 Acres. more or
less.
STAGE
STORAGE (AC-FT)
10.0
10.5
10.7
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
0.000
0.019
0.027
0.038
0.057
0.076
0.095
0.114
0.133
0.152
0.171
0.187
8. Retention Area "E" Slope - storage is linear starting at
Elevation 10.0 feet (NGVD) through Elevation 11.00 feet
(NGVD) over an area of 0.031 Acres, more or less.
STAGE
STORAGE (AC-FT)
10.0
10.5
10.7
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
0.000
0.004
0.008
0.016
0.032
0.047
0.062
0.078
0.094
0.109
0.124
0.138
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES. INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 5 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
9. Retention Area "F" - storage is vertical starting at Elevation
11.0 feet (NGVD) and up, over an area of 0.040 Acres, more or
less.
STAGE
STORAGE (AC-FT)
11.0
11.5
12.0
12.5
13.0
13 .5
14.0
14.5
14.92
0.000
0.020
0.040
0.060
0.080
0.100
0.120
0.140
0.157
10. Site Storage over parking and green is linear starting at
Elevation 11.0 feet (NGVD) through Elevations 14.92 feet
(NGVD) over an area of 1.653 Acres, more or less.
STAGE
STORAGE (AC-FT)
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
0.000
0.053
0.211
0.474
0.843
1.318
1. 898
2.583
3.240
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 6 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
C. TOTAL ABOVE GROUND STORAGE
STAGE
STORAGE (AC-FT)
10.0
10.5
10.7
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
14.92
0.000
0.079
0.119
0.185
0.393
0.703
1. 120
1.642
2.272
3.004
3.841
4.676
IV. WATER QUALITY CALCULATIONS
A. The minimum bleeder hole of a 6 inch equilateral triangle, as set
forth by the Lake Worth Drainage District will control the allow-
able discharge and water quality of this site.
B. The Elevation of the bottom of the "V" shaped bleeder hole has been
set to retain the first 1/2 inch for pretreatment.
1. (3.0 Acres)(1/2 inch)(l foot/12 inches) = 0.12 Acre Feet
2. According to the Stage -Storage Curve, 0.12 Acre Feet is equal
to a Stage of 10.70.feet (NVGD).
C. DISCHARGE CHART:
STAGE HEAD STORAGE (AC-FT)
10.0 0 0
10.5 0 0
10.7 0 0
11.0 0 0.20
11.5 0.47 0.41
12.0 0.97 0.59
12.5 1.47 0.73
13.0 1.97 0.84
13.5 2.47 0.94
14.0 2.97 1.03
14.5 3.47 1.12
14.92 3.89 1.18
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 7 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
S C S
PRO G RAM
PROJECT NAME . , : BOYNTON BEACH FIRE STATION
REVIEWER . : ALFONSO C. TELLO
PROJECT AREA . . , 3.99 ACRES
GROUND STORAGE . 4.31 INCHES
. . . .
TERMINA TION DISCHARGE : HJ.99 CFS
DISTRIBUTION TYPE . . : SFWMD
RETURN FREQUENCY . , . Hl..99 YEARS
RAINFALL DURATION . . : l-DAY
24-HOUR RAINFALL . . , UJ..99 INCHES
REPORTING SEQUENCE . . ST ANDARDIZED
STAGE STORAGE DISCHARGE
(FT) (AF) (CFS)
19.99 .99 ..99
HJ.59 .98 .99
19.19 .12 .99
11.99 ,19 .29
11.50 ,39 .41
12.99 .79 .59
12.59 1.12 .13
13..99 1.64 .84
13.59 2.21 .94
14.99 3.99 1..9 3
14.59 3.84 1.12
14.92 4.68 1.18
"
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 8 of 15 Pages
WATER MANAGEMENT STOOY
BOYNTON BEACH FIRE STATION NO. 3
- - - - - - RES E R V 0 I R - - - - -
RAIN ACCUM. BAS IN ACCUM. ACCUM. INST ANT AVERAGE
TIME FALL RUNOFF OISCHGE INFLOW VOLUME OUTFLOW OISCHGE OISCHGE STAGE
(HR) (IN) (IN) (CFS) (AF) (AF) (AF) (CFS) (CFS) (FT)
.09 .99 .99 .0 .9 .9 .9 .0 .0 19.99
4.99 .45 .09 .0 .0 ,9 .0 .0 .0 19.00
8.09 1.37 .05 .0 .0 .0 .0 .0 .0 10.01
10.09 2.13 .29 ,0 .1 .1 .0 .0 .0 10.42
11.09 2.69 .54 .0 .1 .1 .0 .0 .0 19.73
11.59 3.19 .82 .0 .2 .2 .9 ? .1 19.99
...
11.15 4.89 1.89 .0 .5 .4 .1 .3 .3 11.32
12.99 6.56 3.24 .9 .8 .8 .9 ,5 ,4 11.85
12.59 7.29 3.85 .0 1.9 ,9 .1 .6 .6 12.21
13.09 1.67 4.11 .9 1.9 1.9 .9 .1 .7 12.39
14.99 8.18 4.61 .9 1.2 1.9 .2 .7 .1 12.37
16.09 8.89 5.14 .9 1.3 1.9 .3 .7 .7 12.49
29.99 9.52 5.78 .0 1.4 1.0 .4 .1 .7 12.32
24.09 19.99 6.21 ,0 1.6 .9 .7 .6 .7 12.19
SUMMARY INFORMATION
MAXIMUM STAGE WAS 12.49 FEET AT 16.09 HOURS
MAXIMUM OISCHARGE WAS .7 CFS AT 16.99 HOURS
"
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 9 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
S C S
PRO G RAM
PROJECT NAME , . : BOYNTON BEACH FIRE STATION
REVIEWER . : ALFONSO C.' TELLO
PROJECT AREA . . . 3.99 ACRES
GROUND STORAGE .... 4.31 INCHES
1ERMINA TION DISCHARGE : Bl.99 CFS
- DISTRIBUTION TYPE . . : SFWMD
RETURN FREQUENCY . 25.99 YEARS
RAINFALL DURATION . . : 3-DAY
24-HOUR RAINFALL . 12.99 INCHES
REPORTING SEQUENCE .. STANDARDIZED
STAGE STORAGE DISCHARGE
(FT) (AF) (CFS)
19.99 .99 .99
19.59 .98 .99
19.79 .12 .99
11.99 .19 ,29
11.59 .39 .41
12.99 .79 .59
12.59 1.12 ,73
13.99 1.64 .84
13.59 2.27 .94
14.99 3.99 1.93
14.59 3.84 1.12
14.92 4.68 1.18
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 10 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
- - - - - - RES E R V 0 I R - - - - .
RAIN ACCUK. BASIN ACCUM. ACCUM. INSTANT AVERAGE
TIME FALL RUNOFF DISCHGE INFLOW VOLUME OUTFLOW DISCHGE DISCHGE STAGE
(HR) (IN) (IN) (CFS) (AF) (AF) (AF) (CFS) (CFS) (FT)
.99 .99 .99 .9 .9 .9 .9 .9 .9 19.99
4.99 ,29 ,99 .9 .9 .9 ,9 .9 .9 19.89
8.89 .58 .99 .9 .9 ,9 .9 .9 .9 19.99
12.99 ,88 .99 .8 .9 .9 .9 .9 .9 19.99
16.99 1.17 .92 .9 .9 .9 .9 .9 .9 19.93
29.89 1.46 .97 .9 .9 .9 .9 .9 ,9 19.11
24.99 1.15 .15 .9 .8 .9 .9 .9 ,8 19.24
28.99 2.18 .31 .9 .1 .1 .9 .9 .9 18.48
32.89 2.69 .59 .9 .1 .1 .9 .9 .9 19.12
36.99 3.93 .13 ,9 .2 .2 ,9 .1 .1 19.87
49.89 3.46 .97 .9 .2 .2 .9 .2 .1 19.94
44.99 3.88 1.24 ,9 .3 .2 .1 .2 .2 19.98
48.99 4.31 1.53 .8 .4 .2 .2 .2 ~ 11.81
..
52.89 4.85 1.92 ,9 .5 .2 .3 .2 ,2 11.86
56.99 5.95 2.16 .9 .1 .3 .4 .3 .3 11.34
58.99 6.86 3.49 ,8 .9 .5 .4 .4 ,4 11.58
"
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES. INC.
3240 Corporate Way - Miramar. FL 33025
Order Number 161173
May 26, 1989
Page 11 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
- - - - - - RES E R V 0 I R - - - - -
RAIN ACCUM. BASIN ACCUM. ACCUM. INSTANT AVERAGE
TIME FALL RUNOFF DISCHGE INFLOW VOLUME OUTFLOW DISCHGE DISCHGE STAGE
(HR) (IN) (IN) (CFS) (AF) (AF) (AF) (CFS) (CFS) (FT)
59.99 1.54 4.96 .9 1.9 ,6 .4 .5 .5 11.13
59.59 8.14 4.57 ,9 1.1 .7 .4 .5 .5 11.88
59.75 9.94 6.15 .9 1.5 1.9 .5 .6 .6 12.18
69.99 12.18 8.20 .9 2.0 1.5 .5 .8 .1 12.66
69.59 13.96 9.91 .9 2.3 1.1 .6 .8 .8 13.92
61.09 13.51 9.44 .9 2.4 1.8 .6 .9 .9 13.99
62.99 14.12 19.91 .9 2.5 1.9 ,6 .9 .9 13.16
64.99 14.81 10.71 .0 2.7 1.9 .8 .9 .9 13.19
68.99 15.13 11.53 .9 2.9 1.8 1.1 .9 .9 13.12
12.90 16.31 12.98 ,9 3,0 1.1 1.3 .8 ,9 13.91
SUMMARY INFORMATION
MAXIMUM STAGE WAS 13.19 FEET AT 64.99 HOURS
MAXIMUM DISCHARGE WAS .9 CFS AT 64.99 HOURS
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 12 of 15 Pages
.
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
S C S
PRO G RAM
PROJECT NAME ".,: BOYNTON BEACH FIRE STATION
REVIEWER , . . . : ALFONSO C. TELLO
PROJECT AREA ,...: 3..99 ACRES
GROUND STORAGE ...: 4.31 INCHES
TERMINATION DISCHARGE : 19.99 CFS
DISTRIBUTION TYPE . . : SFWlID
RETURN FREQUENCY .., 1'J9.99 YEARS
RAINFALL DURATION. . : 3-DAY
24-HOUR RAINFALL .., 16.99 INCHES
REPORTING SEQUENCE .. STANDARDIZED
12.99
12.59
13.99
13.59
14.99
.79
1.12
1.64
2.21
3.99
DISCHARGE
(CFS)
.99
.99
.99
.99
..99
.99
.99
.99
.99
.99
STAGE
(FT)
19.99
19.59
19.19
11.99
11.59
STORAGE
(AF)
,99
.98
.12
.19
.39
14.59
14.92
3.84
4.68
.99
.99
...
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 13 of 15 Pages
WATER MANAGEMENT STUDY
BOYNTON BEACH FIRE STATION NO. 3
- - - - - - RES E R V 0 I R - - - - -
RAIN ACCUM. BAS IN ACCUM. ACCUll. INSTANT AVERAGE
TIME FALL RUNOFF DISCHGE INFLOW VOLUME OUTFLOW DISCHGE DISCHGE STAGE
(HR) (IN) (IN) (CFS) (AF) (AF) (AF) (CFS) (CFS) (FT)
.99 ,99 ,99 .9 .9 .9 .9 .~ .~ Hl...HJ
4.00 .39 .00 .9 .0 ,0 ,0 .0 .ft 10.09
8.09 .18 ..90 ..9 ..9 .9 ..9 ..9 ..9 10.00
12.90 1.11 ..9 2 .9 ..9 .0 .0 .9 .9 19.93
16.09 1.56 .19 ..9 .0 .9 .9 .9 .9 19.15
29.99 1.95 .22 ,9 .1 .1 .9 .0 ,9 19.34
24.90 2.34 .38 .9 .1 .1 .9 .9 .9 19.57
28.99 2.99 .66 .9 .2 .2 .9 .9 .0 10.89
32..9 9 3.47 .98 .0 .2 .2 ,.9 ..9 .9 11.14
36.99 4.04 1.35 .0 .3 .3 .0 .0 .0 11.36
ol9.99 4.61 1.14 .0 .4 .4 .9 .0 .0 11.56
44.90 5.18 2.16 .9 .5 .5 .9 .9 .0 11.13
48..99 5.14 2.59 ..9 .6 .6 ..9 .9 .9 11.91
52..99 6.46 3.17 .9 .s .8 ,~ .9 ,0 12.19
Sa.99 1.94 4.49 .9 1.1 1.1 ..9 .9 .9 12.46
58.99 9.15 5.45 ,9 1.4 1.4 .9 ,9 .9 12.71
"
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 14 of 15 Pages
WATER MANAGEMENT. STUDY
BOYNTON BEACH FIRE STATION NO. 3
- - - - - - RES E R V 0 I R - - - - -
RAIN ACCUM. BASIN ACCUM. ACCUM. INSTANT AVERAGE
TIME FALL RUNOFF DISCHGE INFLOW VOLUME OUTFLOW DISCHGE DISCHGE STAGE
(HR) (IN) (IN) (CFS) (A F) (AF) (AF) (CFS) (CFS) (FT)
59.99 19.95 6.25 .9 1.6 1..6 .9 .9 .0 12.99
59.59 10.85 6.98 .9 1.1 1.1 .0 .0 .0 13.04
59.15 13.25 9.19 .9 2.3 2.3 .0 .9 .0 13.39
69.99 16.24 12.91 .9 3.9 3.9 .9 .9 .9 13.16
69.59 11.41 13.13 .9 3.3 3.3 .9 .9 .9 14.12
61.99 18.92 13.71 .9 3.4 3.4 .9 .9 .9 14.23
62.99 18.83 14.49 .9 3.6 3.6 .9 .9 .9 14.36
64.99 19.82 15.45 .9 3.9 3.9 .9 .9 .9 14.59
68.99 29.98 16.56 .9 4.1 4.1 .9 .9 .9 14.65
12.99 21.14 17.31 .9 4.3 4.3 .9 .9 .9 14.74
SUMMARY INFORMATION
MAXIMUM STAGE WAS 14.14 FEET AT 72.99 HOURS
MAXIMUM DISCHARGE WAS .9 CFS AT .99 HOURS
- Prepared by -
SCHWEBKE-SHISKIN & ASSOCIATES, INC.
3240 Corporate Way - Miramar, FL 33025
Order Number 161173
May 26, 1989
Page 15 of 15 Pages
tl~.MQRANP..W.t'.l.
To: Jim Golden
Senior City Planner
04/J."7/U9
From: Vincent A. Finizio
Engineering Department
Subject: Technical Review Board Comments
Fire Station North Congress Ave.
1. In order to have a quantity of four (4) driveways intersecting
the south rights-of-way for Miner Road, a variance procedure must
be followed in order to obtain relief from Boynton Beach Parking
L.ot RE,~(.:;) u 1 at. ion s:; ~ Ay" t. :i. C 1 E'~ X!, '3 (::..:'c t:. :i. 01'''1 ;.:.~""':I. .Il ::;;: (h)!I ( f ) .
2. Revise the plans to indicate stalls eighteen (18) feet in
length. Modify plans to indicate a free back up space of twenty
seven (2'7) fE:'(=t.. S~?cti.on ~:,;'''''14:1. (j) pal'''kinq st.all!:;!. ~j-:l41 (n)
sty" i pi ng !:,t:.i::"ndal~ds; c:lnd S.'E~ct i 01"'1 ~.:j""'14:1. (n) !:::.t.Elnday"d i:.~ppE'ndi >, 'I B I'
parking stall and aisle dimensions.
3. Provide parking lot striping details, regulatory signs and
pavement markings in accordance with sections 5-141 (n)
standal~ds, 5-142 (c) tY"i:\f-fic:: C:OI"',tY"Cll, (k) hi.;\I"'lclic:ap 1'''f::,'quiY''f=rnf2nts~
(1) ~str'iping.
4 Provide construction sec:tion drawings and details for
s. Parkin!.;} lot constn.lct.icm ,,". !sec:ticm 5-",142 (g) ~ (n)
b. Handicap ramps and locations - sectiCln 5-142 (k)
c. Required raised continuous curb - section 5-142 (e), 142 (n)
5. Provid~~ i!~ p.:\Y"king lot li(;;)hting pli::\n
requirements of section 5-:1.42 (a) lighting~
standards inclusive.
consi ~5tf::mt
5.....141 (1'1)
with the
lighting
6. Provide a complete set of drainage system details. Including
the inlet st.ructures that. will be located in grassy swale areas
and provide elevations for the construct.ion of the depressed
grassy retention areas. Section 5-142 (f) drainage and sect.ion 5-
141 (n) drainage standards
7. The placement and t.ype of emergency tra-ffic signalization
ut.ilized along Mi.ner Road and within the rights-of-way of
Congress Avenue will be the responsibility of Acting Fire Chief~
Mr. Ed Allen and Project Manager, Mr. Bill De8eck.
Respectfully submitted,
,\. . ~A'~
~~~;i";-"-"-''''''O~''''''''''''''''''
"!':"'''-
---1-,1"/
. N:
__Un ____ _ ___ .. _H____
_. -
"--'--'--~-'-'--------' -------
MEMORANDUM
ro
Mr. Jarres Golden
DAT~
April 18, 1989
~IL~
rltOM
Lt. Dale S. Han1tack
su.nCT Fire Station
Per our discussion at the Technical Review Board, I am recorrmending the following.
1. Lighting details
2. Confonn with Security Ord. 88-25
3. Traffic Control details: Inc Stop Signs, pavement narking, one way signs,
D:> Not Enter signs and manually controlled emergency lights location.
~:tm
"j") ....,/"""I~TI rED
.t'''~l~/~l:A 'f. I .
APi 19 1989
i fLANI~i..J. OEPT.
"._ __ -=--=___L:'lX:__
__1.....___...____"_ _,__,__._._~__._..~,____
MEMORANDUM
ro
James Golden
Senior City Planner
DAn April 18, 1989
,.ILI
'''0101
Don Jaeger
Site Development
Building Department
SU.HCT SITE PLAN - FIRE DEPARTMENT
SUB-STATION AT NORTH CONGRESS
AVENUE & MINER ROAD
Upon preliminary review of the above referenced site plan, the
following items should be addressed by the design professional:
1. Handicapped accessibility to the buildings must be provided
and details indicated on the plans.
2. One (1) handicapped stall should be provided for the pistol
range parking lot.
3. A thirty-six (36) inch high hedge must be provided between the
right-of-way and all on-site vehicular use areas.
4. Details of proposed signage should be provided.
5. Indicate proposed building setbacks on the plans.
6. A Palm Beach County turn-out permit is required for all work
in the Miner Road right-of-way.
7. Palm Beach County Health Department approval is required.
8. A survey is required.
9. Details of the dumpster enclosure must be provided.
10. All plans submitted for public record by a design professional
registered in the state of Florida must be signed and sealed.
DJ:bh
XC: Med Kopczynski
~'::::::::_--::---=:"-__L.....:...'~J.,J,.J.L.:_,_;
'..~.;:,.'- ...
_._-._~,_._~.~-_...,._...._._--,
MEMORANDUM
18 April 1989
TO: Bill DeBeck
Project Manager
FROM: Tambri J. Heyden
Assistant City Planner
RE: Fire Station at southwest corner of Miner Road and
Congress Avenue - site plan staff comments
Please be advised of the Planning Department's comments regarding
the above-referenced preliminary site plan.
1. A parking lot with two-way traffic flow and 90 degree parking
on both sides of the access aisle must be a minimum of 63 feet
in width; 18 foot spaces in depth and 27 foot access aisle.
I
2. The m~n~mum width for two-way drives is 20 feet and 12 feet
for one-way drives.
3. The pistol range building does not meet the 25 foot building
setback required for front yards.
4. Indicate total building square footage on the site plan.
5. The code does not specifically address the parking space
requirements for this use. The requirement used for the fire
station at the City Hall complex is one parking space per
every employee on a peak shift, plus one space for every City
vehicle parked on the premises.
6. Provide details for all building and freestanding signs; size,
location, height, wording, color, materials, letter size and
style.
7. A lighting plan is required showing location, pole height and
detail, manufacturer's specification, energy source, wattage
and photocell activation.
8. Indicate dumpster location and screening detail; a 6 foot high
CBS wall on three sides on a concrete slab with a minimum 10
foot opening.
9. The parking lot regulations permit 2 driveways per frontage.
A variance to the parking lot regulations will be needed for
the 3 driveways. The application is processed through the
"
Planning Department and requires submitting 6 weeks prior to
a Planning and Zoning Board meeting; 3 weeks prior to a site
plan review deadline.
10. Will vehicles be hosed off on site?
~ ~
J~ ..6 ~/
TAMERI J. H~EN
TJH/csd
cc: central File
~..~___...._____,.___,--:~4_____':"....___
fJR-E STAT+o)J No. .3
/. PL.-V RE~. oR !toD~Fr !)L-.+)JS
:2. 5" v. R v (~'f NoT S fA- L-~ D
3. P (Aft? 5 T E R. )tee ~ S~ 1- 5 c f< r: eN + I/{z
~. JS [!t-).JDs(7rff5- B()ff~R AtJEQC{-*r~ ~ o.~,
~/" ~ :[~)J S [5- r fJ kC ks.' tJ:r s :r B + L-+ r / t-fff: +- c. r+ r
J
f. L~c;.[+,:r)Jk itft:: t-))fr*+L-S
17;eE- S/A.L
2-7 + IF =,~ /~~ a-f >,;t2I.-d--~ /~~ / dJ~A.
f'''?~/tL- LcAt. . ~~ / ~.,', T'd
t ( /1 t/ c/ .
---. /Jt}()'" WI/Y Or2\Ve 1-1 fN~ '~' Z 0 /
-'
-
---
-
-
Il 1/-' -
~~0\ ~ - c -' , " "/?1-~/L-'.
~~J- .- I
,
l~ /
'~ ~? -efld~' ~/1.
i.r //
}QI./.- ~ J! cJ J"',.f~
(, \.. -}r~ ,/.,.
v 7)
11
~ ---ll~~-,~ kl~. :~ChJ:" 1
~ ~) ~(
~//
~.~.~~~P
\
/ ~1:. /f)~-'~ ~~~L4...&~ i4.~4:Ji-L ~ cL ~
~/C r&~~. ./?~ ~'-. eA-HJC;J_ .
c~:~ /U.kA--JL'~_. ~~..~....ft~J 0"1-1../ ~ ~~
d</Pt~A~ ~
~ .' .
...' ~ --.
.';)
,~.
~!-~:r
/~
2ft? ~~. +~A~~~:"
Cf(~ "." J: ',uJL 4~ J) VV~/ _ j
..-.... ~ _=:~ , 6~'~~~
.-.----------------Il:.~
- /},~.(, . I
./ I; ~"-. l"'<"'~ - ti,.t...../ '
-
--- . ."'..-------
~ii#~~
~1--f:i/wu:~ -fa k ~ ..
, . ~ 101/ - 1)
$ (/.j\'vt,V.(,({)~'If./ f( IlV-.-,-vL X C~ .