Loading...
REVIEW COMMENTS PUBLIC WORKS DEPARTMENT MEMORANDUM *94-049 TO: Tambri Heyden, Acting Planning & zoning Director FROM: Robert Eichorst, Public Works Director SUBJ: Major Site Plan Modification - Harvey's Restaurant DATE: February 14, 1994 The Public Works Department has no problems with the above site. obert Eichorst ublic Works Director REier Fei) I 6 /994 'NING ". liNG D~ ... . .---.;.,... " & ill 7. A. 2 Major Site Plan Modification Harvey's Restaurant PLANNING AND ZONING DEPARTMENT MEMORANDUM #200 SITE PLAN REVIEW STAFF REPORT FOR PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION July 6, 1994 DESCRIPTION OF PROJECT: Project Name: Harvey's Restaurant Applicant: Tony Harvey Agent: Tony Harvey Location: 119 Martin Luther King Boulevard File No.: MSPM #94-001 Land Use Plan Designation: Local Retail Commercial Zoning Designation: C-2, Neighborhood Commercial Type of Use: Restaurant Number of Units: NIA Square Footage: Site: Building: 14,000 2,100 (incl. 1,120 sq.ft. addition) surrounding Land Uses and Zoning District: North - Existing Residential Housing, zoned R-2, single and Two Family Residential South - Martin Luther King Boulevard and further south existing commercial buildings, zoned C-2, Neighborhood Commercial East - Vacant land, zoned C-2, Neighborhood commercial West - Residence, zoned C-2, Neighborhood Commercial Existing Site Characteristics: existing restaurant building. Minimally, improved lot with Proposed Development: Addition of 1,120 existing, unoccupied restaurant building landscaping and a parking facility. square feet to and installation an of Concurrency: Concurrency certification is required as part of site plan approval of the project. Commercial projects require certification for traffic and drainage levels of service. a. Traffic: Palm Beach County Traffic Division has stated the project meets the traffic performance standards of Palm Beach County. b. Drainage: Boynton Beach City Engineer provided no adverse concurrency comments. Driveways: Two driveways into the site are provided one exclusively for deliveries (loading zone) and the other two-way driveway allows access to the parking facility. I site Plan Review Harvey's Restaurant Memo #94-200 Page 2 of 2 Parking Facility: The proposed parking facility will accommodate 21 cars (including one handicapped space). A total of 21 parking spaces are required for the 2,100 square feet restaurant building. Following compliance with staff comments the parking facility will comply with the required improvements of the code with the exception of a variance which was approved by the Planning and Development Board on November 9, 1993 and by the city Commission on November 16, 1993 that allowed the back-up space for the parking spaces located east of the building to be reduced to 23.91 feet. The parking facility is designed to comply with the required improvements of the parking lot code. Landscaping: The proposed landscaping will meet code once staff comments have been incorporated into permit plans. Building and Site Regulations: The front setback for the existing building is only 11 feet instead of the required 30 feet. No expansion of this existing non conformity is proposed. The rest of the building and site meets the requirements of the code. Community Design Plan: This site is not located in a community design district and therefore compliance is not required. Signage: Signage was not included as part of the request however, all signage shall comply with the requirements of the Sign Code. REVIEW OF DEPARTMENTAL COMMENTS: Below is a list of those departments that have comments regarding this request. DEPARTMENT ATTACHED MEMORANDUM Public Works utilities Fire Police Engineering Building Parks & Recreation Forester/Environmentalist Planning and Zoning No Comments #94-176 No Comments No Comments Memorandum June 3, 1994 No Comments No Comments No Comments Memorandum July 8, 1994 utility Department, Planning and Zoning Department and Engineering Departments I comments may be addressed on permit application drawings. The remaining departments did not have comments regarding their review of the amended plans. RECOMMENDATION: The Planning and Zoning Department recommends approval of this site plan request, subject to the permit plans for the project being amended to show compliance with staff comments and the applicable City of Boynton Beach Code of Ordinance. a:STAFFREP.har 7- .;' ~ ~ I IjI: · .1' I ~ ~ . I" ~ I~ ,I . . I I j . . ... I 11I11 ' . III ' ' !il . II! iH f I " .. t'1'" !.:t (" I" r- Ii l.\' s .oCli" ~ -- -t I ! ~ i r; ~i'\)~ :. I J I t I" , ..... f!\\ ~ . 2 . . ,.., I I "i I il;II'. $~i I ' J. \ ,jl fa .Ii u. I al!~@@"m ~ Ii II' : II' I,' ~ I 51 I I . I, I', 'p n P.. . . '. ~ 'j, 1'1 !I f ' u ; q jI m Ii H g I !! I I II H ! Ii , 1.'11 C I Ill.' Pi' }I i d 1-, fI' ~* III I I "J' i!iql !,n id. J H; !! P! III! I' 'Iii I, J .= ,I: I!. I~ i I; l. ;i IIf II. I . I II " 'i 'I ,. j I I!I.I' I.' i I .. . . , 'P.'I,lIf':I"111I tt.li'lii.i.'lo i tHllle IIJI I" II. II~ ~:: I 'nllll; 11'1 1IIIi 'H 't.l.h ll~iiii i J.ii , t I i1 it i I 'I! ! I.f,! f J n It ~! t I I JT ;, ," J I'll ji. If f If!: i P ! i : Ii!' P",., , I J) ; ,! J !.' , ~. ~. I s .. I~. Ii I~ I - PROJECT: ... .AMING LOT PCIIt I ...avn.. IlEITAUIUMf "t ....T... U/THER KING aLVQ. ~YNTQN' ~ FLORIO#. CATOR ENGINEERING SERVICES, INC. .. $Tn PLAfoI, DfWlNAGE PLAN & NOTa 200 lOO1TJl JIll.. BOYNTON SUCH. rL :I343e 40'7 7:1&-7047 I . 3 ..-. NJ ............., " .. :N Q....:..'...... i' '. TO: Vincent Fininzio, Deputy City Engineer, Boynton Beach FROM: Ronald W. Last, P.E. DATE: June 3, 1994 RE: SITE PLAN REVIEW COMMENTS (2ND REVIEW) L.N. & A. Project No. 94-174 PROJECT: HARVEY'S RESTAURANT DEVELOPER'S ENGINEER: GATOR ENGINEERING SERVICES D_ SITE PLAN COMMENTS: /}~~\"4 1. ,II The back-up space for parking along east side of building is 23.91 feet. City V(p\ \< ....tJi Code is 27 feet. # o~ 2. Type S-1 Asphalt needs to be 1 *" thick per FOOT Specifications showG Type S-mon detail. 3. Concrete curb needs to be 18" high. 4. Section 02500 - Paving Specification Item 2 should refer to City of Boynton Beach rather than City of Delray Beach. 5. Recommend shielding of lights to prevent "spillage" to adjacent parcels. ZAP\MEMOS\FININZIO .603 .. b .I BUILDING DEPARTMENT MEMORANDUM NO. 94-128 June 3, 1994 To: Tambri Heyden, Acting Planning irector Re: Al Newbold, Deputy Building 0 TRC cOMMENTS - Site Plan - Second Review Harvey's Restaurant 119 Martin Luther King Boulevard Via: Don Jaeger, Building Official From: We have reviewed the plans for the above project and had discussions with the draftsman and Mr. Harvey. We feel our initial comments have been met and support this project going forward. Subsequent to city Commission approval, permit documents must be submitted to the Building Department signed and sealed by a registered architect or engineer. By State Statutes, designers cannot sign and seal commercial construction documents. Also, the handicap ramps must not conflict with the ingress and egress to the parking lot. d17b1~/~ Al Newbold AN:mh Att: A : HARVEY . TRC Boynton Beach Police Department Traffic Unit Memorandum To: Tambri J. Heyden IJate: 02 June 94 FroIn: Sgt. James Cummings Re: Harvey I s Restaurant Site plan review In reviewing these plans I find them to be satisfactory and have no corrections or changes. ~ JUN - '2 10QA rn PlANNING IIND NING DEPT. TO: FROM: DATE: RE: \ )> FIRE DEPARTMENT MEMORANDUM NO. 94-239 WDC PLANNING DEPARTMENT FIRE DEPARTMENT JUNE 2, 1994 Site Plan Review (2nd) Harvey's Restaurant 119 Martin Luther King Jr Blvd We have no objections to this plan. Wilf&' avrf:~~~ Boynton Beach Fire Dept. l-1El-I0RANDUM Utilities #94-176 TO: Tambri J. Heyden, Planning & Zoning FROM: John A. Guidry, Director of Utilities DATE: June 1, 1994 SUBJECT: Harvey's Restaurant, Second Review Staff has reviewed the above referenced project and offer the following comments: 1. Items 1 and 2 of Utility Memo No. 94-049 are still outstanding. 2. These plans will be reviewed again for compliance with City Codes and Ordinances, at time of Building Permit Application. It is our recommendation that the plan proceed through the review process. If you have any questions regarding this subject, please contact Skip Milor at 375-6407 or Peter Mazzella at 375-6404. /b]{s Attachment xc: clyde Peter File "Skip" Hilor Mazzella V ill ID PUBLIC WORKS DEPARTMENT MEMORANDUM #94-152 TO: Tambr i J. Heyden, Planning & Zoning Director /' FROM: Robert Eichorst, Public Works Director SUBJ: Site Plan Review - 2nd Review - Harvey's Restaurant DATE: May 31, 1994 The Public Works Department has no problems with the above site. The plans can be forwarded to the Planning & Development Board/Community Redevelopment Advisory Board for review. Eichorst Works Director REier BUILDING DEPARTMENT MEMORANDUM NO. 94-128 June 3, 1994 To: Tambri Heyden, Acting Planning irector Via: Don Jaeger, Building Official From: Al Newbold, Deputy Building 0 Re: TRC COMMENTS - Site Plan - Second Review Harvey's Restaurant 119 Martin Luther King Boulevard We have reviewed the plans for the above project and had discussions with the draftsman and Mr. Harvey. We feel our initial comments have been met and support this project going forward. Subsequent to City Commission approval, permit documents must be submitted to the Building Department signed and sealed by a registered architect or engineer. By State Statutes, designers cannot sign and seal commercial construction documents. Also, the handicap ramps must not conflict with the ingress and egress to the parking lot. d1 ~/yJJ Al Newbold AN:mh Att: A:HARVEY.TRC .- .:......,... ~ ~:. .:~ ........ ~v TO: Vincent Fininzio, Deputy City Engineer, Boynton Beach FROM: Ronald W. Last, P.E. DATE: June 3, 1994 RE: SITE PLAN REVIEW COMMENTS (2ND REVIEW) L.N. & A. Project No. 94-174 PROJECT: HARVEY'S RESTAURANT DEVELOPER'S ENGINEER: GATOR ENGINEERING SERVICES D_ SITE PLAN COMMENTS: ~if\~ 1. ,liThe back-up space for parking along east side of building is 23.91 feet. City (,\ \~_...t>> Code is 27 feet. o~ 2. Type S-1 Asphalt needs to be 1 % " thick per FOOT Specifications showt Type S-mon detail. 3. Concrete curb needs to be 18" high. 4. Section 02500 - Paving Specification Item 2 should refer to City of Boynton Beach rather than City of Delray Beach. 5. Recommend shielding of lights to prevent "spillage" to adjacent parcels. ZRP\MEMOS\FIN INZIO .603 ta E N Q TO: Vincent Fininzio, Deputy City Engineer, Boynton Beach FROM: Ronald W. Last, P.E. DATE: June 3, 1994 RE: SITE PLAN REVIEW COMMENTS (2ND REVIEW) L.N. & A. Project No. 94-174 PROJECT: HARVEY'S RESTAURANT DEVELOPER'S ENGINEER: GATOR ENGINEERING SERVICES SITE PLAN COMMENTS: 1. The back-up space for parking along east side of building is 23.91 feet. City Code is 27 feet. o~ 2. Type S-1 Asphalt needs to be 1 %" thick per FOOT Specifications showl Type S-Mon detail. 3. Concrete curb needs to be 18" high. 4. Section 02500 - Paving Specification Item 2 should refer to City of Boynton Beach rather than City of Delray Beach. 5. Recommend shielding of lights to prevent "spillage" to adjacent parcels. ZRP\MEMOS\FININZIO .603 TO: FROM: DATE: RE: FIRE DEPARTMENT MEMORANDUM NO. 94-239 WDC PLANNING DEPARTMENT FIRE DEPARTMENT JUNE 2, 1994 Site Plan Review (2nd) Harvey's Restaurant 119 Martin Luther King Jr Blvd We have no objections to this plan. 4b-Il(kQh' FPQ Boynton Beach Fire Dept. MEMORANDUM Utilities #94-176 TO: Tambri J. Heyden, planning & Zoning FROM: John A. Guidry, \\ Director of Utilities \j June 1, 1994 DATE: SUBJECT: Harvey's Restaurant, Second Review Staff has reviewed the above referenced project and offer the following comments: 1. Items 1 and 2 of Utility Memo No. 94-049 are still outstanding. 2. These plans will be reviewed again for compliance with City Codes and Ordinances, at time of Building Permit Application. It is our recommendation that the plan proceed through the review process. If you have any questions regarding this subject, please contact Skip Milor at 375-6407 or Peter Mazzella at 375-6404. Ibks Attachment xc: Clyde Peter File "Skip" Milor Mazzella V ill 0-,,1 - I 191 G Boynton Beach Police Department Traffic Unit Memorandum To: Tambri J. Heyden Date: 02 June 94 Fro~: Sgt. James Cummings Re: Harvey I s Restaurant Site plan review In reviewing these plans I find them to be satisfactory and have no corrections or changes. m ~ - 2 ,qqA m MEMORANDUM TO: 1A~I5~1 /-16tDf;J I ft..-;4,IV,vcwG t-L(J'V/~/fJC 4)(jR.t-....\~ Sol-lv--J Wi&-b~,c,<', fttR{rJ s<-r.F1 (pI, Jri ' ( FROM: DATE: RE: Site Plan Review - New Site Plan - Amended Plans Project: 1{4~V\S11 J l~i5t/4-({/f.Nrf After reviewing the referenced project Department recommends the Planning and consideration. amendecl.~ plans. for ')the : above the #<//(./;" LA: t-i-w f I'I~~ i1E~( that the project be forwarded to Development Board for their This department will not be required to sign-off the permit documents associated with the subject project. . i. ., I C:AHEND1.ALD \ PUBLIC WORKS DEPARTMENT MEMORANDUM *94-152 TO: Tambri J. Heyden, Planning & Zoning Director'/ FROM: Robert Eichorst, Public Works Director SUBJ: Site Plan Review - 2nd Review - Harvey's Restaurant DATE: May 31, 1994 The Public Works Department has no problems with the above site. The plans can be forwarded to the Planning & Development Board/Community Redevelopment Advisory Board for review. Eichorst Works Director REier MEMORANDUM TO: 1ftfl1fJR/ I-If--fbep.)( fLAY\1/Vl'l1J(, +- Zorv;~G -S;Ot-/N Wfl..-~~i-;e fMt:s SL-(;PI' , I b ( /? f; v t 0.< FROM: DATE: '5 - 31-9,/ RE: Site Plan Review - New Site Plan - Amended Plans Project: !-I A~ v f-"(' '5 ~ .est/-l '-l,e /I..,.) f' After reviewing the referenced project Department recommends the Planning and consideration. amended plans for the above the ~ f-,<.. of? f::A-tt' 0.,.J (- fJ AI2tr. 'P If. rsr ' that the project be forwarded to Development Board for their This department will not be required to sign-off the permit documents associated with the subject project. .., /. 'J. ,I C:AMEND1.ALD RECREATION & PARK MEMORANDUM 194-202 FROM: Tambri Heyden, Planning & Zoning Director Kevin J. Hallahan, Forester/Environmentalist t<~~ TO: RE: Harvey's Restaurant - Major Site Plan Modification DATE: May 27, 1994 There are no existing tree concerns on the property, however, the applicant may want to review the existing tree planters (in the public R.O.W.) for additional beautification. The project should continue through the review process. KH:ad ill mn\VJm ill /~ l ~-j) Vi f / 1/ /1 I" MEMORANDUM DATE: Heyden 1 nd :Fzon~;J,;irector ..1.chae E. Haag Site and zoningc elopment Administrator February 28, 199 , '/;f;..,j /~~~.(, . ,7 j \. --'/' RE: Site Plan Review - 1st Review Major Site Plan Modification Project: Harvey's Restaurant Location: 119 Martin Luther King Applicant: Tony Harvey File No. : 809 .' .."'J --"-' ") , -_. ':"'J . ./.,/ <;; / -..)....J .. !' ,.-".....--- Boulevard /~-'1 "V ?l _. !.. I i/l. r../ ". ,~.,. , _.1<' . J?0,.:.,U..( "vt /)t;,tf"~?, V"'^' ..-;,...tl.. The following is a list of 1st review comments regarding the Site'{,& . Plan Review of the plans for the above-referenced project. It .;>q;'1tA~4.,d should be noted that the comments are divided into two (2) ~~'- categories; the first category is a list of comments that identify deficien:ies that are required to be corrected and shown ""f\,J[O in compliance on the plans submitted for second (2nd) review in order for the project to continue through the site plan review process. The second set of comment(s) are recommendations that the Planning and Zoning Department staff believe will enhance the proposed development. The applicant shall understand that all documents/plans submitted for site plan andlor permit review are subject to additional comments. I recommend that the applicant/ agent contact me regarding questions related to the comments. If the applicant is not intending to correct code deficiencies they should contact me regarding the procedures, application forms, fees and submittal deadline dates for seeking relief from the code requirement. .~ <0 '~~ ( /f.' . t, ':. "; I. SITE PLAN REVIEW COMMENTS: 1. Place a note on the plan that refers to the parking lot variance that was approved for the back-up space on the east side of the building. Include the following approval dates: Planning and Development Board on November 9, 1993 and the City Commission on November 16, 1993. 2. Label the existing driveway on the west side of the building as the loading zore. Show and identify the following dimensions for the loading zone: width 12 feet by 35 feet long with a clear height of 14 feet. [Appendix A-Zoning Section 11 J.] 3. Show on the site plan drawing the location and width of the roof overhang. Show on the site plan drawing, the location of the building in compliance with the required zoning district setback dimensions. Setbacks shall be measured from the edge of the overhang to the property line. Add to the site plan the setback dimension from the south property line to the building. [Appendix A-Zoning Section 4 J.3.] 4. With a distinguishable symbol, identify on the elevation view drawings the dividing line between the eXisting construction and the proposed new construction. Also, specify whether the roof overhang on the existing building is existing or proposed for construction. The minimum front setback for the subject zoning district (C-2) is thirty (30) feet. Since the building is not conforming to the present setback dimensions, the applicant may not add to the south side of the building. Specify on the plan, the zoning district of the properties that are located to the north, east and west of the subject property. [Appendix A- Zoning Section 11.1 E.] Harvey's Restaurant - 1st Site Plan Review Page 2 5. Identify on the elevation view drawing, the overall height of the building. [Appendix A-Zoning Section 6 B.3.] 6. Add to the drawings, a detailed section view drawing of the dumpster walls and buffer wall. The walls shall be shown with a stucco finish on both sides. I recommend that the color of the dumpster walls match the color of the walls of the building. Note: Change the name of the wall along the north property line from privacy wall to buffer wall. Show on the plans, a ten (10) foot clear opening width for the dumpster enclosure. The clear opening width shall not be violated by the gate and post material. [Appendix A-Zoning Section 4 1.] 7. To keep the project on track for City review, submit, as soon as possible, for review, a traffic impact statement. The traffic statement shall identify the daily trips for the subject expanded use. The study will be sent to Palm Beach County for their review for conformance with the County Traffic Performance Standard. [City Ordinance Chapter 19 Article VI Section 19-81] 8. Add the following note to the landscape notes: Landscape material will be installed in a sound workmanlike manner and according to accepted good planting procedures. [Landscape Code Section 7.5-35 (a)] 9. Considering that the west driveway will remain, show and identify the required hedge material along the west property line of the site where the vehicle use area is visible from the actual west property line. The hedge material shall follow the perimeter of the building that is encroaching the west property line. [Landscape Code Section 7.5-35 (e)] 10. Show and identify on the plan, the required hedge material along the south property line where the vehicle use area is visible from N.E. lOth Avenue. More specifically, south of the handicapped sidewalk and south of the parking spaces located northwest of the proposed addition. Identify the width of the landscape strip south of the handicapped walkway. [Minimum width is five (5) feet.] [Landscape Code Section 7.5-35 (d)] 11. Show and identify on the plan, where the coco plum hedge material is located and where the buttonwood hedge is located. Also specify the variety of buttonwood (silver or green). [Landscape Code Section 7.5-36] 12. Show and identify on the plan the line-of-sight triangles on both sides of each ingresslegress to the site. Include a note specifying that within the triangular area an unobstructed space between thirty (30) inches and six (6) feet above the vehicle use area shall be maintained clear. Remove all hedge plant material that is located within three (3) feet of each side of all ingress egresses and dimension said three (3) feet. [Landscape Code Section 7.5-35 (h)] 13. Show and identify on the floor plan, the location of the fifty (50) seats. Also add to the floor plan, the parking ratios that are identified on the site plan. Add to the site plan drawing, the square footage of the existing bUilding and the proposed addition. On the floor plan drawing, identify the total square footage of the building. [Appendix A-Zoning Section 11 H.16.d.(1.)] 14. The handicapped walkway shown on the east elevation view drawing is not shown on the site plan. As it appears, the walkway will interfere with the parking spaces located on the east side of the building. Correct the plans accordingly. Harvey's Restaurant - 1st Site Plan Review Page 3 15. Add to the elevation view drawing, the south elevation of the building. On the elevation view drawings, identify the color, manufacturer's name and color number for the following exterior portions of the building: fiberglass roof shingles, cornice fascia, river rock wall veneer, stuccoed block walls, window frames, door face, door frames, and hand railing. [City Ordinance Chapter 7.5 Article V Appendix 11 (d)] II. RECOMMENDATION(S): 1. For the property owners liability, place an easement of the subject property where there is a building encroachment from the property owner to the west. 2. Add to the plan, a medium or small classified tree or palm and ground cover landscape material to the interior parking space island at the rear of the building. 3. Show on the elevation view drawings and site plan, where needed, the location of all site, wall and roof mounted mechanical equipment. Add to the site plan, floor plan and elevation view drawings, screening for same, including screening for the can wash area. I, further, recommend that the screening material blend with the design and color of the building. 4. Add to the drawing, the location, size, letter style and color of the proposed site and building signage. Also include the color and size of the associated sign framework and supports. ShoWing the signage at this time may eliminate possible delay for Board approval for the subject signage in the future. MEHljm A:HARVEY-l.JM PUBLIC WORKS DEPARTMENT MEMORANDUM *94-049 TO: Tambri Heyden, Acting Planning & Zoning Director FROM: Robert Eichorst, Public Works Director SUBJ: Major Site Plan Modification - Harvey's Restaurant DATE: February 14, 1994 The Public Works Department has no problems with the above site. Eichorst Works Director REier m u W & F' I h I:,tlll 'NING ", .,liNG Dc ---....;.".. ill ENGINE~RING DEPARTMENT MEMORANDUM NO. 94-053 TO: Tambri J. Heyden Acting Planning & Zoning Director J~mes D..White, P.E~/1~tJ Clty Englneer tl" U' February II, 1994 FROM: DATE: RE: Technical Review Committee Comments Harvey's Restaurant Planning Department File No. 809 The Engineering Department for the City of Boynton Beach, Florida has reviewed the above referenced plan and herein offer the following comments: 1. Provide geotechnical test data in the form of soil profiles and percolation test data as well as percolation test location plan. 2. The applicant is herein advised, that in all liklihood, the site lighting will be insufficient, reference compliance with minimum standards for illumination levels as set forth in City Code of Ordinances, Chapter 5, Article X, Section 5-142(a)(b), "Parking Lot and Pedestrian Walkway Required Lighting". Prior to issuance of building permit, the plan shall be revised to provide for a sufficient number of light poles as well as submission of a photometric plan necessary for review of this site. JDW:VAF/ck C:HARVEY'S.TRC xc: J. Scott Miller, City Manager roo uu Fl:'~ BUILDING DEPARTMENT MEMORANDUM NO. 94-035 February 14, 1994 From: Tambri Heyden, Acting Planning Director Don Jaeger, Building OffiCia~ Al Newbold, Deputy Building Official To: Via: Re: TRC COMMENTS - Major Site Plan Modification Harvey's Restaurant 119 Martin Luther King Boulevard After review of the plans for the above project, the Building Department has the following comments: The attached elevation and floor plan should match the site plan for handicap locations. To avoid any conflict in parking, the door at the east elevation should be relocated at the northeast corner of the building. Consideration should be given to a handicap ramp at the west door in lieu of the three steps. It would then become a required exit. If we are reviewing this project as a restaurant, the floor plans should not read, "Club Area" and "Recreation Area". AN: mh *~ A'1 ol I I 00 moomowm rn FEB I 4 /994 QA!Vt c.. PLANNING AND ZONING DEPT. A:HARVEY.TRC FIRE DEPARTMENT MEMORANDUM NO. 94-205 WDC TO: Planning Department FROM: Fire Department DATE: February 15, 1994 RE: Major site Plan Harveys Restaurant 119 Martin Luther King Blvd. File #809 We have no objections to this proposal. " ~~'/~ William D. Cavanaugh, FPO Boynton Beach Fire Department oom m 0 \VI ~ FEB I ~ 199n CAV\C, PLANNING AND ZONIN DEPT. rn MEMORANDUM Utilities #94-049 FROM: John A. Guidry, Director of Utilities TO: Tambri J. Heyden. Acting Planning & DATE: February 22, 1994 SUBJECT: Harvey's Restaurant First Review Staff has reviewed the above referenced project and offer the following comments: 1. City water will not be supplied for irrigation, (City Compo Plan. Policy 3C.3.4). 2. Sanitary sewer clean-out at property line. if in new entrance or pavement. to be raised to grade and mini manhole installed by owner (per Utility Department Specifications). 3. Backflow preventors are required. (Sec. 26.107). It 1s our recommendation that the plan proceed through the review process. If you have any questions regarding this subject, please contact Skip Milor at 375-6407 or Peter Mazzella at 375-6404. 19b xc: Clyde "Skip" Milor Peter Mazzella File ill lli @ m m ')()~ HJ3 I. ,'.." PLANNING AND ZONING DEPT. M E M 0 R A N DUM POLICE NO. 94-025 TO: Michael Haag FROM: Sgt. M. Kirrman DATE: February 11, 1994 REF: Harvey's Restaurant, 1st Review Mr. Haag, I have reviewed the plans and have the following comments: 1. Parking lot lighting be pole mounted and facing in towards the building. I further recommend the plans proceed through the approval process. !#U. lU. ~~ Sgt. M. Kirrman ' MK/jb m FEB ~1D'U~1 ~oo MEMORANDUM TO: Tambri Heyden, Acting Pla~ning & Zoning Direc~or John Wildner, Parks Superintendent ~_~ /}-<j-9i ~ V'-' FROM: DATE: RE: Site Plan Review - Major Site Plan Modification - 1st Review Project: /I A~ V c:. '-j 's ~~sfFf tA /fA. vtlr / The Recreation and Parks Department has reviewed the above referenced proj ect. There are no outstanding recreation related issues on this project. m C:PARKS.MSP RECREATION & PARK MEMORANDUM 194-050 TO: Tambri Heyden, Acting Planning & Zoning Director Kevin J. Hallahan, Forester/Environmentalist t(~}f Harvey's Restaurant - Major Site Plan Modification FROM: RE: DATE: February 9, 1994 There are no existing tree concerns on the property, however, the applicant may want to review the existing tree planters (in the public R.O.W.) for additional beautification. The project should continue through the review process. KH:ad ,~; q I'J\!I \. j ......' ~k fEB ,I RECREATION & PARK MEMORANDUM #94-099 TO: Tambri Heyden, Acting Planning & Zoning Director FROM: Kevin J. Hallahan, ForesterlEnvironmentalist ~~~ Harvey's Restaurant (Site Plan) RE: DATE: March 10, 1994 original memo on file. Should proceed under normal review process. KH:ad ~IU~~~ ~ MAR \ \ I9~L)\ plANNING AND tONING OEM. RECREATION & PARK MEMORANDUM 194-202 TO: Tambri Heyden, Planning & Zoning Director t<~ 1+-- FROM: Kevin J. Hallahan, Forester/Environmentalist RE: Harvey's Restaurant - Major Site Plan Modification DATE: May 27, 1994 There are no existing tree concerns on the property, however, the applicant may want to review the existing tree planters (in the public R.O.W.) for additional beautification. The project should continue through the review process. KH:ad ill ill MEMORANDUM DATE: (p /1 / 'i Y !,--,4,N,v:toV& ~ 2c.v,'lI/c 0l:-<?~:t~-<:.. I f "I'" /<. S '1f1 ~ TO: 1 A J.'Iol e I' ( j-f 6- t D f.-v SDI-I.,-' 0\J (I/b/Vr~ . , FROM: RE: Site Plan Review - New Site Plan - Amended Plans Project: I-(I.fKV\~~/ J l?i5f/i'u\'/ft..J~ / After reviewing the referenced project Department recommends the Planning and consideration. amendeq, plans for. the above the ;f.cl.-d ed. h'6A..J f I~V\7K iu,ar- that the project be forwarded to Development Board for their This department will not be required to sign-off the permit documents associated with the subject project. . "I ./. l I 8.ANNN'NG ANO IN<: OEpt C:AMEND1.ALD