Loading...
AGENDA DOCUMENTS ~~ N-h. C I T Y 0 F BOY N TON B E A C H PLANNING & ZONING BOARD MEETING SPECIAL MEETING AGE N D A DATE: Monday, September 16, 1991 TIME: 7:00 P.M. PLACE: Conference Room "c" West Wing City Hall Complex 100 E. Boynton Beach Blvd. Boynton Beach, Fl. 1. Pledge of Allegiance. 2. Introduction of Mayor, Commissioners and Board Members. 3. Agenda Approval. 4. Approval of Minutes. 5. Communications and Announcements. 6. Old Business. A. None 7. New Business. A. SITE PLANS SITE PLAN MODIFICATION 1. PROJECT NAME: Ezell Hester, Jr. Park (f.k.a. North District Park) AGENT: Oscar Vagi & Associates Project Engineers OWNER: City of Boynton Beach LOCATION: 1901 N. Seacrest Boulevard; North Seacrest Boulevard at Boynton Parkway (N.W. 17th Avenue), northwest corner. DESCRIPTION: Request for approval of an amended site plan to construct phase II of the park to include a basketball court and a 1,200 square foot addition to the multi-purpose building to house restrooms and community policing officers. 8. Comments by members. 9. Adjournment. NOTICE Any person who decides to appeal any decision of the Planning and Zoning Board with respect to any matter considered at this meeting will need a record of the proceedings and for such purpose may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. (F.S. 286.0105). A:P&ZAGDA.JM (iPrz./.~cA~..;T- -f .L--& PLANNING DEPT. MEMORANDUM NO. 91-234 FROM: J.~cott ~ill~r City M~pa~r _Ji-d~Q - -'.'-l"tIJ.- A.f~/).~ Cnristophep c~,~p~ann1ng Direct'r ~ TO: DATE: September 17, 1991 SUBJECT: Special Planning and Zoning Board Meeting September 16, 1991 Please be advised that the Planning and Zoning Board met on Monday, September 16, 1991 and took the following action: 1. Unanimously recommended approval of the request for approval of an amended site plan to construct phase II (a basketball court and 1,200 square foot building addition) of the Ezell Hester Jr. Park (f.k.a. North District Park), subject to proviso. Motion was made by Mr. Lehnertz and seconded by Mr. Collins. (PM91-235) CC/jm A:PM91-234.JM PLANNING DEPT. MEMORANDUM NO. 91-235 (AGENDA MEMORANDUM) FROM: J., Scott Miller, City Manager -L~'/]..~-Iv~',~, :1),--.,,1.- y~ Christopl1er-gut.ro-,) Plannrng"I)irector TO: DATE: September 17, 1991 SUBJECT: Ezell Hester Jr. Park Site Plan Modification (phase II) Please place the above-referenced item on the City Commission agenda for Thursday, September 19, 1991, under Development Plans, Consent Agenda. DESCRIPTION: Request for approval of an amended site plan to construct phase II of the park to include a basketball court and a 1,200 square foot addition to the multipurpose building to house restrooms and community policing officers. The project is located at 1901 North Seacrest Boulevard. RECOMMENDATION: The Planning and Zoning Board unanimously recommended approval of this request subject to staff comments, copies of which are attached. To address the safety concerns raised by the Police Department in their memorandum (~91-088), the Board recommended the addition of a window on the south elevation of the satellite City Hall and replacement of the bathroom floor-to-ceiling partitions with typical stall walls. CC/jm A:PM91-235.JM , \ 7A1 Ezell Hester Jr. Park (fka North District Park) SITE PLAN MODIFICATION Oscar Vagi & Associates, agent for the City, is requesting approval of an amended site plan to construct phase II of the park to include a basketball court and a 1,200 square foot addition to the multi-purpose building to house restrooms and community policing officers. The Technical Review Board unanimously recommends approval of this request subject to the attached staff comments. BUILDING DEPARTMENT: FIRE DEPARTMENT: ENGINEERING DEPARTMENT: UTILITIES DEPARTMENT: POLICE DEPARTMENT: PUBLIC WORKS DEPARTMENT: PLANNING DEPARTMENT: FORESTER/HORTICULTURIST: COMMUNITY IMPROVEMENT: STAFF COMMENTS EZELL HESTER JR. PARK SITE PLAN MODIFICATION See attached memorandum No comments No comments No comments See attached memorandum No comments See attached memorandum No comments No comments BUILDING DEPARTMENT MEMORANDUM NO. 91-342 September 10, 1991 TO: Christopher cutro, Planning Director THRU: Don Jaeger, Building official ~pv-l2n FROM: Michael E. Haag, Zoning & Site Development Administrator RE: TRB Comments - September 12, 1991 Meeting SITE PLAN MODIFICATION - EZELL HES~R PARK (SATELLITE CITY HALL AND RESTROOMS) Upon review of the above mentioned project, the following list of comments must be addressed in order to conform with Boynton Beach city Codes: 1. All drawings and/or documents submitted for public record and prepared by a design professional, shall show original legible raised seal and signature of a Florida registered design professional responsible for the drawings. 2. Provide an overall site plan showing all the required and provided parking spaces for the entire site including the proposed new addition. Show on the site plan the parking space ratios that were allowed when the original site plan was approved. Include the parking space ratios for the new addition. I recommend providing one (1) parking space per three hundred (300) square feet of gross floor area. This ratio is consistent with office use as specified within Appendix A-Zoning. If the square footage or the required parking spaces for the proposed addition was included with the figures allowed with the original site plan approval, delineate on the site plan the location of the items and square footage listed on the approved parking calculations sheet and verify that the required number of parking spaces are provided at the site. 3. Identify on the plans the total gross square footage for the proposed addition. The square footage computed by using the dimensions shown on the floor plan does not match the figure identified on the site plan. 4. Show on the site plan the setback distance from the North property line to the proposed new addition. 5. Specify the width of the covered porch on the site plan and floor plan drawings. 6. Show on the site plan a handicapped accessible walkway leading to the entrance of the building and the common restrooms. Specify on the plans the following walkway data: i. width ii. texture of the finish iii. slope for the entire length iv. length v. show the location, width, length and elevation of the five (5) foot by five (5) foot wide level platform that is required at the entrance of the building and restrooms. NOTE: Show consistency in representing the on-site sidewalk leading to the public sidewalk with respect to site plan and floor plan drawings. To: Christopher cutro Re: Ezell Hester Park, Memo # 91-342 Page Two of Two 7. Specify on the plan the elevation of the finish floor for the Satellite City Hall and restrooms. 8. The outline, configuration and material shown and identified on the project drawing(s) submitted with the plan(s) for final sign-off shall match in every respect the colored drawing(s) approved by the City Commission during the approval process of the project. The color of each exterior finish material shown on the final sign-off plans shall be identified by name, color number and manufacturer's name which shall match in every respect with the color(s) shown on the drawing(s) approved by the City Commission. A manufacturer's color chart showing and identifying all approved color(s) shall be submitted with the plans for final sign-off. 9. Specify the specie of sod to be used. 10. Identify on the plan the grade, size at planting, and the installation specification for the proposed landscape material. All specifications must be consistent with the requirements of the Landscape Code. MEMORANDUM POLICE #91-088 TO: Tambri Heyden FROM: Lt. Dale S. Hammack DATE: September 12, 1991 RE: Ezell Hester, Jr. Park - Phase II Initial review of this plan left much to be desired in that this phase plans did not link up with the total picture of the entire park. After an explanation by Mr. DeBeck, I find several problems from a public safety aspect. I find that little thought was given by the architect in crime prevention through environmental design concepts. The two passageways have little natural observation and would tend to lead toward deviant behavior problems. The design and location of the restrooms make what should be a safe and natural activity a potential risk area for personal safety for users and vandalism to the facility. Therefore, I would recommend a total redesign with CPTED concepts built in to ensure the space is utilized for the purpose it was designed for and discourages unsafe activities in what is supposed to be a safe location. ilOcdJ~ Lt. Dale S. Hammack DSH/cgm PLANNING DEPARTMENT MEMORANDUM NO. 91-232 THRU: Chairman and Members planning and Zoning Board r}...~ ~ chrIsfopher cutro, A.I.C.P. Planning Director TO: FROM: Tambri J. Heyden Senior Planner DATE: September 12, 1991 SUBJECT: Ezell Hester, Jr. Park (f.k.a. North District Park) Site Plan Modification (building addition) File No. 641 Please be advised of the following planning Department comments with respect to the above-referenced request: 1. Provide a graphic scale on all drawings. Site plan application, page 5, item #2. 2. Provide a site plan of the entire site indicating where the Phase II addition will be constructed and which recreational amenities are provided or under construction as part of Phase I. Chapter 19, Article II, Section 19-17(b). 3. Add a site data table to the site plan drawing which includes the information from pages 3 and 4 of the site plan application as well as an inventory of the uses provided at the park, including quantities and square footages. 4. Indicate on the site plan and application, the number of parking spaces to be provided and the number of parking spaces required for each use for phase I and Phase II. Review of the parking calculations for this project on file in the Building Department indicates that parking was not allocated for future amenities such as the courts. This documentation can be updated and added to the site date table to reflect phase II construction. Appendix A - Zoning, Section 11.H.16.c(2), d(20), e(4) and e(8). 4. Provide verification that the easement for the sidewalk encroachment on the adjacent property to the north has been recorded. 5. The sidewalk along N.W. 19th Avenue and N.W. 17th Avenue shall be constructed concurrently with the future improvement of these rights-of-way by the City as indicated on the final sign-off plans for the original site plan approval on file in the Building Department. 6. Revise the following pages of the site plan application submitted to reflect this modification: page 2 (#9 and #18), page 3 (#2), page 4 (#6 - f, g and h which conflicts with #5,a on page 3) and page 4 (#9 f~' ;;l ~ Tambri J, H~e~ tjh A:HesterPk xc: central File t-ffrbvd €>tt tJy'gt~ 5', '-h!.- pl tLr, REQUIRED OFF-STREET PARKING . BASE BID , Community Center 3,483 sq. ft. x car/100 sq. ft. = 35 cars Gymnasium 16,409 sq. ft. x 1 car/300 sq. ft. = 55 cars Picnic Shel ter shelter x 1 car/shelter = car Playground 1 playground x 2 cars/playground = 2 cars ADD-ON ALTERNATES Ballfields 2 ballfields x 25 cars/ballfield = 50 cars Picnic Shelter 1 shelter x 1 car/shelter = car PARKING TOTALS Parking Require.d, Parking Provided Base Bid 93 126 Add-On Alternates 144 (51 + 93) 144 Additional Non-Required Parking (Contin@8nt upon available funding. See note below) 41 NOTE: 41 additional parking apces may be provided contin@8nt upon available funding. These additional parking spaces are shown on the site plan. NOTE: 6 parking spaces are provided for the physically handicapped in base bid.