AGENDA DOCUMENTS
MINUTES - REGULAR CITY COMMISSION MEETING
BOYNTON BEACH. FLORIDA
OCTOBER 19. 1993
/
.
Motion
Mayor Pro Tem Matson moved to reduce the lien to $1,655.87. The motion died for
lack of a second.
Motion
Commissioner Katz moved to support the recommendation of the Code Enforcement
Board to reduce the lien to $1,000. Commissioner Walshak seconded the motion,
which carried 3-1. Mayor Pro Tem Matson cast the dissenting vote.
VIII. DEVELOPMENT PLANS
A. Consent Agenda - Unanimously Approved by Planning and Development
B~rcl
.
Jonathan's Grove
Scott Bennewitz, Gee & Jenson
M. 1. Homes
10 acre site located east side of Lawrence Road
approximately 1,000 feet south of Hypoluxo Road
Modification to zoning conditions: Request for
modification to conditions imposed at time of
rezoning to R-1A
Tambri Heyden advised that since the Commission's approval of the Jonathan1s
Grove master plan in July, the applicant has been undergoing a preliminary plat
process. During this review, design issues arose which were not anticipated.
One of the requirements was construction of a wall not to exceed six feet in
height along the north boundary of the project to buffer the homes to the north
which are on large lots. The survey that was submitted at the time of rezoning
did not show the curJent FPL fifteen foot wide easement that exists today along
that north bOundary~~Therefore, the applicant i requesting that the wall be
located fifteen feet south of the north boundar' Secondly, it was required
that the property be platted and shown on e conceptual plan that was presented
at the time of rezoning with a minimum lot size of 70 feet wide by 137 feet
deep{~The aoplicant is requesting that the depth of Lots 1 through 14 and Lots
16 anCF17 be reduced. Lots 1 through 14 are short le s than a foot in depth;
Lot 16 is short 20 feet; ~nd Lot 17 is short 25 feet.x It is also requested that
the width of Lot 1 be reduced from 70 feet to . eet. Lastly, due to
drainage design problems encountered with Lots 16 and 17, dog-leg lots are pro-
posed because the drainage track extends beyond the rear of the lots now. At
its October 12, 1993 meeting, the Planning and Development ~oard unanimously
recommended approval of the above-referenced request, subject to construction of
a six foot high buffer wall to be located fifteen feet south of the northern
boundary of the project. Ms. Heyden advised that the applicant is going to keep
the six foot high chain link fence that had been eliminated from the plat
drawi ngs.
1. Project:
Agent:
Owner:
Location:
Description:
,
- 12 -
-
-