Loading...
AGENDA DOCUMENTS MINUTES - REGULAR CITY COMMISSION MEETING BOYNTON BEACH. FLORIDA OCTOBER 19. 1993 / . Motion Mayor Pro Tem Matson moved to reduce the lien to $1,655.87. The motion died for lack of a second. Motion Commissioner Katz moved to support the recommendation of the Code Enforcement Board to reduce the lien to $1,000. Commissioner Walshak seconded the motion, which carried 3-1. Mayor Pro Tem Matson cast the dissenting vote. VIII. DEVELOPMENT PLANS A. Consent Agenda - Unanimously Approved by Planning and Development B~rcl . Jonathan's Grove Scott Bennewitz, Gee & Jenson M. 1. Homes 10 acre site located east side of Lawrence Road approximately 1,000 feet south of Hypoluxo Road Modification to zoning conditions: Request for modification to conditions imposed at time of rezoning to R-1A Tambri Heyden advised that since the Commission's approval of the Jonathan1s Grove master plan in July, the applicant has been undergoing a preliminary plat process. During this review, design issues arose which were not anticipated. One of the requirements was construction of a wall not to exceed six feet in height along the north boundary of the project to buffer the homes to the north which are on large lots. The survey that was submitted at the time of rezoning did not show the curJent FPL fifteen foot wide easement that exists today along that north bOundary~~Therefore, the applicant i requesting that the wall be located fifteen feet south of the north boundar' Secondly, it was required that the property be platted and shown on e conceptual plan that was presented at the time of rezoning with a minimum lot size of 70 feet wide by 137 feet deep{~The aoplicant is requesting that the depth of Lots 1 through 14 and Lots 16 anCF17 be reduced. Lots 1 through 14 are short le s than a foot in depth; Lot 16 is short 20 feet; ~nd Lot 17 is short 25 feet.x It is also requested that the width of Lot 1 be reduced from 70 feet to . eet. Lastly, due to drainage design problems encountered with Lots 16 and 17, dog-leg lots are pro- posed because the drainage track extends beyond the rear of the lots now. At its October 12, 1993 meeting, the Planning and Development ~oard unanimously recommended approval of the above-referenced request, subject to construction of a six foot high buffer wall to be located fifteen feet south of the northern boundary of the project. Ms. Heyden advised that the applicant is going to keep the six foot high chain link fence that had been eliminated from the plat drawi ngs. 1. Project: Agent: Owner: Location: Description: , - 12 - - -