Loading...
CORRESPONDENCE MEMORANDUM July 30, 1992 TO: Christopher Cutro, Planning and Zoning Director FROM: Michael E. Haag, Zoning and Site Development Administrator RE: Site Plan Review - New Site Plan Amended Plans Project - Kidstop II Location - 3800 Quantum Boulevard Applicant - Mark and Joan Mendel File No. - 684 The amended plans for the above referenced project have been submitted and reviewed. The following comments are either comments from the original set of comments that were not satisfactorily corrected on the amended plans 'or were generated as a result of the way the plans were amended. All comments shall be corrected. However, it is acceptable to show compliance with the outstanding comments on the plans that are required to be submitted to the Building Department for permit review. 1. Specify on the elevation view drawings the color of each exterior finish material and feature. The colors shall match the colors identified on the color elevation drawing. Place a distinguishable symbol where each finish material and feature is shown on the elevation drawings. The symbol shall correlate with the same type of symbol that is placed next to the appropriate color specified on the color list. 2. Specify on the Landscape Plan that the space within the line-of-sight triangle between thirty (30) inches and six (6) feet shall provide unobstructed cross visibility. 3. Show and specify on the Landscape Plan and plant list that fifty (50) percent of the total numbers of all shrub material proposed for the site is of a native specie. Identify on the plant list each native specie material by placing a distinguishable symbol next to the botanical plant name. Note: Eugenia Guianensis is not a native specie. 4. To evaluate the aesthetics of the site as viewed from Quantum Boulevard specify on the Site Plan drawing the elevation of the retaining wall and the elevation of the finish grade on both sides of the wall. Note: If the elevation of the wall and grades vary along the length of the wall, provide at least four elevations along the entire length including an elevation at each end of the wall. 5. I recommend for aesthetic consideration that the dumpster enclosure be relocated to the rear portion of the site and that the code required landscaping material replace the enclosure or that a dense evergreen landscape material of three (3) feet in height at planting, spaced two (2) feet on center be shown, specified and located around three sides of the enclosure directly in front of the five (5) to seven (7) foot high Wax Myrtle plants. The Ixora and Liriode would still be installed but, moved forward allowing room for the medium height hedge material. This recommendation is to conceal the enclosure with a layered effect of short, medium and tall landscape material. The recommendation to relocate the dumpster enclosure to the rear of the parking area is based on the fact that there is a surplus of parking spaces at the site. C:KIDSTOP.ald BUILDING DEPARTMENT MEMORANDUM NO. 92-169 July 22, 1992 TO: Chris Cutro Planning Dlf;'r tor THRU: Don Jaeger Building 0 ~al FROM: Al Newbold Deputy Building Official RE: NEW SITE PLAN - 2nd REVIEW KIDSTOP II DAY SCHOOL The Building Department recommends that the above referenced project be forwarded to the Planning & Development Board. However, the Building Department's previous comments (see memo attached) should be complied with prior to permit issuance. ~ Al New old AN: bh Attachment ,,-~ ~~,..r'.," ... , \'\\ 1 L \~~'l . KIDSTOP2.DOC BUILDING DEPARTMENT MEMORANDUM NO. 92-168 July 15, 1992 TO: Chris Cutro Planning Director THRU: Don Jaeger ~~ Building Of~~ial FROM: Al Newbold Deputy Building Official RE: TRC COMMENTS - SITE PLAN REVIEW KIDSTOP II DAY SCHOOL The Building Department's comments can be addressed at time of permit. They are as follows: 1. Approval by the utility companies is needed for the sign located in the utility easement. 2. When two or more buildings are on the same site and one wall is not a minimum 4-hour fire wall, the percentage of openings and fire wall ratings must comply with Table 600 of the Standard Building Code. This condition would not apply if the buildings were tied together at the breezeway and a single building was created. 3. State on the plans if the driveway will be asphalt or concrete (not both), in order that the appropriate codes will be addressed. "/. ! ~ /J / ~~~ Newbold, 1738-7480 Al AN : bh KIDSTOP2.DOC MEMORANDUM Utilities #92-297 TO: Christopher Cutro, Planning and Zoning D FROM: John A. Guidry, Director of Utilities DATE: July 27, 1992 SUBJECT: Kidstop II Site Plan - Second Review /' We have reviewed the amended site plans for Kidstop II and find it in compliance with our previous comments. The 1 1/2" water meter reservation fee is $1,205.02 and will be due and payable in accordance with Ord. 91.59 (Sec. 26-34(E)). Please refer any questions on this matter to Mike Kazunas of this office. 19b xc: Mike Kazunas Peter Mazzella File Time: Utility Engineer - 1 hour REceiVED JUl2 8 1992 RECREATION & PARK MEMORANDUM #92-264 FROM: Chris Cutro, Planning & Zoning Director Kevin J. Hallahan, Forester/Environmentalist ~~ Kidstop II - Second Review TO: RE: DATE: July 27, 1992 1. The applicant must provide a written document to correlate to the site plan tree management sheet. This document must be prepared prior to permitting the clearing permit for the site. 2. The applicant has not yet supplied a letter from Quantum Associates that the site will not be a microsite set aside area. The note on the tree management sheet must be documented from the association. KH:ad Time: Forester/Environmentalist: 15 minutes Secretary: 15 minutes RECEIVED JUl 2 7 1992 aUI LDING DEPARTMEN T SUBMItTAL DOCUMENTS Congratulations on receiving Site Approval for your proposed constroction within the City of Boynton Beach. We appreciate your choosing to build within our City. In order to ensure a timely permitting process, the following documents are required to be submitted in two (2) sets. Each set must be stapled together. to form a single package. Incomplete sets can not be accepted. I. A signed and sealed survey (not over six (6) months old) by a registered surveyor in the State of Florida indicating: A. All property lines B. North arrow C. Existing structures and paving D. Existing elevations E. Rights-of-way, with elevations F. Easements on or adjacent to the site G. Utilities on or adjacent to the site H. Legal description I. Number of acres to the nearest one-hWldredth (1/100) of an acre J. Location sketch of property K. Surveyor I s Certificate II. A site plan properly d:lmenaioned and to scale showing: A. All proposed structures B. All existing structures that are to remain on site C. Setback lines for all structures drawn perpendicular from the property lines to the closest vertical wall of the stroctures D. Use of each structure (or uses within IUltiple occupancies) E. Use of adjacent properties including right-of-way lines for all streets and alleys, sidewalks, turn lanes and driveways F. Elevations of the lowest finished floor of all stroctures on the site G. Location of existing utility lines on or adjacent to the site H. Location of fire hydrants on or adjacent to the site I. Location of dumpster enclosure and details of constroction III. A paving plan in confomance with the Parking Lot Code (Chapter 5, Article X of the Boynton Beach Code of Ordinances) indicating: A. Calculations for the ~ber of required parking stalls (see Appendix A-Zoning, Section llH) B. Cross sections indicating parking lot constroction C. Raised curbing meeting City Standards D. Double striping meeting City Standards E. Conformance with the Sidewalk Ordinance (Chapter 22, Boynton Beach Code' of Ordinances) F. Handicapped parking stalls in conformance with the State Handicapped Code G. Dimensions for all parking stalls, back-up areas, driveways and traffic lanes H. Traffic control devices and signs IV. A drainage plan for the entire site including: A. Finish grade and pavement elevations B. Drainage calculations C. Details of the drainage systea. If total site area exceeds 25,000 square feet, plans must be prepared by a Florida registered engineer and must be sealed D. Inlets must be placed in grassy swale areas V. A landscape plan showing conforJDanCe with the Landscape Code (Olapter 7.5, Article II, Boynton Beach Code of Ordinances) showing: A. Comp lete final landscape constroction drawings B. Automatic irrigation system plans with 100% coverage (no City water to be used) c. Plant material must be keyed according to species, size and quantity D. Site walls and fences IlUSt be indicated on the plans E. Location and contours of proposed berms VI. A lighting plan for the building exterior and site lighting including: A. Exterior security lighting and pedestrian lighting B. Lighting for driveways and parking lots 1. Location of lighting 2. Fixture types 3. Lamp types and sizes 4. Photometric plan showing illumination levels in footcandles 5. Lighting poles designed for wind loads in accordance with Olapter 12, Standard Building Code VII. Construction documents (aU documents lUSt. be signed, sealed and dated) A. B. C. D. E. F. G. H. 1. J. K. L. H. N. O. P. Floor plans for each proposed structure (indicate use of space) Elevations for each proposed structure (indicate exterior materials and colors) Soil tests Energy calculations plus one (1) cover sheet FOWldation plan Typical wall sections Electrical plan view drawings and riser diagram with calculations Plumbing riser diagra. and plan view drawings Air conditioning plan Tross layout Proposed finish floor elevation identified on the plan Board of Health Departllent stamp (where applicable) Copy of D.E.R. and/or D.E.R.H. pe~t and plans (where applicable) Copy of Army Corps of Engineers permit (where applicable) Copy of Lake Worth Drainage District permit (where applicable) Copy of South Florida Water Management District permit for surface water management or water use (where applicable) bh - 3/92 " ! ~"RHtTAl.. nor. %e City of :Boynton 13eacn 'Pfmr.ning & Zoni"!11)eparttMnt 100 'E. 'Boynton 'Beam 'Boukvarri P.O. 'Bo;rc31O 'Boynton 'Beam, %Jritla 33425.0310 (40i) 738.7490, r!U: (407) 738.7459 August 21, 1992 Mr. Robert E. Kuoppala 5204 10th Avenue North Lake Worth, FL 33463 Re: Kidstop II - 3800 Quantum Boulevard Dear Mr. Kuoppala: This is to advise you that on August 18, 1992, the City Commission of Boynton Beach approved the Site Plan at the above referenced location. The approval of the Site plan was subject to the following conditions: 1. Amend the site plan to show a turn-around at the east end of the property; 2. Amend the site plan to eliminate parking spaces to create the turn-around; 3. Amend the site plan to relocate the dumpster to the turn-around; 4. Building permit plans be modified to address any outstanding comments. The Site Plan approval entitles you to develop the property as shown on the approved plans. If you wish to modify the plan prior to submission of your building plan, please contact the Planning and Zoning Department. Modifications during the building permit process will be handled as part of that process. The approval of the Site Plan remains in effect for one year, until August 18, 1993. If an extension is needed, please forward your request to the Planning and Zoning Department 30 days prior to the expiration date. We have attached a list of submittal documents from the Building Department to assist you in assembling your building permit package. We have also attached copies of the comments that must be met in the building permit submittal. q mn-ira', (;11tf'71!(711 tn thl' (;/l[{,trf'nm To: Robert Kuoppala Re: Kidstop II Page Two of Two We would like to thank you for building in Boynton Beach. If we can be of any further assistance to you, please feel free to call me. Yours truly, ~ Christopher Cutro Planning and Zoning Director CC:ald A:APPROVAL.SP tTfU City of 'Boynton f}Jeacli ~ & Zoning 1JepantrrDU 100 'Eo 'lJoyfttoft 'BUIda. 'Boul4vani 'P.o. 'B~3 10 'Boyntlm'1JuJJ, %Jritla 33425.0310 (407) 738.7490, 7!U: (407) 738.7459 p~ f-v 1 t July 21, 1992 Mr. Robert E. Kuoppala 5204 10th Avenue North Lake Worth, FL 33463 (407) 439-6424 RE: Initial Review Comments - Kidstop II File No. 684 Mr. Kuoppala: The City of Boynton Beach has completed its first review of the site plan for the above referenced project. Attached are comments made by the reviewing departments during their initial review of your project. In order to complete the review process, the site plan and documents must be amended to comply with these comments within 90 days of the date of this letter. (If amended plans are not submitted in 90 days, a new application fee will be required.) When there are comments made by the reviewers that you feel are not applicable to the approval of the project or will be addressed separately and you have not amended the plans to comply with the comment(s), you must prepare written explanation for each comment stating why the comment is not applicable and return the explanation with the amended plans and documents. After amending the plans and documents, please submit twelve (12) complete sets of t~e plans to the Planning and Zoning Department. When the amended plans and documents have been submitted to the Planning and Zoning Department, they will be distributed to the reviewing departments for a second review and the reviewers will recommend if the site plan will be placed on a board approval schedule (see attached). If there are major comments not addressed by new plans or the reviewers recommend that the plan not be forwarded to the Planning and Development Board, this office will notify you on your alternatives regarding the site plan as soon as possible~ ry""'(f""";",,,, ',- t-: "f.rt-",.,." 1-,.., 1-(. ~"(.r("f",.rr",,, -~~.~._._--_._..._-_.,...-._....._-_._- :. .. To: Mr. Kuoppala Re: Initial Review Comments, File No.: 684 Page 2 of 2 We have also enclosed for your convenience an approval schedule and a checklist that contains information regarding the second submission of the plans and documents for review. If you should have any questions regarding the comments or on the approval schedule, please feel free to call Michael Haag who is coordinating the review of your site plan for the Planning and Zoning Department. Yours truly, -r~Lt':;. ~ A Christopher Cutro Planning & Zoning Director CC:ald Attachments XC: Central File ehron. File Project File C:INTLCOM.SDD .. SITE PLAN REVIEW BOARD APPROVAL SCHEDULE Submission Date of P&D* Date of CC* Deadline date Meeting Meeting Jun 23 Jul 14 Jul 21 Jul 21 Aug 11 Aug 18 Aug 17 Sep 8 Sep 15 Sep 22 Oct 13 Oct 20 Oct 20 Nov 10 Nov 17 Nov 13 Dee 8 Dec 15 Dee 17 Jan 12 '93 Jan 19 '93 * P&D = Planning & Development Board CC = City Commission The duties of the Community Appearance Board are now handled by the Planning and Development Board. ~ CHECKLIST The following list and information is provided as a checklist to ensure that the submittal of amended plans and documents is substantially complete for review. Turning in the list and the appropriate plans and documents will enable the submittal to be efficiently checked prior to being accepted by the Site Development Division of the Planning and Zoning Department. Project Name: 1. Submit an amended Site Plan Review application form that reflects the changes that were made as a result of amending the plans and documents to comply with the Code of Ordinances and the Technical Review Committee comments. A copy of the original form with a distinguishable symbol identifying the change(s) may be submitted or a completed new form with the changes identified. It is the agent of the owners responsibility to notify the owner(s) of changes. If there are no changes required to be documented on the application form, a letter from the applicant stating same must be turned in with the amended submittal. 2. Submit twelve (12) assembled and complete sets of plans and documents that show compliance with the Code of Ordinances and comments made by the Technical Review Committee. Two (2) of the sets shall have the appropriate legible raised seal and signature of the designer responsible for the drawing(s). Plans and documents shall be assembled in twelve (12) individual complete packages with the title of the project on all pages and/or sheets and each page or sheet numerically numbered such as the following example: 1 of 3, 2 of 3, 3 of 3. 3. Submit a locator map that identifies the location of the site and the surrounding roadways and zoning districts. (Refer to directions on the attached sheet titled submittal requirements) 4. Submit color photographs of the buildings on the site that are to remain in their existing condition and photos of existing buildings on sites that abut the subject property. (Refer to directions on the attached sheet titled submittal requirements) 5. Submit a legible 8 1/2" by 11" transparency of the landscape site plan drawing. (Refer to directions on the attached sheet titled submittal requirements) 6. Submit colored elevation view drawings - Duplicate drawings of the drawings submitted tpr site plan review that have been colored. (Not mounted - Refer to directions on the attached sheet titled submittal requirements) 7. Submit color samples of the proposed color(s). (Refer to directions on the attached sheet titled submittal requirements) A:CHECKLST.PAD SUBMITTAL REOUIREMENTS The following shall be incorporated as part of the submittal of amended plans and/or documents for review 1. Submit a scaled locator map that identifies the location and perimeter boundary of the site and the surrounding road~ and current zoning districts including the district of the subject property. The map shall show and identify by name the roads surrounding the site and the roadway path that links the site to the closest arterial road with the names of the roads and arterial road(s) identified. The map shall show the zoning district line and the title of the zoning districts that abut the perimeter of the zoning district where the subject property is located. The map shall have the North compass direction and scale identified. Maximum size of locator map is 8 1/2" by.14". 2. Submit color photographs of the buildings on the site that are to remain in their existing condition and photos of existing buildings that are located on the sites that abut the perimeter of the subject property. The minimum size is 8" by 10". Each photograph shall be labeled'to identify the location of the existing structures with respect to the location of the proposed project. 3. Submit a 8-1/2" x II" transparency of the landscape site plan drawing to be used on an overhead projector at board meetings. 4. Submit colored elevation view drawings - a colored duplicate copy of all drawings of the elevation views of each side of all buildings and signage associated with the project. The colored elevation views shall match the elevations shown in the documents that where submitted for site plan review. The applicable exterior surfaces as identified above shall be colored with the color name and associated color reference number identified. The type of exterior surface material shall be identified next to the associated color. The colored elevation drawings shall have compass direction or title of the side of the building identified. The title block of the original drawing shall be shown. The maximum size is 24" by 36". Do no submit on board of any kind. 5. Submit color samples as an example of the proposed colors. Each sample shall have attached a label that identifies the color by name And numerical/letter code from an established color chart. 6. Where a specific exterior surface is not applicable to the project, signify by placing a "N/A" on the appropriate line. 7. Submit a copy of the legal description of the subject property on an 8 1/2" by II" sheet of paper. C:AESTH.REV . 'I1ie City of 'Boynton 'Beacn P!ann.ing & Zoni."!J tJ)tp~nt 100 'E.. 'Boynton. 'Bt.adi 'Boukvarrl 'P.o. 'Boi(310 'Boynton 'Buz&,:TforUfa 33425-0310 (40i) i38-i490, 7!U: (40i) 738-7459 July 8, 1992 Mr. Robert E. Kuoppala 5204 10th Avenue North Lake Worth, FL 33463 (407) 439-6424 RE: Acceptance - Site Plan Review Application & Submittal Documents Site Plan - Kidstop II File No. 684 Mr. Kuoppala: On July 7, 1992, your submittal for Site Plan Review of the above referenced project was reviewed for completeness. It has been determined that the submittal is substantially complete and accepted for further processing. Michael Haag will be responsible for the review and coordination of your site plan thru the remainder of the Site Plan Review process. The next step in the review process is for the Technical Review Committee to review the submittal for compliance with the review standards identified in Part III, Land Development Regulations, Chapter 4, Site Plan Review, Section 8 and all applicable sections of the Boynton Beach Code of Ordinances. The results of the review will be forwarded to you within twenty (20) days of the date identified in the first paragraph of this letter. If I can be of further assistance, please do not hesitate to contact me. Very truly yours, ~~~~ Christopher Cutro Planning and Zoning Director XC: Central File Chronological File Project File ,q nu rica s yateway to the yu({stream tZ~~ r~-I!e PLANNING AND ZONING DEPARTMENT MEMO NO. 92-171 TO: J. Scott Miller, City Manager CJ,,~,pk (, X:::3- Christopher Cutro, Planning and Zoning Director FROM: SUBJECT: Kid Stop DATE: August 13, 1992 Mark and Jan Mendel are proposing to construct a daycare center in the Quantum Park PID. The center would be located at 3800 Quantum Boulevard and would contain a 8,852 structure on a 1.1 acre site. The daycare center is to benefit employees of Motorola, who has recently jointed a national consortium of businesses that will provide daycare services for employees. The proposed site plan has been reviewed by staff and was found to be in compliance with the Code of Ordinances of the City of Boynton Beach. The few outstanding comments are either related to building permit issues or are minor comments that will be corrected on the site plan. At its meeting of August 11, 1992 the Planning and Development Board reviewed this site plan and forwarded the site plan to the City Commission with a recommendation for approval. This item has been scheduled for City Commission consideration on August 18, 1992. CC/cmc C:DAYCARE PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 92-176 August 25,1992 TO: D~E Ja~er, Building Oificial ~~ Christopher Cutro, Planning and Zoning Director FROM: RE: TRANSMITTAL OF APPROVED SITE PLAN FROM THE AUGUST 18, 1992, CITY COMMISSION MEETING Accompanying this memorandum you will find the approved site plan package for the project(s) listed below. The site plan package will include the following items: 1. A copy of the City issued approval letter 2. A copy of the comments made by the Technical Review Committee (TRC) 3. A set of plans reviewed by the TRC 4. The original color elevation view drawing(s) and the associated color samples 5. An aerial photograph of the subject property and abutting sites Xidstop II: Day care center in the Quantum Park PID. The new site plan was approved by the City Commission at their regular meeting held on August 18, 1992. CC:ald Attachment XC: (Memo Only) Al Newbold Central File Project File I I PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 92-152 July 21, 1992 FROM: Robert Eichorst, Public Works Director. ~ .fQ1r~ ll.zuBas, City Elf1gin~eI RIt:.vA4'J .s. 3 U,~ r: Al Newbold, Deputy Building Official . Bill cavanaugh, Fire Prevention Officer .f'~tc Ha~~el-la, Assiln::ant 1::0 tJLllll.Y Dl.L~c"tor M,Kl: K"I"ZI)<VA,r Lt. Don Thrasher, Police Department John Wildner, Parks Superintendent KeVi~}Ial~h~~o ester/Environmentalist -f)t1:'~ ,!, c~ristoPh r t ,Planning & Zoning Director TO: RE: Second Review - New Site Plan Project - Kidstop II Location - 3800 Quantum Boulevard File No. - 684 Attached is the amended site plan for the above referenced development for your final review and recommendation. We would ask that you review this amended site plan to determine if the plans have been adjusted to satisfy comments made previously by your department. If the comments have been satisfied or if your comments can be met at time of building permit, please advise the Planning and zoning Department in writing. If your comments have not been met or must be met by correcting the site plan again, please advise the Planning and Zoning Department in writing. Finally we would ask that you recommend to us if the plan should be forwarded to the Planning and Zoning Board for review or held for further revisions by the applicant. Please return your memo and the revised plans to the Planning and Zoning Department by 5:00 P.M. on July 28, 1992. If you should have any questions regarding this plan, please feel free to call Mike Haag at 228 who is coordinating the review of this development. xc: (Memo Only) Don Jaeger Ed Allen Charlie Frederick Edward Hillery John Guidry Project File chronological File C:2REVIEW.SDD ENGINEERING DEPARTMENT MEMORANDUM NO. 92-182 TO: Christopher Cutro Planning & Zoning Director FROM: Vincent A. Finizio Administrative Coordinator of Engineering RE: Technical Review Committe Comments Kidstop II Kuoppala & Associates, P.A. Metric Engineering Inc. f'e~f;'\1E.O jut '1 \\ \991. DATE: July 10, 1992 In accordance with the City of Boynton Beach, Florida Code of Ordinances, specifically review standards specified in Part III, Land Development Regulations, Chapter 4, Site Plan Review, Section 8, the applicant for the above referenced project shall provide the following information, technical data and plan revisions. l) In accordance with Section 8. IIReview Standardsll, Section 8.3.2, the applicant shall revise plans to depict the removal of a sufficient amount of median (situated south of the Kidstop ingress/ egress approach) within Quantum Boulevard to facilitate and provide adequate left turn movements for vehicles exiting this site onto Quantum Boulevard. Longitudinal skip lines should be applied to pavement surface in order to better delineate the left turn move- ment exiting this site onto Quantum Boulevard. 2) Metric Engineering Inc. attachment sheet #l04, dated July 2, 1992 indicates that the exfiltration test was not conducted on this site. Provide an on-site ex filtration test and indicate upon plans the location of the test hole. Additionally, the drainage plan submitted by Kuoppala & Associates, P.A. (Architects), shall be embossed, dated and signed by a professional Engineer registered in the State of Florida. 3) Metric Engineering Inc., attachment sheet 1 of 4, dated July 2, 1992, item #l states that ~II of dry pretreatment of stormwater is required. This statement does not comply with the City's Code of Ordinances and the Comprehensive Plans drainage element which requires III to be stored on site prior to discharge into a formal stormwater receiving system. Revise attachment and plans accordingly. 4) Last parking stall at the extreme east end of the main parking facility should be eliminated to provide an adequate and suitable turn-around space. This area should be labeled and identified as a IINo Parking II area. Chapter 5, Article X, Appendix, requires 27 ft. free and unobstructed backup space. 5) Ingress/egress approach (driveway) grades shall be modified to prevent stormwater runoff from this site and garbage dumpster pad, from flowing into Quantum Blvd. 6) Revise plans to depict a typical section of the swale area adjacent to Quantum Blvd. Existing topography indicates elevations of +16 to +l8, while proposed inlets have grate elevations of +l8.2 and +l6.0 respectively. Please clarify and explain the effects of the proposed retaining wall on swale grades. Exfiltration trenches should be labeled on plan. Additionally, depict ditch typical sections for the northern swale area. Provide a section drawing detail for the proposed retaining wall. 7) The ingress/egress approach (driveway) from this site to Quantum Blvd. is not detailed. Provide a construction detail for the proposed approach. Technical Review Board Comments Kidstop II July lO, 1992 Page #2 8) Please provide a response as to whether or not the sidewalk shown on the proposed plan is existing or to be constructed concurrent with this project. ( \. . ~~b:4.' ;e:;-- Vincent A. Finizio Admin. Coord. of Engr. ) /i?! /' uJ' J~d6 W. Richard Staudinger, Gee & Jenson Engineers QJ.... VAF:WRS/ck cc: J. Scott Miller, City Manager ~o ~~C€ \~~t ~\'J\. 1. \\ BUILDING DEPARTMENT MEMORANDUM NO. 92-168 July 15, 1992 TO: Chris Cutro Planning Director THRU: Don Jaeger MI1~ Building Of~~ial FROM: Al Newbold Deputy Building Official RE: TRC COMMENTS - SITE PLAN REVIEW KIDSTOP II DAY SCHOOL The Building Department's comments can be addressed at time of permit. They are as follows: 1. Approval by the utility companies is needed for the sign located in the utility easement. 2. When two or more buildings are on the same site and one wall is not a minimum 4-hour fire wall, the percentage of openings and fire wall ratings must comply with Table 600 of the Standard Building Code. This condition would not apply if the buildings were tied together at the breezeway and a single building was created. 3. State on the plans if the driveway will be asphalt or concrete (not both), in order that the appropriate codes will be addressed. ,~ Al ~8-7480 AN: bh RECEIVED JUL 1 6 1992 KIDSTOP2.DOC M E M 0 RAN DUM July 20, 1992 TO: Christopher Cutro, Planning and Zoning Director FROM: Michael E. Haag, Zoning and Site Development Administrator RE: Site Plan Project Location Applicant File No. Review - New Site Plan - Kidstop II - 3800 Quantum Boulevard - Mark and Joan Mendel - 684 The following comments are in response to the submittal of the site plan for the above referenced project. The comments for the project will be discussed at the July 28, 1992, Technical Review Committee meeting. The site plan was reviewed for consistency with the review standards specified in Section 8 of Chapter 4, Site plan Review, Part III, Land Development Regulations of the code of Ordinances. The applicant shall amend the drawings and documents to show compliance with the following comments: 1. Revise the rear setback that is shown in the Project Data from 20 feet to 30 feet. 2. To determine if the location of the structure is within the required setbacks, show (with a distinguishable symbol) and identify on the site plan drawing the perimeter boundary of the roof overhang and specify the width of same. 3. During the preapplication conference, the agent for the applicant stated that to comply with the Code regarding distance between buildings, each building would be connected with a continuous roof. To ensure compliance with the Code, the applicant shall incorporate into the drawings a scaled roof plan drawing that includes showing and identifying the exterior walls of each building. 4. show and identify on the Site Plan and Landscape Plan drawing the location of the retaining wall that is depicted on the drainage plan. Include a section view drawing of the wall that identifies and shows the following information: i . ii. iii. iv. v. vi. vii. elevation of the top of the wall; elevation of the grade on both sides of the wall; location of the property line; location of the chain link fence; dimension of the thickness or width of the wall; type of material proposed for the wall, and finish material and color proposed for the exposed portion of the wall. NOTE: If the elevation of the grade and wall varies provide at least the elevation of the ends of the wall and the length of the wall. Where applicable show the location and describe the height of the steps proposed for the wall. 5. Add the continuous hedge material that is required along the West property line. The hedge is required to screen the on-site vehicle use area from the view along Quantum Boulevard. The hedge material shall start at the double gate and follow the curb line to within three (3) feet of where the edge of the driveway intersects the West property line. Placing the hedge would allow the short section of hedge that abuts the West property line just North of the driveway to be omitted. -2- 6. Identify the specie and size of the tree shown on the property directly north of the driveway entrance into the site. 7. Identify the color of all exterior finish material and architectural features shown on each elevation view drawing. Identify the color of the walls and gates of the dumpster enclosure. I recommend that the enclosure walls match the color of the walls of the building. Include the enclosure gate on all drawings specify on the plan the opaque material proposed for the gates. Note: The colors identified on the elevation view drawings shall match the colors identified and shown on the required color elevation drawings. 8. I recommend for aesthetic consideration that the dumpster enclosure be relocated to the rear portion of the site and the code required landscaping material replace the enclosure or that a dense evergreen landscape material of three (3) feet in height at planting and spaced two (2) feet on center be shown, specified and located around three sides of the enclosure directly in front of the five (5) to seven (7) foot high Wax Myrtle plants. The Ixora and Liriode would still be installed but, moved forward allowing room for the medium height hedge material. This recommendation is to conceal the enclosure with a layered effect of short, medium and tall landscape material. The first recommendation is based on the fact that there is a surplus of parking spaces at the site. E. Haag C:KIDSTOP2.ALD PUBLIC WORKS MEMORANDUM '92-152 TO: Chris Cutro, Planning Director FROM: Carel Fisher, Assistant Public Works Director DATE: July 13, 1992 SUBJECT: Site Plan Review, Quantum Blvd. & 22nd. Avenue RE: KIDSTOP II This will advise that we have reviewed subject site plan, We approve the plan with the following stipulations; 1. The brick paver area that is marked II Sanitation Truck Turn- Around" and II Loading Areall, owner must agree that on scheduled Solid Waste Collection days, the Sanitation Truck shall hace priority access to the entire area. 2. There will be a minimum of 22-ft. overhead clearance in the entire area where the Sanitation Truck must operate. 3. The "Dumpster" enclosure will have a minimum of 12-ft. inside clearence, exclusive of any gate post or enclosures, and a minimum of 10-ft. inside depth from front to back. I f we may provide additional information in these matters, please call, .,.- RECEIVED CC: Files; JUl 1 4 PLANN\NG DEPT. " .- - f--:-- TO: FROM: DATE: RE: PLANNING AND ZONING DEPARTMENT MEMORANDUM NO. 92-150 Robert Eichorst, Public Works Director Mike Kazunas, City Engineer Al Newbold, Deputy Building Official Bill Cavanaugh, Fire Prevention Officer Pete Mazzella, Assistant to Utility Director Lt. Don Thrasher, Police Department John Wildner, Parks Superintendent Kevin Hal~aha If.oresterlEnvironmentalist ~c.. ' Christophe CU ro, Planning & Zoning Director July 7, 1992 SITE PLAN REVIEW PROCEDURES New Site Plan Project - Kidstop II Location - 1.10 acres of Lot 38 at the Northeast corner of Quantum Boulevard and N.W. 22nd Avenue Applicant - Mark and Joan Mendel File No. 684 Find attached for your review the plans and exhibits for the above referenced project. Site Plan Review approval for this project will be granted by the City Commission. To ensure that the project stays on line with the review time frame, I request that the plans and exhibits be reviewed and formal comments transmitted to the Site Development Division of the Planning and Zoning Department no later than 5:00 P.M. on July 21, 1992. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part III, Land Development Regulations, Chapter 4, site Plan Review, Section 8 to review and formulate comments. (See Planning & Zoning Department memo #92-020) 2. The documents submitted for the project were determined to be substantially complete based on the submittal requirements identified in section 7 of the Site Plan Review Ordinance. However, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards, additional data should be requested by the reviewer through the Planning and Zoning Department. To: TRC Members Re: Planning & Zoning Memo, 92-150 Page Two of Two 3. Each comment shall reference the code section and include the language of the submittal requirements and review standards that require the data to be submitted for review. 4. Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. 5. When a TRC Member finds a code deficiency that is outside of hls/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 6. If a TRC member finds the plans acceptable, he/she shall forward the plans and a memo, within the time frame stated above, to the Planning and Zoning Director stating that the plans are approved and they do not have any comments on the plans submitted for review. All comments shall be typed and addressed to the Planning and Zoning Director and transmitted to the Site Development Division for distribution to the applicant. Please include the name and phone number of the reviewer on this memo. Mike Haag will be the Planning and Zoning Department staff member coordinating the review of the project. The Site Development Division will send to the applicant a cover letter which includes the comment(s) and directions to amend the plans to comply with the comments and submit to the Site Development Division within 90 days twelve (12) sets of amended plans for review. When the Site Development Division receives the amended plans, they will distribute the plans with a cover memo to all TRC Members for review and approval. Attachment xc: (Memo Only) Don Jaeger, Building Official Ed Allen, Fire Chief Charlie. Frederick, Parks & Recreation Director Edward Hillery, Police Chief John Guidry, Utilities Director Project File Chronological File TRCFULL.SDD